Loading...
HomeMy WebLinkAbout2013-11-19; Municipal Water District; Resolution 14841 RESOLUTION NO. 1484 2 3 A RESOLUTION OF THE BOARD OF THE CARLSBAD MUNICIPAL WATER DISTRiCT, AUTHORIZING REIMBURSEMENT FROM THE CITY OF CARLSBAD FOR ALL 4 REVENUES OR CREDITS GENERATED FROM THE INTERCONNECTION AGREEMENT WITH SDG&E 5 " 6 ^ WHEREAS, ON August 27, 2013, through Resolution No. 1477, the Board ofthe Carlsbad 8 Municipal Water District awarded a contract to Environmental Construction Inc. to construct 9 the Pressure Control Hydroelectric Facility (PCHF) at Maerkle Reservoir, Project No. 5025; and WHEREAS, the City Council ofthe City of Carlsbad authorized entering into a Generating Facility Interconnection Agreement (Continuous Export) with San Diego Gas & Electric Company (SDG&E) to enable the Electrical Producer to interconnect and operate a Generating Facility in 10 11 12 13 parallel with SDG&E's Distribution System and sell energy produced by such Generating Facility 15 directly to SDG&E pursuant to Rule 21 of SDG&E's tariffs; and WHEREAS, the City of Carlsbad is designated the Electrical Producer in the Interconnection Agreement; and WHEREAS, the Carlsbad Municipal Water District is the owner and operator of the Pressure Control Hydroelectric Facility (Generating Facility); and 16 17 18 19 20 21 WHEREAS, the Carlsbad Municipal Water District owns the Renewable Energy Credits, 22 which can be sold and traded; and WHEREAS, under the Operating Agreement with the City of Carlsbad, dated June 25, 24 1991, approved by Resolution No. 741, the Carlsbad Municipal Water District shall be 25 authorized to receive ali revenues or credits generated from the Interconnection Agreement 26 2y between the City of Carlsbad and SDG&E and the Renewable Energy Credits. 28 1 2 City 3 4 5 6 7 8 // 9 // 10 // 11 12 // 13 // 14 // 15 // 16 // 17 // 18 // 19 // 20 // 21 // 22 // 23 // 24 25 // 26 // 27 // 28 NOW THEREFORE, BE IT RESOLVED by the Carlsbad Municipal Water District Board ofthe Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. City of Carlsbad will reimburse the Carlsbad Municipai Water District any revenue or credit received through the Interconnection Agreement with San Diego Gas and Electric Company (SDG&E) and Renewable Energy Credits: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Joint Special Meeting ofthe Carlsbad Municipal Water District Board of Directors and the Carlsbad City Council, held on the 19*^ day of November, 2013, by the following vote: AYES: NOES: Board Members Hall, Packard, Wood, Blackburn and Douglas. None. ABSENT: None. MATT HALL, Presideht ATTEST: BARBARA ENGLESON, Secretary