Loading...
HomeMy WebLinkAbout2014-07-22; Municipal Water District; Resolution 14941 RESOLUTION NO. 1494 3 2 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD MUNICIPAL WATER DISTRICT (CMWD), APPROVING THE PLANS AND SPECIFICATIONS AND AUTHORIZING THE SECRETARY OF 4 THE BOARD TO ADVERTISE FOR BIDS FOR THE LA COSTA RECYCLED WATER PIPELINE, LOCATED ON EL CAMINO REAL 5 EXTENDING SOUTH FROM ALGA ROAD, NORTH QF LA COSTA AVENUE, PROJECT NO. 5207 6 7 8 9 10 WHEREAS, the Board of Directors of the Carlsbad Municipal Water District, California has determined it necessary, desirable, and in the public interest to an 8-inch recycled water pipeline in El Camino Real from Alga Road to SOO-feet north of La Costa Avenue; and Jl WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, 12 equipment, transportation, and other expenses necessary or incidental of said project have 13 been prepared and are on file in the Utilities Department of the City of Carlsbad and are 14 incorporated by reference herein; and WHEREAS, an environmental impact assessment was conducted for the Phase III Recycled Water Project, and a Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program was approved bythe Board through Resolution No. 1455, on November 27, 2012; and WHEREAS, the Engineer's estimate for the project cost is $1,500,000; and 15 16 17 18 19 20 21 WHEREAS, sufficient funds exist in the Recycled Water Fund. 22 NOW, THEREFORE, BE IT RESOLVED by the Carlsbad Municipal Water District Board of 23 the City of Carlsbad, California, as follows: 24 1. That the above recitations are true and correct. 25 2. That the plans, specifications and contract documents for the La Costa Recycled 26 Water Pipeline, Project No. 5207 are on file in the Utilities Department of the City of Carlsbad 27 and are hereby approved. 3 28 1 3. The Secretary to the Board is hereby authorized and directed to publish, in 2 accordance with State law, a Notice to Contractors Inviting Bids for the construction of the La 3 Costa Recycled Water Pipeline, Project No. 5207, in accordance with the plans, specifications, ^ and contract documents referred to herein. 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 // // // // // // // // // // // // // // // // // // // // // // 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Special Meeting of the Board of Directors of the Carlsbad Municipal Water District ofthe City of Carlsbad on the 22nd day of July 2014, by the following vote to wit: AYES: Board Members Hall, Packard, Wood, Schumacher, Blackburn. NOES: None. ABSENT: None. MATT HALL, President ATTEST: BARBARA ENGLESON, Secretary 1] = = 11