Loading...
HomeMy WebLinkAbout2015-04-21; Municipal Water District; Resolution 1520EXHIBIT 1 1 RESOLUTION NO. 1520 2 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD MUNICIPAL WATER DISTRICT (CMWD), APPROVING AND AUTHORIZING A $35,000 INCREASE IN THE CONSTRUCTION 4 CONTINGENCY FOR THE PRESSURE CONTROL HYDROELECTRIC FACILITY AT THE MAERKLE RESERVOIR, PROJECT NO. 5025. 5 6 7 8 9 10 WHEREAS, on August 27, 2013, the Board adopted Resolution No. 1477 awarding a contract to Environmental Construction, Inc. for the construction of the Pressure Control Hydroelectric Facility at the Maerkle Reservoir, Project No. 5025; and WHEREAS, during the course of construction it was determined that changes and 11 associated costs were incurred; and 12 WHEREAS, staff is requesting an increase of $35,000 in the contingency for the 13 14 15 16 17 NOW, THEREFORE, BE IT RESOLVED by the Carlsbad Municipal Water District Board of 18 the City of Carlsbad, California, as follows that: 1. The above recitations are true and correct. 2. The contingency amount for Project No. 5025, Pressure Control Hydroelectric Facility at the Maerkle Reservoir is increased by $35,000 for a total project contingency of $135,000. construction of the Pressure Control Hydroelectric Facility at the Maerkle Reservoir; and WHEREAS, there are sufficient funds available in the project budget to support this mcrease. 25 $135,000. 26 27 // // 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Special Meering of the Board of Directors of the Carisbad Municipal Water District of the City of Carisbad on the 21st day of April 2015, by the following vote to wit: AYES: NOES: ABSENT: Board Members Hall, Blackburn, Schumacher, Wood, Packard. None. None. MATT HALL, President ATTEST: BARBARA ENGLESON, SiKretary (SEAL) V ^L- " •• -