Loading...
HomeMy WebLinkAbout2017-08-22; Municipal Water District; Resolution 1580RESOLUTION NO. 1580 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT BOARD (CMWD), APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING THE SECRETARY TO THE BOARD OF THE CARLSBAD MUNICIPAL WATER DISTRICT TO ADVERTISE AND RECEIVE BIDS FOR THE VALVE REPLACEMENT: PHASE I, PROJECT NO. 5019-A. EXHIBIT I WHEREAS, the Carlsbad Municipal Water District Board of the City of Carlsbad, California has determined it necessary, desirable, and in the public interest to replace broken valves at prioritized locations and concurrently make other improvements and conduct condition assessment at the same locations; and WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, equipment, transportation, and other expenses necessary, or incidentals of the Valve Replacement: Phase I, Project No. 5019-A (Project), have been prepared and are on file at CMWD and are incorporated by reference herein; and WHEREAS, the Project is exempt from CEQA per State CEQA Guidelines Section 15302{c) - replacement or reconstruction of an existing utility system and/or facility involving negligible or no expansion of capacity; and WHEREAS, the engineer's estimate ofthe construction contractor's bid is $1,600,000; and WHEREAS, sufficient funds exist in the Water Valve Repair/Replacement Program {CIP No. 5019). NOW, THEREFORE, BE IT RESOLVED by the Carlsbad Municipal Water District Board of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the plans, specifications and contract documents for the Valve Replacement: Phase I, Project No. 5019-A, on file at CMWD are hereby approved. EXHIBIT 1 3. The secretary to the Board is hereby authorized and directed to publish, in accordance with State law, a Notice to Contractors Inviting Bids for the construction of the Valve Replacement: Phase I, Project No. 5019-A, in accordance with the plans, specifications, and contract documents referred to herein. PASSED, APPROVED AND ADOPTED at a Special Meeting of the Carlsbad Municipal Water District of the City of Carlsbad on the 22nd day of August, 2017, by the following vote, to wit: AYES: NOES: ABSENT: M. Hall, K. Blackburn, M. Schumacher, C. Schumacher, M. Packard. None. None. (SEAL)