Loading...
HomeMy WebLinkAbout2018-10-16; Municipal Water District; Resolution 1606RESOLUTION NO. 1606 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT BOARD (CMWD), ACCEPTING BIDS AND AWARDING A CONTRACT TO FERREIRA COASTAL CONSTRUCTION CO. FOR AN AMOUNT NOTTO EXCEED $9,487,655 FOR THE RECYCLED WATER PHASE 111 PIPELINE EXPANSION SEGMENT 5, PROJECT NO. 5208-B. EXHIBIT 1 WHEREAS, the Carlsbad Municipal Water District (CMWD) Board of Directors of the City of Carlsbad, California has determined it necessary, desirable, and in the public interest to install approximately 1,400 linear feet of 8-inch diameter and 30,000 linear feet of 6-inch diameter polyvinyl chloride (PVC) recycled water pipeline and 1,850 linear feet of 8-inch diameter and 4,100 linear feet of 6-inch PVC potable water pipeline; and WHEREAS, on Nov. 27, 2012, CMWD Board Resolution No. 1455 approved an environmental impact assessment that was conducted for the Phase Ill Recycled Water Program, and a Mitigated Negative Declaration (MND) and Mitigation Monitoring and Reporting; and WHEREAS, on May 16, 2018, Planning Commission Resolution No. 7296 approved a Coastal Development Permit and Special Use Permit to construct the Project; and WHEREAS, on June 11, 2018, California Coastal Commission issued a Coastal Development Waiver (6-18-0345-W) to construct the Project; and WHEREAS, on July 17, 2018, CMWD Board Resolution No. 1601 approved plans and specifications, and authorized the secretary to the Board to advertise to receive bids for the construction of the Recycled Water Phase Ill Pipeline Expansion Segment 5, Project No. 5208-B (Project); and WHEREAS, on July 17, 2018, CMWD Board Resolution No. 1601 also approved an Addendum to the MND and Supplemental Environmental Package; and WHEREAS, on Aug. 29, 2018, 11 sealed bids were received by CMWD for construction of the Project; and WHEREAS, the lowest responsible bid was submitted by Ferreira Coastal Construction Co. in the amount of $9,487,655; and WHEREAS, funds have been appropriated from the Recycled Water Phase Ill -Pipelines, CIP No. 5208 and Miscellaneous Pipeline Replacements, CIP No. 3904 and are sufficient for completion of this Project; and October 16, 2018 Item #6 Page 6 of 8 WHEREAS, subsection 3.28.040(()(5) of the Carlsbad Municipal Code authorizes the executive manager to approve change orders in the amount equal to the contingency set at the time of project award. NOW, THEREFORE, BE IT RESOLVED by the CMWD Board of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the bid in the amount of $9,487,655 submitted by Ferreira Coastal Construction Co. for construction of the Recycled Water Phase Ill Pipeline Expansion Segment 5, Project No. 5208-B, is accepted and the president of the Board is hereby authorized to execute a contract with Ferreira Coastal Construction Co. 3. That the executive manager or designee is hereby authorized to approve construction change orders up to $948,766. 4. That the award of this contract is contingent upon the bidder submitting the lowest responsible bid, executing the required contract and submitting the required bonds and insurance policies, as described in the contract, within 20 days of adoption of this Resolution. The executive manager may grant reasonable extensions of time. PASSED, APPROVED AND ADOPTED at a Special Meeting of the Carlsbad Municipal Water District of the City of Carlsbad on the 16th day of October, 2018, by the following vote, to wit: AYES: NOES: ABSENT: M. Hall, K. Blackburn, M. Schumacher, C. Schumacher, M. Packard. None. None. (SEAL) October 16, 2018 Item #6 Page 7 of 8