Loading...
HomeMy WebLinkAboutMike Prlich and Sons Inc; 2010-05-10; PWS10-29UTIL Part 2 of 2APPENDIX A PERTINENT CITY OF CARLSBAD STANDARD DRAWINGS FOP OF CONDUIT AND CABLE SECTION 190-E-400 CONCRETE, MAXIMUM 8 SLUMP SLURRY BACKFILL TO SURFACE. FOLLOW WITH 12" WIDE BY 1-1/2" DEEP GRIND AND RESURFACING. ALLOW MIN. 72 HOURS CURE BEFORE GRINDING. D2-AR-4000 ASPHALT CONCRETE ALL CONDUIT AND CABLE EXISTING A.C. PAVEMENT EXISTING BASE MATERIAL MORTAR SAND COMPACTED TO 95% RELATIVE DENSITY. UNDISTURBED SOIL SYMMETRICAL ABOUT CENTERLINE OF TRENCH. GRADE SS-1h EMULSIFIED ASPHALT APPLIED AT 0.15 GALLON PER SQUARE YARD. EXISTING ASPHALT PAVEMENT FINISHED GRADE, SMOOTHNESS & COMPACTION OF RESURFACING SHALL MEET THE REQUIREMENTS OF SEC 302-5.6.2 SSPWC EXCEPT THAT THE SMOOTHNESS SHALL BE DETERMINED OVERTHE LENGTH & WIDTH OF PAVEMENT AREAS DISTURBED BY THE CONTRACTOR S/ PERMITEE S OPERATIONS. MINIMUM WIDTH 4 MAXIMUM WIDTH 6" N.T.S. RESPRAY GRADE SS-1h EMULSIFIED ASPHALT AT 0.15 GALLON PER SQUARE YARD 6" WIDE, CENTERED ON EDGE LINE OF GRIND AFTER PLACING A.C. & BEFORE SURFACE TREATMENT. SURFACE TREATMENT TO MATCH EXISTING PAVEMENT (E.G. SEAL COAT, CHIP SEAL) WHEN THE EDGE OF THE GRIND LINE IS WITHIN 12" OF EDGE OF PAVEMENT, ANY STRUCTURE, AN ADJACENT TRENCH PATCHOR ANY OTHER PAVING JOIN LINE THE 1-1/2" DEEP GRIND SHALL BE EXTENDED TO THE EXISTING STRUCTURE OR JOIN LINE. REV.APPROVED DATE CITY OF CARLSBAD NARROW TRENCH BACKFILL & ASPHALT CONCRETE RESURFACING 6-04 CITY ENGINEER DATE SUPPLEMENTAL STANDARD NO. LIMIT OF GRIND SAWCUT LINE TYPICAL TRENCH WIDTH PER PLAN OR CITY STANDARD ASPHALT CONCRETE FINSH COURSE, SEE NOTE 6 & 7 EXISTING AC AND BASE LIMIT OF GRIND (TYP.) ASPHALT CONCRETE BASE COURSE, SEE NOTE 5 AGGREGATE BASE NOTES: 1. THE DETAIL SHOWN ABOVE APPLIES TO TRENCH RESURFACING FOR A.C. PAVEMENT AND PIPELINES 6 INCHES IN DIAMETER AND LARGER. 2. EXISTING A.C. SHALL BE CUT AND REMOVED IN SUCH A MANNER SO AS NOT TO TEAR. BULGE OR DISPLACE ADJACENT PAVEMENT. EDGES SHALL BE CLEAN AND VERTICAL. ALL CUTS SHALL BE PARALLEL OR PERPENDICULAR TO STREET CENTERLINE, WHEN PRACTICAL 3. BASE MATERIAL SHALL BE REPLACED TO DEPTH OF EXISTING BASE. A.C. MAY BE SUBSTITUTED FOR BASE MATERIAL. 4. A TACK COAT OF ASPHALT1C EMULSION OR PAVING ASPHALT SHALL BE APPLIED TO EXISTING A.C OR P.C.C. CONTACT SURFACES. PRIOR TO RESURFACING. 5. ASPHALT CONCRETE RESURFACING (BASE COURSE): a. MINIMUM TOTAL A.C. THICKNESS SHALL BE ONE INCH GREATER THAN EXISTING A.C. AND SHALL MATCH ADJACENT ELEVATIONS. b.A.C. SHALL BE B-PG64-10 FOR BASE COURSE, PER SECTION 203-6 OF SSPWC. 6. ASPHALT CONCRETE RESURFACING (FINISH COURSE): a. PROVIDE 2 INCH DEEP GRIND AND A.C. FINISH COURSE C2-PG64-10, PER SECTION 203-6 OF SSPWC. b. FINISH COURSE FOR RESURFACING SHALL BE LAID DOWN USING A SPREADER BOX OR PAVER AND COMPACTED WITH A STEEL ROLLER. c. SMOOTHNESS AND COMPACTION OF RESURFACING SHALL MEET THE REQUIREMENTS OF SEC 302-5.6.2 SSPWC EXCEPT THAT THE SMOOTHNESS SHALL BE DETERMINED OVER THE LENGTH AND WIDTH OF PAVEMENT AREAS DISTURBED BY THE CONTRACTOR'S OPERATIONS. 7. SURFACE TREATMENT TO MATCH EXISTING PAVEMENT, E.G.: SLURRY, CHIP SEAL, ETC. 8. SLOUGHING OF TRENCH UNDER PAVEMENT SHALL BE CAUSE FOR REQUIRING ADDITIONAL PAVEMENT AND BASE. 9. WHEN THE EDGE OF THE GRIND LINE IS WITHIN 12 INCHES OF EDGE OF PAVEMENT, ANY STRUCTURE, AN ADJACENT TRENCH PATCH OR ANY OTHER PAVING JOIN LINE THE 2 INCH DEEP GRIND SHALL BE EXTENDED TO THE EXISTING STRUCTURE OR JOIN LINE. REV.APPROVED DATE CITY OF CARLSBAD TRENCH RESURFACING ASPHALT CONCRETE PAVEMENT &AfcdT, JJUmjV, 7//0fa CITY ENGINE^ ^ DATE SUPPLEMENTAL pQ OK STANDARD NO. OO'^O STANDARD CAST IRON MANHOLE FRAME & COVER - SEE DWG. NO. S4. 12" WIDE X 6 PAVEMENT OR CLASS 560-C-3250 CONCRETE COLLAR WITH 3" ASPHALT CONCRETE OVERLAY (TYPICAL). VARIABLE RINGS AS REQUIRED. MAX.=11". MIN.=5". TOP=2-2 1/2 RINGS. JOINT DETAILS SEE DWG S1A MIN. SLOPE WIDTH SHALL EQUAL GRADE PIPE DIA. SECTION A-A 6-INCHES OF 3/4" CRUSHED. ROCK BASE SECTION C-C NOTES: CAST IN PLACE CONCRETE FOR BASE SHALL BE TYPE 560-B-3250. ALL PIPE IN MANHOLE SHALL BE PVC AND SHALL BE INCLUDED AS PART OF MANHOLE. MANHOLE SHALL BE CONSTRUCTED IN ACCORDANCE WITH ASTM C-478. STUB OUTS SHALL HAVE A MINIMUM LENGTH OF 3 FEET BEYOND MANHOLE. SDR 35 PVC PIPE MAY BE INSTALLED IN STRAIGHT-THROUGH MANHOLES WITH NO JUNCTIONS. THE TOP SECTION OF PIPE SHALL BE REMOVED FLUSH WITH TOP OF SHELF. CUTS SHALL BE NEAT AND DRESSED MINIMIZING BURRS AND ROUGH EDGES- EACH SHAFT AND RISER JOINT SHALL BE SEALED PER JOINT DETAIL ON DWG S-1A WITH BUTYL RUBBER SEALANT ROPE. WHEN MANHOLE FORMS THE JUNCTION OF SEWERS AND/OR AN ANGLE IN MAIN ALIGNMENT, SPECIAL CARE SHALL BE USED IN FORMING THE CHANNELS TO FACILITATE THE FLOW OF SEWAGE. INVERTS SHALL BE TRUE TO GRADE AND ALIGNMENT AND FINISHED WITH SMOOTH SURFACE. PLAN B-B NOT TO SCALE REV.APPROVED DATE CITY OF CARLSBAD STANDARD SEWER MANHOLE U^fv^y CITY ENGINEER y DATE SUPPLEMENTAL STANDARD NO.S- STANDARD CAST IRON MANHOLE FRAME & COVER - SEE DWG. 12" WIDE X CONCRETE COLLAR, CLASS 560-C-3250 WITH 3" ASPHALT CONCRETE OVERLAY (TYPICAL). PAVEMENT OR VARIABLE RINGS AS REQUIRED. MAX.=11". MIN.=5", TOP=2-2 1/2 RINGS. MIN. SLOPE 1" PER FT. WIDTH SHALL EQUAL INSIDE OIA OF PIPE. BENTONITE SECTION A-A NOTES: DIA -18- MANHOLE PROFILE PVC PIPE POUR BASE AGAINST 6-INCHES OF 3/4" CRUSHED ROCK BASE PVC LINING BUTYL RUBBER MANHOLE. CHANNEL PLAN PVC - USF. PLASTICMANHOLECOUPLING PLASTIC MANHOLECOUPLING FILL HUH NON SHRI! GROUT MANHOLE BASE FIELD MORTAR 2:1 MASONRY SAND/ PLASTIC CEMENT PVC PIPE SECTION A-A JOINT DETAIL ALL CONCRETE TO CONCRETE JOINTS SHALL BE NOTCHED INSTALL 1" WELD STRIPS WHERE T-LOCK ISWELDED; I.E., TOP OF CHANNEL, SHAFT TOSHELF, TURtf BACK TO PIPE FACE, CORNERS, PVC TURN BACK ON PVC PIPING SHALL BE AMINIMUM OF 6". PVC TURN BACK SHALL BE HELD TIGHT TOPVC PIPING BY 1/2" STEEL BAND WITHCONTACT CEMENT ADHESIVE APPLIED TOBOTH SURFACES. NO aAT SHEET PVC SHALL BE USED. FORMIN T-LOCK OR ARROWLOCK ON SHELF ANDCHANNEL. OVERLAP PVC ONTO MANHOLESHAFT AND CHANNEL LINER; WELD TO BOTH AND COMPLETE WITH 1" WELD STRIPS. INSTALL NONSKID SURFACE ON MANHOLESHELF. INSTALL PRE FORMED CORNER TURN BACKUNDER RING. WELD 4" JOINT STRIPS AND FINISH BOTH EDGES WITH 1" WELD STRIPS. COMPLETE CONCRETE CHANNEL SHALL BECONSTRUCTED WITH FORMS AND ALL BUTTHE LOWER 90' SHALL BE T-LOCK LINED.Hr*1* f*t i A t i niihi \ rr"r\*nf* L » A (* 111 TLJC* TACKED ATTHE TERMINUS OF THE ~ ~ THE TS" SHALL RUN VERTICAL ASMANHOLEE SHAFT AND SHALL BE T/THE TERMINUS OF THE T-LOCK. SIDES AND ENDS OF THE BASE TO BE EITHERFORMED. SANDBAGGED OR POURED AGAINSTUNDISTURBED EARTH. MANHOLE SHELVES TO BE SLOPED 1"FOOT TO CHANNEL.PER WRAP MANHOLE JOINTS BELOW WATER TABLEWITH BENTONITE GEOTEXTILE WATERPROOFINGSYSTEM. VOLCLAY VOLTEX OR APPROVEDEQUAL. ALL LINER JOINTS SHALL BE HEAT WELDEDBY WELDERS CERTIFIED BY THE PVCMANUFACTURER. UNER WILL BE! SPARKTESTED AT 20.000 VOLTS MIN. EPOXY COATING SYSTEM MAY BE USED INLIEU OF PVC LINING FOR THE SHELF AND CHANNEL OF THE MANHOLE. COATING SYSTEM PIPE TO MANHOLE CONNECTION DETAIL NOT TO SCALE REV.APPROVED DATE CITY OF CARLSBAD PVC LINED MANHOLE CITY ENGINEI SUPPLEMENTAL STANDARD NO.S-IA STANDARD CAST IRON MANHOLE CLEANOUT COVER DETAIL FRAME & COVER - SEE DWG. NO. S4. 12" WIDE X CLASS 560-C-3250 CONCRETE COLLAR WITH 3" ASPHALT CONCRETE OVERLAY (TYPICAL). ADJUSTING RINGS AS SEE DWG 5-6. MODIFIED WITH SBF 1243 VALVE BOX, WIN. SLOPE WIDTH SHALL EQUAL INSIDE DIA OF PIPE. REQUIRED. MAX=H", MIN.=5", TOP 5"=2-2 1/2" R3NGS. JOINT DETAIL SEt DWG SI A. 1 SECTION A-A WHEN MANHOLE FORMS THE JUNCTION OF SEWERS AMD/OR AN ANGLE IN MAIN ALIGNMENT, SPECIAL CARE SHALL BE USED IN FORMING THE CHANNELS TO FACILITATE THE FLOW OF SEWAGE. INVERTS SHALL BE TRUE TO GRADE AND ALIGNMENT AND FINISHED WITH SMOOTH SURFACE. 6-INCHES OF 3/4" CRUSHED ROCK BASE. GRADE 3/4" PIPE DIA. SECTION C-C STANDARD CROSS BRANCH SPIGOT END TO BE CUT OFF FLUSH WIIH bUKI-ACE. 0 JOINT WITH CROSS BRANCH AND FIRST SECTION OF PIPE TO BE JOINED PRIOR TO INSTALLATION IN MANHOLE. TWO 3/8"X2 5/4" LAG SCREW EXTENSION SHIELDS GALVANIZED AND 3/8"X6" LAG SCREWS GALVANIZED PER EACH 4 FOOT ACCESSHOLE RING AS SHOWN. CLEAN AND ROUGHEN SURFACE RINGS AND APPLY NEAT CEMENT PASTE PRIOR TO POURING SUPPLY DROP SECTION. 90* PIPE SPIGOT END TO BE CUT OFF FLUSH WITH INSIDE SURFACE. NOTES: ALL CAST IN PLACE CONCRETE SHALL BE TYPE 560-B-3250. ALL PIPE IN MANHOLE SHALL BE PVC OR VITRIFIED CLAY PIPE AMD SHALL BE INCLUDED AS PART OF MANHOLE. DOUBLE DROP MANHOLE IS CONSTRUCTED THE SAME AS DROP MANHOLE EXCEPT THAT IT HAS TWO DROP SECTIONS. TYP. PLAN B-B REV.APPROVED DATE CITY OF CARLSBAD DROP MANHOLE CITY ENGIN '. 7//ofe& DATE SUPPLEMENTAL STANDARD NO. 1 5/8" HALF PLAN FRAME & COVER INNER COVER TOP SIDE INNER COVER 3S 1/8"D 1 3/8"MIN. BOTTOM SIDE HALF SECTION FRAME & COVER 3/4" TYP. F~RIB3~ NOTES: WEIGHTS: INNER COVER OUTER COVER FRAME =155 LBS. =300 LBS. =330 LBS. 3/4" 2. 3. 4. 5. MATERIAL: CAST IRON. MACHINE SEATS TO PREVENT NOISE. FILLET RADII TO BE 12". IMPORTED COVERS AND FRAMES SHALL HAVE CONTRY OF ORIGIN MARKING IN COMPIANCE WITH FEDERAL REGULATIONS.SECTION A-A REV.APPROVED DATE CITY OF CARLSBAD MANHOLE FRAME & COVER CITY ENGINE DATE SUPPLEMENTAL STANDARD NO.S-4 12" CAST IRON GATE CAP PER DETAIL HEREON. #29612 CAST IRON m K BOX/LID MARKED (/ 'f-TSEWER # 6" MIN. SEWER CLEAN- OUT RISERS p TO BE FITTED WITH MALE ^=3'"IPRFW IM r*t nn r^^-— ~i z^z rf-""""^ ^^^^•, .1* '.*"7r*y^!' v 18" MIN. ' " i I \ 12" WIDE X 6" THICK CLASS 560-C-3250 CONCRETE ,^_^ COLLARWITH 3** ASPHALT LA CONCRETE OVERLAY _i— 7 (TYPICAL). h ^y Sy Ear" if 2 EA. STD ^^^^^ 1/8 BEND ^T\^& ^ ^^ ^-* BACKFILL BEDDING TOP OF V8 BEND. SEE DWG. SB FOR BEDDING DETAIL. NOTES: 1. GATE CAP SHALL BE LABELED SEWEI 2 CLEANOUTS MAY BE USED WITH P.V. " MAIN. 3' RISER SHALL BE SAME DIAMETER AS MAIN. TOP OF PAVEMENT GLUED ^mn i6" s GLUED s 12" P.V.C. PIPE. GATE CAP g (HEAVY DUTY)8 i i Y4"U 13 5/8" -J I I//'///////////! • ' IC. SEWER ^ ' I SEWER — 11 1/2" •- REV. APPROVED DATE CITY OF CARLSBAD SEWER ^1 A 1 M n C A M Al IT CITY ENGIN^R ^ DATEIAIN CLtANOUT SUPPLEMENTAL C A STANDARD NO. O"0 CLEAN-OUTS IN YARD TO BE COVERED WITH 10" PLASTIC COVER BY CARSON PART NO. 910 O.A.E. CLEAN-OUTS IN CONCRETE TO HAVE CONCRETE BOX WITH TRAFFIC LID BY J&R OR BROOKS PART NO. 3-R-T. SEWER CLEAN-OUT RISERS TO BE FITTED 5' MINI. WITH MAUL SCKtW IN PLUG. OPTIONAL WYE (WHEN APPROVED). WYE WITH 1 FOOT STUB AND PLUG OPTIONAL 90' ELBOW WHEN APPROVEDWYE (TO BE SET AT 45 DEGREE ANGLE). OR BEDDING AND TRENCH COMPACTION SEE DWG. NO. 55. STAMP CURB FACE SSSECTION PLAN VIEW NOTES: 1. THE LATERAL SHALL BE BEDDED THE SAME AS THE MAIN LINE SEWER. 2. IN NO CASE SHALL A LATERAL CONNECT TO THE SEWER MAIN DIRECTLY ON TOP OF THE PIPE. 3. SEWER LATERALS SHALL HAVE A 27. MINIMUM SLOPE. ALL JOINTS ON SEWER LATERAL PIPE SHALL BE 4. COMPRESSION TYPE OR APPROVED SOLVENT WELD. FACE 5- AS-BUILT SEWER LATERAL LOCATIONS SHALL BE FURNISHED TO THE CITY INSPECTOR ON FORMS PROVIDED PRIOR TO FINAL APPROVAL OF WORK. 6- ALL LATERAL TRENCHES TO PROPERTY LINE AND SEWER MAIN TRENCHES TO BE COMPACTED PER S5. 7- CLEAN-OUT TO BE ADJUSTED TO GRADE AFTER FINAL FINISH GRADING. 8- FOR BACKFILL AROUND CLEANOUT RISER SEE DWG. S-5. NOTE 3. 9- MAINTENANCE OF THE SEWER LATERAL FROM THE SEWER MAIN TO THE BUILDING IS THE RESPONSIBILTY OF THE PROERTY OWNER. REV.APPROVED DATE CITY OF CARLSBAD SEWER LATERAL (WITH OPTIONAL WYE) CITY EN0NI DATE SUPPLEMENTAL STANDARD NO.S-7 ELEVATION -ft- INVERT VARIABLE - 12' MINIMUM OR AS DIRECTED BY WATER DISTRICT. 1/8 BEND. 6" MINIMUM COVER AROUND LATERAL. TOP OF PIPE. BELL FOR BEDDING AND TRENCH COMPACTION SEE DWG. NO. S5. NOTES: THE VERTICAL PIPE SHALL BE BRACED WHILE TRENCH IS BEING BACKFILLED. ALL JOINTS ON SEWER LATERAL PIPE SHALL BE COMPRESSION TYPE OR APPROVED SOLVENT WELD. MAINTENANCE OF SEWER LATERAL FROM MAIN TO BUILDING IS THE RESPONSIBILITY OF THE OWNER. SEE DWG. NO. S7 FOR CONTINUATION OF SEWER LATERAL TO PROPERTY LINE. TRENCH WIDTH PLAN VIEW REV.APPROVED DATE CITY OF CARLSBAD SEWER LATERAL (DEEP CUT HOUSE CONNECTION) kkvnjr; CITY ENGINEE^" DATE SUPPLEMENTAL O Q STANDARD NO. O~0 3"AC 1. SEE SPECIFICATIONS FOR SOLDERING REQUIREMENTS 2. SEE SPECIFICATIONS FOR LID PAINTING REQUIREMENTS 3. SEE IMPROVEMENT PLANS FOR ASSEMBLY SIZE. (SILVER SOLDER)WITH ANODE LEAD WIRE PER STD. DWG. NO 25. ITEM DESCRIPTION SPEC/DWG OUTLET ON PVC PRESURE PIPE W-8 OUTLET ON AC PIPE W-8 OUTLET ON CML&C STEEL PIPE W-9 OUTLET ON DUCTILE IRON PIPE W-9 2" COPPER SERVICE PIPE, (TYPE 'K' SOFT), 2" ANGLE METER STOP 2 METER COMPANION FLANGE. (BRASS NUTS AND BOLTS). 2" BRASS STREET ELL ADAPTER-2" M.I.P. X 2 1/2" NSHT W/ 2 1/2" CAP 10 12" DIA. C.I. VALVE BOX COVER MARKED WATER OR RECYCLED WATER 11 50" DIAMETER X 8" THICK CONCRETE RING 12 12" GRAVITY SEWER PIPE SDR 55 REV.APPROVED DATE CARLSBAD MUNICIPAL WATER DISTRICT 2" BLOW-OFF / MANUAL AIR RELEASE ASSEMBLIES 7/JpX^» CITY ENGINEER DATE STANDARD DWG. NO.W-6 A.C. MAIN P.V.C. MAIN FOR WATER SERVICE CONNECTION ( TYP. ) ITEM DESCRIPTION SPEC/DWG DOUBLE BAND BRASS SERVICE SADDLE. BRONZE DOUBLE STRAP SERVICE SADDLE. CORP. STOP 1 WATER SERVICE.W-3 CORP. STOP 2 WATER SERVICE.W-4 CORP. STOP 1" AIR VACUUM VALVE ASSEMBLY.W-7 CORP. STOP 2" AIR VACUUM VALVE ASSEMBLY W-7 1 MANUAL AIR RELEASE ASSEMBLY W-5 2 BLOW-OFF MANUAL AIR RELEASE ASSEMBLY.W-5&6 2" MANUAL BLOW-OFF / AIR RELEASE ASSEMBLY.W-6&7 REV.APPROVED DATE CARLSBAD MUNICIPAL WATER DISTRICT OUTLETS ON A.C. OR P.V.C. MAIN FOR I INCH THRU 2 INCH ASSEMBLIES CITY ENGIN J»/w»>*v>. 7/o/ofi EER DATE STANDARD DWG. NO.W-8 D.L MAIN STEEL MAIN EOR WATER SERVICE CONNECTION ( TYP. ) ITEM DESCRIPTION SPEC/DWG DOUBLE BAND BRASS SERVICE SADDLE. CORP. STOP 1 WATER SERVICE.W-3 CORP. STOP 2 WATER SERVICE.W-4 CORP. STOP 1 AIR VACUUM VALVE ASSEMBLY.W-7 CORP. STOP 2 AIR VACUUM VALVE ASSEMBLY.W-7 1" MANUAL AIR RELEASE ASSEMBLY.W-5 2" BLOW-OFF MANUAL AIR RELEASE ASSEMBLY.W-6&7 2" BLOW-OFF / AIR RELEASE ASSEMBLY.W-6&7 NOT USED 10 3000 P5I FORGED STEEL COUPLING WELDED TO MAIN.W-14 11 INSULATING BUSHING. ( LEXAN OR DELRIN ).W-10 REV.APPROVED DATE CARLSBAD MUNICIPAL WATER DISTRICT OUTLETS ON D.I. OR STEEL MAIN FOR I INCH THRU 2 INCH ASSEMBLIES CITY ENQNR DATE STANDARD DWG. MO.W-9 B 1)OR(2 24" DIA. [ B PLAN FINISH GRADE. jj-AC PAVEMENT. RISER SHALL NOI REST ON BONNET OF VALVE. (2" MIN. CLEARANCE). SECTION A-A DOMESTIC WATER SECTION B-B RECLAIMED WATER NOTES: 1. IN NON-ROAD AREAS PLACE MARKER POST NEXT TO VALVE BOX ASSEMBLY AS DIRECTED BY THE ENGINEER. ( SEE DRAWING NO. 23 ). 2. ALL BURIED NUTS AND BOLTS SHALL BE WAX TAPE COATED PER SPEC. 09902 SEE DRAWING NO. 23 FOR GATE VALVE EXTENSION. UPPER SIDE OF UD TO RECIEVE 2 COATS OF PAINT. SEE SPECIFICATIONS FOR PAINTING REQUIREMENTS, ( PAGE 4 ). ITEM DESCRIPTION SPEC/DWG VAL. BOX & COVER WITH NON-SKID C.I. COVER AND LIFT HOLE. MARKED "WATER VAL BOX & COVER FOR NORMALLY CLOSED VALVE. VAL. BOX & COVER MARKED RECYCLED WATER". 8" C900 PVC OR ASPHALT COATED WELL CASING. CONCRETE COLLAR IDENTIFY CONG. BY CLASS 56Q-C-325Q POLYETIiYLENE INCASEMENT REV.APPROVED DATE CARLSBAD MUNICIPAL WATER DISTRICT VALVE BOX ASSEMBLY CITY ENGINEER DATE STANDARD DWG. NO. W-IJ FINISHED NOTES: 1. SEE SPECIFICATIONS FOR BURIED FLANGE AND VALVE REQUIREMENTS, 2. SEE DRAWING NO. 19 FOR THRUST BLOCK BEARING AREAS. 3. ALL BURIED NUTS AND BOLTS SHALL BE WAX TAPE COATED PER SECT. 09902. TRENCH ELEVATION PVC PIPE REINFORCING STEEL DETAIL. TRENCH SECTION (TYPICAL) TRENCH ELEVATION STEEL PIPE ITEM DESCRIPTION SPEC/DWG GATE VALVE POLYETHYLENE ENCASEMENT NO. 4 REINFORCING STEEL. CONCRETE THRUST/ANCHOR BLOCK. (3250 P.S.I.) 560-C-3250 W-19 VALVE BOX ASSEMBLY.W-13 REV.APPROVED DATE CARLSBAD MUNICIPAL WATER DISTRICT GATE VALVE INSTALLATION P.V.C., & STEEL PIPE. CITY ENGINI DATE STANDARD DWG. NO.W-I6 VARIABLE - SEE NOTE NOTES: BEARING AREA SHALL BE THE DIFFERENCE BETWEEN THE BEARING AREAS REQUIRED FOR THRUST ANCHORAGE OF MAINS ON EACH SIDE OF REDUCER AS FOUND FROM STD. DWG. 19 PLUS THE AREA OF THE TRENCH OPENING. MINIMUM DIMENSIONS SHOWN SHALL B£ ADHERED TO. ITEM DESCRIPTION SPEC/DWG POLYETHYLENE ENCASEMENT CONCRETE THRUST BLOCK (560-C-3250 CONCRETE^W-19 NO. 4 BAR 9 ON CENTER EACH WAY. REV.APPROVED DATE CARLSBAD MUNICIPAL WATER DISTRICT THRUST ANCHOR FOR WATER MAIN REDUCER - 4 THRU 16 INCH. CITY ENGI DATE STANDARD DWG. NO. W~|8 a>0}1 1 k— 3 CO c: O CD "to E o c 0a>CO 40 30 20 10 0 - , r f t f s ^ ff f 1f f ^ - J ' f { : » J f f j ^ - j / ' , 1 r f ! — t f A s 1f J ^ ( f J * ttt j J i ' •*' (J ^ j / , ' ^ ^ 1 ) 1 f j </ * V LJ^ ,^ J r o j vl 7QTJ j ^( j - - —f. 2A ~ r 2 5t^y*^o 7222*c\1 ^K"* E ii ^*• g^ ^ ^ iir i I/jjf i\t \1y^ r-j D *T 7j3r 2jr vS s IL!? 7r H.ZS 22 OL! V . rL ^ ^ -, Ay^ *• £ 1 J ^ J ^J J < V y\* y ^ ? ^ ^^ N, ? J 1 LV* ^ ^ ^* r ^ V, r ^k! ^y ji"* r ^ "^ T •M J ^* ^ t JT t |J. «J K" sj ^ »/ fal]f \v^ r* s s^ / % ^ ^ ('hi y ^/ »'% ^ Ji n 1 s / '/ / •) y J t ^' .J J ^ J r j V V n ^ PI n j r "^i >v ' 1 /^ J ]V f Af \ 4 J \ ^ ^f ff J ^S| A ^^ > ^ . ^ L ^y rI• •^ if J ^V i* ^f ^ *J L ^ * , / r/ V ^ ,; s ' ^tl 1f J H^, r ^i J /7 , ^ \ ' *j r \ A , ' ^i O / ^ ^ A•^ </ .i>1.* j •'v' ^ / (•4, J* . '1 , .1 ^^ V V f < y ^ > t ^/ jf V .( Jr / * j'j ^ >? y ' ' ^ * / / 4 6 8 10 12 14 16 NOTES: Pipe Diameter in Inches 1. BASED ON 225, PSJ TEST PRESSURE AND BEARING VALUES OF DRY SOILS. 2. VALUES FROM CURVES ARE FOR TEES AND DEADENDS, I.E. ; STRAIGHT LINE THRUST. FOR 90' BEND: 1.4 VALUE FROM CURVE. FOR 45' BEND: 0.8 VALUE FROM CURVE. FOR 22 1/2' BEND: 0.4 VALUE FROM CURVE. 3. FOR CONDITIONS NOT COVERED BY CURVES, SPECIAL THRUST WALLS, THRUST BLOCKS AND ANCHORS MUST BE CALCULATED AND APPROVED. REV.APPROVED DATE CARLSBAD MUNICIPAL WATER DISTRICT THRUST BLOCK BEARING AREAS ^HSPHxIeWvAmk1, T//«/*8 CITY ENGIN^R ' DATE STANDARD DWG. NO. W-IQ APPENDIX B GEOTECHNICAL REPORTS October 21,2008 Project No. 106471001 Mr. Mark Biskup City of Carlsbad Public Works-Engineering 1635 Faraday Avenue Carlsbad, California 92008 Subject: Limited Geotechnical Consulting Services Beech Avenue Sewer Carlsbad, California Reference: Inland Foundation Engineering, 2008, Preliminary Geotechnical Report, Beech Avenue Sewer Project, Carlsbad, California: dated February 26. Dear Mr. Biskup: In accordance with your request and the authorization of the City of Carlsbad, we have performed a review of pertinent background information including the above-referenced geotechnical report and performed a brief site visit in order to conduct a limited geotechnical evaluation regarding the natural formational materials that are expected to be encountered during the construction of the Beech Avenue Sewer Project. We understand that the information we are providing may be used by the project design team that includes Boyle Engineering and Jacobs Associates. The project alignment is located along Beech Avenue between Ocean Street and the Washington Street easement in Carlsbad, California The project consists of replacing approximately 1,000 teet of existing sewer with an 8-inch or 10-inch I.D. sewer by trenchless methods (i.e. microtunneling or auger boring), and open trench construction. The sewer will be installed at a depth of up to approximately 30 feet. Based on geologic maps published by the California Geological Survey, our field reconnaissance, and the referenced geotechnical report, the project alignment is underlain by shallow fill and Pleistocene- age marine terrace deposits, also referred to as "old paralic deposits." Marine terrace deposit materials are anticipated to be encountered at the proposed depths of the new sewer. Relatively shallow surficial soils, such as fill can also occur at places along the alignment. However, the primary earth unit to be encountered in the microtunneling operations is anticipated to be the marine terrace deposits. S7!ORuffinRoad • San Diego, California 92123 • Phone {858} 576-J 000 • Fax (858) 576-9600 San Diego • Irvine • (?ancho Cucarnonga * Los Angeles « Oakland « Las Vegas • Phoenix « Denver • El too Beech Avenue Sewer Carlsbad, California October 21,2008 Project No. 106471001 The marine terrace deposits were laid down by shore and near-shore processes during the Pleistocene epoch at sea levels higher than where they stand today. The predominant constituent is sand, but boulders, gravel, cobbles, and minor amounts of silt and clay also occur in the unit. An interval de- scribed as boulders and cobbles in a sand matrix was encountered in boring B-01 that was drilled for the preparation of the referenced geotechnical report. Cohesionless (or caving) sands may also be present. Based on our experience, overall the Pleistocene marine terrace deposits can be character- ized as varying from slightly cemented sands to sandstones. Based on the above, the natural formational materials that will be encountered during the construction of the Beech Avenue Sewer are expected to have unconfined compressive strengths varying from ten pounds per square inch (psi) for slightly cemented sands to approximately 500 psi for sandstones. These estimates are for the sand/sandstone layers that make up the body of the unit. However, resistant boulders, cobbles, and gravel were encountered and may also occur in other areas within the terrace deposits which may result in difficult drilling conditions for the proposed trenchless construction alternatives. The conclusions provided herein are based on our review of readily available background data and field observations of exposed surface conditions. Ninyo & Moore has not performed any subsurface explo- ration of its own for this project. Additional services including subsurface exploration by Ninyo & Moore could be performed to further refine our conclusions regarding the subsurface conditions. We appreciate the opportunity to be of service on this project. Sincerely, NINYO & MOORE Andres Bernal, GE. Senior Project Engineer Rl/AB/GTF/ek Distribution: (1) Addressee Gregory T. Farrand, C.E.G Principal Geologist 106471001 I, doc a nu D a a GEOTECHNICAL REPORT BEECH AVENUE SEWER PROJECT CARLSBAD, CALIFORNIA PREPARED FOR: Attention: Mark D. Biskup, Associate Engineer CITY OF CARLSBAD Public Works - Engineering 1635 Faraday Avenue Carlsbad, California 92008 PREPARED BY: INLAND FOUNDATION ENGINEERING, INC. 1310 South Santa Fe Avenue San Jacinto, California 92583 December 30, 2008 Project No. K183-010 U G G December 30, 2008 Project No. K1 83-010 INLAND FOUNDATION ENGINEERING, INC. Consulting Geotechnical Engineers 1310 South Santa Fe Avenue San Jacinto, California 92583 (951) 654-1555 FAX (951) 654-0551 G n J U LJ n J G G 0 Attention: Randy Neff, P.E. KRIEGER AND STEWART, INC. 3602 University Avenue Riverside, California 92501-3380 Re: Geotechnical Report Beech Avenue Sewer Project Carlsbad, California Dear Mr. Neff: As requested, we have prepared this Geotechnical Report for the City of Carlsbad for the City's use in the design of the referenced project. This report was prepared in general accordance with our proposal dated October 27, 2006. It is our opinion that the proposed development is feasible from a Geotechnical Engineering standpoint. Our report includes design recommendations along with the field and laboratory data. We appreciate the opportunity of being of service to you on this project. If there are any questions, please contact our office. Respectfully, INLAND FOUNDATION ENGIN m, President/i DRL:LES:kw Distribution: Addressee (7) H U n U I—% TABLE OF CONTENTS H INTRODUCTION 1U SCOPE OF SERVICES 1n J PROJECT DESCRIPTION 3 GEOLOGIC SETTING 4 SUBSURFACE CONDITIONS 11 G G CONCLUSIONS AND RECOMMENDATIONS 13 Excavatability 13 Groundwater 14 Trench Wall Stability 14 Pipe Bedding 15 H Embedment 16 ^ Compaction Characteristics 17 Lateral Design 17 . j Unit Weight 17 ^ Protection of Existing Utilities and Storm Drains 17 ^ Recommended Specifications for Placement of Trench Backfill 17 Pipe Bursting Alternative Considerations 18 Microtunneling Alternative 20 M GENERAL 21 0 G REFERENCES 22 APPENDICES {J APPENDIX A - Field Exploration A-1 -A-6 Explanation of Logs A-2 r-| Exploratory Borings A-3 - A-5 J Site Plan A-6 n APPENDIX B - Laboratory & Soil Mechanic's Testing B-1 - B-8 J Maximum Density-Optimum Moisture Determinations B-4 Classification Testing B-5 r-j Direct Shear Testing B-6 Ij Consolidation Testing B-7 and B-8 n ANALYTICAL TESTING B-3 |J GENERAL B-3 J INTRODUCTION n u-i This report presents the results of geotechnical exploration and testing conducted for ,-, the City of Carlsbad Beech Avenue Sewer Project. Preliminary project plans prepared J by Krieger & Stewart, Inc. were used as a reference during our study. H SCOPE OF SERVICES J —i The purpose of the geotechnical investigation was to provide geotechnical parameters LJ for design and construction of the proposed project. The scope of the geotechnical investigation included: • A review of the general geologic conditions and specific subsurface conditions of the n project site. i I • An evaluation of the engineering and geologic data collected for the project. u • Preparation of a formal report providing geotechnical conclusions and H recommendations for design and construction. U ,-, The tasks performed in order to achieve these objectives included: • The collection and review of data in order to develop an exploration program. f—l ^ • Subsurface exploration to determine the nature and stratigraphy of the subsurface r-i soils and to obtain representative samples for laboratory testing. • A visual reconnaissance of the site and surrounding area to ascertain the existence/—|of any unstable or adverse geologic conditions.i—I n • Laboratory testing of representative samples in order to establish the classification u and engineering properties of the soils. • Analysis of the data collected and the preparation of this report presenting our geotechnical conclusions and recommendations. n <-J Evaluation of hazardous wastes was not within the scope of services provided. The - evaluation of seismic hazards was based upon field mapping and literature review. The J information in this report represents professional opinions that have been developed using that degree of care and skill ordinarily exercised, under similar circumstances, by n U Krieger & Stewart - Beech Ave. Sewer r-1 Project No. K183-010-December 2008 \ Inland Foundation Engineering, Inc. J n LJ L J n LJ n LJ (—1 LJ n U n LJ LJ U n U n U reputable geotechnical consultants practicing in this or similar localities. No other warranty, either expressed or implied, is made as to the professional advice included in this report. Krieger A Stewart - Beech A ve. Sewer r~I Project No. K183-OIO - December 2008 2 Inland Foundation Engineering, Inc. n J nJ J n j n J (—I J n nu PROJECT DESCRIPTION The Beech Avenue Reach consists of approximately 1,060 lineal feet of proposed sewer line extending from Ocean Street to the Washington Street Easement in the City of Carlsbad. This line will replace an existing 8° VCP concrete-encased sewer pipeline. U.S.G.S. Topographic Map, San Luis Rey Quadrangle, and Aerial Photograph (2003) The depth of the proposed sewer ranges from approximately 13 to 30 feet. We understand that the proposed sewer line will be constructed using minimum 8-inch inside diameter gravity sewer. We understand that the new sewer may be constructed using microtunneling or other trenchless construction methods. Because the project will occur along an existing paved street, the project may require the replacement of existing pavement and aggregate base material. We are not aware if the project will involve the replacement of any existing underground utilities. nj Krieger & Stewart Beech Ave. Sewer Project No. Kl83-010 - December 2008 Inland Foundation Engineering, Inc. nu GEOLOGIC SETTING r- Regional Geology: The project area lies along the coastal portion of the geomorphic ,-, province known as the Peninsular Ranges. The Peninsular Ranges are described as a (J series of ranges separated by northwest trending valleys, subparallel to faults branching from the San Andreas Fault. The trend of the topography is similar to the Coast n Ranges, but the geology is more like the Sierra Nevada, with granitic rock intruding the L-J older metamorphic rocks. The Peninsular Ranges extend into lower California and are „ bound on the east by the Colorado Desert. The Los Angeles Basis and the island J group (Santa Catalina, Santa Barbara, and the distinctly terraced San Clemente and San Nicholas islands), together with the surrounding continental shelf (cut by deep n submarine fault troughs), are included in this province (California Department of U Conservation, California Geologic Survey, 2002). i Local Geology: More locally, the subject site rests within the Oceanside 30' x 60' Quadrangle, as mapped by USGS. The area is tectonically and seismically active and H is dissected by four major, northwest trending, oblique right slip, Pacific/North American U Plate boundary fault zones. They include the Elsinore Fault Zone in the northwestern corner of the quadrangle, the Newport-lnglewood-Rose Canyon Fault Zone in the center of the quadrangle (origin of the 1933, M=6.3, Long Beach earthquake), the ^ Coronado Bank Fault Zone in the southwestern corner of the quadrangle (origin of the 1986, ML=5.3, Oceanside earthquake). Landslides are abundant in the western and offshore parts of the quadrangle. Also, seismic hazards are numerous throughout the area. A tsunami hazard exists along the coastal margin. The westerly portion of the ^ quadrangle is underlain by a relatively thick (>1000m) succession of Upper Cretaceous, L-J Tertiary, and Quaternary sedimentary and volcanic rocks that unconformably overlie the -, older plutonic and basement forearc rock sequence. These rocks consist chiefly of u beds of marine, paralic and non marine claystone, siltstone, sandstone and conglomerate and minor flows consisting mostly of Neogene basalt. Many cycles of H uplift, erosion, subsidence and deposition since the Late Mesozoic have created the —' complexity of the existing stratigraphic and structural settings (Kennedy & Tan, 2005). . The soils encountered along the proposed alignment consist of marine terrace deposits. These paralic deposits are defined as deposits laid down on the landward side of a ;-i coast. Based upon our subsurface exploration, the soils are medium dense to dense, weakly M to strongly cemented, silty sand and sand. r-| Following is a portion of the U.S.G.S. Geologic Map of the Oceanside 30' x 60' Lj Quadrangle, California (Kennedy & Tan, 2005) depicting the mapped geologic units in the vicinity of the project alignment: Krieger & Stewart - Beech Ave. Sewer r-i Project No. Ki83-010-December 2008 4 Inland Foundation Engineering, Inc. u nu ntu 0 n LJ 3 n U n LJ LJ LJ LJ Old pantile deposits. Unit 7 (late to middle Pleistocene) — Mostly poorly sorted, moderately permeable, reddish-brown, interfingered strand line, bench, esfuarine and colluvial deposits composed of siltstone, sandstone and conglomerate. These deposits rest on the 9-1 1 m Bird Rock terrace (Fig. 3) Old paraiic ' deposits. Unit 6 (late to middle Pleistocene) — Mostly poorly sorted, moderately permeable, reddish-brown, interfingered strandline, beach, estuarine and colluvial ileposits composed of siltstone, sandstone and conglomerate. These deposits rest on the 22-23 m Nestor terrace n LJ J nJ n iu n LJ n U Groundwater: The study area is located within the San Diego Hydrologic Region, which drains west into the Pacific Ocean. The San Diego Hydrologic Region encompasses approximately 3,900 square miles and is further subdivided into 1 1 major watersheds. This project lies within the Carlsbad Watershed. The Carlsbad Watershed occupies approximately 210 square miles, extending from Lake Wohlford on the east to the Pacific Ocean on the west and from Vista on the north to Cardiff-by-the-Sea on the south. This watershed includes the cities of Oceanside, Carlsbad, Encinitas, Vista, and Escondido. The watershed is drained by Buena Vista, Agua Hedionda, San Marcos and Escondido creeks and contains four coastal lagoons, including Buena Vista, Agua Hediona, Batiquitos and San Elijo lagoons (Dudek & Associates, 2003). Krieger & Stewart - Beech Ave. Sewer Project No. KI83-010 - December 2008 Inland Foundation Engineering, Inc. nj iu ] J n J LJ n LJ Groundwater was encountered within one of our exploratory borings (B-03) at a depth of 25 feet or elevation of 22 feet MSL. This is approximately five feet below the sewer invert elevation at that location. Oxidation-reduction mottling was encountered within this boring at a depth of 24 feet. Seasonal fluctuation of groundwater levels is anticipated and could be a factor during the construction of the sewer. Groundwater levels in the vicinity reported by Gregg Drilling were reviewed for this project. Near the intersection of Tamarack Avenue and the 1-5 Freeway, located approximately 1.2 miles southeast of the site, an approximate depth to groundwater of 45 feet was reported on March 29,1999. The site is approximately 15 feet higher in elevation than the project alignment. A second site, located approximately 0.6 miles east-northeast and approximately 20 feet higher in elevation was drilled on March 8, 2000 and had an approximate groundwater depth of 15 feet (Gregg Drilling, 2006). This data may be of little relevance to the subject site with the exception that the groundwater observations indicate a regional gradient toward the southwest within the portion of Beech Avenue that is the subject of this study. This is illustrated in the following diagram: J nu LJ LJ n LJ J r n LJ 40 30 20 10 Station 0+00 7 I £y°*i . J- '°- 1 L- :- — • - ; ^" Groundwater Station 5+00 BEECH AVENUE Station 10+00 The groundwater data indicated for our current exploration is only representative of the conditions at the time of our exploration and may not reflect the conditions during construction. Therefore, the local groundwater conditions should be assessed by the contractor prior to the commencement of work in order to determine if groundwater will adversely affect the construction process. Seismicitv: The project site does not lie within a State of California Alquist-Priolo Earthquake Fault Zone, however the proposed alignment is located within a seismically active region of Southern California. No documented faults are mapped trending through the alignment; however there are several relatively nearby faults, which are capable of producing significant ground shaking at the site during major earthquakes. Krieger & Stewart - Beech Ave. Sewer Project No. Kl83-010 - December 2008 Inland Foundation Engineering, Inc. n n U 3 0 nj U n LJ The following is a portion of a map and associated legend entitled "Fault Activity Map of California and Adjacent Areas", compiled by Charles W. Jennings (CDMG, Geologic Data Map No. 6, 1994) depicts the mapped faults in the site locale of the subject property. u LJ U n LJ n J n• iU Krieger & Stewart - Beech Ave. Sewer Project No. K183-010 - December 2008 Inland Foundation Engineering, Inc. 0 D G nu nu n J Square on fault indicates where fniih creep slippage has occurred that has been triggered hy an earthquake on Some iiijici-lauli. Date of causative earthquake indicated. Squares u. right and left of date indicate terminal points between which triggered creep slippage has occurred (creep cither continuous or intermittent between these end (mints). lMgB *'WUi«s Hiilocette fault displacement (during past 10.1)0" years) without historic record. Cieomorphic evidence for I loloecne faulting includes sag ponds: scarps showing little erosion, or the following features in llolocenc age deposits: offset stream courses, linear scaips. shutter ridges, and triunuular I'aceied spats. Kccency of faulting olTsltore is based on the interpreted age of the youngest grain displaced by faulting. Pale orange band 3S22XXS2 added to emphasize location of Hnloccnc fault displacement. l-alc Quaternary fault displacement (during past 700.0(10 years). Ckomorphic evidence similar 10 that described lor Holoccnc. faults except features arc less distinct, l-aulting may be younger., but lack of younger overlying dc|x>siis precludes more accurate age classification. Quaternary fault tage iiiidiffcrcmiated). Most faults of this category show evidence of displacement sometime during the past 1.6 million years; possible exceptions are faults which displace rocks of undilfcrcnliaied I'lio-I'leisioccnc age. Unnumbered Quaternary faults were based on Fault Map of California. 1975. Sec .Bulletin 201. Appendix D lor source data. Late Ccno/oic faults within the Sierra Nevada including, bin not restricted.tu. ihe Foothills fault svsteni. Faults show Siralie,raphic and/or gcoinorpliic evidence for displacement of late Miocene and Pliocene deposits. Uy analogy, laic Ceno/oic faults in diis system thai have been investigated in detail may have been active in Quaternary lime. (Data from PG&F.. IW>. Pre-Quatcmary fault (older than 1.6 million years) or fault without recognized Quaternary displacement. Some faults are shown in this category because the source of mapping "serf was of reconnaissance nature, or was not done with the object of dating fault displacements. Faults in this category arc not necessarily inactive. Fault Segment associated with a significant linear trend of accurately located earthquake epicenters (magnitude 0.2 or greater). Cienerally aligned along strike slip faults having Quaternary displacement, hut nut necessarily with historic surface rupture. Ijtck of seismic activity along any fault is no indication that the fault may not be active in the future (e.g. San Andreas fault north of San Francisco). Epicenter data fire derived from closely spaced seismic slationsand include either continuing mieroxeismicily or afters hocks associated with relatively large earthquakes. nu According to maps compiled by the California Department of Conservation, Division of Mines and Geology (DMG) the major faults influencing the site, distances and maximum earthquake magnitudes are as follows: n LJ Fault Zone Newport-lnglewood (Offshore) Rose Canyon Coronado Bank Elsinore-Temecula Elsinore-Julian Distance (Km) 7.1 7.3 33.3 39.2 39.7 Earthquake Magnitude (Mw) 6.9 6.9 7.4 6.8 7.1 Slip Rate (Mm/Yr) 1.50 1.50 3.00 5.00 5.00 D The primary geologic hazard affecting the project is that of ground shaking. Probabilistic site parameters developed using FRISKSP (Blake, 2000) indicate that there is a 10% probability that a site acceleration of 0.28g will be exceeded in a 50-year period. The ground acceleration corresponding to a 10% Probability of Exceedance in 100 years is Krieger & Stewart - Beech Ave. Sewer Project No. K183-010 - December 2008 Inland Foundation Engineering, Inc. u LJ n u U J LJ •i i LJ n fu H U LJ estimated to be 0.36g. The Modal Magnitude based upon a deaggregation analysis is 7.0. 2001 California Building Code Criteria: On the basis of Standard Penetration Testing (SPT), it is our opinion that the Soil Profile Type may be assumed to be SD over the project alignment for the purpose of developing seismic design criteria in accordance with the 2001 California Building Code. On the basis of the subsurface conditions and local fault characteristics, the California Building Code provides the following seismic design parameters: 16-1 16-J 16-Q 16-R 16-S 16-T 16-U Seismic Zone Factor Z Soil Profile Type Seismic Coefficient Ca Seismic Coefficient Cv Near Source Factor Na Near Source Factor Nv Seismic Source Type Recommended Valuep* •- -•" **&$&& "f *• **&m *• 0.4 SD 0.44 0.71 1.1 1.1 B 2007 California Building Code Criteria: Included for this study was an assessment of the seismic parameters of the subject site with respect to the 2007 California Building Code (CBC). The mapped spectral acceleration parameters, coefficients, and other related seismic parameters were determined by using the Java Ground Motion Parameter Calculator (U.S.G.S., 2007) and other sources. On these bases, the 2007 California Building Code provides the following seismic design parameters: VtfctCBC'-Qilfklg',"fW™M^"'i^ifft,.; i, ^ •* •& ,**,» t"-v ,_T»- Table 1613.5.2 Fig. 1613.5(3) Fig. 1613.5(4) 1613.5.3(1) 1613.5.3(1) Eq. 16-37 Eq. 16-38 Eq. 16-39 Eq. 16-40 1613.5.6 V-***, *, -f'''^? " ^I^ci^^w *• J L~>' ^Seii'micV^mtteK^;v:lv .* &#t fWt£&&3p _* f ' *"MiS». -£V **zM. &-vfrf* ,?#* t? **&*,»% Site Class Mapped Spectral Acceleration - Ss Mapped Spectral Acceleration - Si Site Coefficient - Fa Site Coefficient - Fv MCE Spectral Acceleration - SMS MCE Spectral Acceleration - SMI Design Spectral Acceleration - SDS Design Spectral Acceleration - SDi Seismic Design Category ^"Recommended 1 a ?•'« - "*4 '4- Value- -•x v^ %r *^«; ^-A- *"*** if3* * - D 1.338 0.504 1.0 1.5 1.338 0.756 0.892 0.504 D Krieger & Stewart - Beech Ave. Sewer Project No. Kl83-010 - December 2008 Inland Foundation Engineering, Inc. n U It should be noted that these provisions are intended to be the minimum design condition for structures and are often used as the maximum level to which structures are designed. The minimum code criteria are designed to allow occupants to safely n evacuate a structure after an earthquake. The structure may no longer be safe for (j inhabitants and may ultimately have to be demolished. n u IU U n u r~\ n J n U nJ n J Krieger & Stewart - Beech Ave. Sewer r~\ Project NO. K183-010-December 2008 10 Inland Foundation Engineering, Inc. J n J G nu n J SUBSURFACE CONDITIONS The results of our investigation indicate that the site may be characterized as being underlain by both predominately granular soils consisting of interbedded silty sands and sands. Larger particles consisting of cobbles or boulders were encountered within our exploratory boring B-01 at a depth of 26 feet. Due to the nature of the exploratory borings, it is not possible to estimate the size of particles in the cobble and boulder range. L U n u n u nu LJ u n J The granular materials were generally observed to be in a moderately dense to dense condition. In borings B-01 and B-02, cementation may be described as weak to moderate. In Boring B-03, some of the soils were described as being strongly cemented. Groundwater was encountered within one of our exploratory borings (B-03) at a depth of 25 feet. Apparent oxidation-reduction mottling was encountered within this boring at a depth of 24 feet. A generalized profile indicating the boring locations and ground- water levels relative to the sewerline and ground surface is presented below: CMO 40 30 20 « Station 5 ^^ ~— ,-gj- ^-^ ^ 1-- ;^n . I i E"a 1 ;|5!: U j:b llSteS .ill 9 " — — / Existing Surface n """is Exisitng Sewer — \ [ .. - — - — ^ ^j (• •> L"' _ -' "^^^ tT^- Groundwater ~~~^ ^Nr? 0*00 Station 5+00 Station 10+00 BEECH AVENUE Moisture contents of samples retrieved from our borings were variable, depending upon the soil type and the effects of groundwater. Moisture contents ranged from approximately three to twenty-four percent. Optimum Moisture Contents ranged from approximately 9 to 13 percent. U u n LJ nJ Relative Compactions within the upper 20 feet ranged from approximately 81 to 97 percent. The average Relative Compaction was observed to be approximately 94 percent with a statistical uncertainty of 5 percent. These were computed using maximum dry densities determined in accordance with ASTM D1557-07. This is useful in estimating volumetric shrinkage of soil that is excavated and reused as compacted backfill and in estimating the in-situ strength characteristics of the soil (E'). Krieger & Stewart - Beech Ave. Sewer Project No. KI83-OfO - December 2008 11 Inland Foundation Engineering, Inc. n d Consolidation testing indicated that most of the soil is normally- to slightly over- consolidated. The testing reveals slightly compressible soils. [) I—I u n U J n u Lj fl J o LJ ni LJ n u Sand Equivalent (SE) values ranged from 21 to 35. Analytical testing indicates sulfates concentrations are less than 0.001 percent. Chloride concentrations range from 70 to 140 parts per million. Saturated Resistivities ranged from 3,600 to 10,100 ohm-cm and pH values ranged from 7.4 to 8.4. A Corrosion Engineering study was not within the scope of services for this project. Krieger & Stewart - Beech Ave. Sewer Project No. Ki 83-010 - December 2008 1 2 Inland Foundation Engineering, Inc. LJ n U CONCLUSIONS AND RECOMMENDATIONSn On the basis of our exploration and testing, it is our opinion that the feasibility of the q proposed construction will be dependent upon the construction methods used. In LJ general, the soils are in a medium dense to dense condition, are weakly to strongly cemented and are expected to provide a stable environment for the pipeline construction using the proposed replacement technologies. Although the soil conditions may be suitable for a variety of construction techniques, the concrete <~\ encasement of the existing sewerline may present an obstacle to some of the proposed L-l methodologies such as pipe-bursting and micro-tunneling. G G G G G D G G G Caving was not encountered within our exploratory borings. However, hollow-stem augers were used to case the borings in a specific effort to prevent caving. The borings were backfilled with a Bentonite slurry placed through the augers as they were with- drawn in accordance with the requirements of the County of San Diego. Caving of open cuts appears to be likely within the sands encountered in Borings B-01 and B-02. Although the cementation of the soil encountered in Boring B-03 makes caving less likely, groundwater on the northeast portion of the project could trigger caving in that n, area. U r-i Groundwater was not encountered within the zone of anticipated pipeline excavation LJ during this study. Groundwater was encountered at a depth of approximately 25 feet (elevation of 22 feet above MSL) in Boring B-03 located near the eastern end of the propose pipeline alignment. The estimated cover depth at this location is about 19 feet. u The elevation at the tie-in at the east end of the alignment is approximately 19 feet MSL m which is approximately 3 feet below the groundwater level observed in Boring B-03 U located approximately 200 feet to the west. Groundwater should be expected within approximately 65 feet of the tie-in.n All work should be performed in accordance with the specifications of the City of Carlsbad. The following sections present more detailed recommendations and conclusions regarding excavatability, groundwater, trench wall stability, pipe bedding, embedment, compaction characteristics, lateral design, protection of existing utilities and trench backfill: 1. Excavatability: Soils along the alignment may be generally characterized as interbedded silty sands and sands in a medium dense to dense condition. Although some of these soils were strongly cemented, our subsurface exploration does not indicate that the materials encountered within the proposed pipeline depths will cause refusal to normal excavating equipment. The oversized particles encountered in Boring B-01 were deeper than the planned Krieger & Stewart - Beech Ave. Sewer Project No. Ki83-010 - December 2008 13 Inland Foundation Engineering, Inc. n J excavation at that boring location. However, variations in the profile could occur ^ and these materials may be encountered. Caving of clean sands that are weakly L cemented could influence the excavation process. i—\ (J 2. Groundwater: Groundwater was encountered within one of our exploratory borings (B-03) at a depth of 25 feet or elevation of 22 feet MSL. Apparent n oxidation-reduction mottling was encountered within this boring at a depth of 24 <-! feet. Groundwater conditions should be expected to fluctuate. The groundwater data in this report is representative of the conditions at the time of our J exploration and may not reflect the conditions during construction. Therefore, the local groundwater conditions should be assessed by the contractor prior to n the commencement of trenching in order to determine if groundwater will J adversely affect the construction process. Should groundwater be indicated within the planned excavation depths, dewatering should be achieved prior to the commencement of excavation. Monitoring wells should be installed to confirm that dewatering to a depth of at least five feet below the base of the planned n excavation is achieved prior to the commencement of the excavation process. J The groundwater levels should be maintained to at least five feet below the planned excavation depth until the backfilling is complete. The portions of the pipeline that could be affected by groundwater are estimated r to be minor unless the regional groundwater levels rise uniformly. Current data L indicates that groundwater is likely to be encountered in excavations made within approximately 65 feet of the tie-in at Station 10+64.10. Therefore, dewatering n prior to excavating is indicated. LJ n If groundwater occurs at the base of any excavation, we recommend that the u excavation process be discontinued to reduce the magnitude of base heave. The groundwater level should be lowered to at least five feet below the base of n the excavation before proceeding. If the excavation is not properly dewatered iJ and slight base heave occurs, it could result in post-construction settlement of the pipeline and manholes. G 3. Trench Wall Stability: All excavations should be configured in accordance with Cal/OSHA requirements. Our exploration and testing suggests that the soils may be classified as being Type C as described in the Excavation Standard of OSHA. This will not be applicable over any areas affected by saturated soils and/or J groundwater, which should be anticipated over portions of the pipeline alignment. The portions of the pipeline that could be affected by groundwater are estimated r-i to be minor unless the regional groundwater levels rise uniformly. Current data j indicates that groundwater is most to be encountered in excavations made within approximately 65 feet of the tie-in at Station 10+64.10. Krieger & Stewart - Beech Ave. Sewer Project No. K183-01 o - December 2008 14 Inland Foundation Engineering, Inc. LJ nu u 3 n d The classification of the soil and the shoring and/or slope configuration should be the responsibility of the contractor on the basis of the trench depth and the soil encountered. The contractor should have a "competent person" on-site for the purpose of assuring safety within and about all construction excavations. Temporary shoring may be designed to resist the earth pressure with the effects of hydrostatic pressures and surcharged loads superimposed. Cantilever shoring should be based upon a triangular pressure distribution using the active earth pressure. Shoring, which is braced, may be designed assuming a rectangular pressure distribution. The following diagrams illustrate these assumed pressure distributions: n J n u nu p=32H BRACED SHORING UNRESTRAINED SHORING u n U u 4. Pipe Bedding: Where bedding is necessary to bring the trench bottom up to grade, we recommend a minimum bedding thickness of 6 inches be placed to provide uniform and adequate longitudinal support under the pipe. The bedding material should not be compacted within 6 inches of the bottom of the pipe. Blocking should not be used to bring the pipe to grade. Bell holes at each joint should be provided to permit the joint to be assembled properly while maintaining uniform pipe support. nu nj n U Krieger & Stewart - Beech Ave. Sewer Project No. Kl83-010 - December 2008 15 Inland Foundation Engineering, Inc. n J n J L Haunch ;:^N>(/ Zone Embedment iiilli-»- (( / 'Zone Beddingcl(Uncompacted) p\ \ \r ^ ^^S^S&f^^f 5. Embedment: Processed native materials should provide suitable support for the pipe where cover thicknesses are greater than three feet. On-site soils may be classified silty sands and sands. A Lateral Modulus of Subgrade Reaction (E1) of 2,500 pounds per square inch may be assumed for the entire alignment. i~i U If designs are based upon the use of imported granular embedment materials, we recommend that a granular free-draining soil be used. The actual thickness should be determined by the pipeline engineer or manufacturer. We recommend "- that if imported granular embedment material is used, it have a minimum Sand i— I Equivalent (SE) of 30 and be free of particles greater than two inches in J diameter. '""] To provide protection from particle migration, imported pipe embedment material ^ should be in accordance with the following criteria. Di5 > 0.75mm and D5o < 7.5mm, n where DIS and DSQ represent bedding material particle sizes corresponding to U 15 and 50 percent passing by weight, respectively. If these criteria cannot be met, a filter fabric will be required. The most important factor affecting pipe performance and deflection is the n (launching material and its density. Material should be placed and consolidated vJ under the pipe haunch to provide adequate side support to the pipe while avoiding both vertical and lateral displacement of the pipe from proper alignment. n Where coarse material with voids is used for bedding, the same coarse material ^ should also be used for haunching with consideration given to native soil migration. Haunching is placed up to the pipe springline. Krieger & Stewart - Beech Ave. Sewer Project No. Ki83-0to - December 2008 16 Inland Foundation Engineering, Inc. U n u 6. Compaction Characteristics: In general, we anticipate that the soils that are "~1 excavated and replaced as controlled compacted backfill will respond to '—' mechanical compaction. Laboratory testing suggests that jetting may not be a (-, feasible alternative for achieving compaction. As the soils are placed, they j should be compacted in shallow lifts that are compatible with the strength of the pipe, the site conditions and the particular compaction methods used. This is the n responsibility of the contractor to determine. We estimate that the shrinkage of the native soils used in the backfill will be negligible but will vary along the (—I alignment. J 7. Lateral Design: On the basis of laboratory testing, we propose a lateral bearing ; capacity (Passive Earth Pressure) of 250 pounds per square foot per foot of depth below the lowest adjacent grade. This may be limited to 2,500 pounds per n square foot per foot of depth. This may be assumed to be applicable for J resisting jacking forces. 8. Unit Weight: For our recommendations, we have assumed a Unit Weight of 133 pounds per cubic foot for backfill compacted to an average of 93 percent at ^ near optimum moisture content. LJ rn 9. Protection of Existing Utilities and Storm Drains: Where the pipeline is ^ constructed beneath existing utility crossings and storm drains, care should be taken to assure adequate compaction of the backfill beneath the existing utilities. n If the existing utilities are rigid or encased in concrete, we recommend that the ^ backfill consist of compacted soil to a depth of not less than one foot beneath the n utility invert. The remaining backfill should consist of sand-cement slurry poured u around the existing utility line to assure adequate contact at the base. Protection of flexible pipes may also require the placement of sand-cement slurry.n ^ Protection of adjacent utilities will largely depend upon maintaining stable slopes. r-i Planned vertical excavations should be reviewed to verify that they would not {J remove lateral support from any adjacent flexible utilities. n 10. Recommended Specifications for Placement of Trench Backfill: Trench Excavation: Trenches shall be excavated according to the line and grade q as shown on the drawings. Unless otherwise specified, pipeline trenches shall U be excavated with the following clear distances: j • For pipe diameters up to 12-inches, the trench width shall provide 6 to 9- inches of clearance between the edge of the pipe and the wall of the trench. n 1— Krieger & Stewart - Beech Ave. Sewer Project No. KI83-010 - December 2008 11 Inland Foundation Engineering, Inc. Iu • For pipe diameters of over 12 inches, the trench width shall provide at least ^ 12-inches of clearance between the edge of the pipe and the wall of the trench. n i_j The sides of the trench shall be parallel to the pipe and shall maintain an equal distance from the pipe. If the excavation is carried to below the design grade, n the bottom of the excavation shall be refilled with approved material. Where soft or otherwise unstable materials are encountered, the excavation shall be carried r-i to a depth as determined to be necessary by the Engineer and stabilized with U gravel or other approved bedding material. I The excavations receiving backfill shall be free of trash, debris, or other unsuitable materials prior to the placement of backfill. ni J Pipe Zone Backfill: Except as otherwise required by the project specifications, contract drawings or manufacturer's recommendations, imported pipe zone backfill shall consist of clean, cohesionless soil having a Sand Equivalent of greater than 30 and fewer than 10% particles finer than the No. 200 Sieve. To n provide protection from particle migration, imported pipe zone material should ^J also be in accordance with the following criteria: Di5> 0.75mm and D5o < 7.5mm, ^ where Di5 and D50 represent bedding material particle sizes corresponding to *-> 15 and 50 percent passing by weight, respectively. If these criteria cannot be ,-, met, a filter fabric will be required. U This material shall be placed and compacted in a manner that will assure firm ^ continuous encasement for the pipe. This may consist of careful flooding or L-" jetting combined with vibratory compaction. Jetting should be implemented with r-\ care to avoid the accumulation of water in the pipe zone. The minimum Relative LJ Compaction within the pipe zone shall be 90 percent unless otherwise specified. The pipe zone backfill shall extend to 12 inches above the top of the pipe. n ^ Trench Backfill: Trench backfill material should be native or approved granular r~i materials which are free of organic and deleterious materials, rocks or lumps \J greater than 3 inches in greatest dimension and other unsuitable materials Trench backfill may be compacted at near optimum moisture content by r~ mechanical means as necessary for the achievement of satisfactory compaction. Unless otherwise specified by the drawings, specifications or encroachment permits, the minimum acceptable degree of compaction shall be 90 percent of Krieger & Stewart - Beech Ave. Sewer Project NO. Ki 83-010 -December 2008 18 Inland Foundation Engineering, Inc. LJ H the maximum dry density. This is with the exception of the upper 12 inches H within roadway areas which shall be compacted to a minimum of 95 percent "-1 Relative Compaction. n u Observations and Compaction Testing: During backfilling, continuous observations and compaction testing shall be conducted in order to verify r~| satisfactory compaction. The Maximum Dry Density-Optimum Moisture Content u relationship shall be determined by means of the ASTM Standard D1557-07 test r-i method. The field density shall be determined by either the ASTM Standard J D1556-07 or ASTM D6938-07b test method. The compaction shall be verified at maximum intervals of 250 feet for each 2-foot vertical lift or as otherwise H determined to be necessary by the District Inspector in the field during backfilling. Some backfill and compaction methodologies will dictate much n shorter test intervals. Compaction testing is required within the pipe zone backfill LJ unless gravel is specified and used as backfill material within that zone. Continuous observations should also be made during the placement of slurry ' around and beneath existing utilities. n Retests: Should testing reveal insufficient compaction, additional testing will be U necessary in order to define the area requiring recompaction. Without further testing, it will be assumed that the area between a failing test and a passing test I is not properly compacted. As a guideline for evaluation, one test may be taken at a distance from the failing test equal to 20 percent of the distance to the next ^ passing test. If the test reveals satisfactory compaction, the area between the L~J failing test and the passing test shall be recompacted. If the test reveals 0 inadequate compaction, the process should be repeated in order to delineate the J unsatisfactory area. After recompaction of "failing" areas, retesting should be conducted in order to confirm satisfactory compaction. At least one retest is n required for each failing test, even if failing tests are for the purpose of LJ delineating the area requiring additional work. G 3 1 1 . Pipe Bursting Alternative Considerations: If pipe bursting is considered as an alternative for this project, design and installation factors including ground conditions, groundwater conditions, degree of upsizing required, construction and depth of the existing pipeline, etc. should be considered. Typically, n somewhat less favorable soil conditions for pipe bursting involve densely u compacted soils and backfills, soils below the water table and dilatant soils (soils that expand in volume as they are sheared, e.g. angular sands. Each of these H soil conditions tends to increase the force required for the bursting operation and to increase the zone of influence of the ground movements (Simicevic & Sterling, n 2001). ' — u Krieger & Stewart - Beech Ave. Sewer Project No. K183-OW - December 2008 1 9 Inland Foundation Engineering, Inc. Very dense soils are present along the project alignment. In addition, seasonal n fluctuations of the groundwater levels could result in portions of the alignment being below the groundwater table. Perhaps the most significant factor for this n particular project may not be related to soil conditions. The existing pipeline is jj encased in concrete. Special equipment and methodologies are available to address concrete encasement. Therefore, a qualified and experienced n contractor should carefully evaluate these conditions to assess the feasibility and selection of appropriate pipe bursting system. n ij Utilities that interfere with or may be damaged by the burst should be located exposed prior to the burst. The contractor should take all care in protection of '~! existing utilities potentially affected by the pipe bursting operation.u n 12. Microtunneling Alternative: Another alternative under consideration is LJ microtunneling. This is a trenchless technique where pipe-jacking is combined with horizontal drilling or boring to directly install underground pipelines. Hydraulic jacks are used to push specially designed pipes through the ground at the same time the excavation is taking place. The only excavations that are n necessary for the installation are for jacking and receiving pits that may coincide t-J with manhole locations. These are typically retained using sheetpiling designed ,_ in accordance with the parameters provided in this report. If the alignment is to • be collinear with the existing sewer, the presence of existing manholes and concrete encased sewer line could be problematic. i—i <-> Conditions will vary along the pipeline alignment. The soils may be assumed to r-, have negligible adhesion but will impose frictional resistance. Our test data jj suggests a coefficient of friction of up to 0.65. n Our borings indicate soil conditions that are expected to be suitable for this "-J alternative. Seasonal fluctuations of the groundwater levels could result in ,-, portions of the alignment being below the groundwater table. Dewatering as i_i previously discussed in this report will be necessary. A qualified and experienced contractor should carefully evaluate the ground conditions, design n requirements and the site conditions to assess the overall feasibility and the selection of appropriate excavation methods and earth support systems. n u nu n u Krieger & Stewart - Beech Ave. Sewer Project NO. K183-OIO - December 2008 20 Inland Foundation Engineering, Inc. u GENERALn U G n U nu The findings and recommendations presented in this report are based upon an interpolation of the soil conditions between boring locations. Should conditions be encountered during construction that appears to be different than those indicated by this report, this office should be notified. At the request of Krieger & Stewart, Inc., the services provided for this project were n performed for the City of Carlsbad for their use in the design of the Beech Avenue iJ Sewer Project. This report may only be used for this purpose. The use of or reliance upon this report by parties other than Krieger & Stewart, Inc. and the City of Carlsbad or I for other purposes is not authorized without written permission by Inland Foundation Engineering, Inc. Inland Foundation Engineering, Inc. will not be liable for any projects n connected with the unauthorized use of this report. (J (-, The recommendations of this report are considered to be preliminary. The final design LJ parameters may only be determined or confirmed at the completion of project construction on the basis of observations made during the project construction '"I operation. To this extent, this report is not considered to be complete until the u completion of both the design process and project construction. p u . 'n U niu n u n U Krieger & Stewart - Beech Ave. Sewer ^ Project NO. KI 83~oio -December 2008 21 Inland Foundation Engineering, Inc. U nu REFERENCES L Blake, T.F. 1 989, EQSEARCH, A computer program for the estimation of peak horizontal acceleration from Southern California Historical Earthquake Catalog, Version 2.2 (1995). Blake, T.F. 1 989, EQFAULT, A computer program for the deterministic prediction of peak n horizontal acceleration from digitized California faults, Version 2.2 (1995). California Department of Conservation, California Geologic Survey, 2002, California M Geomorphic Provinces, Note 36. i— i City of Carlsbad Water Department, Verbal Communications with Joe Adams, Gary J Goodman, July 5, 2007. H Dudek & Assoc, 2003, Carlsbad Water and Sewer Master Plan, Program EIR.U n Hart, E.W., 1997, "Fault Rupture Hazard Zones in California," California Division of Mines J & Geology Special Publication 42. H Jennings, C.W., "Fault Activity Map of California and Adjacent Areas", 1994, CDMG, u Geologic Data Map No. 6. Krieger & Stewart, Inc., 2007, Preliminary Construction Plans. u r~\ U n U n U nj Pipe Jacking Association, "An introduction to pipe jacking and microtunneling design", ISBN 978-0-9525982-2-0. Simicevic, J, & Sterling, R.L., 2001 , "Guidelines for Pipe Bursting", prepared for Army Corp of Engineers, TTC Technical Report #2001 .02. Krieger & Stewart - Beech A ve. Sewer n Project No. Kl83-010 - December 2008 22 Inland Foundation Engineering, Inc. LJ LJ q APPENDIX A U FIELD EXPLORATION G 0 G G For our field investigation, 3 exploratory borings were excavated by means of a truck mounted rotary auger rig at the approximate locations shown on Figure A- 6. The rig utilized 8-inch diameter, hollow-stem augers. Continuous logs of the materials encountered were made on the site by a Soil Engineer. These are presented on Figures A-3 through A-5. Representative undisturbed samples were obtained within our borings by driving a thin-walled steel penetration sampler with successive 30-inch drops of a 140- q pound hammer. The sampler was lowered to the bottom of the boring through u the hollow-stem auger. The number of blows required to achieve each six inches of penetration were recorded on our boring logs and used for estimatingr~i the relative consistencies of the subsoils. The sampler type carried brass sample rings having diameters of 2.41 inches. Undisturbed samples were n removed from the sampler and placed in moisture sealed containers in order to u preserve the natural soil moisture content. The samples were then transported ^ to our laboratory for further observations and testing. LJ In accordance with the requirements of the County of San Diego, the borings 1-1 were backfilled using a bentonite slurry that was placed through the auger as the ^ augers were withdrawn. G nu G G nu Krieger A Stewart ~ Beech Ave. Sewer n Project No. Ki 83-010- December 2008 A-1 Inland Foundation Engineering, Inc. U UNIFIED SOIL CLASSIFICATION SYSTEM (ASTM D2487-06) PRIMARY DIVISIONS GROUP SYMBOLS SECONDARY DIVISIONS j n U n J G niU LJ U i CO —CO UJo -^^CO ^ CO 2 S> u.*s SiUJCOor §u tro CLEAN GRAVELS (LESS THAN) 5% FINES GW GP GRAVEL WITH FINES GM GC CLEAN SANDS (LESS THAN) 5% FINES SW SP SANDS WITH FINES SM SC WELL GRADED GRAVELS, GRAVEL-SAND MIXTURES, LITTLE OR NO FINES POORLY GRADED GRAVELS OR GRAVEL-SAND MIXTURES, LITTLE OR NO FINES SILTY GRAVELS, GRAVEL-SAND-SILT MIXTURES CLAYEY GRAVELS, GRAVEL-SAND-CLAY MIXTURES WELL GRADED SANDS, GRAVELLY SANDS. LITTLE OR NO FINES POORLY GRADED SANDS OR GRAVELLY SANDS, LITTLE OR NO FINES SILTY SANDS, SAND-SILT MIXTURES CLAYEY SANDS, SAND-CLAY MIXTURES CO CO CO ft_l UJ § si z §! 1 f UJorO if ML INORGANIC SILTS, VERY FINE SANDS, ROCK FLOUR, SILTY OR CLAYEY FINE SANDS CL INORGANIC CLAYS OF LOW TO MEDIUM PLASTICITY, GRAVELLY CLAYS, SANDY CLAYS, SILTY CLAYS, LEAN CLAYS OL ORGANIC SILTS AND ORGANIC SILT-CLAYS OF LOW PLASTICITY Q 5S2j2S•d <->CO to: !£S e MH INORGANIC SILTS, MICACEOUS OR DIATOMACEOUS FINE SANDS OR SILTS, ELASTIC SILTS CH INORGANIC CLAYS OF HIGH PLASTICITY, FAT CLAYS OH ORGANIC CLAYS OF MEDIUM TO HIGH PLASTICITY, ORGANIC SILTS HIGHLY ORGAN 1C SOILS PT PEAT. MUCK AND OTHER HIGHLY ORGANIC SOILS LJ nj n u J SANDSTONES SS >- CO< _J O Ul CL SILTSTONES SH X X X X X X CLAYSTONES CS LIMESTONES LS SHALE SL CONSISTENCY CRITERIA BASES ON FIELD TESTS U n J u RELATIVE DENSITY - COARSE - GRAIN SOIL RELATIVE DENSITY VERY LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE SPT* (# BLOWS/FT) <4 4-10 10-30 30-50 >50 RELATIVE DENSITY (%) 0-15 15-35 35-65 65-85 85-100 MOISTURE CONTENT CONSISTENCY - FINE-GRAIN SOIL CONSISTENCY Very Soft Soft Medium Stiff Stiff Very Stiff Hard SPT (# BLOWS/FT) <2 2-4 4-8 8-15 15-30 >30 TORVANE UNDRAINED SHEAR STRENGTH (tsf) <0.13 0.13-0.25 0.25-0.5 0.5-1.0 1.0-2.0 >2.0 POCKET " PENETROMETER UNCONFINED COMPRESSIVE STRENGTH (tsf) <025 0.25-0.5 0.5-1.0 1.0-2.0 2.0-4.0 >4.0 CEMENTATION • NUMBER OF BLOWS OF 140 POUND HAMMER FALLING 30 INCHES TO DRIVE A 2 INCH O.D. (1 3/8 INCH I.D.) SPLIT BARREL SAMPLER (ASTM -1586 STANDARD PENETRATION TEST) " UNCONFINED COMPRESSIVE STRENGTH IN TONS/SQ.FT. READ FROM POCKET PENETROMETER DESCRIPTION DRY MOIST WET FIELD TEST Absence of moisture, dusty, dry to the touch Damp but no visible water Visible free water, usually soil is below water table DESCRIPTION Weakly Moderately Strongly FIELD TEST Crumbled or breaks with handling or slight finger pressure Crumbles or breaks with considerable finger pressure Will not crumble or break wilh finger pressure EXPLANATION OF LOGS Figure A-2 <—I U r~\ U H u Elevation: Drilling Method: Drilling Rig: Boring Diameter: LOG OF BORING B-01 46.0 Date(s) Drilled: 5/22/07 Logged by: Hammer Type: Sta. 10+95 Hammer Weight: Hammer Drop: FWC Rotary Auger Auto-Trip CME-55 140lb. 8-inches 30-inches , . £. aUJa - 5 - - 10 - - 15 - - 20 - - 25 - 0. C3 V- == '••• ^ & *.:-^ -•> :' 4^. • • (OO(O3 SM SM SM SW SM IfIBBMU SUMMARY OF SUBSURFACE CONDITIONS This summary applies only at the location of the boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered and is representative of interpretations made during drilling. Contrasting data derived from laboratory analysis may not be reflected in these representations. AASPHALT CONCRETE (3.5 inches) r~ SILTY SAND. fine to medium grained, dark red brown, moist. medium dense. TERRACE DEPOSITS (PARALIC) - SILTY SAND. fine to medium grained, dark red brown. moist, medium dense. . - SAND with SILT. fine to coarse grained, red brown, moist. dense, moderately cemented. - . SILTY SAND, fine to verv coarse drained, arav brown. slightly moist, dense, poorly cemented. BOULDERS and COBBLES in SAND MATRIXfine to coarse grained, brown, slightly moist, medium dense to End of boring at 28.25 feet. No groundwater or mottling encountered. Boring backfill with bentonite (full depth). SAMPLES T s ^\\a a> UJa.£ aQ_ <<a •B •JXBssT XBss ^ulXBss[| XBss • •XBss-*B 1xflss1EBss1n"ss~ _ § m 5 8 11 21 25 34 33 50 21 26 21 29 33 50/4" N R £ UJ 1-n 3 10 7 7 5 5 3 3 t. oS 111 116 110 109 105 108 107 „ o uj i- ^ ui OKU •yya* Geotechnical Exploration Figure No AfL INLAND FOUNDATION ENGINEERING, INC. ca^ba^cA 1 • l^ Project No. K183-010 A-3 U H U n u Elevation: Drilling Method: Drilling Rig: Boring Diameter: 54.0 LOG OF BORING B-02 Date(s) Drilled: 5/22/07 Logged by:FWC Rotary Auger CME-55 8-inches Sta. 14+75 Hammer Type: Hammer Weight: Hammer Drop: Auto-Trip 140 Ib. 30-inches srt-£ UlQ • - 5 -:•; - 10 -: - 15 -:: - 20 - - 25 -:• - 30 - . - 35 -• yXa. 5 Oin COUco3 SM SM SM SUMMARY OF SUBSURFACE CONDITIONS This summary applies only at the location of the boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered and is representative of interpretations made during drilling. Contrasting data derived from laboratory analysis may not be reflected in these representations. AASPHALT CONCRETE (3.5 inches) r~ SILTY SAND. fine to medium grained, dark red brown, moist, loose to medium dense. TERRACE DEPOSITS (PARALIC) - SILTY SAND. fine to medium grained, red brown, moist, medium dense to dense. _ SILTY SAND, fine to medium grained . red brown to qrav J brown, moist, medium dense to very dense, slightly to moderately cemented. _ - sand layers throughout - 1 __ End of boring at 36.33 feet. No groundwater or mottling encountered. Boring backfilled with cement-bentonite slurry (full depth). SAMPLES j HI HIo. s1 n.S | £S§ < uj £* i 5 3 <am co • •r-^MVJ SS i1 VM SSTH 1 JXHss 1 Jss 11 xH ss> 11 xH ss 1 1 xH ss .s 33m 18 20 19 31 21 36 33 45 28 50 40 50/5" 33 50/4" g UJDC CO §~ 7 6 2 6 3 4 4 ^*z it?Q S 121 111 106 118 109 105 102 z ujf- b a. u Oecu •|H^III« Geotechnical Exploration Figure NO JffL INLAND FOUNDATION ENGINEERING, INC. JJ^^'cA 1 • I Project No. K183-010 A-4 n cJ H J J n u Elevation: Drilling Method: Drilling Rig: Boring Diameter: LOG OF BORING B-03 47.0 Date(s) Drilled: 5/22/07 Logged by:FWC Rotary Auger CME-55 8-inches Sta. 18+50 Hammer Type: Hammer Weight: Hammer Drop: Auto-Trip 140 Ib. 30-inches £?• 1 it\ a. co\ < I OUJ IK 03 baw -:}y; - 5 - - 10 - - 15 - - 20 - - 25 - SM SM SM SUMMARY OF SUBSURFACE CONDITIONS This summary applies only at the location of the boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered and is representative of interpretations made during drilling. Contrasting data derived from laboratory analysis may not be reflected in these representations. ASPHALT CONCRETE over AGGREGATE BASE(4 inches "\over 8 inches) f~ SILTY SAND.fine to medium grained, dark red brown, slightly moist, dense. TERRACE DEPOSITS ( PARALIC1 - CEMENTED SILTY SAND.fine to medium arained. qrav brown, slightly moist, dense. 2 - mottled gray brown - SILTY SAND, fine to medium grained, blue gray, wet, dense, slightly to moderately cemented. SILTY SAND.fine to coarse grained with clay, light gray, wet to very moist, dense. End of boring at 32.5 feet. Perched groundwater encuntered at 25 feet. Mottling encountered at 24 feet. Boring backfilled with cement-bentonite slurry (full depth). SAMPLES Ij 3 uio- ^s %31 i ^a CD 5? UlI Ul a. 2 <n SSu" ••I XBSS •1 EBss1J EBss II XBss •1M><Bss 1r s oo•^J-^J ^%3 CO 24 50/5" 26 41 44 50/5" 29 50/5" 33 47 19 50 50 £ulC£ to 0s 4 5 7 7 14 24 1°r £ 1 1^ 0 i' Q, 33 1?1 118 115 107 99 104 ^ f1 "•"IP™ Geotechnical Exploration JUT- INLAND FOUNDATION ENGINEERING, INC. ^Trl"I I 1^ cansbad, CA 1 ' • Project No. K1 83-010 )O ' g i > o 5^ So0:0 Figure No. A-5 D D D D D D D D .0 u D D D D D D D D D SITE PLAN City of Carlsbad Beech Avenue Sewer Project Carlsbad, California - .-,r ..,. y?,i fi--t-i=i^.^---^-^i-J-:p GRAPHIC SCALE 50 100 200 1INCH=100FT 400 LEGEND -$- = Approximate Location of Boring INLAND FOUNDATION ENGINEERING, INC. 1310 South Santa Fe Avenue San Jacinto, California (951)654-1555 FAX (951) 654-0551 DRAWN BY: SMG SCALE: r-1001 JOB NO.: K183-010 DATE: 07-09-07 [FIGURE u p u n APPENDIX B U LABORATORY TESTING Representative bulk soil samples were obtained in the field and returned to our n laboratory for additional observations and testing. Laboratory testing was U generally performed in two phases. The first phase consisted of testing in order ^ • to determine the compaction of the existing natural soil and the general jj engineering classifications of the soils across the site. This testing was per- formed in order to estimate the engineering characteristics of the soil and to H serve as a basis for selecting samples for the second phase of testing. The Li second phase consisted of soil mechanics and analytical testing. This testing n included direct shear testing and testing to estimate the concentration of water- jj soluble sulfate. These tests were performed in order to provide a means of developing specific design recommendations based on the strength H characteristics of the soil.u r-, CLASSIFICATION AND COMPACTION TESTING Unit Weight and Moisture Content Determinations: Each undisturbed sample I was weighed and measured in order to determine its unit weight. A small portion of each sample was then subjected to testing in order to determine its moisture n content. This testing was performed in accordance with the ASTM Standards U D2937-04 and D2216-05. This was used in order to determine the dry density of the soil in its natural condition. The results of these tests are shown on thenBoring Logs (Figures A-3 through A-5). <~> Maximum Density-Optimum Moisture Determinations: Representative soiltLJ types were selected for maximum density determinations. This testing was performed in accordance with the ASTM Standard D1557-07 test method A. • The results of these tests are presented graphically on Figures B-4. The maximum densities are compared to the field densities of the soil in order to r] determine the existing relative compaction to the soil. U ,—, Classification Testing: Three soil samples were selected for classification u testing. This testing consists of mechanical grain size analyses, and, Atterberg Limits determinations. This testing was performed in accordance with the ASTM n Standards 0422-63(2002) and D4318-05. Sand Equivalent Testing was also ^ conducted on selected samples. These provide information for developing r-i classifications for the soil in accordance with the Unified Classification System. U Krieger & Stewart - Beech Ave. Sewer n Project No. Ki83-010 - December 2008 B-1 Inland Foundation Engineering, Inc. U LJ _ This classification system categorizes the soil into groups having similar engineering characteristics. The results of these tests are very useful in detecting variations in the soils and in selecting samples for further testing. The r] results of these tests are presented on Figures B-5. U , -, SOIL MECHANIC'S TESTING LJ Direct Shear Testing: One sample was selected for Direct Shear Testing. This H testing measures the shear strength of the soil under various normal pressures ^ and is used in developing parameters for foundation design and lateral design. n Testing was performed using recompacted test specimens, which were saturated LJ prior to testing. Testing was performed using a strain controlled test apparatus with normal pressures ranging from 934 to 2230 pounds per square foot. The results of these tests are shown on Figure B-6. LJ n Consolidation Testing: Two samples were selected for consolidation testing. LJ This testing was performed in accordance with the ASTM Standard D2435-04. For this test, relatively undisturbed samples were selected and carefully trimmed into a one inch thick by 2.41-inch diameter consolidometer. The consolidometerLJ .was moisture sealed in order to preserve the natural moisture content during the initial stages of testing. Loads ranging up to 22,666.1 pounds per square foot were applied progressively with the rate of settlement declining to a value of ^ 0.0002 inches per hour prior to the application of each subsequent load. At a preselected load, water was introduced into the consolidometer in order to observe the potential for saturation collapse. The results of this testing are <~| presented graphically on Figures B-7 and B-8, U J o LJ r~i U LJ ni _J Krieger & Stewart - Beech Ave. Sewer Project No. KI83-010 - December 2008 B-2 Inland Foundation Engineering, Inc. u I—1 u n U nu G n J u n U n1 ;u n u u c nLJ iu r-\ LJ I—I LJ U ANALYTICAL TESTING Five samples were selected to determine the concentration of soluble sulfates, chlorides, pH level, and resistivity of and within the on-site soils. The following table presents the results of this testing: Sample Location B-01 B-02 B-03 Sample Depth (ft.) 2.5-8.5 10.5-36.33 3.5-26.0 Water-Soluble Sulfates (%) <0.001 <0.001 <0.001 Chlorides (ppm) 70 120 140 Minimum Resistivity (ohm-cm) 10,100 3,600 5,900 pH 7.4 8.4 8.1 GENERAL All laboratory testing has been conducted in conformance with the applicable ASTM test methods by personnel trained and supervised in conformance with our QA/QC policy. Our test data only relates to the specific soils tested. Soil conditions typically vary and any significant variations should be reported to our laboratory for review and possible testing. The data presented in this report are for the use of Krieger & Stewart, Inc. and the City of Carlsbad, and may not be reproduced or used by others without written approval of Inland Foundation Engineering, Inc. •—i U Krieger & Stewart — Beech Ave. Sewer Project No. K183-OIO - December 2008 B-3 Inland Foundation Engineering, Inc. 160 155 150 145 140 135 130 u. 8 125 fc 55 111 ° 120 OLQ 115 110 105 100 ( \\\\\\\\\ \\\\ \\\\\\\\\\\ >.y^N//s ,t^mr^ \ \\ \ \< \ \ x \ \\ \\ \ . \ xV \ v \ \ sx\\\\• ^•-^™^ "xm U \ \ \\\ \ \\ \ \\ tt \ \\ \ \ \\ \ \ \ \ \ 1 1 5 10 15 20 25 30 ' MOISTURE CONTENT, % Specimen Identification Classification Max.Density MC% • B-01 2.5 SILTYSANDSM 125.0 10.0 H B-02 10.5 POORLY GRADED SAND SP 113.5 13.0 A B-03 3.5 SILTYSANDSM 132.5 9.0 PROJECT Geotechnical Exploration PROJECT NO. K1 83-010 Beech Street DATE November 14, 2007 MAXIMUM DENSITY-OPTIMUM MOISTURE CURVES Inland Foundation Engineering, Inc L. FIGURE NO. B-4 . '—I I ' LJ 1( c « p E. R E N T( F I N E R B Y W E I G H T U.S. SIEVE OPENING IN INCHES 6 4 3 2 1.5 1 3/4 1/2 378 )0 in }f\ TO 50 50 40 30 20 10 0 I 1 1 ' 3 U.S. SIEVE NUMBERS HYDROMETER L 6 8_° 141620 30 40 50 70100140200 1 I1 "**" Vi t i IJ*: 1 n\ 1 :\ \ \ \\ \ \ 1 1 \ \\v\ Y"•- \V 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS COBBLES GRAVEL coarse Specimen Identification •OB A B-01 2.5 B-02 10.5 B-03 3.5 Specimen Identification • I A B-01 2.5 B-02 10.5 B-03 3.5 fine SAND coarse medium | fine Classification S. SILTY SAND SM POORLY GRADED SAND SP SILTY SAND SM 01 00 4.75 4.75 9.50 D60 0.31 0.47 0.29 D30 0.168 0.249 0.142 D10 %< 0.1585 PROJECT Geotechnical Exploration Beech Street SILT OR CLAY G. LL NP 22 NP 3ravel 0.0 0.0 0.0 PL NP 22 NP %Sand 81.8 95.5 78.1 PI NP NP NP Cc 0.83 %Silt Cu 3.0 %Clay 17.8 4.5 21.9 PROJECT NO. K183-010 DATE November 14, 2007 GRADATION CURVES Inland Foundation Engineering, Inc L. FIGURE NO. B-5 . 2.0 S H E A R S T R E N G T H k sf 1.5 1.0 0.5 0.0 0.0 0.5 1.0 1.5 NORMAL PRESSURE, ksf 2.0 Specimen Identification Classification Phi Cohesion DD MC% B-01 2.5 SILTY SAND SM 33 0.134 113 19 PROJECT Geotechnical Exploration Beech Street PROJECT NO. K183-010 DATE November 14, 2007 SHEAR TEST DIAGRAM Inland Foundation Engineering, Inc FIGURE NO. B-6 0 1 2 3 4 S T R A 5I ° N % 6 7 8 9 10 1 i DO «, \ ( \ \ 9( \ m~ \ \ - ^, ^S '^-^ \ -^-^ v \ -~-^ x •^, \\ •^. \ -— , \ -^ ^ 1,000 10,000 10s STRESS, psf Specimen Identification • PROJECT B-01 18.5 Classification SILTY SAND SM Geotechnical Exploration Beech Street DD 105 MC% i> / PROJECT NO. K183-010 DATE November 14, 2007 CONSOLIDATION TEST Inland Foundation Engineering, Inc FIGURE NO. B-7 . LJ 0 1 2 3 4 S T R; 5 N % 6 7 8 9 101( "1 )0 +:"\ • ^i k i. S *H \ •* V\ •^-_^^-—- \ -^• — . \ — . \ »-~ y \ — - \ -», \ -*, \ -\ *. 1,000 10,000 10° STRESS, psf Specimen Identification • PROJECT L^ B-03 22.5 Classification SILTY SAND SM Geotechnical Exploration Beech Street DD 99 MC% 4 PROJECT NO. K183-010 DATE November 14, 2007 CONSOLIDATION TEST inland Foundation Engineering, Inc FIGURE NO. B-8 j I—I oore Geotechnical and Environmental Sciences Consultants r~L c E L GEOTECHNICAL EVALUATION HOME PLANT LIFT STATION SEWER PIPELINE REPLACEMENT CARLSBAD, CALIFORNIA PREPARED FOR: Boyle Engineering 7807 Convoy Court, Suite 200 San Diego, California 92111 L r L PREPARED BY: Ninyo & Moore Geotechnical and Environmental Sciences Consultants 5710RuffmRoad San Diego, California 92123 c March 5, 2008 (Revised December 8, 2008) Project No. 106275001 •* A 5710RuffinRoad • San Diego, California 92123 • Phone (858) 576-1000 • Fax (858) 576-9600 San Diego • Irvine • Rancho Cucamonga • Los Angeles • Oakland • Las Vegas • Phoenix • Denver • El Paso • Tucson E March 5, 2008 (Revised December 8,2008) Project No. 106275001 pI E C c C P L I C E E E Mr. Roman Obzejta Boyle Engineering 7807 Convoy Court, Suite 200 San Diego, California 92111 Subject: Geotechnical Evaluation Home Plant Lift Station Sewer Pipeline Replacement Carlsbad, California Dear Mr. Obzejta: In accordance with your authorization, we have performed a geotechnical evaluation for the Home Plant Lift Station Sewer Pipeline Replacement project located in the city of Carlsbad, California. This report presents our geotechnical findings, conclusions, and recommendations regarding the proposed project. Our report was prepared in accordance with our proposal dated October 24,2007. We appreciate the opportunity to be of service on this project. Sincerely, NINYO & MOORE Andres Bernal, G.E. Senior Project Engineer Ronald D. Hallum, C.E.G Senior Geologist Gregory T. Farrand, C.E.G. Principal Geologist MJB/RDH/ABS/GTF/ek Distribution: (5) Addressee 5710 Ruffin Road • San Diego, California 92123 • Phone (858) 576-1000 • Fax (858) 576-9600 San Diego • Irvine • Rancho Cucamonga • Los Angeles • Oakland • Las Vegas • Phoenix • Denver • E! Paso • Tucson Sewer Pipeline Replacement Revised December 8,2008 Carlsbad, California Project No. 106275001 f TABLE OF CONTENTS Page C 1. INTRODUCTION 1 2. SCOPE OF SERVICES 1 3. PROJECT AND SITE DESCRIPTION 2 4. SUBSURFACE EXPLORATION AND LABORATORY TESTING 2 5. GEOLOGY AND SUBSURFACE CONDITIONS 3 5.1. Regional Geologic Setting 3 5.2. Site Geology 4 5.2.1. Fill(Qaf) 4 5.2.2. Topsoil/Colluvium (Col) 4 5.2.3. Terrace Deposits (Qt) 4 5.3. Groundwater 5 5.4. Landsliding 5 6. FAULTING AND SEISMICITY 5 6.1. Ground Rupture 6 6.2. Ground Shaking 6 6.3. Liquefaction 6 7. CONCLUSIONS 7 8. RECOMMENDATIONS 7 8.1. Excavation Characteristics 8 8.2. Shoring 8 8.3. Excavation Bottom Stability 9 8.4. Construction Dewatering 10 8.5. Microtunneling and Pipe Jacking 10 8.6. Lateral Pressures for Thrust Blocks 11 8.7. Modulus of Soil Reaction 11 8.8. Pipe Bedding 12 8.9. Trench Backfill 12 li m 8.10. Fill Placement and Compaction 13 I I 8.11. Corrosion 14 8.12. Concrete 14 8.13. Pre-Construction Conference 15 8.14. Construction Observation 15 9. LIMITATIONS 15 10. REFERENCES 17 I06Z7S001R Boyle HOIIK Plain Rev doc Sewer Pipeline Replacement Revised December 8,2008 Carlsbad, California Project No. 106275001 £ Figures • Figure 1 - Site Location Map Figure 2 - Boring Location Map { Figure 3 - Fault Location Map ™ Figure 4 - Lateral Earth Pressures for Braced Excavation Figure 5 - Thrust Block Lateral Earth Pressure Diagram T^Lm Appendices Appendix A - Boring Logs i Appendix B - Laboratory Testing ** Appendix C - Typical Earthwork Guidelines b p 106275001 R Boyle Home Ptonl Rev doc c i c c r L c Sewer Pipeline Replacement Revised December 8,2008 Carlsbad, California Project No. 106275001 1. INTRODUCTION In accordance with your request and our proposal dated October 24, 2007, we have performed a geotechnical evaluation for the Home Plant Lift Station Sewer Pipeline Replacement project lo- cated in Carlsbad, California (Figure 1). The purpose of this study was to evaluate the geotechnical conditions at the site and provide geotechnical design and construction recommen- dations for the proposed improvements. This report presents our geotechnical findings, conclusions, and recommendations regarding the proposed projects. This document is intended to be used only in its entirety. No portion of the document, by itself, is designed to completely represent any aspect of the project described herein. Ninyo & Moore should be contacted if the reader requires additional information or has questions regarding the content, interpretations presented, or completeness of this document. 2. SCOPE OF SERVICES The scope of services for this study included the following: • Reviewing background information including available geotechnical reports, geologic maps, and topographic maps. • Performing a geologic reconnaissance of the site. • Visiting the site to mark the boring locations and coordinating with Underground Service Alert for utility clearance. • Coordinating with the North County Transit District (NCTD) to obtain encroachment per- mits and access to their property for subsurface exploration. • Drilling, logging, and sampling of two exploratory borings with a truck-mounted drilling rig equipped with 8-inch diameter hollow-stem augers. Borings were advanced to depths of up to approximately \9l/i feet below the existing ground surface. • Collecting bulk and relatively undisturbed samples of the soils encountered during the per- formance of the exploratory borings. Samples were then transported to our in-house geotechnical laboratory for testing. • Performing geotechnical laboratory testing on selected samples. Laboratory testing included in-situ moisture content and dry density, grain-size analysis, percentage of particles passing ™ 106275001 R Boyle Home Plant Rev doc L ii Sewer Pipeline Replacement Revised December 8,2008 Carlsbad, California Project No. 106275001r the No. 200 sieve, Atterberg limits, shear strength, and soil corrosivity (pH, resistivity, chlo- ride content, and sulfate content). • Compiling and analyzing the data obtained. • Preparing this geotechnical report for preliminary design of the proposed improvements. : I" 3. PROJECT AND SITE DESCRIPTION to We understand the Home Plant Lift Station Sewer project will consist of replacement of an ap- I* proximately 175 foot long section of an existing 15-inch ductile iron pipe. We understand the H existing pipeline is distressed, with significant deposits, sagging, and an observed break P (Krieger & Stewart, 2007). The new sewer will be constructed, largely utilizing trenchless con- struction methods (e.g., jack-and-bore, microtunneling, etc.), parallel to the existing 15-inch £ sewer. The proposed pipeline will extend from a new manhole to be located southwest of the pump station, beneath the roadway to a new manhole on the east side of Carlsbad Boulevard. We , understand the existing sewer invert is less than 20 feet in depth, with approximate invert eleva- tions between 13 and 17 feet above mean sea level (MSL). IP " The project site is located adjacent to and south of the existing Home Plant Lift Station in north- *• ern Carlsbad. The existing lift station is located at 2359 Carlsbad Boulevard, on the western side *• of Carlsbad Boulevard and north of the NCTD railroad tracks. Carlsbad Boulevard in this area is ^ located atop a fill embankment north of an overpass for the NCTD tracks. The area of the new *i manhole east of Carlsbad Boulevard, at the base of the 8 to 15 foot high road embankment, is •• relatively level and is currently occupied by a cul-de-sac off of State Street, and a storage and maintenance yard owned by NCTD. Surface elevations along the project alignment range from IP" approximately 25 to 40 feet above MSL. 4. SUBSURFACE EXPLORATION AND LABORATORY TESTING Our subsurface exploration was conducted on January 24, 2008 and consisted of the excavation, logging, and sampling of two exploratory borings. The borings were drilled with a truck-mounted drill rig with an 8-inch diameter continuous-flight, hollow-stem auger. The I0627SOOI R Boyle Home Plan) Rev.doc Sewer Pipeline Replacement Revised December 8,2008 Carlsbad, California Project No. 106275001 f* borings were drilled to depths of up to approximately 191A feet below the existing ground sur- face. The purpose of the exploratory borings was to observe and sample the underlying earth P materials. Relatively undisturbed and bulk samples were obtained from the borings at selected intervals. The approximate locations of the borings are shown on Figure 2 and the corresponding 't. logs are presented in Appendix A. Borings were backfilled with bentonite and capped with soil. fit Laboratory testing of samples obtained during our subsurface exploration included an evaluation * of in-situ moisture content and dry density, grain-size analysis, percentage passing the IF No. 200 sieve, Atterberg limits, shear strength, and soil corrosivity (pH, resistivity, chloride con- tent, and sulfate content). The laboratory tests were performed at our in-house geotechnical |P laboratory. The results of the in-situ moisture content and dry density tests are shown at the cor- Ib responding sample depths on the boring logs in Appendix A. The results of the other laboratory *" tests performed are presented in Appendix B. It m 5. GEOLOGY AND SUBSURFACE CONDITIONS Our findings regarding regional and local geology, including faulting and seismicity, landslides, ex- it cavatability, and groundwater conditions at the subject site are provided in the following sections. F> i *• 5.1. Regional Geologic Setting pi The project area is situated in the coastal foothill section of the Peninsular Ranges Geomor- «• phic Province. This geomorphic province encompasses an area that extends approximately »• 900 miles from the Transverse Ranges and the Los Angeles Basin south to the southern tip • of Baja California (Norris and Webb, 1990). The province varies in width from approxi- JP mately 30 to 100 miles. In general, the province consists of rugged mountains underlain by * Jurassic metavolcanic and metasedimentary rocks, and Cretaceous igneous rocks of the southern California batholith.c c The Peninsular Ranges Province is traversed by a group of sub-parallel faults and fault zones trending roughly northwest. Several of these faults are considered active faults. The Elsinore, San Jacinto and San Andreas faults are active fault systems located northeast of the ,06275001 R Bo* Home PUM Rev d« IM Sewer Pipeline Replacement Revised December 8,2008 Carlsbad, California Project No. 106275001 • II Id |g * project area and the Agua Blanca-Coronado Bank, San Clemente, Newport-Inglewood, and Rose Canyon faults are active faults located west of the project area. Major tectonic activity r associated with these and other faults within this regional tectonic framework consists primar- ily of right-lateral, strike-slip movement. Further discussion of faulting relative to the site is r provided in the Faulting and Seismicity section of this report. 5.2. Site Geology Geologic units encountered during our subsurface evaluation include fill materials, top- soil/colluvium and terrace deposits. Generalized descriptions of the earth units encountered during our subsurface exploration are provided in the subsequent sections. More detailed de- scriptions are provided on the boring logs in Appendix A. 5.2.1. Fill (Qaf) Fill material was encountered in exploratory borings B-l and B-2 to depths of approxi- mately 4Yi feet and 7 feet below the existing ground surface (bgs), respectively. As encountered, the fill material generally consisted of dark brown to gray brown, damp to moist, soft, sandy clay and medium dense, clayey and silty sand with trace (less than 5 percent) gravel, cobbles, and small (less than 2 inches in diameter) pieces of asphalt. 5.2.2. Topsoil/Colluvium (Col) Topsoil/coUuvium was encountered in exploratory borings B-l and B-2 underlying the fill materials to depths of approximately 11 feet and 9 feet bgs, respectively. As encountered, this material generally consisted of dark brown, damp to moist, very stiff to hard, sandy clay. 5.2.3. Terrace Deposits (Qt) Quaternary-aged terrace deposits (Tan and Kennedy, 1996) were encountered in ex- ploratory borings B-l and B-2 underlying topsoil/colluvium and extending to the total depths explored. Recently these deposits have been remapped as Old Paralic Deposits (Kennedy and Tan, 2005). As encountered, the deposits generally consisted of light gray 106275001 R Boyle Home Pl.m Rev doc c E c Sewer Pipeline Replacement Revised December 8,2008 Carlsbad, California Project No. 106275001 brown and light reddish brown, damp to moist, dense to very dense, silty fine to me- dium sand, with trace (less than 5 percent) coarse sand and clay. 5.3. Groundwater Groundwater was not encountered in our exploratory borings. Groundwater levels may fluc- tuate due to seasonal variations, irrigation, and other factors or be present as perched groundwater or seepage in some areas. Due to these potential factors, groundwater may be encountered during construction. 5.4. Landsliding Based on our review of the original geotechnical evaluation for the site, other published geo- logic literature, and aerial photographs and our subsurface evaluation, no landslides or related features underlie or are adjacent to the subject site. 6. FAULTING AND SEISMICITY L Based on our review of referenced geologic maps and stereoscopic aerial photographs, active or potentially active faults (i.e., faults that exhibit evidence of ground displacement in the last f*^ 11,000 years and 2,000,000 years, respectively) have not been mapped in the site vicinity. The closest known active fault is the offshore portion of the Rose Canyon fault zone, which is capa- j^ ble of generating an earthquake of magnitude of 7.2 (United States Geological Survey [USGSJ/California Geological Survey [CGS], 2002), located approximately 4 miles west ^jfc of the site (Treiman, 1993). IP The principal seismic hazard considerations at the site are surface ground rupture, ground shak- ing and seismically induced liquefaction. A brief description of the hazards and the potential for their occurrence on site is presented below. 106275001 R Boyle Home Plan. Rev doc Sewer Pipeline Replacement Revised December 8,2008 Carlsbad, California Project No. 106275001 6.1. Ground Rupture The probability of damage from surface ground rupture is low due to the lack of known ac- tive faults underlying the subject site or its vicinity. Surface ground cracking related to shaking from distant events is not considered a significant hazard, although it is a possibility. 6.2. Ground Shaking Based on a Probabilistic Seismic Hazard Assessment for the Western United States, issued by the USGS/CGS (2002), the project site is located in a zone where the horizontal peak ground acceleration having a 10 percent probability of exceedance in 50 years is 0.30g (30 percent of the acceleration of gravity) with an estimated vertical peak ground accelera- tion of 0.20g. The requirements of the governing jurisdictions and the 2007 California Building Code (CBC) should be considered in the project design. 6.3. Liquefaction Liquefaction is the phenomenon in which loosely deposited, saturated granular soils (located below the water table) with clay contents (particles less than 0.005 mm) of less than 15 percent, liquid limit of less than 35 percent, and natural moisture content greater than 90 percent of the liquid limit undergo rapid loss of shear strength due to development of ex- cess pore pressure during strong earthquake-induced ground shaking. Ground shaking of sufficient duration results in the loss of grain-to-grain contact due to rapid rise in pore water pressure, and it eventually causes the soil to behave as a fluid for a short period of time. Liquefaction is known generally to occur in saturated or near-saturated cohesionless soils at depths shallower than 50 feet bgs. Factors known to influence liquefaction potential include composition and thickness of soil layers, grain size, relative density, groundwater level, de- gree of saturation, and both intensity and duration of ground shaking. Based on the lack of encountered groundwater to the depths explored (approximately p. 19V2 feet) and the density of the fill, topsoil/colluvium, and terrace deposits underlying the L 106275001 K Boyle Home Plim Rev doc c c Sewer Pipeline Replacement Revised December 8,2008 Carlsbad, California Project No. 106275001 • site, it is our opinion that the potential for liquefaction and consequent dynamic settlement to occur at this site is not a design consideration. 7. CONCLUSIONS Based on our review of the referenced background data, geologic field reconnaissance, subsurface evaluation, and laboratory testing, it is our opinion that the proposed construction is feasible from a geotechnical standpoint, provided that the recommendations of this report are incorporated into the design and construction of the projects. Geotechnical considerations include the following: • The on-site materials are expected to be excavatable with conventional heavy-duty earth- moving equipment in good working condition. • Although groundwater was not encountered in our exploratory borings, groundwater may be encountered during construction. • No active faults are reported underlying or adjacent to the site. The active Rose Canyon fault zone has been mapped approximately 4 miles west of the site. • Clayey topsoil/colluvial soils were encountered in both borings. These soils are not consid- ered suitable for usage as trench zone (intermediate) backfill. The contractor should be prepared to import soil to the site. Terrace deposits may be reused as trench zone backfill. • Based on the anticipated invert elevation of the proposed pipeline, it is considered likely that the jack-and-bore or microrunneling activities will be performed through terrace deposits. • The project site would be considered corrosive based upon Caltrans criteria. • Based on the lack of encountered groundwater to the depths explored and the consistency of the fill, topsoil/colluvium, and terrace deposits underlying the site, it is our opinion that the potential for liquefaction and consequent dynamic settlement to occur at this site is not a de- sign consideration. 8. RECOMMENDATIONS The following sections include our geotechnical recommendations for the design and construc- tion of the proposed sewer pipelines. These recommendations are based on our evaluation of the site geotechnical conditions and our understanding of the planned construction. We recommend that the site earthwork and construction be performed in accordance with the following recom- 106275001 R Boyle HonK Pl.m Rcvdoc yinyo Sewer Pipeline Replacement Revised December 8,2008 Carlsbad, California Project No. 106275001 f" mendations, the applicable requirements of governing agencies, and the Typical Earthwork Guidelines included in Appendix C. In the event there are conflicting earthwork specifications ^ between applicable standards and the following recommendations, we recommend that the more stringent requirements be followed. 8.1. Excavation Characteristics I For temporary open excavations, such as open trench areas or access pits, we recommend that the following Occupational Safety and Health Administration (OSHA) soil classifica-p» . tions be used: ^ Fill, Topsoil/Colluvium, Terrace Deposits Type C b Upon making the excavations, the soil classifications and excavation performance should be L evaluated in the field by the geotechnical consultant in accordance with OSHA. Temporary excavations should be constructed in accordance with OSHA recommendations. For trench to excavations, OSHA requirements regarding personnel safety should be met using appropri- p. ate shoring (including trench boxes) or by laying back the slopes to no steeper than 1.5:1 IM (horizontal to vertical). Temporary excavations that encounter seepage may be shored or stabilized by placing sand- bags or gravel along the base of the seepage zone. Excavations close to or below the groundwater (before or after dewatering) may encounter wet and loose or soft ground condi- tions. Wet soils may be subject to pumping under heavy equipment loads. On-site safety of ^ personnel is the responsibility of the contractor. rhi 8.2. Shoring It is anticipated that the sewer pipeline will be installed with trenchless methods. We antici- pate that shoring systems with bracings will be installed for the jacking and receiving pits as well as for trenches over 4 feet deep. Shoring systems will be constructed through fill, top- soil/colluvium, and terrace deposit materials. The shoring system should be designed using C C 106275001R Boyle Home PUnt Rn doc Sewer Pipeline Replacement Revised December 8,2008 Carlsbad, California Project No. 106275001 the lateral earth pressures shown on Figure 4. The recommended design pressures are based on the assumptions that the shoring system is constructed without raising the ground surface elevation behind the sheet piles, that there are no surcharge loads, such as soil stockpiles and construction materials, and that no loads act above a 1:1 (horizontal to vertical) plane ex- tending up and back from the base of the sheet pile system. The contractor should include the effect of any surcharge loads on the lateral pressures against the sheet pile wall. Shoring systems should be watertight, especially if a slurry microtunneling method is selected. We anticipate that settlement of the ground surface will occur behind the shoring wall during excavation. The amount of settlement depends heavily on the type of shoring system, the shoring contractor's workmanship, and soil conditions. We recommend that struc- tures/improvements in the vicinity of the planned shoring installation be reviewed with regard to foundation support and tolerance to settlement. To reduce the potential for distress to adjacent improvements, we recommend that the shoring system be designed to reduce the ground settlement behind the shoring system to 1A inch or less. Possible causes of settlement that should be addressed include settlement during shoring installation, excavations, con- struction vibrations, dewatering, and removal of the support system. It is not the intent of this report to provide a detailed shoring plan. Based on the method of installation, the contractor should retain a qualified and experienced engineer to design the shoring system, evaluate the adequacy of these parameters and provide modifications for the design. Shoring plans should be reviewed by the district design engineer. We recommend that the contractor take appropriate measures to protect workers. OSHA requirements per- taining to worker safety should be observed. 8.3. Excavation Bottom Stability In general, we anticipate that the bottom of the excavations will be stable and should provide suitable support to the proposed improvements. Excavations that are close to or below the water table (if encountered) may be unstable. In general, unstable bottom conditions may be mitigated by overexcavating the excavation bottom to suitable depths and replacing with 106275001 R Boyle Home Plant Rev doc Sewer Pipeline Replacement Revised December 8,2008 Carlsbad, California Project No. 106275001 f^ compacted fill. Recommendations for stabilizing excavation bottoms should be based on hi evaluation in the field by the geotechnical consultant at the time of construction. to 8.4. Construction Dewatering i Groundwater was not encountered in our exploratory borings. However, significant fluctua- tions in the groundwater level may occur. Dewatering measures during excavationp« : operations (if necessary) should be prepared by the contractor's engineer and reviewed by the district design engineer. Considerations for construction dewatering should include an- t ^ ticipated drawdown, volume of pumping, potential for settlement, and groundwater discharge. Disposal of groundwater should be performed in accordance with guidelines of jy the Regional Water Quality Control Board. P» h» 8.5. Microtunneling and Pipe Jacking pi We understand microtunneling or jack-and-bore methods may be used for the pipeline sec- ta tion beneath Carlsbad Boulevard. We anticipate that the potential micro tunnel or jack-and- r» bore pipeline segment located beneath Carlsbad Boulevard will be approximately •• 120 lineal feet in length. The invert elevation of the pipeline is not known at this time, but is i- anticipated to be at approximate elevations varying between 13 and 17 feet above MSL. Dense to very sand is expected to be encountered at the anticipated elevations of the pro-p» y posed micro tunnel or jack-and-bore segment of the pipeline. The contractor should take appropriate measures to reduce the loss of material at the drilling or casing head. Pipe fric- ^ tion can be reduced by over drilling, excavating a slightly larger diameter than the pipe size, and by using drilling mud or other lubricants. We recommend that an experienced specialty |§ contractor be used for the micro tunnel or jack-and-bore operations. L C c The terrace deposit materials that will be encountered during the construction are expected to have unconfined compressive strengths varying from zero pounds per square inch (psi) to approximately 20 psi. These estimates are for the sand layers that make up the majority of 106275001 R Boyle Home Plim Rev doc |Q Sewer Pipeline Replacement Carlsbad, California Revised December 8,2008 Project No. 106275001 to to r b. PI to to *• to the unit. However, resistant cobbles and gravel may be encountered which may result in dif- ficult drilling or jacking conditions. Due to the depth of the proposed pipeline, settlement is not anticipated to impact surface improvements and underground utilities, provided an experienced contractor performs the work. However, we recommend that settlement monuments be placed on the street section and other improvements in the vicinity of the pipeline. Settlement monuments should be monitored during construction and for one month after completion. In order to evaluate the load factors on the proposed pipeline, the loading presented in the fol- lowing table should be used. This load includes the embankment fill for Carlsbad Boulevard. Table 1 - Loading on Trenchless Segment of Pipeline Approximate Depth from Existing Ground Surface to Top of Pipeline (feet) 5 10 15 20 25 Load on Pipeline (pounds/lineal foot of pipe) 775 1,275 1,600 1,800 1,900 Notes: Linear interpolation may be used to obtain loading between the depths shown. Loading assumes 36-inch sleeve diameter of the trenchless section. Loading may need to be modified for different sleeve sizes. b •i b 8.6. Lateral Pressures for Thrust Blocks Thrust restraint for buried pipelines may be achieved by transferring the thrust force to the soil outside the pipe through a thrust block. Thrust blocks may be designed using the lateral pas- sive earth pressures presented on Figure 5. Thrust blocks should be backfilled with granular backfill material, and compacted in accordance with recommendations presented in this report. 8.7. Modulus of Soil Reaction We anticipate some trenching will be used on this project. The modulus of soil reaction is used to characterize the stiffness of soil backfill placed at the sides of buried flexible pipelines for 106275001 R Boyle Home Ptom Rev doc 111 to Sewer Pipeline Replacement Revised December 8,2008 Carlsbad, California Project No. 106275001 to i the purpose of evaluating deflection caused by the weight of the backfill above the pipe. For pipelines constructed in granular fill, topsoil/colluvium, and terrace deposit materials, we rec- f ommend that a modulus of soil reaction of 1,000 psi be used for design, provided that granular bedding material is placed adjacent to the pipe, as recommended in this report. 8.8. Pipe Bedding ^y We recommend that pipes in open excavations be supported on 6 inches or more of granular bedding material such as sand with a Sand Equivalent value of 30 or more. Bedding material |g should be placed around the pipe and 12 inches or more above the top of the pipe in accor- dance with the most recent edition of the Standard Specifications for Public Works |g Construction ("Greenbook"). We do not recommend the use of crushed rock as bedding mate- rial. It has been our experience that the voids within a crushed rock material are sufficiently y large to allow fines to migrate into the voids, thereby creating the potential for sinkholes and _ depressions to develop at the ground surface. Where wet and loose or soft soil conditions are It encountered, the trench excavation should be extended to approximately 1 foot or more below 0, the pipe invert elevation and should be backfilled with gravel wrapped in filter fabric. b Special care should be taken to prevent voids beneath and around the pipe. Compaction of *•the bedding material and backfill should proceed up both sides of the pipe. Trench backfill, including bedding material, should be placed in accordance with the recommendations pre- sented in Section 8.9.• m to 8.9. Trench Backfill Fill material, including trench backfill and structure backfill, should consist of granular soil 1^^ U with low expansion potential that conforms to the latest edition of the Standard Specifica- tions for Public Works Construction ("Greenbook") for structure backfill. The clayey ^^ |i topsoil/colluvial materials are not considered suitable for usage as trench zone (intermediate) m backfill. The contractor should be prepared to import soil to the site. The sandy terrace de- !• posit materials are considered suitable for re-use as structural fill material. Fill material „. should be comprised of low-expansion-potential granular soil and should be free of trash, 106275(101 R Boyle Home Pbm Rev doc ] 2 Sewer Pipeline Replacement Revised December 8,2008 Carlsbad, California Project No. 106275001 L I C C debris, roots, vegetation, or deleterious materials. Fill should generally be free of rocks or hard lumps of material in excess of 4 inches in diameter. Rocks or hard lumps larger than about 4 inches in diameter should be broken into smaller pieces or should be removed from the site. Wet materials generated from on-site excavations should be aerated to a moisture content near the laboratory optimum to allow compaction. On-site clayey and organic soils encountered during excavation should be selectively re- moved and stockpiled separately. The clayey and organic soils are not considered suitable for bedding material or structural fill and should be disposed of off site. C C C C C Imported materials should consist of clean, granular materials with a low expansion potential, || corresponding to an expansion index of 50 or less as evaluated in accordance with the Uni- form Building Code Standard 18-2. The corrosion potential of proposed imported soils should •I also be evaluated if structures will be in contact with the imported soils. Import material ,, should be submitted to the geotechnical consultant for review prior to importing to the site, j The contractor should be responsible for the uniformity of import material brought to the site. • 8.10. Fill Placement and Compaction Fill, structure backfill, and trench backfill should be compacted in horizontal lifts to a rela- tive compaction of 90 percent or more as evaluated by the latest edition of the American *• Society for Testing and Materials (ASTM) D 1557. Aggregate base and the upper 12 inches of subgrade beneath pavement areas should be compacted to a relative compaction of f" 95 percent or more. Fill soils should be placed at or above the laboratory optimum moisture •content as evaluated by the latest edition of ASTM D 1557. The optimum lift thickness of fill will depend on the type of compaction equipment used, but generally should not exceed 8 inches in loose thickness. Special care should be taken to avoid pipe damage when com- pacting trench backfill above the pipe. 106275001 R Boyle Home Plain Rev doc ] 3 Jta Sewer Pipeline Replacement Revised December 8,2008 Carlsbad, California Project No. 106275001 E c E 8.11. Corrosion Laboratory testing was performed on a representative sample of the on-site earth materials to evaluate pH and electrical resistivity, as well as chloride and sulfate contents. The pH and electrical resistivity tests were performed in accordance with California Test (CT) 643 and the sulfate and chloride content tests were performed in accordance with CT417 and CT 422, respectively. These laboratory test results are presented in Appendix B. The results of the corrosivity testing indicated an electrical resistivity of 220 ohm-cm, a soil P pH of 7.6, a chloride content of 1,725 parts per million (ppm), and a sulfate content of 0.060 percent (i.e., 600 ppm). Based on the Caltrans corrosion (2003) criteria, the on-site P soils would be classified as corrosive, which is defined as soils with more than 500 ppm chlorides, more than 0.2 percent sulfates, or a pH less than 5.5. Due to the potential variability of soils, we recommend that corrosion protection for im- provements in contact with site soils be designed by a corrosion engineer. The water-soluble sulfate content test results are addressed in the following section of this report. *• 8.12. Concrete f Concrete in contact with soil or water that contains high concentrations of water-soluble sul- ™ fates can be subject to premature chemical and/or physical deterioration. The soil sample p» tested in this evaluation indicated a water-soluble sulfate content of 0.060 percent by weight "* (i.e., about 600 ppm). According to the American Concrete Institute 318-05 building code, *• the potential for sulfate attack is negligible for water-soluble sulfate contents in soils ranging Ib from about 0.00 to 0.10 percent by weight (0 to 1,000 ppm). Therefore, the site soils may be P considered to have a negligible potential for sulfate attack. However, due to the potential b variability of site soils, consideration should be given to using Type V cement and concrete P with a water-cement ratio no higher than 0.45 by weight for normal weight aggregate con- y crete and a 28-day compressive strength of 4,500 psi or more for the project. C c 10621500) R Boyle Home Plant Rev doc J 4 c c E Sewer Pipeline Replacement Revised December 8,2008 Carlsbad, California Project No. 106275001 8.13. Pre-Construction Conference We recommend that a pre-construction conference be held. The owner and/or their represen- tative, the governing agencies' representatives, the civil engineer, Ninyo & Moore, and the contractor should be in attendance to discuss the plans and the project. 8.14. Construction Observation The conclusions and recommendations presented in this report are based on analysis of ob- served conditions encountered in our exploratory borings. If conditions are found to vary from those described in this report, Ninyo & Moore should be notified, and additional rec- ommendations will be provided upon request. Ninyo & Moore should review the project drawings and specifications prior to the commencement of construction. Ninyo & Moore should perform the needed observation and testing services during construction operations. The recommendations provided in this report are based on the assumption that Ninyo & Moore will provide geotechnical observation and testing services during construc- tion. In the event that it is decided not to utilize the services of Ninyo & Moore during t construction, we request that the selected consultant provide the client with a letter (with a copy to Ninyo & Moore) indicating that they fully understand Ninyo & Moore's recommen- 1 dations, and that they are in full agreement with the design parameters and recommendations contained in this report. Construction of proposed improvements should be performed by c L c c c qualified subcontractors utilizing appropriate techniques and construction materials. 9. LIMITATIONS The field evaluation, laboratory testing, and geotechnical analyses presented in this geotechnical report have been conducted in general accordance with current practice and the standard of care exercised by geotechnical consultants performing similar tasks in the project area. No warranty, expressed or implied, is made regarding the conclusions, recommendations, and opinions pre- sented in this report. There is no evaluation detailed enough to reveal every subsurface condition. Variations may exist and conditions not observed or described in this report may be encountered 106275001 R Boyle Home PliM Rev doc ] c li Sewer Pipeline Replacement Revised December 8,2008 Carlsbad, California Project No. 106275001 L E c c c c c r during construction. Uncertainties relative to subsurface conditions can be reduced through addi- tional subsurface exploration. Additional subsurface evaluation will be performed upon request. Please also note that our evaluation was limited to assessment of the geotechnical aspects of the project, and did not include evaluation of structural issues, environmental concerns, or the pres- ence of hazardous materials. This document is intended to be used only in its entirety. No portion of the document, by itself, is designed to completely represent any aspect of the project described herein. Ninyo & Moore should be contacted if the reader requires additional information or has questions regarding the content, interpretations presented, or completeness of this document. This report is intended for design purposes only. It does not provide sufficient data to prepare an accurate bid by contractors. It is suggested that the bidders and their geotechnical consultant per- form an independent evaluation of the subsurface conditions in the project areas. The independent evaluations may include, but not be limited to, review of other geotechnical reports prepared for the adjacent areas, site reconnaissance, and additional exploration and laboratory testing. Our conclusions, recommendations, and opinions are based on an analysis of the observed site conditions. If geotechnical conditions different from those described in this report are encountered, i our office should be notified and additional recommendations, if warranted, will be provided upon request. It should be understood that the conditions of a site could change with time as a result ofpi natural processes or the activities of man at the subject site or nearby sites. In addition, changes to the applicable laws, regulations, codes, and standards of practice may occur due to government ac- tion or the broadening of knowledge. The findings of this report may, therefore, be invalidated over time, in part or in whole, by changes over which Ninyo & Moore has no control. - ^^ b This report is intended exclusively for use by the client. Any use or reuse of the findings, conclu- P* sions, and/or recommendations of this report by parties other than the client is undertaken at said it parties' sole risk. r 106275001 RBoyfe Home Plant Rev doc c c s Sewer Pipeline Replacement Revised December 8,2008 Carlsbad, California Project No. 106275001 10. REFERENCES American Concrete Institute (ACI), 2005, ACI 318-05 Building Code Requirements for Struc- tural Concrete and Commentary. California Building Standards Commission, 2007, California Building Code, Title 24, Part 2, Volumes 1 and 2. California Geological Survey (COS), 1998, Maps of Known Active Fault Near-Source Zones in Cali- fornia and Adjacent Portions of Nevada: International Conference of Building Officials. California Geological Survey, 1999, Seismic Shaking Hazards Maps of California: Map Sheet 48. Caltrans, 2003, Corrosion Guidelines: dated September. International Code Council, Inc. (ICCI), 2006, International Building Code. Kennedy, M.P., and Tan, S.S., 2005, Geologic Map of the San Diego 30' x 60' Quadrangle, California, Scale 1:100,000. Krieger & Stewart, Incorporated, 2007, Draft City of Carlsbad Preliminary Design Report for the CIP Sewer Projects, Evaluation of Rehabilitating Existing Sewers (Project Nos. 1 through 12), dated October. Ninyo & Moore, In-house proprietary information. Norris, R.M., and Webb, R.W., 1990, Geology of California, Second Edition: John Wiley & Sons, Inc. Public Works Standards, Inc., 2006, "Greenbook," Standard Specifications for Public Works Construction. f Tan, S.S. and Kennedy, M.P., 1996, Geologic Maps of the Northwestern Part of San Diego jg County, California; California Geological Survey, Open File Report 96-02. Treiman, J.A., 1993, The Rose Canyon Fault Zone, Southern California: California Geological Sur- '•L vey, Open-File Report 93-02. United States Department of the Interior, Bureau of Reclamation, 1998, Engineering Geology f" Field Manual. United States Geological Survey (USGS), 1968 (Photorevised 1975), San Luis Rey Quadrangle, P* 7.5 Minute Series Topographic Map, San Diego County, California: scale 1:24,000. United States Geological Survey/California Gfeological Survey (USGS/CGS), 2002 (Revised p April 2003), Probabilistic Seismic Hazards Assessment (PSHA) Model, World Wide L Web, http://www.consrv.ca.gov/CGS/rghm/pshamap/pshamain.html. c r Source USDA AERIAL PHOTOGRAPHS Date Flight Numbers 5/2/1953 AXN-14M 19&20 Scale 1:20,000 106275001 R Boyle Home Pl.nl Rev doc ]7 REFERENCE: 2005 THOMAS GUIDE FOR SAN DIEGO COUNTY, STREET GUIDE AND DIRECTORY. 2400 4800 1 -"•"•- APPROXIMATE SCALE IN FEET NOTE: ALL DIMENSIONS. DIRECTIONS AND LOCATIONS ARE APPROXIMATE Map C Rand McNaJly. R.L.07-S-129 PROJECT NO. 106275001 DATE 3/08 SITE LOCATION MAP HOME PLANT LIFT STATION SEWER REPLACEMENT PROJECT CARLSBAD, CALIFORNIA FIGURE 1 ffi i :..:• „ LEGEND APPROXIMATE LOCATION OF EXPLORATORY TD=19.5 BORING TD=TOTAL DEPTH IN FEET ® APPROXIMATE LOCATION OF MANHOLE «...-. APPROXIMATE LOCATION OF PROPOSED ALIGNMENT NOTE: ALL DIMENSIONS. DIRECTIONS AND LOCATIONS ARE APPROXIMATE. NOT TO SCALE REFERENCE: GOOGLE EARTH MAPS. 2008 tyinyo PROJECT NO. 106275001 DATE 3/08 BORING LOCATION MAP HOME PLANT LIFT STATION SEWER REPLACEMENT PROJECT 3BAD, CALIFORNIA FIGURE (' \»™ In •• to SAN BERNARDINO RIVERSIDE CO. <?> 4> A £ APPROXIMATE SCALE 0 30 60 MILES NOTE: ALL DIMENSIONS. DIRECTIONS AND LOCATIONS ARE APPROXIMATE PROJECT NO. 106275001 DATE 3/08 FAULT LOCATION MAP HOME PLANT LIFT STATION SEWER REPLACEMENT PROJECT CARLSBAD, CALIFORNIA FIGURE P" m GROUND SURrACE • H/4 I H 12 INCHES OR MORE 12 INCHES OR MORE D NOTES: APPARENT LATERAL EARTH PRESSURE, Pa Pa = 47h,+ 23hjpsf CONSTRUCTION TRAFFIC INDUCED SURCHARGE PRESSURE, P Ps = 120 psf WATER PRESSURE, Pw Pw= 62.4 H2 psf PASSIVE LATERAL EARTH PRESSURE, Pp Pp = 400 + 57 d psf SURCHARGES FROM EXCAVATED SOIL OR CONSTRUCTION MATERIALS ARE NOT INCLUDED 6. -4- GROUNDWATER TABLE NOT TO SCALE 7 ht 'h?' H AND D ARE IN FEET fL ty//yo*Mium E PROJECT NO. 106275001 DATE 3/08 LATERAL EARTH PRESSURES FOR BRACED EXCAVATION HOME PLANT LIFT STATION SEWER REPLACEMENT PROJECT CARLSBAD, CALIFORNIA FIGURE 4 GROUND SURFACE- ^Offnt, l\ KplV.-Kd-h,)^ THRUST BLOCK \ \y d (VARIES) \ \ \ \ \ \ \ \ , trSTSiSn 1 D (VARIES) P \ \ Kplh^.+ p-h,)^] NOTES: GROUNDWATER BELOW BLOCK Pp = (1/2)Kp7, (D = 180 (DZ-d2) Ib/n 2. GROUNDWATER ABOVE BLOCK Pp = iKp|(D-d)hl7t+(D-d)(d-h1)^) 3 7, =7,- 62.4 pd; USE7,= 120 pd 4 Kp = 3.0 5. ASSUMES BACKFILL IS GRANULAR MATERIAL 6. ASSUMES THRUST BLOCK IS ADJACENT TO COMPETENT MATERIAL 7. T GROUNDWATER TABLE 8. h) ,d AND DARE IN FEET NOT TO SCALE PROJECT NO. 106275001 DATE 3/08 THRUST BLOCK LATERAL EARTH PRESSURE DIAGRAM HOME PLANT LIFT STATION SEWER REPLACEMENT PROJECT CARLSBAD, CALIFORNIA FIGURE APPENDIX A Sewer Pipeline Replacement Revised December 8,2008 Carlsbad, California Project No. 106275001 APPENDIX A BORING LOGS Field Procedure for the Collection of Disturbed Samples Disturbed soil samples were obtained in the field using the following methods. Bulk Samples Bulk samples of representative earth materials were obtained from the exploratory excava- tions. The samples were bagged and transported to the laboratory for testing. Field Procedure for the Collection of Relatively Undisturbed Samples Relatively undisturbed soil samples were obtained in the field using the following methods. The Modified Split-Barrel Drive Sampler The sampler, with an external diameter of 3.0 inches, was lined with 1 -inch long, thin brass rings with inside diameters of approximately 2.4 inches. The sample barrel was driven into the ground with the weight of the hammer of the drill rig in general accordance with ASTM D 3550. The driving weight was permitted to fall freely. The approximate length of the fall, the weight of the hammer, and the number of blows per foot of driving are presented on the boring logs as an in- dex to the relative resistance of the materials sampled. The samples were removed from the sample barrel in the brass rings, sealed, and transported to the laboratory for testing. 106275001 R Boyle Home Plant Rev doc b fL I Q 0 I 5- 20 1 ^ic i \ 1 xx/xx i MOISTURE (%) I9 * |SYMBOL |I' yinyo CLASSIFICATIONU.S.C.S.SM >yi« BORING LOG EXPLANATION SHEET Bulk sample. Modified split-barrel drive sampler. No recovery with modified split-barrel drive sampler. Sample retained by others. Standard Penetration Test (SPT). No recovery with a SPT. Shelby tube sample. Distance pushed in inches/length of sample recovered in inches. No recovery with Shelby tube sampler. Continuous Push Sample. Seepage. Groundwater encountered during drilling. Groundwater measured after drilling. ALLUVIUM: Solid line denotes unit change. EashedTine denotes material change! ~ ~ Attitudes: Strike/Dip b: Bedding c: Contact j: Joint f: Fracture F: Fault cs: Clay Seam s: Shear bss: Basal Slide Surface sf: Shear Fracture sz: Shear Zone sbs: Sheared Bedding Surface The total depth line is a solid line that is drawn at the bottom of the boring. BORING LOGnwkn|%J^ f5 EXPLANATION OF BORING LOG SYMBOLS PROJECT NO. DATE FIGURERev. 01/03 fc ll pt to U.S.C.S. METHOD OF SOIL CLASSIFICATION MAJOR DIVISIONS SYMBOL TYPICAL NAMES oCO s !gi C! g Uidot/3 Q 9 g I GW GRAVELS (More than 1/2 of coarse | fraction > No. 4 sieve size)GM GC SW SANDS (More than 1/2 of coarse fraction <No. 4 sieve size) SILTS & CLAYS Liquid Limit <50 SP SM SC ML SILTS & CLAYS Liquid Limit >50 CH HIGHLY ORGANIC SOILS OH Pt Well graded gravels or gravel-sand mixtures, little or no fines Poorly graded gravels or gravel-sand mixtures, little or no fines Silly gravels, gravel-sand-silt mixtures Clayey gravels, gravel-sand-clay mixtures Well graded sands or gravelly sands, little or no fines Poorly graded sands or gravelly sands, little or no fines Silty sands, sand-silt mixtures Clayey sands, sand-clay mixtures Inorganic silts and very fine sands, rock flour, silty or clayey fine sands or clayey silts with Inorganic clays of low to medium plasticity, gravelly clays, sandy clays, silty clays, lean Organic silts and organic silty clays of low plasticity Inorganic silts, micaceous or diatomaceous fine sandy or silty soils, elastic silts Inorganic clays of high plasticity, fat clays Organic clays of medium to high plasticity, organic silty clays, organic silts Peat and other highly organic soils GRAIN SIZE CHART CLASSIFICATION BOULDERS COBBLES GRAVEL Coarse File SAND Coarse Medium Fine SILT & CLAY RANGE OF GRAIN SIZE U.S. Standard Sieve Size Above 12" 12" to 3" 3" to No 4 3" to 3/4" 3/4" to No. 4 No. 4 to No. 200 No 4 to No. 10 No. 10 to No. 40 No. 40 to No. 200 Below No 200 Grain Size in Millimeters Above 305 305 to 76 2 76 2 to 4.76 762to 1 9.1 191 to 4 76 4 76 to 0.075 4 76 to 2.00 2 00 to 0.420 0.420 to 0.075 Below 0.075 PLASTICITY CHART f£ / CL- Kl / ^-7 / CL , / / ,OL / / / CH / / MHJ / OH / 0 ID 20 30 40 50 BO 70 BO BO 100 LIQ DID LIMIT (IX), V. U.S.C.S. METHOD OF SOIL CLASSIFICATION USCS Soil Clauifiubon UpdUcdNov 2004 15JS I 0.UJo 0 1 15- Vu 0 £ OJ 1 - - 1 J 1 o i:1- 1 1 j $o CD 36 42 82/1 1" 100/8" 1 50/6" M MJv/f g UJ <£. K> O 15.2 13.1 28.6 11.4 *&U OCL i I§ 2>.a:a | 104.8 j{ff /// 109.5 / / / / / / / / / / / / / / / 93, <; 109.6 1O & Oj l— .S«!i 2%3 Jg3 o 5j OQI < CHy //// / / / / / / SP-SM ^MD^ DATE DRILLED 1/24/08 BORING NO. B-l GROUND ELEVATION 33' ±iMSL) SHEET 1 OF 2 METHOD OF DRILLING 8" Diameter Hollow Stem Auger DRIVE WEIGHT 1 40 Ibs. (Cathead) DROP 30" SAMPLED BY MJB/RDH LOGGED BY MJB/RDH REVIEWED BY JG DESCRIPTION/INTERPRETATION FILL: Dark brown (mottled), moist, medium dense, clayey SAND; scattered (less than 5 %) gravel; small (less than 2" in diameter) pieces of asphalt. TOPSOIL/COLLUVIUM: Dark brown, damp to moist, hard, sandy CLAY; flecks of calcium carbonate. TERRACE DEPOSITS: Light gray brown, damp, dense, fine SAND; silty; friable. Very dense. Total Depth =19.5 feet. BORING LOG •%V*^& HOME PLANT LIFT STATION SEWER REPLACEMENT PROJECT imaM V5 CARLSBAD. CALIFORNIA PROJECT NO. DATE FIGURE 106275001 12/08 A-l «. JESI S 20 VU. n <a * ) i •f 5 c ° j §y O ffl A *Jy/" g UJEC CO O ^ C/ 1 f (0 UJQ >. g f0< g CO tj Q < CO9ci^co ^O Ai ^Vl«iF DATE DRILLED 1/24/08 BORING NO. B-l GROUND ELEVATION 33'±(MSL) SHEET 2 OF 2 METHOD OF DRILLING 8" Diameter Hollow Stem Auger DRIVE WEIGHT 140 Ibs. (Cathead) DROP 30" SAMPLED BY MJB/RDH LOGGED BY MJB/RDH REVIEWED BY JO DESCRIPTION/INTERPRETATION Groundwater not encountered during drilling. Backfilled shortly after drilling with bentonite chips on 1/24/08. Note: Groundwater, though not encountered at the time of drilling, may rise to a higher level due to seasonal variations in precipitation and several other factors as discussed in the report. BORING LOG k(%Bft^ft HOME PLANT LIFT STATION SEWER REPLACEMENT PROJECT !«•• ^5 CARLSBAD. CALIFORNIA PROJECT NO. DATE FIGURE 106275001 12/08 A-2 I HIQ 0 5- 10- 15- ,SAMPLES |iCO - I1 c Q BLOWS/FOOT: 50/6" 50/4.5" 61/6"MOISTURE (%)6.8 10.2 13.5 10.2 DRY DENSITY (PCF)J 104.1 ^ / / / / 109.0 101.9 109.2 CLASSIFICATIONU.S.C.S.rSM CH / / [ SM ty/nyo&typ DATE DRILLED 1/24/08 BORING NO. B-2 GROUND ELEVATION 30'±(MSL) SHEET 1 OF 2 METHOD OF DRILLING 8" Diameter Hollow Stem Auger DRIVE WEIGHT 1 40 Ibs. (Cathead) DROP 30" SAMPLED BY MJB/RDH LOGGED BY MJB/RDH REVIEWED BY JG DESCRIPTION/INTERPRETATION FILL: Dark brown, moist, soft, sandy CLAY. (jray~brown,~3amp, medium "Sense, sllty SAND. @ 2'- 3': Few (less than 10 %) gravel and cobbles. Dark brown. TOPSOIL/COLLUVIUM: Dark brown, damp, very stiff, sandy CLAY. TERRACE DEPOSITS: Light reddish brown, moist, very dense, silty fine SAND. Light gray brown. Fine to coarse sand. Total Depth = 19.5 feet. BORING LOG V%V*m^ HOME PLANT UFT STATION SEWER REPLACEMENT PROJECT Vl • ^B CARLSBAD, CALIFORNIA PROJECT NO. DATE FIGURE 106275001 12/08 A-3 ~5 £ F 0.ILIQ 20 Vu. n: 0 £ U)IQ j 0 £ O co m. *Jv/f s LUccpcoO "hU \TI £ CO5o>£o «7, j § to *1 oi— .^wy o"-coS^ o M MVta f DATE DRILLED 1/24/08 BORING NO. B-2 GROUND ELEVATION 30'±(MSL) SHEET 2 OF 2 METHOD OF DRILLING 8" Diameter Hollow Stem Auger DRIVE WEIGHT 140 Ibs. (Cathead) DROP 30" SAMPLED BY MJB/RDH LOGGED BY MJB/RDH REVIEWED BY JG DESCRIPTION/INTERPRETATION Groundwater not encountered during drilling. Backfilled shortly after drilling with bentonite chips on 1/24/08. Note: Groundwater, though not encountered at the time of drilling, may rise to a higher level due to seasonal variations in precipitation and several other factors as discussed in the report. BORING LOG •felflk flk HOME PLANT LIFT STATION SEWER REPLACEMENT PROJECT !%•• ^S CARLSBAD, CALIFORNIA PROJECT NO. DATE FIGURE 106275001 12/08 A-4 r_= KEY TO SYMBOLS I Symbol Description Strata symbols I jHHH clayey sand (Qal) tAfY High plasticity clay I Poorly graded sand with siltim Low plasticity clay I E jl, Silty sand (Qaf, Qal) Soil Samplers • California sampler APPENDIX B Sewer Pipeline Replacement Revised December 12,2008 Carlsbad, California Project No. 106275001 APPENDIX B LABORATORY TESTING Classification Soils were visually and texturally classified in accordance with the Unified Soil Classification System (USCS) in general accordance with ASTM D 2488. Soil classifications are indicated on the logs of the exploratory excavations in Appendix A. ID-Place Moisture and Density Tests The moisture content and dry density of relatively undisturbed samples obtained from the ex- ploratory excavations were evaluated in general accordance with ASTM D 2937. The test results are presented on the logs of the exploratory excavations in Appendix A. Gradation Analysis Gradation analysis tests were performed on selected representative soil samples in general accor- dance with ASTM D 422 and ASTM D 1140. A grain-size distribution curve is shown on Figure B-l. The test results were utilized in evaluating the soil classification in accordance with the Uni- fied Soil Classification System. 200 Wash An evaluation of the percentage of particles finer than the No. 200 sieve in selected soil samples was performed in general accordance with ASTM D 1140. The results of the tests are presented on Figure B-2. Atterberg Limits Tests were performed on a selected representative fine-grained soil sample to evaluate the liquid limit, plastic limit, and plasticity index in general accordance with ASTM D 4318. These test re- sults were utilized to evaluate the soil classification in accordance with the USCS. The test results and classification are shown on Figure B-3. Direct Shear Tests Direct shear tests were performed on undisturbed samples in general accordance with ASTM D 3080 to evaluate the shear strength characteristics of the selected material. The samples were inundated during shearing to represent adverse field conditions. The results are shown on Figures B-4 and B-5. Soil Corrosivity Tests Soil pH and resistivity tests were performed on a representative sample in general accordance with CT 643. The chloride content of the selected sample was evaluated in general accordance with CT 422. The sulfate content of the selected sample was evaluated in general accordance with CT 417. The test results are presented on Figure B-6. 106273001 R Boyle Home PUlU Rev .doc GRAVEL Coarse Fine SAND Coarse | Medium Fine U.S. STANDARD SIEVE NUMBERS 3- 2 W 1" '/.' w%~ 4 8 16 30 50 i \L zUJoDC 30 0 • •UJO. 00 — | I I •» : FINES SILT CLAY HYDROMETER 100 ZOO * K \V "> ,i 100 10 1 0.1 0.01 0.001 0.0001 GRAIN SIZE IN MILLIMETERS Symbol • Sample Location B-2 £ Depth .0-6.5 Liquid Limit -- Plastic Limit - Plasticity Index - D,0 - Dx 0,0 - c. - Cc - Passing No. 200 46 uses SM PERFORMED IN GENERAL ACCORDANCE WITH ASTM D 422-63 (02) Af/nyo*typiwr* GRADATION TEST RESULTS PROJECT NO. 106275001 DATE 12/08 HOME PLANT LIFT STATION SEWER REPLACEMENT PROJECT CARLSBAD, CALIFORNIA FIGURE B-1 106375001 SIEVE B-2 0 5.04.5 d SAMPLE LOCATION B-1 B-2 SAMPLE DEPTH (FT) 15.0-16.2 10.0-11.0 DESCRIPTION SAND with Silt Silty SAND PERCENT PASSING NO. 4 98 100 PERCENT PASSING NO. 200 8 15 uses (TOTAL SAMPLE) SP-SM SM PERFORMED IN GENERAL ACCORDANCE WITH ASTM D 1140-00 PROJECT NO. 106275001 DATE 12/08 NO. 200 SIEVE ANALYSIS HOME PLANT LIFT STATION SEWER REPLACEMENT PROJECT CARLSBAD, CALIFORNIA FIGURE B-2 106276001-200 WASH Pag>1 .III SYMBOL LOCATION B-1 DEPTH (FT) 5.0-6.5 LIQUID LIMIT, LL 52 PLASTIC LIMIT, PL 22 PLASTICITY INDEX, PI 30 uses CLASSIFICATION (Fraction Finer Than No. 40 Sieve) CH uses (Entire Sample) CH NP - INDICATES NON-PLASTIC DU • CL $ 40 Q C V) - os 0. 10 • 0 - ^yr s / CL-ML f CL ( jf / jrOL ^ ML< / / jrOL / Cf- / or OH / / ' MH or / OH / 0 10 20 30 40 50 60 LIQUID LIMIT, LL 70 80 90 100 PERFORMED IN GENERAL ACCORDANCE WITH ASTM D 4318-05 PROJECT NO. 106275001 DATE 12/08 ATTERBERG LIMITS TEST RESULTS HOME PLANT LIFT STATION SEWER REPLACEMENT PROJECT CARLSBAD, CALIFORNIA 106275001 ATTERBiRG PajotJOi 3000 2000u.co toCOlitOL COct I05 1000 X X A X / X X x' X 1000 2000 NORMAL STRESS (PSF) 3000 Description SAND with Silt SAND with Silt Symbol - -X- • Sample Location B-1 B-1 Depth (ft) 15.0-16.2 15.0-16.2 Shear Strength Peak Ultimate Cohesion, c (psf) 280 100 Friction Angle, $ (degrees) 37 31 Soil Type SP-SM SP-SM PERFORMED IN GENERAL ACCORDANCE WITH ASTM D 3080-04 PROJECT NO. 106275001 DATE 12/08 DIRECT SHEAR TEST RESULTS HOME PLANT LIFT STATION SEWER REPLACEMENT PROJECT CARLSBAD, CALIFORNIA FIGURE B-4 108275001 SHEAR B-1 @ 15.0-16.0.xls 3000 1000 2000 NORMAL STRESS (PSF) 3000 Description Silty SAND Silty SAND Symbol - -X - - Sample Location B-2 B-2 Depth (ft) 5.0-6.5 5.0-6.5 Shear Strength Peak Ultimate Cohesion, c (PSf) 260 160 Friction Angle, fy (degrees) 26 26 Soil Type SM SM PERFORMED IN GENERAL ACCORDANCE WITH ASTM D 3080-04 PROJECT NO. 106275001 DATE 12/08 DIRECT SHEAR TEST RESULTS HOME PLANT LIFT STATION SEWER REPLACEMENT PROJECT CARLSBAD, CALIFORNIA FIGURE B-5 106275001 SHEAR B-2 ® 5.0-6.5J(ls SAMPLE LOCATION B-1 SAMPLE DEPTH (FT) 5.0-10.0 pH1 7.6 RESISTIVITY ' (Ohm-cm) 220 SULFATE CONTENT2 (ppm) 600 (%) 0.060 CHLORIDE CONTENT3 (ppm) 1725 1 PERFORMED IN GENERAL ACCORDANCE WITH CALIFORNIA TEST METHOD 643 2 PERFORMED IN GENERAL ACCORDANCE WITH CALIFORNIA TEST METHOD 417 3 PERFORMED IN GENERAL ACCORDANCE WITH CALIFORNIA TEST METHOD 422 PROJECT NO. 106275001 DATE 12/08 CORROSIVITY TEST RESULTS HOME PLANT LIFT STATION SEWER REPLACEMENT PROJECT CARLSBAD, CALIFORNIA FIGURE B-6 106275001 CORROSIVITY PageVtt APPENDIX C Home Plant Lift Station Sewer Replacement Appendix C Carlsbad, California Project No. 106275001 APPENDIX C TYPICAL EARTHWORK GUIDELINES 106275001 Earthwork doc Home Plant Lift Station Sewer Replacement Appendix C Carlsbad, California Project No. 106275001 TABLE OF CONTENTS Page 1. GENERAL 1 2. OBLIGATIONS OF PARTIES 2 3. SITE PREPARATION 3 4. TRENCH BACKFILL 3 5. SITE PROTECTION 4 6. DEFINITIONS OF TERMS 6 106275001 Earthwork doc Home Plant Lift Station Sewer Replacement Appendix C Carlsbad, California Project No. 106275001 TYPICAL EARTHWORK GUIDELINES 1. GENERAL These guidelines are presented as general procedures for earthwork construction. They are to be utilized in conjunction with the project plans. These guidelines are considered a part of the geo- technical report, but are superseded by recommendations in the geotechnical report in the case of conflict. Evaluations performed by the consultant during the course of construction may result in new recommendations which could supersede these specifications and/or the recommendations of the geotechnical report. It is the responsibility of the contractor to read and understand these Guidelines as well as the geotechnical report and project plans. 1.1. The contractor shall not vary from these Guidelines without prior recommendations by the geotechnical consultant and the approval of the client or the client's authorized rep- resentative. Recommendations by the geotechnical consultant and/or client shall not be considered to preclude requirements for approval by the jurisdictional agency prior to the execution of any changes. 1.2. The contractor shall perform the earthwork operations in accordance with these speci- fications, and shall be responsible for the quality of the finished product notwithstanding the fact that earthwork will be observed and tested by the geotechnical consultant. 1.3. It is the responsibility of the contractor to notify the geotechnical consultant and the jurisdictional agencies, as needed, prior to the start of work at the site and at any time that earthwork resumes after interruption. Each step of the earthwork operations shall be observed and documented by the geotechnical consultant and, where needed, re- viewed by the appropriate jurisdictional agency prior to proceeding with subsequent work. 1.4. If, during the earthwork operations, geotechnical conditions are encountered which were not anticipated or described in the geotechnical report, the geotechnical consult- ant shall be notified immediately and additional recommendations, if applicable, may be provided. 1.5. An as-built geotechnical report shall be prepared by the geotechnical consultant and signed by a registered engineer. The report documents the geotechnical consultants' observations, and field and laboratory test results, and provides conclusions regarding whether or not earthwork construction was performed hi accordance with the geotech- nical recommendations and the plans. 106275001 Earthwork doc 1 Rev 12/05 Home Plant Lift Station Sewer Replacement Appendix C Carlsbad, California Project No. 106275001 1.6. Definitions of terms utilized in the remainder of these specifications have been pro- vided in Section 6. 2. OBLIGATIONS OF PARTIES The parties involved in the projects earthwork activities shall be responsible as outlined in the following sections. 2.1. The client is ultimately responsible for each of the aspects of the project. The client or the client's authorized representative has a responsibility to review the findings and recommendations of the geotechnical consultant. The client shall authorize the contrac- tor and/or other consultants to perform work and/or provide services. During earthwork the client or the client's authorized representative shall remain on site or remain rea- sonably accessible to the concerned parties to make the decisions that may be needed to maintain the flow of the project. 2.2. The contractor is responsible for the safety of the project and satisfactory completion of pipeline installation and other associated operations, including, but not limited to, earthwork in accordance with the project plans, specifications, and jurisdictional agency requirements. The contractor shall further remain accessible during non- working hours times, including at night and during days off. 2.3. The geotechnical consultant shall provide observation and testing services and shall make evaluations to advise the client on geotechnical matters. The geotechnical con- sultant shall report findings and recommendations to the client or the client's authorized representative. 2:4. Prior to proceeding with any earthwork operations, the geotechnical consultant shall be notified two working days in advance to schedule the needed observation and test- ing services. 2.4.1. Prior to any significant expansion or reduction in the grading operation, the geotechnical consultant shall be provided with two working days notice to make appropriate adjustments in scheduling of on-site personnel. 2.4.2. Between phases of earthwork operations, the geotechnical consultant shall be provided with two working days notice in advance of commencement of ad- ditional operations. 106275001 Earthwork**: 9 Rev 12/05 Home Plant Lift Station Sewer Replacement Appendix C Carlsbad, California Project No. 106275001 3. SITE PREPARATION Site preparation shall be performed in accordance with the recommendations presented in the following sections. 3.1. The client, prior to any site preparation or earthwork, shall arrange and attend a pre-construction meeting between the contractor, the design engineer, the geotechnical consultant, and representatives of appropriate governing authorities, as well as any other involved parties. The parties shall be given two working days notice. 3.2. Demolition in the areas to be graded shall include removal of pavements, and other manmade surface and subsurface improvements. Demolition of utilities shall include capping or rerouting of pipelines at the project perimeter. 3.3. The debris generated during demolition operations shall be removed from areas to be graded and disposed of off site at a legal dump site. Demolition operations shall be per- formed under the observation of the geotechnical consultant. 4. TRENCH BACKFILL The following sections provide recommendations for backfilling of trenches. 4.1. Trench backfill shall consist of granular soils (bedding) extending from the trench bot- tom to 1 or more feet above the pipe. On-site or imported fill which has been evaluated by the geotechnical consultant may be used above the granular backfill. The cover soils directly in contact with the pipe shall be classified as having a very low expansion po- tential, in accordance with UBC Standard 18-2, and shall contain no rocks or chunks of hard soil larger than 3/4-inch in diameter. 4.2. Trench backfill shall, unless otherwise recommended, be compacted by mechanical means to 90 percent relative compaction as evaluated by ASTM D 1557. Backfill soils shall be placed in loose lifts 8 inches thick or thinner, moisture conditioned, and com- pacted in accordance with the recommendations of the geotechnical report and of these guidelines. The backfill shall be tested by the geotechnical consultant at vertical inter- vals of approximately 2 feet of backfill placed and at spacings along the trench of approximately 100 feet in the same lift. 4.3. Jetting of trench backfill materials is generally not a recommended method of densifi- cation, unless the on-site soils are sufficiently free-draining and provisions have been made for adequate dissipation of the water utilized in the jetting process. 4.4. If it is decided that jetting may be utilized, granular material with a sand equivalent greater than 30 shall be used for backfilling in the areas to be jetted. Jetting shall gener- 106275001 Eanhwofl doc -> Rev 12/05 Home Plant Lift Station Sewer Replacement Appendix C Carlsbad, California Project No. 106275001 • ally be considered for trenches 2 feet or narrower in width and 4 feet or shallower in |l depth. Following jetting operations, trench backfill shall be mechanically compacted to the specified compaction to finish grade. P" m 4.5. Trench backfill which underlies the zone of influence of foundations shall be mechani- cally compacted to a relative compaction of 90 percent as evaluated by ASTM D 1557. p> The zone of influence of the foundations is generally defined as the roughly triangular |§ area within the limits of a 1:1 (horizontal:vertical) projection from the inner and outer edges of the foundation, projected down and out from both edges. «• m 4.6. Trench backfill within slab areas shall be compacted by mechanical means to a relative compaction of 90 percent as evaluated by ASTM D 1557. For minor interior trenches, P» density testing may be omitted or spot testing may be performed, as deemed appropri- || ate by the geotechnical consultant. «• 4.7. When compacting soil in close proximity to utilities, care shall be taken by the contrac- to tor so that mechanical methods used to compact the soils do not damage the utilities. «• 4.8. Clean granular backfill and/or bedding materials are not recommended for use in slope ta areas unless provisions are made for a drainage system to mitigate the potential for buildup of seepage forces or piping of backfill materials. p» ta 4.9. The contractor shall exercise the specified safety precautions, in accordance with OSHA Trench Safety Regulations, while conducting trenching operations. Such pre- P» cautions include shoring or laying back trench excavations at 1:1 or flatter, depending ta on material type, for trenches in excess of 5 feet in depth. The geotechnical consultant is not responsible for the safety of trench operations or stability of the trenches. 5. SITE PROTECTION The site shall be protected as outlined in the following sections. 5.1. Protection of the site during the period of construction shall be the responsibility of the contractor unless other provisions are made in writing and agreed upon among the concerned parties. Completion of a portion of the project shall not be considered to preclude that portion or adjacent areas from the need for site protection, until such time as the project is finished as agreed upon by the geotechnical consultant, the client, and the regulatory agency. 5.2. The contractor is responsible for the stability of temporary excavations. Recommenda- tions by the geotechnical consultant pertaining to temporary excavations are made in consideration of stability of the finished project and, therefore, shall not be considered to preclude the responsibilities of the contractor. Recommendations by the geotechni- 106275001 Earthwork doc A Rev 12/OS Home Plant Lift Station Sewer Replacement Appendix C Carlsbad, California Project No. 106275001 cal consultant shall also not be considered to preclude more restrictive requirements by the applicable regulatory agencies. 5.3. Precautions shall be taken during the performance of site clearing, excavation, and grading to protect the site from flooding, ponding, or inundation by surface runoff. Temporary provisions shall be made during the rainy season so that surface runoff is away from and off the working site. Where low areas cannot be avoided, pumps shall be provided to remove water as appropriate during periods of rainfall. 5.4. Following periods of rainfall, the contractor shall contact the geotechnical consultant and arrange a walk-over of the site in order to visually assess rain-related damage. The geotechnical consultant may also recommend excavation and testing in order to aid in the evaluation. At the request of the geotechnical consultant, the contractor shall make excavations in order to aid in evaluation of the extent of rain-related damage. 5.5. Rain- or irrigation-related damage shall be considered to include, but may not be lim- ited to, erosion, silting, saturation, swelling, structural distress, and other adverse conditions noted by the geotechnical consultant. Soil adversely affected shall be classi- fied as "Unsuitable Material" and shall be subject to overexcavation and replacement with compacted fill or to other remedial grading as recommended by the geotechnical consultant. 106275001 Eanhwoik doc c Rev tlmi Home Plant Lift Station Sewer Replacement Carlsbad, California Appendix C Project No. 106275001 F to 6. DEFINITIONS OF TERMS ALLUVIUM: AS-GRADED (AS-BUILT): BEDROCK: BORROW (IMPORT): CIVIL ENGINEER: CLIENT: COLLUVIUM: COMPACTION: CONTRACTOR: DEBRIS: ENGINEERED FILL: Unconsolidated detrital deposits deposited by flowing water; includes sediments deposited in river beds, canyons, flood plains, lakes, fans at the foot of slopes, and in estuaries. The site conditions upon completion of grading. Relatively undisturbed in-place rock, either at the surface or beneath surficial deposits of soil. Any fill material hauled to the project site from off-site areas. The Registered Civil Engineer or consulting firm responsible for preparation of the grading plans and surveying, and evaluating as-graded topographic conditions. The developer or a project-responsible authorized represen- tative. The client has the responsibility of reviewing the findings and recommendations made by the geotechnical consultant and authorizing the contractor and/or other con- sultants to perform work and/or provide services. Generally loose deposits, usually found on the face or near the base of slopes and brought there chiefly by gravity through slow continuous downhill creep (see also Slope Wash). The densification of a fill by mechanical means. A person or company under contract or otherwise retained by the client to perform, excavation, pipeline installation, and other site improvements. The products of clearing, grubbing, and/or demolition, or contaminated soil material unsuitable for reuse as compacted backfill, and/or any other material so designated by the geo- technical consultant. A fill which the geotechnical consultant or the consultant's representative has observed and/or tested during placement, enabling the consultant to conclude that the fill has been placed in substantial compliance with the recommendations of the geotechnical consultant and the governing agency re- quirements. 106275001 Eanhwxk doc Rev. 12/05 Home Plant Lift Station Sewer Replacement Carlsbad, California Appendix C Project No. 106275001 ENGINEERING GEOLOGIST: * mm Pm M EROSION: EXCAVATION: EXISTING GRADE: FILL: FINISH GRADE: GEOFABRIC: GEOTECHNICAL CONSULTANT: GEOTECHNICAL ENGINEER: GRADING: LANDSLIDE DEPOSITS: A geologist registered by the state licensing agency who ap- plies geologic knowledge and principles to the exploration and evaluation of naturally occurring rock and soil, as re- lated to the design of civil works. The wearing away of the ground surface as a result of the movement of wind, water, and/or ice. The mechanical removal of earth materials. The ground surface configuration prior to grading; original grade. Any deposit of soil, rock, soil-rock blends, or other similar materials placed by man. The as-graded ground surface elevation that conforms to the grading plan. An engineering textile utilized in geotechnical applications such as subgrade stabilization and filtering. The geotechnical engineering and engineering geology con- sulting firm retained to provide technical services for the project. For the purpose of these specifications, observations by the geotechnical consultant include observations by the geotechnical engineer, engineering geologist and other per- sons employed by and responsible to the geotechnical consultant. A licensed civil engineer and geotechnical engineer, regis- tered by the state licensing agency, who applies scientific methods, engineering principles, and professional experience to the acquisition, interpretation, and use of knowledge of materials of the earth's crust to the resolution of engineering problems. Geotechnical engineering encompasses many of the engineering aspects of soil mechanics, rock mechanics, geology, geophysics, hydrology, and related sciences. Any operation consisting of excavation, filling, or combina- tions thereof and associated operations. Material, often porous and of low density, produced from instability of natural or manmade slopes. 106275001 Eanhwoikdoc P 11 IH b P» tt C Home Plant Lift Station Sewer Replacement Carlsbad, California Appendix C Project No. 106275001 OPTIMUM MOISTURE: RELATIVE COMPACTION: SITE: SLOPE WASH: SLOUGH: SOIL: The moisture content that is considered optimum relative to compaction operations. The degree of compaction (expressed as a percentage) of a material as compared to the dry density obtained from ASTM test method D 1557. The particular parcel of land where earthwork is being per- formed. Soil and/or rock material that has been transported down a slope by gravity assisted by the action of water not confined to channels (see also Colluvium). Loose, uncompacted fill material generated during grading operations. Naturally occurring deposits of sand, silt, clay, etc., or com- binations thereof. 106275001 Eiithwockdoc APPENDIX C ENVIRONMENTAL EXEMPTION DOCUMENT City of Carlsbad Planning Department NOVEMBER 4, 2008 TO: MARK BISKUP, ASSOCIATE ENGINEER FROM: CHRIS GARCIA, JUNIOR PLANNER SUBJECT: EA 08-09 - BEECH AVE SEWER AND HOME PLANT LIFT STATION PIPE REPLACEMENT Thank you for submitting an Early Assessment for a sewer replacement project proposed on Beech Avenue between Ocean Street and Washington Street, as well as near the Home Plant Lin Station located on Carlsbad Boulevard (APN 155-200-02-00). The project site consists of public street right-of-way and easements across North County Transit owned property. The proposed project includes the replacement of two existing sewer pipelines using tunneling methods to minimize impacts. The existing sewer pipes are being replaced with either the same size or a slightly larger size (8" to 12") due to current construction standards and are not intended to expand capacity or area served. The Beech Avenue portion will be confined to the improved City right-of-way, and tunneling will minimize impacts to the surface. The Home Plant portion includes a tunnel crossing under Carlsbad Boulevard which will avoid street closure. In response to your application, the Planning Department has prepared this comment letter. Please note that the purpose of an Early Assessment is to provide you with direction and comments on the overall concept of your project. This Early Assessment does not represent an in-depth analysis of your project. It is intended to give you feedback on critical issues based upon the information provided in your submittal. This review is based upon the plans, policies, and standards in effect as of the date of this review. Please be aware that at the time of a formal application submittal. new plans, policies, and standards may be in effect and additional issues of concern may be raised through a more specific and detailed review. Planning: 1. The project is located in the coastal zone. However, repair and maintenance activities not described in C.M.C. Section 21.201.070 do not require a Coastal Development Permit. This includes repair and maintenance activities that are not located in sensitive habitat areas or adjacent to coastal bluffs or waters. The area being disturbed near the Home Plant Lift Station is not located in or adjacent to sensitive habitat. Project noise will not impact any potential nesting birds due to the existing noise caused by the pump station, traffic from Carlsbad Boulevard, and the noise from the adjacent railroad right-of- way. In addition, the existing sewer pipes are being replaced with either the same size, or slightly larger size (8" to 12") due to construction standards. This alone will not cause an increase in sewer capacity and therefore will not require a Coastal Development Permit. 2. The project will not need any permits from planning. 1635 Faraday Avenue » Carlsbad, CA 92008-7314 • <76O) 602-4600 • FAX (760) 602-8559 • wvvw.ci.carlsbad.ca.us EA 08-09 - BEECH AVE SEWER AND HOME PLANT LIFT STATION PIPE REPLACEMENT November 3, 2008 Page 2 3. The removal of any trees that could be used for bird nesting shall be done outside of the bird breeding season or have a survey done prior to removal. 4. The project is exempt from environmental review per CEQA Guidelines Section 15301 (b), concerning repair and maintenance of existing facilities. All necessary application forms, submittal requirements, and fee information are available at the Planning counter located in the Faraday Building at 1635 Faraday Avenue or on line at www.carlsbadca.qov. You may also access the General Plan Land Use Element and the Zoning Ordinance oniine at the website address shown; select Department Listing; select Planning Home Page, Please review all information carefully before submitting. If you would like to schedule a meeting to discuss this letter with the commenting departments, please contact Chris Garcia, Junior Planner, at (760) 602-4622. Sincerely, GARY T. BARBERIO Assistant Planning Director GTB:CG:lt c: Don Neu, Planning Director Dave de Cordova, Principal Planner Bill Plummer File Copy Data Entry APPENDIX D EXAMPLE RESIDENT NOTIFICATION DOOR HANGER APPENDIX "D" CITY OF CARLSBAD ROAD WORK ABC CONTRACTORS OFFICE # (760)XXX-XXXX FIELD # (760)XXX-XXXX Dear resident: As a part of the City of Carlsbad's ongoing Drogram to maintain its streets, your street will be resurfaced with asphalt concrete over the existing roadway surface. This construction will require the closing of your street to through traffic for one day. Your street, from XYZ St. to DEF Ave. will be closed to through traffic and resurfaced on: MON. TUE. WED. THU. FRI. DATE: XX/XX/XX from 7:OOA.M. to 5:00 P.M. If you don't plan to leave your home by 7:00 AM. on the above date please park your car on an adjacent street in your neighborhood that will not be, resurfaced. Streets scheduled for resurfacing can be determined by calling either the Contractor or the City of Carlsbad's Project Inspector. When walking to and from your car, remember not to walk on the newly overlaid street or you will have black residue on the bottom of your shoes. Please do not drive, walk on, walk pets, play, or skate on the newly overlaid asphalt. Also, please refrain from watering your lawns, washing cars, etc., approximately 6-8 hours after the asphalt is laid as running water will cause damage to the new surface. ABC is the Contractor that will be performing the resurfacing work for the city and you may call them at the above phone number if you have any questions regarding the project. Resurfacing of your street will not occur on the day your trash is collected. Mail delivery may be delayed if the postman cannot reach the mailbox that day. If you have a moving company scheduled for that day please call and inform the Contractor of the date. If you have any concerns which cannot be addressed by the Contractor, you may call the City's Project Inspector @ (xxx) xxx-xxxx. Thank you for your cooperation as we work to make a better City of Carlsbad. 'Contractor shall edit the above notification card to reflect the specific type of work and schedule of this contract. APPENDIX E REFERENCED CITY OF CARLSBAD RECORD DRAWINGS BA*IS OF ALL aewsiucA 6>HOWM HEREOM AJJE. AEK1AL COKTTROL FCIMT COORDINATES SUPPLIED SY THE CITY OF CAKLASAt?. ATT-14 M 092<b.OI3l E AT- 1 I 37 (ELEV 15.75) peso BEARIMSS MUCT ae ROTATED oo'cca' 38"CUPCKWISg. -jo AGREE WITH HGEEOM . TAC.< COOT MEW AC MEW CH4.IM FEJJC£ sew 2«-4 REDWOOD HEADeR UE.W U 2 « 12 L0MG STAVCE. flUie>H GKAPfe eeCTIOM DETAIL /^ I NO SCALE SCARIFY £ KECOMPACT 6US&BW3£ ceue>H6D Boctc DETAIL UtW CHAIU LIUK fklX.1 28 20 IE-13.54, W6W IS," D.I.P GRAVITY 6EWEK IS 1.5% SLOPe 12 -^--t^- i°'J 1 r NEW SEWER/ MANHOLE PER1 SDRSD S-17 -ex^T is" yqp GRAVITY SEWiR o+oo ue*/ CAST IRDkJ FT-EXIBLE COOPUWC. NEW RESTRAINED CAST IROM FLEXIBLE COUPUWS O20 OOO PROFILE A PROFILE Br-41 UTIUrTlW ACE 6HOWU OU ! EXIST 8" AC P.M. /^(ABANDON INy PLUG WOCK IU «.WTK)IJ ^ . J. EXST CHAIM LIMK FEMCE •TO.;^._ ^ , CRUSHED ROM SEE DETAIL £i INSTALL""" ^~- " '-- MEW 7' HIGH CHAIM LIMK FEJJCE. (BEARIN&6 OI6TAWCE5 PEE PLAM) COMWECT EX6T CHAIM LIUK FEMCE TO MEW CHAIM UMK SEE SHT.. 2 OF P.M. PLANS; I NEW SEWEET MAMHpLE PER SDRSD S ' 'REMOVE * DISFO6E OP EX€>T CHAIM LIMK FENCE (52 LF) 16" 66E PB3RL£ A COUUEC.T EXftT CHAIM FEKJCE "TO MEW CHA/W LIMK FEMCE / 7 IW5TAU. NEW CROSHED (3JOUMD CCWEJ? CA" MIKJ) PfcTAIL IKKIGAT/ON CONTWLLEft DC6T CHAIU urtK F TO, REMAIM I , ,' ILBTALL WfcW CHAIU LIUK GWfc MATCH EX6T £LEV. 6AWCUT EX6T AC WHEEE. MEW *C- 4 EXST AC ARE. TO 8E JOIMBD S6E CE-TAIU / I. 2 6>LVD SITE PLAN !"• 10' "AS BUILT" SC E EXP DATE REVIEWED BY: INSPECTOR DATE ALMGREN 8 KOPTIONAK.INC. CONSULTING ENGINEERS Son Dl*go, Cdllfornia (619) 36B-59Z2 ,^fiH%^//6, \ ' - — -<;'iy^^ e^P\4 fl^jj^v^JS/ ^4~3[s^^ 5/15^0 0»TE WE • Y A REVISIONS BY WILSON ENGINEERING A /)5 W/^T OCSCKIPTION REVISIONS *PP'D 3HECT2 HOME CITY OF CARLSBADCNSINEERINS DEPAKTHENT SHEET! 20 PLANT SEWAGE PUMP STATION SITE PLAN, DETAILS AND *p"ovEr^rt^ puna BY. SJ/JCCHKO. 8T _aus___FIELD BX, PROJECT NO 3299 PROFILES b-lt-tt DfUWINONO. 315-2 CMWD 85-604 7+00 EXIST 14' CP S.D. EXIST 24" CMP S.D EXIST 36" RCP SD. STA 3+38.9? X AC HORZ ANGLE45.00° , MAZCHLINE SEE SH. 3 EXIST 10 VCP SEWER SEE DWG. 291- 2AFOR IMPROVEMENTS0 CARLSBAD BLVD. STA 3+41.96 „- HpRZ. ANStET PT / "' P.M. ALIGNMENTFUTURE HOMEPLANT P.S. HORZ. ANGLE PT48.50° AS BUILT' '/ HOR?: ANGLE. PT 45. OO" MOTBS 1. SEE mt£ SHEET FOH BASIS OF BEARINQ AND BENCHMARK CITY OF CARLSBAD SH"TS rxQINEEHIHO DEPARTMENT IHORZ. ANGLE PT 45. OO°CONN. TO K) DIP KM. STA I + I9.2O HORZ. ANGLE PT 45.00°PLANS FOR THE CONSTRUCTION OF THE HOME PLANT PUMP STATION FORCE MAIN 2. INSTALL THRUST BLOCKS PER SDRSO W-17 AND W-18 AT ALL VERTICAL AND HORIZONTAL ANQLE POINTS.EXIST 8" P.VC WATER,LENGTH UWDER CARLSBAD BLVD IN 12" STEELCASING PLANS PREPARED BY WILSON ENGINEERING CONSULTING ENGINEERS 2185 FARADAY AVE., SUITE 140 CARLSBAD, CA 92008 (619) 438-4422 STA 1+07.32 TO STA 7+50.003. AU ANGLE POINTS TO BE STANDARD FfTT1NG(S) WITH DEFECTION COUPUNGfS) TO MAKE DEFLECTIONS AS REQUIRED.HORZ. ANGLE PT45.0O"APPROX. LOCATION JACKING PIT4. CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH AND ELECTRICAL CONDUFT PRIOR TO JACKING OPERA HORZ. ANGLE PT45.OO-HE 23889' U CITY ENSINCEd PROJECT NO. 3299REVISION DESCRIPTION CMWD 85-604 101-011 IU y ELECTRICAL SITE PLAN I"" 10' SYMBOL LIST SYMBOL if WP DESCRIPTION ' reoof JUUC.TIOU fOH-U6P' IUPICATK) &PU»1OU PfiCCf El&IP STtft. COUDUlT &JU coutJuiT aiu e£u?w fux>e oe 1\C «>CH 10 w/CODfi ^>IZ£ OUO-W1C6 OOUXJIT TlCkS IU OOUOUIT IUDICAT6 DO. Of- *\i Wl££ LIGHTING FIXTURE SCHEDULE GENERATOR BUILDINGGENERATOR BUILDING ^ ELECTRICAL LIGHTING AND POWER PLAN -'/+ IPIZOV. I* it tXHAUST fiAU <3U BCOf ELECTRICAL CONTROL PLAN '/4"= I-0" yj—RDWIJ T& ^ A.ff IkBCCIftfe 5W PLAlt /Wf +6'-*:Wf +6'-o» I73\ MoouTCU A / SlOt WALL*7 +o»-o» L0*> 4IjOO 1"\ h^) L09 J<T ^"i. ,a . ^] rtU '^^wr ts*-)?" -uaoc our / W.P MOUJTe TO MI6ED OU CHfeX VALVfe flVP Of 3) COMMINUTOR ROOM AND MOTOR ROOM ELECTRICAL PLAN WET WELL AND PUMP ROOM TYPE A & C 0 fe SYMBOL C=ZJ ^. . czm 0 MANUFACTURER AND CATALOG NUMBERS UTHOUIA DO?*.A APPU10U M#I050 UTHOUIA U<0 IZO UTHCUIA LWO «£> HIlEK. TUI56LPSI2O WATTS 17? oo •x. 57 OO LAMP TYPE I-F%1» WW (cow if- e-wor^ffiww \-ftfyf&ff*M no REMARKS W£f UXATlOU SWbKiltP CWf» 1 DIV 1 £P MOUUT OU C&LIU& MOUUT OU C£lLIU6 WAU FAdIC l/4" = 1-0" \ "AS BUILT" RCE PXP DATE REVIEWED BY: BJ3PECTOR DATE ELECTRICAL PLAN \ :ST ALM6REN & KOPTIONAK, INC. CONSULTING ENGINEERS San Dilgo, CeHfarnil 1619) S66-9922 °*Ttl»T f\A3-SUtLT oescmpTioN REVISIONS SM"T CITY OF CARLSBADIP JlcNsiMtcuma D[P«BTMEMT SHEETS20 HOME PLANT SEWAGE PUMP STATION ELECTRICAL SITE PLAN AND FLOOR PLANS1— HI. 239JW \ e V3-b-M-1/ c^J1^^FIELD BK^ ENOINEiB MTE RHOJCCT NO. 3299 m«wimNo. 315-2 CMWD 85-604 7+00 EXIST 14" CP S.D. •'EXIST 24" CMP S.D. EXIST 36" RCP SD. ,, MAXCHLINE SEE SH. 3 EXIST IO VCP SEWER F. M. ALIGNMENT HORZ. ANGLE PT . 11° HORZ. ANGLE PT48.50 HORIZ. ANGLE PT 12.51° HORZ. ANGLE PT21. 98° ,STA 3 + 95.92 /HORZ: ANGLE. PT. 45.00° MOTES 1. SEE TITLf SHEET FOR BASIS OF BEARING AND BENCHMARK SHEET C,TY ofr CARLSBAD SM"TS d. ENGINCERINa DERIkR THENT IIHORZ. ANGLE PT.45. 00°CONN. TO IO DIP F.M. STA I + I9.20 PLANS FOR THE CONSTRUCTION OF THE HOME PLANT PUMP STATION FORCE MAIN 2. INSTALL THRUST BLOCKS PER SDRSD W-17 AND W-18 AT AU. VERTICAL AND HORIZONTAL ANQLE POINTS.EXIST 8 P.VC WATER, LENGTH UNDERCARLSBAD BLVD IN 12" STEEL CASING PLANS PREPARED BY WILSON ENGINEERING CONSULTING ENGINEERS 2IS5 FARADAY AVE., SUITE I40 CARLSBAD, CA 92008 (6I9) 438-4422 STA I+07.32 TO STA 7+50.00AU_ ANGIE POINTS TO BE STANDARD FTTTlNe(S) WTTH DEFECTION COUPUNSIS) TO MAKE DEFLECTIONS AS REQUIRED.HORZ. ANGLE PT45.00°APPROX. LOCATIONJACKING PIT. COHTBACTORTOVERIFYEXACTLOCATlONANDDEPTHOFB'FJll- AND ELECTRICAL CONDUTT PRIOR TO JACKING OPERATION.HORZ. ANGLE PT 45.0O" DRAWWOMO. 315-28REVISION DESCRIPTION CMWD 85-604 UEW e*ete KMte rott. KUU TO* Uf KX£ Hb U3CATIOU 3064 6 If IU ew FAU". COUUfCT Wf>ft6 TIMtty ELECTRICAL SITE PLAN I"* 10' SYMBOL LIST SYMBOL EF EP 0> WP DESCRIPTION ' f" ILIPCATW £XPU»OU PBSOf JUUCflOU CI&IP stfett coiX>uiT euu COUCtAUfiP WHfeEfe Pt»6l6Lfe OXJOUIT OJU &£LOW fuooc oe P^C «>CH 40 "/GODf %iz£ GUD-WIC6 COUOUIT 6tAL TICKS IU OOUPUIT IUDICAT6 UO. Of *l£ Wl££ MOTC* OUTUT LIGHTING FIXTURE SCHEDULE GENERATOR BUILDING ELECTRICAL LIGHTING AND POWER PLAN '/V-i'-o"L\ GENERATOR BUILDING ELECTRICAL CONTROL PLAN\ -'/* If I2OV. I* tf tXHAU6T V TO MK.BO SWITCH OLJ CHtCK. VALVt fW Of 3) fAU ou foot COMMINUTOR ROOM AND MOTOR ROOM WET WELL AND PUMP ROOM TYPE A & C 0 t SYMBOL 1 1 ^• . 1= K) MANUFACTURER AND CATALOG NUMBERS LITHOLJIA DOe*»A APPU1&U A66K60 UTHOUIA iZIO «O UTHOUIA LI4O IZO HITEK: Tu%LPsieo WATTS 175 100 •X. 57 03 LAMP TYPE l-f%1» l*W k30W If Z-rtori2P5WW l-f4oTlZ05UUJ LTD REMARKS w£T LOCATIOU ew>Ktitp cuff> i DIV i ec MOUUT OU C£lLIU6 MOUUT OU C£lLIU6 WALL PACK. ELECTRICAL PLAN 1/4" = 1-0" "AS BUILT" RCE PXP DATE REVIEWED BY: INSPECTOR OATE ELECTRICAL PLAN \ /4"= 1-0" ALMGREN a KOPTIONAK, INC. CONSULTING ENGINEERS 0<|*>, Catifwnio (619) 966-5922 REVISIONS st)"T CITY OF CARLSBAD 15 ENOINCtBINO OEPtBTMENT | 20 HOME PLANT SEWAGE PUMP STATION ELECTRICAL SITE PLAN AND FLOOR PLANS CMWD 85-604 8" CLASS /OO A.C.f>/Pe(L/M£O)/OOAjC.fW»ff (LINED) EXIST, G&.OUH& LINE ENCASED IN SAND : PUMP STAi .FIN. FLK. EL. /5-5/ see r>ET.T. GSC.I.ELEV. BELOWOUTLET 'UMP STAet.ev. 7.01 17 I rL.S.^Tffs> , *S CONCKETE THRUST 8LK. ' BLJILTT TE.E IH PLACE EXIST. ff'CJf.TO IMttOFF TANK.TO BE ABANDONED EXISTING i SEWAGE FLANTTO BE ABANDOMEOUPON COMPLETION OFNEW FORCE MAIN. PL US M7H CONC. HEW 8 c.i- st.eeveCSM. LI USDOEM. LINED CLASS ISO K 'ZOO' L 4O./4't, T.HEW 8"A. C. PIPE MAIN EPOXY LINED NEW 8"~ A.W.W.A. FiAMGED FT&. A.S.A. &I&.I SL.IZS CBM. LIU ED /V£W 8"SATE VALVE & C. I. VALVE BOX PETAIL a NEW FORCE MAIN CONN.V* €> EXIST. PUMP STATION * A.T. & S.F.R.R. License No. DATS ElttST.IHG PUMP STATION SCALE '/•z"=t'-O NOTE-' Remove SXIST/NS CONCHSTS £NCA»fM*NT TO MAKf COM-' TO extST/NSi>it>e. EXIST. MM. *i THIS CONNECTION It NOT TO of MAot UNTIL CA*LSMAD- VlSTA fNTUtCMPTOM Sews* /S IN OPtRATION. SH^T CITY OF CARLSBAD DOWN TOWN FORCE MAIN STA. I8f OO TO STA. ?4 f 43 ±ASSOCIATED ENGINEERS 3O<£5 ROSECRANS PL.SAN Dlt-SQ 10, CALtF. WAVNE R4.ILLOATED i J ... .. . i .: CONCRETE ENCASED SEWER MAIN i±n.i 11. i EXISTS H.R GAS MAIN IISTfe EDOE OF flWEIHENT OF 8 E.S.V. C. R CONCRETE ENCASED EXISTG 4 WATER LINE CONST 81.50 UN. FT. OF 8" E.S.VC.P CONCRETEENCASED SEWER MAIN OCEAN STREET SEE SHEET NO. 2 CARLSBAD BLVD. SHEET C)TY OF CARLSBAD ENGINEERING DEPARTMENT BEECH AVE OCEAN STREET SEWER BEECH AVE. LINE STA. 0+00 TO STA. 5 + 77.50PLAN AND PROFILE a Tyrareun i Ntetua6rj>u&PROJECT NO 77-27 EIJCASED. SIN- .; EXISTG 24 -EUC. TO I BE REMOVED , ^ BY OTHERS IT-' K3+64.IO NST. 202.50 UN. FT OF 8 E.S.VC.I! SEWER MAIN FT OF 8" E.S.V.C.R SEWER MAIN NCASED IN CONCRETE BEECH AVENUE CAUTION EXISfG 12 3/4" HIGH PRESSURE GAS MAIM , CONTACT UTILITY COMF»MY BEFORE EXCAVATING. 36.9' ' SHEET 7 CITY OF CARLSBAD ENGINEERING DEPARTMENT OCEAN STREET SEWER BEECH AVE. LINE STA. 5 + 77.50 TO STA. 10+64. PLAN AMD PROFII F A P P R 0 V E D tl^g (*J£L^^ RE. /g) OWN. BY:*CHKD. BY:FIELD Bit 72-Gr rWY ENGI^fER PROJECT NO. 77-27 DATE: j^ SHEETS 0 yg&Z- VERT: '"' 3' HORZ: _iii£S^ DRAWING NO. IflS-* =&~f=f=f=x-~—l~Tl: apggaiig^^fagggggE -.....-,.--^^- - •-]— , ,..r ~*• '^=^~~ — ~ T~"i •• * "'T" . "1".j£s.:J^.fJaJrr-~-. j^^^^f^i^|^|:^il^^p^ggg^^|:^^S^^fegI^^E rTTT^H •-. rTJr-"i "•rr:: .rrt- l"i-^.i^-.~--4^^ r 223 224 225 226 227 228 ^-cmr^TOKTp_mTHOLe S NO. CURB DATA DELTA OR BUG. 9° 17' It" 'A'/SO'OO'OO" A=/8O°OO'OCf RADIUS 1961' ion' 1660' 5.50' ZOOO' 5.5d LENGTH 64-79' 16119' 0536' n.zs It.OS' 60 d6' TYPE -s-e- MODIFIED'B-Z (2) fcKr'— * nn CURB DATA DELTA OH BRG.RADIUS IOSO LENGTH REMARKS ZOO-Z6' [ MODIFJED I64W\ TYK~G-2" IZZ.73' ' Prepared in tfie office uf Church Engineering, Inc. ?25 Broadway Suite 7QQ San Diego. CA 9?'0t Telephone (619) 237-0722 DATE EMGIMEEfl OF WORK REVISION DESCRIPTION SHEET 13 CITY OF CARLSBADENGINEERING DEPARTMENT! IMPROVEMENT PLAN FOR: CARLSBAD BLVD. STA.223+OOTO STA.228-H50 CITY ENGINEER CMKO «Y:_FIELD BK »ROJtCT NO 3288 OR AWING NO 291-2Q _PHOTO GEODETIC CORPORATION CMWD BASIS OF ALL aEARlWGS SHOWM HEREOKJ AKE. 3ASED OKI AEfSlAL CDKTTROL FOIMT COORDINATES SUPPLIED BY THE CITY OF CARLSBAD. AT - 14 M E AT-15 u<?eas.:5oyr CELEV is,75) E &4ZZ.°>\ 57 DEED BeARIM&S MUST BE ROTATED OO'Ofc' CLOCKWISE TD A&RE£ WITH SHOWM HECE.OM. TACK CCAT - NEW CHAIN LJMK FEMCE CQJSHfcP IE- I3.5fc 0*00 0*20 PROFILE A PROFILE Br-41 EXIST 8" AC F.M. /^(ABANDON IN/Pl^CE) puma A /G/SITE PLAN, .SHT. ID) / / / / // // / / 6HT. 16. Ft* DfcMOUTlOU Of UfW PUMP WTKXIPREFWZE H^EKICH EXST CHAIM LIUK FEK1C£ _ Re.MA_UO ^^ ___ -~~- -- CRUSHED ROCK SE£ DETA/L MEW 7' HI&H CHAIULIIUK DISTANCES PER PLAN) COMWECT ex6T CHAIW LIUK FEMCE TO MEW CHAIU UWK SEE SHT.. 2 QF F.M. PLANS, NEW SEWEfrMA^HpLE PER LSDRSD SvtT / /.^ / / REMCVE « D16P06E C3F CHA1M LINK FEMCE (52 LF)7 TTCP ^ITH PVC ', 16 INSTALL MEW BWSTECTIOW rr CTYP aftliSrfc '*REMOVE t Dispose. 3P\\ ;'^> . ._ MEEOED MEW COMSTteuC '^BALL V IMSTAU- NEW CRUSHED fCOf.SSOUMD coses. £A" MIKJ) set COUUECT E*ST CHAlkJ FEMCE TD KJEW CHAIU LIUK FEMCE ET1C6T CHA1M LWK pEMCE TO, REMAIU f . .' w£w couett C4-IWU LIUK -DELEtEj)MATCH EX5T ELEV. SAWCUT EX6T AC WHEEE KJEW AC < EXST AC ASJE. TO BE OOIUEO SEE DETAIL- / M. aoS> % SITE PLAN I" • IO' "AS BUILT" RCE EXP DATE REVIEWED BY: INSPECTOR DATE ALMGREN 8 KOPTIONAK.INC. CONSULTING ENGINEERS Son DlK ^ o, California (6t9> 566-3922 &vi£fcwQr*W3*±J%/ XCiit^' 5/t5/90 DATE Wb L t REVISIONS BY WILSON ENSINEERING 45 W/iT DESCRIPTION REVISIONS *PP'D SHEET 2 HOME CITY OF CARLSBADENOINEERINO DEPARTMENT SHEETS 20 PLANT SEWAGE PUMP STATION SITE PLAN, DETAILS AND ( rfLv^tfi- //uf/^vf^ rmtt »Y. SJ/JCCHKD »Y «XFIELDS* PROJECT NO 3299 PROFILES Mf-lt DfmiHS NO. 315-2 CMWD 85-604 CONCRETE ENCASED SEWER MAIN SEWER MAIN CONCRETE ENCASED CONST 81.50 UN. FT. OF 8'E.aVC.P CONCRETE ENCASED SEWER MAIN OCEAN STREET SEE SHEET NO. 2 BEECH AVE SCALE I" = 20'T DATE I* BY A aaamtrreiffTSLa jrrtV- ifar DESCRIPTION -«!:•- APP'D REVISIONS SH«T CITY OF CARLSBAD ENGINEERING DEPARTMENT SHEETS OCEAN STREET SEWER BEECH AVE. LINE STA. 0+00 TO STA. 5 + 77.50 PLAN AND PROFILE A P P ROV E D : 4 ~jtf /t^/y RE. /«< DWN.gr.-CHKD.BYFIELD BK fe^ CITY' ENGII»S?R l5.t/da^tPROJECT NO. 77-27 DATE S^fa/fr V.T.'jgtf. WNG NO.-9 ?l , I \ / s^gsiu igogisg iLm.an^ EXISTS 24".EUC. TO (BE REMOVED , rBY OTHERS IT— 10+64.10 eytsris g» EXIST6 H.R'Teas MAIN 284.10 LIN. FT OF 8 E.S.V.CR SEWER MAIN N.55'23 E. (R.O.S 2298 CASED IN CONCRETE CAUTION EXISfG 12 V4" HIGH PRESSURE GAS MAIN , CONTACT UTILITY COMFBNY BEFORE EXCAVATING. BEECH AVENUE •J * t^ ^•i ' i«*\ ^*-°-**- -ifi~" -,H_ T^rr.^. * •*.£-..„•„•_ r^x ±;r .-.r- , •- v a=:!_-.-fc.i- -I. .-.i.;:>=.-fe: ^3=f=&i -ES35-- daiLEa^sE ;-.; _j—?—.----t- -' j.^^r^^rr ',:.Kr r •• T"—:rjr.~? 3Sljgg)g±g.TB; J.4.-- r:.r. JT^'i -T~f_..,— •• ••*-•• ; • T t...... ^JI.^LJ.'.J^ ^fc=L-..y.-J-...;^:--fc-j :=.-Ti il-'l_i.:-ux^bfeE7n ;: i-j= CARLSBAD, CITY OF CARLSBADEMOINECRINS DEPARTMENTPrepared in the office ui Church Engineering, Inc. ZOO 16 MODIFIED "B-Z IMPROVEMENT PLAN FOR: CARLSBAD BLVD. STA.223+OOTO STA. 228+ 50 £ N1ETQ R.C.E. 3O724 REVISION DESCRIPTION CMWD 37-5" APPENDIX F CARLSBAD MUNICIPAL WATER DISTRICT'S APPROVED MATERIALS LIST APPENDIX "C" CARLSBAD MUNICIPAL WATER DISTRICTS APPROVED MATERIALS LIST FOR USE ON CONSTRUCTION OF POTABLE AND RECYCLED WATER FACILITIES Item Description Manufacturer/Model AIR/VACUUM VALVE 2-INCH AIR/VACUUM VALVE ABOVE GRADE ENCLOSURE ANGLE METER STOPS 1-INCH ANGLE METER STOPS 2-INCH BACKFLOW PREVENTER (R.P.) CORPORATION STOP, FLARE XMIP CORPORATION STOP, MIPXMIP BOLTS AND NUTS, 304 SS BOLTS AND NUTS, 316 SS BOLTS AND NUTS, A307 BONDING AGENT, EPOXY BUSHING, INSULATING CASING END SEAL CASING SPACER CATHODIC TEST STATION BOX CATHODIC WELDING CHLORINE COATING, MASTIC Air-Vaccum Valve Assembly. See Standard Dwg W7 See 'Valve Box" for below grade components 1" Bronze Angle Meter Stop (Ball Valve) with 90 Degree Lock Wing, Flare x Outlet Swivel Meter Nut 2" Bronze Angle Meter Stop (Ball Valve) with 90 Degree Lock Wing, Flare x Outlet Meter Flange Reduced Pressure Principal Type Assemblies; Double Check Valve Detector Assemblies for Fire Sprinkler Systems Bronze Flare x MIP Thread Ball Valve (T-Head only) 1"and 2" Full Opening Bronze MIP x MIP Thread Ball Valve (T-Head only), 1" and 2" Full Opening Hex-Head Machine, ASTM A193, Grade B8 Bolts and ASTM A194, Grade 8 Nuts Hex-Head Machine, ASTM A193, Grade B8M Bolts and ASTM A1 94, Grade 8M Nuts Hex-Head Machine, Cadmium/Zinc Plated, ASTM A307, Grade A Bolts and A307 2H Heavy Hex Nuts Epoxy Resin Based Bonding Agent for Bonding New Mortar or Concrete to existing concrete Nylon, 1-1/4" x1", 1-1/2" x1", 2-1/2" x 2" 1/4" Thick Styrene Butadiene Rubber Sheet End Seal. Use 1" Wide Stainless Steel Bands. Zippered End Seals with Stainless Steel Bands may also be used. Stainless Steel Casing Spacer, Center Restrained, Position Type with PVC Liner and Non-metallic Anti-friction Runners 25.4 Kg (54 Ibs) Concrete Body with 5.4 Kg (12 Ib) Ductile Iron Lid and Lid Ring. "CP TEST' shall be cast into the Lid in 25mm (1") Letters. For Cathodic Protection Test Stations, Anode Ground Beds and Insulated Flange Test Stations. For Welding Cathodic Bond Wires to Steel Pipelines Liquid (Gas) or Sodium Hypochlorite Solution. See Section 15040 Cold applied Coal Tar or Epoxy based single component, self- priming, heavy-duty protective exterior coating for buried concrete APCO 145C VAL MATIC 202 CRISPIN UL20 Vent-0-Mat Model 050RBX4021 Pipeline Products VCAS 1830 Tan Ford BA23-444W Jones J1964W Mueller B-24255 Ford BFA23-777W Jones J1973W Mueller B-24277 List of Approved Backflow Prevention Assemblies by the State of California, Department of Health Services most recent version FordFB700, Jones 1929, Mueller B-25025 Ford FB500, Jones J-1 943 Mueller B-2969 (2") Mueller 8-20013(1") Sika Sikadur 32 Hi-Mod Calpico Corrosion Control Products F.H.Mahoney Advanced Products & Sys. Cascade Calpico Pipeline Seal & Insulator Powerseal Raychem Advanced Products & Sys. Cascade Calpico Pipeline Seal & Insulator Powerseal Raychem Christy G5 Carboline Bitumastic 50 Devoe Devtar 5A Polykem 938 Tnemec HB Tnemecol 46-465, HB Tneme-Tar 46H-413 June 2008 APPENDIX "C" CARLSBAD MUNICIPAL WATER DISTRICTS APPROVED MATERIALS LIST FOR USE ON CONSTRUCTION OF POTABLE AND RECYCLED WATER FACILITIES Item Description Manufacturer/Model COATING, WATERPROOF COUPLING; CQOO PVC DEFLECTION COUPLING, C900 PVC CLOSURE OR REPAIR COUPLING, C905 PVC CLOSURE, DEFLECTION OR REPAIR COUPLING, GROOVED COUPLING, STRAIGHT FLEXIBLE COUPLING, TRANSITION FLEXIBLE CUSTOMER SIDE SHUT- OFF VALVE CUSTOMER SIDE SHUT OFF VALVE ELL, BURY, DUCTILE IRON EPOXY ADHESIVE EXPANSION JOINT FIRE HYDRANT SPOOL, DUCTILE OR CAST IRON, FLANGED FIRE HYDRANT FIRE HYDRANT, 200 PSI or Higher FITTING, DUCTILE IRON FITTING, GROOVED Epoxy Resin Based Cemetous Trowel Grade protective waterproofing for concrete 4" through 12" Solid PVC for obtaining deflection only. 4" through 12" Solid PVC for closure or repair 16" through 36" Solid PVC for Closure, Deflection or Repair Use for Above Ground Dl or Steel Pipe 100mm (4") or larger 4" and Larger Steel or Ductile Iron Construction, Slip x Slip, Epoxy Coated with 304 or 316 Stainless Steel Bolts and Nuts. For use on AC, PVC, Dl, or Steel Pipe 4" and Larger, Steel or Ductile Iron Construction, Slip x Slip, Epoxy Coated with 304 or 316 Stainless Steel Bolts and Nuts. For use on AC PVC, Dl or Steel Pipe 3/4" and 1" Bronze Customer Shut-off (Ball Valve), Inlet Swivel Meter Nut x Outlet FIP Thread, Lockable Tabs, with Lever Handle 2" Bronze Customer Shut-off (Ball Valve), Inlet Meter Flange x Outlet FIP Thread, Lockable Tabs, with Lever Handle 6" Ductile Iron Bury Ells, Long Radius, Fig x MJ/PO (Use of Short Radius Bury Ells with District Engineer Approval Only) High-Modulus, Low Vicosity, Epoxy Resin Based Adhesive suitable for Grouting Bolts or Dowels For Water Pipeline Bridge Crossings Ductile or Cast Iron Spool with Integrally Cast Flanges and Machined or Cast Exterior Grooves. Spools 12" or longer shall have grooves 3" from each Flange. Spools shorter than 2" shall have one groove centered between the Flanges. Grooves shall be 3/16" deep, ± 1/16" and 1/4" wide, + 1/16", 6 Holed 6" Standard 150 PSI Wet Barrel Bronze Fire Hydrants with Six-Hole Bolt Pattern. 4" x 2.5" or 4" x 4" x 2.5" Outlets Project Specification Submittal Required Flanged, Mechanical, Joint or Push-on Tees, Bends, Crosses, Recucers, Adapters, etc., for Water Lines 4" and larger. Manufactured per AWWA C1 00, C1 1 1 , C1 53. Double Cement Mortar Lined. (SSB Fittings will not be permitted on C905 Pipe.) Grooved ductile Iron Fittings for Grooved end Pipes, 4" through 24" Sika Top Seal 107 STO CR 241 Certainteed Vinyl Iron HD Certainteed Vinyl Iron HD IPEX Nyloiplast America Septer Grinnell #7001 Tyler 500 Vitaulic #44, #77 APAC 301 Ford FC1 Powerseal 3501 , 3538 Romac 501 Smith-Blair 411 APAC 31 1,31 3 Baker Ford FC2A Powerseal 3501, 3538 Romac 501 Smith-Blair 41 3 Mueller Maxifit Ford B13-332WW/HT34 B13-444WW/HT34 Jones J-1908W Mueller B-24351 BF13-777Ww/HB-67S Jones J-1 91 3W Mueller B-24337 Clow South Bay Foundry Sika Sikadur 31 , Sikadur 35 APAC 703 Dresser 63 Powrseal 3563 Smith-Blair 61 1,61 2 Clow 2050, 2065 Jones J3700, J3775 Bachman Griffin Nappco/Sigma Pipeline Components Star Tyler Grinnell TylerG-B Victaulic June 2008 APPENDIX "C" CARLSBAD MUNICIPAL WATER DISTRICTS APPROVED MATERIALS LIST FOR USE ON CONSTRUCTION OF POTABLE AND RECYCLED WATER FACILITIES Item Description Manufacturer/Model FITTING, PIPE RESTRAINT GASKET GASKET, JOINT RESTRAINT GASKET, RUBBER GASOLINE RESISTANT GASKET, RUBBER RING GREASE GROUT JOINT RESTRAINT ASSEMBLY JOINT SEALING COMPOUND, PLASTIC ROPE LUBRICANT, PIPE GASKET METER METER BOX 1" SERVICE METER BOX 2" SERVICE METER BOX 1" SERVICE ( Exposed to Traffic Loads) METER BOX 2" SERVICE (Exposed to Traffic Loads & for Combination Air Release, Std Dwg W7) METER FLANGE MORTAR, REPAIR PAINT PAINT PAINT May be used with or in lieu of thrust blocks with approval of District Engineer 1/8" Thick Full Face or Ring, Aramid Fiber Bound with Nitrile. No Asbestos Content Rubber Ring Type with Stainless Steel Locking Segments Vulcanized into the Gasket. Fur use on PVC Carrier and Casing Pipes. Gasoline Resistant Pipe Gaskets for Water Mains 3mm (1/8") Thick, Rubber Ring Type, 1.72 Mpa (250 PSI) Maximum. For 1 00mm (4") through 900mm (36" Pipe Flanges For Bolt Corrosion Protection on Buried Bolts, NO-OX-ID Type Non-Shrink Cement Based Construction Grout for Crack Repair, Flooring Mortar, Dowel Grouting, Crack Sealing and General Binding Only where Concrete Thrust Restraint is not possible. Prior approval of District Engineer is required For use on Pre-cast Vault and Manhole in Grooved Joints between sections Rubber Gasket Pipe Lubricant for use on PVC or ductile Iron Pipe Joints, NSF Listing required. Supplied by CMWD 12" x 20" x 12"Polymer Meter Box and Cover for 1" Water Services with meters 1" or smaller. Cover color: Gray for Potable Water Use Purple Lids for Recycled Water Use 17" x 30" x 12" Polymer Meter box with 2-Piece Lid for 2" Water Services with meter larger than 1" and Blowoff Assemblies Cover Color: Gray for Potable Water Use Purple Lids for Recycled Water Use Gray for Potable Water Use Purple Lids for Recycled Water Use Gray for Potable Water Use Purple Lids for Recycled Water Use Bronze Meter Flanges for 1-1/2" and 2" Meters with Slotted Holes Two Component, Low Shrinkage, Cement Based with High Compressive and Bonding Strength Valve Box Lids Prime Coat required on all above ground metal surfaces Fire Hydrants Prime Coat required on all above ground metal surfaces Backflow Assys & Vent Pipes, Prime Coat required on all above ground metal surfaces Romac-GripRing Star Pipe-PVC Ring Lock Series 3500 UniFlange- 1300-C Calpico Garlock 3000 Johns-Manville Klinger4401 Tripac 5000 US Pipe Field Lok 350 Newby Calpico Johns-Manville US Pipe Sanchem NO-OX-ID Dearborn Chemical SikaSikagrout212 STO Epoxy Binder CR633 STO Epoxy Gel CR635 STO N-S Grout CR732 Quickset Joint Sealing Compound Whitlam Blue Lube AmorcastA6000485 Cover A6000484 Lid, Drop In A6000487 Amorcast A6001640PC-12 Cover A6001 643 Lid, Drop In A6000482 Brooks Model No.37 with Traffic Rated Lid Brooks Model No.66 with Traffic Rated Lid Ford CF Series Jones J1 29 A.Y.McDonald610F Sika Sika Top 122, 123 STOCR735, CR740 Frazee Traffic Line and Marking Paint Yellow #5020301 (2 coats) Frazee Aero Plate II, Bright Yellow #6480462 (2 coats) Rust-Oleum No 7671 Dunes Tan (2 coats) June 2008 APPENDIX "C" CARLSBAD MUNICIPAL WATER DISTRICTS APPROVED MATERIALS LIST FOR USE ON CONSTRUCTION OF POTABLE AND RECYCLED WATER FACILITIES Item Description Manufacturer/Model PAINT, PRIME COAT PIPE, COPPER TUBING PIPE, DUCTILE IRON PIPE, PVC C900 PIPE, PVC C905 PIPE, STEEL CEMENT MORTAR LINED AND COATED (CML+C) PLASTIC ENCASEMENT PLASTIC WRAP PRIMER, WAX TAPE PROTECTOR POST, STEEL SEALANT SERVICE SADDLE FOR ACP AND Dl PIPE SERVICE SADDLE FOR PVC C900 PIPE SERVICE SADDLE FOR PVC C905 PIPE TAG, BRASS IDENTIFICATION TAPE, OUTER WRAP Prime Coat, Prime Coat required on all above ground metal surfaces 1" Type K Soft Seamless rolled Tubing 2" Type K Soft Seamless Straight Lengths 1" and 2" Type K Rigid Seamless Straight Lengths For Water Lines 1 00mm (4") and larger manufactured per AWWA C111 C115, C150, C151. Double Cement Mortar Lined For Water Lines 4" through 12" and 8" Gate Wells. AWWA C900 Class 200 only. For Water Lines 16" and 20" through 36". AWWA C905 DR 25 and DR18 Steel Cylinder (CMUC), Per AWWA M11 and Section 15061. 1/4" Minimum Wall Thickness. Steel Pipes Used for Recycled Water Installation are to be identified per District requirements. Submittal required. 12-mil Thick Polyethylene Encasement Sleeve for Ductile Iron Pipe (DIP) per AWWA C105 and Recycled PVC, CMC/L, or DIP Non- Purple Water Pipe. Clear Sleeve for Potable Water Purple Color for Recycled Water 8-mil Thick Polyethylene Encasement for Buried Fittings and Valves — Double Wrap Clear Sleeve for Potable Water Purple Color for Recycled Water Surface Primer for Underground Application of Petrolatum Wax Tape 4" Diameter, 0.250" Wall Galvanized A-120 Steel Pipe, Concrete Filled Chemical Grout for Joint Sealing Cast Brass ASTM B62 Body with Silicone Bronze Double Straps, IP Outlet Sizes 25mm (1") and 50mm (2") Bronze or Brass Saddle with Stainless Steel Four Bolt Strap(s), IP Thread Outlet for Sizes 1" and 2" for Pipe Sizes 4" through 12" Bronze or Brass Saddle with Stainless Steel Four Bolt Strap(s), IP Thread Outlet for Sizes 1" and 2" for Pipe Sizes 16" and Larger. 1" Diameter, 18 Gauge Brass with 3/16" Die Stamped Letters and Numbers, Suitable for Attachment to Cathodic Protection Wires by means of a Nylon Zip Tie. Adhesive Plastic Outer Wrap for Wax Petrolatum Tape in Underground Applications Rust-Oleum No 769 Damp Proof Red or Rust-Oleum No 865 Enamel-Dunes Tan Cerro Halstead Lee Mueller Phelps-Dodge American Pipe Griffin Pacific States U.S. Pipe Certainteed Diamond Plastics Extrusion Technologies IPEX Pacific Western VmylTech Certainteed Extrusion Technologies IPEX J-M Pacific Western Vinyltech Carboline Denso Paste Trenton Tern-Coat 3M Scotch Seal Ford 202B Jones J-979 Smith-Blair 323 Romac 202B Mueller BR2B Ford202BS Jones J-969 Smith-Blair 393 Romac 202BS Mueller BR2S Ford 202BS Jones J-969 Romac 202B Mueller BR2S Ford 202BS Jones J-969 Romac 202N Polyken 960 Trenton Polyply June 2008 APPENDIX "C" CARLSBAD MUNICIPAL WATER DISTRICT'S APPROVED MATERIALS LIST FOR USE ON CONSTRUCTION OF POTABLE AND RECYCLED WATER FACILITIES Item Description Manufacturer/Model TAPE, UTILITY TAPE, WARNING/ IDENTIFICATION TAPE WARNING/ IDENTIFICATION FOR RECYCLED IRRIGATION TAPE, WAX ABOVEGROUND TAPE, WAX UNDERGROUND TAPPING SLEEVE FOR ACP, AND DIP TAPPING SLEEVE FOR PVC(C900-C905) VALVE STEM EXTENSION, FIBERGLASS VALVE STEM EXTENSION, STEEL VALVE, BALL WITH LOCKING TABS VALVE, BUTTERFLY 150PSI VALVE, BUTTERFLY 250 PSI VALVE, GATE, RESILIENT WEDGE (RWGV) VALVE, PRESSURE RELIEF AND SUSTAINING 10 to 50 Mil x 2" Wide General Utility Tape for Corrosion Protection of Above and Below Ground Pipes and Fittings 6" Wide, Warning/Identification (Non-Metallic) Marking Tape for Buried Facilities with Continuous Warning "Caution Water Main Buried Below" or "Caution Recycled Water Main Buried Below" Tape for Recycled Water shall be Purple 3" Wide, Warning/Identification (Non-Metallic) Marking Tape for Buried Irrigation Pipelines. Purple Color with Continuous warning "Caution Reclaimed Water Main Buried Below" Petrolatum Saturated Synthetic Fabric Tape for use on Aboveground Couplings, Flanges, Fittings, etc. Petrolatum Saturated Synthetic Fabric Tape for use on Underground Couplings, Flanges, Fittings, etc. Primer and Outer Wrap Required. Fabricated Steel Tapping Sleeve for 4" through 12" Wet Taps. Epoxy Coated with Stainless Steel Bolts and Nuts Fabricated Steel Tapping Sleeve for 4" through 12" Wet Taps. Epoxy Coated with Stainless Steel Bolts and Nuts Three Part Fiberglass Valve Extension Kit. Use when extension 8 foot or shorter. Round or Square 1-1/2" Diameter Steel Rod, Welded Construction, Hot Dipped galvanized with Top Centering Ring and AWWA 2" Operating Nuts Top and bottom. Use when extension longer than 8 foot. 3/4"Bronze, Straight, FIP x Meter Swivel with Locking Tabs and Purple Handle 18" and Larger, AWWA C504, Class B. Thermosetting or Fusion Bonded Epoxy coated and Lined. Class D or E Flange x Flange Ends 18" and Larger, AWWA C504, Class B. Thermosetting or Fusion Bonded Epoxy coated and Lined. Class D or E Flange x Flange Ends 4" through 16", non-rising Low Zinc Bronze or Stainless Steel Stern, Ductile Body and Bonnet, encapsulated Wedge per AWWA C509 or C51 5 with Epoxy Coated Interior. Manufactured to AWWA C509 or C515, with 250 PSI Rating •Ductile Iron Bodies and Bonnets are required Calpico Northtown Polyken 900 Scotchwrap 3M 50, 51 Calpico, Type 1 Line-Tec, Type B T.Christy Eng., Type 1 Terra Tape, Standard 250 Thor, Elast Tec Northtown Calpico, Type 1 Line-Tec, Type B T.Christy Eng., Type 1 Terra Tape, Standard 250 Thor, Elast Tec Northtown Trenton #1 Wax-Tape Carboline Densyl Tape Trenton #2 Wax-Tape Baker 428 Series Ford FTSC Romac FTS-420 Smith-Blair 622 Ford 'FAST W/S.S. FLANGE Romac SST W/S.S. FLANGE Mueller H304 w/S.S. FLANGE Pipeline Products FPU-210, FPT-200, FPL-220 Pipeline Products SX-900 South Bay Foundry E4160 1"FordB13-444w 1" Jones J 1908 2" Ford BF13-777W 2" Jones J1 91 3 M&H 1450, 4500 Mueller Lineseal III Pratt Groundhog M&H 1450, 4500 (Class 250) Mueller Lineseal XP 250 Pratt Triton HP-250 American FC, Series 2500 AVK25 Clow F6100, F6100 Ductile Kennedy Ken-Seal ii, KRSR Mueller 2361 M&H 4067, 7067, A2361 U.S. Pipe Metroseal & Metroseal 250 Cla-Val June 2008 APPENDIX "C" CARLSBAD MUNICIPAL WATER DISTRICTS APPROVED MATERIALS LIST FOR USE ON CONSTRUCTION OF POTABLE AND RECYCLED WATER FACILITIES Item Description Manufacturer/Model VALVE, HANDLE BALL, 150PSI VALVE BOX RECYCLED WATER VALVES VALVE BOX VALVE BOX VALVE BOX VALVE BOX VALVE BOX VALVE BOX 3/4" Through 2", Used as part of meter assembly and provided by CMWD Lid to be marked "Recycled Water", See Standard Dwg W13 For Gate Valves & Butterfly Valves, See Standard Dwg W13, Lids shall be marked "Water" Normally Close Valve, Lids shall be marked "Water" 1" Blow Off or Manual Air Releases. See Standard Dwg W5, Lids shall be marked "Water" 2" Blow Off or Manual Air Release. See Standard Dwg W6 Lids shall be marked 'Water" 4" Blow Off Assembly. See Standard Dwg W11 Air-Vaccum Valve Assembly. See Standard Dwg W7 Valve Boxes Located in traffic shall use approved manufacturer's Traffic Rated Lids Jones 3/4" J-1 098 Jones 1" J-1908, 2" J-1913 Ford 3/4" B13-332W Ford 1" B13-444W Ford 2" B13-777W South Bay Foundary SBF 1208-N Brooks Service 4TT J&R 4T Brooks Service 3RT Brooks Service 4TT J&R 4T South Bay Foundary SBF 1243 South Bay Foundary SBF 1243 (for 4" Pipe Outlet) and Brooks 4TT or J&R 4T (for Valve) Amorcast A600 1640 PC-12 w/#60001643*Service 5 Cover Brooks 66 (2-piece lid) J&R No W6B (2-pice lid) June 2008 APPENDIX G UNDERGROUND CLASSIFICATION STATE OF CALIFORNIA ARNOLD SCHWARZENEGGER. Governor DEPARTMENT OF INDUSTRIAL RELATIONS DIVISION OF OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION MINING AND TUNNELING UNIT 6150 VAN NUYS BOULEVARD. SUITE 310 VAN NUYS. CA 91401-3333 (818) 901 -5420 FAX (818) 901 -5579 December 14,2009 2009 City of Carlsbad 163 5 Faraday Ave Carlsbad, CA 92008 Attention: Mr. Mark Biskup, Associate Engineer Subject: Underground Classification Numbers: C070 & C071 -073-1OT Beech Avenue and Homeplant Influent Sewer Replacement Dear Mr. Biskup, The information provided to this office regarding the above project has been reviewed. On the basis of this analysis, an Underground Classification of "Potentially Gassy" has been assigned to the tunnel(s) identified in your submittal. Please provide a true and accurate copy of the Classification to the Drilling/Excavation/Construction Contractor and insure that a copy of the Classification is posted at the job site. Kindly insure that the Sub-Contractor notify this office to schedule the mandated Pre-job Safety Conference with the Division prior to commencing any activity associated with the project. Also, be advised that, whenever an employee enters any bore or shaft being constructed under 30-inches in diameter, the Mining and Tunneling Unit then has immediate jurisdiction over that job. Please contact us prior to entering such spaces. If you have any questions on these subjects, please contact this office at your earliest convenience. Sincerely, ics Wittry Acting District Engineer c: File State of California Department of Industrial Relations DIVISION OF OCCUPATIONAL SAFETY AND HEALTH MINING AND TUNNELING UNIT C070-073-10T Van Nuys Office R5D2 Underground Classification North Agua Hedionda Interceptor Sewer Replacement City Project Nos: 3873/5512 (NAME OF TUNNEL OR MINE AND COMPANY NAME) City of Carlsbad of 1635 Faraday Ave. Carload. CA 92008 (MAILING ADDRESS) Beech Avenue Sewer at Along Beech Avenue, between Ocean Street & Washington Street. Carlsbad. California (LOCATION) has been classified as ""POTENTIALLY GASSY*** (CLASSIFICATION) as required by the California Labor Code Section 7955. The Division shall be notified if sufficient quantities of flammable gas or vapors have been encountered underground. Classifications are based on the California Labor Code Part 9, Tunnel Safety Orders and Mine Safety Orders. A 30" diameter steel casing, approximately 814 feet in length to be installed under Beech Avenue between Ocean Street & Washington Street, Carlsbad, San Diego County, California. December 14,2009 State of California Department of Industrial Relations DIVISION OF OCCUPATIONAL SAFETY AND HEALTH MINING AND TUNNELING UNIT I C071-073-1OT | Van Nuys Office R5D2 Underground Classification North Agua Hedionda Interceptor Sewer Replacement City Project Nos: 3873/5512 (NAME OF TUNNEL OR MINE AND COMPANY NAME) City of Carlsbad of 1635 Faraday Ave. Carlbad. CA 92008 (MAILING ADDRESS) Homewood Influent Sewer at In the vicinity of Carlsbad Blvd. Carlsbad. California (LOCATION) has been classified as *** POTENTIALLY GASSY*** (CLASSIFICATION) as required by the California Labor Code Section 7955. The Division shall be notified if sufficient quantities of flammable gas or vapors have been encountered underground. Classifications are based on the California Labor Code Part 9, Tunnel Safety Orders and Mine Safety Orders. A 30" diameter steel casing, approximately 175 feet in length to be installed in the vicinity of Carlsbad Blvd. Carlsbad. San Diego County, California. December 14, 2009 APPENDIX H PROJECT SIGN DETAILS f-0" 7-0" MINIMUM 12'-0' MINIMUM BEECH :TTY OF CARLSBAI SEWER AND HOME PLANT LlFJ CATION ! INFLUENT SEWER REPLACEMENT! i I (t CONTRACTOR: CIVIL ENGINEER: DUDEK AND ASSOCIATED MATT] HALL I COUNClJ MEMBER CLAUDE A. "BUD" LEWIS MAY |ANN J.|KULCHIN I COUNCIL MEMBER 2-3 1/2" MARK RACKAROl COUNCIL) MEMBER I KEITH BI(ACKBURfJ COUNCIL MEMBER | (t ora.SONa.iona SEAL DEC/U. PROWOED )'-8 1/2"1-8 1/2" B'-O" 5-0" HS-l-DCTAIL 0 BRUKAMY FtAWRC PCR CALTRANS STO.OWS RS-2 CONRTACTQR SHALL SUBMITT FOR ENGINEER'S APPROVAL PRIOR TO CONSTRUCTING AND INSTALLING SIGN DETAIL-PROJECT SIGN NO SCALE SEE PAGE 2 FOR LETTERING DIMENSIONS PROJ. NO. 3873 & 5512 TITLE: PROJECT SIGN DETAIL PAGE 1 OE 2 SEE PAGE 2 FOR LETTERING DIMENSIONS P/?OJ. A/0. J95/ & 5500 PROJECT SIGN DETAIL PAGE 2 OF 2 APPENDIX I NCTD LICENSE AGREEMENT & SAMPLE ROE AGREEMENT North County Transit District Encroachment Permit Application Process Background North County Transit District (NCTD) was created in 1976 and owns the railroad right-of-way (ROW) from Orange County line to the Del Mar/San Diego border and from Oceanside to Escondido. NCTD maintains the ROW from Orange County to Santa Fe Depot and from Oceanside to Escondido. The ROW varies from 100-300 feet in width. Passenger and freight trains travel on the coastal ROW every day of the year at speeds up to 90 miles per hour. Passenger and freight trains travel on the inland ROW every day of the year at speeds up to 55 miles per hour. NCTD's Comprehensive Real Estate Policy NCTD may allow the use of the its real estate by public agencies, utilities, telecommunications companies, and others provided that the proposed use does not interfere with NCTD's current or planned use of the real estate. Applicants have the sole responsibility for relocating any improvements at their expense if necessary to accommodate NCTD's future use; they must reimburse NCTD for all costs associated with the proposed use; and they must pay fair market value for the use. Types of Encroachment Documents No matter the purpose, all entry on the ROW requires a permit. If permanent improvements are to remain in the ROW, either a License Agreement or Lease is also required. The Applicant must obtain a License or Lease from before a permit will be issued. a Joint Right-of Entry (JROE) permits, licenses and leases The Metropolitan Transit System ("NITS") owns the ROW located within the boundaries of the City of San Diego. Projects south of Del Mar require a Joint NCTD/MTS permit, additional review, cost and time to process. To obtain further details about JROE permits, licenses and leases, Applicants should contact MTS. a NCTD Right-of-Entry (ROE) Permit Applicants whose projects are in the City of Del Mar and locations north on the coastal ROW, or on NCTD's inland ROW, must obtain a ROE permit from NCTD prior to commencing work. A separate ROE permit is required each time work is performed. NCTD requires the Applicant to deposit the estimated amount of reimbursable costs; attend railroad safety training; provide evidence of liability insurance naming NCTD and other rail users as additional insured; and to meet other conditions determined by NCTD to be necessary to protect NCTD's real property and railroad operations, prior to issuance of the ROE permit. a NCTD License and Lease A License or Lease is required for any permanent improvement or facility that will be located on NCTD property, such as a fence, pipeline or aerial cable. The Licensee or Tenant must maintain the facility at their sole expense, relocate or remove the facility at their sole expense upon notice from NCTD, and maintain liability insurance naming NCTD and other rail users as additional insureds. The License or Lease contains other conditions as NCTD determines are necessary to protect NCTD's real estate and railroad operations. Licensees and Tenants will be required to pay fair value for the use of the property. Payment of fair market value is required for placement of private facilities, and public facilities which are constructed as part of a private project and dedicated to a member agency. Application Packages Applicants requesting permission to enter NCTD property estate must submit an application and obtain a Right-of-Entry Permit, a License, or both prior to commencement of the project or use. Completed applications must include three (3) sets of plans. Plans must show details of the proposed construction affecting the tracks and NCTD's real estate or facilities. The plans must show property lines, all rail facilities and distance to, below or above the rail. Rev. 04/08 North County Transit District Encroachment Permit Application Process mm Three (3) sets of false work plans, false work removal plans, shoring plans, cribbing plans and calculations for false work, shoring or cribbing which are proposed to be located over, under or within 30 feet of tracks must be included with the general plans if not indicated elsewhere. Plans and calculations must be stamped by a registered Professional Engineer licensed in the State of California. Application Review Process NCTD departmental staff and consultants will review applications and plans to determine the potential impact upon NCTD real estate and operations. NCTD reviews applications and plans as staff time is available. The initial review may require 4 to 6 weeks from receipt of completed application. Generally, NCTD will communicate its provisional approval or denial via e-mail, telephone or letter within 45 days of receipt of completed application. Do NOT proceed if NCTD sends a denial letter! Re-submit to meet the criteria. If the application does not propose permanent improvements or facilities within the ROW, NCTD will prepare the ROE permit and send it to the Applicant for signature. The Applicant will sign and return the document with applicable fees. NCTD will execute the ROE permit and return a copy to the Applicant. If permanent improvements or a request to lease is proposed, NCTD will obtain a cost estimate for an appraisal and communicate that dollar estimate to the Applicant. The Applicant must pay for the appraisal. Upon completion of the appraisal and satisfactory acceptance of the valuation, NCTD will prepare and send the License or Lease to the Applicant for signature. The Applicant will sign the License or Lease. NCTD will execute the License or Lease and return a copy to the Applicant. First Submittal/Counter Help Counter help is available to guide the Applicant's first submittal and provide criteria the project must meet. Counter help is provided at no charge to the Applicant however, NCTD staff cannot design the Applicant's project. Extensive staff involvement or multiple meetings with staff or NCTD's consultants will be charged against the deposit (see "Deposit" below). Fees and Deposits a Application Fees A non-refundable application review fee of $250 must be included for consideration of any application. Payment of the application fee does not guarantee or imply NCTD's acceptance or approval of the proposed project or use. a Appraisal Fee If NCTD requires an appraisal to establish fair market value of the property, the Applicant must pay the cost of the appraisal. NCTD will obtain a cost estimate before the appraisal is conducted. a Right-of-Entry If the Applicant's project is approved, the Applicant will submit a non-refundable permit fee. The minimum permit fee is $ 1,000; in some cases the fee will be higher. a Deposit NCTD will consider the Applicant's project, and estimate the cost of flagging, inspection, contractor safety training, permit administration, construction oversight, and other anticipated NCTD expenses. NCTD will notify Applicant of the estimated cost of engineering review or appraisal fees prior to issuing a ROE permit. Applicant must deposit with NCTD such estimated amounts prior to the commencement of Applicant's work on the railroad property. Depending on the length and intensity of activity, additional deposits may be required. NCTD will promptly refund any unused deposit after completion of the work and clearing of all charges against it. Rev. 04/08 North County Transit District Encroachment Permit Application Process a Exhibit or As-Built Fee Applicant must provide as-built drawings signed by the resident engineer for facilities that are permanently placed upon NCTD's ROW. NCTD may require a separate as-built deposit with each application for a License or amendment thereto. The deposit will be retuned in its entirety upon NCTD's satisfaction with the exhibit. a License Fees Licenses carry an annual fee. The nature, location and size of the facility determine the amount of this fee. Please refer to the fee schedule attached hereto. Insurance The ROE permit, License or Lease will specify the types, limits, and other insurance and indemnification requirements. Permitees, Licensees and Tenants will be required to provide a certificate of liability insurance naming NCTD and other rail users as an additional insured. Depending on the nature of the Project, separate Railroad Protective Insurance may be required. Flag Protection Flag protection by a rules-qualified railroad flagman is required for any work within 25 feet of the centerline of any track, or if equipment such as a crane or boom truck can reach into the airspace measured vertically at 25 feet of the centerline of any rail, or in any other instance wherein NCTD determines that the safety of the railroad may be jeopardized by the work. Flagging is provided subject to availability and is at Applicant's sole expense. Contractor Safety Training (CST) All persons working on the railroad property must attend NCTD's 2-hour safety training course. Each crew member will receive a safety manual and a hard-hat sticker valid for one year. NCTD charges a flat rate for CST regardless of the number of people the Applicant sends to a single class. Questions or Comments Further inquiries may be directed to Mr. Ed Singer, Real Estate Asset Administrator, NCTD, 810 Mission Avenue, Oceanside, CA 92054. (760)-966-6556 Rev. 04/08 North San Diego County Transit Development Board STANDARD ENCROACHMENT PERMIT APPLICATION NCTD USE ONLY N C T O- NCTD PERMIT #FLAGGING CONTOLtf NCTD Received Dale Application # APPLICANT: PLEASE COMPLETE ALL ITEMS BELOW; ATTACH PAGES, IF NEEDED MilePost Start MilePost End Name of Applicant Street Address of Project:Mailing Address: Applicant Telephone: Nearest Cross Street(s):Engineer/PM Other Identifying Remarks:PM/Eng. Address, if different PM/Engineer telephone/e-mail THIS IS AN EMERGENCY PROJECT Yes No Dale: Commencement Date: Expected Completion Who will do the work? (List all)Other agencies, entities, companies involved Fully Describe the Project. Include five (5) sets of complete plans with specifications, calculations, maps, if applicable North San Diego County Transit Development Board STANDARD ENCROACHMENT PERMIT APPLICATION "• -v'Ss «^ ~C „ specific Uses, {<meckafl that apply)* "... ~ .*'...'.... Description/Notes USE Temporary Use Place a New Facility Located in Railroad Right- of- Way Located on Other NCTD Property New Construction Maintenance Work Improvement to Existing Facility Communications Line Drainage basin or culvert Electrical supply, guy wires or poles Hazardous Materials Clean up High pressure gas line or valve work Landscaping Livestock crossing Monitoring Well Overhead Work, e.g. bridge or road Description/Notes USE Pedestrian Over/Underpass Private Crossing Public Crossing Repair to Existing Facility Sewer Signage Slope Work Storage of materials Storage of Rail cars Storage of vehicles Storm Water Drain Survey work Underground Work Utility relocation Wall, fencing, etc. Water Supply revised 04/08 Utility Crossings Estimated Fee Schedule Type Electrical Electrical Electrical Electrical Natural Gas Natural Gas Pole, guy, or miscellaneous Telephone, cable, other Telephone, cable, other Sewer, water, storm drain pipeline Sewer, water, storm drain pipeline Perpendicular Crossing* O/H O/H U/G U/G U/G U/G surface O/H U/G U/G U/G Size <69kV =>69kV <69kV =>69kV <=8" >8" n/a n/a n/a =<30" >30" Recurring Fee $1,000 case by case $1,500 case by case $1,500 case by case $750 minimum $1,000 $1,500 $1,000 case by case One time fee Type Sewer or water Sewer or water Storm drain Location U/G U/G U/G or surface Size =< 12" >12" n/a One-time fee case by case case by case case by case * Longitudinal installations are evaluated on a case by case basis O/H = Overhead U/G = Underground ALL FEES ARE SUBJECT TO CHANGE BASED UPON PERMITEE'S SUBMITTED DESIGN 228.9-0110-ROE-PERMITEE RIGHT OF ENTRY PERMIT THIS RIGHT OF ENTRY PERMIT ("Permit"), entered into as of 2010 between the NORTH COUNTY TRANSIT DISTRICT ("NCTD") and , ("Permittee"). RECITALS A. NCTD is the owner of certain railroad right-of-way assets extending from Orange County to San Diego and from Oceanside to Escondido (the "Right-of-Way"). The Right-of-Way is in active use for the operation of freight trains (by the Burlington Northern Santa Fe Railway Company ["BNSF"D. intercity passenger trains (by the National Railroad Passenger Corporation ["AMTRAK"1. and Southern California Regional Rail Authority ["METROLINK"1X and commuter trains (by NCTD). B. Permittee desires to enter onto and use that portion of the Right-of-Way more particularly described in Exhibit A attached hereto (the "Permit Area"). C. NCTD is willing to allow Permittee to enter onto and use a portion of the Right-of- Way, provided that Permittee's entry and use do not interfere with the NCTD's operations, including response to emergencies and routine maintenance, or the safe use of the Right-of-Way by NCTD or its agents, BNSF, AMTRAK, and METROLINK, and provided that Permittee's entry and use are in strict accordance with terms and conditions set forth in this Permit. NOW THEREFORE NCTD and Permittee agree as follows: 1. Basic Permit Terms. 1.1 Permit Fee: One Thousand Dollars ($ 1,000.00). 1.2 Expense Reimbursement Deposit: To be determined. 1.3 Permit Expiration Date: earlier of completion of task or December 31, 2010 1.4 Permitted Use: Construct the Homeplant Lift Station Influent & Beech Avenue Sewer Replacement Project including access to NCTD equipment yard and manhole on Beech Avenue per plans on file with NCTD at approximate MilePost 228.9. 1.5 NCTD Permit Coordinator: Edward J. Singer, Real Estate Asset Administrator Telephone number: (760) 966-6556 1.6 Permittee's Address: Telephone Number: 1.7 Emergency Number: (760) 966-6700 SDPUB\LPUCKETT\380928.3 Page 1 228.9-0110-ROE-PERMITEE 2. Grant of Permit. NCTD hereby permits Permittee to enter upon and use the Permit Area for the purpose and during the time periods set forth in this Permit. 3. Permit Fee. Permittee shall pay to NCTD, in advance, the non-refundable Permit Fee set forth in section 1.1 as partial consideration for the rights and privileges set forth in this Permit. The Permit Fee is payable to North County Transit District on or before execution of this Permit. 4. Cost Reimbursement, hi addition to the Permit Fee, Permittee shall reimburse NCTD for all costs and expenses incurred by NCTD in the review of Permittee's request for this Permit, Permittee's entry upon and use of the Permit Area, and review and inspection of any work performed in the Permit Area; markout of railroad facilities; inspection, flagging, and security services; and installation, removal, repair, and restoration of the Right-of Way and railroad facilities. Upon execution of this Permit, Permittee shall deposit with the NCTD the Expense Reimbursement Deposit amount set forth in section 1.2. NCTD may deduct the costs and expenses from the Expense Reimbursement Deposit as such costs and expenses are incurred. Costs of services provided by NCTD employees will be charged at the employees' fully loaded productive hourly rate (monthly salary and benefits divided by 150 hours). Services provided by NCTD consultants, equipment rentals, and other third party costs will be charged at cost plus a 7.2% administrative fee. Upon demand by NCTD, Permittee shall make any additional deposits that NCTD determines are necessary to reimburse NCTD for the costs and expenses incurred by NCTD. In the event that the costs and expenses incurred by NCTD exceed the amounts deposited, Permittee shall reimburse NCTD for all such costs and expenses within 30 days of invoice. 5. Use of Right of Way. 5.1 Permitted Use. Permittee's entry upon and use of the Permit Area is solely for the purpose set forth in section 1.4. 5.2 Time of Use. a. Permittee shall not enter upon or use the Permit Area or any Right-of-Way until Permittee has paid the Permit Fee set forth in section 1.1, paid the Expense Reimbursement Deposit set forth in section 1.2, satisfied the safety conditions set forth in section 5.3(d), and delivered to NCTD the evidence of insurance set forth in section 8. b. Permittee shall deliver to NCTD a written Flag Protection Right-of-Way Work Request, in the form attached as Exhibit B. not less than three (3) business days prior to each entry upon the Permit Area. The need for flag protection shall be determined in the sole discretion of the NCTD's Manager of Maintenance of Way. In the event that the Manager of Maintenance of Way determines that flag protection is necessary, Permittee shall not enter upon or use the Permit Area until flag protection has been provided. NCTD shall use reasonable SDPUB\LPUCKETT\380928.3 Page 2 228.9-0110-ROE-PERMITEE efforts to provide flag protection on the dates and times of Permittee's requested entries, provided that any work by NCTD or its agents, BNSF, AMTRAK or METROLINK that requires flag protection shall take priority. NCTD shall not be liable for any costs, expenses, or claims if flag protection is not provided on Permittee's requested dates or times of entry. c. The NCTD's Manager of Maintenance of Way has the right to approve the dates and times that Permittee may use the Permit Area. d. This Permit and Permittee's rights hereunder shall terminate automatically upon the completion of the purpose stated in section 1.4, or at 5:00 p.m. on the Permit Expiration Date set forth in section 1.3, which ever is first to occur. 5.3 Restrictions on Use. a. Permittee has no right to use any portion of the Right-of- Way other than the Permit Area for any purpose. b. No use by Permittee shall interfere with or delay any railroad operations on the Right-of-Way or interfere with or cause damage to any railroad facilities. c. Permittee shall protect all railroad facilities, public and private improvements, utilities, communication lines, survey and subdivision monuments, and other facilities of like character, existing or constructed during the term of this Permit upon, over, under, or across the Right-of-Way from damage from Permittee's use. Permittee shall promptly replace or repair all such improvements or facilities which are destroyed or damaged as a result of any entry by Permittee under this Permit. Permittee shall bear the entire cost of replacement or repairs of any and all improvements and facilities damaged or destroyed by reason of Permittee's use under this Permit, whether such improvements or facilities are owned by NCTD or any other owner. Any repair or replacement shall be to the satisfaction, and subject to the approval of NCTD or the owner of the improvements or facilities. d. Every individual who will be entering upon the Right-of-Way under this Permit, before entering onto the Right-of-Way, shall first attend a class conducted by the NCTD or the NCTD's designee on Railroad Worker Protection Safety rules and regulations. Permittee shall comply with the SDNR rules and regulations of the San Diego Northern Railway and the Track Safety Standards, Part 213, Subpart A-F, Class of tracks 1-5, Federal Railroad Administration (FRA) at all times while on the Right-of-Way. Such rules and regulations include, but are not limited to, the wearing of hard hats, protective goggles, reflective vests and steel-toed (or equivalent) shoes at all times while working on the Right-of-Way. All costs of the safety training and of complying with the NCTD's safety requirements will be at the expense of the Permittee. SDPUB\LPUCKETT380928.3 Page 3 228.9-0110-ROE-PERMITEE e. Permittee shall be solely responsible for compliance with all federal, state, and local laws, regulations, rules, and orders applicable to Permittee's entry upon and use of the Right-of-Way. Permittee shall obtain all federal, state, and local permits and approvals applicable to Permittee's entry upon and use of the Right- of-Way. f. No object which can be moved by two persons shall be left on the Right-of- Way unattended. This requirement also applies to objects above and/or outside the Right-of-Way on the uphill side which can be thrown or rolled downhill onto the track(s). 5.4 As-Built Drawings. Permittee shall provide NCTD with a set of as-builts, hard copy, and electronic file, if available, within 30 days of acceptance of work. No excess deposited funds will be released until as-builts are submitted and signed by a licensed engineer in the State of California. 6. Safety and Environmental Protection. 6.1 Compliance with Laws. Permittee shall operate and maintain the Right-of-Way and/or Permit Area so as to avoid injury or damage to any person or property, hi carrying out Permittee's work, Permittee shall at all times, exercise all necessary precautions for the safety and environmental protection of the Right-of-Way and/or Permit Area, and be in compliance with all applicable federal, state and local statutory and regulatory requirements including, but not limited to, those promulgated by the State of California, Division of Industrial Relations (Cal/OSHA), Cal/EPA, US/EPA, and the U.S. Department of Transportation, including the Omnibus Transportation Employee Testing Act. 6.2 Hazardous Materials Prohibited. Permittee shall not use or allow anyone else, including its contractors, to use the Right-of-Way and/or Permit Area to generate, manufacture, refine, transport, treat, store, handle, recycle, release, dispose of, or disrupt any Hazardous Material for the operation of Permittee's activities as contemplated under this Permit. The term "Hazardous Material" shall mean any hazardous, toxic or dangerous waste, substance, pollutant, emission or matter (including petroleum products, whether so defined or not), defined or listed as such in the California Hazardous Waste Control Law (Health & Safety Code, § 25100 et seq.), the Comprehensive Environmental Response, Compensation, and Liability Act (42 U.S.C. § 9601 et seq.), the Resource Conservation and Recovery Act (42 U.S.C. § 6901 et seq.), the Clean Water Act (33 U.S.C. § 1251 et seq.), or any other federal, state, or local statute, law, ordinance, code, rule, or regulation. 6.3 Response Action. Permittee is responsible for any investigation of site conditions, cleanup, remedial, removal or restoration work arising out of or in any manner directly or indirectly connected with Permittee's activities in the Right-of-Way and/or Permit Area that is required (a) under any applicable federal, state, or local statute, law, ordinance, code, rule, or regulation; (b) by any judicial arbitral or SDPUB\LPUCKETTG80928.3 Page 4 228.9-0110-ROE-PERMITEE administrative order; (c) to comply with any agreements affecting the Right-of-Way and/or Permit Area; or (d) to maintain the Right-of-Way and/or Permit Area in a standard of environmental conditions which presents no risk to safety or health and prevents the release of any Hazardous Materials to adjacent property. 6.4 Survival. This Section 6 shall survive the termination of this Permit. 7. Improvements and Work. 7.1 No Permanent Improvements. This Permit does not authorize Permittee to place any improvements or facilities in the Right-of-Way that will remain in the Right-of- Way after the termination of this Permit. Any such improvements or facilities can be authorized only by a separate written license or agreement between NCTD and Permittee or the owner of the improvements or facilities, which license or agreement shall contain such other terms, conditions, covenants, representations, and warranties as NCTD, in NCTD's sole and absolute discretion, determines to be appropriate, including, without limitation, provisions relating to maintenance, term, payments for use of the Right-of-Way, relocation, indemnity, and insurance. 7.2 Approval of Work. Permittee shall deliver to NCTD, for NCTD's review and approval, drawings, specifications, and other construction documents describing any proposed work in the Permit Area in sufficient detail to enable NCTD to determine the scope and nature of the proposed work and the potential effect of such work on the Right-of-Way and the train operations. NCTD may approve or disapprove any work in NCTD's sole and absolute discretion, and NCTD may require such changes or impose such conditions as NCTD, in its sole and absolute discretion, deems necessary or appropriate. In the event that NCTD approves any proposed work, the work by Permittee in the Permit Area shall be done in compliance with the drawings, specifications, and documents approved by NCTD, with the terms and conditions set forth in this Permit, and with all applicable federal, state, and local laws, rules, regulations, permits, and orders. Permittee shall only use a contractor approved by NCTD. NCTD shall have the right inspect the work to determine whether the work is performed in accordance with the terms and conditions of this Permit and to order Permittee to correct or remove any work that does not comply with the terms and conditions of this Permit. Permittee shall reimburse NCTD for the costs of inspections and costs of furnishing any flag protection for the work. 7.3 No Representation or Warranties Regarding Work. NCTD's review and inspection of the drawings, specifications, construction documents, and work is for the purpose of examining the general arrangement, design, and details of the work for potential impact on the Right-of-Way and railroad operations. NCTD and NCTD's employees, consultants, and agents assume no responsibility for and make no representations or warranties, express or implied, as to the design, condition, workmanship, or adequacy of the drawings, specifications, construction documents, or work. No review, comments, requirements, or inspection shall relieve Permittee SDPUB\LPUCKETTv380928.3 PageS 228.9-0110-ROE-PERMITEE or Permittees engineers, contractors, subcontractors, or consultants from the entire responsibility for the errors or omissions in the drawings, specifications, or construction documents, or for the quality or adequacy of the work. 7.4 Permittee's Notification Requirements. a. Permittee shall contact the NCTD Permit Coordinator named in section 1.5 of the Basic Permit Terms prior to the start of any construction work for a markout of NCTD facilities. Please be advised that NCTD is not a member of Dig Alert. b. Permittee shall contact Dig-Alert at (800) 422-4133 prior to any excavation in the Right-of-Way. c. Permittee shall contact Underground Service Alert for MCI Telecommunications installations at (800) 227-2600 prior to any excavation in the Right-of-Way. d. Permittee shall immediately stop work and notify NCTD Permit Coordinator if Permittee becomes aware of any Hazardous Materials or suspected Hazardous Materials in the Right-of-Way and/or Permit Area, violation of any environmental law, or actions brought by third parties against Permittee alleging environmental damage. Permittee shall not take any remedial action in response to the presence of any Hazardous Materials in or about the Right-of- Way and/or Permit Area, nor enter into any settlement, consent decree, or other compromise in respect to any claims relating to any Hazardous Materials, without NCTD's prior written consent. 8. Exculpation and Indemnity. 8.1 Exculpation of NCTD. NCTD shall not be liable to Permittee for any damage to Permittee or Permittee's property from any cause. Permittee waives all claims against NCTD or its agents, BNSF, AMTRAK, METROLINK, and their respective directors, officers, employees, and agents for damage to person or property arising for any reason. Permittee acknowledges that the Right-of-Way is used for operation of trains operating at high speeds. 8.2 Indemnity. a. Permittee hereby indemnifies, defends, and holds NCTD and its agents, BNSF, AMTRAK, and METROLINK, and their respective directors, officers, employees, agents, contractors, or authorized volunteers, harmless from and against any and all liability or claim of liability, loss or expense, including defense costs and legal fees and claims for damages of whatsoever character, nature and kind, whether directly or indirectly arising from or connected with an act or omission of Permittee, or any employee, agent, invitee, contractor of Permittee, or other person acting by or on behalf of Permittee on or about the SDPUB\LPUCKETT\380928.3 Page 6 228.9-0110-ROE-PERMITEE Right-of-Way, including, but not limited to, liability, expense, and claims for: bodily injury, death, personal injury, or property damage; provided, however, that nothing herein shall relieve any party indemnified hereunder from liability to the extent that such liability arises from such party's sole established negligence or willful misconduct. This indemnity shall not require payment of a claim by NCTD or its agents, BNSF, AMTRAK, METROLINK or any of their respective directors, officers, employees, or agents as a condition precedent to the NCTD's recovery hereunder. Permittee's obligation to indemnify hereunder shall not be restricted to insurance proceeds, if any, received by NCTD or its agents, BNSF, AMTRAK, METROLINK, or their respective directors, officers, employees, or agents. b. Permittee hereby indemnifies, defends, and holds NCTD and its agents, BNSF, AMTRAK, and METROLINK, and their respective directors, officers, employees, and agents, contractors, or authorized volunteers, harmless from and against any and all actions, proceedings, damages, costs, attorney's fees, expenses, penalties or liabilities, in law or equity, of every kind or nature whatsoever, arising out of, resulting from, or on account of the violation of any governmental law or regulation, compliance with which is the responsibility of Permittee. c. Permittee hereby indemnifies, defends, and holds NCTD and its agents, BNSF, AMTRAK, and METROLINK, and their respective directors, officers, employees, and agents, contractors, or authorized volunteers, harmless from and against any and all losses, expenses, damages (including damages to the work itself), attorneys' fees, and other costs, including all costs of defense, which any of them may incur with respect to the failure, neglect, or refusal of Permittee to faithfully perform all of its obligations under this Permit, including, but not limited to, the environmental protection provisions in Section 6 of this Permit. Such costs, expenses, and damages shall include all costs, including attorneys' fees, incurred by the indemnified parties in any lawsuit to which they are a party. d. Permittee shall defend, at Permittee's own cost, expense and risk, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against NCTD or NCTD's directors, officers, employees, agents, contractors, or authorized volunteers. NCTD or its authorized representatives shall have full and exclusive authority and discretion to select and retain legal counsel to jointly or severally represent any or all of the parties; determine and control the course, strategy, or defense of any litigation; and compromise, settle or otherwise resolve any or all of the aforesaid suits, actions or other legal proceedings. 8.3 Delay/Cancellation of Trains. Without limiting the indemnity set forth in section 7.2, Permittee agrees to pay all costs associated with the delay or cancellation of trains caused by Permittee. Delay charges are estimated to be $2,000 per passenger SDPUB\LPUCKETT\380928.3 Page 7 228.9-0110-ROE-PERMITEE train delayed over 30 minutes and may include the cost of busing passengers around the work area, if necessary. 8.4 Indemnity Not Limited to Insurance Coverage. The requirements as to the types and limits of insurance coverage to be maintained by Permittee as required by section 8, and any approval of such insurance by NCTD, are not intended to and shall not in any manner limit or qualify the liabilities and obligations otherwise assumed by Permittee pursuant to this Permit, including but not limited to the provisions concerning indemnification. 9. Insurance. Permittee, at Permittee's sole cost and expense, shall procure and maintain the following insurance: 9.1 Railroad Protective Liability Insurance. a. Railroad Protective Liability Insurance covering the operations performed by Permittee or any subcontractor of Permittee within fifty (50) feet vertically or horizontally of railroad tracks. b. The AAR-AASHTO (ISO/RMA) Occurrence Form (claims-made forms are unacceptable) shall be issued in the names of the North County Transit District, San Diego Northern Railroad, Burlington Northern Santa Fe Railway Company, and National Railroad Passenger Corporation. c. The Railroad Protective Liability Insurance policy shall have limits of liability of not less than $5 million per occurrence, combined single limit, for Coverages A and B, for losses arising out of injury to or death of all persons, and for physical loss or damage to or destruction of property, including the loss of use thereof. Additionally, Policy Endorsement CG 28 31 - Pollution Exclusion Amendment, is required to be endorsed onto the policy. A $5 million annual aggregate shall apply. d. At NCTD's request, Permittee shall submit the original Railroad Protective Liability Insurance Policy to NCTD prior to entry upon the right-of-way 9.2. Commercial General Liability Insurance. a. Commercial General Liability Insurance covering liability of the Permittee with respect to all operations to be performed and all obligations assumed by the Permittee under the terms of this Permit. Products-completed operations, independent contractors, and contractual liability coverages are to be included, with the contractual exclusion related to construction/demolition activity within fifty (50) feet of the railroad and any X-C-U exclusions deleted. SDPUB\LPUCKETT\380928.3 PageS 228.9-0110-ROE-PERMITEE b. Coverage for commercial general liability shall be at least as broad as Insurance Services Office Commercial General Liability Coverage (Occurrence Form CG 0001). c. Coverage for completed operations.on Form CG 2037 10, for a period not less than two (2) years after construction of permanent facilities installed over, under, upon or across NCTD property. d. The commercial general liability policy must name North County Transit District, San Diego Northern Railroad, Burlington Northern Santa Fe Railway Company, National Railroad Passenger Corporation, Southern California Regional Rail Authority, and their respective directors, officers, employees, contractors and agents as additional insureds. e. Limits shall be no less than two million dollars ($2,000,000) per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply to the Right-of-Way (with the ISO CG 2503, or ISO CG 2504, or insurer's equivalent endorsement provided to NCTD) or the general aggregate limit shall be twice the required occurrence limit. 9.3 Automobile Liability. a. Automobile liability insurance covering the liability of Permittee arising out of the use of all owned, non-owned, and hired vehicles which bear, or are required to bear, license plates according to the laws of California and which are not covered under the Permittee's Commercial General Liability insurance. Coverage under this policy shall have limits of liability of not less than $2 million per occurrence, combined single limit, for bodily injury and property damage (including loss of use) liability. b. Coverage shall be at least as broad as Insurance Services Office Automobile Liability Coverage (Form CA 0001), covering Symbol 1 (any auto). c. The automobile liability policy must name North County Transit District, San Diego Northern Railroad, Burlington Northern Santa Fe Railway Company, National Railroad Passenger Corporation, Southern California Regional Rail Authority, and their respective directors, officers, employees, contractors and agents as additional insureds. d. Limits shall be not less than two million dollars ($2,000,000) for bodily injury and property damage each accident limit. 9.4 Workers' Compensation and Employer's Liability Insurance. SDPUB\LPUCKETT\380928.3 Page 9 228.9-0110-ROE-PERMITEE a. Workers' compensation and employer's liability insurance complying will the requirements of all applicable laws relating to workers' compensation insurance, covering or insure all of the Permittee's employees working on or about the Right-of-Way. b. Limits shall be no less than two million dollars ($2,000,000) per accident for bodily injury and disease. c. By his/her signature hereunder, Permittee certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and it will comply with such provisions in connection with any work performed on the Site. d. Any persons providing services with or on behalf of Permittee shall be covered by workers' compensation (or qualified self-insurance). 9.5 Policy Forms. All of the insurance shall be provided on policy forms and through companies reasonably satisfactory to NCTD. 9.6 Acceptability of Insurers. Insurance is to be placed with insurers having a current A.M. Best rating of no less than A-, VII or equivalent or as otherwise approved by NCTD. 9.7 Evidences and Cancellation of Insurance. a. Prior to entry on the Right-of-way, Permittee shall file with the Permit Coordinator a certificate of insurance for the commercial general liability, automobile liability, and railroad protective liability policies required by section 8, with an original signature of the insurer's representative . An endorsement shall be attached to the certificate demonstrating that the policy was changed to reflect the additional insured requirements. b. Each insurance policy required by this clause shall state or be endorsed to state that coverage shall not be amended or canceled, except after thirty (30) days prior written notice by U.S. mail has been given to NCTD. 10. Default; Termination. 10.1 Default. If Permittee uses the Right-of-Way for any other purpose than as stated in section 1.4 of the Basic Permit Terms, or fails to act strictly in accordance with the terms and conditions of this Permit, then NCTD may immediately and without prior notice to Permittee terminate this Permit and prevent Permittee from using or remaining upon the Right-of-Way, with or without process of law. In the event that Permittee fails to perform any obligation under this Permit, Permittee shall SDPUB\LPUCKEnA380928.3 Page 10 228.9-01 10-ROE-PERMITEE pay all costs and expenses incurred by NCTD in obtaining performance of such obligations, including costs of suit and reasonable attorney's fees. 10.2 Removal of Work. If Permittee fails to complete any work in accordance with the terms and conditions of this Permit, NCTD may remove such work and restore the Right-of-Way at the expense of Permittee, and Permittee shall be liable to NCTD for all costs and damages occasioned thereby. 10.3 Permittee's Obligations on Termination. Upon termination of this Permit, and at Permittee's sole expense, Permittee shall remove any and all equipment, tools, vehicles, materials, and other personal property placed on the Right-of-Way or used in connection with Permittee's entry onto or use of the Right-of-Way and Permittee shall restore the Right-of-Way in a manner satisfactory to NCTD. Should Permittee fail or refuse to comply with the terms of this section, NCTD may, at its option, perform such work. Permittee shall reimburse NCTD for the cost so incurred. Failure on the part of NCTD to perform the obligations of Permittee shall not release Permittee from liability hereunder for loss or damage occasioned thereby. 10.4 Continuing Obligations of Permittee. No termination or cancellation of this Permit shall relieve or release Permittee from any liability or obligation (whether of indemnity, payment of costs, or otherwise) which may have attached or accrued previous to or which may be accruing at the time of such termination or cancellation. 1 1 . Notices. Except as otherwise provided in this Permit, any notice required or permitted to be given hereunder shall be in writing and may be given by personal delivery or by certified or registered mail, and shall be deemed sufficiently given if delivered or addressed to Permittee at the address in section 1 .6 of the Basic Permit Terms or to NCTD at North County Transit District, 810 Mission Avenue, Department R, Oceanside, CA 92054. Mailed notices shall be deemed given upon actual receipt at the address required, or forty-eight hours following deposit in the mail, postage prepaid, whichever first occurs. Either party may by notice to the other specify a different address for notice purposes. 12. Permittee's Agents. Any contractor or subcontractor performing work on, or in connection with the Permittee's use of or entry onto the Right-of-Way pursuant to this Permit, shall be conclusively deemed to be the servant and agent of Permittee, acting on behalf and within the scope of such contractor's or subcontractor's employment for Permittee. 13. NCTD Agents. Except as otherwise provided in this Permit, the term "NCTD" shall include NCTD's staff and employees. 14. NCTD Contacts. The NCTD Permit Coordinator named in section 1.5 serves as a liaison between NCTD staff and Permittee to assist NCTD staff in the coordination of SDPUB\LPUCKETT\380928.3 page 228.9-0110-ROE-PERMITEE the reviews, approvals, and scheduling of NCTD activities in connection with this Permit. The NCTD Permit Coordinator does not have the authority make agreements on behalf of NCTD or bind NCTD to any decision. 15. Covenant of Non-Discrimination. Permittee covenants for itself, and its successors and assigns, and all persons claiming under and through Permittee, that there shall be no discrimination or segregation of any person or group of persons on account of sex, marital status, race, color, creed, religion, national origin, or ancestry in the sale, lease, sublease, transfer, use, occupancy, tenure or enjoyment of any portion of the Right-of- Way. 16. No Partnership, Joint Venture or Principal-Agent Relationship. Nothing contained in this Permit shall be deemed or construed to create the relationship of principal and agent, or of joint venture, or of partnership between Permittee and NCTD. 17. General Provisions. 17.1 No Further Rights. a. This Permit constitutes a permit only to enter upon and use the Right-of-Way for the purpose set forth in section 1.4 of the Basic Permit Terms and shall not be construed as granting to Permittee any right-of-possession, estate, title or interest whatsoever in or to the Right-of-Way, or any part thereof. b. Permittee hereby acknowledges that it has been informed that NCTD is a public entity and that the subject property has previously been acquired by NCTD for a public purpose. Permittee further acknowledges that any rights acquired under this Permit arose after the date of acquisition of the subject property and that such rights are subject to termination when the property is needed by NCTD for the public purpose. Permittee hereby acknowledges and agrees that at the time of termination of this Permit by NCTD, Permittee will not be a "displaced person" entitled to any of the relocation assistance or benefits offered to displaced persons under State or Federal law. 17.2 Modification of Permit. This Permit and any provision, covenant, condition, or restriction contained herein may be extended, modified, or amended with the unanimous consent of the Parties. No such extension, modification or amendment will be effective until a written instrument setting forth its terms has been executed by NCTD and Permittee. 17.3 Captions The captions of this Permit are inserted only as a matter of convenience and for reference. It does not define, limit or describe the scope of intent of this Permit, and they shall not affect the interpretation thereof. 17.4 Agreement for Exclusive Benefit of Parties Except where expressly provided otherwise in this Permit, the provisions of this Permit are for the exclusive benefit SDPUB\LPUCKETTY380928.3 page \2 228.9-0110-ROE-PERMITEE of the Parties hereto and not for the benefit of any other person nor shall this Permit be deemed to have conferred any rights, express or implied, upon any other person. Neither Permittee, its heirs, legal representatives, successors or assigns, nor any subsequent assignee, shall assign this Permit or any interest herein, without first securing the written consent of NCTD in each instance, and that at the option of NCTD, this Permit shall be forfeited by any such unauthorized assignment, transfer or lease or by any assignment or transfer thereof by operation of law. 17.5 Waiver of Default. A waiver by any Party of any default by another Party must be in writing, and no such waiver shall be implied from any omission by a Party to take any action in respect of such default. No express written waiver of any default shall affect any default or cover any period of time other than the default and period of time specified in such express waiver. One or more written waivers of any default in the performance of any provision of this Permit shall not be deemed to be a waiver of any subsequent default in the performance of the same provision or any other term or provisions contained herein. The consent or approval by a Party to or of any act or request by another Party requiring consent or approval shall not be deemed to waive or render unnecessary the consent or approval to or of any subsequent similar acts or requests. 17.6 Successors. This Permit shall be binding upon and inure to the benefit of the parties hereto and their respective successors and assigns of the parties. 17.7 Governing Laws. This Permit shall be construed, interpreted, governed and enforced in accordance with the laws of the State of California. 17.8 Time of Essence. Time is of the essence with respect to the performance of each of the covenants and agreements contained in this Permit. 17.9 Severability. If any clause, sentence, or other portion of the terms, conditions, covenants, and restrictions of this Permit becomes or is declared to be illegal, null, or void for any reason, or be held by any court of competent jurisdiction to be so, the remaining portions of this Permit will remain in full force and effect. SDPUB\LPUCKETTO80928.3 Page 13 228.9-0110-ROE-PERMITEE Emergency Number. Permittee shall immediately notify the Dispatcher at the Emergency Number set forth in section 1.7 if the tracks become fouled in any way. NORTH COUNTY TRANSIT PERMITEE DISTRICT By: By:_ Thomas Lichterman Director of Operations Title:_ SDPUBVLPUCKETT\380928.3 page 14 228.9-0110-ROE-PERMITEE EXHIBIT "A" Permit Area \ i SDPUB\LPUCKETTA380928.3 Page 15 228.9-0110-ROE-PERMITEE Exhibit B Job Name: Control Number: Billable Party: Hours Authorized: FLAG PROTECTION RIGHT-OF-WAY WORK REQUEST 1. Work performed on the NCTD RIGHT-OF-WAY which involves personnel or equipment must have an NCTD-supplied flagperson for duration of the work, unless specifically waived by NCTD. Cost of the flag person shall be borne by the party requesting the the work. Depending on the extent of the work. NCTD may require the requesting party to provide a deposit to cover the estimated cost of the flag protection. Work Request form MUST BE FILLED OUT COMPLETELY AND RETURNED TO NCTD A MINIMUM OF 72 HOURS PRIOR TO THE BEGINNING OF THE WORK. PLEASE RETURN FORM TO: North County Transit District 810 Mission Avenue Oceanside, CA 92054 Attention: ED SINGER PHONE: (760)966-6556 FAX: (760)754-0644 3. Depending on the nature of the work. NCTD may request a meeting at the job site prior to approving the work request. 4. Contractor shall sign time cards of personnel providing flag protection. 5. Contractor requesting a flag person will be charged a minimum of four hours show-up time if no Contractor personnel is on the jobsite at the time and date specified in this request. NAME OF CONTRACTOR: PHONE: BILLABLE PARTY: Address: City: State: CA Zip: PURPOSE OF WORK: LOCATION OF WORK: EQUIPMENT TO BE USED: WORK START DATE: TIME. COMPLETION DATE: TIME:' PERSON IN CHARGE AT WORK SITE: CONTRACTOR'S SIGNATURE: DATE: APPROVED BY: DATE: PRINT NAME: MP#: SDPUB\LPUCKETT\380928.3 Page 16 228.80-995-PL-CSBD AMENDMENT TO PIPELINE LICENSE This AMENDMENT TO PIPELINE LICENSE is made effective and between NORTH COUNTY TRANSIT DISTRICT ("NCTD") and CITY OF CARLSBAD ("CITY"). .2009 by WHEREAS NCTD is a successor in interest to the Atchison, Topeka and Santa Fe Railway Company, and CITY is a successor in interest to the Carlsbad Sanitary District, and NCTD and CITY are parties to Secretary's Contract No. 33144, dated February 26, 1931 and amended December 1,1948, and CITY desires to install, use, maintain and repair a new 16" PVC sewer line within a portion of NCTD's property at approximate Milepost 228.9. NOW THEREFORE The parties agree as of the date written above, that approximately 214' of 16" sewer pipeline encased in 30" steel casing as indicated on Exhibit "A" attached hereto shall supersede the prior exhibit for that portion of 15" pipeline identified as "ABANDONED 15"VCPSEWER". and Remaining portions of pipeline depicted on Exhibit "A" to Secretary's Contract No. 33144 reasonably reflect the current use. approximate location and dimensions of facilities within the railroad right of way. Executed by Lessor and Lessee as of the date first written above. NORTH COUNTY TRANSIT DISTRICT Matthew O. Tucker Executive Director CITY Approved as to Form Approved as to Form V. By: Ronald Kemp, Beputy City Attorney ATTACHE) TO CONTRACT BETWEEN NORTH COUNTY TRANSIT DISTRICT AND CITY OF CARLSBAD EXST 10' CARLSBAD MUTUAL WATER COMPANY ESMTREC 07-28-5+BOOK 9282, PAGE 155-EOO-Oa CARLSBAD EXST 8' CARLSBAD SANITARY DISTRICT ESMT 07-18-52 BOOK 4531 PACES 220 & 223 HOME PLANT UFTSTATON , 155-200-O3CARLSBAD v__ s 74' OF 1«T PVC SEWER 11,3V OF 16T PVC SEWER 155-300-11 NCTD 155-200-13 NCTD 19442' OF 16T PVC SEWER IN 0425" THICK 3tf STEEL CASING OFTRACKS 2t4J!7 IMAR FEET OF 16-INCH CLASS 150 PVC GRAVITY SOWER M*IN LOCATED ON NCTD PROPERTY NORTH OF THE TRACKS. PIPE SEGMENT UNDER CARLSBAD BOULEVARD IS ENCASED IN JO-INCH STEEL CASING PIPE WFTH A WLL THICKNESS OF 0,25" SCALE IN FEET SUPPLEMENTAL JSGKSEMEOT between TBS AICHISON, TOPEKA AND SANTA. FE HAIIFAX COMPANY and •CARLSBAD SANITARY DISTRICT Amending Secretary's Ho. 3311di» substitution of print. •Dated: December 1, SCTPIEMENTAL AGREEMENT, Ifade this 1st day of December, 191*8, between THE ATCHISCai, TQPEKA AND SANTA FE HAIL- IAT COMPANI, a Kansas corporation, hereinafter called "Railway Conqpany11, first party, and CARLSBAD SANITARY DISTRICT, a California corporation, hereinafter called "District", second farty RECITALS: By an instrument in -writing, dated February 26, 1931* between the parties hereto, designated in the records of the Railway Company as Contract Secretary's Ho. 331 Mi (hereinafter for convenience referred to «s "Original license"), the Railway Company accorded to the District license and permission to.construct, maintain and use a sewer line carrying sewage along and across the right of way and tracks of the Railway Conpany at Carlabad, San Diego County, California, at the locations shown by solid red lines and particularly described upon print of Division Engineer * a Drawing Wo. L-H-11266, revised February 2>, 1931, thereto attached, marked "Exhibit A", and by reference made a part thereof. Recently an additional connection to a branch line has been jnade to said sewer line by the District, and it is the purpose of the parties hereto to supplement the Original license in the manner hereinafter eet forth. ±££ 5 ®U •§!! 1* - -:-' ..-/.-.; -.-.••••.'" .•„-.-•.-•'••••'• -v:' •• • NOlf, THEREFORE, it is agreed by and between th« parties hereto as follows: 1« That print of Division Engineer's Dtrawing Mo. ]>11-11266, last revised October 26, 19U8, hereto attached, Barked "Exhibit A", and by reference made a part hereof, correctly shows by solid red lines the location of said sewer line across the Railway Conpany's right of way and tracks as it now exists at the aforesaid location, and that said print shall be and it hereby ia • substituted in the place and stead of print attached to and made a part of the Original License, nith lite force and effect as though in the first instance attached thereto and made a part thereof. 2. That, as herein supplemented and amended, the Original License shall be and remain in full force and effect. IH WITNESS WHEREOF, the parties hereto have duly executed this Supplemental Agreement, in duplicate, the day and year first above written. THE ATCHISOS, TOPEKA '1380 SANTA FE RAIIKAI COMPANY. APPslOi£t> AS TO^FOR.M Its Assistant tc Gentrai Manager TKX.CH Its >Xyr ^^ (^_Jj^) rs -^- ' - ' "v /y-vx-^r _,It ..-'. Form 1658Standard .... lAppwrwl by OfcMral Solicitor} _ PIPE LINE LICENSE THIS INSTRUMENT, Mades,,thJ3...,...2.&tit...J._.l.day of. '....„ tfehrwary. :..._:...! 19...i31, between-. TEH Af^X8^!WPftKA A^P SA^A'^Rl ' '"•:. '.;.:.. RAILWAY COMPANY,t . •, Ci v.a....;.,JS^U>aaa'....;:........corporatioa (hereinafter called the "Licensor")';" party of the firet part, aad.,..l".*. (hereinafter,'whether one or more persons or corporations, called the "Licensee"), party "of the second part. -'-": IN CONSIDBBATION.of, Jhersuni1pf....ii:Ttev.^4..3a.Q/lp.ft=.r:~.Trr.^ DOLLARS,"tSJS^QQ^r'r.nin hand paid by the Licensee to the Licensor, the receipt of which' la hereby ac- knowledged, and .the "faithful, performance by-.the Licensee of-the. covenants herein contained/the Licensor licenses the-Licensee to construct'and Daaintain...:i.oae.v..~..::f.:'.:/l.-^,) pipe libci.'J; ;par.t->..8.-..!in.Chfifl»...i.':.r.;i ..partfHeirll^te roore'pipe iiaes,' called thV"Ci&0^iNGJ')", to be used for carrying 1™SSH^« ..11.L.C1"."..'.!'...'.!.!.'...'.;.!.!!.' .'.... :.r'..:...:?,s...,..&<xos$ or along the right of way of the Licensor at or near the station of...5?^f:A?^?.S.? •,Ss«llJi)ai6axP.S.ySiX*:...<^l.if.O.^B.ia. „ the exact location of said pipe line or lines being«Jt *.; r r described as follows: As per descriptions shown on Exhibit "A" attached.! 1ST i*' C| *~ T *f" ?f A * 1 .- » * Ci.":.c.-V.fX' said pipeline <?J!lines jbemg'more particularly shown "upon the p*rid6' hereto" attached'marked" "Exhibit'A**andmade a.part.hereof;Xoi';:<:-f- w-fB*.'-;'. ;••'/"<.v.Appr- i;c. (^v^-.iv f.t ..:> •.;."!....•...; •.; 4..; |'.;,rj-;',f <.:a;; x-1.-.•:;... i ;:;u'iN.'cbksJS^ pervisipn.and controlfljf theLicjenspr's Chief engineer,.to locate,: construct.and maiatain tiie.CKOSSINGiin.6UCb A manner and of sucfi tnitehal "that it will not at any time be a source'of danger to of interference with the trades, roadbed and:prop«rty of ihe Licecaor, or^the safe operation of its railroad, aad tocnteaacait that said CROSSING ^X^iXX^X^iS^aSSJS&aA shajl be constructed, installed;and thereafter-maintained in 'conformity' with the" plans Jind specifications shown 6n the print hereto attached-marked "Exhibit's* abd made a part hereof.''If at my time the Licensee ahalt, in the1 judgment of the Licensor,' fail to properly :"perform its* obligations imder"this sectiop," the Licensor may, atitsToption, itself perform such 'work' aa it deems necessary for the safe" operation of its railroad, and in siuch event.Jhe.Uwiisee afflees-topay, within fifteen (15) days after bill shall have been rendered therefor, the cost &> iocuwed by'the licensor, plu$*a sura eq[ual to ten per cent (IQ%) thereof, but fail- ure "on the part of the Licei^sor to jSerfdrm the obligations o;f the Licensee, shaft not release the -Licensee fromliability hereunder for loss or damage occasioned thereby." ••••-. • •• • • - The Licensee further agrees to reimburse the Licensor for any expense incurred by the Licensor for false work to support Licensor's tracks and for flagman to protect its traffic during installation of said CROSSING and for any and all other expense incurred: by the Licensor on account of said GROSSING. The Licensee further agrees at ail times to indemnify and save harmless the Licensor against all claims, de- mands, actions or causes of action arising or growing out of any losa of or damage to property or injury to or death of persons which may be due in any manner to the construction, use, maintenance, state of repair or presence of :the .CROSSING, "and'to pay to the Licensor the full amount of any loss or damage which the Licensor may sus- tain, incur or become liable for on account thereof. ',-'.:.,:.'"".."-. •• , THIS LICENSE 13 given by the Licensor and accepted by the Licensee upon the express condition that the same may be terminated at any time by either party upou ten (10) days' notice in writing to be served upon the other party, stating therein the date that such termination shall take place, and that upon the termination of this license in this or any other manner herein provided, the Licensee, upon demand of the Licensor, shall abandon the use of the CROSSING and remove the same and restore the right of way and tracks of the Licensor to the same condition In which they were prior to the placing of the said CROSSING thereunder. In case the Licensee shall fail to restore the Licensor's premises as aforesaid within ten (10) days after the effective date of termina- tion, th» Licensor may proceed with such work at the expense of the Licensee. No termination hereof shall re- lease tne Licensee from any liability or obligation (whether of indemnity or otherwise) which may have attached ed previous to or which may be accruing at the time of euch termination. • notice, request, instructions or revocation of this license to be given by the Licensor to the Licensee here- • shall be deemed to be properly served if the game be delivered to the Licensee, or if deposited in the post- office, postpaid, addressed to the Licensee at...™JU'aKl§jba)Jj>....C.ali£QEaia,j, _„ In the event that the Licensee herein embraces two or more persons or corporations, all the covenants and agreements of the Licensee in this license shall be the joint and several covenants and agreements of such personsor corporations. All the covenants and provision's of this instrument shall be binding upon and inure to the benefit of the. successor^ legal representatives and assigns of the parties to the same extent and effect as the same are binding upon and inure to the benefit of the parties hereto, but no assignment hereof by the Licensee, jta successors, legal representatives or assigns, or any subsequent assignee, shall be binding upon the Licensor without .the writtenconsent of the Licensor in each instance. .....'„,' '.. '..."-. ».. ......! .. .-.....-. -,.. • "IN WnWESS ^WHEREOF, The parties have executed this agreement in duplicate the day and year_first aboye,written. •• •'.--*..• 'J^^ ' ' " : ~ " ....--•• 1 RAILWAY'COMPANY, Approved as to Description: ... ..By..- ... „. j., f. »„, .. Chief Engineer. " COPY 1 THE ATCHISQN,TOPEKA AND SANTA .FF RAILWAY COMPANY '""AND.;.- •;':.•••'.-;"- .; • /-.- •. CARLSBAD SANITARY ibJSTRlCT. v-,, $- .DECEMBER i. II I93O.As to IVISIQN 10OFT. •?&' . A §ewer Une^consiaiincj partly of 15 inch and 10 iri Pipe, pressure qravii/ flow, ioqether with Manholes, l< Railway Company^ Carlsbad Staiion Grounds or Riqhi colored hereon in Red. > , - Portion of each siz.e of Pipe is as shown above b ihb drdwinq.01 -ji •HIGHWAY Om M-P- tts+O029.S !0SE W E R-L.IN-; (viTRtriEo PIPE) .••""•• •--- • ;"' ..((VITRIFIED 10 M! SEWER •ZB3.82.' ,/ './:. / jfOpp.M.P. I ^. Manhole < *• Z.9f-O44!.3'E/W.UK£.so Rt/v</, Line *\' * o_C ^g<2QiUu CJl*?o«d >f I5*inch and to inch Vi'fcrif ied rwlfefo5Manholes, located onlbe *' i Qrpunds or Riqhfc of Way as shown i« shown,above on ihe face of .', ' on as " ,1, ASewj:n,tine^consiattnq parll/of 8 inch and IOwVttrif»eci e/prepare gravity fiow/tocjether wJih Manholes, located ihe'KefwayCcrnpanyls Carlsbad Station Grounds or Eicjht of r] colored hereon in Red. " ^, \ & .-'PortioS.of eacfi si^ce of Pipe is.os shown above onthefbicev this^fbwlnq; "/»'*- , '""'•• J -*\t.^.^f,""li< t a *^ •* — * * s^ .,-«' T. **"-"* ~ *-» V ,*."*- V >» *5? (VlRl Fl ED -8 SEWE R-LINE «L MAIN TRACK ( VITRIFIEDi SEWER N3r-LrINE-B -•• • "_-_=^-""" --ass.oi »'d lQ''J/ii;rjf ied , \ ' ;AnOol;faf{Sewer Une, consisBnq psrtSy of 8 inch Concrete arihoiefa/located'* .'• and-8«hcb Cesfc'Iron Pipe,, pressure qrasviiyflow, located on T vr/st,'^ '" '; •; • Way and cross! ncj under ibe Kail way Company'^ Main Treacle iboye"on the-pace ". • % as shown colored hereof-? In Red, " *'-,!, l^^'i .; . ''_'-»• - l/*,.V;;.t5aid Sewer Line Is J?.tfeels below. "?<_ Us. -,' t ". '. j' , i***1^ ,'*<', '"r * v >j ' ' ' •*'• "f^ftion oj|eacfj,siz<a.bf ^Jp<a \sa.sI«.ho'v^n above'an ihe'f^ce >"}*»"'*•.-... > ,< i* i , of ih(s,drawif|c|. rC ,* ?, ^ ", ."•,""*»• ' ' %* "• *~v "«.'* "'*>' i "O . T'»/• « 3• y To NATSONAL.CITY • (VJTRIFIED RIPE.) 480.0 ^t 1 > • U*z , « OO w o K D 6 O « ;•'„ -' ** ^,Track%r^d Trac^ MG«S as'shown coiored^hereon In Red. L:',v v'lv.j' '''l ''Sajd'Pipe isJ^QJeet'below^RQijsV^^x „ . .% . ,> Q 2< CJ<« -3 * '"-^ ^