HomeMy WebLinkAboutSan Diego Gas & Electric Company; 2005-06-08; 2787790 (2)Submitted to Applicant By:
Stephen Campbell
SDG&E Work Order@): 2787790
By: MATT HALL Date: b )s
AGREEMENT FOR UTILITY PAYMENT TO APPLICANT FOR INSTALLATION OF
ELECTRIC DISTRIBUTION SYSTEM REQUIRED BY UTILITY
/ t>s
This Agreement is made and entered into by and between SAN DIEGO GAS & ELECTRIC
COMPANY, a corporation, hereinafter called “Utility”, and CITY OF CARLSBAD, hereinafter called
“Applicant”.
1.
2.
3.
4.
Project name: Rancho Santa Fe Rd 208 Conversion- Phase 2
In consideration of the mutual promises herein, the parties agree as follows:
Applicant shall construct, in accordance with the Utility’s Specifications, a complete conduit
system. Said conduit system is to be constructed as delineated in the Specifications except that
the location is subject to change as necessitated by conflicts, obstacles, or difficult soil conditions
revealed by actual excavation, backfilling, compaction, and pavement replacement necessary to
construct said conduit system, including that which is necessitated by any change in location.
Utility shall pay as the agreed value of the conduit bank provided by Applicant at Utility’s request
the sum of $26,853, within 30 days of the Utility’s final acceptance of work pursuant to the
General Conditions.
Applicant hereby agrees that title to the conduit bank provided by Applicant for Utility shall vest in
Utility upon final inspection and acceptance by Utility.
The Contract Documents shall become effective only upon the date signed by the authorized
rep resen tative of Utility.
IN WITNESS WHEREOF, the Darties hereto have caused this anreement to be executed for and
on behalf of each, by their duly authorized agents, partners, or corp&ate officers.
APPLICANT: Ciry 4 CA RCSfiAD SAN DIEGO GAS & ELECTRIC COMPANY,
a corporation 1 In
By: V By:
(Signatuie) (Authorized Signature-Utility)
Title: Mavor Pro Tern
Address: 16 35 FMM-Y 4 VWUC
c*sWo CA 92008
Date: June 8, 2005