HomeMy WebLinkAboutSierra Pacific West Inc; 2008-07-21; 3907CITY OF CARLSBAD CONTRACT CHANGE ORDER TRANSMITTAL-C/O #05 Project: 3907 -OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH Date Routed: Reasons for changes: Department Head Engineering Inspection Finance Director City Manager/Mayor Engineering Inspection Item 1 : The contractor's environmental sub consultant filed a Notice of Termination with the Regional Water Quality Control Board. COST ACCOUNTING SUMMARY: Original contract amount $ 1,598,000.00 / Total amount this c/o $ 2,375.00 ,, Total amount of previous c/o's $ 140,263.98 / Total c/o's to date $ 142,638.98 ,I New Contract Amount $ 1,740,638.98 , Total C/O's as % of original contract 8.93% Contingency monies encumbered $ 240,000.00 Contingency increase $- Contingency Subtotal $ 240,QQQ.QQ I Total c/o's to date $ 142,638.98 Contingency Balance $ 97,361.02 . . Pmject: #3907 OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTE FE ROAD NORTH Change Order No. 3 CITY OF CARLSBAD CONTRACT CHANGE ORDER NO. 03 PROJECT: #3907 OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTE FE ROAD NORTH CONTRACT NO. 3907 ACCOUNT NO. /390719066 CONTRACTOR: Sierra Pacific West ADDRESS: P.O. Box 231640 Encinitas, Ca 92023 P.O. NO. P120426 The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work including charges for field overhead, extended home office overhead, delays, disruptions, cumulative impacts, loss of efficiency, extended equipment costs and overtime premium costs and is expressly agreed between the City and the Contractor to be the complete and final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. This change order is not effective unless signed by the City Manager and/or the Mayor. Pursuant to Section 3-2.4, Agreed Prices, of the General Provisions of this contract, perform the following: Item 1: Provide all labor, equipment and materials necessary to complete the requested extra grading work within the project area between Melrose Drive and the check dam to the northeast as requested in RFQ #2 and modified pursuant to subsequent meetings and correspondence. The extra work generally consists of re-grading the area northwest of the recently constructed 2:1 slopes between Melrose Drive and the check dam. Increase to Contract Cost ..................................................................... : .. $30,788.33 ProJect: #3907 OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTE FE ROAD NORTH ·• Change Order No. 3 Pursuant to Section 3-3, Extra Work, of the General Provisions of this contract, perform the following: Item 2A: Provide all labor, equipment and materials necessary to complete the requested extra irrigation, planting, and maintenance work within the project area between Melrose Drive and the check dam to the northeast as requested in RFQ #2 and modified pursuant to subsequent meetings and correspondence. The extra work generally consists of installing irrigation, planting, and maintaining the area northwest of the recently constructed 2:1 slopes between Melrose Drive and the check dam. Work will be paid for as identified on the attached exhibit. Estimated Increase to Contract Cost ............................................................ $13,621.30 Item 2B: Provide all labor, equipment and materials necessary to perform 4 months of additional maintenance in the planting area established by the work identified in Item 2A of this change order. This area is commonly referred to as planting area "A". Maintenance shall be paid for at the rate of $574.20 per month. Increase to Contract Cost .............................................................................. $2,296.80 Item 3: Reimburse the contractor for costs associated with agency water bills received during the remainder of the contract duration. Upon payment of utility billing contractor shall submit receipt of payments made and the City shall reimburse contractor for utility bills paid. Estimated Increase to Contract Cost ............................................................. $10,000.00 Item 4: Provide all labor, equipment and materials necessary to update the Storm Water Pollution Prevention Plan (SWPPP) such that it complies with the recently adopted NPDES General Permit 2009-0009-DWQ. Increase to Contract Cost .............................................................................. $3,275.00 Item 5: Provide all labor, equipment and materials necessary to perform 4 months of required weekly SWPPP inspections and maintain the project SWPPP as required by the NPDES General Permit 2009-0009-DWQ. Payment will be made at the lump sum price of $2,375.00 per month. Increase to Contract Cost .............................................................................. $9,500.00 ' Item 6: Provide all labor, equipment and materials necessary to perform SWPPP inspections as necessary for weather related incidents as required by the NPDES General Permit 2009-0009-DWQ. Payment will be made at the lump sum price of $250.00 per required inspection. Estimated Increase to Contract Cost ............................................................... $1,500.00 , . . i. P.roject: #3907 OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTE FE ROAD NORTH Change Order No. 3 Item 7: Provide all labor, equipment and materials necessary to perform SWPPP storm water sampling as required by the NPDES General Permit 2009-0009-DWQ. Payment will be made at the lump sum price of $450.00 per required inspection. Estimated Increase to Contract Cost ............................................................... $2,700.00 ,· TOTAL ESTIMATED INCREASE TO CONTRACT COST .................................... $73,681.43 TIME FOR COMPLETION OF ALL WORK UNDER THIS CONTRACT SHALL BE INCREASED AS A RESULT OF THIS CHANGE ORDER. ALL WORK, WITH THE EXCEPTION OF THE MAINTENANCE PERIODS AND SWPPP INSPECTIONS SHALL BE COMPLETED PRIOR TO AUGUST 6, 2010. DISTRUBUTION: PROJECT FILE (ORIGINAL) PURCHASING CONTRACTOR /fa-3-tO (DATE) e,/4/4 ' (DATE) (DATE} DEPUTY CITY ENGINEER, DESIGN . ' AIUA-A Mr. John Cahill Subject: Rancho Santa .Fe R<µUl Reab'gnmenz and Bridge Rep.l~ce,nent Project, Off-Site Wetland Mitlgation. Project -2009, 0 Storm Damage &sessment and Repair Recommendo.tiom Scope or Work Summary: Schedule A (Additional work) Contractor Proposal Additional Bid Items Scope ot Wori< ttem Oescrlptfon Item Approx. Humbel auanttty Mobilization & Preparatory Wortc at a Lump Sum Not A-1 -1 LS. to a«::eed Amount of Clearing & Grubbing (Dolfats lump sum-) A-2 1LS. Finish Grad~ (Dolllilt3 per squar• foot) Jlr.3 29,000 S.F. Soll prep.tnsliOfl {OQ/W$ pel squan, fool) A-4 ~- ImgaliDn System {Repair) (Do/lats lump sum) A-6 1 LS. Platning 1 Gal. Treas (Dollars each} A-6 ~i ~- PrsntlnQ WIiiow Cuttings (Dollar, each) ? f5 Planting t Gal. snnios (Do/lats each} A-7 J/0 ,da. Hydroseed ~" "A• SWS (Dollars per squant foot) A•B 29,000$.F. Hydroseed Mix "8" MFS (Dollars ,,-r square foot) AJJ fM.S.F. 1-lydl"ONlld Mi,, "C" CSS. lf'oll.w por squlfi• loCI) A-10 li.A.S.F. Malnt911BIIC8 Petfod (0-3() days) (Do/IBIS lump sum} A-11 1 LS. Maln1811ance Perlcd (31-60 days) (Dollars lump sum} A-12 1 LS. Maintenance Period {61-90days) (Dolla,s fun¥)sum) A-13 1 LS. Unit price Total $~ i_@__J.S" - ,_. $ __ $ __ $ __ ,,37> -~z,- $ '5"ff,f $ £:4f~t./- tr"' r1.3 · r<l' $ __ $ __ s __ $ ~qq 14 µ, '2,; (J I ').-I s __ s __ $_ $ __ $ __ s_ $ __ $ __ .s __ $ __ $_· ___ s __ s __ s ___ 5 u..b -1-o frA_ '-• 13} tJ.. I 3385-07 'iJ'I.JtJt;'J{ ,o Ftbruay2010 ?J_O - Project: #3907 OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTE FE ROAD NORTH Change Order No. 2 CITY OF CARLSBAD CONTRACT CHANGE ORDER NO. 02 PROJECT: #3907 OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTE FE ROAD NORTH CONTRACT NO. 3907 ACCOUNT NO. /390719066 CONTRACTOR: Sierra Pacific West ADDRESS: P.O. Box 231640 Encinitas, Ca 92023 P.O. NO. P120426 The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work including charges for field overhead, extended home office overhead, delays, disruptions, cumulative impacts, loss of efficiency, extended equipment costs and overtime premium costs and is expressly agreed between the City and the Contractor to be the complete and final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. This change order is not effective unless signed by the City Manager and/or the Mayor. Pursuant to Section 3, Changes in Work, of the General Provisions of this contract, perform the following: Item 1: Provide all labor, equipment and materials necessary to: Complete all contract work, including modifications to contract work made during the course of construction. Completion of all work included, but was not limited to: Perform screening operations necessary to sort all material to be exported from the project site. Stockpile, load and deliver all export material to suitable dump sites. Generate topsoil utilizing onsite materials. Place topsoil in accordance with the contract plans and specifications. Delete bid item A-17, Import and Place Topsoil. Delete 6,852 cubic yards of Unclassified Excavation, bid item A-16. Adjust quantities of original contract bid items necessary to complete all contract work. Decrease to Contract Cost ........................................................................ ($52,630.84)J .. Project: #3907 OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTE FE ROAD NORTH Change Order No. 2 Execution of this change order, and subsequent payments made resulting from execution of this change order, constitutes compensation for all work performed under the current contract. TOTAL DECREASE TO CONTRACT COST .................................................... $ (52,630.84) c/ TIME FOR COMPLETION OF ALL WORK UNDER THIS CONTRACT SHALL NOT BE INCREASED AS A RESULT OF THIS CHANGE ORDER. RECOMMENDED BY: Fl ANGE DIRECTOR ~ DISTRUBUTION: PROJECT FILE (ORIGINAL) PURCHASING CONTRACTOR DEPUTY CITY ENGINEER, DESIGN APPROVED BY: Project #3907 OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTE FE ROAD NORTH Change Order No. 1 CITY OF CARLSBAD CONTRACT CHANGE ORDER NO. 01 PROJECT: #3907 OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTE FE ROAD NORTH CONTRACT NO. 3907 ACCOUNT NO. /390719066 CONTRACTOR: Sierra Pacific West ADDRESS: P.O. Box 231640 Encinitas, Ca 92023 P.O. NO. P120426 The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work including charges for field overhead, extended home office overhead, delays, disruptions, cumulative impacts, loss of efficiency, extended equipment costs and overtime premium costs and is expressly agreed between the City and the Contractor to be the complete and final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. This change order is not effective unless signed by the City Manager and/or the Mayor. Pursuant to subsection 3-2.4 Agreed Prices of the General Provisions of this contract, perform the following: Item 1: Total compensation to increase the project by 195 working days for the lump sum price of $0.00. Increase to Contract Cost. ..................................................................... $00.00 Item 2: Total compensation to provide and install three-hundred tons of 3/8" non-spec stabilized decomposed granite per RFQ #1 for the lump sum price of $21,048.04. Increase to Contract Cost. ............................................................... $21,048.04 Item 3: Total compensation to provide and install four project signs per RFQ #4 for the lump sum price of $874.90. Increase to Contract Cost. ................................................................... $874.90 Item 4: Total compensation to provide and install ten construction area signs per RFQ #3 for the lump sum price of $685.50. Increase to Contract Cost. ................................................................... $685.50 Project: #3907 OFF-SITE WETLA~ !VIITIGATION RESTORATION FOR RANCL-'') SANTE FE ROAD NORTH Change Order No. 1 ..... em 5: Total compensation to provide and install one-hundred door hangers per RFQ #2 for the lump sum price of $169.12 Increase to Contract Cost. .................................................................... $169 .12 Pursuant to subsection 3-3 Extra Work of the General Provisions of this contract, perform the following: Item 5: Compensation to provide flaggers when moving equipment on the pedestrian trails. Estimated increase to Contract Cost.. .................................................. $4,500.00 '· TOTAL ESTIMATED INCREASE TO CONTRACT COST ...................................... $27,277.56 ,,, TIME FOR COMPLETION OF ALL WORK UNDER THIS CONTRACT SHALL BE INCREASED BY 195 WORKING DAYS AS A RESULT OF THIS CHANGE ORDER. RECOMMENDED BY: FINANCE DIRECTOR ~ DISTRUBUTION: PROJECT FILE (ORIGINAL) PURCHASING CONTRACTOR DEPUTY CITY ENGINEER, DESIGN S:J-07 (DATE) I 7 3° 0°1 (DATE) (DATE) APPROVED BY: 7/28/09 (DATE) CITY OF CARLSBAD San Diego County California CONTRACT DOCUMENTS, GENERAL, AND TECHNICAL PROVISIONS FOR OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 BID NO. PWS08-19ENG Revised 11/01/06 Contract No. 3907 TABLE OF CONTENTS Item Page Notice Inviting Bids 1 Contractor's Proposal ; 6 Bid Security Form 13 Bidder's Bond to Accompany Proposal 14 Guide for Completing the "Designation Of Subcontractors" Form 16 Designation of Subcontractor and Amount of Subcontractor's Bid Items 18 Bidder's Statement of Technical Ability and Experience 19 Bidder's Certificate of Insurance for General Liability, Employers' Liability, Automotive Liability and Workers' Compensation 20 Bidder's Statement of Re Debarment 21 Bidder's Disclosure of Discipline Record 22 Non-Collusion Affidavit to Be Executed by Bidder and Submitted with Bid 24 Contract Public Works 25 Labor and Materials Bond 31 Faithful Performance/Warranty Bond 33 Optional Escrow Agreement for Surety Deposits in Lieu of Retention 35 oRevised 11/01/06 Contract No. 3907 GENERAL PROVISIONS Section 1 Terms, Definitions Abbreviations and Symbols 1-1 Terms 38 1-2 Definitions 38 1-3 Abbreviations 42 1-4 Units of Measure 45 Section 2 Scope and Control of The Work 2-1 Award and Execution of Contract 46 2-2 Assignment 46 2-3 Subcontracts 47 2-4 Contract Bonds 48 2-5 Plans and Specifications 49 2-6 Workto be Done 52 2-7 Subsurface Data 52 2-8 Right-of-Way 52 2-9 Surveying 53 2-10 Authority of Board and Engineer 57 2-11 Inspection 57 Section 3 Changes in Work 3-1 Changes Requested by the Contractor 58 3-2 Changes Initiated by theAgency 58 3-3 Extra Work 59 3-4 Changed Conditions 61 3-5 Disputed Work 63 Section 4 Control of Materials 4-1 Materials and Workmanship 65 4-2 Materials Transportation, Handling and Storage 70 Section 5 Utilities 5-1 Location 70 5-2 Protection 71 5-3 Removal 71 5-4 Relocation 71 5-5 Delays 72 5-6 Cooperation 73 Section 6 Prosecution, Progress and Acceptance of the Work 6-1 Construction Schedule and Commencement of Work 73 6-2 Prosecution of Work 77 6-3 Suspension of Work 78 6-4 Default by Contractor 78 6-5 Termination of Contract 79 6-6 Delays and Extensions of Time 79 6-7 Time of Completion 80 6-8 Completion, Acceptance, and Warranty 81 6-9 Liquidated Damages 81 6-10 Use of Improvement During Construction 81 Revised 11/01/06 Contract No. 3907 Section 7 Responsibilities of the Contractor 7-1 Contractor's Equipment and Facilities 82 7-2 Labor 82 7-3 Liability Insurance 83 7-4 Workers' Compensation Insurance 83 7-5 Permits 83 7-6 The Contractor's Representative 83 7-7 Cooperation and Collateral Work 84 7-8 Project Site Maintenance 84 7-9 Protection and Restoration of Existing Improvements 86 7-10 Public Convenience and Safety 86 7-11 Patent Fees or Royalties 93 7-12 Advertising 93 7-13 Laws to be Observed 93 7-14 Antitrust Claims 93 Section 8 Facilities for Agency Personnel 8-1 General 93 8-2 Field Office Facilities 94 Section 9 Measurement and Payment 9-1 Measurement of Quantities for Unit Price Work 94 9-2 Lump Sum Work 95 9-3 Payment : 95 Part 2 SUPPLEMENTAL PROVISIONS TO PART 2, 3 AND 6 OF THE SSPWC Construction Materials Section 200 200-1 200-2 Section 201 201-1 Section 203 203-6 Section 206 206-7 206-8 206-9 Section 207 207-2 207-25 Section 210 210-1 Section 212 212-1 212-2 212-3 Section 213 213-2 213-3 Section 214 214-5 O Rock Materials Rock Products Untreated Base Materials Concrete, Mortar and Related Materials Portland Cement Concrete Bituminous Materials Asphalt Concrete Miscellaneous Metal Items Traffic Signs Light Gage Steel Tubing and Connectors, Portable Changeable Message Sign Pipe Reinforced Concrete Pipe Underground Utility Marking Tape. Paint and Protective Coatings Paint Landscape and Irrigation Materials Landscape Materials Irrigation System Materials Electrical Materials Engineering Fabrics Geotextiles Erosion Control Specialties. Pavement Markers Reflective Pavement Markers. Revised 11/01/06 Contract No. 3907 99 100 101 101 102 103 104 105 105 106 107 111 113 114 115 115 in Section 215 Fencing 215-1 Environmental Fencing 115 PART 3 Construction Methods Section 300 Earthwork 300-1 Clearing and Grubbing 116 300-2 Unclassified Excavation 116 300-3 Structure Excavation and Backfill 118 300-4 Unclassified Fill 118 300-5 Borrow Excavation 119 300-9 Geotextiles for Erosion Control and Water Pollution Control 120 300-11 Stonework for Erosion Control 121 300-12 Rock Slope Protection Fabric 121 300-13 Storm Water Pollution Prevention Plan 121 Section 303 Concrete and Masonry Construction. 303-1 Concrete Structures 124 303-2 Air-Placed Concrete 124 Section 306 Underground Conduit Construction 306-1 Open Trench Operations 124 306-5 Abandonment of Conduits and Structures 128 Section 308 Landscape and Irrigation Installation 308-2 Earthwork and Topsoil Placement 128 308-4 Planting 129 308-5 Irrigation System Installation 132 308-6 Maintenance and Plant Establishment 133 308-7 Guarantee 134 308-8 Measurement and Payment 136 Section 310 Painting 310-5 Painting Various Surfaces 137 Section 312 Pavement Marker Placement and Removal 312-1 Placement 138 Section 313 Temporary Traffic Control Devices 313-1 Temporary Traffic Pavement Markers 138 313-2 Temporary Traffic Signing 139 313-3 Temporary Railing (Type K) and Crash Cushions 139 313-4 Measurement and Payment 141 Appendix A Resource Agency Permits Appendix B Standard Plans Revised 11/01/06 Contract No. 3907 IV CITY OF CARLSBAD, CALIFORNIA NOTICE INVITING BIDS UNTIL 2:00 PM ON FEBRUARY 26, 2008, the City shall accept sealed bids, clearly marked as such, at the Faraday Center, 1635 Faraday Avenue, Carlsbad, CA 92008-7314, Attn: Purchasing Officer, by mail, delivery service or by deposit in the Bid Box located in the first floor lobby, at which time they will be opened and read, for performing the work as follows: Project 3907, Off-Site Wetland Mitigation Restoration for Rancho Santa Fe Road North involves grading, landscape and irrigation work for wetland mitigation restoration work in and adjacent to San Marcos Creek easterly of the Melrose Drive bridge over San Marcos Creek in the City of San Marcos, California. OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 BID NO. PWS08-19ENG INSTRUCTIONS TO BIDDERS AND BID REQUIREMENTS This bid and the terms of the Contract Documents and General Provisions constitute an irrevocable offer that shall remain valid and in full force for a period of 90 days and such additional time as may be mutually agreed upon by the City of Carlsbad and the Bidder. No bid will be received unless it is made on a proposal form furnished by the Purchasing Department. Each bid must be accompanied by security in a form and amount required by law. The bidder's security of the second and third next lowest responsive bidders may be withheld until the Contract has been fully executed. The security submitted by all other unsuccessful bidders shall be returned to them, or deemed void, within ten (10) days after the Contract is awarded. Pursuant to the provisions of law (Public Contract Code section 10263), appropriate securities may be substituted for any obligation required by this notice or for any monies withheld by the City to ensure performance under this Contract. Section 10263 of the Public Contract Code requires monies or securities to be deposited with the City or a state or federally chartered bank in California as the escrow agent. The escrow agent shall maintain insurance to cover negligent acts and omissions of the agent in connection with the handling of retentions under this section in an amount not less than $100,000 per contract. The City of Carlsbad may disqualify a contractor or subcontractor from participating in bidding when a contractor or subcontractor has been debarred by the City of Carlsbad or another jurisdiction in the State of California as an irresponsible bidder. The work shall be performed in strict conformity with the plans and specifications as approved by the City Council of the City of Carlsbad on file with the Engineering Department. The specifications for the work include City of Carlsbad Technical Specifications and the Standard Specifications for Public Works Construction. Sections 2 & 3. 2006 Edition, and the 2006 supplements thereto, all hereinafter designated "SSPWC" as issued by the Southern California Chapter of the American Public Works Association, as amended. Specification Reference is hereby made to the plans and specifications for full particulars and description of the work. The General Provisions (Part 1) to the SSPWC do not apply. Revised 11/01/06 Contract No. 3907 Page 1 of 141 Pages The City of Carlsbad encourages the participation of minority and women-owned businesses. The City of Carlsbad encourages all bidders, suppliers, manufacturers, fabricators and contractors to utilize recycled and recyclable materials when available, appropriate and approved by the Engineer. BID DOCUMENTS The documents which comprise the Bidder's proposal and that must be completed and properly executed including notarization where indicated are: 1. Contractor's Proposal 2. Bidder's Bond 3. Non-Collusion Affidavit 4. Designation of Subcontractor and Amount of Subcontractor's Bid 5. Bidder's Statement of Technical Ability and Experience 6. Acknowledgement of Addendum(a) 7. Certificate of Insurance. The riders covering the City, its officials, employees and volunteers may be omitted at the time of bid submittal but shall be provided by the Bidder prior to award of this contract. 8. Bidder's Statement Re Debarment 9. Bidder's Disclosure Of Discipline Record 10. Escrow Agreement for Security Deposits -(optional, must be completed if the Bidder wishes to use the Escrow Agreement for Security) ENGINEER'S ESTIMATE: All bids will be compared on the basis of the Engineer's Estimate. The estimated quantities are approximate and serve solely as a basis for the comparison of bids. The Engineer's Estimate is $1.900.000.00 TIME OF COMPLETION: The contractor shall complete the Work within the time set in the contract as defined in the General Provisions Section 6-7. SPECIALTY CONTRACTORS: ACCEPTABLE LICENSE TYPES Except as provided herein a bid submitted to the City by a Contractor who is not licensed as a contractor pursuant to the Business and Professions Code shall be considered nonresponsive and shall be rejected by the City. In all contracts where federal funds are involved, no bid submitted shall be invalidated by the failure of the bidder to be licensed in accordance with California law. Where federal funds are involved the contractor shall be properly licensed at the time the contract is awarded. In all other cases the contractor shall state their license number, expiration date and classification in the proposal, under penalty of perjury. This invitation to bid does not involve federal funds. The following classifications are acceptable for this contract: A - General Engineering C27 - Landscaping Revised 11/01/06 Contract No. 3907 Page 2 of 141 Pages ESCROW AGREEMENT If the Contractor intends to utilize the escrow agreement included in the contract documents in lieu of the usual 10% retention from each payment, these documents must be completed and submitted with the signed contract. The escrow agreement may not be substituted at a later date. OBTAINING PLANS AND SPECIFICATIONS Sets of plans, various supplemental provisions, and Contract documents may be obtained at the Cashier's Counter of the Faraday Center located at 1635 Faraday Avenue, Carlsbad, California 92008-7314, for a non-refundable fee of $ 40.00 per set. If plans and specifications are to be mailed, the cost for postage should be added. INTENT OF PLANS AND SPECIFICATIONS Any prospective bidder who is in doubt as to the intended meaning of any part of the drawings, specifications or other contract documents, or finds discrepancies in or omissions from the drawings and specifications may submit to the Engineer a written request for clarification or correction. Any response will be made only by a written addendum duly issued by the Engineer a copy of which will be mailed or delivered to each person receiving a set of the contract documents. No oral response will be made to such inquiry. Prior to the award of the contract, no addition to, modification of or interpretation of any provision in the contract documents will be given by any agent, employee or contractor of the City of Carlsbad except as hereinbefore specified. No bidder may rely on directions given by any agent, employee or contractor of the City of Carlsbad except as hereinbefore specified. REJECTION OF BIDS The City of Carlsbad reserves the right to reject any or all bids and to waive any minor irregularity or informality in such bids. PREVAILING WAGE TO BE PAID The general prevailing rate of wages for each craft or type of worker needed to execute the Contract shall be those as determined by the Director of Industrial Relations pursuant to the sections 1770, 1773, and 1773.1 of the Labor Code. Pursuant to section 1773.2 of the Labor Code, a current copy of applicable wage rates is on file in the Office of the City Engineer. The Contractor to whom the Contract is awarded shall not pay less than the said specified prevailing rates of wages to all workers employed by him or her in the execution of the Contract. The Prime Contractor shall be responsible for insuring compliance with provisions of section 1777.5 of the Labor Code and section 4100 et seq. of the Public Contracts Code, "Subletting and Subcontracting Fair Practices Act." The City Engineer is the City's "duly authorized officer" for the purposes of section 4107 and 4107.5. The provisions of Part 7, Chapter 1, of the Labor Code commencing with section 1720 shall apply to the Contract for work. PRE BID MEETING A pre-bid meeting and tour of the project site will be held at the project site at 9:00 AM on Tuesday, February 14, 2008. The project site can be reached via the dirt road on the east side of Melrose Drive immediately south of the Melrose Drive bridge over San Marcos Creek. Revised 11/01/06 Contract No. 3907 Page 3 of 141 Pages UNIT PRICES AND COMPUTATION OF BIDS All bids are to be computed on the basis of the given estimated quantities of work, as indicated in this proposal, times the unit price as submitted by the bidder. In case of a discrepancy between words and figures, the words shall prevail. In case of an error in the extension of a unit price, the corrected extension shall be calculated and the bids will be computed as indicated above and compared on the basis of the corrected totals. All prices must be in ink or typewritten. Changes or corrections may be crossed out and typed or written in with ink and must be initialed in ink by a person authorized to sign for the Contractor. ADDENDUMS Bidders are advised to verify the issuance of all addenda and receipt thereof one day prior to bidding. Submission of bids without acknowledgment of addenda may be cause of rejection of bid. BOND AND INSURANCE REQUIREMENTS The Contractor shall provide bonds to secure faithful performance and warranty of the work in an amount equal to one hundred percent (100%) of the Contract price on this project. The Contractor shall provide bonds to secure payment of laborers and materials suppliers, in an amount equal to one hundred percent (100%) of the total amount payable by the terms of the contract. These bonds shall be kept in full force and effect during the course of this project, and shall extend in full force and effect and be retained by the City until they are released as stated in the General Provisions section of this contract. All bonds are to be placed with a surety insurance carrier admitted and authorized to transact the business of insurance in California and whose assets exceed their liabilities in an amount equal to or in excess of the amount of the bond. The bonds are to be accompanied by the following documents: 1 ) An original, or a certified copy, of the unrevoked appointment, power of attorney, by laws, or other instrument entitling or authorizing the person who executed the bond to do so. 2) A certified copy of the certificate of authority of the insurer issued by the insurance commissioner. If the bid is accepted, the City may require copies of the insurer's most recent annual statement and quarterly statement filed with the Department of Insurance pursuant to Article 10 (commencing with section 900) of Chapter 1 of Part 2 of Division 1 of the Insurance Code, within 10 calendar days of the insurer's receipt of a request to submit the statements. Insurance is to be placed with insurers that: 1 ) Have a rating in the most recent Best's Key Rating Guide of at least A-:VII 2) Are admitted and authorized to transact the business of insurance in the State of California by the Insurance Commissioner. Auto policies offered to meet the specification of this contract must: 1 ) Meet the conditions stated above for all insurance companies. 2) Cover any vehicle used in the performance of the contract, used onsite or offsite, whether owned, non-owned or hired, and whether scheduled or non-scheduled. Workers' compensation insurance required under this contract must be offered by a company meeting the above standards with the exception that the Best's rating condition is waived. The City does accept policies issued by the State Compensation Fund meeting the requirement for workers' compensation insurance. The Contractor shall be required to maintain insurance as specified in the Contract. Any additional cost of said insurance shall be included in the bid price. The award of the contract by the City Council is contingent upon the Contractor submitting the required bonds and insurance, as described in the contract, within twenty days of bid opening. If the Contractor fails to comply with these requirements, the City may award the contract to the second or third lowest bidder and the bid security of the lowest bidder may be forfeited. Revised 1 1/01/06 Contract No. 3907 Page 4 of 141 Pages BUSINESS LICENSE The prime contractor and all subcontractors are required to have and maintain a valid City of Carlsbad Business License for the duration of the contract. Approved by the City Council of the City of Carlsbad, California, by Resolution No. 2008-003, adopted on the 8™ day of January, 2008. January 15. 2008 Date PUBLISH: JANUARY 21, 2008 Revised 11/01/06 Contract No. 3907 Page 5 of 141 Pages CITY OF CARLSBAD "*'**"" ^ttf^ OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 CONTRACTOR'S PROPOSAL City Council City of Carlsbad 1200 Carlsbad Village Drive Carlsbad, California 92008 The undersigned declares he/she has carefully examined the location of the work, read the Notice Inviting Bids, examined the Plans, Specifications, General Provisions, Contract Documents, and addenda thereto, and hereby proposes to furnish all labor, materials, equipment, transportation, and services required to do all the work to complete Contract No. 3907 in accordance with the Plans, Specifications, General Provisions, Contract Documents, and addenda thereto and that he/she will take in full payment therefore the following unit prices for each item complete, to wit: SCHEDULE "A" Item No. Description A-1 Mobilization and Preparatory Work at a lump sum not to exceed $45,000 Approximate Quantity and Unit 1 LS Unit Price $ li-SODQ.QD Total Dollars (Lump Sum) A-2 Clearing and Grubbing at 1 LS $ Z 2-0.1 6 %.^ \ $220,16%^ I Dollars (Lump Sum) A-3 Finish Grade 160,736 SF $ 0.2-3 $?>\D fi\f{\ , Dollars per Square Foot A-4 Soil Preparation 1 29,809 SF $0-\1 Dollars per Square Foot A-5 Irrigation System 1 LS $lflZ)*H5, Dollars (Lump Sum) Revised 02/12/08 Addendum No. 2 - Contract No. 3907 Page 6 of 141 Pages A-6 1 Gallon Trees Dollars Each Dollars Each A-8 Hydroseed Mix A (SWS) Clfrfe ^Dollars (Lump Sum) A-15 Environmental Fencing 4. 526 EA $ \Q, it) $ %. 9.D& (00 A-7 1 Gallon Shrubs „ A , 19.350EA $ If*doll/ire4 *-Vi*> 94,089 SF $ Dollars per Square Foot A-9 Hydroseed Mix B (MFS)27,210 SF $»l I Dollars per Square Foot A-10 Hydroseed Mix C (CSS)18,500 SF $ Dollars per Square Foot A-11 Maintenance Period (1-30 Days) 1 LS $ Dollars (Lump Sum) A-12 Maintenance Period (31-60 1 LS Dollars (Lump Sum) A-13 Maintenance Period (61 -90 1 LS $£"71. Dollars (Luhip Sum) A-14 Maintenance Period (91 -120 . 0\ . ID . 00 . OP $2,677. OP 1 LS $_2aSJILj?P $ 9,300 LF $ Revised 02/12/08 Addendum No. 2 - Contract No. 3907 Page 7 of 141 Pages Dollars per lineal Foot A-16 Unclassified Excavation 36,360 CY $ 2*0 '. O] $15 1 5^ I • 'S va T> flue Dollars Each A-20 Drainage Swale 530 LF $\ Dollars (Lump Sum) A-22 Silt Fence , ^ 3,775 LF $ Dollars Each A-25 Remove Brow Ditch 470 LF $One /foliar ^ -f7)f-K| Dollars per Cubic Yard A-17 Import and Place Topsoil 5,415 CY $ Z(l* 2>l $1^. Dollars Each A-24 Stabilized Construction 1 EA $ 2-i'2?5(l. 3'7 Entrancetwo DollarsT>er Cubic Yard A-18 Modified Brow Ditch Type D 1 ,060 LF $ IT 33 $ {9} er SDRSD D-75 Dollars-'per Lineal Foot" A-19 Rip Rap Energy Dissipator 1 EA $ '^j Dl^ . %£> $ ^ Ol3. Dollars^per lineal Foot A-21 Check Dam . 1 LS $2.il.'26 $9)1 :l\\ .-two Doflars per Lineal Foot A-23 Gravel Bags , 125EA $ 9- ^^ $ I .OPT.. per Lineal Foot Revised 02/12/08 Addendum No. 2 - Contract No. 3907 Page 8 of 141 Pages A-26 Remove Rip Rap Energy 2 EA $ H^D. Dissipator , Dollars Eac Total amount of bid in words for Schedule "A": Qflfc MlHJ(M PiVC Total amount of bid in numbers for Schedule "A": $ j6^^ OOP- Price(s) given above are firm for 90 days after date of bid opening. Addendum(a) No(s). \ } %• , O _ has/have been received and is/are included in this proposal. The Undersigned has carefully checked all of the above figures and understands that the City will not be responsible for any error or omission on the part of the Undersigned in preparing this bid. The Undersigned agrees that in case of default in executing the required Contract with necessary bonds and insurance policies within twenty (20) days from the date of award of Contract by the City Council of the City of Carlsbad, the City may administratively authorize award of the contract to the second or third lowest bidder and the bid security of the lowest bidder may be forfeited. The Undersigned bidder declares, under penalty of perjury, that the undersigned is licensed to do business or act in the capacity of a contractor within the State of California, validly licensed under license number 6^1 "7^62. _ , classification _ £± _ which expires on luvi 1\J fyQ&f) _ , and that this statement is true and correct and has the legal effect of an affi 1\J fidavit. A bid submitted to the City by a Contractor who is not licensed as a contractor pursuant to the Business and Professions Code shall be considered nonresponsive and shall be rejected by the City § 7028.15(e). In all contracts where federal funds are involved, no bid submitted shall be invalidated by the failure of the bidder to be licensed in accordance with California law. However, at the time the contract is awarded, the contractor shall be properly licensed. The Undersigned bidder hereby represents as follows: 1. That no Council member, officer agent, or employee of the City of Carlsbad is personally interested, directly or indirectly, in this Contract, or the compensation to be paid hereunder; that no representation, oral or in writing, of the City Council, its officers, agents, or employees has inducted him/her to enter into this Contract, excepting only those contained in this form of Contract and the papers made a part hereof by its terms; and 2. That this bid is made without connection with any person, firm, or corporation making a bid for the same work, and is in all respects fair and without collusion or fraud. Accompanying this proposal is CHA &OY\(A (Cash, Certified Check, Bond or Cashier's Check) for ten percent (10%) of the amount bid. The Undersigned is aware of the provisions of section 3700 of the Labor Code which requires every Revised 02/12/08 Addendum No. 2 - Contract No. 3907 Page 9 of 141 Pages employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and agrees to comply with such provisions before commencing the performance of the work of this Contract and continue to comply until the contract is complete. The Undersigned is aware of the provisions of the Labor Code, Part 7, Chapter 1, Article 2, relative to the general prevailing rate of wages for each craft or type of worker needed to execute the Contract and agrees to comply with its provisions. IF A SOLE OWNER OR SOLE CONTRACTOR SIGN HERE: (1) Name under which business is conducted pj I n (2) Signature (given and surname) of proprietor (3) Place of Business Ki |f\ City and State W |/\ (4) Zip Code ki|/\ Telephone No. H|ft (5) E-Mail N |/V N|A (Street and Number) IF A PARTNERSHIP, SIGN HERE: (1) Name under which business is conducted N r\ (2) Signature (given and surname and character of partner) (Note: Signature must be made by a general partner) N|(\ (3) Place of Business City and State \^A. (4) Zip Code VJ [ f\ (5) E-Mail f\ (Street and Number) Telephone No.N [ f\ Revised 02/12/08 Addendum No. 2 - Contract No. 3907 Page 10 of 141 Pages IF A CORPORATION, SIGN HERE: (1) Name under which business is conducted S if IfTd (2), (Signature) I/ v- grown, (Title) Impress Corporate Seal here (3) Incorporated under the laws of the State (4) Place of Business i / - . i rt » City and State V I £tfl . CA (Street and Number) (5) Zip Code 0\1,0&\ _ Telephone No. "1(lO» %<\(\ com NOTARIAL ACKNOWLEDGMENT OF EXECUTION BY ALL SIGNATORIES MUST BE ATTACHED Revised 11/01/06 Contract No. 3907 Page 11 of 141 Pages ACKNOWLEDGMENT State of California County of San Diego On June 2, 2008 before me, Laura L. Mikels, Notary Public (here insert name and title of the officer) personally appeared Thomas L. Brown, President personally known to me (or proved to me on the basis of satisfactory evidence) to be the personfefwhose namej^ is/aWsubscribed to the within instrument and acknowledged to me that he/s^/fh^ executed the same in his/h^ffth^Tr authorized capacity(i^), and that by his/h^thW^signature(^bn the instrument the per or the entity upon behalf of which the person^acted, executed the instrument. WITNESS my hand and official seal. (Seal) Check A License: Contractor's License Detail Page 1 of2 W*' Skip to: CSLB Home | Content | Footer | Accessibility [ Search CSLB Department of Consumer Affairs **•* .._.^ Contractors State License feoard 08 1 I 07 BULMm OFFICIALS GENERAL INFO WHAT YOU CAN DO About CSLB CSLB Newsroom Board and Committee Meetings Disaster Information Center CSLB Library Frequently Asked Questions Online Services • Check A License or HIS Registration • Filing a ^ Construction Complaint • Processing Times • Check Application Status • Search for a Surety Bond Insurance Company • Search for a Workers' Compensation Company How to Participate CONTRACTOR'S LICENSE DETAIL <LJL\ DISCLAIMER: A license status check provides information taken from the CSLB license database. Before relying on this information, you should be aware of the following limitations. • CSLB complaint disclosure is restricted by law (B&P7124J.). If this entity is subject to public complaint disclosure, a link for complaint disclosure will appear below. Click on the link or button to obtain complaint and/or legal action information. • Per B&P 7071.17, only construction related civil judgments reported to the CSLB are disclosed. • Arbitrations are not listed unless the contractor fails to comply with the terms of the arbitration. • Due to workload, there may be relevant information that has not yet been entered onto the Board's license database. License Number: Business Information: Entity: Issue Date: Expire Date: License Status: Classifications: Bonding: 597852 Extract Date: 05/21/2008 SIERRA PACIFIC WEST INC PO BOX 231640 ENCINITAS, CA 92023-1640 Business Phone Number: (760) 599-0755 Corporation 07/06/1990 07/31/2008 This license is current and active. All information below should be reviewed. CLASS DESCRIPTION GENERAL ENGINEERING CONTRACTOR CONTRACTOR'S BOND This license filed Contractor's Bond number 103465334 in the amount of $12,500 with the bonding company JEWELERS CASyAJLIY^ AMERICA. Effective Date: 01/01/2007 Contractor's. Bonding History BOND OF QUALIFYING INDIVIDUAL http://www2.cslb.ca.gov/General-Information/interactive-tools/check-a-license/License+Detail.asp?Lic... 05/21/2008 Check A License: Contractor's License Detail Page 2 of2 Workers' Compensation: 1. The Responsible Managing Officer (RMO) SANDRA LEE BROWN certified that he/she owns 1 0 percent or more of the voting stock/equity of the corporation. A bond of qualifying individual is not required. Effective Date: 10/06/1995 This license has workers compensation insurance with the Policy Number: 01 DKRM1 2003026 Effective Date: 03/01/2008 Expire Date: 03/01/2009 W^kereLCornp&Tsatipn History. Personnel List Consumers | Contractors | Applicants | Journeymen | Public Works | Building Officials | General Info CSLBHome | Conditions of Use | Privacy | Contact CSLB Copyright © 2007 State of California http://www2.cslb.ca.gov/General-Information/interactive-tools/check-a-license/License+Detail.asp?Lic... 05/21/2008 List below names of president, vice president, secretary and assistant secretary, if a corporation; if a partnership, list names of all general partners, and managing partners: u L V. P. Revised 11/01/06 Contract No. 3907 Page 12 of 141 Pages BID SECURITY FORM (Check to Accompany Bid) OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 (NOTE: The following form shall be used if check accompanies bid.) Accompanying this proposal is a *Certified *Cashiers check p CARLSBAD, in the sum of fder of CITY OF this amount being ten percent (10%) of the total amotrntxOflfeheNaid. Th^proceeds of this check shall become the property of the City provided this proposal sNnallupe accented by the City through action of its legally constituted contracting authorities and the undersigned snail fail to execute a contract and furnish the required Performance, Warranty and Paynq§nt Bonds and proof of insurance coverage within the stipulated time; otherwise, the checVshall be retumeprto the undersigned. The proceeds of this check shall also become the property of trVcjty if the u/raersigned shall withdraw his or her bid within the period of fifteen (15) days after the\jate set ior the opening thereof, unless otherwise required by law, and notwithstanding the awefakorthe cojxtract to another bidder. BIDDER * Delete the inapplicable w6rd. (NOTE: If the Bidder desires to use a bond instead of check, the Bid Bond form on the following pages shall be executed~the swi of this bond shall be not less than ten percent (10%) of the total amount of the bid.) Revised 11/01/06 Contract No. 3907 Page 13 of 141 Pages BIDDER'S BOND TO ACCOMPANY PROPOSAL OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 KNOW ALL PERSONS BY THESE PRESENTS: Travelers Casualty and Surety That we, Sierra Pacific West, Inc. as Principal, and Company of America , as Surety are held and firmly bound unto the City of Carlsbad, California, in an amount as follows: (must be at least ten percent (10%) of the bid amount) Ten Percent of Bid (10% of Bid1 for which payment, well and truly made, we bind ourselves, our heirs, executors and administrators, successors or assigns, jointly and severally, firmly by these presents, THE CONDITION OF THE FOREGOING OBLIGATION IS SUCH that if the proposal of the above- bounden Principal for: OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 in the City of Carlsbad, is accepted by the City Council, and if the Principal shall duly enter into and execute a Contract including required bonds and insurance policies within twenty (20) days from the date of award of Contract by the City Council of the City of Carlsbad, being duly notified of said award, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect, and the amount specified herein shall be forfeited to the said City. In the event Principal executed this bond as an individual, it is agreed that the death of Principal shall Revised 11/01/06 Contract No, 3907 Page 14 of 141 Pages not exonerate the Surety from its obligations under this bond. Executed by PRINCIPAL this 10th day of April .2008 . PRiNClPAL: Sierra Pacific West, (sign here) Thomas L. Brown (print name here) President (Title and Organization of Signatory) By: (sign here) (print name here) (title and organization of signatory) Executed by SURETY this 10th of April , 2008 SURETY; Travelers Casualty and Surety Company of America (name of Surety) 9325 Sky Park Court, #220 San Diea.0, CA 92123 (address of Surety) (858)616-6252 (telep! nature of Attorney^ in-Fact)y nes Baldassare, Jr. (printed name of Attorney-in-Fact) (Attach corporate resolution showing current power of attorney.) (Proper notarial acknowledgment of execution by PRINCIPAL and SURETY must be attached.) (President or vice-president and secretary or assistant secretary must sign for corporations. If only one officer signs, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate sea) empowering that officer to bind the corporation.) APPROVED AS TO FORM: RONALD R, BALL City Attorney > Deputy City Attorney Revised 11/01/06 Contract No, 3907 Page 15 of 141 Pages ACKNOWLEDGMENT State of California County of San Diego On April 10, 2008 before me, Laura L. Mikels, Notary Public (here insert name and title of the officer) personally appeared Thomas L. Brown, President personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(sf) whose name(^Q is/a^ subscribed to the within instrument and acknowledged to me that he/sfe^/th^y executed the same in his/h^r/th^ir authorized capacity^), and that by his/he^t^r signature^ on the instrument the person^, or the entity upon behalf of which the person^) acted, executed the instrument. WITNESS my hand and official seal. Signature) ; -*• (Seal) RESOLUTIONS AND UNANIMOUS WRITTEN CONSENT OF BOARD OF DIRECTORS OF SIERRA PACIFIC WEST, INC. A California Corporation TO BOARD ACTION WITHOUT MEETING Pursuant to Section 307 (b) of the Corporation Code of the State of California, and the Bylaws of this Corporation, the undersigned, constituting all of the directors of SIERRA PACIFIC WEST, INC. a California corporation, HEREBY unanimously consent to the actions taken by the Board of Directors of said Corporation as December 31, 2000, by the following resolutions of the Board of Directors of said Corporation made without a meeting of said Board of Directors: RESOLVED, that any one signature of the CEO/Secretary or President, or any combination thereof, shall be and hereby are authorized and empowered in the name and on behalf of this Corporation, to take whatever action and execute whatever contract documents that are needed to put said resolution into effect. We, the undersigned, unanimously consent to the foregoing resolutions, which shall relate back to the date first above written in the foregoing consent. SANDRA L. BROWN, CEO / SECRETARY _L /i THOMAS{L^gROWN, PRESIDENT CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of California County of San Diego On APR 1 0 2008 before me, Penny E. Kelley, Notary Public Dale Here Inserl Name and Tille of Ihe OHicer personally appeared James Baldassare, Jr. Name(s) ol Signer(s) PENNY E. KELLEYCOMM. #1535728 o NOTARY PUBLIC-CALIFORNIA W SAN DIEGO COUNTY 2My Commission Expires • DECEMBER 26, 2008__| who proved to me on the basis of satisfactory evidence to be the person(d) whose name(^) ixtere subscribed to the within instrument and acknowledged to me that hej&attfo9$ executed the same in his^KMXMKauthorized capacity(£6X and that by his/ftxfti&tr signature^ on the instrument the person(jQ, or the entity upon behalf of which the person(fr) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my haVid and official seal. Place Notary Seal Above Signature OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: Document Date:. Number of Pages:. Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: D Individual D Corporate Officer —Title(s): D Partner — D Limited D General D Attorney in Fact D Trustee D Guardian or Conservator D Other: Signer Is Representing:. Top of thumb here Signer's Name: D Individual D Corporate Officer — Title(s): D Partner — D Limited D General D Attorney in Fact D Trustee D Guardian or Conservator D Other: Signer Is Representing: Hft£!?$2eS3?Sg&S2$5wSeS03^^ C2007 Natonal Notary Association^ 9350 DeSotoAvn., P.O. Box 2402 •Chatsworth.CA 91313-2402-wwv.NaUonalNolary.org Item #5907 Reorder Call Toll-Free 1-800-876-6827 TRAVELERS) WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER POWER OF ATTORNEY Farmington Casualty Company Fidelity and Guaranty Insurance Company Fidelity and Guaranty Insurance Underwriters, Inc. Seaboard Surety Company St. Paul Fire and Marine Insurance Company St. Paul Guardian Insurance Company St. Paul Mercury Insurance Company Travelers Casualty and Surety Company Travelers Casualty and Surety Company of America United States Fidelity and Guaranty Company Attorney-In Fact No.217991 Certificate No.,001996344 KNOW ALL MEN BY THESE PRESENTS: That Seaboard Surety Company is a corporation duly organized under the laws of the State of New York, that St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company and St. Paul Mercury Insurance Company are corporations duly organized under the laws of the State of Minnesota, that Farmington Casualty Company, Travelers Casualty and Surety Company, and Travelers Casualty and Surety Company of America are corporations duly organized under the laws of the State of Connecticut, that United States Fidelity and Guaranty Company is a corporation duly organized under the laws of the State of Maryland, that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc. is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint Christine A. Paterson, Penny E. Kelley, James Baldassare Jr., Lawrence F. McMahon, James R. Sommerville, and America San Martin of the City of _San Diego State of California . , their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNEgjA^gEjREOF, the Compaausjijhave caused this instrument to be signed and their corporate seals to be hereto affixed, this . day of , . 5th State of Connecticut City of Hartford ss. On this the _ 5th Farmington Casualty Company Fidelity and Guaranty Insurance Company Fidelity and Guaranty Insurance Underwriters, Inc. Seaboard Surety Company St. Paul Fire and Marine Insurance Company St. Paul Guardian Insurance Company St. Paul Mercury Insurance Company Travelers Casualty and Surety Company Travelers Casualty and Surety Company of America United States Fidelity and Guaranty Company _ day of _ October Thompson, Senior Vice President 2007 , before me personally appeared George W. Thompson, who acknowledged himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. c•Tn Witness Whereof, I hereunto set my hand and official seal. Commission expires the 30th day of June, 2011.Marie C. Tetreault, Notary Public 58440-5-07 Printed in U.S.A. WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any power of attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such power of attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kori M. Johanson, the undersigned, Assistant Secretary, of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is in full force and effect and has not been revoked. APR 1 0 2008 IN TESTIMONY WHEREOF, 1 have hereunto set my hand and.affixed the seals of said Companies this .day of _,20 Kori M. Johansdo/Assistant Secretary To verify the authenticity of this Power of Attorney, call 1-800-421-3880 or contact us at www.travelersbond.com. Please refer to the Attorney-In-Fact number, the above-named individuals and the details of the bond to which the power is attached. WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER Company Profile Page 1 of 2 Company Profile TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA ONE TOWER SQUARE, 4MN TRAVELERS / Mary T. Restelli HARTFORD, CT 06183 877-872-8737 Former Names for Company Old Name: AETNA CASUALTY & SURETY COMPANY OF AMERICA Effective Date: 07-01-1997 Agent for Service of Process KAREN HARRIS, 2730 GATEWAY OAKS DRIVE SUITE 100 SACRAMENTO, CA 95833 Unable to Locate the Agent for Service of Process? Reference Information NAIC#: 31194 NAIC Group #: 3548 California Company ID #: 2444-8 Date authorized in California: July 31, 1981 License Status: UNLIMITED-NORMAL Company Type: Property & Casualty State of Domicile: CONNECTICUT Lines of Insurance Authorized to Transact company is authorized to transact business within these lines of insurance. For an explanation of any of these terms, please refer to the glossary. <sa»^' AIRCRAFT AUTOMOBILE BOILER AND MACHINERY BURGLARY COMMON CARRIER LIABILITY CREDIT DISABILITY FIRE LIABILITY MARINE MISCELLANEOUS PLATE GLASS SPRINKLER SURETY TEAM AND VEHICLE WORKERS' COMPENSATION Company Complaint Information '""•^^^ Company Enforcement Action Documents Company Performance & Comparison Data Composite Complaint Studies http://interactive.web.insurance.ca.gov/webuser/idb_co_prof_utl.get_co_pr... 04/17/2008 Company Profile Page 2 of 2 Want More? Help Me Find a Company Representative in My Area Financial Ratine Organizations Last Revised - March 12, 2008 07:19 PM Copyright © California Department of Insurance http://interactive.web.insurance.ca.gov/webuser/idb_co_prof_utl.get_cojpr... 04/17/2008 GUIDE FOR COMPLETING THE "DESIGNATION OF SUBCONTRACTORS" FORM REFERENCES Prior to preparation of the following "Subcontractor Disclosure Form" Bidders are urged to review the definitions in section 1-2 of the General Provisions to this Contract, especially, "Bid", "Bidder", "Contract", "Contractor", "Contract Price", "Contract Unit Price", "Engineer", "Own Organization", "Subcontractor", and "Work". Bidders are further urged to review sections 2-3 SUBCONTRACTS of the General Provisions. CAUTIONS This form will be used by the Agency to determine the percentage of work that the Bidder proposes to perform. Bidders are cautioned that failure to provide complete and correct information may result in rejection of the bid as non-responsive. Any bid that proposes performance of more than 50 percent of the work by subcontractors or otherwise to be preformed by forces other than the Bidder's own organization will be rejected as non-responsive. Specialty items of work that may be so designated by the Engineer on the "Contractor's Proposal" are not included in computing the percentage of work proposed to be performed by the Bidder. INSTRUCTIONS The Bidder shall set forth the name and location of business of each and every subcontractor whom the Bidder proposes to perform work or labor or render service in or about the work or improvement, and every subcontractor licensed as a contractor by the State of California whom the Bidder proposes to specially fabricate and install any portion of the work or improvement according to detailed drawings contained in the plans and specifications in excess of one-half of one percent (0.5%) of the Bidder's total bid or, in the case of bids or offers for the construction of streets and highways, including bridges, in excess of one-half of one percent (0.5%) or ten thousand dollars ($10,000) whichever is greater. Said name(s) and location(s) of business of subcontractor(s) shall be set forth and included as an integral part of the bid offer. The Designation of Subcontractors form must be submitted as a part of the Bidder's sealed bid. Failure to provide complete and correct information may result in rejection of the bid as non- responsive. Suppliers of materials from sources outside the limits of work are not subcontractors. The value of materials and transport of materials from sources outside the limits of work, as shown on the plans, shall be assigned to the Contractor or the Subcontractor as the case may be, that the Bidder proposes as installer of said materials. The value of material incorporated in any Subcontractor- installed bid item that is supplied by the Bidder shall be included as a part of the work that the Bidder proposes to be performed by the Subcontractor installing said item. When a Subcontractor has a Carlsbad business license, the number must be entered on the proper form. If the Subcontractor does not have a valid business license, enter "NONE" in the appropriate space. When the Bidder proposes using a Subcontractor to construct or install less than 100 percent of a bid item, the Bidder shall attach an explanation sheet to the Designation of Subcontractor form. The explanation sheet shall clearly apprise the City of the specific facts that show the Bidder proposes to perform no less than fifty percent (50%) of the work with its own forces. Determination of the subcontract amounts for purposes of award of the contract shall be determined by the City Council in conformance with the provisions of the contract documents and the various supplemental provisions. The decision of the City Council shall be final. Revised 11/01/06 Contract No. 3907 Page 16 of 141 Pages Contractor is prohibited from performing any work on this project with a subcontractor who is ineligible to perform work on a public works project pursuant to Labor Code Sections 1771.1 or 1777.7. Bidders shall make any additional copies of the disclosure forms as may be necessary to provide the required information. The page number and total number of additional form pages shall be entered in the location provided on each type of form so duplicated. Revised 11/01/06 Contract No. 3907 Page 17 of 141 Pages Contractor is prohibited from performing any work on this project with a subcontractor who is ineligible to perform work on a public works project pursuant to Labor Code Sections 1771.1 or 1777.7. Bidders shall make any additional copies of the disclosure forms as may be necessary to provide the required information. The page number and total number of additional form pages shall be entered in the location provided on each type of form so duplicated. Revised 11/01/06 Contract No. 3907 Page 17 of 141 Pages DESIGNATION OF SUBCONTRACTOR AND AMOUNT OF SUBCONTRACTOR'S BID ITEMS (To Accompany Proposal) OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 The Bidder certifies that it has used the sub-bid of the following listed subcontractors in preparing this bid for the Work and that the listed subcontractors will be used to perform the portions of the Work as designated in this list in accordance with applicable provisions of the specifications and section 4100 et seq. of the Public Contract Code, "Subletting and Subcontracting Fair Practices Act." The Bidder further certifies that no additional subcontractor will be allowed to perform any portion of the Work in excess of one-half of one percent (0.5%) of the Bidder's total bid, or in the case of bids or offers for construction of streets and highways, including bridges, in excess of one-half of one percent (0.5%) or ten thousand dollars ($10,000); whichever is greater, and that no changes in the subcontractors listed work will be made except upon the prior approval of the Agency. SUBCONTRACTOR'S BID ITEMS .-t Portion of Work ; Subcontractor Name and Location .of Business f p^^ . Subcontractor's Ucensa No; and ' Classification* Amount of / Work by Subcontractor in Dollars* /d 97* *- Page of pages of this Subcontractor Designation form Pursuant to section 4104 (a)(2)(A) California Public Contract Code, receipt of the information preceded by an asterisk may be submitted by the Bidder up to 24 hours after the deadline for submitting bids contained in the "Notice Inviting Bids.* Revised 11701/06 Contract No. 3907 Page 18 of 141 Pages BIDDER'S STATEMENT OF TECHNICAL ABILITY AND EXPERIENCE (To Accompany Proposal) OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 The Bidder is required to state what work of a similar character to that included in the proposed Contract he/she has successfully performed and give references, with telephone numbers, which will enable the City to judge his/her responsibility, experience and skill. An attachment can be used. umtm Contract Completed /1,I' Name and Address of the Employer \ \ i f < - ^\Y-^iP v J /-4 r /} • /j / Name and Phone No. of Person to Contract \ f\ { ]\\r&y,.f\ ^ / /IK- />> ^/ .:''' TypaofWorK ? Airiuuni Of Contract Revised 11/01/06 Contract No. 3907 Page 19 of 141 Pages DESIGNATION OF SUBCONTRACTOR AND AMOUNT OF SUBCONTRACTOR'S BID ITEMS (To Accompany Proposal) OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 The Bidder certifies that it has used the sub-bid of the following listed subcontractors in preparing this bid for the Work and that the listed subcontractors will be used to perform the portions of the Work as designated in this list in accordance with applicable provisions of the specifications and section 4100 et seq. of the Public Contract Code, "Subletting and Subcontracting Fair Practices Act." The Bidder further certifies that no additional subcontractor will be allowed to perform any portion of the Work in excess of one-half of one percent (0.5%) of the Bidder's total bid, or in the case of bids or offers for construction of streets and highways, including bridges, in excess of one-half of one percent (0.5%) or ten thousand dollars ($10,000), whichever is greater, and that no changes in the subcontractors listed work will be made except upon the prior approval of the Agency. SUBCONTRACTOR'S BID ITEMS Portion of Work Subcontractor Name and Location of Business Subcontractor's License No. and Classification* Amount of Work by Subcontractor In Dollars* Page of pages of this Subcontractor Designation form Pursuant to section 4104 (a)(2)(A) California Public Contract Code, receipt of the information preceded by an asterisk may be submitted by the Bidder up to 24 hours after the deadline for submitting bids contained in the "Notice Inviting Bids." Revised 11/01/06 Contract No. 3907 Page 18 of 141 Pages SIERRA PACIFIC WEST, INC. General Engineering Contractor Date Agency/Address 2007 City of Encinitas 505 S. Vulcan Avenue Encinitas, CA 92024 2007 City of Solana Beach 635 S. Hwy 101 Solana Beach, CA 92075 2006 San Diego County Water Authority 4677 Overland Avenue San Diego, CA92123 2006 City of Solana Beach 635 S. Hwy 101 Solana Beach, CA 92075 2006 San Diego State Univ. 5500 Campanile Dr. San Diego, CA92182 Contact Pfoiect/Tvpe of Work Contract Greg Shields Bonita Drive Improvements .8 M 760-633-2600 Street Improvements Dan Goldberg Fletcher Cove Park 2.5 M 858-720-2470 Park Improvements TonyCandotti Wetland Creation at Manchester 1.1 M 858-522-6851 Wetland Creation Dan Goldberg Solana Beach Coastal Rail Trail 2.7 M 858-720-2470 Improvements Tony Fulton Tennis & Softball Complex 4.5 M 619-594-5224 P.O. BOX 231640 • ENCINITAS, CA 92023-1640 • (760) 599-0755 • FAX (760) 599-0668 LICENSE NO. 597852 • www.SIERRAPACIFICWEST.com BIDDER'S CERTIFICATE OF INSURANCE FOR GENERAL LIABILITY, EMPLOYERS' LIABILITY, AUTOMOTIVE LIABILITY AND WORKERS' COMPENSATION (To Accompany Proposal) OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 As a required part of the Bidder's proposal the Bidder must attach either of the following to this page. 1) Certificates of insurance showing conformance with the requirements herein for each of: M Comprehensive General Liability H Automobile Liability [3 Workers Compensation 0 Employer's Liability 2) Statement with an insurance carrier's notarized signature stating that the carrier can, and upon payment of fees and/or premiums by the Bidder, will issue to the Bidder Policies of insurance for Comprehensive General Liability, Automobile Liability, Workers Compensation and Employer's Liability in conformance with the requirements herein and Certificates of insurance to the Agency showing conformance with the requirements herein. All certificates of insurance and statements of willingness to issue insurance for auto policies offered to meet the specification of this contract must: 1) Meet the conditions stated in The Notice Inviting Bids and the General Provisions for this project for each insurance company that the Contractor proposes. 2) Cover any vehicle used in the performance of the contract, used onsite or offsite, whether owned, non-owned or hired, and whether scheduled or non-scheduled. Revised 11/01/06 Contract No. 3907 Page 20 of 141 Pages r ACORD, CERTIFICATE OF LIABILITY INSURANCE 8Iffltf» PRODUCER ( \ .Wateridge Insurance Services ' x 0717 Sorrento Valley Rd. N Mian Diego CA 92121 ! Phone:858-452-2200 Fax:858-452-6004 , INSURED Sierra Pacific West, Inc.P O Box 231646Encinitas CA 92023-1640 DATE (MM/DD/YYW) 06/09/08 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. INSURERS AFFORDING COVERAGE INSURER A: Liberty Surplui Insuranca Corp INSURERS: Aitarioan Statoe Insurance Co INSURER C: H»tional Union Fir* In* Co of INSURER D: Dalos Insurance Company INSURER E: NAIC# 19445 #35408 COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAI D CLAIMS. IRSTT LTR A B >*N C D ADD'LNSRt X TYPE OF INSURANCE GENERAL LIABILITY ^ COMMERCIAL GENERAL LIABILITY [ CLAIMS MADE | X | OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: | POLICY [x~[ SECT 1 1 LOG AUTOMOBILE LIABILITY IK"ANY AUTO ALL OWNED AUTOS SCHEDULED AUTOS HIRED AUTOS NON-OWNED AUTOS GARAGE LIABILITY ANY AUTO EXCESS/UMBRELLA LIABILITY X | OCCUR | [ CLAIMS MADE DEDUCTIBLE RETENTION $ WORKERS COMPENSATION AND EMPLOYERS1 LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVEOFFICER/MEMBER EXCLUDED? If yes, describe under SPECIAL PROVISIONS below OTHER POLICY NUMBER DGL-SF-184 603-035 24CC14354'72 i BE 982 95 9 6 01DKRM1-2003-026 POLICY EFFECTIVEDATE(MM/DD/YY) 10/15/07 10/15/07 10/15/07 03/01/08 . POLICTEXPIRATIOPTDATE(MM(DD/YY) 10/15/08 10/15/08 10/15/08 03/01/09 LIMITS EACH OCCURRENCE DAMAGE TO REN i tu PREMISES (Ea occurence) MEOEXP (Any one person) PERSONAL &ADV INJURY GENERAL AGGREGATE PRODUCTS - COMP/OP AGG COMBINED SINGLE LIMIT(Ea accident) BODILY INJURY (Per person) BODILY INJURY(Per accident) PROPERTY DAMAGE(Per accident) AUTO ONLY - EA ACCIDENT OTHER THAN EAACC AUTO ONLY: AOG EACH OCCURRENCE AGGREGATE S.I.R. X ) WCSIAIU- JUIH-1 TORY LIMITS | ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE E.L. DISEASE - POLICY LIMIT $1,000,000 $50,000 $ EXCLUDED $1,000,000 $2,000,000 $2,000,000 $1,000,000 $ $ $ $ $ $ $5,000,000 $5,000,000 $$10,000 $ % $1,000,000 $1,000,000 $1,000,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT / SPECIAL PKOVISU-jNg *EXCEPT 10-DAYS NOTICE FOR NON-PAYMENT OF PREMIUM. THE CITY- OF CARLSBAD, ITS OFFICIALS, EMPLOYEES AND VOLUNTEERS ARE NAMED ADDITIONAL INSURED WITH RESPECT TO GENERAL LIABILITY PER ATTACHED CGL2010 11/85 WITH^ PRIMARY PER CGL1031 04/03. RE: OFF-SITE WETLAND MITIGATION RESTORATION IBID FOR THE RANCHO SANTA FE ROAD NORTH; #3907 (XXX) CERTIFICATE HOLDER CANCELLATION CITYCAR SH°U1-D ANY OF THE ABOVE: DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL r^raBWOIPTO MAIL 30* DAYS WRITTEN CITY OF CARLSBAD NOTICE TO THE CERTIFICATE HOLD* ^ 1VTTM. KKVTN DAVIS, PUBtTC ,„.,„.,. ,„„*,,,.,,. WORKS PURCHASING DEPT. r!635 FARADAY AVE CARLSBAD CA 92008-7314 AUTHORIZED REPRESENTATIVE /. S£SZ4/S&. S&A~f ACORD 25 (2001/08) ' ©ACORD CORPORATION 1988 LSICorporation Mealier «f Uluny Muilnl Craup Liberty Surplus Insurance Corporation ENDORSEMENT NO. 4 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. Endorsement Effective Date: 10/15/07 Policy No.: PGI-SF-184603-035 Insured: Siena Pacific Wffit. Inc. ______^^_ ADDITIONAL INSU i OR CONTRACTORS - SCHEDULE Name of Person or Organization: As per written contract (If no entry appears above, Information required to complete this endorsement will be shown In the Declarations as applicable to this endorsement) WHO IS AN INSURED (Section II) is amended to include as an insured the person or organization shown In the Schedule, but only with respect to liability arising out of "your work" for that insured by or for you. w CGL 2010 1185 Pagel of I *;•.., LSICorporation Mnnhcr lit Ulicny Munal Croup Liberty Surplus Insurance Corporation ENDORSEMENT NO. 16 TfflS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY Endorsement Effective Date: l.Q/15/07 Policy No: :DGL-SF-184603-035 Insured: Sierra Pacific West Inc. PRIMARY INSURANCE CLAUSE ENDORSEMENT To the extent that this insurance is afforded to any additional insured under the policy, such insurance shall apply as primary and not contributing with any insurance carried by such additional insured, as required by written contract. Nothing herein contained shall be held to waive, vary, alter or extend any condition or provision of the policy other than as above stated. COL 1031 0403 Page] of 1 BIDDER'S STATEMENT RE DEBARMENT (To Accompany Proposal) OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 1) Have you or any of your subcontractors ever been debarred as an irresponsible bidder by another jurisdiction in the State of California? ""***' yes no 2) If yes, what was/were the name(s) of the agency(ies) and what was/were the period (s) of debarment(s)? Attach additional copies of this page to accommodate more than two debarments. ivJ party debarred party debarred agency agency period of debarment period of debarment BY CONTRACTOR: (print name/title) Page.'_ of 'pages of this Re Debarment form Revised 11/01/06 Contract No. 3907 Page 21 of 141 Pages U BIDDER'S CERTIFICATE OF INSURANCE FOR GENERAL LIABILITY, EMPLOYERS' LIABILITY, AUTOMOTIVE LIABILITY AND WORKERS' COMPENSATION (To Accompany Proposal) OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 As a required part of the Bidder's proposal the Bidder must attach either of the following to this page. 1) Certificates of insurance showing conformance with the requirements herein for each of: M Comprehensive General Liability Automobile Liability Workers Compensation Ef Employer's Liability 2) Statement with an insurance carrier's notarized signature stating that the carrier can, and upon payment of fees and/or premiums by the Bidder, will issue to the Bidder Policies of insurance for Comprehensive General Liability, Automobile Liability, Workers Compensation and Employer's Liability in conformance with the requirements herein and Certificates of insurance to the Agency showing conformance with the requirements herein. All certificates of insurance and statements of willingness to issue insurance for auto policies offered to meet the specification of this contract must: 1) Meet the conditions stated in The Notice Inviting Bids and the General Provisions for this project for each insurance company that the Contractor proposes. 2) Cover any vehicle used in the performance of the contract, used onsite or offsite, whether owned, non-owned or hired, and whether scheduled or non-scheduled. A*¥ Revised 11/01/06 Contract No. 3907 Page 20 of 141 Pages BIDDER'S DISCLOSURE OF DISCIPLINE RECORD (To Accompany Proposal) OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 Contractors are required by law to be licensed and regulated by the Contractors' State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within 10 years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors' State License board, P.O. Box 26000, Sacramento, California 95826. 1) Have you ever had your contractor's license suspended or revoked by the California Contractors' State license Board two or more times within an eight year period? yes no 2) Has the suspension or revocation of your contractor's license ever been stayed? X yes no 3) Have any subcontractors that you propose to perform any portion of the Work ever had their contractor's license suspended or revoked by the California Contractors' State license Board two or more times within an eight year period? yes no 4) Has the suspension or revocation of the license of any subcontractor's that you propose to perform any portion of the Work ever been stayed? yes no 5) If the answer to either of 1. or 3. above is yes fully identify, in each and every case, the party disciplined, the date of and violation that the disciplinary action pertain to, describe the nature of the violation and the disciplinary action taken therefore. (If needed attach additional sheets to provide full disclosure.) Page i of A" pages of this Disclosure of Discipline form Revised 11/01/06 Contract No. 3907 Page 22 of 141 Pages BIDDER'S DISCLOSURE OF DISCIPLINE RECORD (CONTINUED) (To Accompany Proposal) OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 6) If the answer to either of 2. or 4. above is yes fully identify, in each and every case, the party who's discipline was stayed, the date of the violation that the disciplinary action pertains to, describe the nature of the violation and the condition (if any) upon which the disciplinary action was stayed. (If needed attach additional sheets to provide full disclosure.) BY CONTRACTOR: fk/ifu/ W&T Infr- (nameof Contractoi) , tractoi) ^ Jt *WV^ - -^ (sign here) (/ U Bvnwn resident (print name/title) 1 "9Page /- of ^ pages of this Disclosure of Discipline form Revised 11/01/06 Contract No. 3907 Page 23 of 141 Pages NON-COLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID PUBLIC CONTRACT CODE SECTION 7106 OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 State of California ) ) ss. County of ^Xu~> Q \LS> ) L- - (Name of Bidder) and says that he or she is _ Y f(L*? , being first duly sworn, deposes (Title) of O v ^..rr'i'-^ Y fa ('( HL^ (Name of Firm) the party making the foregoing bid that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. I declare under penalty of Rgriury that the foregoing is true and correct and that_this affidavit was executed on the tXH"^ day of \"tJbru^Lr^ , 20_ Signature of Bidder -"(\\^-y\CM^ (__ Subscribed and sworn to before me on the day of , 20_ (NOTARY SEAL) Signature of Notary Revised 11/01/06 Contract No. 3907 Page 24 of 141 Pages CONTRACT PUBLIC WORKS This agreement is made this day of , 20 , by and between the City of Carlsbad, California, a municipal corporation, (hereinafter called "City"), and whose principal place of business is (hereinafter called "Contractor"). City and Contractor agree as follows: 1. Description of Work. Contractor shall perform all work specified in the Contract documents for: OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 (hereinafter called "project") 2. Provisions of Labor and Materials. Contractor shall provide all labor, materials, tools, equipment, and personnel to perform the work specified by the Contract Documents. 3. Contract Documents. The Contract Documents consist of this Contract, Notice Inviting Bids, Contractor's Proposal, Bidder's Bond, Designation of Subcontractors, Technical Ability and Experience, Re Debarment, Non-collusion Affidavit, Escrow Agreement, Release Form, the Plans and Specifications, the General Provisions, addendum(s) to said Plans and Specifications and General Provisions, and all proper amendments and changes made thereto in accordance with this Contract or the Plans and Specifications, and all bonds for the project; all of which are incorporated herein by this reference. Contractor, her/his subcontractors, and materials suppliers shall provide and install the work as indicated, specified, and implied by the Contract Documents. Any items of work not indicated or specified, but which are essential to the completion of the work, shall be provided at the Contractor's expense to fulfill the intent of said documents. In all instances through the life of the Contract, the City will be the interpreter of the intent of the Contract Documents, and the City's decision relative to said intent will be final and binding. Failure of the Contractor to apprise subcontractors and materials suppliers of this condition of the Contract will not relieve responsibility of compliance. 4. Payment. For all compensation for Contractor's performance of work under this Contract, City shall make payment to the Contractor per section 9-3 PAYMENT of the General Provisions section of this contract. The Engineer will close the estimate of work completed for progress payments on the last working day of each month. The City shall withhold retention as required by Public Contract Code Section 9203. Revised 11/01/06 Contract No. 3907 Page 25 of 141 Pages ACKNOWLEDGMENT State of California County of San Diego On February 25, 2008before me Laura L. Mikels, Notary Public (here insert name and title of the officer) personally appeared Thomas L. Brown, President personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. WITNESS my hand and official seal. ^ A. s\ , /> Signature / VI Ui Lt<L~ / - - (Seal) of Carlsbad Public Works - Contract Administration February 4, 2008 ADDENDUM NO. 1 RECEIVED FEB 05 ?00> SIERRA PACIFIC WES !NC RE: OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH, PROJECT NO. 3907 Please include the attached addendum in the Notice to Bidder/Request for Bids you have for the above project. Please note the CORRECTED pre-bid date and time for the above-mentioned bid. Date and time for MANDATORY pre-bid meeting is: Tuesday, February 12, 2008 at 9:00 am Location for the MANDATORY pre-bid meeting: The project site can be reached via the dirt road on the east side of Melrose Drive immediately south of the Melrose Drive Bridge over San Marcos Creek. This addendum-receipt acknowledged-must be included to your bid when your bid is submitted. KEVIN DAVIS Sr. Contract Administrator ACKNOWLEDGE RECEIPT OF ADDENDUM NO. 1 1635 Faraday Avenue - Carlsbad, CA 920O8-7314 - (76O) 6O2-4677 - FAX (760) 6O2-8562 This addendum is to correct an error in the date of the pre bid meeting. On page 3 of the Specifications the date for the pre bid meeting is shown as February 14, 2008. The correct date is February 12,2008. Replace the section on pre bid meeting with the following: PRE BID MEETING A pre-bid meeting and tour of the project site will be held at the project site at 9:00 AM on Tuesday, February 12, 2008. The project site can be reached via the dirt road on the east side of Melrose Drive immediately south of the Melrose Drive bridge over San Marcos Creek. of Carlsbad Public Works - Contract Administration .February 19, 2008 ADDENDUM NO. 2 RE: OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH, BID NO PWS08-19ENG Please include the attached addendum in the Notice to Bidders/Request for Bids you have for the above project. Please note that a new bid due date has been set: Bids will be accepted until 2:00 PM on March 25. 2008. Also an additional pre-bid meeting has been scheduled: AN ADDITIONAL PRE-BID MEETING WILL HE HELD AT 9:00 AM ON MARCH 4. 2008 AT THE SAME SITE AS THE PREVIOUS MEETING. THE LOCATION CAN BE FOUND IN THE "NOTICE INVITING BIDS" SECTION OF THE BID DOCUMENTS. THIS MEETING IS NOT MANDATORY. The mandatory status of the first pre-bid meeting is hereby rescinded. The City will accept bids from contractors who have not sent representatives to either meeting. This addendum includes: changes to project plans and specifications, responses to several requests for information, an attendance list for the first pre-bid meeting and a copy of an updated "Notice Inviting Bids" advertisement document. This addendum—receipt acknowledged—must be included in your bid when your bid is submitted. KEVINTDAVIS Sr. Contract Administrator I ACKNOWLEDGE RECEIPT OF ADDENDUM NO. 2 1 __ RECEIVED FEB2G 200? SIERRA PACIFIC WEST, INC. Bidder's Sigriat 1635 Faraday Avenue • Carlsbad, CA 92008-7314 • (760) 602-4677 • FAX (76O) 602-8562 ADDENDUM No. 2 RE: OFF-SITE WETLAND MITIGATION RESTOATION FOR RANCHO SANTA FE ROAD NORTH, PROJECT NO. 3907 1. DELETE the notes on plan sheets I-2, I-3 and TS-3 regarding deductive alternatives for irrigation items and planting areas. The will not be any deductive alternative in the bid. -2: DELETE the following from the plans: Irrigation Valve B-7 along with tho irrigation line and sprinklers served by valve B-7. This is an existing creek enhancement area and irrigation is not necessary in this location. The intended plantings in this area will be done on a non-irrigated basis. 3. ADD Hydroseed Mix C to the plans as shown below: RANCHO SANTA FE RD. OFFSITE REVEGETATION SITE SEED MIX C COASTAL SAGE SCRUB BUFFER Coastal Sage Scrub Hydroseed Mix "C" " ,' Artemesia californica - California sagebrush Encelia californica - coastal sunflower Eriogonum fasciculatum - California buckwheat Eriophyllum confertiflorum - golden yarrow Eschscholzia californica - California poppy Hemizonia fasciculate - fascicled tarplant Isocoma menziesii - coastal goldenbush Isomeris arborea - bladderpod Lotus scoparius - deerweed Lupinus bicolor - pygmy-leaved lupine Mimulus aurantiacus - sticky monkeyflower Nasella pulchra - purple needlegrass Plantago insularis - plantain Salvia apiana - white sage Salvia mellifera - black sage Total Lbs. Per Acre *%P/%e 15/50 40/60 10/65 30/60 98/75 10/25 20/40 90/65 90/60 98/80 5/70 70/60 98/75 70/50 70/50 Lbs/Ae. 3 2 5 2 2 1 1 1 3 2 2 3 2 2 3 34 Local collection of propagules from the coastal San Diego County region will be required as the source for these species. Slurry Mix Components: (same as planting note 13, as follows) Virgin Wood Cellulose fiber Mulch @ 2,200 Ibs./acre Feritlizer (0-45-0) Triple super phosphate, + 19% soil sulfer @ 250 Ibs./acre Az-Tac Binder (Nov.-Feb.) @ 100 Ibs./acre Addendum No. 2 - RSF Rd. North, Project No. 3907 Page 2 4. The correct call out for the brow ditch shown on the plans is a Modified Brow Ditch Type D. The detail on sheet 5 is correct. The call out in the Legend on Sheet No. 1 of the grading plan for a Type A brow ditch is incorrect as is the Type B brow ditch listed in Contractor's proposal. See revised Contractor's Proposal attached hereto and made a part hereof. 5. DELETE the grading and over-excavation within the northeast corner of the old rock quarry area, as shown on Sheet No's 5 & 7 of the grading plans. This is no longer necessary due to current field conditions. Vehicular access to these areas is no longer possible, only hand work can be implemented in these areas due to the previous mitigation effort and the re-growth of wetlands surrounding these areas. These areas shall be cleared and grubbed by hand and will be left at existing grades and then irrigated and planted as indicted on the plans. Environmental fencing and silt fencing within this area, as shown on sheets 3 & 9 will be deleted. See attached marked-up exhibits A-D by Dudek, dated 2/12/08 for reference. 6. ADVISORY NOTE: Vehicular access to the grading areas east of the rock quarry, as shown on Sheet No's 3 & 6 of the grading plans will be very limited. Small track equipment will only be possible for grading work in this area. Access will be from the existing trail to a point in the bottom of the canyon where the access road will diverge from the trail. Off-road access will be necessary from this point down into the canyon grading area along a previously used route. The trail fencing will temporarily be removed to allow access and then replaced and repaired after construction is complete. All damage to the surfaces and edging of the trail shall be repaired by the contractor, at no additional cost to the City. Access to wheeled vehicles is limited to the upper road and trail at the top of the quarry. The City and Dudek help identify the location where the trail fencing is to be temporarily removed. 7. REPLACE the Contractor's Proposal, page 6 through and including page 10, in the Specifications with the attached Contractors Proposal pages. CITY OF CARLSBAD OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 CONTRACTOR'S PROPOSAL City Council City of Carlsbad 1200 Carlsbad Village Drive Carlsbad, California 92008 The undersigned declares he/she has carefully examined the location of the work, read the Notice Inviting Bids, examined the Plans, Specifications, General Provisions, Contract Documents, and addenda thereto, and hereby proposes to furnish all labor, materials, equipment, transportation, and services required to do all the work to complete Contract No. 3907 in accordance with the Plans, Specifications, General Provisions, Contract Documents, and addenda thereto and that he/she will take in full payment therefore the following unit prices for each item complete, to wit: SCHEDULE"A" Item Na A-1 Description Mobilization and Preparatory Work at a lump sum not to exceed $45,000 Approximate Quantity and Unit 1 LS Unit Price Total 160,736 SF $_ Dollars (Lump Sum) A-2 Clearing and Grubbing at 1 LS Dollars (Lump Sum) A-3 Finish Grade Dollars per Square Foot A-4 Soil Preparation Dollars per Square Foot A-5 Irrigation System 1 LS $ Dollars (Lump Sum) Revised 02/12/08 Addendum No. 2 - Contract No. 3907 129,809 SF $_$ $ Page 6 of 141 Pages A-6 1 Gallon Trees 526 EA $ Dollars Each A-7 1 Gallon Shrubs 19,350 EA $ Dollars Each A-8 Hydroseed Mix A (SWS) 94,089 SF $_ Dollars per Square Foot A-9 Hydroseed Mix B (MFS) Dollars per Square Foot A-10 Hydroseed Mix C (CSS) Dollars per Square Foot A-11 Maintenance Period (1-30 Days) Dollars (Lump Sum) A-12 Maintenance Period (31-60 Days) Dollars (Lump Sum) A-13 Maintenance Period (61-90 Days) Dollars (Lump Sum) A-14 Maintenance Period (91-120 Days) Dollars (Lump Sum) A-15 Environmental Fencing 27,21 OSF $_ 18,500 SF $_ 1 LS $_ 1 LS $_ 1 LS $ 1 LS. $_ $ $ 9,300 LF $_ Revised 02/12/08 Addendum No. 2 - Contract No. 3907 Page 7 of 141 Pages Dollars per lineal Foot A-16 Unclassified Excavation 36,360 CY $ $_ A-17 A-18 A-19 A-20 A-21 A-22 A-23 A-24 A-25 Dollars per Cubic Yard Import and Place Topsoil Dollars per Cubic Yard Modified Brow Ditch Type D per SDRSD D-75 Dollars per Lineal Foot Rip Rap Energy Dissipator Dollars Each Drainage Swale Dollars per lineal Foot Check Dam Dollars (Lump Sum) Silt Fence Dollars per Lineal Foot Gravel Bags Dollars Each Stabilized Construction Entrance Dollars Each Remove Brow Ditch 5.41 5 CY $ 1.060LF $ 1 EA $ 530 LF $ 1 LS $ 3,775 LF $ 125 EA $ 1 EA $ 470 LF $ $_ $ $ $ $ Dollars per Lineal Foot Revised 02/12/08 Addendum No. 2 - Contract No. 3907 Page 8 of 141 Pages A-26 Remove Rip Rap Energy 2 EA Dissipator Dollars Each Total amount of bid in words for Schedule "A": Total amount of bid in numbers for Schedule "A": $ Price(s) given above are firm for 90 days after date of bid opening. Addendum(a) No(s). has/have been received and is/are included in this proposal. The Undersigned has carefully checked all of the above figures and understands that the City will not be responsible for any error or omission on the part of the Undersigned in preparing this bid. The Undersigned agrees that in case of default in executing the required Contract with necessary bonds and insurance policies within twenty (20) days from the date of award of Contract by the City Council of the City of Carlsbad, the City may administratively authorize award of the contract to the second or third lowest bidder and the bid security of the lowest bidder may be forfeited. Tne Undersigned bidder declares, under penalty of perjury, that the undersigned is licensed to do business or act in the capacity of a contractor within the State of California, validly licensed under license number , classification which expires on , and that this statement is true and correct and has the legal effect of an affidavit. A bid submitted to the City by a Contractor who is not licensed as a contractor pursuant to the Business and Professions Code shall be considered nonresponsive and shall be rejected by the City § 7028.15(e). In all contracts where federal funds are involved, no bid submitted shall be invalidated by the failure of the bidder to be licensed in accordance with California law. However, at the time the contract is" awarded, the contractor shall be properly licensed. The Undersigned bidder hereby represents as follows: 1. That no Council member, officer agent, or employee of the City of Carlsbad is personally interested, directly or indirectly, in this Contract, or the compensation to be paid hereunder; that no representation, oral or in writing, of the City Council, its officers, agents, or employees has inducted him/her to enter into this Contract, excepting only those contained in this form of Contract and the papers made a part hereof by its terms; and 2. That this bid is made without connection with any person, firm, or corporation making a bid for the same work, and is in all respects fair and without collusion or fraud. Accompanying this proposal is (Cash, Certified Check, Bond or Cashier's Check) for ten percent (10%) of the amount bid. The Undersigned is aware of the provisions of section 3700 of the Labor Code which requires every Revised 02/12/08 Addendum No. 2 - Contract No. 3907 Page 9 of 141 Pages employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and agrees to comply with such provisions before commencing the performance of the work of this Contract and continue to comply until the contract is complete. The Undersigned is aware of the provisions of the Labor Code, Part 7, Chapter 1, Article 2, relative to the general prevailing rate of wages for each craft or type of worker needed to execute the Contract and agrees to comply with its provisions. IF A SOLE OWNER OR SOLE CONTRACTOR SIGN HERE: (1) Name under which business is conducted (2) Signature (given and surname) of proprietor , (3) Place of Business (Street and Number) City and State (4) Zip Code Telephone No. (5) E-Mail IF A PARTNERSHIP. SIGN HERE: (1) Name under which business is conducted. (2) Signature (given and surname and character of partner) (Note: Signature must be made by a general partner) (3) Place of Business (Street and Number) City and State (4) Zip Code Telephone No. (5) E-Mail Revised 02/12/08 Addendum No. 2 - Contract No. 3907 Page 10 of 141 Pages RESPONSE TO REQUEST FOR INFORMATION R.F.I. NO. DATE: PROJECT NAME: PROJECT # : 1 2/13/2008 Wetlands Mitigation - RSF Rd. 3907 (Bid # PWS08-19ENG) Regarding: Soils Report 1. Will the City post the soils report on the e-bid board website for this job? RESPONSE: No. Regarding: Auto CAD Files 2. It would be very helpful if the grading plans for this job could be provided in Auto Cad format. Will the City post the CAD files on the website for this job? RESPONSE: No. Regarding: Precedence of Contract Documents 3. The precedence of documents (as shown on page 49 of the contract documents) shows Carlsbad General Provision as number two. Are the Carlsbad General Provisions the same as the Supplemental Provisions to the Green Book (see page 99)? RESPONSE: No. The Carlsbad General Provisions are found starting on page 38 in the project specifications. Regarding: Brow Ditch 4. The Contractors Proposal Schedule "A" calls for a Brow Ditch Type B per SDRSD D-75. The legend on the cover sheet of the Grading Plans calls for a Type A. The detail for the Brow Ditch on page 5 of the Grading Plans calls for a Modified Type D. Please clarify which type of Brow Ditch should be used for this project. RESPONSE: The Modified Type 'D' Brow Ditch shown in the detail on sheet 5 of the grading plan is the correct ditch type. A revised Contractor's proposal will be included in an addendum. Regarding: Soil Preparation 5. Planting note number 12 on landscape sheet PL-1 says, '...Amending material and associated disking would be considered a change order item. Base bid should assume an amendment allotment of $X per acre for soil amending to be modified based upon the soil analysis.' Pages 129-130 of the Supplemental Provisions to the Green Book have very specific soil amendment and backfill requirements. Assuming the supplemental provisions override the plans, amended soil preparation is required in the base bid and will not be considered a change order. Is this assumption correct? RESPONSE: The soil preparation and amending specifications in the Supplemental Provisions (pgs. 129-130) should be used to establish the base bid amending allotment cost. Contractor would still be required to take soil samples as described on note 12, sht. PL-1 and send the samples to a soils testing lab for analysis and amending Response to RFI No. 1 Page 2 recommendations. The recommendations from the final soils analysis would be used to modify the contract amount either up or down depending upon the results of the tests. Regarding: Erosion Control Matting 6. It has been assumed that erosion control matting will only be required on slopes 3:1 and greater. Is this assumption correct? RESPONSE: Yes Regarding: Irrigation Placement in Clear & Grub Area 7. Grading Plan sheet 3 defines the clear and grub areas with a diagonal line pattern. The southwest area just northwest of the Trail is one of the clear and grub areas (large area where new check dam will be located - see attached Exhibit A). Part of the area within this clear and grub designation, adjacent to the trail, is not shown to receive any new planting (see planting plan sheet TP-2) but is shown to receive hew irrigation (see irrigation plan sheet I-2). Please clarify to what extent this area is to be cleared and grubbed. Will any new planting go in this area? If so, what type? RESPONSE: Yes, this area is to be cleared and grubbed as part of the grading work. This area is to be irrigated as shown on the irrigation plans. As an addendum to the planting plans, this area will be hydrpseeded with two different hydroseed mixes. The lower portion of the area (i.e. 3:1 area) will be seeded with Hydroseed Mix B per Sht. PL-1. The upper portion of the area (i.e. 2:1 portion) will be seeded with a transitional coastal sage scrub Hydroseed Mix C. An addendum will be issued that will include seed mix B & C and also add bid items for these two seed mixes. Regarding: Hydroseed Type MSF 8. Item A-8 of Schedule A on the Contractor's Proposal only shows Hydroseed SWS. There is no line item for Hydroseed MSF. Please revise Schedule A to include this item. RESPONSE: An addendum will be issued to add a bid item for the MFS seeding. Regarding: Deductive Alternate 9. Irrigation plan sheet I-2 has a note in the bottom right corner that says, ' Bid Note: Portion of mainline serving valves B3-B7, from ball valve at valve B-1 to end, (sht. I-3) is considered to be a deductive alternate.' The landscape planting plans have a similar note at the top of sheets TP-3 and SP-3. Schedule A does not show any requirement for a deductive alternate. Is the area noted above a deductive alternate? If so, will Schedule A be revised to include a line item for the alternate? RESPONSE: The notes on sheets I-2, I-3 and TP-3 regarding deductive alternative are to be deleted from the plans. The plans were originally shown this way due to some uncertainty regarding the implementation of the areas east of the quarry. At this time, there are no longer any bid alternates required as part of the project. The alignment of the irrigation mainline and location of valves B-3 thru B-7, feeding the areas east of the quarry, will need to be field adjusted from what is shown on the plans. The mainline shall follow the University Commons irrigation mainline alignment on the south side of the creek. The valves would be located on the south side of the creek, in the approximate center of the circuits. RANCHO SANTA F ROAD OFF-SITE WETLANDS MITIGATION, PROJECT NO. 3907 MEETING SIGN IN SHEET: February 12, 2008 @ 9:00 AM - On-Site Name Company E-Mail Phone No. 2 0075 ffyLU&1(&&P3T •5&*-f± Semeryg,•if-r^j/ao RANCHO SANTA F ROAD OFF-SITE WETLANDS MITIGATION, PROJECT NO. 3907 MEETING SIGN IN SHEET: February 12, 2008 @ 9:00 AM - On-Site Name Company E-Mai!Phone No. Doug Helming Helming Engineering DouqHei@aol.com (760) 533-6020 v>\ ( A ** 7 ^tr ^ r » tl o " -y i V'' 7^-336, ^.M C 5 Hofr l ) 372 CITY OF CARLSBAD, CALIFORNIA NOTICE INVITING BIDS UNTIL 2:00 PM ON MARCH 25, 2008, the City shall accept sealed bids, clearly marked as such, at the Faraday Center, 1635 Faraday Avenue, Carlsbad, CA 92008-7314, Attn: Purchasing Officer, by mail, delivery service or by deposit in the Bid Box located in the first floor lobby, at which time they will be opened and read, for performing the work as follows: Project 3907, Off-Site Wetland Mitigation Restoration for Rancho Santa Fe Road North involves grading, landscape and irrigation work for wetland mitigation restoration work in and adjacent to San Marcos Creek easterly of the Melrose Drive bridge over San Marcos Creek in the City of San Marcos, California. OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 BID NO. PWS08-19ENG (SECOND ADVERTISEMENT) ADDENDA As of the publish date of this notice, two (2) addenda have been issued. Bidders are advised to verify the issuance of all addenda and receipt thereof one day prior to bidding. Submission of bids without acknowledgment of addenda may be cause for rejection of bid. PRE BID MEETING As of the publish date of this notice, one pre-bid meeting has already been held. A second pre-bid meeting and tour of the project site will be held at the project site at 9:00 AM on Tuesday, March 4, 2008. The project site can be reached via the dirt road on the east side of Melrose Drive immediately south of the Melrose Drive bridge over San Marcos Creek (Thomas Guide page 1128, section C6). This meeting is NOT mandatory. Also, the mandatory attendance status of the first meeting has been rescinded. While attendance at one of these meetings is recommended, the City will accept bids from Contractors who have not sent representatives to either meeting. INSTRUCTIONS TO BIDDERS AND BID REQUIREMENTS This bid and the terms of the Contract Documents and General Provisions constitute an irrevocable offer that shall remain valid and in full force for a period of 90 days and such additional time as may be mutually agreed upon by the City of Carlsbad and the Bidder. No bid will be received unless it is made on a proposal form furnished by the Purchasing Department. Each bid must be accompanied by security in a form and amount required by law. The bidder's security of the second and third next lowest responsive bidders may be withheld until the Contract has been fully executed. The security submitted by all other unsuccessful bidders shall be returned to them, or deemed void, within ten (10) days after the Contract is awarded. Pursuant to the provisions of law (Public Contract Code section 10263), appropriate securities may be substituted for any obligation required by this notice or for any monies withheld by the City to ensure performance under this Contract. Section 10263 of the Public Contract Code requires monies or securities to be deposited with the City or a state or federally chartered bank in California as the escrow agent. The escrow agent shall maintain insurance to cover negligent acts and omissions of the agent in connection with the handling of retentions under this section in an amount not less than $100,000 per contract. The City of Carlsbad may disqualify a contractor or subcontractor from participating in bidding when a contractor or subcontractor has been debarred by the City of Carlsbad or another jurisdiction in the State of California as an irresponsible bidder. The work shall be performed in strict conformity with the plans and specifications as approved by the City Council of the City of Carlsbad on file with the Engineering Department. The specifications for the work include City of Carlsbad Technical Specifications and the Standard Specifications for Public Works Construction, Sections 2 & 3. 2006 Edition, and the 2006 supplements thereto, all hereinafter designated "SSPWC" as issued by the Southern California Chapter of the American Public Works Association, as amended. Specification Reference is hereby made to the plans and specifications for full particulars and description of the work. The General Provisions (Part 1) to the SSPWC do not apply. The City of Carlsbad encourages the participation of minority and women-owned businesses. The City of Carlsbad encourages all bidders, suppliers, manufacturers, fabricators and contractors to utilize recycled and recyclable materials when available, appropriate and approved by the Engineer. BID DOCUMENTS The documents which comprise the Bidder's proposal and that must be completed and properly executed including notarization where indicated are: 1. Contractor's Proposal 2. Bidder's Bond 3. Non-Collusion Affidavit 4. Designation of Subcontractor and Amount of Subcontractor's Bid 5. Bidder's Statement of Technical Ability and Experience 6. Acknowledgement of Addendum(a) 7. Certificate of Insurance. The riders covering the City, its officials, employees and volunteers may be omitted at the time of bid submittal but shall be provided by the Bidder prior to award of this contract. 8. Bidder's Statement Re Debarment 9. Bidder's Disclosure Of Discipline Record 10. Escrow Agreement for Security Deposits -(optional, must be completed if the Bidder wishes to use the Escrow Agreement for Security) ENGINEER'S ESTIMATE: All bids will be compared on the basis of the Engineer's Estimate. The estimated quantities are approximate and serve solely as a basis for the comparison of bids. The Engineer's Estimate is $1.900,000.00 SPECIALTY CONTRACTORS: ACCEPTABLE LICENSE TYPES Except as provided herein a bid submitted to the City by a Contractor who is not licensed as a contractor pursuant to the Business and Professions Code shall be considered nonresponsive and shall be rejected by the City. In all contracts where federal funds are involved, no bid submitted shall be invalidated by the failure of the bidder to be licensed in accordance with California law. Where federal funds are involved the contractor shall be properly licensed at the time the contract is awarded. In all other cases the contractor shall state their license number, expiration date and classification in the proposal, under penalty of perjury. This invitation to bid does not involve federal funds. The following classifications are acceptable for this contract: A - General Engineering OR C27 - Landscaping ESCROW AGREEMENT If the Contractor intends to utilize the escrow agreement included in the contract documents in lieu of the usual 10% retention from each payment, these documents must be completed and submitted with the signed contract. The escrow agreement may not be substituted at a later date. OBTAINING PLANS AND SPECIFICATIONS Sets of plans, various supplemental provisions, and Contract documents may be obtained at the Cashier's Counter of the Faraday Center located at 1635 Faraday Avenue, Carlsbad, California 92008-7314, for a non-refundable fee of $ 40.00 per set. If plans and specifications are to be mailed, the cost for postage should be added. INTENT OF PLANS AND SPECIFICATIONS Any prospective bidder who is in doubt as to the intended meaning of any part of the drawings, specifications or other contract documents, or finds discrepancies in or omissions from the drawings and specifications may submit to the Engineer a written request for clarification or correction. Any response will be made only by a written addendum duly issued by the Engineer a copy of which will be mailed or delivered to each person receiving a set of the contract documents. No oral response will be made to such inquiry. Prior to the award of the contract, no addition to, modification of or interpretation of any provision in the contract documents will be given by any agent, employee or contractor of the City of Carlsbad except as hereinbefore specified. No bidder may rely on directions given by any agent, employee or contractor of the City of Carlsbad except as hereinbefore specified. REJECTION OF BIDS The City of Carlsbad reserves the right to reject any or all bids and to waive any minor irregularity or informality in such bids. PREVAILING WAGE TO BE PAID The general prevailing rate of wages for each craft or type of worker needed to execute the Contract shall be those as determined by the Director of Industrial Relations pursuant to the sections 1770, 1773, and 1773.1 of the Labor Code. Pursuant to section 1773.2 of the Labor Code, a current copy of applicable wage rates is on file in the Office of the City Engineer. The Contractor to whom the Contract is awarded shall not pay less than the said specified prevailing rates of wages to all workers employed by him or her in the execution of the Contract. The Prime Contractor shall be responsible for insuring compliance with provisions of section 1777.5 of the Labor Code and section 4100 et seq. of the Public Contracts Code, "Subletting and Subcontracting Fair Practices Act." The City Engineer is the City's "duly authorized officer" for the purposes of section 4107 and 4107.5. The provisions of Part 7, Chapter 1, of the Labor Code commencing with section 1720 shall apply to the Contract for work. BOND AND INSURANCE REQUIREMENTS The Contractor shall provide bonds to secure faithful performance and warranty of the work in an amount equal to one hundred percent (100%) of the Contract price on this project. The Contractor shall provide bonds to secure payment of laborers and materials suppliers, in an amount equal to one hundred percent (100%) of the total amount payable by the terms of the contract. These bonds shall be kept in full force and effect during the course of this project, and shall extend in full force and effect and be retained by the City until they are released as stated in the General Provisions section of this contract. All bonds are to be placed with a surety insurance carrier admitted and authorized to transact the business of insurance in California and whose assets exceed their liabilities in an amount equal to or in excess of the amount of the bond. The bonds are to be accompanied by the following documents: 1) An original, or a certified copy, of the unrevoked appointment, power of attorney, by laws, or other instrument entitling or authorizing the person who executed the bond to do so. 2) A certified copy of the certificate of authority of the insurer issued by the insurance commissioner. If the bid is accepted, the City may require copies of the insurer's most recent annual statement and quarterly statement filed with the Department of Insurance pursuant to Article 10 (commencing with section 900) of Chapter 1 of Part 2 of Division 1 of the Insurance Code, within 10 calendar days of the insurer's receipt of a request to submit the statements. Insurance is to be placed with insurers that: •""** 1) Have a rating in the most recent Best's Key Rating Guide of at least A-:VII ***«* 2) Are admitted and authorized to transact the business of insurance in the State of California by the Insurance Commissioner. Auto policies offered to meet the specification of this contract must: 1) Meet the conditions stated above for all insurance companies. 2) Cover any vehicle used in the performance of the contract, used onsite or offsite, whether owned, non-owned or hired, and whether scheduled or non-scheduled. Workers' compensation insurance required under this contract must be offered by a company meeting the above standards with the exception that the Best's rating condition is waived. The City does accept policies issued by the State Compensation Fund meeting the requirement for workers' compensation insurance. The Contractor shall be required to maintain insurance as specified in the Contract. Any additional cost of said insurance shall be included in the bid price. The award of the contract by the City Council is contingent upon the Contractor submitting the required bonds and insurance, as described in the contract, within twenty days of bid opening. If the Contractor fails to comply with these requirements, the City may award the contract to the second or third lowest bidder and the bid security of the lowest bidder may be forfeited. BUSINESS LICENSE The prime contractor and all subcontractors are required to have and maintain a valid City of Carlsbad Business License for the duration of the contract. Approved by the City Council of the City of Carlsbad, California, by Resolution No. 2008-003, *. . adopted on the 8™ day of January, 2008. Date Deputy City Clerk of Carlsbad Public Works - Contract Administration March 12, 2008 ADDENDUM NO. 3 x,.. RE: OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH, PROJECT NO. 3907 PW BID NO. PWS08-19ENG Please include the attached addendum in the Notice to Bidder/Request for Bids you have for the above project. Please note change in due date for the above-mentioned bid. New date for bid opening is: April 16, 2008 Time remains the same: 2:00 p.m. This addendum-receipt acknowledged-must be included to your bid when your bid is submitted. KEVIN DAVIS Sr. Contract Administrator ACKNOWLEDGE RECEIPT OF ADDENDUM NO. 3 SIERRA PACIFIC WEST, INC. Bidder's Signatut Thomas L. Brown, President 1635 Faraday Avenue • Carlsbad, CA 92008-7314 • (760) 6O2-4677 • FAX (760) 602-8562 ****" ADDENDUM No. 3 RE: OFF-SITE WETLAND MITIGATION RESTOATION FOR RANCHO SANTA FE ROAD NORTH, PROJECT NO. 3907 1. QUESTION: Please clarify the "irregular" notations for the irrigation drawings for the valves and lateral pipe sizes, (all irrigation sheets). There appears to be a typo which makes it difficult to read the information needed for the estimate. RESPONSE: REPLACE sheets TS-1,1-1,1-2,1-3 & 1-4 of Drawing No. 368-2M with the sheets dated 3/3/2008, included as part of this addendum. There was a plotting error on the original mylar plan sheets for the irrigation sizing. There was also a plotting on the sheet TS-1 in the Sheet Layout Map area in the upper left portion of the sheet.. 2. QUESTION: The drawings state to use 32 inch rebar for the irrigation heads. Since this area is extremely rocky, can 18 inch rebar be substituted? RESPONSE: The use of 18-inch rebar is permitted due to the rocky nature of the soils. 3. QUESTION: There is a discrepancy between the quantities given for two of the seed mixes. On the plans (found with the seed mix tables on PL-1), the quantities for the seed mixes are: Mix A 101,058 sf (1.68 and 0.64 acres) Mix B: 12,197 sf (0.04 and 0.24 acres total) Within Schedule A (from addenda #2), the quantities are: Mix A 94,089 sf MixB: 27,210 sf Can you please verify which one is correct? RESPONSE: The quantities shown on Schedule A (from addenda #2) are correct. 4. QUESTION: On the bid documents, only Hydroseed (SWS) is shown. Are we only including this Hydroseed mix? The MFS and FWM areas are shown on the plans with shrub planting and im'gation. RESPONSE: Please see information contained in Addendum No. 2 Addendum No. 3 OFF-SITE WETLAND MITIGATION RESTOATION FOR RANCHO SANTA FE ROAD NORTH, PROJECT NO. 3907 5. QUESTION: Are we bidding this proposal based on the quantities provided on the plans? RESPONSE: Bids are to be based on quantities shown on Schedule A of the bid documents. 6. QUESTION: On sheet SP-3 on the plans, there is a bid note regarding an alternate for the entire sheet. Does this alternate include all irrigation equipment and the controller? Where are we putting this on the bid documents? RESPONSE: Please see information contained in Addendum No. 2 7. QUESTION: The temporary construction access is to be re-seeded after disturbance but it is not part of your bid documents. Are we including this in our proposal? If yes, the area of disturbance to the access is unknown please provide an approximate SF and let us know if this will be a separate 120-Day Maintenance period. RESPONSE: The area covered by the temporary construction entrance is currently part of the access for the site and the City of San Marcos trail. After removal of the temporary construction access any disturbed ground is to be returned to equal or better condition than existed at the time construction started. Should any vegetation be disturbed by the temporary construction entrance the contractor will be responsible for replacement to the satisfaction of the Center for Natural Lands Management. This condition of the site prior to construction will be documented by inspection and photographs. 8. QUESTION: The controllers are required to be upgradeable to 'radio remote control'. As I understand it, they either are or are not so I am not clear what is meant by upgradeable. Are you looking for the X model or the XC? RESPONSE: Order the controller as shown on the plan legend as XR-8. Note: two of these controllers are needed for the installation (i.e. Controllers A & B). This controller model has the capability of being factory wired to be remote control capable. We do not need to have this controller supplied this way initially, we just want the ability to modify it later if necessary. The contractor has the option of supplying it this way if he/she chooses to do so for future maintenance flexibility, at no additional cost to the City. If so it would be ordered as model XRC-8. 9. QUESTION: Please provide additional detail with respect to the enclosure. The plans call for a wire enclosure but also call for the rain sensor to be mounted on the side of the controller column. Did you intend to specify the Leit SS enclosure that only encloses the controller itself? RESPONSE: Use the mesh controller enclosure shown on the detail. We do not need to install the Leit stainless steel enclosure, as the mesh will be sufficient. The rain sensor can be installed on the column base as shown, or could be installed on a separate galvanized pipe post adjacent to the enclosure if desired, at no additional cost to the City. Addendum No. 3 OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH, PROJECT NO. 3907 10. QUESTION: With respect to the DIG LEMA valves, the legend calls for 1 or 1.5 inch while the plans show 1.5,2 and 2.5 inch. Please clarify. I am told that 2 inch is the largest these valves come. RESPONSE: This is correct, there are 2" and 2 1/2" valves shown on the plans and not on the legend. DIG does not manufacture a 2 1/2" valve. For the instances on the plan where a 2 1/2" valve is shown, the 2" valve can be used instead and will still be within the manufacturers recommended flow range. For ordering information use the following: 1"-LEMA160HE-100 1 1/2"-LEMA160HE-150 2"-LEMA160HE-200 11. QUESTION: What is the estimated quantity of export material? RESPONSE: The estimated amount of export may be as much as the quantity of unclassified excavation. However, the amount of export may be less if some of the excavated material can be utilized on-site for rip rap or in other areas. CONTRACT PUBLIC WORKS day ofThis agreement is made this _ by and between the City of Carlsbad, California, a municij5aT'cCTporation((hereinafter called "City"), and _ SIERRA PACIFIC WEST. INC. _ __whose principal place of business is _ PO BOX 231640 ENCINITAS CA 92023-1640 _ (hereinafter called "Contractor"). City and Contractor agree as follows: 1. Description of Work. Contractor shall perform all work specified in the Contract documents for: OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 (hereinafter called "project") 2. Provisions of Labor and Materials. Contractor shall provide all labor, materials, tools, equipment, and personnel to perform the work specified by the Contract Documents. 3. Contract Documents. The Contract Documents consist of this Contract, Notice Inviting Bids, Contractor's Proposal, Bidder's Bond, Designation of Subcontractors, Technical Ability and Experience, Re Debarment, Non-collusion Affidavit, Escrow Agreement, Release Form, the Plans and Specifications, the General Provisions, addendum(s) to said Plans and Specifications and General Provisions, and all proper amendments and changes made thereto in accordance with this Contract or the Plans and Specifications, and all bonds for the project; all of which are incorporated herein by this reference. Contractor, her/his subcontractors, and materials suppliers shall provide and install the work as indicated, specified, and implied by the Contract Documents. Any items of work not indicated or specified, but which are essential to the completion of the work, shall be provided at the Contractor's expense to fulfill the intent of said documents. In all instances through the life of the Contract, the City will be the interpreter of the intent of the Contract Documents, and the City's decision relative to said intent will be final and binding. Failure of the Contractor to apprise subcontractors and materials suppliers of this condition of the Contract will not relieve responsibility of compliance. 4. Payment. For all compensation for Contractor's performance of work under this Contract, City shall make payment to the Contractor per section 9-3 PAYMENT of the General Provisions section of this contract. The Engineer will close the estimate of work completed for progress payments on the last working day of each month. The City shall withhold retention as required by Public Contract Code Section 9203. Revised 1 1/01/06 Contract No. 3907 Page 25 of 141 Pages 5. Independent Investigation. Contractor has made an independent investigation of the jobsite, the soil conditions at the jobsite, and all other conditions that might affect the progress of the work, and is aware of those conditions. The Contract price includes payment for all work that may be done by Contractor, whether anticipated or not, in order to overcome underground conditions. Any information that may have been furnished to Contractor by City about underground conditions or other job conditions is for Contractor's convenience only, and City does not warrant that the conditions are as thus indicated. Contractor is satisfied with all job conditions, including underground conditions and has not relied on information furnished by City. 6. Hazardous Waste or Other Unusual Conditions. If the contract involves digging trenches or other excavations that extend deeper than four feet below the surface Contractor shall promptly, and before the following conditions are disturbed, notify City, in writing, of any: A. Hazardous Waste. Material that Contractor believes may be material that is hazardous waste, as defined in section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law. B. Differing Conditions. Subsurface or latent physical conditions at the site differing from those indicated. C. Unknown Physical Conditions. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract. City shall promptly investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in contractor's costs of, or the time required for, performance of any part of the work shall issue a change order under the procedures described in this contract. In the event that a dispute arises between City and Contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the contractor's cost of, or time required for, performance of any part of the work, contractor shall not be excused from any scheduled completion date provided for by the contract, but shall proceed with all work to be performed under the contract. Contractor shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the contracting parties. 7. Immigration Reform and Control Act. Contractor certifies it is aware of the requirements of the Immigration Reform and Control Act of 1986 (8 USC sections 1101-1525) and has complied and will comply with these requirements, including, but not limited to, verifying the eligibility for employment of all agents, employees, subcontractors, and consultants that are included in this Contract. 8. Prevailing Wage. Pursuant to the California Labor Code, the director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in accordance with California Labor Code, section 1773 and a copy of a schedule of said general prevailing wage rates is on file in the office of the City Engineer, and is incorporated by reference herein. Pursuant to California Labor Code, section 1775, Contractor shall pay prevailing wages. Contractor shall post copies of all applicable prevailing wages on the job site. A•K Revised 11/01/06 Contract No. 3907 Page 26 of 141 Pages 9. Indemnification. Contractor shall assume the defense of, pay all expenses of defense, and indemnify and hold harmless the City, and its officers and employees, from all claims, loss, damage, injury and liability of every kind, nature and description, directly or indirectly arising from or in connection with the performance of the Contract or work; or from any failure or alleged failure of Contractor to comply with any applicable law, rules or regulations including those relating to safety and health; and from any and all claims, loss, damages, injury and liability, howsoever the same may be caused, resulting directly or indirectly from the nature of the work covered by the Contract, except for loss or damage caused by the sole or active negligence or willful misconduct of the City. The expenses of defense include all costs and expenses including attorneys' fees for litigation, arbitration, or other dispute resolution method. Contractor shall also defend and indemnify the City against any challenges to the award of the contract to Contractor, and Contractor will pay all costs, including defense costs for the City. Defense costs include the cost of separate counsel for City, if City requests separate counsel. Contractor shall also defend and indemnify the City against any challenges to the award of the contract to Contractor, arising in whole or in part from alleged inaccuracies or misrepresentation by the Contractor, whether intentional or otherwise, and Contractor will pay all costs, including defense costs for the City. Defense costs include the cost of separate counsel for City, if City requests separate counsel. 10. Insurance. Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his or her agents, representatives, employees or subcontractors. Said insurance shall meet the City's policy for insurance as stated in City Council Policy # 70. (A) Coverages And Limits Contractor shall maintain the types of coverages and minimum limits indicted herein: a. Commercial General Liability Insurance: $1,000,000 combined single limit per occurrence for bodily injury and property damage. If the policy has an aggregate limit, a separate aggregate in the amounts specified shall be established for the risks for which the City or its agents, officers or employees are additional insured. b. Business Automobile Liability Insurance: $1,000,000 combined single limit per accident for bodily injury and property damage. In addition, the auto policy must cover any vehicle used in the performance of the contract, used onsite or offsite, whether owned, non-owned or hired, and whether scheduled or non-scheduled. c. Workers' Compensation and Employers' Liability Insurance: Workers' compensation limits as required by the Labor Code of the State of California. Workers' compensation offered by the State Compensation Insurance Fund is acceptable to the City. (B) Additional Provisions: Contractor shall ensure that the policies of insurance required under this agreement with the exception of Workers' Compensation and Business Automobile Liability Insurance contain, or are endorsed to contain, the following provisions. a. The City, its officials, employees and volunteers are to be covered as additional insured as respects: liability arising out of activities performed by or on behalf of the Contractor; products and completed operations of the contractor; premises owned, leased, hired or borrowed by the contractor. The coverage shall contain no special limitations on the scope of protection afforded to the City, its officials, employees or volunteers. All additional insured endorsements must be evidenced using separate documents attached to the certificate of insurance; one for each company affording general liability, and employers' liability coverage. o Revised 11/01/06 Contract No. 3907 Page 27 of 141 Pages b. The Contractor's insurance coverage shall be primary insurance as respects the City, its officials, employees and volunteers. Any insurance or self-insurance maintained by the City, its officials, employees or volunteers shall be in excess of the contractor's insurance and shall not contribute with it. c. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its officials, employees or volunteers. d. Coverage shall state that the contractor's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. (C) Notice Of Cancellation. Each insurance policy required by this agreement shall be endorsed to state that coverage shall not be nonrenewed, suspended, voided, canceled, or reduced in coverage or limits except after ten (10) days' prior written notice has been sent to the City by certified mail, return receipt requested. (D) Deductibles And Self-Insured Retention (S.I.R.) Levels. Any deductibles or self-insured retention levels must be declared to and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles or self-insured retention levels as respects the City, its officials and employees; or the contractor shall procure a bond guaranteeing payment of losses and related investigation, claim administration and defense expenses. (E) Waiver Of Subrogation. All policies of insurance required under this agreement shall contain a waiver of all rights of subrogation the insurer may have or may acquire against the City or any of its officials or employees. (F) Subcontractors. Contractor shall include all subcontractors as insured under its policies or shall furnish separate certificates and endorsements for each subcontractor. Coverages for subcontractors shall be subject to all of the requirements stated herein. (G) Acceptability Of Insurers. Insurance is to be placed with insurers that have a rating in Best's Key Rating Guide of at least A-:VII. Insurers must also be authorized to transact the business of insurance by the State of California Insurance Commissioner as admitted carriers as evidenced by a listing in the official publication of the Department of Insurance of the State of California and/or under the standards specified by City Council Policy # 70. (H) Verification Of Coverage. Contractor shall furnish the City with certificates of insurance and original endorsements affecting coverage required by this clause. The certificates and endorsements for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. The certificates and endorsements are to be in forms approved by the City and are to be received and approved by the City before the Contract is executed by the City. (I) Cost Of Insurance. The Cost of all insurance required under this agreement shall be included in the Contractor's bid. 11. Claims and Lawsuits. All claims by contractor for $375,000 or less shall be resolved in accordance with the provisions in the Public Contract Code, Division 2, Part 3, Chapter 1, Article 1.5 (commencing with section 20104) which are incorporated by reference. A copy of Article 1.5 is included in Section 3 of the General Provisions. The contractor shall initially submit all claims over $375,000 to the City using the informal dispute resolution process described in Public Contract Code subsections 20104.2(a), (c), (d). Notwithstanding the provisions of this section of the contract, all claims shall comply with the Government Tort Claim Act (section 900 et seq., of the California Government Code) for any claim or cause of action for money or damages prior to filing any lawsuit for breach of this agreement. Revised 1 1/01/06 Contract No. 3907 Page 28 of 141 Pages (A) Assertion of Claims. Contractor hereby agrees that any contract claim submitted to the City must be asserted as part of the contract process as set forth in this agreement and not in anticipation of litigation or in conjunction with litigation. (B) False Claims. Contractor acknowledges that if a false claim is submitted to the City, it may be considered fraud and the Contractor may be subject to criminal prosecution. (C) Government Code. Contractor acknowledges that California Government Code sections 12650 et seq., the False Claims Act, provides for civil penalties where a person knowingly submits a false claim to a public entity. These provisions include false claims made with deliberate ignorance of the false information or in reckless disregard of the truth or falsity of the information. (D) Penalty Recovery. If the City of Carlsbad seeks to recover penalties pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorney's fees. (E) Debarment for False Claims. Contractor hereby acknowledges that the filing of a false claim may subject the Contractor to an administrative debarment proceeding wherein the Contractor may be prevented from further bidding on public contracts for a period of up to five years. (F) Carlsbad Municipal Code. The provisions of Carlsbad Municipal Code sections 3.32.025, 3.32.026, 3.32.027 and 3.32.028 pertaining to false claims are incorporated herein by reference. (G) Debarment from Other Jurisdictions. Contractor hereby acknowledges that debarment by another jurisdiction is grounds for the City of Carlsbad to disqualify the Contractor or subcontractor from participating in future contract bidding. (H) Jurisdiction. Contractor agrees and hereby stipulates that the proper venue and jurisdiction for resolution of any disputes between the parties arising out of this agreement is San Diego County, California. ffl init W0 initI have read and understand all provisions of Section 11 above. lo init ~!?T0 init 12. Maintenance of Records. Contractor shall maintain and make available at no cost to the City, upon request, records in accordance with sections 1776 and 1812 of Part 7, Chapter 1, Article 2, of the Labor Code. If the Contractor does not maintain the records at Contractor's principal place of business as specified above, Contractor shall so inform the City by certified letter accompanying the return of this Contract. Contractor shall notify the City by certified mail of any change of address of such records. 13. Labor Code Provisions. The provisions of Part 7, Chapter 1, commencing with section 1720 of the Labor Code are incorporated herein by reference. 14. Security. Securities in the form of cash, cashier's check, or certified check may be substituted for any monies withheld by the City to secure performance of this contract for any obligation established by this contract. Any other security that is mutually agreed to by the Contractor and the City may be substituted for monies withheld to ensure performance under this Contract. Revised 11/01/06 Contract No. 3907 Page 29 of 141 Pages 15. Unfair Business Practices. In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the contractor or subcontractor offers and agrees to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the contractor, without further acknowledgment by the parties. 16. Provisions Required by Law Deemed Inserted. Each and every provision of law and clause required by law to be inserted in this Contract shall be deemed to be inserted herein and included herein, and if, through mistake or otherwise, any such provision is not inserted, or is not correctly inserted, then upon application of either party, the Contract shall forthwith be physically amended to make such insertion or correction. 17. Additional Provisions. Any additional provisions of this agreement are set forth in the "General Provisions" or "Supplemental Provisions" attached hereto and made a part hereof. NOTARIAL ACKNOWLEDGMENT OF EXECUTION BY ALL SIGNATORIES MUST BE ATTACHED (CORPORATE SEAL) CONTRACTOR: By: Thowifl/s U. BvDWn. . (print name and title) CITY the St; By: Hayol ATTEST: „ RLSBAD a /nuni ali/ornia corporation of (sign here) Clerk ' (print name aridtitley '->; ^M»^ ^ ''"'»„£,i^xx President or vice-president and secretary or assistant secretary must sign for corporations. If only one officer signs, the corporation must attach a resolution certified by the secretary or assistant secretary under the corporate seal empowering that officer to bind the corporation. APPROVED AS TO FORM: RONALD R. BALL City Attorney Deputy City Attorney Revised 11/01/06 Contract No. 3907 Page 30 of 141 Pages SIERRA PACIFIC WEST, INC, General Engineering Ccnirasior . RESOLUTIONS AND UNANIMOUS WRITTEN CONSENT BOARD OF DIRECTORS OF SIERRA PACIFIC WEST, INC. A California Corporation TO BOARD ACTION WITHOUT MEETING Pursuant to Section 307 (b) of the Corporation Code of the State of California, and the Bylaws of this Corporation, the undersigned, constituting all of the directors of SIERRA PACIFIC WEST, INC. a California corporation, HEREBY unanimously consent to the actions taken by the Board of Directors of said Corporation as December 31, 2000, by the following resolutions of the Board of Directors of said Corporation made without a meeting of said Board of Directors: RESOLVED, that any one signature of the CEO/Secretary or President, or any combination thereof, shall be and hereby are authorized and empowered in the name and on behalf of this Corporation, to take whatever action and execute whatever contract documents that are needed to put said resolution into effect, We, the undersigned, unanimously consent to the foregoing resolutions, which shall relate back to the date first above written in the foregoing consent. SANDRA L BROWN, CEO / SECRETARY THOltfAS^BROWN, PRESIDENT P.O. BOX 231640 • ENCINITAS, CA 92023-1640 • (760) 599-0755 • FAX (760) 599-0668 LICENSE NO. 597S52 • www.SiERRAPACiFiCWEST.com ACKNOWLEDGMENT State of California County of San Diego On June 19, 2008 before me, Laura L. Mikels, Notary Public (here insert name and title of the officer) personally appeared Thomas L. Brown, President personally known to me (or proved to me on the basis of satisfactory evidence) to be the person^) whose namej^ is/a)^ subscribed to the within instrument and acknowledged to me that he/?K^/tbey executed the same in his/h^r/tr^ir authorized capacity(j^, and that by his/h^/fheff signature^ on the instrument the person^), or the entity upon behalf of which the person^) acted, executed the instrument. WITNESS my hand and official seal. (Seal) Bond No. 105130715 Premium: $14,589.000 Premium is for Contract Term and Subject to Adjustment Based on Final Contract Price FAITHFUL PERFORMANCE/WARRANTY BOND WHEREAS, the City Council of the City of Carlsbad, State of California, by Resolution No. 2008-142, adopted May 20, 2008, has awarded to _ SIERRA PACIFIC WEST, INC. _ (hereinafter designated as the "Principal"), a Contract for: OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 in the City of Carlsbad, in strict conformity with the contract, the drawings and specifications, and other Contract Documents now on file in the Office of the City Clerk of the City of Carlsbad, all of which are incorporated herein by this reference. WHEREAS, Principal has executed or is about to execute said Contract and the terms thereof require the furnishing of a bond for the faithful performance and warranty of said Contract; NOW. THEREFORE, WE __ SIERRA PACIFIC WEST. INC. __ as Principal, (hereinafter designated as the "Contractor"), and Travelers Casualty and Surety Company of _ America _ as Surety, are held firmly bound unto the City of Carlsbad in the sum of ONE MILLION FIVE HUNDRED NINETY EIGHT THOUSAND Dollars ($1,598,000.00), said sum being an amount equal to: One hundred percent (100%) of the total amount payable under the terms of the contract by the City of Carlsbad, and for which payment well and truly to be made we bind ourselves, our heirs, executors and administrators, successors, or assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH that if the above bounden Contractor, their heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions, and agreements in the Contract and any alteration thereof made as therein provided on their part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless the City of Carlsbad, its officers, employees and agents, as therein stipulated, then this obligation shall become null and void; otherwise it shall remain in full force and effect. As a part of the obligation secured hereby and in addition to the face amount specified therefore, there shall be included costs and reasonable expenses and fees, including reasonable attorney's fees, incurred by the City in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered. Surety stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract, or to the work to be performed there under or the specifications accompanying the same shall affect its obligations on this bond, and it does hereby waive notice of any change, extension of time, alterations or addition to the terms of the contract or to the work or to the specifications. Revised 11/01/06 Contract No. 3907 Page 33 of 141 Pages In the event that Contractor is an individual, it is agreed that the death of any such Contractor shall not exonerate the Surety from its obligations under this bond. Executed by CONTRACTOR this day of J U jg& 2000 . CONTRACTOR: Sierra Pacific West, toe. By: here) u ferown (print name here) Sima ifoiHc Weft. InC (title ahd organization of signatory)" Mtechol (sign here) (print name here) Executed by SURETY this. of June 11th .day „, 2Q08__. SURETY: Travelers Casualty and Surety Company of America (name of Surety) 9325 Sky Park Court, Suite 220, San Diego, CA 92123 (address of Surety) 858.616.6252 rof; (signathfe of Attorhey-irT-Fact)" Penny E. Kelley, Attorney-ln-Fact (printed name of Attorney-in-Fact) (attach corporate resolution showing current power of attorney) V.(title and organization of signatory) (Proper notarial acknowledgment of execution by CONTRACTOR and SURETY must be attached.) (President or vice-president and secretary or assistant secretary must sign for corporations. If only one officer signs, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering that officer to bind the corporation.) APPROVED AS TO FORM: RONALD R. BALL City Attorney By: De|5uty City Attorney Revised 11/01/06 Contract No. 3907 Page 32 of 141 Pages SIERRA PACIFIC WEST, INC. i : ', RESOLUTIONS AND UNANIMOUS WRITTEN CONSENT OF BOARD OF DIRECTORS OF SIERRA PACIFIC WEST, INC. A California Corporation TO BOARD ACTION WITHOUT MEETING Pursuant to Section 307 (b) of the Corporation Code of the State of California, and the Bylaws of this Corporation, the undersigned, constituting all of the directors of SIERRA PACIFIC WEST, INC. a California corporation, HEREBY unanimously consent to the actions taken by the Board of Directors of said Corporation as December 31, 2000, by the following resolutions of the Board of Directors of said Corporation made without a meeting of said Board of Directors: RESOLVED, that any one signature of the CEO/Secretary or President, or any combination thereof, shall be and hereby are authorized and empowered in the name and on behalf of this Corporation, to take whatever action and execute whatever contract documents that are needed to put said resolution into effect. We, the undersigned, unanimously consent to the foregoing resolutions, which shall relate back to the date first above written in the foregoing consent. SANDRA L BROWN, CEO / SECRETARY THOMAS t^BROWN, PRESIDENT .O. BOX 231640 • ENCINITAS, CA 92023-1640 • (760) 599-0755 • FAX (750) 599-05SS LICENSE NO. 597352 • www.SiERRAPACiFiCWE3T.com CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of California County of San Diego QnJUN 1 1 2008 before me, Sarah Stupin , Notary Public personally appeared Penny E, Kelley who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are, subscribed to the within instrument and acknowledged to me thatTie/she/fliey^ executed the same in1u§/her/their capacity(ies), and that bylws/her/lheii; signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PURJURY under the laws of the state of California that the foregoing paragraph is true and correct. COMM. #1778881 NOTARY PUBLIC'CALIFORNIASAN DIEGO COUNTY ,Commission Expires Nov. 8,2011 IMMMM)W><vB&MMM<WVWVWUvt WITNESS m ial seal. Signature of itfotarAC \ OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER D INDIVIDUAL D CORPORATE OFFICER DESCRIPTION OF ATTACHED DOCUMENT Title or Type of Document D PARTNER(S) D MEMBER of LLC Kl ATTORNEY-IN-FACT D TRUSTEE(S) D GUARDIAN/CONSERVATOR OTHER: SIGNER IS REPRESENTING. NAME OF PERSON(S) OR ENTnY(IES) Number of Pages Date of Document Signer(s) other than named above V TRAVELERSJ WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER POWER OF ATTORNEY c Farmington Casualty Company Fidelity and Guaranty Insurance Company Fidelity and Guaranty Insurance Underwriters, Inc. Seaboard Surety Company St. Paul Fire and Marine Insurance Company St. Paul Guardian Insurance Company St. Paul Mercury Insurance Company Travelers Casualty and Surety Company Travelers Casualty and Surety Company of America United States Fidelity and Guaranty Company Attorney-In Fact No. 217991 Certificate No.,.001996525 KNOW ALL MEN BY THESE PRESENTS: That Seaboard Surety Company is a corporation duly organized under the laws of the State of New York, that St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company and St. Paul Mercury Insurance Company are corporations duly organized under the laws of the State of Minnesota, that Farmington Casualty Company, Travelers Casualty and Surety Company, and Travelers Casualty and Surety Company of America are corporations duly organized under the laws of the State of Connecticut, that United States Fidelity and Guaranty Company is a corporation duly organized under the laws of the State of Maryland, that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc. is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint Christine A. Paterson, Penny E. Kelley, James Baldassare Jr., Lawrence F. McMahon, James R. Sommerville, and America San Martin of the Citv of San Diego _, State of_California . , their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. N WITN of. ;REOF, the CompaniesJiave caused this instrument to be signed and their corporate seals to be hereto affixed, this £\J\J I 5th Farmington Casualty Company Fidelity and Guaranty Insurance Company Fidelity and Guaranty Insurance Underwriters, Inc. Seaboard Surety Company St. Paul Fire and Marine Insurance Company St. Paul Guardian Insurance Company St. Paul Mercury Insurance Company Travelers Casualty and Surety Company Travelers Casualty and Surety Company of America United States Fidelity and Guaranty Company State of Connecticut City of Hartford ss.Thompson, Senior J/ice President On this the _ 5th _day of_October 2007 _, before me personally appeared George W. Thompson, who acknowledged himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. Cn Witness Whereof, I hereunto set my hand and official seal. y Commission expires the 30th day of June, 2011.Marie C. Tetreault, Notary Public 58440-5-07 Printed in U.S.A. WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington CasuaMy Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vi President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and Agents to act for and on behal of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any power of attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such power of attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kori M. Johanson, the undersigned, Assistant Secretary, of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing is a true and correct copy of the Power <>f Attorney executed by said Companies, which is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this .day of _JUN 1 1 2008 ,20 Kori M. Johanson/Assistant Secretary To verify the authenticity of this Power of Attorney, call 1-800-421-3880 or contact us at www.travelersbond.com. Please refer to the Attorney-In-Fact number, the above-named individuals and the details of the bond to which the power is attached. WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER ACKNOWLEDGMENT State of California County of San Diego On June 19, 2008 before me, Laura L. Mikels, Notary Public (here insert name and title of the officer) personally appeared Thomas L. Brown, President personally known to me (or proved to me on the basis of satisfactory evidence) to be the person^) whose namej^O is/a)^ subscribed to the within instrument and acknowledged to me that he/s^/tbey executed the same in his/j^r/t^lr authorized capacity(j^j, and that by his/h^r/fhefr signature^ on the instrument the person]^), or the entity upon behalf of which the person^) acted, executed the instrument. WITNESS my hand and official seal. ? >?;,•ommissionExp.»tey01,2001Signature ^ ^ (Seal) Bond No. 105130715 Premium: Included LABOR AND MATERIALS BOND WHEREAS, the City Council of the City of Carlsbad, State of California, by Resolution No. 2008-142, adopted May 20, 2008, has awarded to SIERRA PACIFIC WEST. INC. (hereinafter designated as the "Principal"), a Contract for: OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 in the City of Carlsbad, in strict conformity with the drawings and specifications, and other Contract Documents now on file in the Office of the City Clerk of the City of Carlsbad and all of which are incorporated herein by this reference. WHEREAS, Principal has executed or is about to execute said Contract and the terms thereof require the furnishing of a bond, providing that if Principal or any of their subcontractors shall fail to pay for any materials, provisions, provender or other supplies or teams used in, upon or about the performance of the work agreed to be done, or for any work or labor done thereon of any kind, the Surety on this bond will pay the same to the extent hereinafter set forth. NOW, THEREFORE, WE SIERRA PACIFIC WEST. INC. as Principal, (hereinafter designated as the "Contractor"), and Travelers Casualty and Surety Company of America as Surety, are held firmly bound unto the City of Carlsbad in the sum of ONE MILLION FIVE HUNDRED NINETY EIGHT THOUSAND Dollars ($1,598,000.00), said sum being an amount equal to: One hundred percent (100%) of the total amount payable under the terms of the contract by the City of Carlsbad, and for which payment well and truly to be made we bind ourselves, our heirs, executors and administrators, successors, or assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH that if the Contractor or his/her subcontractors fail to pay for any materials, provisions, provender, supplies, or teams used in, upon, for, or about the performance of the work contracted to be done, or for any other work or labor thereon of any kind, consistent with California Civil Code section 3181, or for amounts due under the Unemployment Insurance Code with respect to the work or labor performed under this Contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the contractor and subcontractors pursuant to section 13020 of the Unemployment Insurance Code with respect to the work and labor, that the Surety will pay for the same, and, also, in case suit is brought upon the bond, reasonable attorney's fees, to be fixed by the court consistent with California Civil Code section 3248. This bond shall inure to the benefit of any of the persons named in California Civil Code section 3181, so as to give a right of action to those persons or their assigns in any suit brought upon the bond. Surety stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract, or to the work to be performed hereunder or the specifications accompanying the same shall affect its obligations on this bond, and it does hereby waive notice of any change, extension of time, alterations or addition to the terms of the contract or to the work or to the specifications. Revised 11/01/06 Contract No. 3907 Page 31 of 141 Pages In the event that Contractor is an individual, it is agreed that the death of any such Contractor shall not exonerate the Surety from its obligations under this bond. Executed by CONTRACTOR this. day of Pl/HflE/ , 2000. CONTRACTOR: Sierra Pacific West. Inc. /gn here) Thomas i- ferown (print name here) i waft, \ nc. (title and organization of signatory) By: (sign here) .dayExecuted by SURETY this 11th of June . 2008 , SURETY: Travelers Casualty and Surety Company of America (name of Surety) 9325 Sky Park Court, Suite 220, San Diego, CA 92123 (address of Surety) 858.616.625^ slpphone numbep (print name here) (signature cwAttorney-in-Fact) Penny E. Kelleyf Attorney-ln-Fact (printed name of Attorney-in-Fact) (attach corporate resolution showing current power of attorney) (title and organization of signatory) (Proper notarial acknowledgment of execution by CONTRACTOR and SURETY must be attached.) (President or vice-president and secretary or assistant secretary must sign for corporations. If only one officer signs, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering that officer to bind the corporation.) APPROVED AS TO FORM: RONALD R. BALL City Attorney By: Deputy City Attorney 0Revised 11/01/06 Contract No. 3907 Page 32 of 141 Pages SIERRA PACIFIC WEST, INC. ', RESOLUTIONS AND UNANIMOUS WRITTEN CONSENT OF BOARD OF DIRECTORS OF SIERRA PACIFIC WEST, INC. A California Corporation TO BOARD ACTION WITHOUT MEETING Pursuant to Section 307 (b) of the Corporation Code of the State of California, and the Bylaws of this Corporation, the undersigned, constituting all of the directors of SIERRA PACIFIC WEST, INC. a California corporation, HEREBY unanimously consent to the actions taken by the Board of Directors of said Corporation as December 31, 2000, by the following resolutions of the Board of Directors of said Corporation made without a meeting of said Board of Directors: RESOLVED, that any one signature of the CEO/Secretary or President, or any combination thereof, shall be and hereby are authorized and empowered in the name and on behalf of this Corporation, to take whatever action and execute whatever contract documents that are needed to put said resolution into effect We, the undersigned, unanimously consent to the foregoing resolutions, which shall relate back to the date first above written in the foregoing consent. SANDRA L. BROWN, CEO / SECRETARY THOMAS IL^BROWN, PRESIDENT P.O. BOX 231640 * ENCINiTAS, CA 92023-1640 • (7SO) 599-0755 • FAX (750) 599-0668 LICENSE NO. 597352 • www.SiERRAPACiFiCWEST.com CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT l»^*»l "**•"• State of California County of San Diego n JUN 1 1 2008 , f , , e.On before me, Sarah Stupin personally appeared Penny E. Kellev who proved to me on the basis of satisfactory e within instrument and acknowledged to me tha that bylns/her/lheii: signature(s) on the instrum acted, executed the instrument. Though the data below is not required by law, it may fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER D INDIVIDUAL D CORPORATE OFFICER D PARTNER(S) D MEMBER of LLC IEI ATTORNEY-IN-FACT D TRUSTEE(S) D GUARDIAN/CONSERVATOR OTHER: SIGNER IS REPRESENTING. NAME OF PERSON(S) OR ENTITY(IES) , Notary Public vidence to be the person(s) whose name(s) is/are, subscribed to the tshe/she/they^ executed the same inlvis/her/their capacity(ies), and ent the person(s), or the entity upon behalf of which the person(s) I certify under PENALTY OF PURJURY under the laws of the state of California that the foregoing paragraph is true and correct. WITNESS myjiand and^rffjpial seal. Signature of.Notarv/" ^\ >^ j^ ~^^ OPTIONAL prove valuable to persons relying on the document and could prevent DESCRIPTION OF ATTACHED DOCUMENT Title or Type of Document Number of Pages Date of Document Signer(s) other than named above V TRAVELERSJ C WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER POWER OF ATTORNEY Farmington Casualty Company Fidelity and Guaranty Insurance Company Fidelity and Guaranty Insurance Underwriters, Inc. Seaboard Surety Company St. Paul Fire and Marine Insurance Company St. Paul Guardian Insurance Company St. Paul Mercury Insurance Company Travelers Casualty and Surety Company Travelers Casualty and Surety Company of America United States Fidelity and Guaranty Company Attorney-In Fact No. 217991 Certificate No.,001996526 KNOW ALL MEN BY THESE PRESENTS: That Seaboard Surety Company is a corporation duly organized under the laws of the State of New York, that St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company and St. Paul Mercury Insurance Company are corporations duly organized under the laws of the State of Minnesota, that Farmington Casualty Company, Travelers Casualty and Surety Company, and Travelers Casualty and Surety Company of America are corporations duly organized under the laws of the State of Connecticut, that United States Fidelity and Guaranty Company is a corporation duly organized under the laws of the State of Maryland, that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc. is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint Christine A. Paterson, Penny E. Kelley, James Baldassare Jr., Lawrence F. McMahon, James R. Sommerville, and America San Martin of the Citv of San Diego California, State of ^diiiuiiud ^ thdr tn]e and ,awful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. C 5th WITNESStJMHEREOF, the Compawg»jhave caused this instrument to be signed and their corporate seals to be hereto affixed, this . iy of , . State of Connecticut City of Hartford ss. On this the 5th Farmington Casualty Company Fidelity and Guaranty Insurance Company Fidelity and Guaranty Insurance Underwriters, Inc. Seaboard Surety Company St. Paul Fire and Marine Insurance Company St. Paul Guardian Insurance Company St. Paul Mercury Insurance Company Travelers Casualty and Surety Company Travelers Casualty and Surety Company of America United States Fidelity and Guaranty Company _day of_ October / Thompson, Senior Vice President 2007 , before me personally appeared George W. Thompson, who acknowledged himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. CWitness Whereof, I hereunto set my hand and official seal. / Commission expires the 30th day of June, 2011.Marie C. Tetreault, Notary Public 58440-5-07 Printed in U.S.A. WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vi President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and Agents to act for and on behal of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is P FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any power of attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such power of attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kori M. Johanson, the undersigned, Assistant Secretary, of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing is a true and correct copy of the Power, of Attorney executed by said Companies, which is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this .. day of _JUN 1 1 2008 ,20 Kori M. Johanson/Assistant Secretary To verify the authenticity of this Power of Attorney, call 1-800-421-3880 or contact us at www.travelersbond.com. Please refer to the Attorney-In-Fact number, the above-named individuals and the details of the bond to which the power is attached. 3 WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER ACKNOWLEDGMENT State of Caiifornia County of San Diego On June 19, 2008 before me, Laura L. Mikels, Notary Public (here insert name and title of the officer) personally appeared Thomas L. Brown, President personally known to me (or proved to me on the basis of satisfactory evidence) to be the person^ whose namei^O is/a)^ subscribed to the within instrument and acknowledged to me that he/s^/tbey executed the same in his/h^r/t^ir authorized capacity(i^5, and that by his/h^/fh^ff signature^ on the instrument the person^), or the entity upon behalf of which the person^) acted, executed the instrument. WITNESS my hand and official seal. Signature <''" (Seal) OPTIONAL ESCROW AGREEMENT FOR SECURITY DEPOSITS IN LIEU OF RETENTION This Escrow Agreement is made and entered into by and between the City of Carlsbad whose address is 1200 Carlsbad Village Drive, Carlsbad, California, 92008, hereinafter called "City" and _ Sierra Pacific West, Inc. _ whose address is P.O. Box 231640, Encinitas, CA 92023-1640 _ hereinafter called "Contractor" and California Bank and Trust _ whose address is 11717 Bernardo Plaza Court, San Diego, CA 92128 _ hereinafter called "Escrow Agent." For the consideration hereinafter set forth, the City, Contractor and Escrow Agent agree as follows: 1 . Pursuant to sections 22300 and 10263 of the Public Contract Code of the State of California, the Contractor has the option to deposit securities with the Escrow Agent as a substitute for retention earnings required to be withheld by the City pursuant to the Construction Contract entered into between the City and Contractor for OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 in the amount of $1,598,000.00 _ dated _ (hereinafter referred to as the "Contract"). Alternatively, on written request of the Contractor, the City shall make payments of the retention earnings directly to the Escrow Agent. When the Contractor deposits the securities as a substitute for Contract earnings, the Escrow Agent shall notify the City within 10 days of the deposit. The Escrow Agent shall maintain insurance to cover negligent acts and omissions of the Escrow Agent in connection with the handling of retentions under these sections in an amount not less than $100,000 per contract. The market value of the securities at the time of the substitution shall be a least equal to the cash amount then required to be withheld as retention under the terms of the contract between the City and Contractor. Securities shall be held in the name of the City and shall designate the Contractor as the beneficial owner. 2. The City shall make progress payments to the Contractor for such funds which otherwise would be withheld from progress payments pursuant to the Contract provisions, provided that the Escrow Agent holds securities in the form and amount specified above. 3. When the City makes payment of retentions earned directly to the Escrow Agent, the Escrow Agent shall hold them for the benefit of the Contractor until such time as the escrow created under this contract is terminated. The Contractor may direct the investment of the payments into securities. All terms and conditions of this agreement and the rights and responsibilities of the parties shall be equally applicable and binding when the City pays the Escrow Agent directly. 4. The Contractor shall be responsible for paying all fees for the expenses incurred by the Escrow Agent in administering the Escrow Account and all expenses of the City. These expenses and payment terms shall be determined by the City, Contractor and Escrow Agent. 5. The interest earned on the securities or the money market accounts held in escrow and all interest earned on that interest shall be for the sole account of Contractor and shall be subject to withdrawal by Contractor at any time and from time to time without notice to the City. Revised 11/01/06 Contract No. 3907 Page 35 of 141 Pages 6. Contractor shall have the right to withdraw all or any part of the principal in the Escrow Account only by written notice to Escrow Agent accompanied by written authorization from City to the Escrow Agent that City consents to the withdrawal of the amount sought to be withdrawn by Contractor. 7. The City shall have a right to draw upon the securities in the event of default by the Contractor. Upon seven days' written notice to the Escrow Agent from the City of the default, the Escrow Agent shall immediately convert the securities to cash and shaii distribute the cash as instructed by the City. 8. Upon receipt of written notification from the City certifying that the Contract is final and complete and that the Contractor has complied with all requirements and procedures applicable to the Contract, the Escrow Agent shall release to Contractor all securities and interest on deposit less escrow fees and charges of the Escrow Account. The escrow shall be closed immediately upon disbursement of all moneys and securities on deposit and payments of fees and charges. 9. The Escrow Agent shall rely on the written notifications from the City and the Contractor pursuant to sections (1) to (8), inclusive, of this agreement and the City and Contractor shall hold Escrow Agent harmless from Escrow Agent's release, conversion and disbursement of the securities and interest as set forth above. 10. The names of the persons who are authorized to give written notices or to receive written notice on behalf of the City and on behalf of Contractor in connection with the foregoing, and exemplars of their respective signatures are as follows: For City:Title FINANCE DIRECTOR Name Signature For Contractor: Address 1635 Faraday Avenue. Carlsbad, CA 92008 Title Thomas L. Brown, President Name Thomas L/ Brown A Signature Address P.O. Box 231640, Encinitas, CA 92023-1640 Title Vice President/ Branch Manager Name Nell J Frltts Signature ^^^^^^California Bank &"Trust Address 11717 Bernardo Plaza Ct San Diego CA 92128 At the time the Escrow Account is opened, the City and Contractor shall deliver to the Escrow Agent a fully executed counterpart of this Agreement. For Escrow Agent: Revised 11/01/06 Contract No. 3907 Page 36 of 141 Pages ,f IN WITNESS WHEREOF, the parties have executed this Agreement by their proper officers on the date first set forth above. For City:Title MAYOR Name Signature Address 1 rive/CarlsBad. CA 92008 For Contractor:Title Executive Assistant Name Brittany Card Signature Address P.O. Box 231640, Encinitas, CA 92023-1640 For Escrow Agent:Title Vice President/ Branch Manager Name Neil J Fritts Signature ^^^^^^^^^^CaliforniaBank& Trust Address 11717 Bernardo Plaza Ct San Diego CA 92128 Revised 11/01/06 Contract No. 3907 Page 37 of 141 Pages GENERAL PROVISIONS FOR OFF-SITE WETLAND MITIGATION RESTORATION FOR RANCHO SANTA FE ROAD NORTH CONTRACT NO. 3907 CITY OF CARLSBAD BIDDERS ARE ADVISED THAT THIS SECTION REPLACES PART 1, GENERAL PROVISIONS, OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION SECTION 1 -TERMS, DEFINITIONS ABBREVIATIONS AND SYMBOLS 1-1 TERMS - Unless otherwise stated, the words directed, required, permitted, ordered, instructed, designated, considered necessary, prescribed, approved, acceptable, satisfactory, or words of like meaning, refer to actions, expressions, and prerogatives of the Engineer. 1-1.1 Reference to.Drawings. Where words "shown", "indicated", "detailed", "noted", "scheduled", or words of similar import are used, it shall be understood that reference is made to the plans accompanying these provisions, unless stated otherwise. 1-1.2 Directions. Where words "directed", "designated", "selected", or words of similar import are used, it shall be understood that the direction, designation or selection of the Engineer is intended, unless stated otherwise. The word "required" and words of similar import shall be understood to mean "as required to properly complete the work as required and as approved by the Engineer," unless stated otherwise. 1-1.3 Equals and Approvals. Where the words "equal", "approved equal", "equivalent", and such words of similar import are used, it shall be understood such words are followed by the expression "in the opinion of the Engineer", unless otherwise stated. Where the words "approved", "approval", "acceptance", or words of similar import are used, it shall be understood that the approval, acceptance, or similar import of the Engineer is intended. 1-1.4 Perform. The word "perform" shall be understood to mean that the Contractor, at its expense, shall perform all operations, labor, tools and equipment, and further, including the furnishing and installing of materials that are indicated, specified or required to mean that the Contractor, at its expense, shall furnish and install the work, complete in place and ready to use, including furnishing of necessary labor, materials, tools, equipment, and transportation. 1-2 Definitions. The following words, or groups of words, shall be exclusively defined by the definitions assigned to them herein. Revised 11/01/06 Contract No. 3907 Page 38 of 141 Pages Addendum - Written or graphic instrument issued prior to the opening of Bids which clarifies, corrects, or changes the bidding or Contract Documents. The term Addendum shall include bulletins and all other types of written notices issued to potential bidders prior to opening of Bids. Agency - the City of Carlsbad, California. Agreement - See Contract. Assessment Act Contract - A Contract financed by special assessments authorized under a State Act or procedural ordinance of a City or County. Base - A layer of specified material of planned thickness placed immediately below the pavement or surfacing. Bid - The offer or proposal of the Bidder submitted on the prescribed form setting forth the prices for the Work. Bidder-Any individual, firm, partnership, corporation, or combination thereof, submitting a Bid for the Work, acting directly or through a duly authorized representative. Board - The officer or body constituting the awarding authority of the Agency, which is the City Council for the City of Carlsbad or the Board of Directors of Carlsbad Municipal Water District. Bond - Bid, performance, and payment bond or other instrument of security. City Council - the City Council of the City of Carlsbad. City Manager - the City Manager of the City of Carlsbad or his/her approved representative. Cash Contract - A Contract financed by means other than special assessments. Change Order - A written order to the Contractor signed by the Agency directing an addition, deletion, or revision in the Work, or an adjustment in the Contract Price or the Contract time issued after the effective date of the Contract. A Change Order may or may not also be signed by the Contractor. Code - The terms Government Code, Labor Code, etc., refer to codes of the State of California. Construction Manager- the Project Inspector's immediate supervisor and first level of appeal for informal dispute resolution. Contract- The written agreement between the Agency and the Contractor covering the Work. Contract Documents - Including but not limited to; the Contract, any Addendum (which pertain to the contract documents), Notice Inviting Bids, Instructions to Bidders; Bid (including documentation accompanying the Bid and any post-bid documentation submitted prior to the Notice of Award) when attached as an exhibit to the Contract, the Bonds, the general conditions, permits from other agencies, the Special Provisions, the Plans, Standard Plans, Standard Specifications, Reference Specifications, and all Modifications issued after the execution of the Contract. Contractor - The individual, partnership, corporation, joint venture, or other legal entity having a Contract with the Agency to perform the Work. In the case of work being done under permit issued Revised 11/01/06 Contract No. 3907 Page 39 of 141 Pages by the Agency, the permittee shall be constructed to be the Contractor. The term "prime contractor" shall mean Contractor. Contract Price - The total amount of money for which the Contract is awarded. Contract Unit Price - The amount stated in the Bid for a single unit of an item of work. County Sealer - The Sealer of Weights and Measures of the county in which the Contract is let. Days - Days shall mean consecutive calendar's days unless otherwise specified. Deputy City Engineer, Construction Management & Inspection - The Construction Manager's immediate supervisor and second level of appeal for informal dispute resolution. Dispute Board - persons designated by the City Manager of the City of Carlsbad or Executive Manager of the Carlsbad Municipal Water District, to hear and advise the City Manager on claims submitted by the Contractor. The City Manager for the City of Carlsbad or the Executive Manager for the Carlsbad Municipal Water District is the last appeal level for informal dispute resolution. Electrolier - Street light assembly complete, including foundation, standard, luminaire arm, luminaire, etc. Engineer - the City Engineer of the City of Carlsbad or his/her approved representative. The Engineer is the third level of appeal for informal dispute resolution. Geotextile - Synthetic fiber used in civil engineering applications, serving the primary functions of separation and filtration. House Connection Sewer — A sewer, within a public street or right-of-way, proposed to connect any parcel, lot, or part of a lot with a mainline sewer. House Sewer - A sewer, wholly within private property, proposed to connect any building to a house connection sewer. Luminaire - The lamp housing including the optical and socket assemblies (and ballast if so specified). Luminaire Arm - The structural member, bracket, or mast arm, which, mounted on the standard, supports the luminaire. Minor Bid Item - a single contract item constituting less than 10 percent (10%) of the original Contract Price bid. Modification - Includes Change Orders and Supplemental Agreements. A Modification may only be used after the effective date of the Contract. Notice of Award - The written notice by the Agency to the successful Bidder stating that upon compliance by it with the required conditions, the Agency will execute the Contract. Notice to Proceed - A written notice given by the Agency to the Contractor fixing the date on which the Contract time will start. Revised 11/01/06 Contract No. 3907 Page 40 of 141 Pages Own Organization - When used in Section 2-3.1 - Employees of the Contractor who are hired, directed, supervised and paid by the Contractor to accomplish the completion of the Work. Further, such employees have their employment taxes, State disability insurance payments, State and Federal income taxes paid and administered, as applicable, by the Contractor. When used in Section 2-3.1 "own organization" means construction equipment that the Contractor owns or leases and uses to accomplish the Work. Equipment that is owner operated or leased equipment with an operator is not part of the Contractor's Own Organization and will not be included for the purpose of compliance with Section 2-3.1. Person - Any individual, firm, association, partnership, corporation, trust, joint venture, or other legal entity. Plans - The drawings, profiles, cross sections, working drawings, and supplemental drawings, or reproductions thereof, approved by the Engineer, which show the location, character, dimensions, or details of the Work. Private Contract - Work subject to Agency inspection, control, and approval, involving private funds, not administered by the Agency. Project Inspector - the Engineer's designated representative for inspection, contract administration and first level for informal dispute resolution. Proposal - See Bid. Reference Specifications - Those bulletins, standards, rules, methods of analysis or test, codes, and specifications of other agencies, engineering societies, or industrial associations referred to in the Contract Documents. These refer to the latest edition, including amendments in effect and published at the time of advertising the project or issuing the permit, unless specifically referred to by edition, volume, or date. Roadway - The portion of a street reserved for vehicular use. Service Connection - Service connections are all or any portion of the conduit, cable, or duct, including meter, between a utility distribution line and an individual consumer. Sewer - Any conduit intended for the reception and transfer of sewage and fluid industrial waste. Specifications - Standard Specifications, Reference Specifications, Special Provisions, and specifications in Supplemental Agreements between the Contractor and the Board. Special Provisions - Additions and revisions to the Standard Specifications setting forth conditions and requirements peculiar to the work. Standard - The shaft or pole used to support street lighting luminaire, traffic signal heads, mast arms, etc. Standard Plans - Details of standard structures, devices, or instructions referred to on the Plans or in Specifications by title or number. Standard Specifications - The Standard Specifications for Public Works Construction (SSPWC), the "Greenbook". 0Revised 11/01/06 Contract No. 3907 Page 41 of 141 Pages State - State of California. /-w^ Storm Drain - Any conduit and appurtenances intended for the reception and transfer of storm water. Street-Any road, highway, parkway, freeway, alley, walk, or way. Subbase - A layer of specified material of planned thickness between a base and the subgrade. Subcontractor - An individual, firm, or corporation having a direct contract with the Contractor or with any other Subcontractor for the performance of a part of the Work. Subgrade - For roadways, that portion of the roadbed on which pavement, surfacing, base, subbase, or a layer of other material is placed. For structures, the soil prepared to support a structure. Supervision - Supervision, where used to indicate supervision by the Engineer, shall mean the performance of obligations, and the exercise of rights, specifically imposed upon and granted to the Agency in becoming a party to the Contract. Except as specifically stated herein, supervision by the Agency shall not mean active and direct superintendence of details of the Work. Supplemental Agreement - A written amendment of the Contract Documents signed by both parties. Surety - Any individua.1, firm, or corporation, bound with and for the Contractor for the acceptable performance, execution, and completion of the Work, and for the satisfaction of all obligations ^^ incurred. >—^ Tonne - Also referred to as "metric ton". Represents a unit of measure in the International System of Units equal to 1,000 kilograms. Utility - Tracks, overhead or underground wires, pipeline, conduits, ducts, or structures, sewers, or storm drains owned, operated, or maintained in or across a public right of way or private easement. Work - That which is proposed to be constructed or done under the Contract or permit, including the furnishing of all labor, materials, equipment, and services. 1-3 ABBREVIATIONS 1-3.1 General. The abbreviation herein, together with others in general use, are applicable to these Standard Specifications and to project Plans or other Contract Documents. All abbreviations and symbols used on Plans for structural steel construction shall conform to those given by the "Manual of Steel Construction" published by the American Institute of Steel Construction, Inc. 1-3.2 Common Usage Abbreviation Word or Words ABAN Abandon ACP Asbestos cement pipe *^^ ABAND Abandoned ACWS Asphalt concrete wearing surface ^^/ ABS Acrylonitrile - butadiene - styrene ALT Alternate AC Asphalt Concrete ARTS Apartment and Apartments Revised 11/01/06 Contract No. 3907 Page 42 of 141 Pages AMER STD American Standard AWG American Wire Gage (nonferrous wire) BC Beginning of curve BCR Beginning of curb return BDRY Boundary BF Bottom of footing BLDG Building and Buildings BM Bench mark BVC Beginning of vertical curve B/W Back of wall C/C Center to center CAB Crushed aggregate base CAL/OSHA California Occupational Safety and Health Administration CalTrans California Department of Transportation CAP Corrugated aluminum pipe CB Catch Basin Cb Curb CBP Catch Basin Connection Pipe CBR California Bearing Ratio CCR California Code of Regulations CCTV Closed Circuit TV CES Carlsbad Engineering Standards CF Curb face CF Cubic foot C&G Curb and gutter CFR Code of Federal Regulations CFS Cubic Feet per Second CIP Cast iron pipe CIPP Cast-in place pipe CL Clearance, center line CLF Chain link fence CMB Crushed miscellaneous base CMC Cement mortar-coated CML Cement mortar-lined CMWD... Carlsbad Municipal Water District CO Cleanout (Sewer) COL Column COMM Commercial CONG Concrete CONN Connection CONST Construct, Construction COORD Coordinate CSP Corrugated steel pipe CSSD Carlsbad Supplemental Standard Drawings CTB Cement treated base CV Check valve CY Cubic yard D Load of pipe dB Decibels DEL Double DF Douglas fir DIA Diameter DIP Ductile iron pipe DL Dead load DR Dimension Ratio DT Drain Tile DWG Drawing DWY Driveway DWY APPR Driveway approach E Electric EA Each EC End of curve ECR End of curb return EF Each face EG Edge of gutter EGL Energy grade line El Elevation ELC Electrolier lighting conduit ELT Extra long ton ENGR Engineer, Engineering EP Edge of pavement ESMT Easement ETB Emulsion-treated base EVC End of vertical curb EWA Encina Wastewater Authority EXC Excavation EXP JT Expansion joint EXST Existing F Fahrenheit F&C Frame and cover F&l Furnish and install FAB Fabricate FAS Flashing arrow sign FD Floor drain FDN Foundation FED SPEC Federal Specification FG Finished grade FH Fire hydrant FL Flow line FS Finished surface FT-LB Foot-pound FTG Footing FW Face of wall G Gas GA Gauge GAL Gallon and Gallons GALV Galvanized GAR Garage and Garages GIP Galvanized iron pipe GL Ground line or grade line GM Gas meter GNV Ground Not Visible GP Guy pole GPM gallons per minute GR Grade GRTG Grating GSP Galvanized steel pipe H ....High or height HB Hose bib HC House connection HDWL Headwall HGL Hydraulic grade line HORIZ Horizontal HP Horsepower HPG High pressure gas HPS High pressure sodium (Light) HYDR Hydraulic IE Invert Elevation ID Inside diameter INCL Including INSP Inspection INV Invert IP Iron pipe JC Junction chamber JCT Junction Revised 11/01/06 Contract No. 3907 Page 43 of 141 Pages JS Junction structure JT Joint L Length LAB Laboratory LAT Lateral LB Pound LD Local depression LF Linear foot LH Lamp hole LL Live load LOL Layout line LONG Longitudinal LP Lamppost LPS Low pressure sodium (Light) LS Lump sum LTS Lime treated soil LWD Leucadia Wastewater District MAINT Maintenance MAX Maximum MCR Middle of curb return MEAS Measure MH Manhole, maintenance hole MIL SPEC Military specification MISC Miscellaneous MOD Modified, modify MON Monument MSL. Mean Sea Level (Reg. Standard Drawing M-12) MTBM Microtunneling Boring Machine MULT Multiple MUTCD.... Manual on Uniform Traffic Control Devices MVL Mercury vapor light NCTD North County Transit District NRCP Nonreinforced concrete pipe OBS Obsolete OC On center OD Outside diameter OE Outer edge OHE Overhead Electric OMWD Olivenhain Municipal Water District OPP Opposite ORIG Original PB Pull box PC Point of curvature PCC Portland cement concrete or point of compound curvature PCVC Point of compound vertical curve PE Polyethylene PI Point of intersection PL Property line PMB Processed miscellaneous base POC Point on curve POT Point on tangent PP Power pole PRC Point of reverse curve PRVC Point of reverse vertical curve PSI Pounds per square inch PT Point of tangency PVC Polyvinyl chloride PVMT Pavement PVT R/W Private right-of-way Q Rate of flow in cubic feet per second QUAD Quadrangle, Quadrant R Radius R&O Rock and oil R/W Right-of-way RA Recycling agent RAC Recycled asphalt concrete RAP Reclaimed asphalt pavement RBAC Rubberized asphalt concrete RC Reinforced concrete RGB Reinforced concrete box RCE Registered civil engineer RCP Reinforced concrete pipe RCV Remote control valve REF Reference REINF Reinforced or reinforcement RES Reservoir RGE Registered geotechnical engineer ROW Right-of-Way RR Railroad RSE Registered structural engineer RTE Registered traffic engineer S Sewer or Slope, as applicable SCCP Steel cylinder concrete pipe SD Storm drain SDNR San Diego Northern Railway SDR Standard thermoplastic pipe dimension ratio (ratio of pipe O.D. to minimum wall thickness) SDRSD San Diego Regional Standard Drawings SE Sand Equivalent SEC Section SF Square foot SFM Sewer Force Main SI International System of Units (Metric) SPEC Specifications SPPWC Standard Plans for Public Works Construction SSPWC Standard Specifications for Public Works Construction STHWY State highway STA Station STD Standard STR Straight STR GR Straight grade STRUG Structural/Structure SW Sidewalk SWD. Sidewalk drain SY Square yard T Telephone TAN Tangent TC Top of curb TEL Telephone TF Top of footing TOPO Topography TR Tract TRANS Transition TS Traffic signal or transition structure TSC Traffic signal conduit TSS Traffic signal standard TW Top of wall TYP Typical UE Underground Electric USA Underground Service Alert VAR Varies, Variable VB Valve box VC Vertical curve VCP Vitrified clay pipe VERT Vertical VOL Volume VWD Vallecitos Water District W Water, Wider or Width, as applicable WATCH Work Area Traffic Control Handbook Revised 11/01/06 Contract No. 3907 Page 44 of 141 Pages Wl Wrought iron XCONN Cross connection WM Water meter XSEC Cross section WPJ Weakened plane joint 1 -3.3 Institutions. Abbreviation Word or Words AASHTO American Association of State Highway and Transportation Officials AISC American Institute of Steel Construction ANSI American National Standards Institute API American Petroleum Institute AREA American Railway Engineering Association ASTM American Society for Testing and Materials AWPA American Wood Preservers Association AWS American Welding Society AWWA American Water Works Association FHWA Federal Highway Administration GRI Geosynthetic Research Institute NEMA National Electrical Manufacturers Association NOAA National Oceanic and Atmospheric Administration (Dept. of Commerce) UL Underwriters' Laboratories Inc. USGS United States Geological Survey 1-4 UNITS OF MEASURE. 1-4.1 General. U.S. Standard Measures, also called U.S. Customary System, are the principal measurement system in these specifications. However, certain material specifications and test requirements contained herein use SI units specifically and conversions to U.S. Standard Measures may or may not have been included in these circumstances. When U.S. Standard Measures are not included in parenthesis, then the SI units shall control. S.I. units and U.S. Standard Measures in parenthesis may or may not be exactly equivalent. Reference is also made to ASTM E 380 for definitions of various units of the SI system and a more extensive set of conversion factors. 1 -4.2 Units of Measure and Their Abbreviations. U.S. Customary Unit (Equal To) SI Unit (Abbreviations) (Abbreviations) 1 mil (=0.001 in) 25.4 micrometer (urn) 1 inch (in) 25.4 millimeter (mm) 1 inch (in) 2.54 centimeter (cm) 1 foot (ft) 0.3048 meter (m) 1 yard (yd) 0.9144 meter (m) 1 mile (mi) 1.6093 kilometer (km) 1 square foot (ft) 0.0929 square meter (m, 1 square yard (yd ) 0.8361 square meter (m 1 cubic foot (ft3),. 0.0283 cubic meter (rr 1 cubic yard (yd ) 0.7646 cubic meter (m 1 acre 0.4047 hectare (ha) 1 U.S. gallon (gal) 3.7854 Liter (L) 1 fluid ounce (fi. oz.) 29.5735 millileter (ml) 1 pound mass (Ib) (avoirdupois) 0.4536 kilogram (kg) Revised 11/01/06 Contract No. 3907 Page 45 of 141 Pages 1 ounce mass (oz) ................................................................................ 0.02835 kilogram (kg) 1 Ton (=2000 Ib avoirdupois) ................................................................ 0.9072 Tonne (= 90/ kg) 1 Poise .................................................................................................. 0.1 pascal second (Pa s) 1 centistoke (cs) ................................................................................... 1 square millimeters per second (mm Is) 1 pound force (Ibf) ................................................................................ 4.4482 Newton (N) 1 pounds per square inch (psi) ............................................................. 6.8948 Kilopascal (kPa) 1 pound force per foot (Ibf/ft) ................................................................ 1.4594 Newton per meter (N/m) 1 foot-pound force (ft-lbf) ...................................................................... 1.3558 Joules (J) 1 foot-pound force per second ([ft-lbf]/s) .............................................. 1.3558 Watt (W) 1 part per million (ppm) ......................................................................... 1 milligram/liter (mg/L) Temperature Units and Abbreviations Degree Fahrenheit (°F): ........................................................................ Degree Celsius (°C): °F = (1.8 x °C) + 32 ............................................................................... °C = (°F -32)71.8 SI Units (abbreviation) Commonly Used in Both Systems 1 Ampere (A) 1 Volt (V) 1 Candela (cd) 1 Lumen (Im) 1 second (s) Common Metric Prefixes kilo(k) ................................................................................................... 10, centi(c) ................................................................................................. 10'* milli(m) ......................................................................... '. ....................... 10'3 micro (n) ............................................................................................... 10"^ nano(n) ................................................................................................ 10 , pico(p) .................................................................................................. 10'12 1-5 SYMBOLS A Delta, the central angle or angle between tangents Z. Angle % Percent Feet or minutes Inches or seconds1 Number / per or (between words) Degree PL Property line CL Centerline SL Survey line or station line SECTION 2 - SCOPE AND CONTROL OF WORK 2-1 AWARD AND EXECUTION OF CONTRACT. Award and execution of Contract will be as provided for in the Specifications, Instruction to Bidders, or Notice Inviting Bids. 2-2 ASSIGNMENT. No Contract or portion thereof may be assigned without consent of the Board, except that the Contractor may assign money due or which will accrue to it under the Contract. If given written notice, such assignment will be recognized by the Board to the extent permitted by law. Any assignment of money shall be subject to all proper withholdings in favor of the Agency and to all deductions provided for in the Contract. All money withheld, whether assigned or not, shall be subject to being used by the Agency for completion of the Work, should the Contractor be in default. Revised 11/01/06 Contract No. 3907 Page 46 of 141 Pages 2-3 SUBCONTRACTS. 2-3.1 General. Each Bidder shall comply with the Chapter of the Public Contract Code including Sections 4100 through 4113. The following excerpts or summaries of some of the requirements of this Chapter are included below for information: The Bidder shall set forth in the Bid, as provided in 4104: "(a) The name and location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvements, or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid, or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one- half of 1 percent of the prime contractor's total bid or ten thousand dollars ($10,000), which- ever is greater." "(b) The portion of the work which will be done by each such subcontractor under this act. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in his bid." If the Contractor fails to specify a Subcontractor, or specifies more than one Subcontractor for the same portion of the work to be performed under the Contract (in excess of one-half of 1 percent of the Contractor's total Bid), the Contractor shall be qualified to perform that portion itself, and shall perform that portion itself, except as otherwise provided in the Code. As provided in Section 4107, no Contractor whose Bid is accepted shall substitute any person as Subcontractor in place of the Subcontractor listed in the original Bid, except for causes and by procedures established in Section 4107.5. This section provides procedures to correct a clerical error in the listing of a Subcontractor. Section 4110 provides that a Contractor violating any of the provisions of the Chapter violates the Contract and the Board may exercise the option either to cancel the Contract or assess the Contractor a penalty in an amount of not more than 10 percent of the subcontract involved, after a public hearing. Should the Contractor fail to adhere to the provisions requiring the Contractor to complete 50 percent of the contract price with its own organization, the Agency may at its sole discretion elect to cancel the contract or deduct an amount equal to 10 percent of the value of the work performed in excess of 50 percent of the contract price by other than the Contractor's own organization. The Board shall be the sole body for determination of a violation of these provisions. In any proceedings under this section, the prime contractor shall be entitled to a public hearing before the Board and shall be notified ten (10) days in advance of the time and location of said hearing. The determination of the City Council shall be final. 2-3.2 Additional Responsibility. The Contractor shall give personal attention to the fulfillment of the Contract and shall keep the Work under its control. The Contractor shall perform, with its own organization, Contract work amounting to at least 50 percent of the Contract Price except that any designated "Specialty Items" may be performed by subcontract, and the amount of any such "Specialty Items" so performed may be deducted from the Contract Price before computing the amount required to be performed by the Contractor with its own organization. "Specialty Items" will be identified by the Agency in the Bid or Proposal. Where an entire item is subcontracted, the value of work subcontracted will be based on the Contract Unit Revised 11/01/06 Contract No. 3907 Page 47 of 141 Pages Price. When a portion of an item is subcontracted, the value of work subcontracted will be based on the estimated percentage of the Contract Unit Price. This will be determined from information submitted by the Contractor, and subject to approval by the Engineer. Before the work of any Subcontractor is started, the Contractor shall submit to the Engineer for approval a written statement showing the work to be subcontracted giving the name and business of each Subcontractor and description and value of each portion of the work to be so subcontracted. 2-3.3 Status of Subcontractors. Subcontractors shall be considered employees of the Contractor, and the Contractor shall be responsible for their work. 2-4 CONTRACT BONDS. Before execution of the Contract, the Bidder shall file surety bonds with the Agency to be approved by the Board in the amounts and for the purposes noted below. Bonds issued by a surety, who is authorized to issue bonds in California, and whose bonding limitation shown in said circular is sufficient to provide bonds in the amount required by the Contract shall be deemed to be approved unless specifically rejected by the Agency. Bonds from all other sureties shall be accompanied by all of the documents enumerated in Code of Civil Procedure 995.660 (a). The Bidder shall pay all bond premiums, costs, and incidentals. Each bond shall incorporate, by reference, the Contract and be signed by both the Bidder and Surety and the signature of the authorized agent of the Surety shall be notarized. The Contractor shall provide a faithful performance/warranty bond and payment bond (labor and materials bond) for this contract. The faithful performance/warranty bond shall be in a sum not less than one hundred percent of the total amount payable by the terms of this contract. The Contractor shall provide bonds to secure payment of laborers and materials suppliers in a sum not less than one hundred percent of the total amount payable by the terms of this contract. Both bonds shall extend in full force and effect and be retained by the Agency during this project until they are released according to the provisions of this section. The faithful performance/warranty bond will be reduced to 25 percent of the original amount 30 days after recordation of the Notice of Completion and will remain in full force and effect for the one year warranty period and until all warranty repairs are completed to the satisfaction of the Engineer. The bonds to secure payment of laborers and materials suppliers shall be released six months plus 30 days after recordation of the Notice of Completion if all claims have been paid. All bonds are to be placed with a surety insurance carrier admitted and authorized to transact the business of insurance in California and whose assets exceed their liabilities in an amount equal to or in excess of the amount of the bond. The bonds are to contain the following documents: 1) An original, or a certified copy, of the un-revoked appointment, power of attorney, by laws, or other instrument entitling or authorizing the person who executed the bond to do so. 2) A certified copy of the certificate of authority of the insurer issued by the insurance commissioner. If the bid is accepted, the Agency may require a financial statement of the assets and liabilities of the insurer at the end of the quarter calendar year prior to 30 days next preceding the date of the execution of the bond. The financial statement shall be made by an officer's certificate as defined in Section 173 of the Corporations Code. In the case of a foreign insurer, the financial statement may be verified by the oath of the principal officer or manager residing within the United States. Should any bond become insufficient, the Contractor shall renew the bond within 10 days after receiving notice from the Agency. A•^ Revised 11/01/06 Contract No. 3907 Page 48 of 141 Pages Should any Surety at any time be unsatisfactory to the Board, notice will be given the Contractor to that effect. No further payments shall be deemed due or will be made under the contract until a new Surety shall qualify and be accepted by the Board. Changes in the Work or extensions of time, made pursuant to the Contract, shall in no way release the Contractor or Surety from its obligations. Notice of such changes or extensions shall be waived by the Surety. 2-5 PLANS AND SPECIFICATIONS. 2-5.1 General. The Contractor shall keep at the Work site a copy of the Plans and Specifications, to which the Engineer shall have access at all times. The specifications for the work include the project technical specifications, Carlsbad Engineering Standards (CES), Standard Specifications for Public Works Construction, (SSPWC), 2006 Edition (Part 2 & 3), and the 2006 supplements thereto (Part 2 & 3) hereinafter designated "SSPWC", as written and promulgated by Joint Cooperative Committee of the Southern California Chapter American Public Works Association and Southern California Districts Associated General Contractors of California, and as amended by the Supplemental Provisions section of this contract. The construction plans consist of two (2) sets. The first set is designated as City of Carlsbad Drawing No. 368-2E and consists of 9 sheets. The second set is designated as City of Carlsbad Drawing No. 368-2M and consists of 19 sheets. The standard drawings used for this project are the latest edition of the San Diego Area Regional Standard Drawings, hereinafter designated SDRSD, as issued by the San Diego County Department of Public Works, together with the most recent editions of the City of Carlsbad Supplemental Standard Drawings, hereinafter designated as CSSD, as issued by the City of Carlsbad and the Carlsbad Municipal Water District Standard Plans hereinafter designated as CMWDSD, as issued by the Carlsbad Municipal Water District. Copies of some of the pertinent standard drawings are enclosed as an appendix to these Supplemental Provisions. The Plans, Specifications, and other Contract Documents shall govern the Work. The Contract Documents are intended to be complementary and cooperative. Anything specified in the Specifications and not shown on the Plans, or shown on the Plans and not specified in the Specifications, shall be as though shown on or specified in both. The Plans shall be supplemented by such working drawings and shop drawings as are necessary to adequately control the Work. The Contractor shall ascertain the existence of any conditions affecting the cost of the Work through a reasonable examination of the Work site prior to submitting the Bid. Existing improvements visible at the Work site, for which no specific disposition is made on the Plans, but which interfere with the completion of the Work, shall be removed and disposed of by the Contractor. The Contractor shall, upon discovering any error or omission in the Plans or Specifications, immediately call it to the attention of the Engineer. 2-5.2 Precedence of Contract Documents. If there is a conflict between Contract Documents, the document highest in precedence shall control. The precedence shall be the most recent edition of the following documents listed in order of highest to lowest precedence: 1) Permits from other agencies as may be required by law. 2) Carlsbad General Provisions. 3) Plans. 4) City of Carlsbad Engineering Standards, 2004 Edition. 5) San Diego Regional Standard Drawings Revised 11/01/06 Contract No. 3907 Page 49 of 141 Pages 6) State of California Department of Transportation Standard Plans 7) Standard Specifications for Public Works Construction 8) Reference Specifications 9) Manufacturer's Installation Recommendations Change Orders, Supplemental Agreements and approved revisions to Plans and Specifications will take precedence over items 2) through 9) above. Detailed plans and plan views shall have precedence over general plans. 2-5.2.1 Precedence of Contract Documents, add the following: Where CALTRANS specifications are used to modify the SSPWC or added to the SSPWC by any of the contract documents the CALTRANS specifications shall have precedence only in reference to the materials and construction materials referred to in the CALTRANS specifications. The Invitation to Bid, Contract for Public Works, Part 1 of these Supplemental Provisions and Part 1 of the SSPWC, in the order of precedence in Section 2-5.2 of the SSPWC, shall prevail over the CALTRANS specifications in all other matters. 2-5.3 Submittals. 2-5.3.1 General. Submittals shall be provided, at the Contractor's expense, as required in 2-5.3.2, 2- 5.3.3 and 2-5.3.4, when required by the Plans or Special Provisions, or when requested by the Engineer. Materials shall neither be furnished nor fabricated, nor shall any work for which submittals are required by performed, before the required submittals have been reviewed and accepted by the Engineer. Neither review nor acceptance of submittals by the Engineer shall relieve the Contractor from responsibility for errors, omissions, or deviations from the Contract Documents, unless such deviations were specifically called to the attention of the Engineer in the letter of transmittal. The Contractor shall be responsible for the correctness of the submittals. The Contractor shall allow a minimum of 20 working days for review of submittals unless otherwise specified in the Special Provisions. Each submittal shall be accompanied by a letter of transmittal. Each submittal shall be consecutively numbered. Resubmittals shall be labeled with the number of the original submittal followed by an ascending alphabetical designation (e.g. The label '4-C' would indicate the third instance that the fourth submittal had been given to the Engineer). Each sheet of each submittal shall be consecutively numbered. Each set of shop drawings and submittals shall be accompanied by a letter of transmittal on the Contractor's letterhead. The Letter of transmittal shall contain the following: 1) Project title and Agency contract number. 2) Number of complete sets. 3) Contractor's certification statement. 4) Specification section number(s) pertaining to material submitted for review. 5) Submittal number (Submittal numbers shall be consecutive including subsequent submittals for the same materials.) 6) Description of the contents of the submittal. 7) Identification of deviations from the contract documents. When submitted for the Engineer's review, Shop Drawings shall bear the Contractor's certification that the Contractor has reviewed, checked, and approved the Shop Drawings and that they are in conformance with the requirements of the Contract Documents. The Contractor shall subscribe to and shall place the following certification on all submittals: A•^ Revised 11/01/06 Contract No. 3907 Page 50 of 141 Pages "I hereby certify that the (equipment, material) shown and marked in this submittal is that proposed to be incorporated into this Project, is in compliance with the Contract Documents, can be installed in the allocat/bdjspaces/and is submitted for approval." By:Title:Thom<fls u frrcwn Date: t 1QO& Company Name: $\£\\A W^t. 2-5.3.2 Working Drawings. Working drawings are drawings showing details not shown on the Plans which are required to be designed by the Contractor. Working drawings shall be of a size and scale to clearly show all necessary details. Six copies and one reproducible shall be submitted. If no revisions are required, three of the copies will be returned to the Contractor. If revisions are required, the Engineer will return one copy along with the reproducible for resubmission. Upon acceptance, the Engineer will return two of the copies to the Contractor and retain the remaining copies and the reproducible. Working drawings are required in the following sections: TABLE 2-5.3.2 (A) Item Section Number Title Subject1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 7-10.4.1 207-2.5 207-8.4 207-10.2.1 300-3.2 303-1.6.1 303-1.7.1 303-3.1 304-1.1.1 304-1.1.2 304-2.1 306-2.1 306-3.1 306-3.4 306-6 306-8 307-4.3 Safety Orders Joints Joints General Cofferdams General General General Shop Drawings Falsework Plans General General General Tunnel Supports Remodeling Existing Sewer Facilities Microtunneling Controller Cabinet Wiring Diagrams Trench Shoring Reinforced Concrete Pipe Vitrified Clay Pipe Fabricated Steel Pipe Structure Excavation & Backfill Falsework Placing Reinforcement Prestressed Concrete Construction Structural Steel Structural Steel Metal Hand Railings Jacking Operations Tunneling Operations Tunneling Operations Polyethylene Liner Installation Microtunneling Operations Traffic Signal Construction Working drawings listed above as Items 5, 6, 8, 9, 10, 12, 13, 14 and 16 shall be prepared by a Civil or Structural Engineer registered by the State of California. 2-5.3.3 Shop Drawings. Shop drawings are drawings showing details of manufactured or assembled products proposed to be incorporated into the Work. Shop drawings required shall be as specified in the Special Provisions. Revised 11/01/06 Contract No. 3907 Page 51 of 141 Pages 2-5.3.4 Supporting Information. Supporting information is information required by the Specifications for the purposes of administration of the Contract, analysis for verification of conformance with the Specifications, the operation and maintenance of a manufactured product or system to be constructed as part of the Work, and other information as may be required by the Engineer. Six copies of the supporting information shall be submitted to the Engineer prior to the start of the Work unless otherwise specified in the Special Provisions or directed by the Engineer. Supporting information for systems shall be bound together and include all manufactured items for the system. If resubmittal is not required, three copies will be returned to the Contractor. Supporting information shall consist of the following and is required unless otherwise specified in the Special Provisions: 1) List of Subcontractors per 2-3.2. 2) List of Materials per 4-1.4. 3) Certifications per 4-1.5. 4) Construction Schedule per 6-1. 5) Confined Space Entry Program per 7-10.4.4. 6) Concrete mix designs per 201 -1.1. 7) Asphalt concrete mix designs per 203-6.1. 8) Data, including, but not limited to, catalog sheets, manufacturer's brochures, technical bulletins, specifications, diagrams, product samples, and other information necessary to describe a system, product or item. This information is required for irrigation systems, street lighting systems, and traffic signals, and may also be required for any product, manufactured item, or system. 2-5.4 RECORD DRAWINGS. The Contractor shall provide and keep up-to-date a complete "as-built" record set of blue-line prints, which shall be corrected in red daily and show every change from the original drawings and specifications and the exact "as-built" locations, sizes and kinds of equipment, underground piping, valves, and all other work not visible at surface grade. Prints for this purpose may be obtained from the Agency at cost. This set of drawings shall be kept on the job and shall be used only as a record set and shall be delivered to the Engineer within ten (10) days of completion of the work. Payment for performing the work required by Section 2-5.4 shall be included in the various bid items and no additional payment will be made therefore. 2-6 WORK TO BE DONE. The Contractor shall perform all work necessary to complete the Contract in a satisfactory manner. Unless otherwise provided, the Contractor shall furnish all materials, equipment, tools, labor, and incidentals necessary to complete the Work. 2-7 SUBSURFACE DATA. All soil and test hole data, water table elevations, and soil analyses shown on the drawings or included in the Specifications apply only at the location of the test holes and to the depths indicated. Soil test reports for test holes which have been drilled are available for inspection at the office of the Engineer. Any additional subsurface exploration shall be done by Bidders or the Contractor at their own expense. The indicated elevation of the water table is that which existed on the date when test hole data was determined. It is the Contractor's responsibility to determine and allow for the elevation of groundwater at the date of project construction. A difference in elevation between groundwater shown in soil boring logs and groundwater actually encountered during construction will not be considered as a basis for extra work. 2-8 RIGHT-OF-WAY. Rights-of-way, easements, or rights-of-entry for the Work will be provided by the Agency. Unless otherwise provided, the Contractor shall make arrangements, pay for, and assume all responsibility for acquiring, using, and disposing of additional work areas and facilities temporarily required. The Contractor shall indemnify and hold the Agency harmless from all claims Revised 11/01/06 Contract No. 3907 Page 52 of 141 Pages for damages caused by such actions. 2-9 SURVEYING. 2-9.1 Permanent Survey Markers. The Contractor shall not cover or disturb permanent survey monuments or benchmarks without the consent of the Engineer. Where the Engineer concurs, in writing, with the Contractor that protecting an existing monument in place is impractical, the Contractor shall employ a licensed land surveyor or a registered civil engineer authorized to practice land surveying within the State of California, hereinafter Surveyor, to establish the location of the monument before it is disturbed. The Contractor shall have the monument replaced by the Surveyor no later than thirty (30) days after construction at the site of the replacement is completed. The Surveyor shall file corner record(s) as required by §§ 8772 and 8773, et seq. of the California Business and Professions Code. When a change is made in the finished elevation of the pavement of any roadway in which a permanent survey monument is located, the Contractor shall adjust the monument frame and cover to the new grade within 7 days of paving unless the Engineer shall approve otherwise. Monument frames and covers shall be protected during street sealing or painting projects or be cleaned to the satisfaction of the Engineer. 2-9.2 Survey Service. The Contractor shall hire and pay for the services of a Surveyor, hereinafter Surveyor to perform all work necessary for establishing control, construction staking, records research and all other surveying work necessary to construct the work, provide surveying services as required herein and provide surveying, drafting and other professional services required to satisfy the requirements of the Land Surveyors Act. Surveyor shall be resident on the site during all surveying operations and shall personally supervise and certify the surveying work. 2-9.2.1 Submittal of Surveying Data, All surveying data submittals shall conform to the requirements of Section 2-5.3.3, "Submittals", herein. The Contractor shall submit grade sheets to the Engineer before commencing work in the area affected by the grade sheets. The Contractor shall submit field notes for all surveying required herein to the Engineer within ten days of performing the survey. All surveying field notes, grade sheets and survey calculations shall be submitted in bound form on 215mm by 280 mm (81/2" by 11") paper. The field notes, calculations and supporting data shall be clear and complete. Supporting data shall include all maps, affidavits, plats, field notes from earlier surveys and all other evidence used by the Surveyor to determine the location of the monuments set. The field notes and calculations will be labeled with name of the Surveyor, the party chief, the field crewmembers and the author of the field notes or calculations. They shall be annotated with the date of observation or calculation, be numbered with consecutive page numbers and shall be readable without resort to any electronic aid, computer program or documentation for any computer program. The field notes shall be prepared in conformance with the CALTRANS "Surveys Manual". The Contractor shall have a Record of Survey prepared by the Surveyor and file it in conformance with §§ 8700 - 8805 of the State of California Business and Professions Code when the Surveyor performs any surveying that such map is required under §§ 8762 of the State of California Business and Professions Code and whenever the Surveyor shall establish, set or construct any permanent survey monument. SDRS drawing M-10 type monuments, bolts, spikes, leaded tacks and nails (when set in concrete), iron pipes, reinforcing steel and all monuments and marks that are at, or accessory to, property corners and street centerlines are permanent survey monuments. The Record of Survey shall show all monuments set, control monuments used, the basis of bearings and all other data needed to determine the procedure of survey and the degree of accuracy attained by the field surveying including the unadjusted ratio of closure. The unadjusted ratio of closure shall not exceed 1 part in 40,000. The record of survey shall show the location and justification of location of all permanent monuments set and their relation to the street right-of-way. Record(s) of Survey(s) shall be submitted for the Engineer's review and approval before submittal to Revised 11/01/06 Contract No. 3907 Page 53 of 141 Pages the County Surveyor and before submittal to the County Recorder. 2-9.2.2 Survey Requirements, Stakes shall be set at offsets approved by the Engineer at no greater intervals than specified in TABLE 2-9.2.2(A) as measured along the project stationing. Stakes shall be set to show the location and grade of future curbs adjacent to traffic signal locations where the curb is not being built as a part of this contract. Staking and marking shall be completed by the Surveyor and inspected and approved by the Engineer before the start of construction in the area marked. Centerline monument shall have the disk stamped with the date the monument was set and the registration number of the Surveyor. Habitat mitigation sites and other areas to be preserved that are shown on the plans shall be staked and flagged prior to the start of any other activities within the limits of the work. When curb and gutter does not exist and is not being installed as a part of the project the location of adjacent facilities being constructed as a part of the contract the Contractor shall place stakes defining the horizontal and vertical location of such adjacent utility vaults, poles or other facilities that are being installed as parts of, or adjunct to, the project either by the Contractor and/or those noted on the plans as to be installed by others. TABLE 2-9.2.2(A) Survey Requirements for Construction Staking Feature Staked Street Centerline Clearing Slope Fence Rough Grade Cuts or Fills £ 10 m (33') Final Grade (includes top of: Basement soil, subbase and base) Asphalt Pavement Finish Course Drainage Structures, Pipes & similar Facilities®, © Curb Traffic Signal ® Signal Poles & Stake Description ® SDRS M-10 Monument Lath in soil, painted line on PCC & AC surfaces RP + Marker Stake RP + Marker Stake RP + Marker Stake RP + Marker Stake, Blue- top in grading area RP, paint on previous course RP + Marker Stake RP + Marker Stake RP + Marker Centerline or Parallel to Centerline Spacing®, <E> £1000', Street Intersections, Begin and end of curves, only when shown on the plans lath - Intervisible, < 50' on tangents & < 25' on curves, Painted line - continuous Intervisible and < 50' £ 200' on tangents, < 50' on curves when R£ 1000' & 25' on curves when R< 1000' <;50' £ 50' on tangents & curves when R> 1000' & <: 25' on curves when R < 1000' < 25' or as per the intersection grid points shown on the plan whichever provides the denser information intervisible & <, 25', beginning and end, BC & EC of facilities, Grade breaks, Alignment breaks, Junctions, Inlets & similar facilities, Risers & similar facilities (except plumbing), Skewed cut-off lines £ 25', BC & EC, at '/JA, VzA & V'A on curb returns & at beginning & end Vertical locations shall be based on the ultimate elevation of curb and sidewalk at each pole & controller location Lateral Spacing <3>, ® on street centerline at clearing line Grade Breaks &<25' N/A ( constant offset) N/A <22' edge of pavement, paving pass width, crown line & grade breaks as appropriate ( constant offset) as appropriate Setting Tolerance (Within) 0.02' Horizontal, also see Section 2-9.2.1 herein 1' Horizontal 0.1 ' Vertical & Horizontal 0.1' Horizontal 0.1' Vertical* Horizontal J/8" Horizontal & V Vertical •V Horizontal & "U" Vertical %" Horizontal & V4" Vertical V Horizontal & V/ Vertical J/8" Horizontal & V/ 3 Revised 11/01/06 Contract No. 3907 Page 54 of 141 Pages Feature Staked Controller CD Junction Box ® Conduit CD Minor Structure © Abutment Fill Wall® Major Structure CD Footings, Bents, Abutments & Wingwalls Superstructures Miscellaneous CD Contour Grading CD Utilities ®, d> Channels, Dikes & Ditches CD Signs ® Subsurface Drains ® Overside Drains ® Markers ® Railings & Barriers ® AC Dikes ® Box Culverts Pavement Markers® Stake Description ® Stake RP + Marker Stake RP + Marker Stake RP + Marker Stake + Line Stake RP + Marker Stake + Line Stake RP + Marker Stake + Line Point +Guard Stake RP + Marker Stake + Line Point +Guard Stake RP RP + Marker Stake RP + Marker Stake RP + Marker Stake RP + Marker Stake + Line Point -i-Guard Stake RP + Marker Stake RP + Marker Stake RP + Marker Stake RP + Marker Stake RP + Marker Stake RP Centerline or Parallel to Centerline Spacing®, <£> at each junction box location < 50' on tangents & curves when R> 1000' & < 25' on curves when R < 1 000' or where grades 0.30% for catch basins: at centerline of box, ends of box & wings & at each end of the local depression CD < 50' & along end slopes & conic transitions < 50' and at beginning & end of: each wall, BC & EC, layout line angle points, changes in footing dimensions &/or elevation & wall height 10' to 33' as required by the Engineer, BC & EC, transition points & at beginning & end. Elevation points on footings at bottom of columns 10' to 33' sufficient to use string lines, BC & EC, transition points & at beginning & end. Elevation points on footings at bottom of columns <50' < 50' on tangents & curves when R^ 1000' & < 25' on curves when R < 1000' or where grades 0.30% intervisible & < 100', BC & EC of facilities, Grade breaks, Alignment breaks, Junctions, Inlets & similar facilities At sign location intervisible & < 50', BC & EC of facilities, Grade breaks, Alignment breaks, Junctions, Inlets & similar facilities, Risers & similar facilities longitudinal location for asphalt street surfacing < 50' on tangents & curves when R> 1000' & < 25' on curves when R< 1000'. At beginning & end and < 50' on tangents & curves when R £ 1 000' & ^ 25' on curves when R< 1000' At beginning & end 10' to 33' as required by the Engineer, BC & EC, transition points & at beginning & end. Elevation points on footings & at invert 200' on tangents, 50' on curves when Lateral Spacing <3>, ® as appropriate as appropriate as appropriate as appropriate as appropriate as appropriate as appropriate along contour line as appropriate as appropriate Line point as appropriate At beginning & end At marker location(s) at railing & barrier location(s) as appropriate as appropriate at pavement marker Setting Tolerance (Within) Vertical J/8" Horizontal & V4" Vertical J/e" Horizontal & when depth cannot be measured from existing pavement V4" Vertical V Horizontal & V4" Vertical (when vertical data needed) 0.1' Vertical & Horizontal V4" Horizontal & V4" Vertical •V Horizontal & V4" Vertical V Horizontal & V4" Vertical 0.1' Verticals Horizontal V Horizontal & V4" Vertical 0.1' Horizontals V4" Vertical 0.1 'Verticals Horizontal 0.1' Horizontal & V4" Vertical 0.1' Horizontals V4" Vertical V4" Horizontal •Va" Horizontal & Vertical 0.1' Horizontal & Vertical V Horizontal & V Vertical V4" Horizontal Revised 11701706 Contract No. 3907 Page 55 of 141 Pages Feature Staked Stake Description Centerline or Parallel to Centerline Spacing®, <B> R k 1000' & 25' on curves when R £ 1000'. For PCC surfaced streets lane cold joints will suffice Lateral Spacing <3>, ® location(s) Setting Tolerance (Within)o Staking for feature may be omitted when adjacent marker stakes reference the offset and elevation of those features and the accuracy requirements of the RP meet the requirements for the feature ® Reference points shall be sufficiently durable and set securely enough to survive with accuracy intact throughout the installation & inspection of the features or adjacent facilities for which they provide control. RP means reference point for the purposes of this table ® Perpendicular to centerline. 0 Some features are not necessarily parallel to centerline but are referenced thereto ® Multi-plane surfaced features shall be staked so as to provide line & grade information for each plane of the feature © > means greater than, or equal to, the number following the symbol. < means less than, or equal to, the number fol- lowing the symbol. © The cut datum for storm drainage & sanitary sewer pipes & similar structures shall be their invert. The cut datum for all other utilities shall be the top of their pipe or conduit. All guard stakes, line stakes and lath shall be flagged. Unless otherwise approved by the Engineer flagging, paint and marking cards shall be the color specified in TABLE 2-9.2.2(6) TABLE 2-9.2.2(6) Survey Stake Color Code for Construction Staking Type of Stake Horizontal Control Vertical Control Clearing Grading Structure Drainage, Sewer, Curb Right-of-Way Miscellaneous Description Coordinated control points, control lines, control reference points, centerline, alignments, etc. Bench marks Limits of clearing Slope, intermediate slope, abutment fill, rough grade, contour grading, final grade, etc. Bridges, sound and retaining walls, box culverts, etc. Pipe culverts, junction boxes, drop inlets, headwalls, sewer lines, storm drains, slope protection, curbs, gutters, etc. Fences, R/ W lines, easements, property monuments, etc. Signs, railings, barriers, lighting, etc. Color* White/Red White/Orange Yellow/Black Yellow White Blue White/Yellow Orange * Flagging and marking cards, if used. O 2-9.2.3 Payment for Survey, Payment for work performed to satisfy the requirements of Sections 2- 9.1 through 2-9.2.2 shall be included in the actual bid items requiring the survey work and no additional payment will be made. Extension of unit prices for extra work shall include full compensation for attendant survey work and no additional payment will be made. Payment for the replacement of disturbed monuments and the filing of records of survey and/or corner records, including filing fees, shall be incidental to the work necessitating the disturbance of said monuments and no additional payment will be made. 2-9.3 Private Engineers. Surveying by private engineers on the Work shall conform to the quality and practice required by the Engineer. 2-9.4 Line and Grade. All work shall conform to the lines, elevations, and grades shown on the Plans. Three consecutive points set on the same slope shall be used together so that any variation from a straight grade can be detected. Any such variation shall be reported to the Engineer. In the absence of such report, the Contractor shall be responsible for any error in the grade of the finished work. Revised 11/01/06 Contract No. 3907 Page 56 of 141 Pages Grades for underground conduits will be set at the surface of the ground. The Contractor shall transfer them to the bottom of the trench. 2-10 AUTHORITY OF BOARD AND ENGINEER. The Board has the final authority in all matters affecting the Work. Within the scope of the Contract, the Engineer has the authority to enforce compliance with the Plans and Specifications. The Contractor shall promptly comply with instructions from the Engineer or an authorized representative. The decision of the Engineer is final and binding on all questions relating to: quantities; acceptability of material, equipment, or work; execution, progress or sequence of work; and interpretation of the Plans, Specifications, or other drawings. This shall be precedent to any payment under the Contract, unless otherwise ordered by the Board. 2-10.1 Availability of Records, The Contractor shall, at no charge to the Agency, provide copies of all records in the Contractor's or subcontractor's possession pertaining to the work that the Engineer may request. 2-10.2 Audit And Inspection, Contractor agrees to maintain and/or make available, to the Engineer, within San Diego County, accurate books and accounting records relative to all its activities and to contractually require all subcontractors to this Contract to do the same. The Engineer shall have the right to monitor, assess, and evaluate Contractor's and its subcontractors performance pursuant to this Agreement, said monitoring, assessments, and evaluations to include, but not be limited to, audits, inspection of premises, reports, contracts, subcontracts and interviews of Contractor's staff and the staff of all subcontractors to this contract. At any time during normal business hours and as often as the Engineer may deem necessary, upon reasonable advance notice, Contractor shall make available to the Engineer for examination, all of its, and all subcontractors to this contract, records with respect to all matters covered by this Contract and will permit the Engineer to audit, examine, copy and make excerpts or transcripts from such data and records, and to make audits of all invoices, materials, payrolls, records of personnel, and other data relating to all matters covered by this Contract. However, any such activities shall be carried out in a manner so as to not unreasonably interfere with Contractor's ongoing business operations. Contractor and all subcontractors to this contract shall maintain such data and records for as long as may be required by applicable laws and regulations. 2-11 INSPECTION. The Work is subject to inspection and approval by the Engineer. The Contractor shall notify the Engineer before noon of the working day before inspection is required. Work shall be done only in the presence of the Engineer, unless otherwise authorized. Any work done without proper inspection will be subject to rejection. The Engineer and any authorized representatives shall at all times have access to the Work during its construction at shops and yards as well as the project site. The Contractor shall provide every reasonable facility for ascertaining that the materials and workmanship are in accordance with these specifications. Inspection of the Work shall not relieve the Contractor of the obligation to fulfill all conditions of the Contract. Revised 11/01/06 Contract No. 3907 Page 57 of 141 Pages SECTION 3 - CHANGES IN WORK 3-1 CHANGES REQUESTED BY THE CONTRACTOR. 3-1.1 General. Changes in the Plans and Specifications, requested in writing by the Contractor, which do not materially affect the Work and which are not detrimental to the Work or to the interests of the Agency, may be granted by the Engineer. Nothing herein shall be construed as granting a right to the Contractor to demand acceptance of such changes. 3-1.2 Payment for Changes Requested by the Contractor. If such changes are granted, they shall be made at a reduction in cost or no additional cost to the Agency. 3-2 CHANGES INITIATED BY THE AGENCY. 3-2.1 General. The Agency may change the Plans, Specifications, character of the work, or quantity of work provided the total arithmetic dollar value of all such changes, both additive and deductive, does not exceed 25 percent of the Contract Price. Should it become necessary to exceed this limitation, the change shall be by written Supplemental Agreement between the Contractor and Agency, unless both parties agree to proceed with the change by Change Order. Change Orders shall be in writing and state the dollar value of the change or established method of payment, any adjustment in contract time of completion, and when negotiated prices are involved, shall provide for the Contractor's signature indicating acceptance. 3-2.2 Payment. 3-2.2.1 Contract Unit Prices. If a change is ordered in an item of work covered by a Contract Unit Price, and such change does not involve substantial change in character of the work from that shown on the Plans or specified in the Specifications, then an adjustment in payment will be made. This adjustment will be based upon the increase or decrease in quantity and the Contract Unit Price. If the actual quantity of an item of work covered by a Contract Unit Price and constructed in conformance with the Plans and Specifications varies from the Bid quantity by 25 percent or less, payment will be made at the Contract Unit Price. If the actual quantity of said item of work varies from the Bid quantity by more than 25 percent, payment will be made per Section 3-2.2.2 or 3-2.2.3 as appropriate. If a change is ordered in an item of work covered by a Contract Unit Price, and such change does involve a substantial change in the character of the work from that shown on the Plans or specified in the Specifications, an adjustment in payment will be made per Section 3-2.4. 3-2.2.2 Increases of More Than 25 Percent. Should the actual quantity of an item of work covered by a Contract Unit Price and constructed in conformance with the Plans and Specifications, exceed the Bid quantity by more than 25 percent, payment for the quantity in excess of 125 percent of the Bid quantity will be made on the basis of an adjustment in the Contract Unit Price mutually agreed to by the Contractor and the Agency, or at the option of the Engineer, on the basis of Extra Work per Section 3-3. The Extra Work per Section 3-3, basis of payment, shall not include fixed costs. Fixed costs shall be deemed to have been recovered by the Contractor through payment for 125 percent of the Bid quantity at the Contract Unit Price. Revised 11/01/06 Contract No. 3907 Page 58 of 141 Pages 3-2.2.3 Decreases of More Than 25 Percent. Should the actual quantity of an item of work covered by a Contract Unit Price, and constructed in conformance with the Plans and Specifications, be less than 75 percent of the Bid quantity, an adjustment in payment will not be made unless so requested in writing by the Contractor. If the Contractor so requests, payment will be made on the basis of an adjustment in the Contract Unit Price mutually agreed to by the Contractor and the Agency, or at the option of the Engineer, on the basis of Extra Work per Section 3-3; however, in no case will payment be less than would be made for the actual quantity at the Contract Unit Price nor more than would be made for 75 percent of the Bid quantity at the Contract Unit Price. 3-2.3 Stipulated Unit Prices. Stipulated Unit Prices are unit prices established by the Agency in the Contract Documents as distinguished from Contract Unit Prices submitted by the Contractor. Stipulated Unit Prices may be used for the adjustment of Contract changes when so specified in the Special Provisions. 3-2.4 Agreed Prices. Agreed Prices are prices for new or unforeseen work, or adjustments in Contract Unit Prices per Section 3-2.2, established by mutual agreement between the Contractor and the Agency. If mutual agreement can not be reached, the Engineer may direct the Contractor to proceed on the basis of Extra Work in accordance per Section 3-3, except as otherwise specified in Sections 3-2.2.2 and 3-2.2.3. 3.2.5 Eliminated Items. Should any Bid item be eliminated in its entirety, payment will be made to the Contractor for its actual costs incurred in connection with the eliminated item prior to notification in writing from the Engineer so stating its elimination. If material conforming to the Plans and Specifications is ordered by the Contractor for use in the eliminated item prior to the date of notification of elimination by the Engineer, and if the order for that material can not be canceled, payment will be made to the Contractor for the actual cost of the material. In this case, the material shall become the property of the Agency. Payment will be made to the Contractor for its actual costs for any further handling. If the material is returnable, the material shall be returned and payment will be made to the Contractor for the actual cost of charges made by the supplier for returning the material and for handling by the Contractor. Actual costs, as used herein, shall be computed on the basis of Extra Work per Section 3-3. 3-3 EXTRA WORK. 3-3.1 General. New or unforeseen work will be classified as "extra work" when the Engineer determines that it is not covered by Contract Unit Prices or stipulated unit prices. 3-3.2 Payment. 3-3.2.1 General. When the price for the extra work cannot be agreed upon, the Agency will pay for the extra work based on the accumulation of costs as provided herein. 3-3.2.2 Basis for Establishing Costs. (a) Labor. The costs of labor will be the actual cost for wages of workers performing the extra work at the time the extra work is done, plus employer payments of payroll taxes, workers compensation insurance, liability insurance, health and welfare, pension, vacation, apprenticeship funds, and other direct costs, resulting from Federal, State, or local laws, as well as assessments or benefits required by lawful collective bargaining agreements. The use of a labor classification which would increase the extra work cost will not be permitted unless the Contractor establishes the necessity for such additional costs. Labor costs for equipment operators and helpers shall be reported only when such costs are not included in the invoice for Revised 11/01/06 Contract No. 3907 Page 59 of 141 Pages equipment rental. The labor cost for foremen shall be proportioned to all of their assigned work and only that applicable to extra work will be paid. Nondirect labor costs, including superintendence, shall be considered part of the markup of Section 3-3.2.3 (a). (b) Materials. The cost of materials reported shall be at invoice or lowest current price at which such materials are locally available and delivered to the job site in the quantities involved, plus sales tax, freight, and delivery. The Agency reserves the right to approve materials and sources of supply, or to supply materials to the Contractor if necessary for the progress of the Work. No markup shall be applied to any material provided by the Agency. (c) Tool and Equipment Rental. No payment will be made for the use of tools which have a replacement value of $200 or less. Regardless of ownership, the rates and right-of-way delay factors to be used in determining rental and delay costs shall be the edition of the, "Labor Surcharge and Equipment Rental Rates" published by CALTRANS, current at the time of the actual use of the tool or equipment. The right-of-way delay factors therein shall be used as multipliers of the rental rates for determining the value of costs for delay to the Contractor and subcontractors, if any. The labor surcharge rates published therein are not a part of this contract. The rental rates paid shall include the cost of fuel, oil, lubrication, supplies, small tools, necessary attachments, repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals. Necessary loading and transportation costs for equipment used on the extra work shall be included. If equipment is used intermittently and, when not in use, could be returned to its rental source at less expense to the Agency than holding it at the Work site, it shall be returned, unless the Contractor elects to keep it at the Work site, at no expense to the Agency. All equipment shall be acceptable to the Engineer, in good working condition, and suitable for the purpose for which it is to be used. Manufacturer's ratings and approved modifications shall be used to classify equipment and it shall be powered by a unit of at least the minimum rating recommended by the manufacturer. The reported rental time for equipment already at the Work site shall be the duration of its use on the extra work. This time begins when equipment is first put into actual operation on the extra work, plus the time required to move it from its previous site and back, or to a closer site. (d) Other Items. The Agency may authorize other items which may be required on the extra work, including labor, services, material, and equipment. These items must be different in their nature from those required for the Work, and be of a type not ordinarily available from the Contractor or Subcontractors. Invoices covering all such items in detail shall be submitted with the request for payment. (e) Invoices. Vendors' invoices for material, equipment rental and other expenditures shall be submitted with the request for payment. If the request for payment is not substantiated by invoices or other documentation, the Agency may establish the cost of the item involved at the lowest price which was current at the time of the report. Revised 11/01/06 Contract No. 3907 Page 60 of 141 Pages 3-3.2.3 Markup. (a) Work by Contractor. The following percentages shall be added to the Contractor's costs and shall constitute the markup for all overhead and profits: 1) Labor 20 2) Materials 15 3) Equipment Rental 15 4) Other Items and Expenditures .. 15 To the sum of the costs and markups provided for in this section, 1 percent shall be added as compensation for bonding. (b) Work by Subcontractor. When all or any part of the extra work is performed by a Subcontractor, the markup established in Section 3-3.2.3(a) shall be applied to the Subcontractor's actual cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor. 3-3.3 Daily Reports by Contractor. When the price for the extra work cannot be agreed upon, the Contractor shall submit a daily report to the Engineer on forms approved by the Agency. Included are applicable delivery tickets, listing all labor, materials, and equipment involved for that day, and other services and expenditures when authorized. Payment for extra work will not be made until such time that the Contractor submits completed daily reports and all supporting documents to the Engineer. Failure to submit the daily report by the close of the next working day may waive any rights for that day. An attempt shall be made to reconcile the report daily, and it shall be signed by the Engineer and the Contractor. In the event of disagreement, pertinent notes shall be entered by each party to explain points which cannot be resolved immediately. Each party shall retain a signed copy of the report. Reports by Subcontractors or others shall be submitted through the Contractor. The report shall: 1. Show names of workers, classifications, and hours worked. 2. Describe and list quantities of materials used. 3. Show type of equipment, size, identification number, and hours of operation, including loading and transportation, if applicable. 4. Describe other services and expenditures in such detail as the Agency may require. 3-4 CHANGED CONDITIONS. The Contractor shall promptly notify the Engineer of the following Work site conditions (hereinafter called changed conditions), in writing, upon their discovery and before they are disturbed: 1. Subsurface or latent physical conditions differing materially from those represented in the Contract; 2. Unknown physical conditions of an unusual nature differing materially from those ordinarily encountered and generally recognized as inherent in work of the character being performed; and 3. Material differing from that represented in the Contract which the Contractor believes may be hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required Revised 11/01/06 Contract No. 3907 Page 61 of 141 Pages to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of ^"»^ existing law. The Engineer will promptly investigate conditions which appear to be changed conditions. If the Engineer determines that conditions are changed conditions and they will materially affect performance time, the Contractor, upon submitting a written request, will be granted an extension of time subject to the provisions of 6-6. If the Engineer determines that the conditions do not justify an adjustment in compensation, the Contractor will be notified in writing. This notice will also advise the Contractor of its obligation to notify the Engineer in writing if the Contractor disagrees. The Contractor's failure to give notice of changed conditions promptly upon their discovery and before they are disturbed shall constitute a waiver of all claims in connection therewith. The Contractor shall not be entitled to the payment of any additional compensation for any act, or failure to act, by the Engineer, including failure or refusal to issue a change order, or for the happening of any event, thing, occurrence, or other cause, unless the Contractor shall have first given the Engineer due written notice of potential claim as hereinafter specified. Compliance with this section shall not be required as a prerequisite to notice provisions in Section 6-7.3 Contract Time Accounting, nor to any claim that is based on differences in measurement or errors of computation as to contract quantities. The written notice of potential claim for changed conditions shall be submitted by the Contractor to the Engineer upon their discovery and prior to the time that the Contractor performs the work giving rise to the potential claim. The Contractor's failure to give written notice of potential claim for changed conditions to the agency upon their discovery and before they are disturbed shall constitute a waiver of all claims in connection therewith. The Contractor shall provide the City with a written document containing a description of the particular circumstances giving rise to the potential claim, the reasons for which the Contractor believes additional compensation may be due and nature of any and all costs involved within 20 working days of the date of service of the written notice of potential claim for changed conditions. Verbal notifications are disallowed. The potential claim shall include the following certification relative to the California False Claims Act, Government Code Sections 12650-12655. "The undersigned certifies that the above statements are made in full cognizance of the California False Claims Act, Government Code Sections 12650-12655. The undersigned further understands and agrees that this potential claim, unless resolved, must be restated as a claim in response to the City's propojledjloal enupate in order for it to be further considered." Title: Thowifl ^ L- firswrn Date: Company Name: SVnTft Ru \ffc> W^>\ , \Y\G- The Contractor's estimate of costs may be updated when actual costs are known. The Contractor shall submit substantiation of its actual costs to the Engineer within 20 working days after the affected work is completed. Failure to do so shall be sufficient cause for denial of any claim subsequently filed on the basis of said notice of potential claim. ^% Revised 11/01/06 Contract No. 3907 Page 62 of 141 Pages It is the intention of this section that differences between the parties arising under and by virtue of the contract be brought to the attention of the Engineer at the earliest possible time in order that such matters be settled, if possible, or other appropriate action promptly taken. 3-5 DISPUTED WORK. The Contractor shall give the agency written notice of potential claim prior to commencing any disputed work. Failure to give said notice shall constitute a waiver of all claims in connection therewith. If the contractor and the agency are unable to reach agreement on disputed work, the Agency may direct the contractor to proceed with the work. Prior to proceeding with dispute resolution pursuant to Public Contract Code provisions specified hereinafter, the contractor shall attempt to resolve all disputes informally through the following dispute resolution chain of command: 1. Project Inspector 2. Construction Manager 3. Deputy City Engineer, Construction Management & Inspection 4. City Engineer 5. City Manager The Contractor shall submit a complete report within 20 working days after completion of the disputed work stating its position on the claim, the contractual basis for the claim, along with all documentation supporting the costs and all other evidentiary materials. At each level of claim or appeal of claim the City will, within 10 working days of receipt of said claim or appeal of claim, review the Contractor's report and respond with a position, request additional information or request that the Contractor meet and present its report. When additional information or a meeting is requested the City will provide its position within 10 working days of receipt of said additional information or Contractor's presentation of its report. The Contractor may appeal each level's position up to the City Manager after which the Contractor may proceed under the provisions of the Public Contract Code. The authority within the dispute resolution chain of command is limited to recommending a resolution to a claim to the City Manager. Actual approval of the claim is subject to the change order provisions in the contract. All claims by the contractor for $375,000 or less shall be resolved in accordance with the procedures in the Public Contract Code, Division 2, Part 3, Chapter 1, Article 1.5 (commencing with Section 20104) which is set forth below: ARTICLE 1.5 RESOLUTION OF CONSTRUCTION CLAIMS 20104. (a)(1) This article applies to all public works claims of three hundred seventy-five thousand dollars ($375,000) or less which arise between a contractor and a local agency. (2) This article shall not apply to any claims resulting from a contract between a contractor and a public agency when the public agency has elected to resolve any disputes pursuant to Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2. (b)(1) "Public work" has the same meaning as in Sections 3100 and 3106 of the Civil Code, except that "public work" does not include any work or improvement contracted for by the state or the Regents of the University of California. (2) "Claim" means a separate demand by the contractor for (A) a time extension, (B) payment of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public work and payment of which is not otherwise expressly provided for or the claimant is not otherwise entitled to, or (C) an amount the payment of which is disputed by the local agency. A•^ Revised 11/01/06 Contract No. 3907 Page 63 of 141 Pages (c) The provisions of this article or a summary thereof shall be set forth in the plans or specifications for any work which may give rise to a claim under this article. (d) This article applies only to contracts entered into on or after January 1, 1991. 20104.2. For any claim subject to this article, the following requirements apply: (a) The claim shall be in writing and include the documents necessary to substantiate the claim. Claims must be filed on or before the date of final payment. Nothing in this subdivision is intended to extend the time limit or supersede notice requirements otherwise provided by contract for the filing of claims. (b)(1) For claims of less than fifty thousand dollars ($50,000), the local agency shall respond in writing to any written claim within 45 days of receipt of the claim, or may request, in writing, within 30 days of receipt of the claim, any additional documentation supporting the claim or relating to defenses to the claim the local agency may have against the claimant. (2) If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of the local agency and the claimant. (3) The local agency's written response to the claim, as further documented, shall be submitted to the claimant within 15 days after receipt of the further documentation or within a period of time no greater than that taken by the claimant in producing the additional information, whichever is greater. (c)(1) For claims of over fifty thousand dollars ($50,000) and less than or equal to three hundred seventy-five thousand dollars ($375,000), the local agency shall respond in writing to all written claims within 60 days of receipt of the claim, or may request, in writing, within 30 days of receipt of the claim, any additional documentation supporting the claim or relating to defenses to the claim the local agency may have against the claimant. (2) If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of the local agency and the claimant. (3) The local agency's written response to the claim, as further documented, shall be submitted to the claimant within 30 days after receipt of the further documentation, or within a period of time no greater than that taken by the claimant in producing the additional information or requested documentation, whichever is greater. (d) If the claimant disputes the local agency's written response, or the local agency fails to respond within the time prescribed, the claimant may so notify the local agency, in writing, either within 15 days of receipt of the local agency's response or within 15 days of the local agency's failure to respond within the time prescribed, respectively, and demand an informal conference to meet and confer for settlement of the issues in dispute. Upon a demand, the local agency shall schedule a meet and confer conference within 30 days for settlement of the dispute. (e) Following the meet and confer conference, if the claim or any portion remains in dispute, the claimant may file a claim as provided in Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time the claimant submits his or her written claim pursuant to subdivision (a) until the time that claim is denied as a result of the meet and confer process, including any period of time utilized by the meet and confer process. (f) This article does not apply to tort claims and nothing in this article is intended nor shall be construed to change the time periods for filing tort claims or actions specified by Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. 20104.4. The following procedures are established for all civil actions filed to resolve claims subject to this article: (a) Within 60 days, but no earlier than 30 days, following the filing or responsive pleadings, the court shall submit the matter to non-binding mediation unless waived by mutual stipulation of both parties. The mediation process shall provide for the selection within 15 days by both parties of a disinterested third person as mediator, shall be commenced within 30 days of the submittal, and shall be Revised 11/01/06 Contract No. 3907 Page 64 of 141 Pages concluded within 15 days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court or by stipulation of both parties. If the parties fail to select a mediator within the 15-day period, any party may petition the court to appoint the mediator. (b)(1) If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1141.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil procedure) shall apply to any proceeding brought under the subdivision consistent with the rules pertaining to judicial arbitration. (2) Notwithstanding any other provision of law, upon stipulation of the parties, arbitrators appointed for purposes of this article shall be experienced in construction law, and, upon stipulation of the parties, mediators and arbitrators shall be paid necessary and reasonable hourly rates of pay not to exceed their customary rate, and such fees and expenses shall be paid equally by the parties, except in the case of arbitration where the arbitrator, for good cause, determines a different division. In no event shall these fees or expenses be paid by state or county funds. (3) In addition to Chapter 2.5 (commencing with Section 1141.10) Title 3 of Part 3 of the Code of Civil Procedure, any party who after receiving an arbitration award requests a trial de novo but does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, pay the attorney's fees of the other party arising out of the trial de novo. (c) The court may, upon request by any party, order any witnesses to participate in the mediation or arbitration process. 20104.6. (a) No local agency shall fail to pay money as to any portion of a claim which is undisputed except as otherwise provided in the contract. (b) In any suit filed under Section 20104.4, the local agency shall pay interest at the legal rate on any arbitration award or judgment. The interest shall begin to accrue on the date the suit is filed in a court of law. Although not to be construed as proceeding under extra work provisions, the Contractor shall keep and furnish records of disputed work in accordance with Section 3-3. SECTION 4 - CONTROL OF MATERIALS 4-1 MATERIALS AND WORKMANSHIP. 4-1.1. General. All materials, parts, and equipment furnished by the Contractor in the Work shall be new, high grade, and free from defects. Quality of work shall be in accordance with the generally accepted standards. Material and work quality shall be subject to the Engineer's approval. Materials and work quality not conforming to the requirements of the Specifications shall be considered defective and will be subject to rejection. Defective work or material, whether in place or not, shall be removed immediately from the site by the Contractor, at its expense, when so directed by the Engineer. If the Contractor fails to replace any defective or damaged work or material after reasonable notice, the Engineer may cause such work or materials to be replaced. The replacement expense will be deducted from the amount to be paid to the Contractor. Used or secondhand materials, parts, and equipment may be used only if permitted by the Specifications. 4-1.2 Protection of Work and Materials. The Contractor shall provide and maintain storage facilities and employ such measures as will preserve the specified quality and fitness of materials to be used in the Work. Stored materials shall be reasonably accessible for inspection. The Contractor Revised 11/01/06 Contract No. 3907 Page 65 of 141 Pages shall also adequately protect new and existing work and all items of equipment for the duration of the Contract. The Contractor shall not, without the Agency's consent, assign, sell, mortgage, hypothecate, or remove equipment or materials which have been installed or delivered and which may be necessary for the completion of the Contract. 4-1.3 Inspection Requirements. 4-1.3.1 General. Unless otherwise specified, inspection is required at the source for such typical materials and fabricated items as bituminous paving mixtures, structural concrete, metal fabrication, metal casting, welding, concrete pipe manufacture, protective coating application, and similar shop or plant operations. Steel pipe in sizes less than 18 inches and vitrified clay and cast iron pipe in all sizes are acceptable upon certification as to compliance with the Specifications, subject to sampling and testing by the Agency. Standard items of equipment such as electric motors, conveyors, elevators, plumbing fixtures, etc., are subject to inspection at the job site only. Special items of equipment such as designed electrical panel boards, large pumps, sewage plant equipment, etc., are subject to inspection at the source, normally only for performance testing. The Specifications may require inspection at the source for other items not typical of those listed in this section. The Contractor shall provide the Engineer free and safe access to any and all parts of work at any time. Such free and safe access shall include means of safe access and egress, ventilation, lighting, shoring, dewatering and all elements pertaining to the safety of persons as contained in the State of California, California Code of Regulations, Title 8, Industrial Relations, Chapter 4, Division of Industrial Safety, Subchapter 4, Construction Safety Orders and such other safety regulations as may apply. Contractor shall furnish Engineer with such information as may be necessary to keep the Engineer fully informed regarding progress and manner of work and character of materials. Inspection or testing of the whole or any portion of the work or materials incorporated in the work shall not relieve Contractor from any obligation to fulfill this Contract. 4-1.3.2 Inspection of Materials Not Locally Produced. When the Contractor intends to purchase materials, fabricated products, or equipment from sources located more than 50 miles outside the geographical limits of the Agency, an inspector or accredited testing laboratory (approved by the Engineer), shall be engaged by the Contractor at its expense, to inspect the materials, equipment or process. This approval shall be obtained before producing any material or equipment. The inspector or representative of the testing laboratory shall judge the materials by the requirements of the Plans and Specifications. The Contractor shall forward reports required by the Engineer. No material or equipment shall be shipped nor shall any processing, fabrication or treatment of such materials be done without proper inspection by the approved agent. Approval by said agent shall not relieve the Contractor of responsibility for complying with the Contract requirements. 4-1.3.3 Inspection by the Agency. The Agency will provide all inspection and testing laboratory services within 50 miles of the geographical limits of the Agency. For private contracts, all costs of inspection at the source, including salaries and mileage costs, shall be paid by the permittee. Revised 11/01/06 Contract No. 3907 Page 66 of 141 Pages 4-1.4 Test of Material. Before incorporation in the Work, the Contractor shall submit samples of materials, as the Engineer may require, at no cost to the Agency. The Contractor, at its expense, shall deliver the materials for testing to the place and at the time designated by the Engineer. Unless otherwise provided, all initial testing will be performed under the direction of the Engineer, and at no expense to the Contractor. If the Contractor is to provide and pay for testing, it will be stated in the Specifications. For private contracts, the testing expense shall be borne by the permittee. The Contractor shall notify the Engineer in writing, at least 15 days in advance, of its intention to use materials for which tests are specified, to allow sufficient time to perform the tests. The notice shall name the proposed supplier and source of material. If the notice of intent to use is sent before the materials are available for testing or inspection, or is sent so far in advance that the materials on hand at the time will not last but will be replaced by a new lot prior to use on the Work, it will be the Contractor's responsibility to renotify the Engineer when samples which are representative may be obtained. Except as specified in these Provisions, the Agency will bear the cost of testing of locally produced materials and/or on-site workmanship where the results of such tests meet or exceed the requirements indicated in the Standard Specifications, Technical Specification, and any Supplemental Provisions. The cost of all other tests shall be borne by the Contractor. At the option of the Engineer, the source of supply of each of the materials shall be approved by the Engineer before the delivery is started. All materials proposed for use may be inspected or tested at any time during their preparation and use. If, after incorporating such materials into the Work, it is found that sources of supply that have been approved do not furnish a uniform product, or if the product from any source proves unacceptable at any time, the Contractor shall furnish approved material from other approved sources. If any product proves unacceptable after improper storage, handling or for any other reason it shall be rejected, not incorporated into the work and shall be removed from the project site all at the Contractor's expense. Compaction tests may be made by the Engineer and all costs for tests that meet or exceed the requirements of the specifications shall be borne by the Agency. Said tests may be made at any place along the work as deemed necessary by the Engineer. The costs of any retests made necessary by noncompliance with the specifications shall be borne by the Contractor. 4-1.5 Certification. The Engineer may waive materials testing requirements of the Specifications and accept the manufacturer's written certification that the materials to be supplied meet those requirements. Material test data may be required as part of the certification. 4-1.6 Trade Names or Equals. The Contractor may supply any of the materials specified or offer an equivalent. The Engineer shall determine whether the material offered is equivalent to that specified. Adequate time shall be allowed for the Engineer to make this determination. Whenever any particular material, process, or equipment is indicated by patent, proprietary or brand name, or by name of manufacturer, such wording is used for the purpose of facilitating its description and shall be deemed to be followed by the words or equal. A listing of materials is not intended to be comprehensive, or in order of preference. The Contractor may offer any material, process, or equipment considered to be equivalent to that indicated. The substantiation of offers shall be submitted as provided in the contract documents. The Contractor shall, at its expense, furnish data concerning items offered by it as equivalent to those specified. The Contractor shall have the material tested as required by the Engineer to determine that the quality, strength, physical, chemical, or other characteristics, including durability, Revised 11/01/06 Contract No. 3907 Page 67 of 141 Pages finish, efficiency, dimensions, service, and suitability are such that the item will fulfill its intended function. Test methods shall be subject to the approval of the Engineer. Test results shall be reported promptly to the Engineer, who will evaluate the results and determine if the substitute item is equivalent. The Engineer's findings shall be final. Installation and use of a substitute item shall not be made until approved by the Engineer. If a substitute offered by the Contractor is not found to be equal to the specified material, the Contractor shall furnish and install the specified material. The specified Contract completion time shall not be affected by any circumstance developing from the provisions of this section. The Contractor is responsible for the satisfactory performance of substituted items. If, in the sole opinion of the Engineer, the substitution is determined to be unsatisfactory in performance, appearance, durability, compatibility with associated items, availability of repair parts and suitability of application the Contractor shall remove the substituted item and replace it with the originally specified item at no cost to the Agency. 4-1.7 Weighing and Metering Equipment. All scales and metering equipment used for proportioning materials shall be inspected for accuracy and certified within the past 12 months by the State of California Bureau of Weights and Measures, by the County Director or Sealer of Weights and Measures, or by a scale mechanic registered with or licensed by the County. The accuracy of the work of a scale service agency, except as stated herein, shall meet the standards of the California Business and Professions Code and the California Code of Regulations pertaining to weighing devices. A certificate of compliance shall be presented, prior to operation, to the Engineer for approval and shall be renewed whenever required by the Engineer at no cost to the Agency. All scales shall be arranged so they may be read easily from the operator's platform or area. They shall indicate the true net weight without the application of any factor. The figures of the scales shall be clearly legible. Scales shall be accurate to within 1 percent when tested with the plant shut down. Weighing equipment shall be so insulated against vibration or moving of other operating equipment in the plant area that the error in weighing with the entire plant running will not exceed 2 percent for any setting nor 1.5 percent for any batch. 4-1.8 Calibration of Testing Equipment Testing equipment, such as, but not limited to pressure gages, metering devices, hydraulic systems, force (load) measuring instruments, and strain- measuring devices shall be calibrated by a testing agency acceptable to the Engineer at intervals not to exceed 12 months and following repairs, modification, or relocation of the equipment. Calibration certificates shall be provided when requested by the Engineer. Revised 11/01/06 Contract No. 3907 Page 68 of 141 Pages 4-1.9 Construction Materials Dispute Resolution (Soils, Rock Materials, Concrete, Mortar and Related Materials, Masonry Materials, Bituminous Materials, Rock Products, and Modified Asphalts). In the interest of safety and public value, whenever credible evidence arises to contradict the test values of materials, the Agency and the Contractor will initiate an immediate and cooperative investigation. Test values of materials are results of the materials' tests, as defined by these Specifications or by the special provisions, required to accept the Work. Credible evidence is process observations or test values gathered using industry accepted practices. A contradiction exists whenever test values or process observations of the same or similar materials are diverse enough such that the work acceptance or performance becomes suspect. The investigation shall allow access to all test results, procedures, and facilities relevant to the disputed work and consider all available information and, when necessary, gather new and additional information in an attempt to determine the validity, the cause, and if necessary, the remedy to the contradiction. If the cooperative investigation reaches any resolution mechanism acceptable to both the Agency and the Contractor, the contradiction shall be considered resolved and the cooperative investigation concluded. Whenever the cooperative investigation is unable to reach resolution, the investigation may then either conclude without resolution or continue by written notification of one party to the other requesting the implementation of a resolution process by committee. The continuance of the investigation shall be contingent upon recipient's agreement and acknowledged in writing within 3 calendar days after receiving a request. Without acknowledgement, the investigation shall conclude without resolution. The committee shall consist of three State of California Registered Civil Engineers. Within 7 calendar days after the written request notification, the Agency and the Contractor will each select one engineer. Within 14 calendar days of the written request notification, the two selected engineers will select a third engineer. The goal in selection of the third member is to complement the professional experience of the first two engineers. Should the two engineers fail to select the third engineer, the Agency and the Contractor shall each propose 2 engineers to be the third member within 21 calendar days after the written request notification. The first two engineers previously selected shall then select one of the four proposed engineers in a blind draw. The committee shall be a continuance of the cooperative investigation and will re-consider all available information and if necessary gather new and additional information to determine the validity, the cause, and if necessary, the remedy to the contradiction. The committee will focus upon the performance adequacy of the material(s) using standard engineering principles and practices and to ensure public value, the committee may provide engineering recommendations as necessary. Unless otherwise agreed, the committee will have 30 calendar days from its formation to complete their review and submit their findings. The final resolution of the committee shall be by majority opinion, in writing, stamped and signed. Should the final resolution not be unanimous, the dissenter may attach a written, stamped, and signed minority opinion. Once started, the resolution process by committee shall continue to full conclusion unless: 1. Within 7 days of the formation of the committee, the Agency and the Contractor reach an acceptable resolution mechanism; or 2. Within 14 days of the formation of the committee, the initiating party withdraws its written notification and agrees to bear all investigative related costs thus far incurred; or 0Revised 11/01/06 Contract No. 3907 Page 69 of 141 Pages 3. At any point by the mutual agreement of the Agency and the Contractor. Unless otherwise agreed, the Contractor shall bear and maintain a record for all the investigative costs until resolution. Should the investigation discover assignable causes for the contradiction, the assignable party, the Agency or the Contractor, shall bear all costs associated with the investigation. Should assignable causes for the contradiction extended to both parties, the investigation will assign costs cooperatively with each party or when necessary, equally. Should the investigation substantiate a contradiction without assignable cause, the investiga- tion will assign costs cooperatively with each party or when necessary, equally. Should the investigation be unable to substantiate a contradiction, the initiator of the investigation shall bear all investigative costs. All claim notification requirements of the contract pertaining to the contradiction shall be suspended until the investigation is concluded. 4-2 MATERIALS TRANSPORTATION, HANDLING AND STORAGE. The Contractor shall order, purchase, transport, coordinate delivery, accept delivery, confirm the quantity and quality received, prepare storage area(s), store, handle, protect, move, relocate, remove and dispose excess of all materials used to accomplish the Work. Materials shall be delivered to the site of the work only during working hours, as defined in Section 6-7.2, and shall be accompanied by bills of lading that shall clearly state for each delivery: the name of the Contractor as consignee, the project name and number, address of delivery and name of consignor and a description of the material(s) shipped. Prior to storage of any materials which have been shipped to or by the Contractor to any location within the Agency's boundaries the Contractor shall provide the Engineer a copy of lease agreements for each property where such materials are stored. The lease agreement shall clearly state the term of the lease, the description of materials allowed to be stored and shall provide for the removal of the materials and restoration of the storage site within the time allowed for the Work. All such storage shall conform to all laws and ordinances that may pertain to the materials stored and to preparation of the storage site and the location of the site on which the materials are stored. Loss, damage or deterioration of all stored materials shall be the Contractor's responsibility. Conformance to the requirements of this section, both within and outside the limits of work are a part of the Work. The Engineer shall have the right to verify the suitability of materials and their proper storage at any time during the Work. SECTION 5 - UTILITIES 5-1 LOCATION. The Agency and affected utility companies have, by a search of known records, endeavored to locate and indicate on the Plans, all utilities which exist within the limits of the work. However, the accuracy and/or completeness of the nature, size and/or location of utilities indicated on the Plans is not guaranteed. Where underground main distribution conduits such as water, gas, sewer, electric power, telephone, or cable television are shown on the Plans, the Contractor shall assume that every property parcel will be served by a service connection for each type of utility. As provided in Section 4216 of the California Government Code, at least 2 working days prior to commencing any excavation, the Contractor shall contact the regional notification center (Underground Service Alert of Southern California) and obtain an inquiry identification number. The California Department of Transportation is not required by Section 4216 to become a member of the regional notification center. The Contractor shall contact it for location of its subsurface installations. The Contractor shall determine the location and depth of all utilities, including service connections, which have been marked by the respective owners and which may affect or be affected by its Revised 1 1/01/06 Contract No. 3907 Page 70 of 141 Pages operations. If no pay item is provided in the Contract for this work, full compensation for such work shall be considered as included in the prices bid for other items of work. 5-2 PROTECTION. The Contractor shall not interrupt the service function or disturb the support of any utility without authority from the owner or order from the Agency. All valves, switches, vaults, and meters shall be maintained readily accessible for emergency shutoff. Where protection is required to ensure support of utilities located as shown on the Plans or in accordance with Section 5-1, the Contractor shall, unless otherwise provided, furnish and place the necessary protection at its expense. Upon learning of the existence and location of any utility omitted from or shown incorrectly on the Plans, the Contractor shall immediately notify the Engineer in writing. When authorized by the Engineer, support or protection of the utility will be paid for as provided in Section 3-2.2.3 or 3-3. The Contractor shall immediately notify the Engineer and the utility owner if any utility is disturbed or damaged. The Contractor shall bear the costs of repair or replacement of any utility damaged if located as noted in Section 5-1. When placing concrete around or contiguous to any non-metallic utility installation, the Contractor shall at its expense: 1. Furnish and install a 2 inch cushion of expansion joint material or other similar resilient material; or 2. Provide a sleeve or other opening which will result in a 2 inch minimum-clear annular space between the concrete and the utility; or 3. Provide other acceptable means to prevent embedment in or bonding to the concrete. Where concrete is used for backfill or for structures which would result in embedment, or partial embedment, of a metallic utility installation; or where the coating, bedding or other cathodic protection system is exposed or damaged by the Contractor's operations, the Contractor shall notify the Engineer and arrange to secure the advice of the affected utility owner regarding the procedures required to maintain or restore the integrity of the system. 5-3 REMOVAL. Unless otherwise specified, the Contractor shall remove all interfering portions of utilities shown on the Plans or indicated in the Bid documents as "abandoned" or "to be abandoned in place". Before starting removal operations, the Contractor shall ascertain from the Agency whether the abandonment is complete, and the costs involved in the removal and disposal shall be included in the Bid for the items of work necessitating such removals. 5-4 RELOCATION. When feasible, the owners responsible for utilities within the area affected by the Work will complete their necessary installations, relocations, repairs, or replacements before commencement of work by the Contractor. When the Plans or Specifications indicate that a utility installation is to be relocated, altered, or constructed by others, the Agency will conduct all negotiations with the owners and work will be done at no cost to the Contractor, except for manhole frame and cover sets to be brought to grade as provided in the Standard Specifications for Public Works Construction, Section 301-1.6, 2006 Edition, and the 2006 supplements thereto. Utilities which are relocated in order to avoid interference shall be protected in their position and the cost of such protection shall be included in the Bid for the items of work necessitating such relocation. Revised 11/01/06 Contract No. 3907 Page 71 of 141 Pages After award of the Contract, portions of utilities which are found to interfere with the Work will be relocated, altered or reconstructed by the owners, or the Engineer may order changes in the Work to avoid interference. Such changes will be paid for in accordance with Section 3-2. When the Plans or Specifications provide for the Contractor to alter, relocate, or reconstruct a utility, all costs for such work shall be included in the Bid for the items of work necessitating such work. Temporary or permanent relocation or alteration of utilities requested by the Contractor for its convenience shall be its responsibility and it shall make all arrangements and bear all costs. The utility owner will relocate service connections as necessary within the limits of the Work or within temporary construction or slope easements. When directed by the Engineer, the Contractor shall arrange for the relocation of service connections as necessary between the meter and property line, or between a meter and the limits of temporary construction or slope easements. The relocation of such service connections will be paid for in accordance with provisions of Section 3-3. Payment will include the restoration of all existing improvements which may be affected thereby. The Contractor may agree with the owner of any utility to disconnect and reconnect interfering service connections. The Agency will not be involved in any such agreement. In conformance with Section 5-6 the Contractor shall coordinate the work with utility agencies and companies. Prior to the installation of any and all utility structures within the limits of work by any utility agency or company, or its contractor, the Contractor shall place all curb or curb and gutter that is a part of the work and adjacent to the location where such utility structures are shown on the plans and are noted as being located, relocated or are otherwise shown as installed by others. In order to minimize delays to the Contractor caused by the failure of other parties to relocate utilities that interfere with the construction, the Contractor, upon the Engineer's approval, may be permitted to temporarily omit the portion of work affected by the utility. If such temporary omission is approved by the Engineer the Contractor shall place survey or other physical control markers sufficient to locate the curb or curb and gutter to the satisfaction of the utility agency or company. Such temporary omission shall be for the Contractor's convenience and no additional compensation will be allowed therefore or for additional work, materials or delay associated with the temporary omission. The portion thus omitted shall be constructed by the Contractor immediately following the relocation of the utility involved unless otherwise directed by the Engineer. 5-5 DELAYS. The Contractor shall notify the Engineer of its construction schedule insofar as it affects the protection, removal, or relocation of utilities. Said notification shall be included as a part of the construction schedule required in Section 6-1. The Contractor shall notify the Engineer in writing of any subsequent changes in the construction schedule which will affect the time available for protection, removal, or relocation of utilities. The Contractor will not be entitled to damages or additional payment for delays attributable to utility relocations or alterations if correctly located, noted, and completed in accordance with Section 5-1. The Contractor may be given an extension of time for unforeseen delays attributable to unreasonably protracted interference by utilities in performing work correctly shown on the Plans. The Agency will assume responsibility for the timely removal, relocation, or protection of existing main or trunkline utility facilities within the area affected by the Work if such utilities are not identified in the Contract Documents. The Contractor will not be assessed liquidated damages for any delay caused by failure of Agency to provide for the timely removal, relocation, or protection of such existing facilities. If the Contractor sustains loss due to delays attributable to interferences, relocations, or alterations not covered by Section 5-1, which could not have been avoided by the judicious handling of forces, equipment, or plant, there shall be paid to the Contractor such amount as the Engineer may find to Revised 11/01/06 Contract No. 3907 Page 72 of 141 Pages be fair and reasonable compensation for such part of the Contractor's actual loss as was unavoidable and the Contractor may be granted an extension of time. 5-6 COOPERATION. When necessary, the Contractor shall so conduct its operations as to permit access to the Work site and provide time for utility work to be accomplished during the progress of the Work. SECTION 6 - PROSECUTION, PROGRESS, AND ACCEPTANCE OF THE WORK 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK. Except as otherwise provided herein and unless otherwise prohibited by permits from other agencies as may be required by law the Contractor shall begin work within 15 calendar days after receipt of the "Notice to Proceed". 6-1.1 Pre-Construction Meeting. After, or upon, notification of contract award, the Engineer will set the time and location for the Preconstruction Meeting. Attendance of the Contractor's management personnel responsible for the management, administration, and execution of the project is mandatory for the meeting to be convened. Failure of the Contractor to have the Contractor's responsible project personnel attend the Preconstruction Meeting will be grounds for default by Contractor per Section 6-4. No separate payment will be made for the Contractor's attendance at the meeting. The notice to proceed will only be issued on or after the completion of the preconstruction meeting. 6-1.1.1 Baseline Construction Schedule Submittal. The Contractor shall submit the Baseline Construction Schedule per the submittal requirements of Section 2-5.3. The submittal of the Baseline Construction Schedule shall include each item and element of Sections 6-1.2 through 6- 1.2.9 and shall be on hard (paper) copy and electronic media conforming to Section 6-1.3.3 Electronic Media. 6-1.2 Preparation and Review of the Baseline Construction Schedule. The Contractor shall prepare the Baseline Construction Schedule as a Critical Path Method (CPM) Schedule in the precedence diagram method (activity-on-node) format. The Baseline Construction Schedule shall depict a workable plan showing the sequence, duration, and interdependence of all activities required to represent the complete performance of all project work as well as periods where work is precluded. The Baseline Construction Schedule shall begin with the projected date of issuance of the notice to proceed and conclude with the date of final completion per the contract duration. The Baseline Construction Schedule shall include detail of all project phasing, staging, and sequencing, including all milestones necessary to define beginning and ending of each phase or stage. 6-1.2.1 Time-Scaled Network Diagram. As a part of the Baseline Construction Schedule the Contractor shall prepare and submit to the Engineer a complete time-scaled network diagram showing all of the activities, logic relationships, and milestones comprising the schedule. 6-1.2.2 Tabular Listing. As a part of the Baseline Construction Schedule the Contractor shall prepare and submit to the Engineer a tabular listing of all of the activities, showing for each activity the identification number, the description, the duration, the early start, the early finish, the late start, the late finish, the total float, and all predecessor and successor activities for the activity described. 6-1.2.3 Bar Chart As a part of the Baseline Construction Schedule the Contractor shall prepare and submit to the Engineer a chart showing individual tasks and their durations arranged with the tasks Revised 11/01/06 Contract No. 3907 Page 73 of 141 Pages on the vertical axis and duration on the horizontal axis. The bar chart shall use differing texture patterns or distinctive line types to show the critical path. 6-1.2.4 Schedule Software. The Contractor shall use commercially available software equal to the Windows 2000 compatible "Suretrak" program by Primavera or "Project" program by Microsoft Corporation to prepare the Baseline Construction Schedule and all updates thereto. The Contractor shall submit to the Agency a CD-ROM data disk with all network information contained thereon, in a format readable by a Microsoft Windows 2000 system. The Agency will use a "Suretrak", "Project" or equal software program for review of the Contractor's schedule. Should the Contractor elect to use a scheduling program other than the "Suretrak" program by Primavera or "Project" program by Microsoft Corporation the Contractor shall provide the Engineer three copies of the substituted program that are fully licensed to the Agency and 32 class hours of on-site training by the program publisher for up to eight Agency staff members. The classes shall be presented on Mondays through Thursdays, inclusive, between the hours of 8:00 a.m. and 5:00 p.m. The on-site training shall be held at 1635 Faraday Avenue, Carlsbad, California. The dates and times of the on-site training shall be submitted to the Engineer for approval five working days before the start of the on-site training. The on-site training shall be completed prior to the submittal of the first Baseline Construction Schedule. 6-1.2.5 Schedule Activities. Except for submittal activities, activity durations shall not be shorter than 1 working day nor longer than 15 working days, unless specifically and individually allowed by the Engineer. The Baseline Construction Schedule shall include between 100 and 500 activities, including submittals, interfaces between utility companies and other agencies, project milestones and equipment and material deliveries. The number of activities will be sufficient, in the judgment of the Engineer, to communicate the Contractor's plan for project execution, to accurately describe the project work, and to allow monitoring and evaluation of progress and of time impacts. Each activity's description shall accurately define the work planned for the activity and each activity shall have recognizable beginning and end points. 6-1.2.6 Float. Float or slack time within the schedule is available without charge or compensation to whatever party or contingency first exhausts it. 6-1.2.7 Restraints to Activities. Any submittals, utility interfaces, or any furnishing of Agency supplied materials, equipment, or services, which may impact any activity's construction shall be shown as a restraint to those activities. Time periods to accommodate the review and correction of submittals shall be included in the schedule. 6-1.2.8 Late Completion. A Baseline Construction Schedule showing a project duration longer than the specified contract duration will not be acceptable and will be grounds for determination of default by Contractor, per Section 6-4. 6-1.2.9 Early Completion. The Baseline Construction Schedule will show the Contractor's plan to support and maintain the project for the entire contractual time span of the project. Should the Contractor propose a project duration shorter than contract duration, a complete Baseline Construction Schedule must be submitted, reflecting the shorter duration, in complete accordance with all schedule requirements of Section 6-1 . The Engineer may choose to accept the Contractor's proposal of a project duration shorter than the duration specified; provided the Agency is satisfied the shortened Baseline Construction Schedule is reasonable and the Agency and all other entities, public and private, which interface with the project are able to support the provisions of the shortened Baseline Construction Schedule. The Agency's acceptance of a shortened duration project will be confirmed through the execution of a contract change order revising the project duration and implementing all contractual requirements including liquidated damages in accordance with the revised duration. Revised 1 1/01/06 Contract No. 3907 Page 74 of 141 Pages 6-1 .2.10 Engineer's Review. The Construction Schedule is subject to the review of the Engineer. The Engineer's determination that the Baseline Construction Schedule proposed by the Contractor complies with the requirements of these supplemental provisions shall be a condition precedent to issuance of the Notice to Proceed by the Engineer. If the Engineer determines that the Construction Schedule does not meet the requirements of these specifications the Contractor shall correct the Construction Schedule to meet these specifications and resubmit it to the Engineer. Failure of the Contractor to obtain the Engineer's determination that the initial Construction Schedule proposed by the Contractor complies with the requirements of these supplemental provisions within thirty (30) working days after the date of the preconstruction meeting shall be grounds for termination of the contract per Section 6-4. Days used by the Engineer to review the initial Construction Schedule will not be included in the 30 working days. The Engineer will review and return to the Contractor, with any comments, the Baseline Construction Schedule within 15 working days of submittal. The Baseline Construction Schedule will be returned marked as per Sections 6-1.2.10.1 through 6-1.2.10.3. 6-1.2.10.1 "Accepted." The Contractor may proceed with the project work upon issuance of the Notice to Proceed, and will receive payment for the schedule in accordance with Section 6-1.8.1. 6-1.2.10.2 "Accepted with Comments." The Contractor may proceed with the project work upon issuance of the Notice to Proceed. The Contractor must resubmit the schedule incorporating the comments prior to receipt of payment per Section 6-1 .8.1 . 6-1.2.10.3 "Not Accepted." The Contractor must resubmit the schedule incorporating the corrections and changes of the comments prior to receipt of payment per Section 6-1 .8.1 . The Notice to Proceed will not be issued by the Engineer if the changes of the comments are not submitted as required hereinbefore and marked "Accepted" or "Accepted with Comments" by the Engineer. The Contractor, at the sole option of the Engineer, may be considered as having defaulted the contract under the provisions of Section 6-4 DEFAULT BY CONTRACTOR if the changes of the comments are not submitted as required hereinbefore and marked "Accepted" by the Engineer. 6-1.3 Preparation of Schedule Updates and Revisions. The Contractor shall meet with the Engineer during the last week of each month to agree upon each activity's schedule status and shall submit monthly updates of the Baseline Construction Schedule confirming the agreements no later than the fifth working day of the following month. The monthly update will be submitted on hard (paper) copy and electronic media conforming to Section 6-1.3.3 Electronic Media per the submittal requirements of Section 2-5.3 and will include each item and element of Sections 6-1 .2 through 6- 1.2.9 and 6-1.3.1 through 6-1.3.7. 6-1.3.1 Actual Activity Dates. The actual dates each activity was started and/or completed during the month. After first reporting an actual date, the Contractor shall not change that actual date in later updates without specific notification to the Engineer with the update. 6-1.3.2 Activity Percent Complete. For each activity underway at the end of the month, the Contractor shall report the percentage determined by the Engineer as complete for the activity. 6-1.3.3 Electronic Media. The schedule data disk shall be a CD-ROM, labeled with the project name and number, the Contractor's name and the date of preparation of the schedule data disk. The schedule data disk shall be readable by the software specified in Section 6-1.2.4 "Schedule Software" and shall be free of file locking, encryption or any other protocol that would impede full access of all data stored on it. Revised 11/01/06 Contract No. 3907 Page 75 of 141 Pages 6-1.3.4 List of Changes. A list of all changes made to the activities or to the interconnecting logic, with an explanation for each change. 6-1.3.5 Change Orders. Each monthly update will include the addition of the network revisions reflecting the change orders approved in the previous month. The network revisions will be as agreed upon during the review and acceptance of the Contractor's change orders. 6-1.3.6 Bar Chart Each monthly update will include a chart showing individual tasks and their durations arranged with the tasks on the vertical axis and duration on the horizontal axis. The bar chart shall use differing texture patterns or distinctive line types to show the critical path. 6-1.4 Engineer's Review of Updated Construction Schedule. The Engineer will review and return the Updated Construction Schedule to the Contractor, with any comments, within 5 working days of submittal. The Updated Construction Schedule will be returned marked as per Sections 6-1.4.1 through 6-1.4.3. Any Updated Construction Schedule marked "Accepted with Comments" or "Not Accepted" by the Engineer will be returned to the Contractor for correction. Upon resubmittal the Engineer will review and return the resubmitted Updated Construction Schedule to the Contractor, with any comments, within 5 working days. Failure of the Contractor to submit a monthly updated construction schedule will invoke the same consequences as the Engineer returning a monthly updated construction schedule marked "Not Accepted". 6-1.4.1 "Accepted." The Contractor may proceed with the project work, and will receive payment for the schedule in accordance with Section 6-1.8.2. 6-1.4.2 "Accepted with Comments." The Contractor may proceed with the project work. The Contractor must resubmit the Updated Construction Schedule to the Engineer incorporating the corrections and changes noted in the Engineer's comments prior to receipt of payment per Section 6-1.8.2. 6-1.4.3 "Not Accepted." The Contractor must resubmit the Updated Construction Schedule to the Engineer incorporating the corrections and changes noted in the Engineer's comments prior to receipt of payment per Section 6-1.8.2. The Contractor, at the sole option of the Engineer, may be considered as having defaulted the contract under the provisions of Section 6-4 DEFAULT BY CONTRACTOR if the changes of the comments are not submitted and marked "Accepted" by the Engineer before the last day of the month in which the Updated Construction Schedule is due. If the Contractor fails to submit the corrected Updated Construction Schedule as required herein the Contractor may elect to proceed with the project at its own risk. Should the Contractor elect not to proceed with the project, any resulting delay, impact, or disruption to the project will be the Contractor's responsibility. 6-1.5 Late Completion or Milestone Dates. Should the Schedule Update indicate a completion or contractually required milestone date later than the properly adjusted contract or milestone duration, the Agency may withhold Liquidated Damages for the number of days late. Should a subsequent "Accepted" Schedule Update remove all or a portion of the delay, all or the allocated portion of the previously held Liquidated Damages shall be released in the monthly payment to the Contractor immediately following the "Accepted" schedule. 6-1.6 Interim Revisions. Should the actual or projected progress of the work become substantially different from that depicted in the Project Schedule, independently of and prior to the next monthly update, the Contractor will submit a revised Baseline Construction Schedule, with a list and explanation of each change made to the schedule. The Revised Construction Schedule will be submitted per the submittal requirements of Section 2-5.3 and per the schedule review and acceptance requirements of Section 6-1, including but not limited to the acceptance and payment Revised 11/01/06 Contract No. 3907 Page 76 of 141 Pages provisions. As used in this section "substantially different" means a time variance greater than 5 percent of the number of days of duration for the project. 6-1.7 Final Schedule Update. The Contractor shall prepare and submit a final schedule update when one hundred percent of the construction work is completed. The Contractor's Final Schedule Update must accurately represent the actual dates for all activities. The final schedule update shall be prepared and reviewed per Sections 6-1.3 Preparation of Schedule Updates and Revisions and 6-1. 4 Engineer's Review of Updated Construction Schedule. Acceptance of the final schedule update is required for completion of the project and release of any and all funds retained per Section 9-3.2. 6-1.8 Measurement and Payment. Construction Schedule will be paid for at the stipulated lump sum price of thirty-five thousand dollars ($35,000.00). The stipulated lump sum price paid for Construction Schedule shall include full compensation for furnishing all labor, materials including, but not limited to, the computer hardware and software, tools, equipment, and incidentals; and for doing all the work involved in attending meetings, preparing, furnishing, updating, revising the tabular, bar and flow chart Construction Schedules and narrative reports required by these supplemental provisions and as directed by the Engineer. The Engineer's determination that each and any construction schedule proposed by the Contractor complies with the requirements of these supplemental provisions shall be precedent to each and any payment for the Construction Schedule. Payments for Construction Schedule will be made as per Sections 6-1.8.1 through 6-1.8.3. 6-1.8.1 Initial Payment. Ten thousand dollars ($10,000.00) of the stipulated lump sum bid for the Construction Schedule will be made when the Engineer has accepted a Construction Schedule for this project 6-1.8.2 Monthly Updated Construction Schedule Payments. Monthly Updated Construction Schedule Payments of one thousand two hundred dollars ($1,200.00) will be made subsequent to the initial payment for the Construction Schedule for each monthly Construction Schedule, updated as required herein, that the Engineer has accepted as sufficient within the month that the monthly progress payment pertains. No payment shall be made, nor shall any payment accrue, for any monthly updated construction schedule that is not marked "Accepted" by the Engineer on or before the twentieth working day of the month such monthly updated construction schedule is due per Section 6-1.3 Preparation of Schedule Updates and Revisions. The sum of the amounts paid for Construction Schedule during the initial and subsequent payment periods, or extensions to the contract, shall not exceed the stipulated lump sum price for Construction Schedule. 6-1.8.3 Concluding Payment. A Final payment of seven thousand dollars ($7,000.00) for the Construction Schedule will be made when both one hundred percent of the contract work is completed and the Engineer has accepted a final construction schedule update prepared and submitted by the Contractor as required herein that shows the actual beginning and ending dates and all other data that is required for baseline and update schedules for each activity shown on the baseline construction schedule and updates thereto that the Engineer accepted for this project. 6-2 PROSECUTION OF WORK. To minimize public inconvenience and possible hazard and to restore street and other work areas to their original condition and state of usefulness as soon as practicable, the Contractor shall diligently prosecute the Work to completion. If the Engineer determines that the Contractor is failing to prosecute the Work to the proper extent, the Contractor shall, upon orders from the Engineer, immediately take steps to remedy the situation. All costs of prosecuting the Work as described herein shall be included in the Contractor's Bid. Should the Contractor fail to take the necessary steps to fully accomplish said purposes, after orders of the Engineer, the Engineer may suspend the work in whole or part, until the Contractor takes said steps. A•^ Revised 11/01/06 Contract No. 3907 Page 77 of 141 Pages As soon as possible under the provisions of the Specifications, the Contractor shall backfill all excavations and restore to usefulness all improvements existing prior to the start of the Work. If Work is suspended through no fault of the Agency, all expenses and losses incurred by the Contractor during such suspensions shall be borne by the Contractor. If the Contractor fails to properly provide for public safety, traffic, and protection of the Work during periods of suspension, the Agency may elect to do so, and deduct the cost thereof from monies due the Contractor. Such actions will not relieve the Contractor from liability. 6-2.1 Order of Work. The work to be done shall consist of furnishing all labor, equipment and materials, and performing all operations necessary to complete the Project Work as shown on the Project Plans and as specified in the Specifications. The work includes planting and irrigation with supporting earthwork within San Marcos Creek. The work is necessary to implement the wetlands . mitigation restoration plan for Rancho Santa Fe Road North realignment and widening. The work shown on Drawing No's. 368-2E and 368-2M is located within and adjacent to San Marcos Creek easterly of the Melrose Drive bridge over San Marcos Creek in the City of San Marcos. The timing for this work shall be coordinated with the construction management & inspection division of the City of Carlsbad. 6-2.3 Project Meetings. The Engineer will establish the time and location of bi-weekly Project Meetings. A different frequency for these meetings may be agreed to at the preconstruction meeting if agreed to by all parties and appropriate notification of such changes are given. The Contractor's Representative shall attend each Project Meeting. The Project Representative shall be the individual determined under Section 7-6, "The Contractor's Representative". No separate payment for attendance of the Contractor, the Contractor's Representative or any other employee or subcontractor or subcontractor's employee at these meetings will be made. 6-3 SUSPENSION OF WORK. 6-3.1 General. The Work may be suspended in whole or in part when determined by the Engineer that the suspension is necessary in the interest of the Agency. The Contractor shall comply immediately with any written order of the Engineer. Such suspension shall be without liability to the Contractor on the part of the Agency except as otherwise specified in Section 6-6.3. 6-3.2 Archaeological and Paleontological Discoveries. If discovery is made of items of archaeological or paleontological interest, the Contractor shall immediately cease excavation in the area of discovery and shall not continue until ordered by the Engineer. When resumed, excavation operations within the area of discovery shall be as directed by the Engineer. Discoveries which may be encountered may include, but not be limited to, dwelling sites, stone implements or other artifacts, animal bones, human bones, and fossils. The Contractor shall be entitled to an extension of time and compensation in accordance with the provisions of Section 6-6. 6-4 DEFAULT BY CONTRACTOR. If the Contractor fails to begin delivery of material and equipment, to commence the Work within the time specified, to maintain the rate of delivery of material, to execute the Work in the manner and at such locations as specified, or fails to maintain the Work schedule which will insure the Agency's interest, or, if the Contractor is not carrying out the intent of the Contract, the Agency may serve written notice upon the Contractor and the Surety on its Faithful Performance Bond demanding satisfactory compliance with the Contract. Revised 11/01/06 Contract No. 3907 Page 78 of 141 Pages The Contract may be canceled by the Board without liability for damage, when in the Board's opinion the Contractor is not complying in good faith, has become insolvent, or has assigned or subcontracted any part of the Work without the Board's consent. In the event of such cancellation, the Contractor will be paid the actual amount due based on Contract Unit Prices or lump sums bid and the quantity of the Work completed at the time of cancellation, less damages caused to the Agency by acts of the Contractor. The Contractor, in having tendered a Bid, shall be deemed to have waived any and all claims for damages because of cancellation of Contract for any such reason. If the Agency declares the Contract canceled for any of the above reasons, written notice to that effect shall be served upon the Surety. The Surety shall, within five (5) days, assume control and perform the Work as successor to the Contractor. If the Surety assumes any part of the Work, it shall take the Contractor's place in all respects for that part, and shall be paid by the Agency for all work performed by it in accordance with the Contract. If the Surety assumes the entire Contract, all money due the Contractor at the time of its default shall be payable to the Surety as the Work progresses, subject to the terms of the Contract. If the Surety does not assume control and perform the Work within 5 days after receiving notice of cancellation, or fails to continue to comply, the Agency may exclude the Surety from the premises. The Agency may then take possession of all material and equipment and complete the Work by Agency forces, by letting the unfinished Work to another Contractor, or by a combination of such methods. In any event, the cost of completing the Work shall be charged against the Contractor and its Surety and may be deducted from any money due or becoming due from the Agency. If the sums due under the Contract are insufficient for completion, the Contractor or Surety shall pay to the Agency within 5 days after the completion, all costs in excess of the sums due. The provisions of this section shall be in addition to all other rights and remedies available to the Agency under law. 6-5 TERMINATION OF CONTRACT. The Board may terminate the Contract at its own discretion or when conditions encountered during the Work make it impossible or impracticable to proceed, or when the Agency is prevented from proceeding with the Contract by act of God, by law, or by official action of a public authority. 6-6 DELAYS AND EXTENSIONS OF TIME. 6-6.1 General. If delays are caused by unforeseen events beyond the control of the Contractor, such delays will entitle the Contractor to an extension of time as provided herein, but the Contractor will not be entitled to damages or additional payment due to such delays, except as provided in 6-6.3. Such unforeseen events may include: war, government regulations, labor disputes, strikes, fires, floods, adverse weather or elements necessitating cessation of work, inability to obtain materials, labor or equipment, required extra work, or other specific events as may be further described in the Specifications. No extension of time will be granted for a delay caused by the Contractor's inability to obtain materials unless the Contractor furnishes to the Engineer documentary proof, the proof must be provided in a timely manner in accordance with the sequence of the Contractor's operations and the approved construction schedule. If delays beyond the Contractor's control are caused by events other than those mentioned above, the Engineer may deem an extension of time to be in the best interests of the Agency. The Contractor will not be entitled to damages or additional payment due to such delays, except as provided in Section 6-6.3. Revised 11/01/06 Contract No. 3907 Page 79 of 141 Pages If delays beyond the Contractor's control are caused solely by action or inaction by the Agency, such delays will entitle the Contractor to an extension of time as provided in Section 6-6.2. 6-6.2 Extensions of Time. Extensions of time, when granted, will be based upon the effect of delays to the Work. They will not be granted for noncontrolling delays to minor portions of the Work unless it can be shown that such delays did or will delay the progress of the Work. 6-6.3 Payment for Delays to Contractor. The Contractor will be compensated for damages incurred due to delays for which the Agency is responsible. Such actual costs will be determined by the Engineer. The Agency will not be liable for damages which the Contractor could have avoided by any reasonable means, such as judicious handling of forces, equipment, or plant. The determination of what damages the Contractor could have avoided will be made by the Engineer. 6-6.4 Written Notice and Report. The Contractor shall provide written notice to the Engineer within two hours of the beginning of any period that the Contractor has placed any workers or equipment on standby for any reason that the Contractor has determined to be caused by the Agency or by any organization that the Agency may otherwise be obligated by. The Contractor shall provide continuing daily written notice to the Engineer, each working day, throughout the duration of such period of delay. The initial and continuing written notices shall include the classification of each workman and supervisor and the make and model of each piece of equipment placed on standby, the cumulative duration of the standby, the Contractor's opinion of the cause of the delay and a cogent explanation of why the Contractor could not avoid the delay by reasonable means. Should the Contractor fail to provide the notice(s) required by this section the Contractor agrees that no delay has occurred and that it will not submit any claim(s) therefore. 6-7 TIME OF COMPLETION. 6-7.1 General. The Contractor shall complete the Work within the time set forth in the Contract. The Contractor shall complete each portion of the Work within such time as set forth in the Contract for such portion. Unless otherwise specified, the time of completion of the Contract shall be expressed in working days. The Contractor shall diligently prosecute the work to completion within 315 working days after the starting date specified in the Notice to Proceed. 6-7.2 Working Day. A working day is any day within the period between the start of the Contract time as defined in Section 6-1 and the date provided for completion, or upon field acceptance by the Engineer for all work provided for in the Contract, whichever occurs first, other than: 1. Saturday, 2. Sunday, 3. any day designated as a holiday by the Agency, 4. any other day designated as a holiday in a Master Labor Agreement entered into by the Contractor or on behalf of the Contractor as an eligible member of a contractor association, 5. any day the Contractor is prevented from working at the beginning of the workday for cause as defined in Section 6-6.1, 6. any day the Contractor is prevented from working during the first 5 hours with at least 60 percent of the normal work force for cause as defined in Section 6-6.1. Unless otherwise approved in writing by the Engineer, the hours of work shall be between the hours of 7:00 a.m. and 4:00 p.m. on Mondays through Fridays, excluding Agency holidays. The Contractor shall obtain the written approval of the Engineer if the Contractor desires to work outside said hours or at any time during weekends and/or holidays. This written permission must be obtained at least 48 hours prior to such work The Engineer may approve work outside the hours and/or days stated Revised 11/01/06 Contract No. 3907 Page 80 of 141 Pages herein when, in his/her sole opinion, such work conducted by the Contractor is beneficial to the best interests of the Agency. The Contractor shall pay the inspection costs of such work. No work involving vegetation removal within the stream shall be performed by the contractor between March 15 to July 31 to avoid impacts to nesting birds. The Contractor shall incorporate the dates, areas and types of work prohibited in this section in the Construction Schedule required by Section 6.1. No additional payment, adjustment of bid prices or adjustment of contract time of completion will be allowed as a consequence of the prohibition of work being performed within the dates, areas and/or types of work prohibited in this section. 6-7.3 Contract Time Accounting. The Engineer will make a daily determination of each working day to be charged against the Contract time. These determinations will be discussed and the Contractor will be furnished a periodic statement showing allowable number of working days of Contract time, as adjusted, at the beginning of the reporting period. The statement will also indicate the number of working days charged during the reporting period and the number of working days of Contract time remaining. If the Contractor does not agree with the statement, it shall file a written protest within 15 days after receipt, setting forth the facts of the protest. Otherwise, the statement will be deemed to have been accepted. 6-8 COMPLETION, ACCEPTANCE, AND WARRANTY. The Work will be inspected by the Engineer for acceptance upon receipt of the Contractor's written assertion that the Work has been completed. The Engineer will not accept the Work or any portion of the Work before all of the Work is completed and all outstanding deficiencies that may exist are corrected by the Contractor and the Engineer is satisfied that all the materials and workmanship, and all other features of the Work, meet the requirements of all of the specifications for the Work. Use, temporary, interim or permanent, of all, or portions of, the Work does not constitute acceptance of the Work. If, in the Engineer's judgment, the Work has been completed and is ready for acceptance the Engineer will so certify to the Board. Upon such certification by the Engineer the Board may accept the completed Work. Upon the Board's acceptance of the Work the Engineer will cause a "Notice of Completion" to be filed in the office of the San Diego County Recorder. The date of recordation shall be the date of completion of the Work. All work shall be warranted for one (1) year after recordation of the "Notice of Completion" and any faulty work or materials discovered during the warranty period shall be repaired or replaced by the Contractor, at its expense. Twenty-five percent of the faithful performance bond shall be retained as a warranty bond for the one year warranty period. The Contractor shall replace or repair any such defective work in a manner satisfactory to the Engineer, after notice to do so from the Engineer, and within the time specified in the notice. If the Contractor fails to make such replacement or repairs within the time specified in the notice, the Agency may perform this work and the Contractor's sureties shall be liable for the cost thereof. 6-9 LIQUIDATED DAMAGES. Failure of the Contractor to complete the Work within the time allowed will result in damages being sustained by the Agency. For each consecutive calendar day in excess of the time specified for completion of Work, as adjusted in accordance with Section 6-6, the Contractor shall pay the Agency, or have withheld monies due it, the sum of Five Hundred Dollars ($500.00). Such sum is liquidated damages and shall not be construed as a penalty, and may be deducted from payments due the Contractor if such delay occurs. Execution of the Contract shall constitute agreement by the Agency and Contractor that Five Hundred Dollars ($500.00) per day is the minimum value of costs and actual damages caused by the Contractor to complete the Work within the allotted time. Any progress payments made after the specified completion date shall not constitute a waiver of this paragraph or of any damages. 6-10 USE OF IMPROVEMENT DURING CONSTRUCTION. The Agency reserves the right to take over and utilize all or part of any completed facility or appurtenance. The Contractor will be notified in Revised 11/01/06 Contract No. 3907 Page 81 of 141 Pages writing in advance of such action. Such action by the Agency will relieve the Contractor of responsibility for injury or damage to said completed portions of the improvement resulting from use by public traffic or from the action of the elements or from any other cause, except Contractor operations or negligence. The Contractor will not be required to reclean such portions of the improvement before field acceptance, except for cleanup made necessary by its operations. Nothing in this section shall be construed as relieving the Contractor from full responsibility for correcting defective work or materials. In the event the Agency exercises its right to place into service and utilize all or part of any completed facility or appurtenance, the Agency will assume the responsibility and liability for injury to persons or property resulting from the utilization of the facility or appurtenance so placed into service, except for any such injury to persons or property caused by any willful or negligent act or omission by the Contractor, Subcontractor, their officers, employees, or agents. SECTION 7 - RESPONSIBILITIES OF THE CONTRACTOR 7-1 CONTRACTOR'S EQUIPMENT AND FACILITIES. The Contractor shall furnish and maintain in good condition all equipment and facilities as required for the proper execution and inspection of the Work. Such equipment and facilities shall meet all requirements of applicable ordinances and laws. 7-2 LABOR. 7-2.1 General. Only competent workers shall be employed on the Work. Any person employed who is found to be incompetent, intemperate, troublesome, disorderly, or otherwise objectionable, or who fails or refuses to perform work properly and acceptably, shall be immediately removed from the Work by the Contractor and not be reemployed on the Work. 7-2.2 Laws. The Contractor, its agents, and employees shall be bound by and comply with applicable provisions of the Labor Code and Federal, State, and local laws related to labor. The Contractor shall strictly adhere to the provisions of the Labor Code regarding minimum wages; the 8-hour day and 40-hour week; overtime; Saturday, Sunday, and holiday work; and nondiscrimina- tion because of race, color, national origin, sex, or religion. The Contractor shall forfeit to the Agency the penalties prescribed in the Labor Code for violations. In accordance with the Labor Code, the Board has on file and will publish a schedule of prevailing wage rates for the types of work to be done under the Contract. The Contractor shall not pay less than these rates. Each worker shall be paid subsistence and travel as required by the collective bargaining agreement on file with the State of California Department of Industrial Relations. The Contractor's attention is directed to Section 1776 of the Labor Code which imposes responsibility upon the Contractor for the maintenance, certification, and availability for inspection of such records for all persons employed by the Contractor or Subcontractor in connection with the project. The Contractor shall agree through the Contract to comply with this Section and the remaining provisions of the Labor Code. 7-3 LIABILITY INSURANCE. Insurance shall be required as specified in section 10 of the Public Works Contract. The cost of this insurance shall be included in the Contractor's Bid. Revised 11/01/06 Contract No. 3907 Page 82 of 141 Pages 7-4 WORKERS' COMPENSATION INSURANCE. Before execution of the Contract by the Board, the Contractor shall file with the Engineer the following signed certification: "I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract." The Contractor shall also comply with Section 3800 of the Labor Code by securing, paying for, and maintaining in full force and effect for the duration of the contract, complete Workers' Compensation Insurance, and shall furnish a Certificate of Insurance to the Engineer before execution of the Contract. The Agency, its officers, or employees, will not be responsible for any claims in law or equity occasioned by failure of the Contractor to comply with this paragraph. All compensation insurance policies shall bear an endorsement or shall have attached a rider whereby it is provided that, in the event of expiration or proposed cancellation of such policies for any reason whatsoever, the Agency shall be notified by registered mail not less than 30 days before expiration or cancellation is effective. All insurance is to be placed with insurers that are admitted and authorized to conduct business in the state of California and are listed in the official publication of the Department of Insurance of the State of California. Policies issued by the State Compensation Fund meet the requirement for workers' compensation insurance. 7-5 PERMITS. Except as specified herein the Contractor will obtain, at no cost to the Contractor all City of San Marcos encroachment, right-of-way, grading and building permits necessary to perform work for this contract on Agency property, streets, or other rights-of-way. Contractor shall not begin work until all permits incidental to the work are obtained. The Contractor shall obtain and pay for all permits for the disposal of all materials removed from the project. The cost of said permit(s) shall be included in the price bid for the appropriate bid item and no additional compensation will be allowed therefore. The Contractor shall obtain and pay for all costs incurred for permits necessitated by its operations such as, but not limited to, those permits required for night work, overload, blasting, and demolition. For private contracts, the Contractor shall obtain all permits incidental to the Work or made necessary by its operations, and pay all costs incurred by the permit requirements. The Contractor shall pay all business taxes or license fees that are required for the work. 7-5.1 Resource Agency Permits. Resource agency permits for the Work are included in Appendix 'A of these supplemental provisions. Resource agency permits pertaining to this project include: 1) California Department of Fish and Game permit number SAA #5-142-00 issued in May 2001, and amendments dated September 1, 2003 and October 9, 2007. 2) California Water Quality Control Board permit number OOC-045 issued on January 8, 2001. 3) United States Army Corps of Engineers permit number 200001251 issued on August 24, 2000. 7-6 THE CONTRACTOR'S REPRESENTATIVE. Before starting work, the Contractor shall designate in writing a representative who shall have complete authority to act for it. An alternative representative may be designated as well. The representative or alternate shall be present at the Work site whenever work is in progress or whenever actions of the elements necessitate its presence to take measures necessary to protect the Work, persons, or property. Any order or Revised 11/01/06 Contract No. 3907 Page 83 of 141 Pages communication given to this representative shall be deemed delivered to the Contractor. A joint venture shall designate only one representative and alternate. In the absence of the Contractor or its representative, instructions or directions may be given by the Engineer to the superintendent or person in charge of the specific work to which the order applies. Such order shall be complied with promptly and referred to the Contractor or its representative. In order to communicate with the Agency, the Contractor's representative, superintendent, or person in charge of specific work shall be able to speak, read, and write the English language. 7-7 COOPERATION AND COLLATERAL WORK. The Contractor shall be responsible for ascertaining the nature and extent of any simultaneous, collateral, and essential work by others. The Agency, its workers and contractors and others, shall have the right to operate within or adjacent to the Work site during the performance of such work. The Agency, the Contractor, and each of such workers, contractors and others, shall coordinate their operations and cooperate to minimize interference. The Contractor shall include in its Bid all costs involved as a result of coordinating its work with others, the Contractor will not be entitled to additional compensation from the Agency for damages resulting from such simultaneous, collateral, and essential work. If necessary to avoid or minimize such damage or delay, the Contractor shall redeploy its work force to other parts of the Work. Should the Contractor be delayed by the Agency, and such delay could not have been reasonably foreseen or prevented by the Contractor, the Engineer will determine the extent of the delay, the effect on the project, and any extension of time. 7-7.1 Coordination. The Contractor shall coordinate and cooperate with all the utility companies during the relocation or construction of their lines. The Contractor may be granted a time extension if, in the opinion of the Engineer, a delay is caused by the utility company. No additional compensation will be made to the Contractor for any such delay. 7-8 PROJECT SITE MAINTENANCE. 7-8.1 Cleanup and Dust Control. Throughout all phases of construction, including suspension of work, and until the final acceptance, the Contractor shall keep the site clean and free from rubbish and debris. The Contractor shall also abate dust nuisance by cleaning, sweeping and sprinkling with water, or other means as necessary. The use of water resulting in mud on public streets will not be permitted as a substitute for sweeping or other methods. When required by the Plans or Specifications, the Contractor shall furnish and operate a self-loading motor sweeper with spray nozzles at least once each working day for the purpose of keeping paved areas acceptably clean wherever construction, including restoration, is incomplete. Materials and equipment shall be removed from the site as soon as they are no longer necessary. Before the final inspection, the site shall be cleared of equipment, unused materials, and rubbish so as to present a satisfactory clean and neat appearance. All cleanup costs shall be included in the Contractor's Bid. Care shall be taken to prevent spillage on haul routes. Any such spillage shall be removed immediately and the area cleaned. Revised 11/01/06 Contract No. 3907 Page 84 of 141 Pages Excess excavation material from catch basins or similar structures shall be removed from the site immediately. Sufficient material may remain for use as backfill if permitted by the Specifications. Forms and form lumber shall be removed from the site as soon as practicable after stripping. Failure of the Contractor to comply with the Engineer's cleanup orders may result in an order to suspend work until the condition is corrected. No additional compensation will be allowed as a result of such suspension. Cleanup and dust control required herein shall also be executed on weekends and other non-working days when needed to preserve the health safety or welfare of the public. The Contractor shall conduct effective cleanup and dust control throughout the duration of the Contract. The Engineer may require increased levels of cleanup and dust control that, in his/her sole discretion, are necessary to preserve the health, safety and welfare of the public. Cleanup and dust control shall be considered incidental to the items of work that they are associated with and no additional payment will be made therefore. 7-8.2 Air Pollution Control. The Contractor shall not discharge smoke, dust, or any other air contaminants into the atmosphere in such quantity as will violate the regulations of any legally constituted authority. 7-8.3 Vermin Control. At the time of acceptance, structures entirely constructed under the Contract shall be free of rodents, insects, vermin, and pests. Necessary extermination work shall be arranged and paid for by the Contractor as part of the Work within the Contract time, and shall be performed by a licensed exterminator in accordance with requirements of governing authorities. The Contractor shall be liable for injury to persons or property and responsible for the elimination of offensive odors resulting from extermination operations. 7-8.4 Sanitation. The Contractor shall provide and maintain enclosed toilets for the use of employees engaged in the Work. These accommodations shall be maintained in a neat and sanitary condition. They shall also comply with all applicable laws, ordinances, and regulations pertaining to public health and sanitation of dwellings and camps. Wastewater shall not be interrupted. Should the Contractor disrupt existing sewer facilities, sewage shall be conveyed in closed conduits and disposed of in a sanitary sewer system. Sewage shall not be permitted to flow in trenches or be covered by backfill. 7-8.5 Temporary Light, Power, and Water. The Contractor shall furnish, install, maintain, and remove all temporary light, power, and water at its own expense. These include piping, wiring, lamps, and other equipment necessary for the Work. The Contractor shall not draw water from any fire hydrant (except to extinguish a fire), without obtaining permission from the water agency concerned. The Contractor shall obtain a construction meter for water used for the construction, plant establishment, maintenance, cleanup, testing and all other work requiring water related to this contract. The Contractor shall contact the appropriate water agency for requirements. The Contractor shall pay all costs of temporary light, power and water including hookup, service, meter and any, and all, other charges, deposits and/or fees therefore. Said costs shall be considered incidental to the items of work that they are associated with and no additional payment will be made therefore. 7-8.6 Water Pollution Control. The Contractor shall exercise every reasonable precaution to protect channels, storm drains, and bodies of water from pollution. It shall conduct and schedule operations so as to minimize or avoid muddying and silting of said channels, drains, and waters. Water pollution control work shall consist of constructing those facilities which may be required to provide prevention, control, and abatement of water pollution. Revised 11/01/06 Contract No. 3907 Page 85 of 141 Pages The Contractor shall comply with the California State Water Resources Control Board (SWRCB) Order Number 99-08-DWQ, National Pollutant Discharge Elimination System (NPDES) General Permit Number CAS000002, Waste Discharge Requirements (WDR's) for Discharges of Stormwater Runoff associated with Construction Activity (General Permit) and subsequent adopted modifications and with all requirements of the Storm Water Pollution Prevention and Monitoring Plans for this project in accordance with these regulations. The Contractor shall be responsible for the preparation and implementation of the SWPPP and coordination with the City and the Regional Water Quality Control Board. All costs for preparing and implementing the Storm Water Pollution Prevention and Monitoring Plans and coordination with the City and the Regional Water Quality Control Board shall be included as part of the contract price bid. 7-8.7 Drainage Control. The Contractor shall maintain drainage within and through the work areas. Earth dams will not be permitted in paved areas. Temporary dams of sandbags, asphaltic concrete, or other acceptable material will be permitted when necessary. Such dams shall be removed from the site as soon as their use is no longer necessary. 7-8.8 Noise Control. All internal combustion engines used in the construction shall be equipped with mufflers in good repair when in use on the project with special attention to the City Noise Control Ordinance, Carlsbad Municipal Code Chapter 8.48. 7-9 PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS. The Contractor shall be responsible for the protection of public and private property adjacent to the Work and shall exercise due caution to avoid damage to such property. The Contractor shall repair or replace all existing improvements within the right-of-way which are not designated for removal (e.g., curbs, sidewalks, driveways, fences, walls, signs, utility installations, pavement, structures, etc.) which are damaged or removed as a result of its operations. When a portion of a sprinkler system within the right-of-way must be removed, the remaining lines shall be capped. Repairs and replacements shall be at least equal to existing improvements and shall match them in finish and dimension. Maintenance of street and traffic signal systems that are damaged, temporarily removed or relocated shall be done in conformance with 307-1.5. Trees, lawns, and shrubbery that are not to be removed shall be protected from damage or injury. If damaged or removed due to Contractor's operations, they shall be restored or replaced in as nearly the original condition and location as is reasonably possible. Lawns shall be reseeded and covered with suitable mulch. The Contractor shall give reasonable notice to occupants or owners of adjacent property to permit them to salvage or relocate plants, trees, fences, sprinklers, and other improvements, within the right-of-way which are designated for removal and would be destroyed because of the Work. All costs to the Contractor for protecting, removing, and restoring existing improvements shall be included in the Bid. 7-10 PUBLIC CONVENIENCE AND SAFETY. A*¥ Revised 11/01/06 Contract No. 3907 Page 86 of 141 Pages 7-10.1 Traffic and Access. The Contractor's operations shall cause no unnecessary inconvenience. The access rights of the public shall be considered at all times. Unless otherwise authorized, traffic shall be permitted to pass through the Work, or an approved detour shall be provided. Safe and adequate pedestrian and vehicular access shall be provided and maintained to: fire hydrants; commercial and industrial establishments; churches, schools and parking lots; service stations and motels; hospitals; police and fire stations; and establishments of similar nature. Access to these facilities shall be continuous and unobstructed unless otherwise approved by the Engineer. Safe and adequate pedestrian zones and public transportation stops, as well as pedestrian crossings of the Work at intervals not exceeding 90 m (300 feet), shall be maintained unless otherwise approved by the Engineer. Vehicular access to residential driveways shall be maintained to the property line except when necessary construction precludes such access for reasonable periods of time. If backfill has been completed to the extent that safe access may be provided, and the street is opened to local traffic, the Contractor shall immediately clear the street and driveways and provide and maintain access. The Contractor shall cooperate with the various parties involved in the delivery of mail and the collection and removal of trash and garbage to maintain existing schedules for these services. Grading operations, roadway excavation and fill construction shall be conducted by the Contractor in a manner to provide a reasonably satisfactory surface for traffic. When rough grading is completed, the roadbed surface shall be brought to a smooth, even condition satisfactory for traffic. Unless otherwise authorized, work shall be performed in only one-half the roadway at one time. One half shall be kept open and unobstructed until the opposite side is ready for use. If one-half a street only is being improved, the other half shall be conditioned and maintained as a detour. The Contractor shall schedule the work so as to prevent damage by all traffic, including but not limited to mail delivery. The Contractor shall not schedule work so as to conflict with trash pickup. The trash hauling schedule can be obtained by calling the City's contracted waste disposal company, Coast Waste Management at 929-9417. During overlay operations, the Contractors schedule for overlay application shall be designated to provide residents and business owners whose streets are to be overlaid sufficient paved parking within an 800 foot distance from their homes or businesses. Seventy-two hours prior to the start of any construction in the public right-of-way that affects vehicular traffic and/or parking or pedestrian routes, the Contractor shall give written notification of the impending disruption. For a full street closure, all residences and/or businesses on the affected street or alley shall be notified. For partial street closures, or curb, sidewalk and driveway repairs, the residences and/or businesses directly affected by the work shall be notified. The notification shall be hand delivered and shall state the date and time the work will begin and its anticipated duration. The notification shall list two telephone numbers that may be called to obtain additional information. One number shall be the Contractor's permanent office or field office and the other number shall be a 24-hour number answered by someone who is knowledgeable about the project. At least one of the phone numbers shall be in the (760) area code. An answering machine shall not be connected to either number. The notification shall also give a brief description of the work and simple instructions to the home or business owner on what they need to do to facilitate the construction. The Contractor shall submit the contents of the notification to the Engineer for approval. Notices shall not be distributed until approved by the Engineer. Revised 11/01/06 Contract No. 3907 Page 87 of 141 Pages For residences, the notification shall be pre-cut in a manner that enables it to be affixed to a ^J doorknob without adhesives. It shall be a minimum size of 3-1/2 inches by 8-1/2 inches and shall be brightly colored with contrasting printing. The material shall be equivalent in strength and durability to 65 Ib. card stock. The printing on the notice shall be no smaller than 12 point. An example of such notice is provided in Appendix "A". In addition to the notifications, the contractor shall post no parking signs 48 hours in advance of the work being performed. The no parking signs shall state the date and time of parking restriction for a duration not to exceed the time necessary to complete the work at that location. Failure of the contractor to meet the posted date requires re-posting the no parking signs 48 hours in advance of the rescheduled work. If the work is delayed or rescheduled the no parking signs shall be removed and re-posted 48 hours in advance of the rescheduled work. The preparation, materials, printing and distribution of the notifications shall be included in the contract price bid for traffic control and the Contractor will not be entitled to any additional compensation for printing and distributing these notices. The contractor shall replace all street markings and striping damaged by construction activities. The Contractor shall include in its Bid all costs for the above requirements. 7-10.2 Storage of Equipment and Materials in Public Streets. Construction materials shall not be stored in streets, roads, or highways for more than 5 days after unloading. All materials or equipment not installed or used in construction within 5 days after unloading shall be stored elsewhere by the Contractor at its expense unless authorized additional storage time. ^\ Construction equipment shall not be stored at the Work site before its actual use on the Work nor for more than 5 days after it is no longer needed. Time necessary for repair or assembly of equipment may be authorized by the Engineer. Excavated material, except that which is to be used as backfill in the adjacent trench, shall not be stored in public streets unless otherwise permitted. After placing backfill, all excess material shall be removed immediately from the site. 7-10.3 Street Closures, Detours, Barricades. The Contractor shall comply with all applicable State, County, and City requirements for closure of streets. The Contractor shall provide barriers, guards, lights, signs, temporary bridges, flagpersons, and watchpersons. The Contractor shall be responsible for compliance with additional public safety requirements which may arise. The Contractor shall furnish and install signs and warning devices and promptly remove them upon completion of the Work. The Contractor shall comply with all requirements of the engineer, the City of San Marcos, the San Marcos Fire Protection District, San Diego County Sheriff and the Vallecitos Water District and any other agency impacted by the closure, detour or barricades. The Contractor shall obtain the Engineer's written approval prior to deviating from the requirements of 2) through, and including, 7) above. The Contractor shall obtain the written approval no less than five working days prior to placing any traffic control that affects bus stops. The Contractor shall secure approval, in advance, from authorities concerned for the use of any bridges proposed by it for public use. Temporary bridges shall be clearly posted as to load limit, with ^*% signs and posting conforming to current requirements covering "signs" as set forth in the Traffic ^/ A*¥ Revised 11/01/06 Contract No. 3907 Page 88 of 141 Pages Manual published by the California Department of Transportation. This manual shall also apply to the street closures, barricades, detours, lights, and other safety devices required. All costs involved shall be included in the Bid. Traffic controls shall be in accordance with the plans, The California Manual on Uniform Traffic Control Devices (FHWA MUTCD 2003 Revision 1, as amended for use in California) and these provisions. If any component in the traffic control system is damaged, displaced, or ceases to operate or function as specified, from any cause, during the progress of the work, the Contractor shall immediately repair said component to its original condition or replace said component and shall restore the component to its original location. In the event that the Contractor fails to install and/or maintain barricades or such other traffic signs, markings, delineation or devices as may be required herein, the Engineer may, at his/her sole option, install the traffic signs, markings, delineation or devices and charge the Contractor twenty dollars ($25.00) per day per traffic sign or device, or the actual cost of providing such traffic control facility, whichever is the greater. 7-10.3.1 Construction Area Signs and Control Devices. All construction traffic signs and control devices shall be maintained throughout the duration of work in good order and according to the approved traffic control plan. All construction area signs shall conform to the provisions of Section 206-7.2 et seq. All temporary reflective pavement markers shall conform to the provisions of Section 214-5.1 .et seq. All temporary reflective channelizers shall conform to the provisions of Section 214- 5.2 et seq. All paint for temporary traffic striping, pavement marking, and curb marking shall conform to the provisions of Section 210-1.6 et seq. except that all temporary paint shall be rapid dry water borne conforming to Section 210-1.6 for materials and Section 310-5 et seq. For workmanship. Warning and advisory signs, lights and devices installed or placed to provide traffic control, direction and/or warning shall be furnished, installed and maintained by the Contractor. Warning and advisory signs, lights and devices shall be promptly removed by the Contractor when no longer required. Warning and advisory signs that remain in place overnight shall be stationary mounted signs. Stationary signs that warn of non-existent conditions shall be removed from the traveled way and from the view of motorists in the traveled way or shielded from the view of the traveling public during such periods that their message does not pertain to existing conditions. Care shall be used in performing excavation for signs in order to protect underground facilities. All excavation required to install stationary construction area signs shall be performed by hand methods without the use of power equipment. Warning and advisory signs that are used only during working hours may be portable signs. Portable signs shall be removed from the traveled way and shielded from the view of the traveling public during non-working hours. During the hours of darkness, as defined in Division 1, Section 280, of the California Vehicle Code, portable signs shall be illuminated or, at the option of the Contractor, shall be in conformance with the provisions in Section 206-7.2 et seq. If illuminated traffic cones rather than post-type delineators are used during the hours of darkness, they shall be affixed or covered with reflective cone sleeves as specified in CALTRANS "Standard Specifications", except the sleeves shall be 7" long. Personal vehicles of the Contractor's employees shall not be parked within the traveled way, including any Section closed to public traffic. Whenever the Contractor's vehicles or equipment are parked on the shoulder within 6' of a traffic lane, the shoulder area shall be closed with fluorescent traffic cones or portable delineators placed on a taper in advance of the parked vehicles or equipment and along the edge of the pavement at not less than 25' intervals to a point not less than 25' past the last vehicle or piece of equipment. A minimum of nine (9) cones or portable delineators shall be used for the taper. A W20-1 (Road Work Ahead) or C24 (Shoulder Work Ahead) sign shall be mounted, as required herein, on a signpost or telescoping flag tree with flags. The signpost or flag tree shall be placed where directed by the Engineer. 7-10.3.2 Maintaining Traffic. The Contractor's personnel shall not work closer than 1.8 m (6'), nor operate equipment within 0.6 m (2') from any traffic lane occupied by traffic. For equipment the than 0.6 m (2') shall be measured from the closest approach of any part of the equipment as it is operated and/or maneuvered in performing the work. This requirement may be waived when the Engineer has Revised 11/01/06 Contract No. 3907 Page 89 of 141 Pages given written authorization to the reduction in clearance that is specific to the time, duration and location of such waiver, when such reduction is shown on the traffic control plans included in these contract documents, when such reduction is shown on the traffic control plans prepared by the Contractor and approved by the Engineer or for the work of installing, maintaining and removing traffic control devices. As a condition of such waiver the Engineer may require the Contractor to detour traffic, adjust the width of, or realign the adjacent traffic lane, close the adjacent traffic lane or provide barriers. During the entire construction, a minimum of one (1) paved traffic lane, not less than 12' wide, shall be open for use by public traffic in each direction of travel. 7-10.3.3 Traffic Control System for Lane Closure. A traffic control system consists of closing traffic lanes or pedestrian walkways in accordance with the details shown on the plans, California Manual on Uniform Traffic Control Devices (FHWA MUTCD 2003 Revision 1, as amended for use in California) and provisions under "Maintaining Traffic" elsewhere in these Provisions. The provisions in this section will not relieve the Contractor from its responsibility to provide such additional devices or take such measures as may be necessary to maintain public safety. When lanes are closed for only the duration of work periods, all components of the traffic control system, except portable delineators placed along open trenches or excavation adjacent to the traveled way, shall be removed from the traveled way and shoulder at the end work period. If the Contractor so elects, said components may be stored at selected central locations, approved by the Engineer, within the limits of the right-of-way. 7-10.3.4 Traffic Control for Permanent and Temporary Traffic Striping. During traffic stripe operations, traffic shall be controlled with lane closures, as provided for under "Traffic Control System for Lane Closure" of these Supplemental Provisions or by use of an alternative traffic control plan proposed by the Contractor and approved by the Engineer. The Contractor shall not start traffic striping operations using an alternative plan until the Contractor has submitted its plan to the Engineer and has received the Engineer's written approval of said plan. 7-10.3.5 Temporary Pavement Delineation. Temporary pavement delineation shall be furnished, placed, maintained and removed in accordance with the minimum standards specified in the California Manual on Uniform Traffic Control Devices (FHWA MUTCD 2003 Revision 1, as amended for use in California) published by CALTRANS. Whenever the work causes obliteration of pavement delineation, temporary or permanent pavement delineation shall be in place prior to opening the traveled way to public traffic. Lane line or centerline pavement delineation shall be provided at all times for traveled ways open to public traffic. All work necessary, including any required lines or marks, to establish the alignment of temporary pavement delineation shall be performed by the Contractor. When temporary pavement delineation is removed, all lines and marks used to establish the alignment of the temporary pavement delineation shall be removed by grinding. Surfaces to receive temporary pavement delineation shall be dry and free of dirt and loose material. Temporary pavement delineation shall not be applied over existing pavement delineation or other temporary pavement delineation. Temporary pavement delineation shall be maintained until superseded or replaced with permanent pavement delineation. Temporary pavement delineation shall be removed when, as determined by the Engineer, the temporary pavement delineation conflicts with the permanent pavement delineation or with a new traffic pattern for the area and is no longer required for the direction of public traffic. When temporary pavement delineation is required to be removed, all lines and marks used to establish the alignment of the temporary pavement delineation shall be removed. Revised 11/01/06 Contract No. 3907 Page 90 of 141 Pages 7-10.3.6 Preparation of New, or Modifications and Additions to Existing, Traffic Control Plan Sheets. If no traffic control plans (TCP) or Traffic Control Staging plans (TCP) are included in the project plans, or if the Contractor elects to modify TCP included in the project plans, the Contractor shall have such new or modified TCP prepared and submitted as a part of the Work for any and all construction activities that are located within the traveled way. The Contractor shall have TCP prepared and submitted as a part of the Work for any construction activities that are a part of this project that are not included in the project plans. The Contractor must submit the TCP for the Engineer's review in conformance with the requirements of Section 2-5.3, et seq. and obtain the Engineer's approval of the TCP prior to implementing them. The minimum 20-day review period specified in Section 2-5.3.1 for shop drawings and submittals shall pertain to each submittal of TCP, new, modified or added to, for the Engineer's review. New or revised TCP submittals shall include all TCP needed for the entire duration of the Work. Each phase of the TCP shall be shown in sufficient scale and detail to show the lane widths, transition lengths, curve radii, stationing of features affecting the traffic control plan and the methodology proposed to transition to the subsequent TCP phase. When the vertical alignment of the traveled surface differs from the finished pavement elevation vertical curves must also be shown. Such modifications, supplements and/or new design of TCP shall meet the requirements of the Engineer and the California Manual on Uniform Traffic Control Devices (FHWA MUTCD 2003 Revision 1, as amended for use in California) as published by CALTRANS. Such modification, addition, supplement, and/or new design of TCP shall be prepared by a registered professional engineer appropriately registered in the State of California. The Engineer shall be the sole judge of the suitability and quality of any such modifications, supplements, and/or new designs to TCP. The Engineer may approve any such modifications, supplements, and/or new designs to the TCP when, in the Engineer's sole opinion, such modifications, supplements, and/or new designs to the TCP prepared by the registered professional engineer retained by the Contractor will be beneficial to the best interests of the Agency. Such modification, addition, supplement, and/or new design shall not be implemented and no work shall be commenced that is contingent on such approval until the changed TCP are approved by the Engineer. The preparation of such modification, addition, supplement, and/or new designs of TCP shall not presuppose their approval or obligate the Agency in any fashion. Submittal and review requirements for such modifications, supplements, and/or new designs to TCP shall conform to the requirements of Section 2-5.3 Shop Drawings and Submittals. 7-10.3.7 Payment. The Contractor shall prepare and implement traffic control plans and shall furnish all labor and materials to perform, install, maintain, replace and remove all traffic control as incidentals to the work with which they are associated and no other compensation will be allowed therefore. 7-10.4 Safety. 7-10.4.1 Safety Orders. The Contractor shall have at the Work site, copies or suitable extracts of: Construction Safety Orders, Tunnel Safety Orders and General Industry Safety Orders issued by the State Division of Industrial Safety. The Contractor shall comply with provisions of these and all other applicable laws, ordinances, and regulations. Before excavating any trench 5 feet or more in depth, the Contractor shall submit a detailed plan to the Agency showing the design of shoring, bracing, sloping, or other provisions to be made for the workers' protection from the hazard of caving ground during the excavation of such trench. If the plan varies from the shoring system standards, the plan shall be prepared by a registered Civil Engineer. No excavation shall start until the Engineer has accepted the plan and the Contractor has obtained a permit from the State Division of Industrial Safety. A copy of the permit shall be submitted to the Engineer. Revised 11/01/06 Contract No. 3907 Page 91 of 141 Pages Payment for performing all work necessary to provide safety measures shall be included in the prices bid for other items of work except where separate bid items for excavation safety are provided, or required by law. 7-10.4.2 Use of Explosives. Explosives may be used only when authorized in writing by the Engineer, or as otherwise stated in the Specifications. Explosives shall be handled, used, and stored in accordance with all applicable regulations. The Engineer's approval of the use of explosives shall not relieve the Contractor from liability for claims caused by blasting operations. 7-10.4.3 Special Hazardous Substances and Processes. Materials that contain hazardous substances or mixtures may be required on the Work. A Material Safety Data Sheet as described in Section 5194 of the California Code of Regulations shall be requested by the Contractor from the manufacturer of any hazardous products used. Material usage shall be accomplished with strict adherence to California Division of Industrial Safety requirements and all manufacturer warnings and application instructions listed on the Material Safety Data Sheet and on the product container label. The Contractor shall notify the Engineer if a specified product cannot be used under safe conditions. 7-10.4.4 Confined Spaces. (a) Confined Space Entry Program. The Contractor shall be responsible for implementing, administering and maintaining a confined space entry program (CSEP) in accordance with Sections 5156, 5157 and 5158, Title 8, CCR. Prior to starting the Work, the Contractor shall prepare and submit its comprehensive CSEP to the Engineer. The CSEP shall address all potential physical and environmental hazards and contain procedures for safe entry into confined spaces, including, but not limited to the following: 1. Training of personnel 2. Purging and cleaning the space of materials and residue 3. Potential isolation and control of energy and material inflow 4. Controlled access to the space 5. Atmospheric testing of the space 6. Ventilation of the space 7. Special hazards consideration 8. Personal protective equipment 9. Rescue plan provisions The Contractor's submittal shall include the names of its personnel, including subcontractor personnel, assigned to the project who will have CSEP responsibilities, their CSEP training, and their specific assignment and responsibility in carrying out the CSEP. (b) Permit-Required Confined Spaces. Entry into permit-required confined spaces as defined in Section 5157, Title 8, CCR may be required as a part of the Work. All manholes, tanks, vaults, pipelines, excavations, or other enclosed or partially enclosed spaces shall be considered permit- required confined spaces until the pre-entry procedures demonstrate otherwise. The Contractor shall implement a permit space program prior to performing any work in a permit-required confined space. A copy of the permit shall be available at all times for review by Contractor and Agency personnel at the Work site. Revised 11/01/06 Contract No. 3907 Page 92 of 141 Pages (c) Payment. Payment for implementing, administering, and providing all equipment and personnel to perform the CSEP shall be included in the bid items for which the CSEP is required. 7-10.4.5 Safety and Protection of Workers and Public. The Contractor shall take all necessary precautions for the safety of employees on the work and shall comply with all applicable provisions of Federal, State and Municipal safety laws and building codes to prevent accidents or injury to persons on, about, or adjacent to the premises where the work is being performed. The Contractor shall erect and properly maintain at all times, as required by the conditions and progress of the work, all necessary safeguards for the protection of workers and public, and shall use danger signs warning against hazards created by such features of construction as protruding nails, hoists, well holes, and falling materials. 7-11 PATENT FEES OR ROYALTIES. The Contractor shall absorb in its Bid the patent fees or royalties on any patented article or process furnished or used in the Work. The Contractor shall indemnify and hold the Agency harmless from any legal action that may be brought for infringement of patents. 7-12 ADVERTISING. The names, addresses and specialties of Contractors, Subcontractors, architects, or engineers may be displayed on removable signs. The size and location shall be subject to the Engineer's approval. Commercial advertising matter shall not be attached to or painted on the surfaces of buildings, fences, canopies, or barricades. 7-13 LAWS TO BE OBSERVED. The Contractor shall keep fully informed of State and National laws and County and Municipal ordinances and regulations which in any manner affect those employed in the Work or the materials used in the Work or in any way affect the conduct of the Work. The Contractor shall at all times observe and comply with such laws, ordinances, and regulations. Municipal ordinances that affect this work include Chapter 11.06. Excavation and Grading. If this notice specifies locations or possible materials, such as borrow pits or gravel beds, for use in the proposed construction project which would be subject to Section 1601 or Section 1603 of the Fish and Game Code, the conditions established pursuant to Section 1601 et seq. of the Fish and Game Code shall become conditions of the contract. 7-14 ANTITRUST CLAIMS. Section 7103.5 of the Public Contract Code provides: "In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the contractor or subcontractor offers and agrees to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec 15) or Cartwright Act (Chapter 2 [commencing with Section 16700] of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or subcontract. The assignment shall be made and become effective at the time the awarding body tenders final payment to the contractor, without further acknowledgment of the parties." SECTION 8 - FACILITIES FOR AGENCY PERSONNEL 8-1 GENERAL. All facilities provided for Agency personnel shall be at suitable locations approved by the Engineer. Such facilities must be in a room, building, or trailer provided for this purpose with acceptable means for locking. Revised 11/01/06 Contract No. 3907 Page 93 of 141 Pages A Class "A" Field Office in accordance with Section 8-2.1 shall be provided at any offsite plant facility furnishing pipe subject to Agency inspection during manufacture. A Field Laboratory in accordance with Section 8-3.1 shall be provided at any offsite or project site plant facility furnishing Portland cement concrete or asphalt paving material. Any other facilities for Agency personnel shall be provided only when required by the Specifications. Offices and laboratories at plants may be used concurrently by inspection personnel of other agencies provided such use does not seriously conflict with Agency use. When facilities are shared in this manner, at least one locker provided with a hasp for a padlock must be available for the exclusive use of Agency inspectors. Otherwise any facilities furnished are for the exclusive use of Agency personnel. All facilities shall conform to the applicable codes, ordinances, and regulations of the local jurisdiction and of the State of California, and shall conform to current practice. The interior shall be paneled or suitably lined to provide a facility of good appearance. The Contractor shall provide janitorial and other maintenance services in all types of facilities provided. Such services shall include the supply of the appropriate paper products and dispensers. Trash receptacles shall be provided and emptied by the Contractor at weekly intervals or sooner as required. The trash shall be removed from the project site. All costs to furnish, maintain, service, and remove the specified facilities at the project site shall be included in the price bid for such facilities. If no bid item is provided in the proposal, costs shall be included in other items for which bids are entered. The first progress payment will not be approved until all facilities are in place and fully comply with the Specifications. 8-2 FIELD OFFICE FACILITIES. A field office will not be required for this contract. SECTION 9 - MEASUREMENT AND PAYMENT 9-1 MEASUREMENT OF QUANTITIES FOR UNIT PRICE WORK. 9-1.1 General. Unless otherwise specified, quantities of work shall be determined from measurements or dimensions in horizontal planes. However, linear quantities of pipe, piling, fencing and timber shall be considered as being the true length measured along longitudinal axis. Unless otherwise provided in Specifications, volumetric quantities shall be the product of the mean area of vertical or horizontal sections and the intervening horizontal or vertical dimension. The planimeter shall be considered an instrument of precision adapted to measurement of all areas. 9-1.2 Methods of Measurement. Materials and items of work which are to be paid for on basis of measurement shall be measured in accordance with methods stipulated in the particular sections involved. 9-1.3 Certified Weights. When payment is to be made on the basis of weight, the weighing shall be done on certified platform scales or, when approved by the Engineer, on a completely automated weighing and recording system. The Contractor shall furnish the Engineer with duplicate licensed weighmaster's certificates showing actual net weights. The Agency will accept the certificates as evidence of weights delivered. Revised 11/01/06 Contract No. 3907 Page 94 of 141 Pages -,..,• 9-1.4 Units of Measurement. The system of measure for this contract shall be the U.S. Standard Measures. 9-2 LUMP SUM WORK. Items for which quantities are indicated "Lump Sum", "L.S.", or "Job", shall be paid for at the price indicated in the Bid. Such payment shall be full compensation for the items of work and all work appurtenant thereto. When required by the Specifications or requested by the Engineer, the Contractor shall submit to the Engineer within 15 days after award of Contract, a detailed schedule in triplicate, to be used only as a basis for determining progress payments on a lump sum contract or designated lump sum bid item. This schedule shall equal the lump sum bid and shall be in such form and sufficiently detailed as to satisfy the Engineer that it correctly represents a reasonable apportionment of the lump sum. 9-3 PAYMENT 9-3.1 General. The quantities listed in the Bid schedule will not govern final payment. Payment to the Contractor will be made only for actual quantities of Contract items constructed in accordance with the Plans and Specifications. Upon completion of construction, if the actual quantities show either an increase or decrease from the quantities given in the Bid schedule, the Contract Unit Prices will prevail subject to the provisions of Section 3-2.2.1. The unit and lump sum prices to be paid shall be full compensation for the items of work and all appurtenant work, including furnishing all materials, labor, equipment, tools, and incidentals. Payment will not be made for materials wasted or disposed of in a manner not called for under the Contract. This includes rejected material not unloaded from vehicles, material rejected after it has been placed, and material placed outside of the Plan lines. No compensation will be allowed for disposing of rejected or excess material. Payment for work performed or materials furnished under an Assessment Act Contract will be made as provided in particular proceedings or legislative act under which such contract was awarded. Whenever any portion of the Work is performed by the Agency at the Contractor's request, the cost thereof shall be charged against the Contractor, and may be deducted from any amount due or becoming due from the Agency. Whenever immediate action is required to prevent injury, death, or property damage, and precautions which are the Contractor's responsibility have not been taken and are not reasonably expected to be taken, the Agency may, after reasonable attempt to notify the Contractor, cause such precautions to be taken and shall charge the cost thereof against the Contractor, or may deduct such cost from any amount due or becoming due from the Agency. Agency action or inaction under such circumstances shall not be construed as relieving the Contractor or its Surety from liability. Payment shall not relieve the Contractor from its obligations under the Contract; nor shall such payment be construed to be acceptance of any of the Work. Payment shall not be construed as the transfer of ownership of any equipment or materials to the Agency. Responsibility of ownership shall remain with the Contractor who shall be obligated to store any fully or partially completed work or structure for which payment has been made; or replace any materials or equipment required to be provided under the Contract which may be damaged, lost, stolen or otherwise degraded in any way prior to acceptance of the Work, except as provided in Section 6-10. Guarantee periods shall not be affected by any payment but shall commence on the date of recordation of the "Notice of Completion." Revised 11/01/06 Contract No. 3907 Page 95 of 141 Pages If, within the time fixed by law, a properly executed notice to stop payment is filed with the Agency, due to the Contractor's failure to pay for labor or materials used in the Work, all money due for such labor or materials will be withheld from payment to the Contractor in accordance with applicable laws. At the expiration of 35 days from the date of acceptance of the Work by the Board, or as prescribed by law, the amount deducted from the final estimate and retained by the Agency will be paid to the Contractor except such amounts as are required by law to be withheld by properly executed and filed notices to stop payment, or as may be authorized by the Contract to be further retained. 9-3.2 Partial and Final Payment. The Engineer will, after award of Contract, establish a closure date for the purpose of making monthly progress payments. The Contractor may request in writing that such monthly closure date be changed. The Engineer may approve such request when it is compatible with the Agency's payment procedure. Each month, the Engineer will make an approximate measurement of the work performed to the closure date as basis for making monthly progress payments. The estimated value will be based on contract unit prices, completed change order work and as provided for in Section 9-2 of these General Provisions. Progress payments shall be made no later than thirty (30) calendar days after the closure date. Five (5) working days following the closure date, the Engineer shall complete the detailed progress pay estimate and submit it to the Contractor for the Contractor's information. Should the Contractor assert that additional payment is due, the Contractor shall within ten (10) days of receipt of the progress estimate, submit a supplemental payment request to the Engineer with adequate justification supporting the amount of supplemental payment request. Upon receipt of the supplemental payment request, the Engineer shall, as soon as practicable after receipt, determine whether the supplemental payment request is a proper payment request. If the Engineer determines that the supplemental payment request is not proper, then the request shall be returned to the Contractor as soon as practicable, but not later than seven (7) days after receipt. The returned request shall be accompanied by a document setting forth in writing the reasons why the supplemental payment request was not proper. In conformance with Public Contract Code Section 20104.50, the City shall make payments within thirty (30) days after receipt of an undisputed and properly submitted supplemental payment request from the Contractor. If payment of the undisputed supplemental payment request is not made within thirty (30) days after receipt by the Engineer, then the City shall pay interest to the Contractor equivalent to the legal rate set forth in subdivision (a) of Section 685.010 of the Code of Civil Procedure. From each progress estimate, 10 percent will be deducted and retained by the Agency, and the remainder less the amount of all previous payments will be paid. After 50 percent of the Work has been completed and if progress on the Work is satisfactory, the deduction to be made from remaining progress estimates and from the final estimate may be limited to $500 or 10 percent of the first half of total Contract amount, whichever is greater. No progress payment made to the Contractor or its sureties will constitute a waiver of the liquidated damages under 6-9. As provided in Section 22300 of the California Public Contract Code, the Contractor may substitute securities for any monies withheld by the Agency to ensure performance under the Contract. After final inspection, the Engineer will make a Final Payment Estimate and process a corresponding payment. This estimate will be in writing and shall be for the total amount owed the Contractor as determined by the Engineer and shall be itemized by the contract bid item and change order item with quantities and payment amounts and shall show all deductions made or to be made for prior Revised 1 1/01/06 Contract No. 3907 Page 96 of 141 Pages payments and amounts to be deducted under provisions of the contract. All prior estimates and progress payments shall be subject to correction in the Final Payment Estimate. The Contractor shall have 30 calendar days from receipt of the Final Payment Estimate to make written statement disputing any bid item or change order item quantity or payment amount. The Contractor shall provide all documentation at the time of submitting the statement supporting its position. Should the Contractor fail to submit the statement and supporting documentation within the time specified, the Contractor acknowledges that full and final payment has been made for all contract bid items and change order items. If the Contractor submits a written statement with documentation in the aforementioned time, the Engineer will review the disputed item within 30 calendar days and make any appropriate adjustments on the Final Payment. Remaining disputed quantities or amounts not approved by the Engineer will be subject to resolution as specified in Section 3-5, Disputed Work. The written statement filed by the Contractor shall be in sufficient detail to enable the Engineer to ascertain the basis and amount of said disputed items. The Engineer will consider the merits of the Contractor's claims. It will be the responsibility of the Contractor to furnish within a reasonable time such further information and details as may be required by the Engineer to determine the facts or contentions involved in its claims. Failure to submit such information and details will be sufficient cause for denying payment for the disputed items. 9-3.2.1 Payment for Claims. Except for those final payment items disputed in the written statement required in Section 9-3.2 all claims of any dollar amount shall be submitted in a written statement by the Contractor no later than the date of receipt of the final payment estimate. Those final payment items disputed in the written statement required in Section 9-3.2 shall be submitted no later than 30 days after receipt of the Final Payment estimate. No claim will be considered that was not included in this written statement, nor will any claim be allowed for which written notice or protest is required under any provision of this contract including Sections 3-4 Changed Conditions, 3-5 Disputed Work, 6-6.3 Payment for Delays to Contractor, 6-6.4 Written Notice and Report, or 6-7.3 Contract Time Accounting, unless the Contractor has complied with notice or protest requirements. The claims filed by the Contractor shall be in sufficient detail to enable the Engineer to ascertain the basis and amount of said claims. The Engineer will consider and determine the Contractor's claims and it will be the responsibility of the Contractor to furnish within a reasonable time such further information and details as may be required by the Engineer to determine the facts or contentions involved in its claims. Failure to submit such information and details will be sufficient cause for denying the claims. Payment for claims shall be processed within 30 calendar days of their resolution for those claims approved by the Engineer. The Contractor shall proceed with informal dispute resolution under Section 3-5, Disputed Work, for those claims remaining in dispute. 9-3.3 Delivered Materials. When provided for in the Specifications, and subject to the limitation and conditions therein, the cost of materials and equipment delivered but not incorporated into the Work will be included in the progress estimate. 9-3.3.1 Delivered Materials. The cost of materials and equipment delivered but not incorporated into the work will not be included in the progress estimate. 9-3.4 Mobilization. When a bid item is included in the Proposal form for mobilization and subject to the conditions and limitations in the Specifications, the costs of work in advance of construction operations and not directly attributable to any specific bid item will be included in the progress Revised 11/01/06 Contract No. 3907 Page 97 of 141 Pages estimate. When no such bid item is provided, payment for such costs will be considered to be included in the other items of work. 9-3.4.1 Mobilization and Preparatory Work. Payment for mobilization and preparatory Work will be made at the stipulated lump-sum price bid therefore in the bid schedule OR The Contract lump-sum price paid for mobilization shall not exceed forty-five thousand dollars ($45,000.00), and includes full compensation for furnishing all insurance, bonds, licenses, labor, materials, utilities, tools, equipment and incidentals, and for doing all the work involved in mobilization and preparatory work and operations, including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidental to preparing to conduct work on and off the project site and other offsite facilities necessary for work on the project; for all other facilities, sureties, work and operations which must be performed or costs incurred prior to beginning work on various contract items on or off the project site, excepting those specifically paid for under separate sections of these specifications. The Contractor hereby agrees that the stipulated lump sum amount is sufficient for Mobilization and Preparatory Work, as described in this section, and that the Contractor shall have no right to additional compensation for Mobilization and Preparatory Work. Progress payments for Mobilization and Preparatory Work will be made as follows: For the first progress payment (after the issuance of the Notice to Proceed), forty percent (40%) of the amount bid for Mobilization And Preparatory Work will be allowed. For the second progress payment, an additional sixty percent (60%) of the amount bid for mobilization and preparatory work will be allowed therefore. Revised 11/01/06 Contract No. 3907 Page 98 of 141 Pages SUPPLEMENTAL PROVISIONS TO "GREEN BOOK" STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION PART 2, CONSTRUCTION MATERIALS SECTION 200 - ROCK MATERIALS 200-1 ROCK PRODUCTS Add the following section: 200-1.2.2 Permeable Material. Permeable material shall consist of hard, durable, clean sand, gravel, or crushed stone, and shall be free from organic material, clay balls, or other deleterious substances. Class 1 and Class 2 permeable material shall have a Durability Index of not less than 40. Class 2 Permeable material shall have a Sand Equivalent value of not less than 75. Class 1 permeable material shall conform to the requirements in this section and Table 200-1.2.2(A). Class 2 permeable material shall conform to the requirements in this section and Table 200-1.2.2(6). When permeable material is required and the class or kind is not specified, Class 1 permeable material shall be used. The alternative gradings within Class 1 permeable material are identified by types. Unless otherwise shown on the plans the Contractor will be permitted to furnish and place any one of the types provided for this class. The percentage composition by mass of permeable material in place shall conform to the gradings in Tables 200-1.2.2(A) and 200-1.2.2(8). TABLE 200-1.2.2(A) CLASS 1 PERMEABLE MATERIAL Sieve Sizes 50-mm (2") 37.5-mm(11/2") 19-mm(3/4") -\2.5-mn\Cl2) 9.5-mm (3/8") 4.75-mm (No. 4) 2.36-mm (No. 8) 75-um (no. 200) Percen Type A — — 100 95-100 70-100 0-55 0-10 0-3 :age Passing TypeB 100 95-100 50-100 — 15-55 0-25 0-5 0-3 TABLE 200-1.2.2(6) CLASS 2 PERMEABLE MATERIAL Sieve Sizes Percentage Passing 25-mm(1") 19-mm(3/4") 9.5-mm (3/8") 4.75-mm (No. 4) 2.36-mm (No. 8) 600-um (No. 30) 300-um (No. 50) 75-um (no. 200) 100 90-100 40-100 25-40 18-33 5-15 0-7 0-3 Revised 11701706 Contract No. 3907 Page 99 of 141 Pages 200-2 UNTREATED BASE MATERIALS 200-2.1 General. Add the following: Aggregate base shall be Class 2 Aggregate Base per Caltrans Standard Specification, July 1999, Section 26: Aggregate Bases, Subsection 26-1.02A Class 2 Aggregate Base and as specified herein. Add the following section: 200-2.7 Class 2 Aggregate Base. Aggregate for Class 2 aggregate base shall be free from organic matter and other deleterious substances, and shall be of such nature that it can be compacted readily under watering and rolling to form a firm, stable base. Aggregate may include material processed from reclaimed asphalt concrete, portland cement concrete, lean concrete base, cement treated base or a combination of any of these materials. Aggregate shall conform to the grading and quality requirements shown in the following tables. At the option of the Contractor, the grading for either the 11/2-inch maximum or 3/4 inch maximum shall be used, except that once a grading is selected it shall not be changed without the Engineer's written approval. AGGREGATE GRADING REQUIREMENTS Percentage Passing 11/2" Maximum 3/4" Maximum Operating Operating Sieve Sizes Range Range 2" .................................. 100 — 11/2" ............................. 90-100 — 1" .................................. — 100 3/4" ............................... 50-85 90-100 No. 4 ............................. 25-45 35-60 No. 30 ........................... 10-25 10-30 No. 200 ........................ 2-9 2-9 QUALITY REQUIREMENTS Operating Tests Range Resistance (R-value) 78 Min. Sand Equivalent 25 Min. Durability Index 35 Min. The aggregate shall not be treated with lime, cement or other chemical material before the Durability Index test is performed. If the results of either or both the aggregate grading and Sand Equivalent tests do not meet the requirements specified for "Operating Range" but meet the "Contract Compliance" requirements, placement of the aggregate base may be continued for the remainder of that day. However, another day's work may not be started until tests, or other information, indicate to the satisfaction of the Engineer that the next material to be used in the work will comply with the requirements specified for "Operating Range." If the results of either or both the aggregate grading and Sand Equivalent tests do not meet the requirements specified for "Contract Compliance," the aggregate base which is represented by these tests shall be removed. However, if requested by the Contractor and approved by the Engineer, the aggregate base may remain in place and the Contractor shall pay to the City $2.25 per cubic yard for such aggregate base left in place. The City may deduct this amount from any moneys due, or that may become due, the Contractor under the contract. If both the aggregate grading and Sand Equivalent do not conform to the "Contract Compliance" requirements, only one adjustment shall apply. No single aggregate grading or Sand Equivalent test shall represent more than 500 cubic yards or one day's production, whichever is smaller. SECTION 201 - CONCRETE, MORTAR, AND RELATED MATERIALS A•^ Revised 11/01/06 Contract No. 3907 Page 100 of 141 Pages 201-1 PORTLAND CEMENT CONCRETE TABLE 201-1.1.2(A) Modify as follows: TABLE 201-1.1.2(A)(3) PORTLAND CEMENT CONCRETE Type of Construction All Concrete Used Within the Right-of-Way Trench Backfill Slurry Street Light Foundations and Survey Monuments Traffic Signal Foundations Concreted-Rock Erosion Protection Concrete Class 330-C-23 (560-C-3250) (1) 115-E-3 (190-E-400) 330-C-23 (560-C-3250) 350-C-27 (590-C-3750) 310-C-17 (520-C-2500P) Maximum Slump mm (Inches) (2) 200 (8") 100 (4") 100 (4") per Table 300-1 1.3.1 (1) Except that concrete required to be of higher strength by Table 201-1.1.2(A) SSPWC shall be as per Table 201-1.1.2(A) SSPWC. (2) As per Table 201-1.1.2(A) SSPWC. (3) Portions of Table 201-1.1.2(A) of the Standard Specifications for Public Works Construction not shown herein as changed are not affected by this table. SECTION 203 - BITUMINOUS MATERIALS 203-6 ASPHALT CONCRETE. DELETE sections 203-6.2 and 203-6.3.2 and ADD the following: 203-6.1 General. Add the following: The Contractor shall submit a design mix report and verification data for review by the Engineer for each source of supply and type of mixture specified. The design mix report shall indicate the results of all testing requirements identified in sections 203-1.2 and 203-6.3 of the standard specifications for public works construction and these special provisions. 203-6.2 Materials. Add the following: Asphalt concrete shall be class C2-AR-4000 for surface course, and B-AR-4000 for base course. Asphalt concrete shall be class D2-AR-8000 for dikes and class E-AR-8000 ditches. 203-6.3.2 Composition and Grading. Add the following: Evaluation of asphalt concrete shall be determined from samples of asphalt concrete taken after completion of all processing (Wet Mix) or by core sample analysis of the in-place asphalt concrete or by direct central plant inspection that confirms the production of a particular mix design and verifies using samples of aggregate taken before the addition of asphalt and mineral filler (Bin). All samples shall be taken in accordance with Calif. Test 125. When Wet Mix or Core samples of asphalt concrete are to be used for evaluation, sufficient size samples shall be taken to ensure representative and adequate quantity of material for: 1. Asphalt Content and Gradation of Extraction using Calif. Test 382 or ASTM 2172, and Calif. Test 202. AW" Revised 11/01/06 Contract No. 3907 Page 101 of 141 Pages 2. Stability1 using: a. Stabilometer Value2 using Calif. Test 366 and shall be the average of three individual Stabilometer Values And/or b. Marshall Stability in accordance with the Asphalt Institute's MS-2 fabricated and tested for traffic volume and shall be the average of three specimens. Stability will be waived provided the extracted asphalt concrete is within +I-.5 of mix design and the extracted gradation complies with Table 203-6.3.2 (A). 2Use Marshall Stability when the deviation between individual Stabilometer Values are greater than +1-4. When using core sample analysis, the samples must be properly prepared to safeguard against influx of outside contaminates and so that the cut surfaces do not influence the test results. The amount of asphalt binder used in asphalt concrete placed in dikes, gutters, gutter flares, overside drains and aprons at the ends of drainage structures shall be increased one percent by mass of the aggregate over the amount of asphalt binder determined for use in asphalt concrete placed on the traveled way. 203-6.3.3 Acceptance. Wet Mix or Core sampled asphalt concrete will be considered in conformance with the mix design when the asphalt content is within +I-.5 of the design mix and the gradation conforms to the grading as shown in Table 203-6.3.2 (A). Deviations in gradation may be considered in conformance with the mix design provided the stability of the completed mix complies with the requirements for Stabilometer Value per Table 203-6.3.2 (A) Marshall Stability using Asphalt Institute MS-2. Plant inspected asphalt concrete will be considered in conformance with the mix design when visually inspected and the combined gradation of the Bin samples show conformance to the grading as shown in Table 203-6.3.2 (A). 203-6.6.2, Batch Plant Method, modify as follows: Third paragraph, last sentence, delete "and from the Engineer's field laboratory". Last paragraph, add after D 2172: "method A or B." 203-6.7 Asphalt Concrete Storage, add the following: Open graded asphalt concrete stored in excess of 2 hours, and any other asphalt concrete stored in excess of 1 8 hours, shall not be used in the work. SECTION 206 - MISCELLANEOUS METAL ITEMS Add the following section: 206-7 TRAFFIC SIGNS. Add the following section: 206-7.1 Temporary Traffic Signs. Add the following section: 206-7.1.1 Temporary Traffic Sign Posts. Posts shall be 10-gage or 12-gage cold-rolled steel perforated tubing used for the support and stabilization of stationary mounted temporary signs. Post size and number of posts shall be as shown on the plans, except that when stationary mounted signs are installed and the type of sign installation is not shown on the plans, post size and the number of A•^ Revised 11/01/06 Contract No. 3907 Page 102 of 141 Pages posts will be determined by the Engineer. Sign panels for stationary mounted signs shall consist of reflective sheeting applied to a sign substrate. Add the following section: 206-7.1.2 Portable Temporary Traffic Signs. Each portable temporary traffic sign shall consist of a base, standard or framework and a sign panel. The units shall be capable of being delivered to the site of use and placed in immediate operation. Sign panels for portable signs shall conform to the requirements of sign panels for stationary mounted signs in the "Specifications For Reflective Sheeting Signs, October 1993, or shall be cotton drill fabric, flexible industrial nylon fabric, or other approved fabric. Fabric signs shall not be used during the hours of darkness. Size, color, and legend requirements for portable signs shall be as described for stationary mounted sign panels in section 206-7.2 of these Supplemental Provisions. The height to the bottom of the sign panel above the edge of traveled way shall be at least 0.3-m (12"). All parts of the sign standard or framework shall be finished with 2 applications of orange enamel which will match the color of the sign panel background. Testing of paint will not be required. Add the following section: 206-8 LIGHT GAGE STEEL TUBING AND CONNECTORS. Add the following section: 206-8.1 General. This Section pertains to 10-gage and 12-gage cold-rolled steel perforated tubing used for the support and stabilization of signs. All shapes shall have a galvanized finish and shall be cold-roll-formed steel conforming to ASTM Designation A-446, Grade A. Galvanizing shall conform to ASTM A-525, Designation G-90. Galvanizing shall be performed after all forming and punching operations have been completed. Cold-rolled steel perforated tubing shall be perforated on all four faces with 11 mm (7/16") holes on 25 mm (1") centers. Add the following section: 206-8.2 Tolerances. Wall thickness tolerance shall not exceed +0.28 mm, -0.13 mm (+0.011", -0.005"). Convexity and concavity measured in the center of the flat side shall not exceed a tolerance of +0.25 mm (+0.010") applied to the specific size determined at the corner. Straightness tolerance variation shall not exceed 1.6 mm in 1 m (1/16 " in 3'). Tolerance for corner radius is 4.0mm (5/32"), plus or minus 0.40 mm (1/64"). Weld flash on corner-welded square tubing shall permit 3.60 mm (9/64") radius gage to be placed in the corner. Using 10-gage or 12-gage square tube, consecutive size tubes shall telescope freely for 3.1m (10'). Tolerance on hole size is plus or minus 0.40 mm (1/64") on a size. Tolerance on hole spacing is plus or minus 3.2 mm in 6.1 m (1/8" in 20'). In addition, for the following specific sizes of light gage steel tubing, dimensional tolerances shall not exceed those listed in tables 206-8.2 (A) and 206-8.2(6). TABLE 206-8.2(A) LIGHT GAGE STEEL TUBING SIZE TOLERANCE Nominal Outside Dimensions mm (inches) 25x25 32x32 38x38 44x44 51 x51 56x56 57x57 64x64 51 x76 (1 x1) (11/4x11/4) dVaxV/a) (13/4x13/4) (2x2) (23/16 x 23/16) (21/4 x 21/4) (2V2 x 21/2) (2x3) Outside Tolerance for All Sides at Corners mm (inches) 0.13 0.15 0.15 0.20 0.20 0.25 0.25 0.25 0.25 0.005 0.006 0.006 0.008 0.008 0.010 0.010 0.010 0.010 oRevised 11/01/06 Contract No. 3907 Page 103 of 141 Pages TABLE 206-8.2(6) LIGHT GAGE STEEL TUBING SQUARENESS OF SIDES AND TWIST Nominal Outside Dimension mm (Inches) 25x25 32x32 38x38 44x44 51 x51 56x56 57x57 64x64 51x76 (1x1) (1-V4X1-V4) d-VaXl-Vz) (1-3/4x1-3/4) (2x2) (2-3/16 x 2-3/16) (2-1/4 x 2-1/4) (2-1/2x2-1/2) (2x3) Squareness0' mm (Inches) 0.15 0.18 0.20 0.25 0.30 0.36 0.36 0.38 0.46 0.006 0.007 0.009 0.010 0.012 0.014 1.014 0.015 0.018 Twist Permissible in 900 mm (3") mm(2) (lnches)(2) 1.3 1.3 1.3 1.6 1.6 1.6 1.6 1.9 1.9 0.050 0.050 0.050 0.062 0.062 0.062 0.062 0.075 0.075 (1) Tubing may have its sides failing to be 90 degrees to each other by the tolerance listed. w Twist is measured by holding down the edge of one end of a square tube on a surface plate with the bottom side of the tube parallel to the surface plate, and noting the height that either corner on the opposite end of the bottom side is above the surface plate. Add the following section: 206-8.3 Fasteners. Fasteners used to assemble cold-rolled steel perforated tubing shall be steel "pull-through" electrogalvanized rivets with 9.5 mm (3/8") diameter shank, 22 mm (7/8") diameter head, and a grip range of from 5 mm (0.200") to 0.90 mm (0.356"). The fasteners shall conform to ASTM B-633, Type III Add the following section: 206-9 PORTABLE CHANGEABLE MESSAGE SIGN Add the following section: 206-9.1 General. Each portable changeable message sign (PCMS) unit shall consist of a controller unit, a power supply, and a structural support system all mounted on a trailer. The PCMS unit shall be assembled to form a complete self-contained portable changeable message sign, which can be delivered to the site of the work and placed in immediate operation. The complete PCMS unit shall be capable of operating in an ambient air temperature range of -20°C (-4°F) to +70°C (158°F) and shall not be affected by unauthorized mobile radio transmissions. The trailer shall be equipped so that it can be leveled and plumbed. Full operation height shall be with the bottom of the sign at least 2.1 m (71) above the ground and the top no more than 4.4 m (14.5') above the ground. After initial placement, PCMS shall be moved from location to location as directed by the Engineer Add the following section: 206-9.2 Message Board. The message displayed on the PCMS shall be visible from a distance of 460 m (1500') and shall be legible from a distance of 230 m (7501), at noon on a cloudless day, by persons with vision corrected to 20/20. The sign panel shall be 3-line matrix and shall display not less than 7 characters per line. Sign messages to be displayed shall be as approved by the Engineer. The sign face shall be flat black and shall be protected from glare of the sun by a method which does not interfere with the clarity of the sign message. The sign shall be raised and lowered by means of a power driven lifting mechanism. The matrix sign shall be capable of complete alphanumeric selection. Lamp matrix type signs shall be equipped with an automatic dimming operational mode that automatically compensates for the influence of a temporary light source or other abnormal lighting conditions. The sign shall have manual dimming operation modes of 3 or more different lamp intensities. o Revised 11/01/06 Contract No. 3907 Page 104 of 141 Pages Matrix signs not utilizing lamps shall be either internally or externally illuminated at night. The controller shall be an all solid-state unit containing all the necessary circuitry for the storage of at least 5 pre-programmed messages. The controller shall be installed in a location allowing the operator to perform all functions from one position. A keyboard entry system shall be provided to allow an operator to generate an infinite number of additional messages over the pre-programmed stored messages. The keyboard shall be equipped with a security lockout feature to prevent unauthorized use of the controller. The controller shall contain a nonvolatile memory to hold the keyboard created messages in memory during periods when the power is not activated. The controller shall provide for a variable message display rate which allows the operator to match the information display to the speed of the approaching traffic. The flashing off time shall be operator adjustable within the control cabinet. Add the following section: 206-9.3 Operation and Maintenance. PCMS shall be furnished, placed, operated, and maintained at locations shown on the plans, specified herein, or designated by the Engineer. The PCMS will be diligently maintained and repaired by the Contractor throughout the project in accordance with the manufacturer's recommendations. When ownership is transferred to the City (at the end of the job), it must be demonstrated to be in good working condition, and meet the provisions of these specifications, including current registration. Add the following section: 206-9.4 Measurement and Payment. The contract unit price PCMS shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in furnishing, placing, operating, maintaining, repairing, replacing, transporting from location to location, and delivery of the signs to the City at the completion of the construction, in good working order, and as directed by the Engineer, and no other compensation will be made. SECTION 207 - PIPE 207-2 REINFORCED CONCRETE PIPE. 207-2.5 Joints. Add the following: When watertight joints are indicated on the plans they shall be of the rubber-gasketed type meeting the requirements of ASTM Standard Specification designations C 361-95 and C 443-94. Pipe designated in the plans as "pressure pipe" or with a 100-year hydraulic grade line at or above the soffit shall be bell and groove spigot joint with "O" rings conforming to ASTM C-443 and C-361 for the limits shown on the plans. Add the following section: 207-25 UNDERGROUND UTILITY MARKING TAPE. Add the following section: 207-25.1 Detectable Underground Utility Marking Tape: Detectable Underground Utility Marking Tape shall have a minimum 0.13 mm (0.005") overall thickness, with no less than a 35 gauge (AWG), 0.14 mm aluminum foil core. The foil must be visible from both sides. The layers shall be laminated together with the extrusion lamination process, not adhesives. No inks or printing shall extend to the edges of the tape. All printing shall be encased to avoid ink rub-off. Detectable Underground Utility Marking Tape shall conform to the properties listed in Tables 207-25(A) and 207- 25 (B). TABLE 207-25.1 (A) DETECTABLE UNDERGROUND UTILITY MARKING TAPE PROPERTIES Revised 11/01/06 Contract No. 3907 Page 105 of 141 Pages Property Thickness Tensile strength Elongation Printability Flexibility Inks Message repeat Foil Top layer Bottom layer Adhesives Bond strength Colors Method ASTM D2103 ASTM D882 ASTM D882-88 ASTM D2578 ASTM D671-81 Manufacturingspecifications Manufacturing specifications Manufacturing specifications Manufacturing specifications Manufacturing specifications Manufacturing specifications Boiling H2O at 100 degrees Celsius APWA Code Value 01 14 mm (0.0056") 4500g/cm (25 Ibs/inch) (5,500 PSI) <50 percent at break >50 dynes/square centimeter Pliable hand Heat-set Mylex Every 500 mm(20") Dead soft/annealed Virgin PET Virgin LDPE >30 percent, solid 1.5#/R Five hours without peel See Table 207-25.1 (B) o Color TABLE 207-25.1 (B) DETECTABLE UNDERGROUND UTILITY MARKING TAPE COLORS Utility Marked Red Yellow Orange Blue Green Brown Purple Electric power, distribution, transmission, and municipal electric Gas and oil distribution and transmission, dangerous materials, systems. product and steam. Telephone and telegraph systems, police and fire communications, and cable television. Water systems. Sanitary and storm sewer systems, nonpotable. Force mains. Reclaimed water lines.O Add the following section: 207-25.2 Materials Approvals. Detectable Underground Utility Marking Tape shall meet the requirements of each of the following agency/association publications. A. Department of Transportation, Materials Transportation Bureau, Office of Pipeline Safety. USAS code for pressure piping B31.8, paragraph 192.321 (e). B. National Transportation Safety Board, Washington, DC, Special Study Prevention of Damage to Pipelines. Adopted June 7, 1974. Report NTSB-PSS-73-1. C. American Petroleum Institute (API). Recommended practice for marking buried liquid petroleum pipelines - APR RP 1109. D. General Services Administration, Washington, DC, Public Buildings Service Guide Specification for Mechanical and Electrical Equipment - PBS 4-1501, Amendment 2, Page 501-14, Paragraph 18, Subparagraph 18.1, Clause 18.1.1. E. Rural Electrification Authority (REA), U.S. Department of Agriculture, Washington, DC, National Electrical Safety Code for Underground Construction for remote and immediate hazards. SECTION 210 - PAINT AND PROTECTIVE COATINGS 210-1 PAINT. 210-1.5 Paint Systems. Add the following to Table 210-1.5(A) TABLE 210-1.5 (A) Revised 11/01/06 Contract No. 3907 Page 106 of 141 Pages Surface to be Painted Temporary Railing type (K) Pre-reatment / Surface Preparation Abrasive Blast Cleaning to a Roughened, Textured Appearance Primer None Finish Coats Two coats white Acrylic Emulsion Paint (1) (1) acrylic emulsion paint designed for use on exterior masonry. This paint shall comply in all respects to Federal Specification TT-P-19 (latest revision), Paint, Acrylic Emulsion, Exterior. This paint may be tinted by using "universal" or "all purpose" concentrates. 210-1.6 Paint for Traffic Striping, Pavement Marking, and Curb Marking. Modify as follows: Paint for traffic lane lines, turn pocket lines, edge lines, channelizing lines, bike lane lines, chevrons, and curbs shall be rapid dry water borne conforming to CALTRANS Specification No. PTWB-01. Paint for pavement legends, pavement symbols, pavement arrows, cross walks, parking stall markings and stop bars shall be alkyd thermoplastic conforming to CALTRANS Specification No. 8010-19A. Glass beads shall be applied to the surface of the rapid dry water borne paint and the molten thermoplastic material and shall conform to the requirements of CALTRANS Specification No. 8010-004 (Type II). CALTRANS Specifications for water borne paint, thermoplastic material and glass beads may be obtained from the CALTRANS Transportation Laboratory, P.O. Box 19128, Sacramento, CA 95819, telephone number (916) 227-7000. SECTION 212 - LANDSCAPE AND IRRIGATION MATERIALS 212-1 LANDSCAPE MATERIALS. 212-1.2.3 Commercial Fertilizer, add the following: Preplant fertilizer shall be granular commercial fertilizer 7-7-7 or approved equal. Postplant fertilizer shall be 12-4-6 or approved equal with Ca, Fe, Zn, and Mn and with the majority of nitrogen in nonammoniac form to prevent acidification of soil. Planting tablets shall be compressed fertilizer tablets with a 20-10-5 analysis. Hydroseed fertilizer shall be long-lasting, controlled-release, plastic-coated, uniform in composition, free-flowing, suitable for application with approved equipment, and shall contain the minimum available percentages of nitrogen, phosphoric acid, potash and sulfur required by tables 212-1.2.5.1 (A) through 212-1-2-5- 3(A). 212-1.2.4 Organic Soil Amendment. Add the following: For all types of Organic Soil Amendment mulch materials produced from pine trees grown in Alameda, Monterey, Santa Clara, Santa Cruz or San Mateo Counties shall not be used in the Work. Type 1A Organic Soil Amendment shall conform to the requirements for type 1 Organic Soil Amendment except as modified hereinafter. Type 1A Organic Soil Amendment shall be a wood or rice residual product derived from the bark of pine, white fir, or red fir or cedar or redwood shavings or rice hulls. Type 1A Organic Soil Amendment shall be manufactured from clean wood, free from clods coarse objects and rocks and shall conform to the properties shown in Table 212-1.2.4(6): Table 212-1.2.4(8) SOIL AMENDMENT PROPERTIES Property Dry Weight Nitrogen Dry Weight Passing 25 mm (1") Sieve Dry Weight Passing #4 Sieve Dry Weight Passing #16 Sieve Dry Weight Passing #30 Sieve Dry Weight Passing #50 Sieve Dry Weight Passing #100 Sieve Minimum (1) 100% 95% 45% 30% 0% 0% Maximum (1) 100% 100% 65% 40% 10% 2% Revised 11701706 Contract No. 3907 Page 107 of 141 Pages Salinity Iron ( Dilute acid soluble on dry weight basis) Ash (dry weight basis) PH Wettability (D 0.08% 0% 6.0 (1) (D — 6.0% 7.0 (D (1) (As Required by Table 212-1.2.4(A) SSPWC) For all types of Organic Soil Amendment the Contractor shall supply the Engineer a sample of the proposed amendment accompanied by an analytical analysis from a qualified agricultural laboratory certifying compliance to the requirements herein. Qualified agricultural laboratories shall have an on- going quality assurance program that fulfills the requirements of the most recent version of the "Western States Laboratory Proficiency Testing Program Soil and Plant Analytical Methods". Certificates of compliance shall contain a statement attesting that the organic soil amendment meets the requirements of these specifications and that the testing agricultural laboratory does fulfill the requirements of "Western States Laboratory Proficiency Testing Program Soil and Plant Analytical Methods". Said submittal shall be in accordance with Section 2-5.3.3. 212-1.2.5 Mulch for Hydraulic Method Seed Lawn Planting. Add the following: The terms Hydroseeding and Hydroseed shall be synonymous with Hydraulic for the purposes of Section 212. Disturbed Areas, Southern Willow Scrub and Riparian Scrub and Upland Transition Zone planting areas shall be mulched, fertilized and seeded using the method specified on the plans. Mulch shall be manufactured from virgin wood cellulose fiber mulch and shall not contain growth or germination inhibitors. When mixed with water, the mulch shall remain in uniform suspension and when blended with the seed, fertilizer, and other approved additives, shall form a homogeneous slurry. When applied, the fibers shall form a moisture absorbing membrane with adequate percolation properties sufficient to allow one hundred percent of water applied at the rate of 3.1 liters per minute per square meter (0.075 gallons per minute per square foot) onto a surface inclined at a 2:1 (horizontal: vertical) slope to pass through the membrane. A non-phyto-toxic wetting agent shall be added to the slurry mixture. A water soluble, non-toxic green dye shall be added in sufficient quantity to clearly delineate the planted areas. When required, binder shall be added to the slurry mixture and shall be "CPA 4000", "AZTAC", "Ecology Control", "M-Binder", or approved equal. Add the following section: 212-1.2.5.1 Disturbed Area Mulch Fertilizer and Additives. In addition to the seed mix shown in the table for Disturbed Areas the slurry mixture shall be applied at the rates shown in Table 212- 1.2.5.1 (A) Table 212-1.2.5.1 (A) DISTURBED AREA MULCH FERTILIZER AND ADDITIVES Component Virgin Wood Cellulose Fiber Mulch Binder (1) Fertilizer (16-20-0) Ammonium Phosphate Sulfate, Plus 15% Soil Sulfur Wetting Agent Green Colorant Applicati grams per sq. meter 225 7 35 on Rate (pounds per acre) (2000) (60) (300) Per Mfg. Recommendation Per Mfg. Recommendation (1) Required to be incorporated only when applied between the months of Nov. through Feb. Add the following section: 212-1.2.6 Herbicides and Pesticides. Shall be used in their appropriate applications with strict adherence to manufacturer's specifications and instructions. Postemergent herbicide for all areas o 3 Revised 11/01/06 Contract No. 3907 Page 108 of 141 Pages shall be Glyphosate, N-(phosphonomethyl) glycine, in the form of its isopropylamine salt such as Roundup Pro, Diquat, Montar, or approved equal. Preemergent herbicide for shrubs and groundcover areas planted from flats shall be Treflan, Surflan, Eptan, or approved equal. Add the following section: 212-1.2.7 General Soil Conditioners. > Agricultural-grade gypsum shall be a calcium sulfate (CaSO4 H20) product - 94.3 percent. 90 percent shall pass a 50-mesh screen. Control of dust during application is mandatory. Iron Sulfate shall be ferrous sulfate in pelletized or granular form containing not less than 20.0 percent iron expressed as metallic iron. Iron Sulfate pellets shall be of size and gradation such that 98 percent is retained on a 10-mesh screen. Add the following section: 212-1.2.8 Stabilizing Emulsion. Stabilizing emulsion shall be a concentrated liquid chemical that forms a plastic film upon drying and allows water and air to penetrate. The film shall be nonflammable and shall have an effective life of at least one year. Stabilizing emulsion shall be nontoxic to plant and animal life and nonthinking to concrete or painted surfaces. In the cured state the stabilizing emulsion shall not be re-emulsifiable. The material shall be registered with, and licensed by the California, Department of Food and Agriculture, as an "auxiliary soil chemical". Stabilizing emulsion shall be miscible with water at time of mixing and application. 212-1.3 Seed. Add following: The quantity of pure live seed supplied shall meet or exceed the quantity shown in the specified mixes. Seed shall not contain more than 0.5 percent weed seed by volume Seed types shall be as specified on the plans and planting legends, and shall be applied at the rates indicated. All brand-name, patented seed must be received by Contractor in original manufacturer's bag. Seed shall be received by Contractor in separate containers specifying kind, quantity, purity, and germination. Contractor shall provide the Engineer with each seed bag label used in the Work. Add the following section: 212-1.3.1 Seed for Disturbed Areas. Hydroseeding mix for Disturbed Areas (all areas excepting Southern Willow Scrub and Riparian Scrub and Upland Transition Zone seeded areas) shall consist of no less than the seed varieties shown in Table 212-1.3.1 (A). Table 212-1.3.1 (A) SEED FOR DISTURBED AREAS Seed Variety Rose Clover Festuca Megalura, Zorro Fescue Eschscholzia Californica Achillea Millefolia Alyssum (Carpet Of Snow) Dimorpholeca Applicat grams per sq. meter 2.5 2.5 0.35 0.45 0.35 0.25 on Rate (pounds per acre) 20 d) 20 3 4 3 2 (1) Rose Clover shall be inoculated with a nitrogen fixing bacteria and be applied dry either by drilling or broadcasting immediately before hydraulic application of the remaining seed mix and mulch. 212-1.4.1 General. Add the following: Plants shall be the variety and size shown on the plans or in the special provisions and shall conform to the requirements of these specifications. Contractor shall notify the Engineer 48 hours before each plant delivery so that the Engineer can inspect the plants. A*¥ Revised 11/01/06 Contract No. 3907 Page 109 of 141 Pages The scientific and common names of plants herein specified shall conform to the approved names given in "A Checklist of Woody Ornamental Plants in California, Oregon and Washington" published by the University of California, Division of Agriculture Sciences, Publication 4091 (1979). Each group of plant materials delivered on site shall be labeled clearly as to species and variety. All patented plants (cultivars) required by the plant list shall be delivered with a proper plant patent attached. The Contractor shall obtain clearance from the County Agricultural Commissioner, as required by law, before planting plants delivered from outside the County in which they are to be planted. Evidence that clearance has been obtained shall be filed with the Engineer. All plants furnished by the Contractor shall be true to type or name as shown on the plans and shall be tagged identifying the plants by species or variety; however, determination of plant species or variety will be made by the Engineer and the Engineer's decision shall be final. Plants shall be individually tagged or tagged in groups by species or variety. Carpobrotus cuttings need not be tagged. All plants shall comply with Federal and State laws requiring inspection for plant diseases and infestations. Inspection certificates required by law shall accompany each shipment of plants, and certificates shall be delivered to the Engineer. Plants furnished by the Contractor shall be healthy, shapely, and well-rooted, and roots shall show no evidence of having been restricted or deformed at any time. Plants shall be well-grown, free from insect pests and disease, and shall be grown in nurseries which have been inspected by the State Department of Food and Agriculture and have complied with the regulations thereof. The Engineer is the sole judge as to acceptability of each plant. Vigorous, healthy, well-proportioned plants are the intent of this specification. Plants which are even moderately "overgrown", or are showing signs of decline or lack of vigor, are subject to rejection. The size of the plants will be as shown on the plans. Plants larger in size than specified may be used with the approval of the Engineer, but the use of larger plants will make no change in contract price. If the use of larger plants is approved, soil amendments shall be increased proportionately. All plants not conforming to the requirements herein specified shall be considered defective and such plants, whether in place or not, shall be marked as rejected, and immediately removed from the site and replaced with new plants by the Contractor at the Contractor's expense. The Engineer reserves the right to change the species, variety, and/or sizes of plant material to be furnished, provided that the cost of such plant changes do not exceed the cost of plants in the original bid, and with the provision that the Contractor shall be notified in writing, at least 60 days before the planting operation has commenced. No plant shall be transported to the planting area that is not thoroughly wet throughout the ball of earth surrounding the roots. Any plant that, in the opinion of the Engineer, has a damaged root ball or is dry or in a wilted condition when delivered to the planting area will not be accepted, and shall be replaced by the Contractor at the Contractor's expense. Each plant shall be handled and packed in the approved manner for that species or variety, and all necessary precautions shall be taken to ensure that the plants will arrive at the site of the work in proper condition for successful growth. Trucks used for transporting plants shall be equipped with covers to protect plants from windburn. Root condition of plants furnished by the Contractor in containers will be determined by removal of earth from the roots of not less than 2 plants nor more than 2 percent of the total number of plants of each species or variety, except when container-grown plants are from several sources, the roots of not less than 2 plants of each species or variety from each source will be inspected by the Engineer. In case the sample plants inspected are found to be defective, the Agency reserves the right to reject the entire lot or lots of plants represented by the defective samples. Any plants rendered unsuitable for planting because of this inspection will be considered as samples and will not be paid for. The Contractor shall notify the Engineer when plants are to be shipped to the project site. The notification shall be given not less than 10 days prior to the actual shipment date. Revised 11/01/06 Contract No. 3907 Page 110 of 141 Pages Carpobrotus cuttings shall be 250 mm (10") or more in length and shall not be rooted. Delosperma cuttings shall be 150 mm (6") or more in length and shall not be rooted. Cuttings shall be tip cuttings from healthy, vigorous and strong-growing plants and shall be insect and disease free. Mature or brown-colored stem growths or cuttings which have been trimmed will not be accepted. Cuttings shall be planted not more than 2 days after cutting and shall not be allowed to dry or wither. Carpobrotus cuttings shall not be taken from any plants that indicate the presence of ice plant scale (Pulvinaria species). The Contractor shall notify the Engineer of the location where cuttings are to be taken at least 10 days prior to taking the cuttings and shall be responsible for all permit and inspection fees involved in obtaining cuttings. 212-1.5.3 Tree Stakes. Modify as follows: Tree stakes shall be 50mm (2") diameter turned lodgepole pine, pointed on their driven end. Add the following section: 212-1.6 Erosion Control Matting. Erosion control matting shall be made of 100-percent- biodegradable, weed-free wheat straw of thickness and density yielding 270 grams per square meter (0.50 Ib./sy) with photodegradable polypropylene netting with a density of 0.89 grams per square meter (1.64 lb/1000 sy) having an approximate mesh interval of 50 mm x 50 mm (2" x 2") on each face of the straw mat. The straw mat shall be sewn together with unidirectional lines of cotton or polypropylene thread spaced approximately 50 mm (2") apart. Erosion control matting shall be "North American Green, DS150", "BonTerra S2", or approved equal. Add the following section: 212-1.7 Erosion Control Mat Staples. Erosion control mat staples shall be 25 mm x 150 mm (1" x 6"), U-shaped 11-gauge mild steel staples. Add the following section: 212-1.8 Root Barriers. Root barriers shall be no less than 1m (39") in width. Root barriers shall be "Biobarrier", as manufactured by Reemay, Inc., 70 Old Hickory Boulevard, Old Hickory, TN 97138, Phone 615-847-7000, no substitutes will be accepted. 212-2 IRRIGATION SYSTEM MATERIALS. 212-2.1.3 Plastic Pipe for Use with Solvent Weld Socket or Threaded Fittings, add the following. Except as provided in this section, all buried piping in the irrigation system shall be installed with underground utility marking tape conforming to the requirements of section 207-21 and identifying it as reclaimed water. Intermittent pressure lines (lines on the downstream side of a controller valve that will not be subject to constant pressure) will not require underground utility marking tape. All PVC pipe used for irrigation systems shall be colored purple by the addition of a dye integral to the PVC. Painted pipe will not be accepted. Pressure mainline piping for sizes 50 mm (2") and larger shall be PVC having a pressure rating of 2170 kPa (315 PSI), S.D.R. 13.5. Stenciled pipe is required for all irrigation system piping including portions not required to be marked with underground utility marking tape. All pipe shall have stenciling appearing on both sides of the pipe with the marking "Reclaimed Water" in 16 mm (5/s") high letters repeated every 300 mm (12"). PVC non-pressure buried lateral line piping shall be PVC Schedule 40. Add the following section: 212-2.1.7 Brass Pipe and Fittings. Brass pipe shall be IPS standard weight 125 LB 85 percent copper and 15 percent zinc, trade designation seamless red brass pipe conforming to the requirements of ASTM B43-91. Brass pipe fittings and connections shall be Standard 125 LB class Revised 11/01/06 Contract No. 3907 Page 111 of 141 Pages 85 percent red brass fittings and connections. .•**** 212-2.2.7 Valve Boxes. Add the following: All valve boxes shall be marked "RCV", "BV" or "QC", "PB" respectively. Remote control valves shall be marked with station numbers embossed on the valve cover with a brass tag. (RCV boxes shall have locking covers.) Other boxes such as pull boxes, etc., shall be marked with appropriate identification. Add the following section: 212-2.2.8 Ball Valves. Ball valves shall have bottom-loaded pressure-retaining stems, glass- reinforced seats, and reinforced TFE stem packing seals. Valves sizes 13 mm (!4") to 50 mm (2") shall be pressure rated at 4140 kPa (600 PSI) WOG and 1030 kPa (150-PSI) saturated steam. Each valve shall be tested, air under water, in the opened and closed position by the manufacturer. Ball valve must conform to Federal Specification WW-V-35B, Type II, Class A, Style 3, End Connection A orC. Add the following section: 212-2.2.9 Pressure Regulator Valve. Pressure regulator valve shall be bronze body with screw fitting. Add the following section: 212-2.2.9 Wye Strainers. Wye strainers shall have a cast iron or all-bronze body with a removable stainless steel or monel strainer. Wye strainers shall be capable of withstanding a cold water working pressure of 1034 kPa (150 psi). Wye strainers at backflow preventer assemblies shall be equipped with a gate valve at the outlet. All other wye strainers shall be equipped with a garden valve at the outlet. The strainer screen for the wye strainer in a backflow preventer assembly shall have an open area ^^ equal to at least 3 times the cross-sectional area of the pipe based on an iron pipe size and shall be '**? woven wire fabric with 850-um mesh or perforated sheet with 1.14 mm (0.045") diameter holes. All other wye strainers shall be equipped with 425-um strainer screens. 212-2.4 Sprinkler Equipment. Add the following: All sprinkler heads are to have factory built-in check valves or a check valve under each head. Drip assemblies shall meet the following requirements: The drip emitter shall be Pepco Quadra or Rainbird XERI-Bird-8 or approved equal as called on drawings, with four ports. Drip tubing for emitter outlets shall be Rainbird (RBT-160V), Salco, or approved equal. Drip tubing stakes shall be Rainbird No. RS-13, Salco, or approved equal. Bug cap for drip tubing shall be manufactured by Rainbird, Pepco, or approved equal. The drip pressure regulator shall be Rainbird, Netafim PVR, or approved equal. Drip emitter filter shall be Amiad, Rainbird, or approved equal. Drip emitter access boxes shall be Rainbird No. SEB-6X, Salco Subterranean Emitter Box, or approved equal. Check valves shall be of heavy-duty virgin PVC construction with FIP thread inlet and outlet. Internal parts shall be stainless steel and neoprene. Antidrain valves shall be field adjustable against drain out from 1 .5 m to 12 m (5' to 40') of head. All sprinkler heads that are without valves in the heads are to have an antidrain valve feature and shall have an excess flow feature, which will automatically stop the flow of water when it exceeds the GPM preset by the manufacturer. Check valves shall be King Bros., Rainbird, or approved equal. 212-2.3 Backflow Preventer Assembly. Add the following: Backflow preventers shall be one of the approved reduced pressure principle devices listed by the California Department of Health Services, Division of Drinking Water and Environmental Management, 601 North 7th Street, Mailing Station (MS) 92, P.O. Box 942732, Sacramento, CA 94234-7320. Backflow preventers shall be factory assembled and shall include 2 check valves, one pressure differential relief valve, 2 shut-off valves and 4 test cocks. Backflow preventer and valves shall be Revised 11/01/06 Contract No. 3907 Page 112 of 141 Pages the same size as the pipeline in which they are installed, unless otherwise shown on the plans. Backflow preventer shut-off valves shall be manufactured from iron or bronze and shall be either resilient wedged gate valves, resilient seated and fully ported ball valves, or resilient seated butterfly valves. Threaded type shut-off valves shall be provided with a union on one side of each valve. Unions shall be brass or malleable iron. Add the following section: 212-2.4.1 Additional Equipment. Contractor shall provide the following items to the Engineer: 1. Two control valve keys. 2. Two wrenches for removing each different type of sprinkler head. 3. Two quick coupler keys. The keys and hose ells shall be of the same manufacturer as 4. the coupling valve. 5. Five keys for opening and locking each automatic controller and enclosure. Add the following section: 212-2.5 Flexible Hose.— Flexible hose shall be nonrigid polyvinyl chloride (nonrigid PVC) hose conforming to the specifications of ASTM Designation: D 2287, Cell-type 6464500. Wall thicknesses of nonrigid PVC hose shall conform to Table 212-2.5(A) when determined in accordance with ASTM Designation: D 2122. TABLE 212-2.5(A) FLEXIBLE HOSE Hose! (Millimeters) 15 20 25 iize-Nominal (Inches) % 3/41 Minimum Wa (Millimeters) 3.73 3.91 4.55 II Thickness* (Inches) 0.147 0.154 0.179 Range (Percent) 12 12 12 *as measured at any point on the cross section. The hose shall provide leak-free, non-separating connections suitable for the purpose intended when connected to the fittings specified herein. Fittings for flexible hose shall be injection molded PVC, Schedule 40, conforming to the specifications of ASTM Designation: D 2466. Fittings shall be solvent cemented type. Solvent cement for flexible hose and fittings shall be of commercial quality specifically manufactured for use with nonrigid PVC hose. Primer for flexible hose fittings shall be the same as specified for plastic pipe supply line fittings. 212-3 ELECTRICAL MATERIALS. 212-3.1 General. Add the following: the 1996 National Electrical Code. All electrical materials shall conform to the requirements of 212-3.2.2 Conductors. Add the following: Low voltage electric wiring running from controller to the automatic control valves shall be no smaller than No. 14 solid single conductor, copper wire, 0.015 mm (60 mil) insulation, 0.015 mm (60 mil) neoprene jacket, style UF (Direct Burial), or equal, color code wires to each valve. Neutral wires shall be white, no smaller than No. 12 solid single conductor wire, 0.015 mm (60 mil) insulation, 0.015 mm (60 mil) neoprene jacket, style UF (Direct Burial). 212-3.3 Controller Unit. Add the following: All controllers shall be grounded by one 19 mm (5/8") diameter by 3 m (10') long stainless steel grounding rod and a 50-ohm resistance lightning arrester. Add the following section. Revised 11/01/06 Contract No. 3907 Page 113 of 141 Pages 212-3.4 Irrigation Electrical Service Equipment and Enclosures. Electrical service equipment shall incorporate the following elements: 1. One 100-amp, 120/240-volt, single-phase load center, as approved by the Engineer; 2. One 100-amp rated commercial meter socket suitable for the San Diego Gas and Electric Company meter, with provision for test block bypass having a UL listing and EUSERC approval; 3. One 15-amp circuit breaker for each irrigation controller energized by the service; 4. One 20-amp circuit breaker for the duplex receptacle. 5. The design, assembly, grounding, wiring, and components of the irrigation electrical service equipment and enclosure shall meet the requirements of the 1996 edition of the National Electrical Code. 6. Electrical service equipment shall be enclosed in a cabinet constructed entirely of 14-gage, or heavier, 304 stainless steel. The cabinet shall be of welded construction with a brushed finish; anchoring points shall be inside the enclosure. 7. The cabinet shall be HYDROSAFE Model No. HS9, Strong Box, or approved equal. 8. The cabinet shall have a 304 stainless steel interior bulkhead separating the 120/240-volt electrical service section from the irrigation controller section. 9. No wood components shall be used in the enclosure. 10. Each section of the cabinet shall have full front opening doors with piano hinges, integral keylock and hasp and staple, or other provision, for padlock. 11. The cabinet shall be provided with cross-flow ventilation. Ventilation openings shall be located and designed to preclude rain, irrigation splash, vermin, and insects from entering the cabinet. 12. The controller side door shall have provision for mounting control schematics without the use of adhesives or fasteners. The service side door shall have a clear acrylic plastic window to allow the electrical meter to be read. 13. The cabinet shall have a duplex 15-amp, 120-volt receptacle with ground fault interrupter protection mounted on the interior service side. 14. Concrete footings and pads supporting the Electrical service equipment shall be 560-C-3250 and shall be no less than 150 mm (6") thick. 15. Anchor bolts to secure the service equipment to the concrete pad shall be 10 mm (3/8") diameter by 150 mm (6") long hot dip galvanized or stainless steel headed bolts with washers, without sleeves, conforming to section 304-1.7. Anchor bolts to secure the service equipment to the concrete pad shall be embedded in the concrete slab between 65 mm and 100 mm (21/2n and 4"). SECTION 213 - ENGINEERING FABRICS 213-2 GEOTEXTILES. 213-2.1 General. Add the following: Geotextile types shall be used for the applications listed in Table 213-2.1 (A) Table 213-2.1 (A) GEOTEXTILE APPLICATIONS Application of Geotextile Separation of Soil and Street Structural Section Separation of Soil and Subsurface Aggregate Drain Reinforcement of Street Structural Section Remediation and Separation of Soil Reinforcement of Soil Drainage at the Interface of Soil Structures Drainage at the Interface of Soil and Structures Rock Slope Protection Fabric for Rock Sizes Below 225 kg (% Ton) Type Designation 90WS 180N 200WS 270WS 270WS N/A N/A 180N jr^ Revised 11/01/06 Contract No. 3907 Page 114 of 141 Pages Application of Geotextile Rock Slope Protection Fabric for Rock Sizes Including and Above 225 kg (1/4 Ton) Plant Protection Covering Erosion Control Fence with 14 AWG - 150 mm x 150 mm (6"x6") Wire and 3 m (10') Post Spacing Erosion Control Fence with 1.8m (61) Post Spacing and No Wire Fencing Type Designation 250N 90N SOWS 200WS Add the following section: 213-3 EROSION CONTROL SPECIALTIES. Add the following section: 213-3 Gravel bags. Gravel bags for the use of temporary erosion control shall be burlap type, filled with no less than 23kg (50 Ibs) of 19 mm (3/4") crushed rock and securely tied closed. Plastic bags are not acceptable. SECTION 214 - PAVEMENT MARKERS 214-5 REFLECTIVE PAVEMENT MARKERS Add the following section: 214-5.1 Temporary Reflective Pavement Markers. Temporary pavement markers shown on the plans and required in the specifications shall be one of the types shown in Table 214-5.1 (A), or equal thereto. TABLE 214-5.1 (A) TEMPORARY REFLECTIVE PAVEMENT MARKERS Type Manufacturer of Distributor TFPM DAPCO Davidson Plastics Company, 18726 East Valley Highway, Kent, Washington 98032, Telephone (206) 251-8140. SECTION 215 - FENCING Add the following section: 215-1 ENVIRONMENTAL FENCING Add the following section: 215-1.1 Materials. Environmental fence shall be minimum 4' high, orange colored plastic construction fencing installed prior to performing any work. Environmental fence shall be constructed of non-toxic, non-conductive polyethylene capable of withstanding temperatures from -58F degrees to 194F degrees. Color shall be non-fading. Posts shall be 6'-6" long, shall be spaced no more than 10'-0" apart and buried portion shall be no less than 2'-6" deep. Used materials may be installed providing the used materials are good, sound, and are suitable for the purpose intended, as determined by the Engineer. Materials may be commercial quality providing the dimensions and sizes of the materials are equal to, or greater than, the dimensions and sizes specified herein. Posts shall be either metal or wood at the Contractor's option. Galvanizing and painting of steel items will not be required. Treating wood with wood preservatives will not be required. Concrete footings for metal posts will not be required. Revised 11/01/06 Contract No. 3907 Page 115 of 141 Pages SUPPLEMENTAL PROVISIONS TO STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION PART 3, CONSTRUCTION METHODS SECTION 300 - EARTHWORK 300-1 CLEARING AND GRUBBING. 300-1.1 General, add the following to the third paragraph: During surface clearing operations, the Contractor shall not cover or bury any plant growth or other objectionable materials. If the Contractor cannot successfully separate the plant growth from the surface soil and advertently or inadvertently mixes organic or other objectionable materials with the soil, the soil so contaminated shall be removed from the site by the Contractor. All costs, if any, associated with removing the soil mixed with organic or other objectionable materials and importing soil to replace said contaminated soil shall be borne by the Contractor and no additional payment therefore shall be made to the Contractor. 300-1.3 Removal and Disposal of Materials, add the following: Also included in clearing and grubbing shall be removal and disposal of existing street poles and lights, metal guard rail, fences, asphalt concrete and aggregate base, concrete curb and gutter, concrete sidewalk, existing gate, existing headwalls, rip-rap, traffic signs, and other existing features which interfere with the work. Whether or not such items are shown on the plans they shall be removed as a part of clearing and grubbing. Existing underground pipes and conduits that are shown on the plans and designated to be removed shall be removed by the Contractor as a part of clearing and grubbing. 300-1 .4 Payment modify as follows: Payment for clearing and grubbing shall be made at the contract lump sum price for clearing and grubbing within the project limits and at stockpile locations and no other payments will be made. Unless otherwise noted on plans, the Contractor shall remove all existing abandoned pipelines and conduits of any type, or use, and pipelines and conduits of any type, or use, that are abandoned during the course of the work and shall replace said pipelines and conduits with properly compacted soils. Payment for removal and disposal of abandoned utilities shall be included in the lump-sum bid for Clearing and Grubbing, and no additional payment will be made. 300-2 UNCLASSIFIED EXCAVATION. 300-2.1 General, add the following: Unclassified excavation shall include removal and stockpile of suitable material, recompaction, mixing, grading for mitigation work, trenching and backfilling of storm drains, sewers, other utilities, disposal of unsuitable materials not included in the bid item for clearing and grubbing, all cut and fill including, salvaging clean excavated material and filling areas to the required grades and cross section. Unclassified excavation shall be utilized onsite to make all fills shown on the plans. Unclassified excavation shall also include scarification and moisture adjustment and compaction of the top 300 mm (1 ') of the subgrade in the roadway prism in cut areas to 95 percent relative compaction, wetland mitigation grading and attendant work, export of remaining excess material to a disposal site or spoil area acquired by the Contractor and pumping and disposal of storm and ground water. Revised 11/01/06 Contract No. 3907 Page 116 of 141 Pages 300-2.2.1 General, add the following: Alluvial and colluvial removal and recompaction shall consist of excavating, blending and recompacting loose soils in areas that are designated to receive fills. The existing loose soils shall be removed by the Contractor until a firm unyielding surface is exposed or to a depth determined by the Engineer. If the excavated material contains 4%, or more, water than the optimum moisture content the Contractor shall blend the wet soil with soils having a lower moisture content and/or spread the excavated material in a manner that enables the material to dry to optimum moisture content. The cost of spreading and/or drying shall be included in the contract unit price for removal and recompaction. The excavated material shall be placed and compacted in accordance with section 300-4 of the specifications except that section 300-4.9, Measurement and Payment, shall not apply. 300-2.2.1 General, add the following to the first paragraph: Such direction may include, but is not limited to, directing the Contractor to blend, adjust moisture content of, rework, and place unsuitable soils at specific locations or elevations on the site. Add the following section: 300-2.2.3 Compressible Soil. Compressible soils such as existing uncontrolled or unacceptable fill, alluvium, and colluvium may exist within portions of the Project site. Where required by the Engineer, the Contractor shall remove such compressible soils from areas to receive fill or from areas upon which surface improvements are to be placed. The removal and disposal of such compressible soils shall be paid for at the Contract Unit Price for unclassified excavation unless it is considered otherwise unsuitable by the Engineer in which case it may be paid for in accordance with section 300-2.2.1. 300-2.2.4 Instability of Cuts. Add the following: The Contractor shall remove additional material as directed by the Engineer to improve the stability of excavated cuts. The removal of such excavated material shall be paid for at the Contract Unit Price for unclassified excavation unless it is considered otherwise unsuitable by the Engineer, in which case it will be paid for in accordance with Subsection 300-2.2.1. 300-2.5 Slopes, add the following: The hinge points (the top and bottom) of slopes shall be located within 75 mm (0.25') of the locations shown on the plans. 300-2.5 Slopes, add the following: after the first sentence of the first paragraph: A slope shall be defined as any area steeper than three horizontal to one vertical. 300-2.6 Surplus Material, add the following: The Contractor shall haul and dispose of all surplus material from the project. The Contractor shall utilize highway legal haul trucks for this export of material from the project site and to a site secured by the Contractor. No earth moving equipment or special construction equipment, as defined in section 565 of the California Vehicle Code, will be allowed for hauling material on public streets. 300-2.8 Measurement, delete the second paragraph relating to materials removed from stockpiles and add the following: Unclassified Excavation shall be measured based on the volume it occupies in its original position before excavating. The measurement shall be from the original ground contours after clearing and grubbing and the bottom of areas of excavation to the design elevations shown on the plans or actual ground contours existing in borrow sites after excavation or those for removal and recompaction of alluvial and colluvial materials or those for materials excavated to improve the stability of cuts, whichever is lower in elevation. No excavated material which is re-excavated will be measured for payment. No allowance for shrinkage or swell will be considered. Materials excavated or otherwise removed as all or part of any other bid item shall not be measured as Unclassified Excavation. Revised 11/01/06 Contract No. 3907 Page 117 of 141 Pages 300-2.9 Payment, add the following: Payment for work performed under sections 300-2.2.1, 300-2.2.2, 300-2.2.3 and 300-2.2.4, when the Engineer determines that the soils are unsuitable, shall be made for the actual labor, materials and equipment used to accomplish the work as per section 3- 3 EXTRA WORK of the specifications. 300-2.9 Payment substitute the following: Payment for Unclassified Excavation will be made at the unit price bid in the proposal. Only the quantity of unclassified excavation measured shall be paid for. No excavated material which is re-excavated will be paid for. For progress payments, the quantity of unclassified excavation shall be estimated by the Engineer. The Engineer's calculations shall be considered the definitive determinant for quantities for final payment. All topographic surveying and calculations necessary to quantify payment quantities for Unclassified Excavation shall be performed by the Engineer. Payment for Unclassified Excavation shall include costs of surveying, staking, preparation of earthwork quantity reports, placement, compaction, soil remediation, moisture adjustment and water therefore, rework of compressible soils, slope rounding, grading, stockpiling, access road, temporary detour roads, earthen swales and drainage channels as shown on the drawings or required by the contract documents. Add the following section: 300-2.10 Grading Tolerance. The Contractor shall finish excavated areas other than slopes and subgrade below structures, within the roadway and sidewalk areas within 30 mm (0.1') of the grades shown on the plans. Subgrade tolerances shall conform to the requirements of section 301-1.4 SSPWC. 300-3 STRUCTURE EXCAVATION AND BACKFILL 300-3.1 General, add the following: The Contractor shall excavate to the lines and levels required and/or shown on the Drawings. The Contractor shall provide all shoring, bracing, cribbing, pumping, and planking required. The Contractor shall excavate and maintain the bottom of all trenches in a condition that is level, firm, clean and free from all debris or foreign matter. Excavations shall be kept free from water at all times. The Contractor shall remove any unsuitable material encountered below grade as directed by the Engineer 300-3.6 Payment, add the following: Dewatering shall be paid for as an incidental to lunclassified excavation and no additional compensation will be made therefore. Except for unsuitable materials removed as part of the clearing and grubbing item unsuitable material encountered below grade will be paid for at the unit price bid for unclassified excavation. 300-4 UNCLASSIFIED FILL 300-4.2 Preparation of Fill Areas, add the following: Except as provided in section 300-4.7, "Compaction", areas proposed for improvements all fill (including backfill and scarified ground surfaces) shall be compacted by the Contractor to no less than 90 percent of maximum dry density as determined in accordance with ASTM Test Procedure D1557-91. 300-4.4 Benching, add the following: Benching shall conform to the details shown on the plans. 300-4.5 Placing Materials for Fills, add the following: The Contractor shall perform grading such that the upper 900 mm (31) of fill placed in the roadway pavement area is composed of properly compacted low expansive soils. The more highly expansive soils shall be placed in the deeper fill Revised 11/01/06 Contract No. 3907 Page 118 of 141 Pages areas and properly compacted or exported from the site. Low expansive soils are defined as those soils that have an Expansion Index of 50 or less when tested in accordance with 1994 UBC Standard 18-2 as published by the International Conference of Building Officials. Should insufficient soils meeting the requirement of an expansion index of 50 or less be present within the limits of work, soils of the least expansion index that are available within the limits of work shall be incorporated in the upper 900 mm (3') of fill placed in the roadway. The Contractor shall break rock encountered in the excavation into particles of less than 75 mm (3"). Particles with dimensions greater than 75 mm (3") shall be uniformly distributed over the area to be filled so that construction equipment can be operated in such a manner that the larger pieces will be broken into smaller particles and become incorporated with the other materials in the layer. This requirement for particle size reduction does not apply to cobbles, small boulders, and small hard rocks found within the surface soils and formational materials. Rocks having any dimension greater than 460mm (18") shall not be incorporated into the fill. Rock exceeding 150 mm (6") in diameter shall not be placed in the upper 900 mm (3') of any fill. When there are large quantities of rock to be placed in the fill, rocks shall not be nested, but shall be spread with sufficient room between them so that intervening voids can be adequately filled with fine material to form a dense, compact mass. Oversize material which cannot be utilized for erosion mitigation or landscaping onsite shall be broken to acceptable sizes or removed from the site by the Contractor. If disposed of within the City of Carlsbad, a separate grading permit will be required for disposal of rock. 300-4.6 Application of Water, add the following: The Contractor shall place all fill soil at a moisture content no less than one (1) percent below optimum moisture as determined by ASTM test D-1557- 91. 300-4.7 Compaction, add the following: The Contractor shall compact all fill soils placed within the top 1 m (31) of roadway subgrade to a minimum of 95 percent relative compaction. On all areas to receive planting, the top 150 mm (6") shall be compacted to 85%, +2% -5%, to allow for plant growth. 300-4.8 Slopes, add the following: Feathering of fill over the tops of slopes will not be permitted. The Contractor shall compact the faces of fill slopes with a sheep's foot roller at vertical intervals no greater than 600 mm (2') or shall be built and cut back to finish grade. In addition, if not over built and cut back, the face of the slope shall be track walked upon completion. 300-4.9 Measurement and Payment, delete and substitute the following: Unclassified fill, grading, shaping, compacting or consolidating, slope rounding, construction of transitions and all work included in and incidental to Section 300-4, "Unclassified Fill" will be paid for as a part of unclassified excavation, and no additional payment will be made therefore. 300-5 BORROW EXCAVATION. Add the following section: 300-5.2.1 Imported Borrow Properties. The Contractor shall provide imported borrow that is clean well graded soil consisting of material conforming to all of the requirements in Table 300-5.2.1 (A) and the following requirements. Rock included in the top 1 m (3') of imported borrow shall be particles of less than 75 mm (3"). Rock included below the top 1 m (3') of imported borrow shall be particles of less than 150 mm (6"). TABLE 300-5.2.1 (A) IMPORTED BORROW PROPERTIES Tests R-Value Test Method No. Calif. 301 Requirements 40 Min. Revised 11/01/06 Contract No. 3907 Page 119 of 141 Pages Expansion Index Plasticity Index Sieve Analysis UBC Standard 18-2 ASTM D 424 ASTM D 422 10 Max. 4 Max. Percent Passing 75|i (No. 200) 1 5 Max.o 300-9 GEOTEXTILES FOR EROSION CONTROL. Modify as follows: 300-9 GEOTEXTILES FOR EROSION CONTROL AND WATER POLLUTION CONTROL. Add the following section: 300-9.2 General. The Contractor shall provide erosion control and water pollution control conforming to the requirements shown on the plans, as specified herein, and as elsewhere required by the Contract Documents. Erosion control and water pollution control shall include the work specified herein, and such additional measures, as may be directed by the Engineer, to meet Best Management Practices, as defined herein, and to properly control erosion and storm water damage of the limits of work and construction impacts upon areas receiving drainage flows from within the limits of work. Add the following section: 300-9.2.1 Grading Controls. The Contractor shall protect all areas that have been graded and/or cleared and grubbed as well as areas that have not been graded and/or cleared and grubbed within the limits of work from erosion. The Contractor shall provide temporary earth berms, gravel bags, silt fences, stabilized construction entrances and similar measures, coordinated with its construction procedures, as necessary and as shown on the plans to control on site and off site erosion during the construction period. The Contractor will be required to protect areas which have been cleared and grubbed prior to excavation or embankment operations, and which are subject to runoff during the duration of the contract. The criteria used to determine the appropriate erosion control measures shall be the "Best Management Practices", hereinafter BMP, defined and described in the, "Stormwater Best Management Practices Handbook, Construction", January 2003 edition as published by the California Stormwater Quality Association. The Contractor shall maintain a copy of the "Stormwater Best Management Practices Handbook, Construction", January 2003 edition on the project site and shall conduct its operations in conformity to said Handbook. Temporary erosion control measures provided by the Contractor shall include, but not be limited to, the following: a) Embankment areas, while being brought up to grade and during periods of completion prior to final roadbed construction, shall be graded so as to direct runoff into impoundment areas within the limits of work where such runoff shall have pollutants removed by BMP methods . b) The Contractor shall provide protection by BMP measures to eliminate erosion and the siltation of downstream facilities and adjacent areas. These measures shall include, but shall not be limited to: temporary down drains, either in the form of pipes or paved ditches with protected outfall berms; graded berms around areas to eliminate erosion of embankment slopes by surface runoff; confined ponding areas to desilt runoff; and to desilt runoff. c) Excavation areas, while being brought to grade, shall be protected from erosion and the resulting siltation of downstream facilities and adjacent areas by the use of BMP measures. These measures shall include, but shall not be limited to, methods shown on the plans and described herein. Add the following section: 300-9.2.2 Payment. Full compensation for performing erosion control and water pollution control, conforming to the operational requirements herein, of the BMP and conforming to the requirements of the Federal Water Pollution Control Act, including the latest amendments thereto, which is not a part of the planned permanent work or included as a separate bid item shall be considered as Revised 11/01/06 Contract No. 3907 Page 120 of 141 Pages included in the contract price bid for unclassified excavation, and no additional compensation will be allowed therefore. 300-11 STONEWORK FOR EROSION CONTROL. 300-11.4 Payment, delete and replace as follows: Rock protection will be paid for at the lump sum contract Price Bid for rock protection, complete and in place, in accordance with the details and requirements of the plans and specifications. 300-12 ROCK SLOPE PROTECTION FABRIC. Add the following section: 300-12.1 Preparation of Subgrade. Prior to placing rock slope protection fabric the Contractor shall clear the surfaces upon or against which rock slope protection fabric is to be placed of loose or extraneous material and sharp objects that may damage the fabric during installation. Equipment or vehicles shall not be operated or driven directly on the rock slope protection fabric. Rock slope protection fabric damaged during placement shall be replaced or repaired by the Contractor at its expense as directed by the Engineer. Add the following section: 300-12.2 Placement The Contractor shall place rock slope protection fabric prior to placing rock slope protection. The Contractor shall grade surfaces to be covered by rock slope protection so as to provide full support for the fabric. Rock slope protection fabric shall conform to the provisions in Section 213-2, "Geotextiles," and shall be placed by the Contractor in accordance with the details shown on the plans and as specified herein. The Contractor shall handle rock slope protection fabric with care that it is not torn or stretched and place it in accordance with the manufacturer's recommendations, these specifications and as directed by the Engineer. The Contractor shall place and fit rock slope protection fabric loosely upon or against the surface to receive the fabric so that the fabric conforms to the surface without damage when the cover material is placed. Rock slope protection fabrics shall be joined, at the option of the Contractor, either with overlapped joints or stitched seams. When fabric is joined with overlapped joints, all adjacent borders of the fabric shall be overlapped not less than 610 mm (24"). The fabric shall be placed such that the fabric being placed shall overlap the adjacent section of fabric in the direction the cover material is being placed. When the fabric is joined by stitched seams, the fabric shall be stitched with yarn of a contrasting color. The size and composition of the yarn shall be as recommended by the fabric manufacturer. The number of stitches per 25 mm (1") of seam shall be 6 ± 1. The strength of stitched seams shall be the same as specified for the fabric, except when stitched seams are oriented up and down a slope the strength shall be a minimum of 80 percent of that specified for the fabric. Fabric damaged beyond repair, as determined by the Engineer, shall be replaced by the Contractor and no additional payment will be made therefore. Repairing damaged fabric shall consist of placing new fabric over the damaged area. The minimum fabric overlap from the edge of the damaged area shall be 1 m (3') for overlap joints. If the new fabric joints at the damaged areas are joined by stitching, the stitched joints shall conform to the requirements specified herein. Damaged fabric that is suitable for repair, as determined by the Engineer, shall be repaired by the Contractor and no additional payment will be made therefore. Add the following section: 300.12.3 Measurement and Payment. Payment for rock slope protection fabric will be included in the unit and/or lump sum prices for items which have said fabric in their design and no additional payment will be made therefore. 300-13 STORM WATER POLLUTION PREVENTION PLAN Revised 11/01/06 Contract No. 3907 Page 121 of 141 Pages Add the following section: 300-13.1 Storm Water Pollution Prevention Plan. As part of the storm water pollution prevention work, the Contractor shall prepare and submit Storm Water Pollution Prevention Plan, hereafter referred to as the "SWPPP,". The SWPPP shall conform to the requirements of the "Greenbook" Standard Specifications for Public Works Construction, the requirements in the California Storm Water Quality Association, Stormwater Best Management Practice Handbook, Construction ("Handbook"), the requirements of the Permit, the requirements in the plans and these supplemental provisions. 300-13.1.1 SWPPP Document Within 15 calendar days after the execution of the contract, the Contractor shall submit 3 copies of the SWPPP to the Engineer, in accordance with Section 2-5.3.3 of these Special Provisions. Contractor can download the digital format for SWPPP to complete required sections at www.cabmphandbooks.com. If revisions are required, as determined by the Engineer, the Contractor shall revise and resubmit the SWPPP within 15 days of receipt of the Engineer's comments and shall allow 5 days for the Engineer to review the revisions. Upon the Engineer's acceptance of the SWPPP, 3 additional copies of the SWPPP, incorporating the required changes, shall be submitted to the Engineer. In order to allow construction activities to proceed, the Engineer may conditionally approve the SWPPP while minor revisions are being completed. The objectives of the SWPPP shall be to identify pollution sources that may adversely affect the quality of storm water discharges associated with the project and to identify, construct, implement and maintain storm water pollution prevention measures, hereafter referred to as control measures, to reduce to the extent feasible pollutants in storm water discharges from the construction site both during and after construction is completed under this contract. The SWPPP shall incorporate control measures in the following categories: **& 1. Soil stabilization practices; 2. Sediment control practices; 3. Wind erosion control practices; and 4. Non-storm water management and waste management and disposal control practices. Specific objectives and minimum requirements for each category of control measures are contained in the Handbook. The Contractor shall designate a Water Pollution Control Manager who will have the responsibilities outlined in the SWPPP. The SWPPP shall include, but not be limited to, the following items as described in the SWPPP: 1. Source Identification; 2. Erosion and Sediment Controls; 3. Non-Storm Water Management; 4. Waste Management and Disposal; 5. Maintenance, Inspection and Repair; 6. Training; 7. List of Contractors and Subcontractors; 8. Post-Construction Storm Water Management; 9. Preparer; 10. Copy of the local permit; 11. BMP Consideration Checklist; 12. SWPPP Checklist; 13. Schedule of Values; and Revised 11/01/06 Contract No. 3907 Page 122 of 141 Pages V, ,„. 14. Storm Water Pollution Prevention Drawings. The Contractor shall amend the SWPPP, graphically and in narrative form, whenever there is a change in construction activities or operations which may affect the discharge of significant quantities of pollutants to surface waters, ground waters, municipal storm drain systems, or when deemed necessary by the Engineer. The SWPPP shall also be amended if it is in violation of any condition of the Permit, or has not effectively achieved the objective of reducing pollutants in storm water discharges. Amendments shall show additional control measures or revised operations, including those in areas not shown in the initially accepted SWPPP, which are required on the project to control water pollution effectively. Amendments to the SWPPP shall be submitted for review and acceptance by the Engineer in the same manner specified for the initially accepted SWPPP. Accepted amendments shall be dated and logged in the SWPPP. Upon acceptance of the amendment, the Contractor shall implement the additional control measures or revised operations. The Contractor shall keep a copy of the accepted SWPPP and accepted amendments at the project site. The SWPPP shall be made available upon request of a representative of the Regional Water Quality Control Board, State Water Resources Control Board, U.S. Environmental Protection Agency or local storm water management agency. Requests by the public shall be directed to the Engineer. By June 15 of each year, the Contractor shall submit an annual certification to the Engineer stating compliance with the requirements governing the Permit. If the project is in non-compliance at any time, the Contractor shall make a written report to the Engineer within 15 days of identification of non-compliance. Add the following section: 300-13.1.2 Payment. Preparation, implementation and management of SWPPP shall be considered incidental to the items of work and no additional payment will be made therefore. Add the following section: 300-13.1.3 SWPPP Implementation. Upon acceptance of the SWPPP, the Contractor shall be responsible throughout the duration of the project for installing, constructing, inspecting and maintaining the control measures included in the SWPPP and any amendments thereto and for removing and disposing of temporary control measures. Unless otherwise directed by the Engineer or specified in these supplemental provisions, the Contractor's responsibility for SWPPP implementation shall continue throughout any temporary suspension of work ordered in accordance with Section 6-3, "Suspension of Work". Requirements for installation, construction, inspection, maintenance, removal and disposal of control measures are specified in the "Handbook" and these supplemental provisions. Soil stabilization practices and sediment control measures, including minimum requirements, shall be provided throughout the winter season, defined as between October 1 and April 30. Implementation of soil stabilization practices and sediment control measures for soil-disturbed areas of the project site shall be completed, except as provided for below, no later than 20 days prior to the beginning of the winter season or upon start of applicable construction activities for projects which begin either during or within 20 days of the winter season. The Contractor shall implement, year-round and throughout the duration of the project, control measures included in the SWPPP for sediment tracking, wind erosion, non-storm water management and waste management and disposal. Revised 11/01/06 Contract No. 3907 Page 123 of 141 Pages The Engineer may order the suspension of construction operations, at the Contractor's cost, which create water pollution if the Contractor fails to conform to the requirements of this section as determined by the Engineer. Add the following section: 300-13.1.4 Maintenance. To ensure the proper implementation and functioning of control measures, the Contractor shall regularly inspect and maintain the construction site for the control measures identified in the SWPPP. The Contractor shall identify corrective actions and time frames to address any damaged measures or reinitiate any measures that have been discontinued. The construction site inspection checklist provided in the "Handbook" shall be used to ensure that the necessary measures are being properly implemented, and to ensure that the control measures are functioning adequately. The Contractor shall submit one copy of each site inspection record to the Engineer, within two days of the inspection. During the winter season, inspections of the construction site shall be conducted by the Contractor to identify deficient measures, as follows: 1. When the five-day rain probability forecast exceeds forty percent (40%). 2. After any precipitation which causes runoff capable of carrying sediment from the construction site; 3. At 24 hour intervals during extended precipitation events; and 4. Routinely, at a minimum of once every week. If the Contractor or the Engineer identifies a deficiency in the deployment or functioning of an identified control measure, the deficiency shall be corrected by the Contractor immediately, or by a later date and time if requested by the Contractor and accepted by the Engineer in writing, but not later than the onset of subsequent precipitation events. The correction of deficiencies shall be at no additional cost to the City. SECTION 303 CONCRETE AND MASONRY CONSTRUCTION. 303-1 CONCRETE STRUCTURES Add the following section: 303-1.9.5 Surface Finish for Concrete Spillway. The Contractor shall provide a surface finish for concrete spillway to prevent the use of rollerblades, skateboards, and other rolling devices. Surface finish shall be a rough rake finish approved by the Engineer. 303-2 AIR-PLACED CONCRETE. 303-2.1.1 General, add the following: Modify Regional Standard Drawing D-75 as follows: replace stucco netting with 150mm x 150mm (6" x 6") by No. 10 by No. 10 welded wire mesh. Add the following section: SECTION 306 - UNDERGROUND CONDUIT CONSTRUCTION 306-1 OPEN TRENCH OPERATIONS Revised 11/01/06 Contract No. 3907 Page 124 of 141 Pages Add the following section: 306-1.1.7 Steel Plate Bridging - With a Non-Skid Surface. This section covers the use of steel plate bridging. The Contractor shall not employ the use or use steel plate bridging or trench plate that does not meet the requirements of this section both in application and circumstance of use. Add the following section: 306-1.1.7.1 Requirements for Use. Alternate construction methods that avoid the use of steel plate bridging shall be used by the Contractor unless otherwise approved by the Engineer. It is recognized that to accommodate excavation work, steel plate bridging may be necessary. All conditions for use of steel plate bridging set forth in the following requirements must be fulfilled as conditions of approval of the use of steel plate bridging. Consideration of steel plate bridging in the review process will take into account the following factors: 1. Traffic volume and composition. 2. Duration of use of the steel plate bridging. 3. Size of the proposed excavation. 4. Weather conditions. The following formula shall be used to score the permitted use of steel plate bridging: PS = [ APT + EWL + DAYS + 10 X WEEKEND + 5 X NIGHTS + 20 X WEATHER + SPEED (kmh) + SLOPE X 100] X LANES 1000 8 PS = [ APT + EWL + DAYS + 10 X WEEKEND + 5 X NIGHTS + 20 X WEATHER + SPEED (mph) + SLOPE X 100] X LANES 1000 5 where: PS = plate score. ADT = average daily traffic as defined in the Federal Highway Administration (FHWA) Manual on Uniform Traffic Control Devices (MUTCD) 2003 Edition as amended by the MUTCD 2003 California Supplement. EWL = equivalent wheel loads as defined in the Federal Highway Administration (FHWA) Manual on Uniform Traffic Control Devices (MUTCD) 2003 Edition as amended by the MUTCD 2003 California Supplement. DAYS = total number of 24 hour periods during which the plates will be utilized at the site being considered. WEEKEND = total number of Saturdays, Sundays and holidays that the plates will be utilized at the site being considered. NIGHTS = total number of overnight periods that the plates will be in place, exclusive of Saturday, Sunday and holiday nights. WEATHER = total number of 24-hour periods that the plates will be utilized at the site being considered when the possibility of rain exceeds 40 percent. SPEED = the design speed in kilometers per hour or miles per hour, as applicable in the formulae above, of the street where the plates are to be installed. This number shall not be reduced for construction zone speed reductions. SLOPE = the quotient of the vertical differential divided by the horizontal distance. The vertical and horizontal dimensions shall be measured at the locations spanning a distance of 15 m (50') up and downstream of the position of the proposed steel plate bridging. LANES = the number of lanes where plates will be used. When the computed value of the plate score exceeds 50, steel plate bridging shall not be used unless, and at the sole discretion of the Engineer, the Engineer determines that no alternative method of construction is possible in lieu of using steel plate bridging or that other overriding considerations make the use of steel plate bridging acceptable. Alternatives considered to bridging Revised 11/01/06 Contract No. 3907 Page 125 of 141 Pages shall include, but not be limited to, detouring traffic, construction detour routes, tunneling, boring and ^-^ other methods of trenchless construction. Unless specifically noted in the provisions of the ,_J Engineer's approval, the use of steel plate bridging at each location so approved shall not exceed four (4) consecutive working days in any given week. Add the following section: 306-1.1.7.2 Additional Requirements. In all cases when the depth of the trench exceeds the width of the steel plate bridging resting on each side of the pavement adjacent to the trench, safety regulations require or the Engineer determines that shoring is necessary to protect the health or safety of workers or the public the Contractor shall install shoring conforming to Section 7-10.4.1 of the Standard Specifications. The trench shoring shall be designed and installed to support the steel plate bridging and traffic loads. All approvals for design, substitution of materials or methods shall be submitted by the Contractor in accordance with all provisions of section 2-5.3 Shop Drawings and Submittals. The Contractor shall backfill and resurface excavations in accordance with section 306-1.5. Add the following section: 306-1.1.7.3 Installation. When backfilling operations of an excavation in the traveled way, whether transverse or longitudinal cannot be properly completed within a work day, steel plate bridging with a non-skid surface and shoring may be required to preserve unobstructed traffic flow. In such cases, the following conditions shall apply: a) Steel plate bridging when the plate score exceeds 50 is not allowed except when, at the sole discretion of the Engineer, it is approved as specified hereinbefore. b) Steel plates used for bridging must extend a minimum of 610 mm (2') beyond the edges of the trench. c) Steel plate bridging shall be installed to operate with minimum noise. ^% When the use of steel plate bridging and shoring is approved by the Engineer, the Contractor shall install using either Method (1) or (2) depending on the design speed of the portion of street where the steel plate bridging is proposed for use. Method 1 [For speeds more than 70 Km/hr (45 MPH)]: The pavement shall be cold planed to a depth equal to the thickness of the plate and to a width and length equal to the dimensions of the plate. The cold milling shall produce a flat surface that the plate shall rest on with no horizontal or vertical movement. Horizontal gaps between the unmilled pavement and the plate shall not exceed 25 mm (1") and shall be filled with elastomeric sealant material which may, at the contractor's option, be mixed with no more that 50%, by volume, of Type I aggregate conforming to the requirements of tables 203-5.2(6) and 203-5.3(A). Method 2 [For speeds 70 Km/hr (45 MPH) or less]: Approach plate(s) and ending plate (if longitudinal placement) shall be attached to the roadway and shall be secured against displacement by using two adjustable cleats that are no less than 50 mm (2") shorter than the width of the trench bolted to the underside of each plate and located within 150 mm (6") of the beginning and end of the trench for plates at the beginning and end of the trench, a minimum of two 300 mm long by 19 mm diameter (12" x 3/i") steel bolts placed through the plate and driven into holes drilled 300 mm (12") into the pavement section, or other devices approved by the Engineer. Subsequent plates shall be butted to each other. Fine graded asphalt concrete shall be compacted to form ramps, maximum slope 8.5% with a minimum 300 mm (12") taper to cover all edges of the steel plates. When steel plates are removed, the dowel holes in the pavement section shall be completely filled with elastomeric sealant material. At the Contractor's option, the methods required for Method 1 may be used. If the Contractor so elects, all requirements of Method 1 shall be used. The Contractor shall ^"^ maintain the steel plates, shoring, and asphalt concrete ramps and maintain and restore the street >—/ surface during and after their use. Revised 11/01/06 Contract No. 3907 Page 126 of 141 Pages Add the following section: 306-1.1.7.4 Materials. The minimal thickness of steel plate bridging shall be as shown in Table 306-1.1.7.4(A) TABLE 306-1.1.7.4(A) REQUIRED PLATE THICKNESS FOR A GIVEN TRENCH WIDTH Maximum Trench Width (1) 0.3m (10") 0.6m (23") 0.8m (31") 1.0m (41") 1.6m (63") Minimum Plate Thickness 13mm (V2") 19mm (3/4") 22mm (7/8") 25mm (1") 32 mm (1 %") (1) For spans greater than 1.6 m (5'), a structural design shall be prepared by a registered civil engineer and submitted to the Engineer for review and approval in accordance with section 2-5.3. Steel plate bridging shall be steel plate designed to support the HS20-44 truck loading per CALTRANS Bridge Design Specifications Manual. The Contractor shall maintain a non-skid surface on the steel plate with no less than a coefficient of friction of 0.35 as determined by California Test Method 342. If a different test method is used, the Contractor may utilize standard test plates with known coefficients of friction available from the CALTRANS District 11 Materials Engineer to correlate skid resistance results to California Test Method 342. In addition to all other required construction signing, the Contractor shall install Rough Road (W33) sign with black lettering on an orange background in advance of steel plate bridging. Add the following section: 306-1.1.7.5 Measurement and Payment. Steel plate bridge materials including, but not limited to: steel plates, anchoring devices, cold milling, elastomeric sealant material, asphalt ramping and padding, signage, placing, installation, removal, relocation, preparation and processing of shop drawings and submittals to support the use of steel plate bridging and all other materials, labor, supervision, overhead of any type or description will be paid for as an incidental to the work that the bridging is installed to facilitate. No separate payment for steel plate bridging will be made. No extension to contract time will be allowed for, or because of, the use of steel plate bridging. 306-1.2.4 Field Jointing of Reinforced Concrete Pipe, add the following: The Contractor shall provide Gasket-type joints for reinforced concrete pipe (watertight joints) where indicated on plans. 306-1.3.1 General, add the following: The Contractor shall install detectable underground utility marking tape 230 mm x75 mm (9" x 3") above each or, in the case of bundled underground conduit of the same type, the upper underground conduit being installed by the open trench method. The type and color of detectable underground utility marking tape shall conform to the requirements of section 207-25 et seq. 306-1.3.4 Compaction Requirements, delete Section 306-1.3.4 and replace with the following: The Contractor shall densify trench backfill to a minimum of 90 percent relative compaction except that in the top 300 mm (12") of the street right-of-way, compaction shall be 95 percent. Revised 11/01/06 Contract No. 3907 Page 127 of 141 Pages 306-1.5 Trench Resurfacing. 306-1.5.1 Temporary Resurfacing. Delete the fourth and fifth paragraphs and substitute the following: Temporary bituminous resurfacing materials which are placed by the Contractor are for its convenience and shall be at no cost to the Agency. Temporary bituminous resurfacing materials shall be used in lieu of permanent resurfacing only when approved by the Engineer. When temporary bituminous resurfacing materials are used in lieu of permanent resurfacing it shall be removed and replaced with permanent resurfacing within 7 days of placement. No additional payment will be made for temporary bituminous resurfacing materials. The price bid for the associated conduit or structure shall include full compensation for furnishing, placing, maintaining, removing, and disposing of such temporary resurfacing materials. 306-1.5.2 Permanent Resurfacing. Add the following: Except as provided in section 306-1.5.1, "Temporary Resurfacing," the Contractor shall perform permanent trench resurfacing within 24 hours after the completion of backfill and densification of backfill and aggregate base materials. 306-1.6 Basis of Payment for Open Trench Installation, add the following: Payment for utilities undergrounding which includes the utility trench for CATV and SDG&E and conduit for SDG&E's electric conversion shall be made on the basis of contract lump sum price for utilities undergrounding and no other payments will be made. Cox Cable will supply and deliver conduits and fittings to be installed by the Contractor. Cox Cable will install enclosures. The Contractor will furnish and install 6.4 mm (%") nylon pull ropes in all conduit. 306-5 ABANDONMENT OF CONDUITS AND STRUCTURES. Add the following: Unless otherwise noted on plans, the Contractor shall remove all existing abandoned pipelines and conduits of any type, or use, and pipelines and conduits of any type, or use, that are abandoned during the course of the work and shall replace said pipelines and conduits with properly compacted soils. Payment for removal and disposal of abandoned utilities shall be included in the lump-sum bid for Clearing and Grubbing, and no additional payment will be made. SECTION 308 LANDSCAPE AND IRRIGATION INSTALLATION 308-2 EARTHWORK AND TOPSOIL PLACEMENT 308-2.3.2 Fertilization and Conditioning Procedures, add the following: The Contractor shall cultivate the surface of all areas to be planted or hydroseeded by discing, ripping or scarifying the finish grade. After cultivation the Contractor shall clear the planting areas of stones to the depth of cultivation and shall be rake the planting areas to a smooth friable and plantable surface. The Contractor shall cultivate all planting areas, except slopes steeper than 3-1/2:1 (horizontal to vertical), to a depth of 300 mm (12"). The planting areas that are slopes steeper than 3-1/2:1, shall be cultivated to a depth of 150 mm (6"). After cultivation, the soil amendments shown in table 308-2.3.2(A) shall be thoroughly blended 150 mm (6") deep in all planting areas. Except for planting pits the cultivation depths are designated as the root area. Backfill for planting pits shall conform to the requirements of section 308-4.5. After surface preparation and application of the soil amendments shown in Table 308-2.3.2(A) the Contractor shall obtain a minimum of one test for each soil property listed in Tables 308-2.3.2(6) and 308-2.3.2(C) from each median planter, at least one test per 150 m (500') from each parkway and for each hectare (2.5 acres) of hydroseeded area and shall submit the results of said tests to the Engineer. The Contractor shall then adjust the soil properties to the acceptable ranges of soil properties shown in Tables 308-2.3.2(6) and 308-2.3.2(C) using such materials and methods as may be necessary. Organic soil amendment materials shall not be included in the samples used to determine compliance to the soil particle gradation requirements of Table 308-2.3.2(C). If adjustments are necessary the soil shall be tested by the Contractor after such adjustments for each soil property listed in Table 308-2.3.2(6) and 308- Revised 11/01/06 Contract No. 3907 Page 128 of 141 Pages 2.3.2(C) to determine that the adjustments to the soil made by the Contractor result in soil properties within the acceptable range. The Contractor shall adjust the soil properties and show acceptable ranges prior to any planting or application of hydroseed slurry. Prior to the start of any planting or application of hydroseed slurry the surface and root area shall be evenly and thoroughly moistened to no less than 75 percent of field capacity. The Contractor shall certify, in writing, that the ground surface has been prepared in accordance with this section and shall request inspection by the Engineer prior to any planting or seeding. The Contractor shall obtain the Engineer's approval before any planting or hydroseeding. TABLE 308-2.3. 2(A) SOIL AMENDMENTS Soil Amendment Agricultural Gypsum Iron Sulfate Calcium Carbonate Lime Organic Soil Amendment Metric Application Rate 500 g per square meter 50 g per square meter 500 g per square meter 0.041 15 cubic meters per square meter (average depth 41 mm) Approx. U.S. Application Rate 1 00 Ibs. per 1 ,000 square feet 1 0 Ibs. per 1 ,000 square feet 100 Ibs. per 1,000 square feet 5 cubic yards per 1 ,000 square feet (average depth 1 5/8") TABLE 308-2.3.2(8) SOIL PROPERTIES Soil Property PH Dissolved Salts (EC.) Liquid Limit Plasticity Index Acceptable Range 6.5 to 7.3 < 4.0 dS nY1 N/A to 30 NPtolO Test Method Saturation Paste pH Saturation Paste Soluble Salts ASTM D 423 ASTM D424 Repeatability Range of Test ±0.1 pH ± 7% ± 2 ± 2 TABLE 308-2.3.2(0) SOIL PARTICLE GRADATION Sieve Siize 19 mm(3/4") 9.5 mm (3/8") 4.75 mm (No. 4) 1.89 mm (No. 10) 475 urn (No. 40) 75 fim (No. 200) Percent Passing 100 95-100 60-85 40-75 35-70 30-70 For areas to receive planting of all types, excluding only hydroseeding, the Contractor shall amend the prepared soil by blending 200 g of 7-7-7 fertilizer per square meter (40 Ibs. per 1,000 square feet) into the top 150 mm (6") of soil after the completion of adjustment of soil properties and acceptance of the planting area by the Engineer. The Contractor shall apply post-plant 12-4-6 fertilizer at the rate of 20 pounds per 1,000 square feet, 30 days after planting and every 30 days through the end of the maintenance period. 308-2.4 Finish Grading., add following: The Contractor shall prepare the finish grade in hydroseed slope areas with a moderately rough texture to provide a suitable surface for adherence of the hydroseed mix. 308-4 PLANTING. Revised 11/01/06 Contract No. 3907 Page 129 of 141 Pages 308-4.1 General, add the following: The Contractor shall perform actual planting during those periods when weather and soil conditions are suitable and in accordance with locally accepted horticultural practice and as approved by the Engineer. No planting shall be done in any area until it has been satisfactorily prepared in accordance with these specifications. Soil moisture level prior to planting shall be no less than 75 percent of field capacity. The Contractor shall obtain the Engineer's approval of planting pits before planting operations begin. For pit planted vegetation when the soil moisture level is found to be insufficient for planting, the Contractor shall fill the planting pits with water and allow them to drain before starting planting operations. No more plants shall be distributed in the planting area on any day than can be planted and watered on that day. The Contractor shall plant and water all plants as herein specified immediately after removal from their containers. Containers shall not be cut prior to placing the plants in the planting area. It shall be the responsibility of the Contractor to provide continuous horticultural services and temporary and/or permanent irrigation to all planted and hydroseeded areas so that the planted and hydroseeded vegetation is 100 percent healthy and thriving prior to, and throughout the, landscape maintenance period. 308-4.2 Protection and Storage, add the following: The Contractor shall submit a sheltered and secure location for on-site plant storage area for the Engineer's approval prior to the delivery of any plant materials. Any plant determined by the Engineer to be wilted, broken, or otherwise damaged shall be rejected at any time during the project, whether in the ground or not. All plants shall be handled by their containers. Any plant that has been handled by its trunk or stem shall be rejected. All rejected plants shall be removed from the site immediately. 308-4.3 Layout and Plant Location, modify as follows: Planting areas shall be staked by the Contractor and the Contractor shall obtain the Engineer's approval of the planting layout before planting operations begin. 308-4.5 Tree and Shrub Planting, add the following: The Contractor shall amend the backfill for planting holes to a thoroughly blended mixture of clean loamy soil meeting the requirements of Tables 308-2.3.2(6) and 308-2.3.2(C) and then blend the amendments listed in Table 308-4.5(A) into the backfill for planting holes. TABLE 308-4.5(A) BACKFILL AND AMENDMENTS FOR TREE AND SHRUB PLANTING o Soil Amendment Agricultural Gypsum Iron Sulfate Calcium Carbonate Lime Organic Soil Amendment Planting Tablets 1 Planting Tablets n Planting Tablets 1 Metric Application Rate 18 kg per cubic meter 600 g per cubic meter 6 kg per cubic meter 0.67 cubic meters per cubic meter 1 per 100 mm dia. pot container 2 per 19 liter container 1 per each 50 mm width of each box- size container Approx. U.S. Application Rate 30 Ibs. per cubic yard 1 Ib. per cubic yard 1 0 Ibs. per cubic yard z/3 cubic yards per cubic yard 1 per 4" dia. pot container 2 per 5 gal. container 1 per each 2" width of each box- size container 1 Planting tablet requirements are not cumulative and apply to the size container indicated Pruning shall be limited to the minimum necessary to remove injured twigs and branches, and to compensate for loss of roots during transplanting, but never to exceed one-tenth the branching structure. Pruning may be done only with the approval of, and in the presence of, the Engineer. Cuts over 19 mm (%") shall be painted with an approved tree wound paint. 308-4.6 Plant Staking and Guying, add the following: The Contractor shall install all boxed trees per drawings L-1 and L-2 of the San Diego Regional Standard Drawings unless details shown on the project plans differ therefrom. Revised 11/01/06 Contract No. 3907 Page 130 of 141 Pages 308-4.8.2(b) Method B. add the following: The Contractor shall prepare hydroseeding slurry on the job site. Slurry additives shall arrive at the site in bags sealed and properly identified by the manufacturer. All specified additives and water shall be added on the job site at the rates specified and shall be thoroughly mixed at the job site. The Contractor shall add seed to the slurry after the fiber mulch has been thoroughly incorporated. The Contractor shall spray all areas with a uniform, visible coat using the green color of the mulch as a guide. The Contractor shall apply the slurry in a sweeping motion, in an arched stream so as to fall like rain allowing the mulch fibers to built on each other until a good coat is achieved and the material is spread, evenly, at the required rate per area. The Contractor shall use care not to drag spray hoses over container planted material and shall attempt to spray from the edges of the planting areas wherever possible. Any slurry mixture which has not been applied to the planting areas within four (4) hours after mixing is be rejected and removed from the project at the Contractor's expense. Any slurry spilled into areas outside the limits of work shall be cleaned up at the Contractor's expense to the satisfaction of the Engineer. The Contractor shall assure that the site is properly prepared. The Contractor shall repair all tire ruts created by the equipment. Areas needing grading repair prior to hydroseeding shall be blended and floated to match surrounding grades. Areas having less than 80% plant coverage within thirty (30) days after the initial application shall be reseeded every twenty (20) days until 80% of the ground surface is evenly covered by hydroseeded or subsequently reseeded growth. Add the following section: 308-4.8.3.1 Weed Eradication. The Contractor shall water all irrigated areas to be hydroseeded for three (3) weeks prior to hydroseeding to allow for germination of the weed seeds. The Contractor shall spray all weeds with a post emergent herbicide immediately after the completion of the three week irrigation period. After two (2) weeks, the Contractor shall again eradicate the weeds and complete the preparation of the soil prior to the application of the hydroseed mixes. Add the following section, 308-4.10 Erosion Control Matting Installation Add the following section, 308-4.10.1 General. Before installation of erosion control matting the Contractor shall complete all soil preparation, fine grading, and hydroseeding of the areas to receive erosion control matting. Add the following section: 308-4.10.2 Coordination with Hydroseeding. Erosion control matting shall be installed by the Contractor immediately after the first application of hydroseed materials. In all cases the Contractor shall place the erosion control matting within three days after the first hydroseed material application. Should any seed in the hydroseed materials begin to germinate within the three-day period after application or before the installation of the erosion control matting, the installation of the erosion control matting shall be considered as late and the Contractor shall disc the hydroseed materials into the top 100m (4") of the underlying soil, condition the soil for hydroseeding, apply hydroseeding materials at the rates and of the type specified and then install the erosion control matting. No additional payment will be made for second or subsequent hydroseed applications resulting from late installation of erosion control matting. Add the following section: 308-4.10.3 Installation. The Contractor shall install erosion control matting using the following techniques: 1. Begin at the top of the slope by placing the erosion control matting into a 150 mm (6") wide by 150 mm (6") deep trench with the end of the matting laid flat in the bottom of the trench 2. Anchor the end of the erosion control matting with erosion control mat staples spaced no more Revised 11/01/06 Contract No. 3907 Page 131 of 141 Pages than 300 mm (12") on centers placed at the intersection of the bottom and the downhill vertical face of the trench. 3. Roll the erosion control matting down the slope. 4. Staple the erosion control matting on an alternating grid consisting of three across and two across lines of staples in horizontal lines spaced 900mm (3') on centers. 5. Erosion control mat so stapled shall be spaced such that no less than 1 % staples per square meter (\Vz staples per square yard) are provided to anchor the erosion control matting. 6. Start the adjacent erosion control mat as in Item 1. of this section, overlapping the previously placed mat by no less than 50 mm (2"). 7. Staple placement may be such as to use the staples used to secure the adjacent mat to secure both mats along their edges. 308-5 IRRIGATION SYSTEM INSTALLATION. 308-5.1 General, add the following: The Contractor shall apply irrigation water as often and in sufficient amounts, as conditions may require, to germinate and establish the seed and keep the container plants healthy and growing. The Contractor shall lay out lines, valves, and other underground utilities and receive the approval of the Engineer before digging trenches. The Contractor shall be responsible for damages caused by its operations. Connections shall be made at approximately the locations shown on the drawings. The Contractor shall be responsible for unapproved changes. Permission to shut off any existing in-use water lines must be obtained 48 hours in advance, as to the date, time and exact length of time of each shut-off. The Contractor shall demonstrate that the entire irrigation system is under full automatic operation for a period of seven days prior to any planting. 308-5.2 Irrigation Pipeline Installation, add the following: The Contractor shall install all pressure main line piping from the irrigation system so as to maintain 3.1 m (10') minimum horizontal separation from all potable water piping. Where reclaimed and potable water pressure mainline piping cross, the reclaimed water piping shall be installed below the potable water piping, sleeved in a pressure rating of 200 PSI SDR 21 "Alertline" PVC sleeve which extends a minimum of 3.1 m (10') on either side of the potable water piping and be located to provide a minimum vertical clearance of 300 mm (12") between the reclaimed and potable water lines. Conventional (white) PVC pipe Schedule 40 may be used for sleeving material if it is taped along its entire length with 75 mm (3") wide purple warning tape which reads "Caution Reclaimed Water". For trenching through areas where topsoil has been spread, the Contractor shall deposit topsoil on one side of trench and subsoil on opposite side. Subsoil shall be free of all rocks 13 mm (1/4") in diameter or larger, debris, and litter, prior to use as backfill. The Contractor shall repair any leaks and replace all defective pipe or fittings until lines meet test requirements. The Contractor shall not cover any lines until they have been inspected and approved by the Engineer for tightness, quality of workmanship, and materials. The Contractor shall not be backfill trenches until all required tests and observations are performed. Observations include sprinkler heads, all fittings, lateral and mainline pipe, valves, and direct burial wire. 308-5.2.3 Plastic Pipeline, add the following: The Contractor shall store all pipe and fittings under cover until used, and all pipe and fittings shall transported in a vehicle with a bed long enough to allow the length of pipe to lay flat so as not to be subjected to undue bending or concentrated external load at any point. Pipe ends and fittings shall be wiped with MEK, or equal, before welding solvent is applied. Welded joints shall be given a minimum of 15 minutes to set before moving or handling. All field cuts shall be beveled to remove burrs and excess before fitting and gluing together. The Contractor shall center load pipe with small amount of backfill to prevent arching and slipping under pressure. Joints shall be exposed for inspection during testing. Plastic-to-plastic joints shall be solvent-welded, using only solvent recommended by pipe manufacturer. Revised 11/01/06 Contract No. 3907 Page 132 of 141 Pages Add the following section: 308-5.3.1 Valves, add the following: The Contractor shall install each control valve in a separate valve box with a minimum of 300 mm (12") separation between valves and 150 mm (6") from any fixed object or structure. Add the following section 308-5.3.2 Valve Boxes. The Contractor shall install no more than one valve per box. All boxes are to be marked as to the type of valve. Remote control valve boxes shall also indicate control station number. Add the following section: 308-5.3.3 Backflow Preventer. The Contractor shall install backflow preventer assembly in accordance with manufacturer's specifications and as directed on drawings. Exact location and positioning shall be verified on the site by the Engineer. 308-5.4.4 Sprinkler Head Adjustment, add the following: The Contractor shall flush and adjust all irrigation heads and valves for optimum performance and to prevent overspray onto walks, roadways buildings, walls, and other structures. Add the following section: 308-5.4.5 Drip Assembly. The Contractor shall install drip emitter filter on the supply side of all electric pressure regulating control valve for all emitter systems. The Contractor shall install a flush valve on the discharge side of all drip laterals. 308-5.5 Automatic Control System Installation, add the following: The Contractor shall install all portions of the electrical installation with materials and methods conforming to the requirements of the 1996 National Electrical Code. The Contractor shall provide no less than one control wire and one common ground wire to service each valve in system. 308-5.6.3 Sprinkler Coverage Test, add the following: This test shall be accomplished before any ground cover is planted. 308-6 MAINTENANCE AND PLANT ESTABLISHMENT. Add the following: For hydroseeded areas, median planting and mitigation area, The Contractor shall maintain said areas for period of no less than 120 days or until final acceptance of the project, whichever is the greater. Mowing is not required for hydroseeded areas. The Contractor shall provide complete landscape maintenance of all planted areas. The work shall include, but not be limited to, watering, litter control, weed control, stake repair, cultivating, supplementary fertilization, repair of irrigation systems, and control of diseases and pests. The Contractor shall submit a written plan to control weeds, disease, and pest infestations in the planting areas. The submittal shall conform to the requirements for shop drawings as specified in section 2-5.3 et seq. of the specifications. The Engineer shall approve all methods and materials for such control. Upon approval, the Contractor shall implement the control measures, exercising extreme caution in using pesticides and taking all steps to ensure the safety of the public. Only licensed personnel will be permitted to perform toxic spraying work. During the plant establishment period, the Contractor shall furnish sufficient workers and equipment on a daily basis to perform the work required by this section. Any day when the Contractor fails to adequately carry out specified maintenance work, as determined necessary by the Engineer, will not be credited as one of the plant establishment days. All planting areas which are damaged by construction shall be repaired by the Contractor within twenty (20) days following completion of construction in such. The Contractor shall repair such damaged areas. The repair shall consist of bringing the damaged area back to final grade, preparing the soil, replanting the area with the same vegetation as originally specified, and maintaining the area to achieve acceptable plant establishment. Revised 11/01/06 Contract No. 3907 Page 133 of 141 Pages The Contractor shall provide temporary irrigation for hydroseeded areas for a minimum of 120 days to ensure adequate plant establishment. Towards the end of the maintenance period, the Contractor shall gradually reduce the amount of irrigation to allow plant adaptation to non-irrigated conditions. Upon the approval of the engineer, the temporary irrigation system shall be shut off at the end of the maintenance period. The hydroseeded areas must have their growth of 80% established and the coverage must be evenly successful over the entire hydroseeded area and adequate to prevent erosion no less than 30 days before the end of the maintenance period. Should the coverage not be achieved the maintenance period shall be extended until the required coverage is achieved plus an additional 30 day period. The Contractor shall call for a final inspection 30 days before the end of the maintenance period and at the end of the maintenance period. Failure to pass inspection will result in an extension of the maintenance period. The Contractor shall continue to provide maintenance for such time necessary to obtain conformance to the specifications. 308-7 GUARANTEE. Add following: The Contractor shall guarantee all 600 mm (24") box trees installed under the contract to live and grow for one year from the day of final acceptance of the contract work. The Contractor shall guarantee all other plant material, including ground covers to live and grow for a period of 30 days from the last day of the maintenance period or final acceptance of the contract work, whichever is the later. The Contractor shall replace, at its expense, all plant material found to be dead, missing, or in poor condition during the maintenance period within 5 days of discovery of such plant material. The Engineer shall be the sole judge as to the condition of the plant material. Plant material found to be dead or in poor condition within the guarantee period shall be replaced by the Contractor, at its expense, within 15 days of written notification. Replacements shall be made to the same specifications required for the original plantings. The Contractor shall submit written vegetation, planting and irrigation guarantee in approved form that all work showing defects in materials or workmanship will be repaired or replaced at no cost to the Engineer for a period of one year from the date of acceptance by the Engineer. The Guarantee form shall be retyped on the Contractor's letterhead and contain the following verbiage: "Guarantee For Vegetation, Planting and Irrigation System For (Project Name) We hereby guarantee that the vegetation, planting and irrigation system we have furnished and installed for (project name) is free from defects in materials and workmanship, and the work has been completed in accordance with the drawings and specifications. We agree to repair or replace any defect in vegetation, material or workmanship, including that due to ordinary wear and tear, which may develop during the periods specified in section 308-7 of the Standard Specifications and the Special Provisions of said project from date of completion of the Work or termination of any maintenance period, whichever is the later, and also to repair or replace any damage resulting from the repairing or replacing of such defects at no additional cost to the Agency. . This guarantee does not extend to unusual abuse or neglect that may occur subsequent to the date of completion of the Work or termination of any maintenance period, whichever is the later. We shall make such repairs or replacements within a reasonable time, as determined by the Engineer, after receipt of written notice. In the event of failure to make such repairs or replacements within a reasonable time after receipt of written notice from the Engineer, we authorize the Engineer to proceed to have said repairs or replacements made at our expense, and we will pay the costs and charges therefore upon demand. Project: (Project Name) Location: (Legal Description of Project Property) Name of Contractor: Address: (Of Contractor) Telephone:: (Of Contractor) W' Revised 11/01/06 Contract No. 3907 Page 134 of 141 Pages By: (Typed or printed names of signing Officers) of the Contractor authorized to bind the Contractor in legal matters) Title: (Of said officers)) Signature(s) Date of Execution:" Add the following section: 308-7.1 Record Drawings. In addition to the requirements of section 2-5.4, herein, the Contractor shall prepare record drawings that show all changes in the work constituting departures from the original contract drawings, including those involving both constant-pressure and intermittent-pressure lines and appurtenances. The Contractor shall accurately record, on a daily basis, on one set of blue line prints of the irrigation drawings, all changes in work constituting departures from the original contract drawings, including changes in both pressure and nonpressure line. The Contractor shall post information on record drawings no later than the next working day after the work is installed. The Contractor shall record changes and dimensions in a legible and professional manner. When the drawings are approved by the Engineer the Contractor shall transfer all information to a set of reproducible photo mylar drawings. Items required to be shown shall be dimensioned by the Contractor from two permanent points of reference (buildings, monuments, sidewalks, curbs, pavement). The accuracy of location of all items to be shown on the drawings shall be 150 mm (6") in both the vertical and horizontal planes. All text and numerals placed on drawings shall be 0.30 mm (V8") in size. Facilities and items to be located in their horizontal and vertical positions and shown on the record drawings include all: a) Point(s) of connection, for water and electrical services b) Routing of irrigation pressure mainlines c) Backflow preventers d) Ball, gate and check valves e) Irrigation control valves. f) Quick coupler valves g) Routing of service wires h) Routing of control wires i) Electrical service equipment j) Electrical junction boxes k) Irrigation controllers I) Sleeves for future connections m) Other equipment of a similar nature (as directed by the Engineer). The Contractor shall keep the blue print drawings available for the Engineer's inspection at any time. The Contractor shall make all changes to reproducible drawings in waterproof black ink (no ball point pen). Changes in dimensions shall be recorded in a legible and professional manner. Record construction drawings shall be maintained at the job site during construction. The Contractor shall provide one set of mylar "record" drawings to the Engineer after submitting blueline prints of the proposed "record" drawings for, and obtaining their approval by, the Engineer. Add the following section: 308-7.2 Controller Chart. The Contractor shall prepare record drawings which shall be submitted to the Engineer for approval by the Engineer before charts are prepared. The Contractor shall provide one controller chart of the maximum size the controller doorwill allow, for each controller supplied, showing the area covered by that automatic controller. The chart shall be a reduction of the actual record system drawing with a legend to explain all symbols. If the controller sequence is not legible when the drawing is reduced, The Contractor shall enlarge it to a size that will be readable when reduced. The Contractor shall photocopy the chart, with a pastel transparent color used to show area of coverage for each station. When completed and approved, the Contractor shall hermetically seal the chart between two pieces of plastic, each piece being a minimum 20 mils thick. The Contractor Revised 11/01/06 Contract No. 3907 Page 135 of 141 Pages shall complete the charts and obtain the Engineers approval prior to final inspection of the irrigation system. Add the following section: 308-7.3 Operation and Maintenance Manuals. The Contractor shall prepare and deliver to the Engineer, within 10 calendar days prior to completion of construction, all required and necessary descriptive material in complete detail and sufficient quantity, properly prepared in four individual bound copies. The descriptive material shall describe the material installed in sufficient detail to permit qualified operating personnel to understand, operate, and maintain all equipment. The Contractor shall include spare parts list and related manufacturer information for each equipment item installed. Each manual shall include the following: a) Index sheet stating Contractor's address and telephone number. b) Duration of Guarantee period. c) List of equipment, with names and addresses of manufacturer's local representative. d) Complete operating and maintenance instructions on all major equipment. e) In addition to the maintenance manuals, the Contractor shall provide the agency maintenance personnel with instructions for major equipment, and show written evidence to the Engineer at the conclusion of the work that this service has been rendered. Add the following section: 308-7.4 Check List. The Contractor shall complete and forward signed and dated checklist to the Engineer before final acceptance of project. the following checklist at the end of the project, using the format shown: a) Plumbing permits (if none required, so note) b) Materials approval c) Pressure mainline test (by whom, and date) d) Record drawings completed (received by, and date) e) Controller chart completed (received by, and date) f) Materials furnished (received by, and date) g) Operation and maintenance manuals furnished (received by, and date) h) System and equipment operation instructions (received by, and date) i) Manufacturer warranties (received by, and date) j) Written guarantee by Contractor (received by, and date) 308-8 MEASUREMENT AND PAYMENT, add the following: The lump-sum or unit prices set forth in the contract documents shall include, but not be limited to, full compensation for furnishing all labor, materials, tools, and equipment and performing all work necessary to complete, maintain, and guarantee the planting and irrigation work described or specified in the contract documents, including soils testing and recommended soil amendments, seed and hydroseed slurry, tree stakes, bark mulch, erosion control matting, plant materials, temporary irrigation and permanent irrigation, including reduced-pressure back-flow preventer, ball valves, drip valve assembly, electric control valves, quick couplers, control wires, pull boxes, valve boxes, all piping and sleeves, electrical conduits, irrigation heads, drip emitters, bubblers, drip irrigation equipment, connection from electrical service to irrigation electrical meter, connection from meter to irrigation controller(s), installation of controller enclosure, concrete pads, preparation, correction, reproduction and lamination of "as-built" drawings, controller charts, assembly and submittal of the check list and operation and maintenance manuals and all appurtenances to the aforementioned items, as well as 120 days' maintenance and project guarantees. After completion of the project, the Engineer will retain $12,000 of the total contract amount, and will subsequently disburse the $12,000 to the Contractor on a monthly basis of $3,000 per month. The Engineer reserves the right to stop payment until all punch list submitted to the Contractor every month are completed. Revised 11/01/06 Contract No. 3907 Page 136 of 141 Pages SECTION 310-PAINTING 310-5 PAINTING VARIOUS SURFACES. 310-5.6 Painting Traffic Striping, Pavement Markings and Curb Markings. Modify the fifth paragraph as follows: The Contractor shall furnish all equipment, materials, labor, and supervision necessary for painting traffic lanes, directional arrows, guidelines, curbs, parking lines, crosswalks, and other designated markings in accordance with the Plans, or for approved temporary detours essential for safe control of traffic through and around the construction site. The Contractor shall remove by wet grinding all existing or temporary traffic markings and lines that may confuse the public. When temporary detour striping or markings are no longer required, they shall be removed prior to painting the new traffic stripes or markings. 310-5.6.3 Equipment. Delete the ninth paragraph and substitute the following: The Contractor shall provide a wet grinding machine with sufficient capacity to completely remove all existing or temporary traffic striping or markings that conflict with the striping plan, or are contrary to the Traffic Manual, or that may be confusing to the public. The surface produced by grinding the existing or temporary traffic striping or markings on pavement shall not exceed variations from a uniform plane more than 3 mm (V) in 3 m (10') when measured parallel to the centerline of the street or more than 6 mm (1/4") in 3 m (10') when measured perpendicular to the centerline of the street. The use of any equipment that leaves ridges, indentations or other objectionable marks in the pavement shall be discontinued, and equipment capable of providing acceptable surface shall be furnished by the Contractor. This equipment shall meet all requirements of the air pollution control district having jurisdiction. 310-5.6.6 Preparation of Existing Surfaces. Modify the first paragraph as follows: The Contractor shall remove all existing markings and striping, either permanent or temporary, which are to be abandoned, obliterated or that conflict with the plans by wet grinding methods. Removal of striping by high velocity water jet may be permitted when there is neither potential of the water and detritus from the high velocity water jetting to damage vehicles or private property nor to flow from the street into any storm drain or water course and when approved by the Engineer. The Contractor shall vacuum all water and detritus resulting from high velocity water jet striping removal from the pavement immediately after the water jetting and shall not allow such materials to flow in the gutter, enter the storm drain system or to leave the pavement surface. Surface variation limitations for high velocity water jet striping removal shall be the same as for grinding. The Contractor shall not use dry or wet sandblasting in any areas. Alternate methods of paint removal require prior approval of the Engineer. Obliteration of traffic striping with black paint, light emulsion oil or any other masking method other than a minimum 30mm (0.101) thick asphalt concrete overlay is not permitted. 310-5.6.7 Layout, Alignment, and Spotting. Modify the first paragraph as follows: The Contractor shall establish the necessary control points for all required pavement striping and markings by surveying methods. No layout of traffic striping shall be performed by the Contractor before establishment of the necessary control points. The Contractor shall establish all traffic striping between these points by string line or other method to provide striping that will vary less than 80mm per 100m (1/2 inch in 50 feet) from the specified alignment. The Contractor shall obliterate, straight stripes deviating more than 80mm per 100mm (1/ 2 inch in 50 feet) by wet grinding, and then correcting the markings. The Contractor shall lay out (cat track) immediately behind installation of surface course asphalt and as the work progresses. 310-5.6.8 Application of Paint. Modify the second paragraph as follows: The Contractor shall apply the first coat of paint immediately upon approval of striping layout by the Engineer. The Contractor shall paint the ends of each median nose yellow. Revised 11/01/06 Contract No. 3907 Page 137 of 141 Pages Add the following to the eighth paragraph: The Contractor shall apply temporary traffic stripes in one coat. Temporary traffic stripes shall be maintained by the Contractor so that the stripes are clearly visible both day and night. 310-5.6.10 Measurement and Payment. Modify the first paragraph as follows: Final and temporary traffic striping, curb markings and pavement markings as shown on the plans and required by the specifications shall be included in the lump-sum price bid for temporary and final traffic striping, and no additional compensation will be allowed therefore. Reapplication of temporary stripes and markings shall be repainted at the Contractor's expense, and no additional compensation will be allowed therefore. The lump sum prices bid and shall include all labor, tools, equipment, materials, and incidentals for doing all work in installing the final and temporary traffic striping. SECTION 312 - PAVEMENT MARKER PLACEMENT AND REMOVAL 312-1 PLACEMENT. Add the following to the third paragraph: 4) When being installed on asphalt concrete pavement sooner than 14 days after placement of the asphalt concrete pavement course on which the pavement markers are to be placed. Add the following section: 312-1.1 Reflective Channelizer Placement and Removal. The Contractor shall place and remove reflective channelizers the same as for pavement marker placement and removal. The Contractor shall place the channelizers uniformly, straight on tangent alignment and on a true arc on curved alignment to the same tolerances of position as for application of paint in section 310-5.6.8. The Contractor shall perform all layout work necessary to place the channelizers to the proper alignment. If the channelizers are displaced or fail to remain in an upright position, from any cause, the channelizers shall immediately be replaced or restored to their original location, by the Contractor. When reflective channelizers are removed the pavement surface shall be restored to the same color and surface finish as the adjacent pavement. SECTION 313 - TEMPORARY TRAFFIC CONTROL DEVICES Add the following section: 313-1 TEMPORARY TRAFFIC PAVEMENT MARKERS. Add the following section: 313-1.1 General. The Contractor shall supply and install temporary traffic pavement markers, channelizers, signing, railing (type K), crash cushions and appurtenances at the locations shown on the plans and as required in the specifications, complete in place prior to opening the traveled way served by said final and temporary traffic pavement markers, signing, railing (type K) and appurtenances to public traffic. 313-1.2 Temporary Pavement Markers. Temporary reflective raised pavement markers shall be placed in accordance with the manufacturer's instructions. Temporary reflective raised pavement markers shall be cemented to the surfacing with the adhesive recommended by the manufacturer, except epoxy adhesive shall not be used to place temporary reflective raised pavement markers in areas where removal of the markers will be required. Pavement striping, legends and markers which conflict with any traffic pattern shall be removed by grinding as determined by the Engineer. The Contractor shall use temporary reflective raised pavement markers for temporary pavement marking, except when the temporary pavement markers are used to replace patterns of temporary traffic stripe that will be in place for less than 30 days. Reflective pavement markers used in place of the removable-type pavement markers shall conform to the section 312 "Pavement Marker Placement and Removal", except the 14-day waiting period before placing the pavement markers on new asphalt concrete surfacing as specified in section 312-1 "Placement", shall not apply; and epoxy adhesive shall not be used to place pavement markers in areas where removal of the markers will be required. Add the following section: Revised 11/01/06 Contract No. 3907 Page 138 of 141 Pages 313-1.3 Channelizers. Channelizers shall be new surface-mounted type and shall be furnished, placed, and maintained at the locations shown on the plans. Channelizer posts shall be orange in color. Channelizers shall have affixed white reflective sheeting as specified in the special provisions. The reflective sheeting shall be 75 mm x 300 mm (3" x 12") in size. The reflective sheeting shall be visible at 300 m (1000') at night under illumination of legal high beam headlights, by persons with vision of or corrected to 20/20. The channelizer bases shall be cemented to the pavement in the same manner as provided for cementing pavement markers to pavement in section 312-1, "Placement." Channelizers shall be applied only on a clean, dry surface. Channeiizers shall be placed on the alignment and location shown on the plans and as directed by the Engineer. The Channelizers shall be placed uniformly, straight on tangent alignment and on a true arc on curved alignment. All layout work necessary to place the Channelizers to the proper alignment shall be performed by the Contractor. If the Channelizers are displaced or fail to remain in an upright position, from any cause, the Channelizers shall immediately be replaced or restored to their original location, by the Contractor. The Contractor shall provide the Engineer with a Certificate of Compliance in accordance with the provisions of section 4-1.5, "Certification". Said certificate shall certify that the Channelizers comply with the plans and specifications and conform to the prequalified design and material requirements approved by the Engineer and were manufactured in accordance with a quality control program approved by the Engineer. Add the following section: 313-2 TEMPORARY TRAFFIC SIGNING. Add the following section: 313-2.1 General. The Contractor shall provide and install all temporary traffic control signs, markers, markings, and delineators at locations shown on plans and specified herein. Add the following section: 313-2.2 Maintenance of Temporary Traffic Signs. If temporary traffic signs are displaced or overturned, from any cause, during the progress of the work, the Contractor shall immediately replace the signs in their original approved locations. The Contractor shall maintain all temporary traffic signs used in the Work in a clean, reflective and readable condition. The Contractor shall replace or restore graffiti marked temporary traffic signs and posts used in the Work within 18 hours of such marking being discovered during non-working hours or, when the marking is discovered during working hours, within 2 hours of such discovery of marking. Add the following section: 313-3 TEMPORARY RAILING (TYPE K) AND CRASH CUSHIONS. Add the following section: 313-3.1 Temporary Railing and Crash Cushions. Temporary railing (Type K) shall consist of interconnected new or undamaged used precast concrete barrier units as shown on the plans. Temporary sand-filled crash cushions shall consist of new or undamaged used temporary sand-filled crash cushions units as shown on the plans. 313-3.1.1 Appearance. Exposed surfaces of new and used units of Temporary railing (Type K) shall be freshly coated with a white color paint prior to their first use on the project. The paint shall conform to the provisions in sections 210-1.5 "Paint Systems" and 310 "Painting". Contractor shall be responsible for the removal and cleanup or painting over the graffiti from the K-Rails within 48 hours. The Contractor Shall replace or repaint units of Temporary railing (Type K) or shall remove graffiti, tire or vehicle marks, dirt or any and all materials such that said marks or discoloration mar the appearance of said units when ordered by the Engineer after the units are in place. Add the following section. Revised 11/01/06 Contract No. 3907 Page 139 of 141 Pages 313-3.1.2 Manufacture of Temporary Railing. In addition to the requirements herein the temporary railing (Type K) shall be manufactured per CALTRANS Standard Drawing T3. Concrete used to manufacture Temporary railing (Type K) shall conform to the provisions in sections 201-1, "Portland Cement Concrete" and 303-1 "Concrete Structures"." Load tickets and a Certificate of Compliance will not be required. Reinforcing steel shall conform to the provisions sections 201-1, "Portland Cement Concrete" and 303-1 "Concrete Structures". Steel bars to receive bolts at ends of concrete panels shall conform to ASTM Designation: A 36/A 36M. The bolts shall conform to ASTM Designation: A 307. A round bar of the same diameter may be substituted for the end-connecting bolt shown on the plans. The bar shall conform to ASTM Designation: A 36/A 36M, shall have a minimum length of 660 mm and shall have a 75 mm (3") diameter by 9 mm (3/8") thick plate welded on the upper end with a 5-mm (3/16") fillet weld. The final surface finish of temporary railings (Type K) shall conform to the provisions in section 303-1.9.2 "Ordinary Surface Finish." Exposed surfaces of concrete elements shall be cured by the water method, the forms-in-place method, or the pigmented curing compound method. The pigmented curing compound shall be type 2 curing compound. Temporary railing (Type K) may have the Contractor's name or logo on each panel. The name or logo shall not be more than 100 mm in height and shall be located not more than 300 mm above the bottom of the rail panel. Add the following section. 313-3.1.3 Installation of Temporary Railing. In addition to the requirements herein the temporary railing (Type K) shall be installed per CALTRANS Standard Drawing T3. Temporary railing (Type K) shall be set on firm, stable foundation. The foundation shall be graded to provide a uniform bearing throughout the entire length of the railing. Abutting ends of precast concrete units shall be placed and maintained in alignment without substantial offset to each other. The precast concrete units shall be positioned straight on tangent alignment and on a true arc on curved alignment Each rail unit placed within 3 m (10') of a traffic lane shall have a reflector installed on top of the rail as directed by the Engineer. Reflectors and adhesive will be furnished by the Contractor. A Type P marker panel conforming to the requirements of the Federal Highway Administration (FHWA) Manual on Uniform Traffic Control Devices (MUTCD) 2003 Edition as amended by the MUTCD 2003 California Supplement shall also be installed at each end of railing installed adjacent to a two-lane, two-way highway and at the end facing traffic of railing installed adjacent to a one-way roadbed. If the railing is placed on a skew, the marker shall be installed at the end of the skew nearest the traveled way. Type P marker panels shall conform to the provisions of section 206-7.2, "Temporary Traffic Signs". Where shown on the plans, threaded rods or dowels shall be bonded in holes drilled in existing concrete. When temporary railings (Type K) are removed, any area where temporary excavation or embankment was used to accommodate the temporary railing shall be restored to its previous condition, or constructed to its planned condition. Add the following section: 313-3.2 Temporary Sand-Filled Crash Cushions. Temporary sand-filled crash cushion units shall be "Energite III" manufactured by Energy Absorption Systems, "Fitch Inertial Barrier System Modules" manufactured by Roadway Safety Service, or equal. Features required to determine equivalence of any other temporary sand-filled crash cushion units shall be approval of the system by CALTRANS and that the temporary sand-filled crash cushion units meet NCHRP 350 standards. Other features will be suitability to application, operational characteristics, durability and other such characteristics that the Engineer shall determine. Temporary sand-filled crash cushions (TSFCC) shall be of the type and array configurations shown on plans, and installed at every end of, or gap in, the temporary railing (Type K) whenever the closest point of approach of traffic, regardless of direction, is 4.6 m (15') or less to the end of the temporary railing (Type K) being considered. The TSFCC shall be installed per CALTRANS Standard Drawings T1 and T2 for approach speeds no less than the posted speed of the street prior to construction or 55 kilometers per hour (35 mph), whichever is the greater. The TSFCC array shall be appropriate to the application as shown on said standard drawings. A Type J and/or P marker panel conforming to the requirements of the Federal Highway Revised 11/01/06 Contract No. 3907 Page 140 of 141 Pages Administration (FHWA) Manual on Uniform Traffic Control Devices (MUTCD) 2003 Edition as amended by the MUTCD 2003 California Supplement shall also be installed at each TSFCC array as shown in CALTRANS Standard Drawings T1 and T2. Particular care shall be taken to assure that crash cushions are installed with the soil supporting them and the adjacent soil leveled to match the elevation of the bottom of the temporary railing immediately adjacent to the crash cushion. All routes of approach to the TSCFF array shall be graded such that any vehicle diverging from the travelled way to strike the TSCFF will travel on a vertical alignment parallel to the segment of the travel lane that it departed from. Add the following section: 313-4 MEASUREMENT AND PAYMENT. Temporary traffic pavement markers, temporary channelizers, temporary signing, temporary railing (type K), temporary crash cushions and temporary appurtenances thereto shown on the plans or required in the specifications are a part of the lump- sum item for traffic control and payment therefore shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in applying, installing, maintaining, and removing temporary traffic pavement markers, channelizers, signing, railing (type K), crash cushions and appurtenances, complete in place, as shown on the plans, as specified in the Standard Specification and these special provisions, and as directed by the Engineer. Payment for temporary crash cushions, concrete barriers and the signs and reflectors marking them shall include the installation, grading for installation, grading for the approach path, maintenance, painting and re-painting, replacement of damaged units and removal and shall also be included in the lump-sum price bid for traffic control. Payment for installation and/or relocation of K- rails and crash cushions when not shown on the plans and requested by the Engineer shall be made per section 3-3, Extra Work. Revised 11/01/06 Contract No. 3907 Page 141 of 141 Pages APPENDIX "A" RESOURCE AGENCY PERMITS FEDERAL HIGHWAY ADMINISTRATION 916498 5008;01/25/02 17:55; #724;Page 2/3 U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION CALIFORNIA DIVISFON 980 Ninth Street, Suite 400 Sacnunento, CA. 95814-2724 January 25,2002 IN REPLY REFER 10 HDA-CA Fib#:ll-SD-0-Carisbad Rancho Santa Fe STPLF-5308(007) Document #: P38246 Mr. Pedro Orso-Dclgado, Interim District Director Caltrans, District 11 P.O. Box 85406 San Diego. CA. 92186-5406 Attention: Kelly Dunlap, Associate Environmental Planner pear Mr. Orso-Delgado: SUBJECT: RANCHO SANTA FE REALIGNMENT/BRIDGE REPLACEMENT FONSl We have reviewed the Environmental Assessment (EA) (received on January 22,2002) for the proposed Rancho Santa Fe realignment and bridge replacement in the City of Carlsbad, County of San Diego and have determined thai a Finding of No Significant Impact (FONSl) is applicable. The design features as presented in the EA are conceptually approved. The original signed FONSl is enclosed. You may proceed with the notification to the State and area wide clearinghouse of the availability of this FONSL Should you have any questions, please contact Jeff Lewis, Senior Transportation Engineer at (916) 498-5035 or e-mail "jeff. Iewi5@fliwa.dot.gov." f Sincerely, Michael G. Ritchie Division Administrator Enclosure FEDERAL HIGHWAY ADMINISTRATION FINDING OF NO SIGNIFICANT IMPACT! FOR Proposed Rancho Santa Fe Realignment and Bridge Replacement Project City of Carlsbad In San Diego Cousty I The Federal Highway Administration (FHWA) has determined thai the proposed Rancho Santa Fe realignment and bridge replacement project will have no significant impact on the human environment This Finding of No Significant Impact is based on the attached Environmental Assessment (EA) and incorporated technical reports, which have been independently evaluated by the FHWA and determined to adequately and accurately discuss the need, environmental issues, and impacts of the proposed project and appropriate mitigation measures. These | documents provide sufficient evidence and analysis for determining that an Environmental I Impact Statement (HIS) is not required. The FHWA assumes responsibility for the accuracy, $ scope, and content of the attached BA and incorporated technical reports. Date Chief. District Operations - South REPLY TO Office of the Chief Regulatory Branch DEPARTMENT OF THE ARMY LOS ANGELES DISTRICT, CORPS OF ENGINEERS SAN DIEGO FIELD OFFICE 16885 WEST BERNARDO DRIVE, SUITE 300A SAN DIEGO, CALIFORNIA 92127 August 24,2000 City of Carlsbad ATTN: Mr. Dave Hansen Deputy Qty Engineer Engineering Department 2075 Las Palmas Court Carlsbad, California 92009 File Number 200001251 Gentlemen: This is in reply to your May 19,2000 letter concerning your proposal to widen and realign a section of Rancho Santa Fe Road from approximately 100 feet south of the La Costa Avenue/Rancho Santa Fe Road intersection to approximately 100 feet north of the Melrose Drive/Rancho Santa Fe Road intersection. This project is part of the City of Carlsbad's General Plan to upgrade Rancho Sata Fe Road to meet its designation as a Prime Arterial Roadway and affects a portion of San Marcos Creek and its tributaries in the City of San Marcos, San Diego County, California. This project includes the relocation of a sanitary sewer line from the old bridge structure to a location under San Marcos Creek in the footprint of the construction disturbance area for the new bridge. The Corps has determined that your proposed activity complies with the terms and conditions of nationwide permit NW14 for fills for roads crossing waters of the United States (including wetlands and other special aquatic sites) and encompasses three separate locations with permanent impacts of 0.5,0.27 and 0.15 respectively. Additionally, the Corps has determined that your proposed activity complies with the terms and conditions of the nationwide permits NW12 for utility line discharges (0.04 of an acre of impact) lying within the foot print at the San Marcos Creek Bridge site, NW 18 for minor discharges (0.01 acre of permanent impact) and NW 33 temporary construction access and dewatering for roads crossing waters of the United States (including wetlands and other special aquatic sites) encompasses two separate descriptions with temporary impacts of 1.18 acres. - ••* You must comply with all terms and applicable conditions (regional, general, 404 only, and 401 conditions) described in Enclosure 1 and complete the compliance statement (Enclosure 2). -2- Furthermore, you must comply with the following Special Condition(s): 1. The pennittee shall abide by any special conditions stated in the Section 401 Water Quality Certification or waiver from the California Regional Water Quality Board and/or the Section 1601 Streambed Alteration Agreement from the California Department of Fish and Game. 2. The pennittee shall compensate for impacts to waters of the US, including wetlands by restoring and/or enhancing at least 231 acres of riparian habitat within the San Marcos Creek watershed as dose to the impact area as is feasible. This acreage is estimated using a minimum ratio of 3:1 for impacts to Southern Willow Scrub and disturbed wetlands and a 1:1 ratio for impacts to unvegetated ephemeral waters. Prior to initiating construction of Ranchp Santa Fe Road Realignment and widening project, the permittee shall submit to the Corps a mitigation plan consistent with the Los Angeles District Habitat Mitigation and Monitoring Proposal Guidelines, dated June 1993. The permittee shall obtain final written approval of their mitigation plan from the Corps prior to construction of the Rancho Santa Fe Road Realignment and widening project 3. The permittee shall develop a Biological Mitigation and Monitoring Plan, which identifies the location, duration, and method for a monitoring program, success standards, and contingency measures. The permittee shall obtain written approval of this plan from the Corps of Engineers prior to initiation of construction. 4. The permittee shall submit to the Corps annual written progress reports on the mitigation area in accordance with the approved plan. These reports shall include photographic documentation of the mitigation area. Five years after the project is completed, the pennittee shall submit to the Corps a report documenting the degree of revegetation of the site. If the mitigation area(s) have not achieved the criteria stated in the approved mitigation plan the pennittee shall reevaluate the soil, vegetative, and hydrologic conditions of the mitigation area to determine what remedial actions need to be taken. Following implementation of appropriate corrective actions, the permittee shall replant the project site with native wetland and riparian vegetation and monitor until the stated success criteria are achieved. 5. The permittee shall employ all standard Best Management Practices to ensure that toxic material, silt, debris or excessive erosion do not enter Sdn Marcos Creek during project construction. 6. The permittee shall ensure that all vehicles maintenance, staging, storage and dispensing of fuel occurs in designated upland areas. The permittee shall ensure that these designated upland areas are located in such a manner as to prevent any runoff from entering waters of the U.S. 7. Hie permittee shall remove all excess fill and/or construction debris, temporary fill or structures used for access and dewatering for construction purposes, and equipment from the site immediately upon completion of construction. 8. Prior to onset of construction/excavation, the permittee shall provide the contractors) with a copy of this permit. The contractor shall read and agree to comply with all conditions herein. 9. Disturbed slope areas in the vicinity of any jurisdictional waters of the US. Shall be stabilized using jute netting or other appropriate means, and revegetated with native vegetation prior to the onset of the first winter rains following construction, so as to minimize sedimentation and related impacts to the drainage. 10. The permittee shall provide notification, either written or verbal, to the Corps of Engineers at least one week prior to the start of work as to the anticipated beginning and ending dates of construction. 11. A copy of the permit shall be on the job site at all times during construction. The permittee shall provide a copy of this permit to aUonsite contractors), subcontractors) and forepersons(s). The permittee shall require that all such contractors), subcontractors) and forepersons(s) read mis authorization in its entirety prior to initiation of the project and ensure that all appropriate permit conditions are implemented as intended. 12. Implementation of the mitigation plan shall be initiated as a point when the continued development of the site would not impinge upon the potential viability of the installed mitigation. Implementation of the mitigation should be timed to take advantage of the cool winter wet season. 13. Within 45 days of completion of the project, the permittee shall submit to the Corps of Engineers: a. Photographs taken at the project site before, during and after construction for those aspects Significant to impacts to waters of the US; and b. One copy of "as builf • drawings. This letter of verification is valid for a period not to exceed two years unless the nationwide permit is modified, reissued, or revoked before that time. It is incumbent upon you to remain informed of changes to the nationwide permits. A nationwide permit does not grant any property rights or exclusive privileges. Also, it does not authorize any injury to the property or rights of others or authorize interference with any existing or proposed Federal project. Furthermore, it does not obviate the need to obtain other Federal, state, or local authorizations required by law. Thank you for participating in our regulatory program. If you have questions, please contact Karon M Marzec at (858) 674-5384. Enclosures Mark Durham Chief, South Coast Section Regulatory Branch -1- LOS ANGELES DISTRICT US. ASM* CORPS OF ENGINEERS CERTIFICATION OF COMPLIANCE WITH DEPARTMENT OF THE ARMY NATIONWIDE PERMIT Permit Number 200001251 Date of Issuance: August 24,2000 Name of Permittee: City of Carlsbad City of Carlsbad Engineering Department 2075 Las Palmas Court Carlsbad, California 92009 Upon completion of the activity authorized by this permit, sign mis certification and return it with an original signature to the following address: US. Army Corps of Engineers ATTENTION: Regulatory BrancJ\ (200001251) P.O. Box 532711 Los Angeles, California 90053-2325 Please note that your permitted activity is subject to a compliance inspection by a Corps of Engineers' representative. If you fail to comply with these Nationwide permits you may be subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced Nationwide permit has been completed in accordance with the terms and conditions of said permit. Signature of Permittee Date NATIONWIDE PERMIT NUMBER NW12, NW14, NW18, and NW33 TERMS AND CONDITIONS 1. Nationwide Permit NW12, NW14, NW18, and NW33 Terms: Your activity is authorized under NW12, NW14, NW18 jtnd NW33 subject to the following terms: Nationwide Number 12: Utility Lien Discharges. Discharges of dredged of fill material associated with excavation, backfill or bedding for utility lines, including outfall and intake structures, provided there is no change in preconstruction contours. A "utility line "is defined as any pipe or pipeline for the transportation of any gaseous, liquid, liquefiable, or slurry substance, for the purpose/and any cable, line, or wire for the transmission for any purpose of electrical energy, telephone and telegraph messages, and radio and television communication. The term "utility line" does not apply to pipes conveying drainage from another area. This NWP authorizes mechanized land clearing necessary for the installation of utility lines, including overhead utility lines, provided the cleared area is kept to the minimum necessary and preconstruction contours are maintained. However, access roads, temporary or permanent, or foundations associated with overhead utility lines, are not authorized by this NWP. Material resulting from trench excavation may be temporarily sidecast (up to three months) into waters of the United States, provided that the material is not placed in such a manner that it is dispersed by currents or other forces. The DE may extend the period of temporary side-casting not to exceed a total of 180 days, where appropriate. The area of waters of the United States that is disturbed must be limited to the minimum necessary to construct the utility line. In wetlands the top 6" to 12" of the trench should generally be backfilled with topsoil from the trench. Excess material must be removed to upland areas immediately up completion of construction. Any exposed slopes and stream banks must be stabilized immediately upon completion of the utility line. (See 33 CFR Part 322). Notification: The permittee must notify the district engineer in accordance with the "Notification" general condition, if any of the following criteria are net: / a. Mechanized land clearing in a forested wetland; b. A Section 10 permit is required for the utility line; c. The utility line is waters of the united States exceeds 500 feet; or, d. The utility line is placed within a jurisdictional area (i.e., a water of the United States), and it runs parallel to a streambed that is within that jurisdictional area. (Section 10 and 404) ^i. Nationwide Number 14: Road Crossings. Fills for roads crossing waters of the United States (including wetlands and other special aquatic sites) provided the activity meets all of the following criteria: a. The width of the fill is limited to the minimum necessary for the actual crossing; b. The fill placed in non-tidal waters of the United States is limited to a filled area of no more than 1/2 acre for each separate and distinct crossing. c. The crossing is culverted, bridged or otherwise designed to prevent the restriction of, and to withstand, expected high flows and tidal flows, and to prevent the restriction of low flows and the movement of aquatic organisms; d. The crossing, including all attendant features, both temporary and permanent, is part of a single and complete project for crossing of a water of the United States; and, e. For fills in special aquatic sites, including wetlands, the permittee notifies the District Engineer in accordance with the "Notification" general condition. The notification must also include a delineation of affected special aquatic sites, including wetlands. This NWP may not be combined with NWP18 or NWP 26 for the purpose of increasing the footprint of the road crossing. Some road fills may be eligible for an exemption from the need for a Section 404 permit altogether (see 33 CFR 323.4). Also, where local circumstances indicate the need, District Engineers will define the term "expected high flows" for the purpose of establishing applicability of this NWP. (Sections 10 and 404) Nationwide Number 18: Minor Discharges. Minor discharges of dredged or fill material into all waters of the United States provided that the activity meets all of the following criteria:' -' ' ' ' • a. The quantity of discharged material and the volume of excavated area does not exceed 25 cubic yards below the plane of the ordinary high water mark or the high tide line; b. The discharge, including any excavated area, will not cause the loss of more than 1/10 acre of a special aquatic site, including wetlands. For the purposes of this NWP, the acreage limitation includes the filled area and excavated area plus special aquatic sites that are adversely affected by flooding and special aquatic sites that are drained so mat they would no longer be a water of the United States as a result of the project; c. If the discharge, including any excavated area, exceeds 10 cubic yards below the plane of the ordinary high water mark or the high tide line or if the discharge is in a special aquatic site, including wetlands, the permittee notifies the District Engineer in accordance with the "Notification" general condition. For discharges in special aquatic sites, including wetlands, the notification must also include a delineation of affected special aquatic sites, including wetlands (Also see 33 ,CFR 330.1(e)); and d. The discharge, including all attendant features, both temporary and permanent, is part of a single and complete project and is not placed for the purpose of a stream diversion. e. This NWP cannot be used in conjunction with NWP 26 for any single and complete project. (Sections 10 and 404) Nationwide Number 33: Temporary Construction. Access and Dewatering. Temporary structures, work and discharges, including cofferdams, necessary for construction activities or access fills or .dewatering of construction sites; provided 'that the associated primary activity is authorized by the Corps of Engineers or the U.S. Coast Guard, or for other construction activities not subject to the Corps or US. Coast Guard regulations. Appropriate measures must be taken to maintain near normal downstream flows and to minimize flooding. Fill must be of materials, and placed in a manner, mat will not be eroded by expected high flows. The use of dredged material may be allowed if it is determined by the District Engineer mat it will not cause more than minimal adverse effects on aquatic resources, temporary fill must be entirely removed to upland areas, or dredged material returned to its original location, following completion of the construction activity, and the affected areas must be restored to the pre-project conditions. Cofferdams cannot be used to dewater wetlands or'other aquatic areas so as to change their use. Structures left in place after cofferdams are removed require a Section 10 permit if located in navigable waters of the United States. (See 33 CFR Part 322). The permittee must notify the District Engineer in accordance with the "Notification" general condition. The notification must also include a restoration plan of reasonable measures to avoid and minimize adverse effects to aquatic resources. The District Engineer will add special conditions, where necessary, to ensure that adverse environmental effects are minimal. Such conditions may include: limiting the temporary work to the minimum necessary; requiring seasonal restrictions; modifying the restoration plan; and requiring alternative construction methods (e.g., construction mats in wetlands where practicable.). (Sections 10 and 404) 2. Nationwide Permit General Conditions A. The following general conditions must be followed in order for any authorization by a NWP to be valid: 1. Navigation. No activity may cause more than a minimal adverse effect on navigation. 2. Proper Maintenance. Any structure or fill authorized shall be properly maintained, including maintenance to ensure public safety. 3. Soil Erosion and Sediment Controls. Appropriate soil erosion and sediment controls must be used and maintained in effective operating condition during construction, and all exposed soil and other fills, as well as any work below the ordinary high water mark or high tide line, must be permanently stabilized at the earliest practicable date. 4. Aquatic Life Movements. No activity may substantially disrupt the movement of those species of aquatic life indigenous to the waterbody, including those species that normally migrate through the area, unless the activity's primary purpose is to impound water. Culverts placed in streams must be installed to maintain low flow conditions. ' 5. Equipment. Heavy equipment working in wetlands must be placed on mats, or other measures must be taken to minimize soil disturbance. 6. Regional and Case-By-Case Conditions. The activity must comply with any regional conditions that may have been added by the division engineer (see 33 CFR 330.4(e)) and with any case specific conditions added by the Corps or by the State or tribe in its Section 401 water quality certification and Coastal Zone Management Act consistency determination. 7. Wild and Scenic Rivers. No activity may occur in a component of the National Wild and Scenic River System; or in a river officially designated by Congress as a "study river" for possible inclusion in the system, while the river is in an official study status; unless the appropriate Federal agency, with direct management responsibility for such river, has determined in writing that the proposed activity will not adversely affect the Wild and Scenic River designation, or study status. Information on Wild and Scenic Rivers may be obtained from the appropriate Federal land management agency in the area (e.g.. National Park Service, US. Forest Service, Bureau of Land Management, US. Fish and Wildlife Service). 8. Tribal Rights. No activity or its operation may impair reserved tribal rights, including, but not limited to, reserved water rights and treaty fishing and hunting rights. 9. Water Quality. (a) In certain States and tribal lands an individual 401 water quality certification must be obtained or waived (See 33 CFR 330-4(c». (b) For NWPs 12,14,17,18,32,39,40,42,43, and 44, where the State or tribal 401 certification (either genetically or individually) does not require or approve a water quality management plan, the permittee must include design criteria and techniques that will ensure that the authorized work does not result in more than minimal degradation of water quality. An important component of a water quality management plan includes stormwater management that minimizes degradation of the downstream aquatic system, including water quality. Refer to General Condition 21 for stormwater management requirements. Another important component of a water quality management plan is the establishment and maintenance of vegetated buffers next to open waters, including streams. Refer to General Condition 19 for vegetated buffer requirements for the NWPs. 10. Coastal Zone Management. In certain states, an individual state coastal zone management consistency concurrence must be obtained or waived (see Section 330.4(d)). 11. Endangered Species, (a) No activity is authorized under any NWP which is likely to jeopardize the continued existence of a threatened or endangered species or a species proposed for such designation, as identified under the Federal Endangered Species Act, or which will destroy or adversely modify the critical habitat of such species. Non-federal permittees shall notify the District Engineer if any listed species or designated critical habitat might be affected or is in the vicinity of the project, or is located in the designated critical habitat and shall not begin work on the activity until notified by the District Engineer that the requirements of the Endangered Species Act have been satisfied and that the activity is authorized. For activities that may affect Federally-listed endangered or threatened species or designated critical habitat, the notification must include the name(s) of the endangered or threatened species that may be affected by the proposed work or that utilize the designated critical habitat that may be affected by the proposed work. As a result of formal or informal consultation with the FWS or NMFS, the District Engineer may add species-specific regional endangered species conditions to the NWPs. (b) Authorization of an activity by a nationwide permit does not authorize the 'take" of a threatened or endangered species as defined under the Federal Endangered Species Act In the absence of separate authorization (e.g., an ESA Section 10 Permit, a Biological Opinion with "incidental take" provisions, etc.) from the US. Fish and Wildlife Service or the National Marine Fisheries Service, both lethal and non-lethal "takes" of protected species are in violation of the Endangered Species Act Information on the location of threatened and endangered species and their critical habitat can be obtained directly from the offices of the U.S. Fish and Wildlife Service and National Marine Fisheries Service or their world wide web pages at http://www.fws.gov/r9endspp/endsppJibnl and http://wwwjunfs.gov /prot_res/esahome.html, respectively. 12. Historic Properties. No activity which may affect historic properties listed, or eligible for listing, in the National Register of Historic Places is authorized, until the DE has complied with the provisions of 33 CFR Part 325, Appendix C. The prospective permittee must notify the District Engineer if the authorized activity may affect any historic properties listed, determined to be eligible, or which the prospective permittee has reason to believe may be eligible for listing on the National Register of Historic Places, and shall not begin die activity until notified by the District Engineer that the requirements of the National Historic Preservation Act have been satisfied and that the activity is authorized. Information on the location and existence of historic resources can be obtained from the State Historic Preservation Office and the National Register of Historic Places (see 33 CFR 330.4(g)). For activities that may affect historic properties listed in, or eligible for listing in, the National Register of Historic Places, the notification must state which historic property may be affected by the proposed work or include a vicinity map indicating the location of the historic property. 13. Notification. (a) Timing: Where required by the terms of the NWP, the prospective permittee must notify the District Engineer with a preconstruction notification (PCN) as early as possible. The District Engineer must determine if the PCN is complete within 30 days of the date of receipt and can request the additional information necessary to make the PCN complete only once. However, if the prospective permittee does not provide all of the requested information, then the District Engineer will notify the prospective permittee that the PCN is still incomplete and the PCN review process will not commence until all of the requested information has been received by the District Engineer. The prospective permittee shall not begin the activity: (1) Until notified in writing by the District Engineer that the activity may proceed under the NWP with any special conditions imposed by the District or Division Engineer; or (2) If notified in writing by the District or Division Engineer that an individual permit is required; or • (3) Unless 45 days have passed from the District Engineer's receipt of the complete notification and the prospective permittee has not received written notice from the District or Division Engineer. Subsequently, the permittee's right to proceed under the NWP may be modified, suspended, or revoked only in accordance with the procedure set forth in 33 CFR 330.5(d)(2). (b) Contents of Notification: The notification must be in writing and include the following information: (1) Name, address, and telephone numbers of the prospective permittee; (2) Location of the proposed project; (3) Brief description of the proposed project; the project's purpose; direct and indirect adverse environmental effects the project would cause; any other NWP(s), regional general permit(s), or individual permit(s) used or intended to be used to authorize any part of the proposed project or any related activity; and (4) For NWPs 7,12,14,18,21,34,38,39,40,42, and 43, the PCN must also include a delineation of affected special aquatic sites, including wetlands, vegetated shallows (e.g., submerged aquatic vegetation, seagrass beds), and riffle and pool complexes (see paragraph 13(f)); (5) For NWP 7, Outfall Structures and Maintenance, the PCN must include information regarding the original design capacities and configurations of those areas, of the facility where maintenance dredging or excavation is proposed. (6) For NWP 14, Linear Transportation Crossings, the PCN must include a compensatory mitigation proposal to offset permanent losses of waters of the United States and a statement describing how temporary losses of waters of the United States will be minimized to the maximum extent practicable. (7) For NWP 21, Surface Coal Mining Activities, the PCN must include an Office of Surface Mining (OSM) or state-approved mitigation plan. (8) For NWP 27, Stream and Wetland Restoration, the PCN must include documentation of the prior condition of the site that will be reverted by the permittee. (9) For NWP 29, Single-Family Housing, the PCN must also include: (i) Any past use of this NWP by the individual permittee and/or the permittee's spouse; (ii) A statement that the single-family housing activity is for a personal residence of the permittee; (iii) A description of the entire parcel, including its size, and a delineation of wetlands. For the purpose of this NWP, parcels of land measuring 1/4 acre or less will not require a formal on-site delineation. However, the applicant shall provide an indication of where the wetlands are and the amount of wetlands that exists on the property. For parcels greater than 1/4 acre in size, a formal wetland delineation must be prepared in accordance with the current method required by the Corps. (See paragraph 13(0); (iv) A written description of all land (including, if available, legal descriptions) owned by the prospective permittee and/or the prospective permittee's spouse, within a one mile radius of the parcel, in any form of ownership (including any land owned as a partner, corporation, joint tenant, co-tenant, or as a tenant-by-the-entirety) and any land on which a purchase and sale agreement or other contract for sale or purchase has been executed; (10) For NWP 31, Maintenance of Existing Flood'Control Projects, the prospective permittee must either notify the District Engineer with a PCN prior to each maintenance activity or submit a five year (or less) maintenance plan. In addition, the PCN must include all of the following: (i) Sufficient baseline information so as to identify the approved channel depths and configurations and existing facilities. Minor deviations are authorized, provided the approved flood control protection or drainage is not increased; (ii) A delineation of any affected special aquatic sites, including wetlands; and, (iii) Location of the dredged material disposal site. (11) For NWP 33, Temporary Construction, Access, and Dewatering, the PCN must also include a restoration plan of reasonable measures to avoid and minimize adverse effects to aquatic resources. (12) For NWPs 39,43, and 44, the PCN must also include a written statement to the District Engineer explaining how avoidance and minimization of losses of waters of the United States were achieved on the project site. 13) For NWP 39, Residential, Commercial, and Institutional Developments, the PCN must include a compensatory mitigation proposal that offsets unavoidable losses of waters of the United States or justification explaining why compensatory mitigation should not be required. (14) For NWP 40, Agricultural Activities, the PCN must include a compensatory mitigation proposal to offset losses of waters of the United States. (15) For NWP 43, Stormwater Management Facilities, the PCN must include, for the construction of new stormwater management facilities, a maintenance plan (in accordance with State and local . .requirements, if applicable) and a compensatory mitigation proposal to offset losses of waters of the United States. (16) For NWP 44, Mining Activities, the PCN must include a description of all waters of the United States adversely affected by the project, a description of measures taken to minimize adverse effects to waters of the United States, a description of measures taken to comply with the criteria of the NWP, and a reclamation plan (for aggregate mining activities in isolated waters and non-tidal wetlands adjacent to headwaters and any hard rock/mineral mining activities). (17) For activities that may adversely affect Federally-listed endangered or threatened species, the PCN must include the name(s) of those endangered or threatened species that may be affected by the proposed work or utilize the designated critical habitat that may be affected by the proposed work. (18) For activities that may affect historic properties listed in, or eligible for listing in, the National Register of Historic Places, the PCN must state which historic property may be affected by the proposed work or include a vicinity map indicating the location of the historic property. (19) For NWPs 12,14,29,39,40,42,43, and 44, where the proposed work involves discharges of dredged or fill material into waters of the United States resulting in permanent, above-grade fills within 100-year floodplains (as identified on FEMA's Flood Insurance Rate Maps or FEMA- approved local floodplain maps), the notification must include documentation demonstrating that the proposed work complies with the appropriate FEMA or FEMA-approved local floodplain construction requirements. (c) Form of Notification: The standard individual permit application form (Form ENG 4345) may be used as the notification but must clearly indicate that it is a PCN and must include all of the information required in (b) (1)-(19) °f General Condition 13. A letter containing the requisite information may also be used. (d) District Engineer's Decision: In reviewing the PCN for the proposed activity, the District Engineer will determine whether the activity authorized by the NWP will result in more man minimal individual or cumulative adverse environmental effects or may be contrary to the public interest. The prospective permittee may, optionally, submit a proposed mitigation plan with the PCN to expedite the process and the District Engineer will consider any proposed compensatory mitigation the applicant has included in the proposal in determining whether the net adverse environmental effects to the aquatic environment of the proposed work are minimal. If the District Engineer determines that the activity complies with the terms and conditions of the NWP and that the adverse effects on the aquatic environment are minimal, the District Engineer will notify the permittee and include any conditions the District Engineer deems necessary. Any compensatory mitigation proposal must be approved by the District Engineer prior to commencing work. If the prospective permittee is required to submit a compensatory mitigation proposal with the PCN, the proposal may be either conceptual or detailed. If the prospective permittee elects to submit a compensatory mitigation plan with the PCN, the District Engineer will expeditiously review the proposed compensatory mitigation plan. The District Engineer must review the plan within 45 days of receiving a complete PCN and determine whether the conceptual or specific proposed mitigation would ensure no more than minimal adverse effects on the aquatic environment If the net adverse effects of the project on the aquatic environment (after consideration of the compensatory mitigation proposal) are determined by the District Engineer to be minimal, the District Engineer will provide a timely written response to the applicant stating that the project can proceed under the terms and conditions of the nationwide permit. If the District Engineer determines that the adverse effects of the proposed work are more than minimal, then he will notify the applicant either: (1) that the project does not qualify for authorization under the NWP and instruct the applicant on the procedures to seek authorization under an individual permit; (2) that the project is authorized under the NWP subject to the applicant's submission of a mitigation proposal that would reduce the adverse effects on the aquatic environment to the minimal level; or (3) that the project is authorized under the NWP with specific modifications or conditions. Where the District Engineer determines that mitigation is required in order to ensure no more than minimal adverse effects on the aquatic environment, the activity will be authorized within the 45-day PCN period, including the necessary conceptual or specific mitigation or a requirement that the applicant submit a mitigation proposal that would reduce the adverse effects on the aquatic environment to the minimal level. When conceptual mitigation is included, or a mitigation plan is required under item (2) above, no work in waters of the United States will occur until the District Engineer has approved a specific mitigation plan. (e) Agency Coordination: The District Engineer will consider any comments from Federal and State agencies concerning the proposed activity's compliance with the terms and conditions of the NWPs and the need for mitigation to reduce the project's adverse effects on the aquatic environment to a minimal level. For activities requiring notification to the District Engineer that result in the loss of greater than 1/2 acre of waters of the United States, the District Engineer will, upon receipt of a notification, provide immediately (e.g., via facsimile transmission, overnight mail, or other expeditious manner), a copy to the appropriate offices of the Fish and Wildlife Service, State natural resource or water quality agency, EPA, State Historic Preservation Officer (SHPO), and, if appropriate, the National Marine Fisheries Service. With the exception of NWP 37, these agencies will then have 10 calendar days from the date me material is transmitted to telephone or fax the District Engineer notice that they intend to provide substantive, site-specific comments. If so contacted by an agency, the District Engineer will wait an additional 15 calendar days before making a decision on the notification. The District Engineer will fully consider agency comments received within the specified time frame, but will provide no response to the resource agency, except as provided below. The District Engineer will indicate in the administrative record associated with each notification that the resource agencies' concerns were considered. As required by Section 305{bX4)(B) of the Magnuson-Stevens Fishery Conservation and Management Act, the District Engineer will provide a response to National Marine Fisheries Service within 30 days of receipt of any Essential Fish Habitat conservation recommendations. Applicants are encouraged to provide the Corps multiple copies of notifications to expedite agency notification, (f) Wetlands Delineations: Wetland delineations must be prepared in accordance with the current method required by the Corps. For NWP 29 see paragraph (b)(9)(iii) for parcels less than 1/4 acre in size. The permittee may ask the Corps to delineate the special aquatic site. There may be some delay if the Corps does the delineation. Furthermore, the 45-day period will not start until the wetland delineation has been completed and submitted to the Corps, where appropriate. 14. Compliance Certification. Every permittee who has received a Nationwide permit verification from the Corps will submit a signed certification regarding the completed work and any required mitigation. The certification will be forwarded by the Corps with the authorization letter. The certification will include: a.) A statement that the authorized work was done in accordance with the Corps authorization, including any general or specific conditions; b.) A statement that any required mitigation was completed in accordance with the permit conditions; and c.) The signature of the permittee certifying the completion of the work and mitigation. 15. Use of Multiple Nationwide Permits. The use of more than one NWP for a single and complete project is prohibited, except when the acreage loss of waters of the United States authorized by the NWPs does not exceed the acreage limit of the NWP with the highest specified acreage limit. For example, if a road crossing over tidal waters is constructed under NWP 14, with associated bank stabilization authorized by NWP 13, the maximum acreage loss of waters of the United States for the total project cannot exceed 1/3 acre. 16. Water Supply Intakes. No activity, including structures and work in navigable waters of the United States or discharges of dredged or fill material, may occur in the proximity of a public water supply intake except where the activity is for repair of the public water supply intake structures or adjacent bank stabilization. 17. Shellfish Beds, No activity, including structures and work in navigable waters of the United States or discharges of dredged or fill material, may occur in areas of concentrated shellfish populations, unless the activity is directly related to a shellfish harvesting activity authorized by NWP 4. 18. Suitable Material. No activity, including structures and work in navigable waters of the United States or discharges of dredged or fill material, may consist of unsuitable material (e.g., trash, debris, car bodies, asphalt, etc.) and material used for construction or discharged must be free from toxic pollutants in toxic amounts (see Section 307 of the Clean Water Act). 19. Mitigation. The project must be designed and constructed to avoid and minimize adverse effects to waters of the United States to the maximum extent practicable at the project site (i.e., on site). Mitigation will be required when necessary to ensure that the adverse effects to the aquatic environment are minimal. The District Engineer will consider the factors discussed below when determining the acceptability of appropriate and practicable mitigation necessary to offset adverse effects on the aquatic environment that are more man minimal. "*" (a) To be practicable, the mitigation must be available and capable of being done considering costs, existing technology, and logistics in light of the overall project purposes. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferably in the same watershed; •'• . •' . - 3(b) The District Engineer will require restoration, creation, enhancement, or preservation of other ****r aquatic resources in order to offset the authorized impacts to the extent necessary to ensure that the adverse effects on the aquatic environment are minimal. An important element of any compensatory mitigation plan for projects in or near streams or other open waters is the establishment and maintenance, to the maximum extent practicable, of vegetated buffers next to open waters on the project site. The vegetated buffer should consist of native species. The District Engineer will determine the appropriate width of the vegetated buffer and in which cases it will be required. Normally, the vegetated buffer will be 25 to 50 feet wide on each side of the stream, but the District Engineer may require wider vegetated buffers to address documented water quality concerns. If there are open waters on the project site and the District Engineer requires compensatory mitigation for wetland impacts to ensure mat the net adverse effects on the aquatic environment are minimal, any vegetated buffer will comprise no more than 1/3 of the remaining compensatory mitigation acreage after the permanently filled wetlands have been replaced on a one-to-one acreage basis. In addition, compensatory mitigation must address adverse effects on wetland functions and values and cannot be used to offset the acreage of wetland losses that would occur in order to meet the acreage limits of some of the NWPs(e.g., for NWP 39,1/4 acre of wetlands cannot be created to change a 1/2 acre loss of wetlands to a 1 /4 acre loss; however, 1 /2 acre of created wetlands can be used to reduce the impacts of a 1 /3 acre loss of wetlands). If the prospective permittee is required to submit a compensatory mitigation proposal with the PCN, the proposal may be either conceptual or detailed. (c) To the extent appropriate, permittees should consider mitigation banking and other appropriate forms of compensatory mitigation. If die District Engineer determines that compensatory mitigation is necessary to offset losses of waters of the United States and ensure that the net adverse effects of the authorized work on the aquatic environment are minimal, consolidated mitigation approaches, such as mitigation banks, will be the preferred method of providing compensatory mitigation, unless the District Engineer determines that activity-specific compensatory mitigation is more appropriate, based on which is best for the aquatic environment These types of mitigation are preferred because they involve larger blocks of protected aquatic environment, are more likely to meet the mitigation goals, and are more easily checked for compliance. If a mitigation bank or other consolidated mitigation approach is not available in the watershed, the District Engineer will consider other appropriate forms of compensatory mitigation to offset the losses of waters of the United States to ensure that the net adverse effects of the authorized work on the aquatic environment are minimal. 20. Spawning Areas. Activities, including structures and work in navigable waters of the United States or discharges of dredged or fill material, in spawning areas during spawning seasons must be avoided to the maximum extent practicable. Activities that result in the physical destruction (e.g., excavate, fill, or smother downstream by substantial turbidity) of an important spawning area are not authorized. 21. Management of Water Flows. To the maximum extent practicable, the activity must be designed to maintain preconstruction downstream flow conditions (e.g., location, capacity, and flow rates). Furthermore, the activity must not permanently restrict or impede the passage of normal or expected high flows (unless the primary purpose of the fill is to impound waters) and the structure or discharge of dredged or rill material must withstand expected high flows. The activity must, to the maximum extent practicable, provide for retaining excess flows from the site, provide for maintaining surface flow rates from the site similar to preconstruction conditions, and must not increase water flows from the project site, relocate water, or redirect water flow beyond preconstruction conditions. In addition, the activity must, to the maximum extent practicable, reduce adverse effects such as flooding or erosion downstream and upstream of the project site, unless the activity is part of a larger system designed to manage water flows. 22. Adverse Effects From Impoundments. If the activity, including structures and work in navigable waters of the United States or discharge of dredged or fill material, creates an impoundment of water, adverse effects on the aquatic system caused by the accelerated passage of water and/or the restriction of its flow shall be minimized to me maximum extent practicable. 23. Waterfowl Breeding Areas. Activities, including structures and work in navigable waters of the United States or discharges of dredged or fill material, into breeding areas for migratory waterfowl must be avoided to the maximum extent practicable. 24. Removal of Temporary Fills. Any temporary fills must be removed in their entirety and the affected areas returned to their preexisting elevation. 25. Designated Critical Resource Waters. Critical resource waters include, NOAA-designated marine sanctuaries. National Estuarine Research Reserves, National Wild and Scenic Rivers, critical habitat for Federally listed threatened and endangered species, coral reefs. State natural heritage sites, and outstanding national resource waters or other waters officially designated by a State as having particular environmental or ecological significance and identified by the District Engineer after notice and opportunity for public comment. The District Engineer may also designate additional critical resource waters after notice and opportunity for comment* (a) Except as noted below, discharges of dredged or fill material into waters of the United States are not authorized by NWPs 7,12,14,16,17,21,29,31,35,39,40,42,43, and 44 for any activity within, or directly affecting, critical resource waters, including, wetlands adjacent to such waters. Discharges of dredged or fill materials into waters of the United States may be authorized by the above NWPs in National Wild and Scenic Rivers if the activity complies with General Condition 7. Further, such discharges may be authorized in designated critical habitat for Federally listed threatened or endangered species if the activity complies with General Condition 11 and the US. Fish and Wildlife Service or the National Marine Fisheries Service has concurred in a determination of compliance with this condition. (b) For NWPs 3,8,10,13,15,18,19,22,23,25,27,28,30,33,34,36,37, and 38, notification is required in accordance with General Condition 13, for any activity proposed in4 the designated critical resource waters including wetlands adjacent to those waters. The District Engineer may authorize activities under these NWPs only after he determines that the impacts to the critical resource waters will be no . more than minimal. 26. Fills Within 100-Year Floodplains. For purposes of mis general condition, 100-year floodplains will be identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps or FEMA-approved local floodplain maps. • (a) Discharges Below Headwaters. Discharges of dredged or fill material into waters of the United States resulting in permanent, above-grade fills within the 100-year floodplain at or below the point on a stream where the average annual flow is five cubic feet per second (Le., below headwaters) are not authorized by NWPs 29,39,40,42,43, and 44. For NWPs 12 and 14, the prospective permittee must notify the District Engineer in accordance with General Condition 13 and the notification must include documentation that any permanent, above-grade fills in waters of the United States within the 100-year floodplain below headwaters comply with FEMA or FEMA-approved local floodplain construction requirements. (b) Discharges in Headwaters (i.e., above the point on a stream where the average annual flow is five cubic feet per second). (1) Flood Fringe. Discharges of dredged or fill material into waters of the United States resulting in permanent, above-grade fills within the flood fringe of the 100-year floodplain of headwaters are not authorized by NWPs 12,14,29,39,40,42,43, and 44, unless the prospective permittee notifies the District Engineer in accordance with General Condition 13. The notification must include documentation that such discharges comply with FEMA or FEMA-approved local floodplain construction requirements. (2) Floodwav. Discharges of dredged or fill material into waters of the United States resulting in permanent, above- grade fills within the floodway of the 100-year floodplain of headwaters are not authorized by NVVPs 29,39,40,42, 43, and 44. For NWPs 12 and 14, the permittee must notify the District Engineer in accordance with General Condition 13 and the notification must include documentation thatany permanent, above grade fills proposed in the floodway comply with FEMA or FEMA-approved local floodplain construction requirements. O California Regional Water Quality Control Board •• San Diego Region Winston H. Hickox Internet Address: http^/www .swrcb.ca.gov/-rwqcb9/ •vE'V-Jtll VEjjjby Davis -,retatyfor 9771 Clairemont Mesa Boulevard, Suite A, San Diego, California 92124-1324 , Governor 'ironmental Pbone(858)467-2952*FAX(858)571-6972 Mill -t /\ Protection Action on Request for Clean Water Act section 401 Water Quality Certification for Discharge of Dredged and/or Fill Materials PROJECT: Rancho Santa Fe Road (File No. OOC-045) APPLICANT: Mr. David Hauser City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 ACTION: 1. D Order for Standard Certification 2. • Order for Technically-conditioned Certification ' '3. D Order for Denial of Certification STANDARD CONDITIONS: The following three standard conditions apply to all certification actions, except as noted under Condition 3 for denials (Action 3). 1. This certification action is subject to modification or'revocation upon administrative or judicial review, including review and amendment pursuant to section 13330 of the California Water Code and section 3867 of Title 23 of the California Code of Regulations (23 CCR). 2. This certification action is not intended and shall not be construed to apply to any discharge from any activity involving a hydroelectric facility requiring a Federal Energy Regulatory Commission (FERC) license or an amendment to a FERC license unless the pertinent certification application was filed pursuant to 23 CCR subsection 3855(b) and the application specifically identified that a FERC license or amendment to a FERC license for a hydroelectric facility was being sought. 3. The validity of any non-denial certification action (Actions 1 and 2) shall be conditioned upon total payment of the full fee required under 23 CCR section 3833, unless otherwise stated in writing by the certifying agency. California Environmental Protection Agency Recycled Paper FileNo.OOC-045 ADDITIONAL CONDITIONS: In addition to the three standard conditions, the applicant shall satisfy the following: 1. The project shall be implemented as described in the application submitted on April 26, 2000. Any deviation from the proposed project, as described in File No. OOC-045, shall require additional 401 Water Quality Certification. 2. All storm drain inlets shall have storm drain inlet filters (e.g., Fossil filters or their equivalent) to treat urban runoff. Maintenance of these,filters shall be conducted per the manufacturers specifications by the City of Carlsbad. REGIONAL WATER QUALITY CONTROL BOARD CONTACT PERSON: Stacey Baczkowski California Regional Water Quality Control Board, San Diego Region 9771 Clairemont Mesa Blvd;, Suite A San Diego, CA 92124 858-637-5594 WATER QUALITY CERTIFICATION: I hereby certify that the proposed discharge from the Rancho Santa Fe Road project will comply with the applicable provisions of sections 301 ("Effluent Limitations"), 302 ("Water Quality Related Effluent Limitations"), 303 ("Water Quality Standards and Implementation Plans"), 306 ("National Standards of Performance"), and 307 (Toxic and Pretreatment Effluent Standards") of the Clean Water Act. Although we anticipate no further regulatory involvement, should new information come to our attention that indicates a water quality problem, we may issue waste discharge requirements at that time. _ JoftVH. Robertus Date utive Officer Regional Water Quality Control Board • • Attachments 1 and 2 Attachment 1 FileNo.OOC-045 o Applicant: Applicant Representatives: Project Name: Project Location: Type of Project: Project Description: ATTACHMENT 1 PROJECT INFORMATION Mr. David Mauser City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 760-602-2739 760-602-8562 (f) Ms. Sherri Miller ... ' Dudek and Associates, Inc. 605 Third Street Encinitas, CA 92024 760-942-5147 760-632-8710 (f) Rancho Santa Fe Road (OOC-045) The proposed project site is located in the eastern portion of the City of Carlsbad, in northern San Diego County. The project footprint lies within the northwestern portion of the Rancho Santa Fe United States Geological Survey 7.5 minute quadrangle; sections 1,6,19,20,29,30,31, 32; Townships 12 and 13 South; Range 3 and 4 West. Road realignment and sewer pipeline. The proposed widening and realignment project is pan of the City of Carlsbad's General Plan to upgrade Rancho Santa Fe Road to a Prime Arterial Roadway Designation. A Prime Arterial Roadway has a 126-foot right-of-way containing six travel lanes, a bike lane, an 18 foot raised median, sidewalks, curb, and gutter. The northerly approach for the new bridge(s) would be approximately 2,200 feet long and include the reconstruction of the La Costa Meadows Drive/Rancho Santa Fe Road intersection, and the reconstruction of approximately 300 feet of La Costa Meadows Drive east of the intersection. The realigned Rancho Santa Fe Road would be constructed to the full width on the east side of the median, with sidewalks, curb and gutter, and street lights from the bridge to north of Melrose Drive. The Melrose Drive/Rancho Santa Fe Road intersection would be moved approximately 400 feet to the north of the present intersection. Melrose Drive would be realigned from the Cornita Drive/Melrose Drive intersection northwest to the realigned Melrose Drive/Rancho Santa Fe Road intersection. Comita Drive would be extended to connect with the realigned Melrose Drive. A 24-inch sewer pipeline would also be installed by the Vallecitos Water Attachment 1 File No. OOC-045 Federal Agency/Permit: Other Required Regulatory Approvals: California Environmental Quality Act (CEQA) Compliance: Receiving Water District during construction of the bridge. The pipeline would be within the limits of temporary disturbance associated with the bridge and would not result in any additional impacts. The pipeline will be encased with concrete and riprap, with a slope of 1.5:1, will be placed around the pipe. The pipeline, concrete, and riprap will be placed below grade with a minimum of 1 foot of cover over the top. U.S. Army Corps of Engineers : Nationwide Permit 14,18, and 33 California Department of Fish and,Game Streambed Alteration Agreement In 1992, the City of Carlsbad approved the preliminary alignment for the Rancho Santa Fe Road realignment and Mass Grading Project; the EIR for this project was certified by the City of Carlsbad on April 3,1992. An addendum to the final EIR was prepared in March 2000 to address the final alignment of Rancho Santa Fe Road. San Marcos Creek, unnamed ephemeral drainages Impacted Waters of the United States: Dredge Volume: Related Projects Implemented/to be Implemented by the Applicaiit(s): Compensatory Mitigation: Best Management Practices: The proposed project will permanently impact 0.42 acre of southern willow scrub, 0.27 acre of disturbed wetlands, and 0.24 acre of unvegetated ephemeral waters of the U.S. Temporary impacts include 0.97 acre of southern willow scrub. 1,227 cubic yards. The City of Carlsbad has implemented two projects in the past five years that have resulted hi temporary impacts to San Marcos Creek. The first project consisted of emergency access to repair a dip section of the Gibralter Street bridge. The second project replaced and/or repaired pedestrian and golf cart bridges at La Costa. Temporary impacts for both of these projects are estimated at 0.1 to 0.3 acre. The proposed mitigation program will include a total of 2.2 acres of offsite creation and 1.4 acres of off site enhancement of jurisdictional southern willow scrub and freshwater marsh. The proposed mitigation area is located immediately east of the project area within University Commons along San Marcos Creek. The mitigation area will be preserved as an element of the Fieldstone HCP. In addition, 0.54 acre of jurisdictional southern willow scrub will be restored onsite within the area of impact along San Marcos Creek. All storm drain inlets shall have storm drain inlet filters (e.g., Fossil filters or their equivalent) to treat urban runoff. Maintenance of these filters shall be conducted per the manufacturers specifications by the City of Carlsbad. Attachment 2 FileNo.OOC-045 ATTACHMENT 2 DISTRIBUTION LIST Mr. terry Dean Army Corps of Engineers Regulatory Branch 16885 West Bernardo Drive, Suite 300A San Diego, CA 92127 Ms. Sherri Miller Dudek and Associates, Inc. 60S Third Street Encinitas, CA 92024 State Water Resources Control Board Division of Water Quality STATE OF CAUFORMA- THE RESOURCES AGENCY ARNOLD 9CHWAR2HSIEQGER. DEPARTMENT OF FISH AND GAME South Coast Region 4949 VtewrWge Avenue San Diego, California 92123 (858)487-4201 October 9,2007 Mr. David Mauser City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008-7314 Dear Mr. Mauser Re: Rancho Santa Fe Road Realignment and Widening Project, SAA#5-142-00, Amendment We have reviewed your request to amend our Streambed Alteration Agreement, 5-142-00. Pursuant to Fish and Game Code Section 1600 et. seq., this letter, when countersigned by you amends our agreement as follows: Condition number five shall be amended in its entirety as follows: 5. The Operator shall submit a Final Revegetation/Monitoring Plan for both the 3.60 acres of mitigation off-site and the 0.54 acres on-site to the Department for review within 30 days of signing this Streambed Alteration Agreement. The plan shall specify a non-native plant control program, plant palette and include a long- term maintenance provision for the on-site mitigation and a plant palette for the on-site revegetation. The Operator shall receive Department approval prior to project initiation/Impacts. All mitigation shall be installed no later than March 31.2009. Be advised that all terms of agreement 5-142-00 remain in force. A copy of said agreement AND THIS AMENDMENT LETTER must be kept on site and be shown upon request to Department personnel during all periods of work. Two copies of this letter are being sent to you. PLEASE RETURN ONE SIGNED ORIGINAL to the Department of Fish and Game, at 4949 Viewridge Avenue, San Diego, Page 1 of 2 CA 92123. If you have further questions, please contact me at (858)467-4223. Sincerely, Tamara A. Sj^sr Environmental Scientist CONCURRENCE:DATE: cc: Doug Helming Page 2 of 2 "ATE OF CALIFORNIA- THE RESOURCES AGENCY GRAY DAVIS. Gowncr DEPARTMENT OF FISH AND GAME South Coast Region 4949 Viewridge Avenue San Diego, California 92123 (858)467-4201 September 5.2003 David Hauser City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92009 RE: Rancho Santa Fe Road Relignment Project, Strearnbed Alteration Agreement #5-142-00 Amendment and Extension No. 1 Dear Mr, Hauser: We have reviewed your request to amend and extend our Strearnbed Alteration Agreement, #5-142-00, ta alter the streambed of thirteen unnamed ephemeral drainages, tributaries to San Marcos Creek and San Marcos Creek In San Diego County. Pursuant to Fish and Game Code Section 1600 et. seq., this letter, when countersigned by you amends our agreement as follows; 5. The Operator shall submit a Final Revegetation/Monitoring Plan for both the 3.60 acres of mitigation off-site and the 0.54 acres on-stte to the Department for review within 30 days of signing this Strearnbed Alteration Agreement. The plan shall specify a non-native plant control program, plant palette and include a long-term maintenance provision for the on-site mitigation and a plant palette for the on-site revegetation. The Operator shall receive Department approval prior to project initiation/impacts. AH mitigation shall be installed no later than March 31. 2006. This letter, when countersigned by you, extends the period during which activities otherwise authorized by the agreement may continue. .The new termination date of the agreement is December 31, 2005. Be advised that all terms of agreement 5-142-00 remain in force throughout the new term of the agreement. A copy of said agreement AND THIS AMENDMENT AND EXTENSION LETTER must be kept on site and be shown upon request to Department personnel during all periods of work. Page 1 of 2 Two copies of this letter are being sent to you. PLfeASE RETURN ONE SIGNED ORIGINAL to the Department of Fish and Game, at 494$ Vfewridde Avenue San CA 32*23, » . If you haveftirther questions, please contact me at (858)467-4223. Sincerely, Environmental Socialist HI CONCURRENCE DATE: Page 2 of 2 CTATE OF CALIFORNIA THE RESOURCES AGENCY DEPARTMENT OF FISH AND GAME {Uth Coast Region \9 Vmwridg* Avenu* »o Dwgo. California 92123 (858) 467-4201 FAX <8S«) 467-4235 RECEIVED JUNO 7 2001 ENG/NEER/NG DEPARTMENT June OS, 2001 City of Carlsbad Attn. David Hauser 163 5 Faraday Avenue Carlsbad, CA 92009 Dear Mr. Hauser: Enclosed is Streambed Alteration Agreement 5-142-00 that authorizes work on the Rancho Santa Fe Road Realignment and Mass Grading project impacting San Marcos Creek in San Diego County. This action is authorized under Section 1600 of the Fish and Game Code and has been approved by the California Department of Fish and Game. Pursuant to the requirements of the California Environmental Quality Act (CEQA). the Department filed a Notice of Determination (NOD) on the project on OL Itf* jOl . Under CEQA regulations, the project has a 30-day statute of limitations on court challenges of the Department's approval under CEQA. The Department believes that the project fully meets the requirements of the Fish and Game Code and CEQA However, if court challenges on the NOD are received during the 30- day period, then an additional review or even modification of the project may be required. If no comments are received during the 30-day period, then any subsequent comments need not be responded to. This information is provided to you so that if you choose to undertake the project prior to the close of the 30-day period, you do so with the knowledge that additional actions may be required based on the results of any court challenges/ that are filed during that period. Please contact Tamara Spear at (858) 467-4223 if you have any questions regarding the Streambed Alteration Agreement. Sincerely. C.F. Raysbrook Regional Manager Enclosure cc: Tamara Spear CALIFORNIA DEPARTMENT OF FISH AND GAME 4949 Viewridge Avenue San Diego. California 92123 Notification No.5-142-00 AGREEMENT REGARDING PROPOSED STREAM OR LAKE ALTERATION THIS AGREEMENT, entered into between the State of California. Department of Fish and Game, hereinafter called the Department, and David Mauser, representing the City of Carlsbad, a municipal corporation State of California... hereinafter called the Operator, is as follows: WHEREAS, pursuant to Section 1601 of California Fish and Game Code, the Operator, on the 22nd day of May. 2000. notified the Department that they intend to divert or obstruct the natural flow of. or change the bed, channel, or bank of, or use material from the streambed(s) of. the following waterfs): thirteen unnamed ephemeral drainages, tributaries to San Marcos Creek and San Marcos Creek. San Diego County. California. Sections 1.6.19.20.29.30.31.32 Township 12S. 135 Range 3W.4W . WHEREAS, the Department (represented by Tamara Spear through a site visit on the 15th day of June. 2000) has determined that such operations may substantially adversely affect those existing fish and wildlife resources within the streambed of thirteen unnamed ephemeral drainages, tributaries to San Marcos Creek and San Marcos Creek, specifically identified as follows: Birds: least Sell's vireo (Vireo bella pusillus). southwestern willow flycatcher fEmo/otanax trails extimus).California onatoatcher (Poliootila catifbmica ca/ifomica). northern harrier (Circus cvaneus). white-tailed kite (Elanus leucurus). Cooper's hawk (Acco/tercooperi) red-tailed hawk (Buteo iamaicensis). red-shouldered hawk (flt/feo p/afrpten/sp/afvpterus).southem California rufous-crowned sparrow (Aimoohifa ruficeos). Bell's sage sparrow (Amohisofza belli belli}, loggerhead shrike (Lanius tudovicianusY Reptiles and Amphibians: arrovo southwestern toad (Bufb mtcroscaohus califomicus). San Diego homed lizard IPhrvnosoma coronatum blainvillei). western soadefoot toad (Scaohioous hammondn. red-diamond rattlesnake (Crotalus rubert. coastal rosy boa (LJchanura trivirgata). two-striped oarter snake (Thamnoohis hammondii): Mammals: San Diego pocket mouse (Chaetocfious fallax fellax). Dulzura California pocket mouse (Chaetodious califbmicus femoralisl San Diego black-tailed jack rabbit (Leous califomicus). desert woodrat (Neotoma teo/da): Invertebrates: ouino checkerspot butterfly (Euohvdrvas edithaguinoY monarch butterfly fDanaus olexiousY. Plants: San Dieao golden star (Muilla c/eve/and/V). San Dieoo thommint (Acanthomintha ilicifbtia). Nevin's barberry (Berbe/fs newn/fl. thread-leaved brodiaea IBrodiaea Rlifblia). coast woolly-heads (Nemacaulis denudata var denudata). smooth tarolant (Hemizonia ounaens sso. laevis) mud nama (Nama stenocarpum) including the southern willow scrub, freshwater marsh, and surrounding Dieqan coastal sage scrub, southern mixed chaparral, valley needleqrass grassland, annual grassland and eucalyptus grassland which provide habitat for such species in the area. THEREFORE, the Department hereby proposes measures to protect fish and wildlife resources during the Operator's work. The Operator hereby agrees to accept the following measures/conditions as part of the proposed work. If the Operator's work changes from that stated in the notification specified above, this Agreement is no longer valid and a new notification shall be submitted to the Department of Fish and Game. Failure to comply with the provisions of this Agreement and with other pertinent code sections, including but not limited to Fish and Game Code Sections 5650. 5652. 5937, and 5948, may result in prosecution. STREAMBED ALTERATION AGREEMENT #5-142-00 Nothing in this Agreement authorizes the Operator to trespass on any land or property nor does it relieve the Operator of responsibility for compliance with applicable federal state ' or local laws or ordinances. A consummated Agreement does not constitute Department of' Rsh and Game endorsement of the proposed operation, or assure the Department's concurrence with permits required from other agendas. This Agreement becomes effective the date of Department*s signature and terminates December 31.2004 for project construction only. This Agreement shall remain in effect for that fame necessary to satisfy the terms/conditions of this Agreement. 1. The following provisions constitute the limit of'activities agreed to and resolved by this Agreement The signing of this Agreement does not imply that the Operator is precluded from doing other activities at the site. However, activities not specifically agreed to and resolved by this Agreement shall be subject to separate notification pursuant to Fish and Game Code Sections 1600 et seq. 2. The Operator proposes to alter the streambed of thirteen unnamed ephemeral drainages, tributaries to San Marcos Creek and San Marcos Creek to accommodate the roadway realignment, widening and bridge replacement improvements to Rancho Santa Fe Road. A 24-inch sewer pipeline will also be installed within the limits of temporary disturbance at the proposed bridge footprint by Vallecitos Water District during the bridge construction. The project is located from approximately 100 south of the La Costa Avenue/Rancho Fe Road intersection to approximately 100 feet north of the Melrose Drive/Rancho Santa Fe Road within the City of Carlsbad, San Diego County impacting 2.11 acres of streambed. 3. The agreed work includes activities associated with No. 2 above. The project area is located in the streambed of thirteen unnamed ephemeral drainages, tributaries to San Marcos Creek and San Marcos Creek, San Diego County. Specific work areas and mitigation measures are described on/in the plans and documents submitted by the Operator, including an Addendum to the Final Environmental Impact Report for the Rancho Santa Fe Road Realignment and Mass Grading. SCH#90O1D850 dated March 2000: Conceptual Wetland Mitigation and Monitoring Plan for the Rancho Santa Fe Road Realignment, dated December 2000: Biological Resources Report and Impact Analysis for the Rancho Santa Fe Road Realignment-dated November 2000 and-shall be implemented as proposed unless directed differently by this agreement 4. The Operator shall not impact more than 2.11 acres of jurisdictional habitat comprised of 1.39 acres southern willow scrub, 0.27 acres disturbed freshwater marsh, 0.45 unvegetated ephemeral streambed. Of these impacts, 0.93 are permanent and 1.18 are temporary. Permanent impacts caused by the project include 0.42 acres of southern willow scrub, 0.27 of disturbed wetland and 0.24 acres unvegetated streambed. Mitigation for permanent impacts to southern willow scrub shall occur at a 3:1 ratio of creation. Disturbed freshwater marsh shall be mitigated at a 1:1 ratio of creation and 2:1 ratio of enhancement, and unvegetated streambed shall be mitigated at a 1:1 ratio of creation. All mitigation for permanent impacts shall be in-kind, occur off-site, and include 1.77 acres creation and 0.54 acres enhancement for a total of 2.31 acres. Temporary impacts caused by the project include 0.97 acres of southern willow scrub and STREAMBED ALTERATION AGREEMENT #5-142-00 '."•'.'' . 0.21 acres unvegetated streambed. 0.54 acres of southern willow scrub shall be restored on-site at a 1:1 ratio. 0.47 acres of southern willow scrub shall be mitigated at a 1:1 ratio of creation and 2:1 ratio of enhancement. 0.21 acres of unvegetated streambed shall also be restored on-site. 1.29 acres of mitigation for temporary impacts shall occur off-site including 0.43 acres of creation and 0.86 enhancement and shall be in-kind. The off-site mitigation area of 3.60 acres for the project is located along San Marcos Creek in the City of San Marcos, within the University Commons Specific Plan. 5. The Operator shall submit a Final Revegetation/Monitoring Plan for both the 3.60 acres of mitigation off-site and the 0.54 acres on-site to the Department for review within 30 days of signing this Streambed Alteration Agreement The plan shall specify a non-native plant control program, plant palette and include a long-term maintenance provision for the on-site mitigation and a plant palette for the on-site revegetation. The Operator shall receive Department approval prior to project initiation/impacts. All mitigation shall be installed no later than March 31. 2003. 6. The Operator shall not remove vegetation within the stream from March 15 to July 31 to avoid impacts to nesting birds. 7. The Operator shall have a qualified biologist onsite daily during any impacts to vegetation for the purpose of monitoring and enforcing condition numbers 6. 9, 14, and 21 ofthisagreeemenL •. •8. No equipment shall be operated in ponded or flowing areas. 9. Disturbance or removal of vegetation shall not exceed the limits approved by the Department The disturbed portions of any stream channel shall be restored. Restoration shall include the revegetation of stripped or exposed areas with vegetation native to the area 10. Installation of bridges, culverts, or other structures shall be such that water flow is not impaired. Bottoms of temporary culverts shall be placed at stream channel grade; bottoms of permanent culverts shall be placed at or below stream channel grade. 11. Preparation shall be made so that runoff from steep, credible surfaces will be diverted into stable areas with little erosion potential. Frequent water checks shall be placed on dirt roads, cat tracks, or other work trails to control erosion. 12. Water containing mud, silt or other pollutants from aggregate washing or other activities shall not be allowed to enter a lake or flowing stream or placed in locations that maybe subjected to high storm flows. -*• 13. Structures and associated materials not designed to withstand high seasonal flows shall be removed to areas above the high water mark before such flows occur. 14. The perimeter of the work site shall be adequately flagged to prevent damage to adjacent riparian habitat. ,—^ 15. Staging/storage areas for equipment and materials shall be located outside of the stream. STREAMBED ALTERATION AGREEMENT #5-142-00 16. The Operator shall comply with all litter and pollution laws. All contractors subcontractors and employees shall also obey these laws and it shall be the responsibility of the operator to ensure compliance. 17. If a stream's low flow channel, bed or banks/lake bed or banks have been altered, these shall be returned as nearly as possible to their original configuration and width, without creating future erosion problems. 18. All planting shall have a minimum of 100% survival the first year, based on the original quantity planted and 90% survival for container trees and 80% survival for container shrubs thereafter and/or shall attain 75% native wetland cover after 3 years and 90% native wetland cover after 5 years for trie-life of the project If the survival and cover requirements have not been met. the Operator is responsible for replacement planting to achieve these requirements. Replacement plants shall be monitored with the same survival and growth requirements for 5 years of planting. 19. All planting shall be done between October 1 and April 30 to take advantage of the winter rainy season. 20. An annual report shall be submitted to the Department by January 1 of each year for 5 /ears after planting. This report shall include the survival, percent cover, and height of both tree and shrub species. The number by species of plants replaced, an overview of the reyegetation effort, and the method used to assess these parameters shall also be included. Photos from designated photo stations shall be included. 21. Access to the work site shall be via existing roads and access ramps. 22. Spoil sites shall not be located within a stream/lake, where spoil shall be washed back into a stream/lake, or where it will cover aquatic or riparian vegetation. 23. Raw cement/concrete or washings thereof, asphalt, paint or other coating material, oil or other petroleum products, or any other substances which could be hazardous to aquatic life, resulting from project related activities, shall be prevented from contaminating the soil and/or entering the waters of the state. These materials, placed within or where they may enter a stream/lake, by Operator or any party working under contract, or with the permission of the Operator, shall be removed immediately. 24. No debris, soil, silt, sand, bark, slash, sawdust, rubbish, cement or concrete or washings thereof, oil or petroleum products or other organic or earthen material from any construction, or associated activity of whatever nature shall be allowed to enter into or placed where it may be washed by rainfall or runoff into, waters of the State. When operations are completed, any excess materials or debris shall be removed from the work area No rubbish shall be deposited within 150 feet of the high water mark of any stream or lake. 25. No equipment maintenance shall be done within or near any stream channel where petroleum products or other pollutants from the equipment may enter these areas under any flow. 26. The Operator shall provide a copy of this Agreement to all contractors, subcontractors, and the Operator's project supervisors. Copies of the Agreement shall be readily available at work sites at all times during periods of active work and must be presented to any Department personnel, or personnel from another agency upon STREAMBED ALTERATION AGREEMENT #5-142-00 demand. 27. The Department reserves the right to enter the project site at any time to ensure compliance with terms/conditions of this Agreement. 28. The Operator shall notify the Department, in writing, at least five (5) days prior to initiation of construction (project) activities and at least five (5) days prior to completion of construction (project) activities. Notification shall be sent to the Department at 4949 Viewridge Avenue, San Diego, CA 92123 Attn: Tamara A. Spear 29. It is understood the Department has entered into this Streambed Alteration Agreement for purposes of establishing protective features for fish and wildlife. The decision to proceed with the project is the sole responsibility of the Operator, and is not required by this agreement It is further agreed all liability and/or incurred cost related to or arising out of the Operator's project and the fish and wildlife protective conditions of this agreement, remain the sole responsibility of the Operator. The • Operator agrees to hold harmless the State of California and the Department of Fish and Game against any related claim made by any party or parties for personal injury or any other damages. 30. The Operator shall request an extension of this agreement prior to its termination. Extensions may be granted for up to 12 months from the date of termination of the agreement and are subject to Departmental approval. The extension request and fees shall be submitted to the Department's Region 5 office at the above address. If the Operator fails to request the extension prior to the agreement's termination, then the Operator shall submit a new notification with fees and required information to the Department. Any activities conducted under an expired agreement are a violation of Fish and Game Code Section 1600 et seq. The Operator may request a maximum of one extension of this agreement. 31. The Department reserves the right to suspend or cancel this Agreement for other reasons, including but not limited to the following: ; a. The Department determines that the information provided by the Operator in support of the Notification/Agreement is incomplete or inaccurate; b. The Department obtains new information that was not known to it in preparing the terms and conditions of the Agreement; c. The project or project activities as described in the Notification/Agreement have changed; d. The conditions affecting fish and wildlife resources change or the Department determines that project activities will result in a substantial adverse effect on the environment •-!•. 32. Before any suspension or cancellation of the Agreement, the Department will notify the Operator in writing of the circumstances which the Department believes warrant suspension or cancellation. The Operator will have seven (7) working days from the date of receipt of this notification to respond in writing to the circumstances described in the Department's notification. During the seven (7) day response period, the Operator shall immediately cease any project activities which the Department specified in its notification. The Operator shall not continue the specified activities until that time when the Department notifies the Operator in writing that adequate methods and/or measures have been identified and agreed upon to mitigate or eliminate the significant adverse effect. STREAMBED ALTERATION AGREEMENT #5-142-00 CONCURRENCE (David Mauser)California Dept. of Fish and Game fsig A ,*J{ signature)(date)(signa (data) (Utle) C.F. Ravsbrook. Regional Manager (UOe) APPENDIX "B" STANDARD PLANS This drawing is NOT in conformance with latest UBC and should be used with care and judgment. 3 Bottom may be rounded at the option of the contractor. — TYPE A -3"279kg/M*-C-14-Mpa (470-C-2000) concrete or 76mm (3") 17 Mpa (2500psi)v air placed concrete with 38mm (1-1/2") x 38mm (1-1/2")' 17 gage stucco netting. BROW DITCH TYPE B Bottom may be rounded at the option of the contractor. TYPE C •3" 470-C-2000 concrete or 3" 2500 psi, oir placed concrete with 38mm (1 1/2")x38mrn (1-1/2")- 17 gage stucco netting. TERRACE DITCH TYPE D NOTES 1. Longitudinal slope of lined ditch shall be 2% minimum. 2. Over slope down ditches shall employ 152mm (6") thickened edge section at both sides of ditch. LEGEND ON PLANS Revision ORIGINAL Add Metric By Approved Kercheval 12/75 T. Stanton Date 03/03 SAN DIEGO REGIONAL STANDARD DRAWING DRAINAGE DITCHES RECOMMENDED BY THE SAN DIEGO REGIONAL STANDARDS COMMITTEE Chairperson R.C.E. 19246 Dote DRAWING NUMBER D-75