HomeMy WebLinkAbout1991-01-08; Housing & Redevelopment Commission; 173; Construction of Street Parking LotHOUSING AND -= cDEVELOPMEN1 COMMISS. N - AGEkDA BILL AWARD OF CONTRACT FOR CONSTRUCTION OF MTG. l/08/91 CARLSBAD VILLAGE DRIVE AND ROOSEVELT DEPT. RED:MP STREET PARKING LOT, PROJECT NO. 3291 RECOMMENDED ACTION: Adopt Resolution No. 183 accepting bids and awarding a contract for the construction of the Carlsbad Village Drive and Roosevelt Street Parking Lot, Project No. 3291. ITEM EXPLANATION: On October 9, 1990, the Housing and Redevelopment Commission adopted Resolution No. 176 authorizing the advertisement of bids for the construction of the Carlsbad Village Drive and Roosevelt Street Parking Lot. On December 6, 1990, 'seven (7) sealed bids were received as follows: Caves Construction $ 80,996.OO Clyde Enterprises 82,074.OO ABC Construction Company, Inc. 84,377.50 Southland Paving, Inc. 89,830.10 Frank and Son 92,211.oo William Kirchnavy Construction 102,510.71 Rota Construction 107,817.80 This project will provide for the construction of a parking lot consisting of 55 parking spaces on a 17,500 square foot parcel of land located at the northeast corner of Carlsbad Village Drive and Roosevelt Street. Landscaping compatible with the established Streetscape theme will surround the lot on all four (4) sides. Pole-mounted lighting will be installed to illuminate the parking lot at night. A driveway entrance will be installed on Roosevelt Street as the primary access to the parking lot with secondary access from the alley between Roosevelt Street and Madison Street. Construction will require approximately sixty (60) days to complete. References have been verified on the low bidder and staff recommends the award of this contract to Caves Construction. FISCAL IMPACT: $198,000 of unencumbered funds from the Tax Allocation Bond sale together with $52,000 from the current fiscal Redevelopment operating budget have been previously appropriated by the Housing and Redevelopment Commission for this project. A summary of the estimated project costs is as follows: Project Construction $80,996.00 Construction Contingencies (10%) 8,099.60 (Est.) Project Design, Management, & Inspection lO,OOO.OO (Est.) Geotechnical Testing 4.000.00 (Est.) Page 2 of Agenda Bill No. /73 TOTAL PROJECT COSTS $103,095.60 CURRENT APPROPRIATIONS $250,000.00 ANTICIPATED AVAILABLE BALANCE $146,904.40 No additional appropriations are necessary at this time. EXHIBITS: 1. Location map. 2. Resolution No. 183 accepting bids and awarding Contract No. 3291 for the construction of the Carlsbad Village Drive and Roosevelt Street Parking Lot. LOCATION MAP GRAND AVENUE r //////////////////////////I/ //////////////////////////// ////////////////////////////// //////////////////////////// //////////////////////////// /////////////////////////// //////////////////////////// //////////////////////////// #: /////////////////////////// /////////////////////////// < //////////////////////////// m //////////////////////////// //////////////////////////// r //////////////////////////// ‘p -I ~/////////////////////// ////////////////////////~?~/ r / r m I( b ELM AVENUE LEGEND :::;::::yj- tl :::$:::::& m AREA TO BE I,MPROVED Q ;‘/5 EXISTING PARKING LOT I ‘ROJECT NAME PROJECT + EXHIBIT ROOSEVELT STREET PARKING LOT 3291 1 .A 1 RESOLUTION NO. 183 2 3 4 A RESOLUTION OF THE CARLSBAD HOUSING AND REDEVELOPMENT COMMISSION ACCEPTING BIDS AND AWARDING A CONTRACT FOR THE CONSTRUCTION OF CARLSBAD VILLAGE DRIVE AND ROOSEVELT STREET PARKING LOT, PROJECT NO. 3291 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 2% WHEREAS, bids have been received by the Carlsbad Housing and Redevelopment Commission for the construction of Carlsbad Village Drive and Roosevelt Street Parking Lot, Project No. 3291; and WHEREAS, the low bid received for said project was submitted by Caves Construction in the amount of $80,996:00; and WHEREAS, there are sufficient funds available in the Project Account No. 811-820-1880-3291 to award this contract. NOW, THEREFORE, BE IT RESOLVED by the Carlsbad Housing and Redevelopment Commission as follows: 1. That the above recitations are true and correct. /// /// /// /// /// //I /// /// /// /// /// /// /// 1 2. That the low bid submitted by Caves Construction for 2 the construction of Carlsbad Village Drive and Roosevelt Street 3 Parking Lot, Project No. 3291 is hereby accepted. 4 PASSED, APPROVED AND ADOPTED at a regular meeting of the 5 Carlsbad Housing and Redevelopment Commission held on the 8th day 6 of January I 1991, by the following vote, to wit: 7 AYES: Commissioners Lewis, Kulchin, Larson and Nygaard a NOES: None ABSTAIN: Commissioner Sta 15 16 17 is 19 20 Ii 21 II 22 11 23 24 25 26 27 28 (SEAL)