HomeMy WebLinkAbout1992-04-07; Housing & Redevelopment Commission; 205; Presidential Centre - Professional Office Building&REE.IJ. HOUSING AND-REDEVELOPMENT COMMIS.FQN - AGENDA S&L fi~#a- -RP 91-6 - PRESIDENTIAL CENTRE : APPROVAL MTG. 417192 OF A MAJOR REDEVELOPMENT PERMIT FOR A PROFESSIONAL OFFICE BUILDING PROJECT AT 2615 JEFFERSON STREET DEPT. RED WITHIN SUB-AREA 1 OF THE VILLAGE REDEVELOPMENT ZONE. Cln MO RECOMMENDED ACTION: That the Housing and Redevelopment Commission direct the City Attorney to prepare documents APPROVING RP 91-6 based on the findings and subject to the conditions contained therein. Staff recommends that the current fee schedule- be applied. RP 91-6, Presidential Centre, is a request for a Major Redevelopment Permit for an 8,700 square foot two-story professional office building to be constructed above a larger, partially subterranean garage structure which is not visible at ground level. A concrete slab covering the parking structure 4.5’ above grade provides the sub-floor of the structures, walkways, courtyards and landscaped areas. As proposed, the project will provide 29 parking spaces designated for office uses only. Condition 18 of the Design Review Board’s Conditions of Approval states “Medical or dental uses shall not be allowed in this project unless square footage is reduced proportionately to accommodate parking for medical use.” If the building were to provide for medical uses, building square footage would have to be reduced from 8700 square feet to 5800 (reduction of 2900 square feet). As an alternative to reduction in building square footage, an additional 15 parking spaces would be required for medical uses, bringing the total parking space requirement to 44 spaces. The office project is consistent with the’ RMH/O General Plan Designation and all applicable ordinances since the proposed development is oriented to pedestrian traffic, provides open space amenities, and reflects the village theme as required by the Village Design Manual and all required development standards for building/lot coverage, building height, landscape coverage, and parkirrg spaces have been satisfied. The project’s 38% compact spaces falls below the maximum 40% compact spaces allowed by Section IX of the Village Design Manual. Presidential Centre was reviewed by the Design Review Board and unanimously recommended for approval on February 19, 1992. The applicant for Presidential Centre requested, in his letter dated February 10, 1992 (Exhibit 5), that the 1987 Fee Schedule be applied to the project. Periodically the City will conduct a fee study to establish a link between the costs of providing City services and a fair fee rate. The City’s goal with respect to development fees is complete cost recovery. The current Fee Schedule was adopted by the City Council in August of 1990 (updated December l991), and represents the most recent information available connecting development fees to the actual cost of development services provided. he applicant for Presidential Centre states that in 1988 a commercial project virtually identical to his, and at the same location, was approved but never constructed. At the time of the project’s approval, the 1987 Fee Schedule was in effect. The applicant for Presidential Centre, recommended for approval in February 1992, has requested that consideration be given to 2 g ?einstatement of the 1987 Fee Schedule for ‘his project. He asserts that the request is reasonable 2 0 based on the fact that the project will generate additional tax dollars for the City, and the earlier G c’ a pproved project did not have the. same fee requirements as his recently approved project. s 2 s 00 PAGE2OFAB#,$@S The applicants request has been reviewed and staff can find no justification or compelling reason to recommend such an action to the City Council. In fact, permitting the use of an obsolete fee schedule would not only establish a precedent for other projects, it would result in the loss of full cost recovery for development and in effect require subsidization of the project utilizing City funds. FISCAL IMPACT Development of Presidential Centre will create an increase of approximately $888,835 in assessed value (land and improvements) and would result in approximately $8,888 in additional Redevelopment Tax Increment Revenues annually. This project will provide additional revenues through development fees, business licenses and sales taxes. The applicant is requesting that the Commission consider a reduction and/or waiver of development fees as outlined in Exhibit 5. EXHIBITS 1. Design Review Board Resolution No. 178 2. Location Map 3. Staff Report dated February 19, 1992 4. Design Review Board Minutes dated February 19, 1992 5. Letter dated February 10, 1992 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 I~ 21~ 22 23 24 25 26 27 28 referred to t le Design Review Board; and DESIGN REVIEW BOARD RESOLUTION NO. 178 A RESOLUTION OF THE DESIGN REVIEW BOARD OF THE CITY OF CARLSBAD, CALIFORNIA RECOMMENDING APPROVAL OF A MAJOR REDEVELOPMENT PERMIT TO ALLOW THE CONSTRUCTION OF A TWO-STORY OFFICE BUILDING WITH SUBTERRANEAN PARKING ON PROPERTY GENERALLY LOCATED AT 2815 JEFFERSON STREET. CASE NAME: PRESIDENTIAL CENTRE CASE NO: RP 91-6 WHEREAS, a verified application has been filed with the City of Carls,bad and WHEREAS, said verified application constitutes a request as provided by Title ~ 21 of the Carlsbad Municipal Code; and I WHEREAS, pursuant to the provisions of the Municipal Code, the Design Review Board did, on the 19th day of February, 1992, hold a duly noticed public hearing to consider said application on property described as: Parcel #l : The southwesterly 50.0’ of the northwesterly 241 .O’ of Lot 48 the seaside lands according to the map thereof No. 1722 filed in the office of the County Recorder of San Diego County, July 28, 1921; except the southwesterly 120.0’. Parcel #2: The southeasterly 15.0’ of the northwesterly 191.0’ of Lot 48 of seaside lands according to the map thereof No. 1722 filed in the office of the County Recorder of San Diego County, July 28, 1921; except the southwesterly 120.0’. WHEREAS, at said public hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, said Design Review Board considered all factors relating to RP 91-6. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Design Review Board as follows: A) That the foregoing recitations are true and correct. B) That based on the evidence presented at the public hearing, the Design Review Board RECOMMENDS APPROVAL of RP 91-6 , based on the following findings and I I subject to the following conditions: - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Findinns: 1. 2. 3. 4. 5. The project is consistent with the goals and objectives of the Village Design Manual as detailed in the Staff Report dated February 19, 1992. The project meets all the requirements of the Zoning Ordinance, including the goals and design and development standards specified by the Village Design Manual for the Village Redevelopment Zone, Sub-area 1, including Section IX, Offstreet Parking Areas, of the Village Redevelopment Manual permitting up to 40% of the required parking spaces to be compact at the election of the Housing & Redevelopment Commission. The proposed project will contribute to the economic revitalization of the Redevelopment Area. The proposed project is compatible with the surrounding future land uses since surrounding properties are designated for RMH/O Medium High Residential/Office development on the General Plan. This project is consistent with the City’s Growth Management Ordinance as it has been conditioned to comply with any requirement approved as part of the Local Facilities Management Plan for Zone 1. Planning Conditions: 1. 2. 3. 4. Approval is granted for RP 91-6, as shown on Exhibits “A” - “.I’, dated February 19, 1992, incorporated by reference and on file in the Planning Department. Development shall occur substantially as shown unless otherwise noted in these conditions. The developer shall provide the City with a reproducible 24” x 36”, mylar copy of the site plan as approved by the Planning Commission. The site plan shall reflect the conditions of approval by the City. The site plan copy shall be submitted to the City Engineer prior to building, grading or improvement plan submittal, whichever occurs first. This project is approved upon the express condition that building permits will not be issued for development of the subject property unless the City Engineer determines that sewer facilities are available at the time of application for such sewer permits and will continue to be available until time of occupancy. This project is also approved under the express condition that the applicant pay the public facilities fee adopted by the City Council on July 28, 1987 and as amended from time to time, and any development fees established by the City Council pursuant to Chapter 21.90 of the Carlsbad Municipal Code or other ordinance adopted to implement a growth management system or facilities and improvement DRB RESO NO. 178 -2- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. plan and to fulfil1 the subdivider’s agreement to pay the public facilities fee dated June 3, 1991, a copy of which is on file with the City Clerk and is incorporated by this reference. If the fees are not paid this application will not be consistent with the General Plan and approval for this project will be void. This project shall comply with all conditions and mitigation required by the Zone 1 Local Facilities Management Plan approved by the City Council on September 1, 1987, incorporated herein and on file in the Planning Department and any future amendments to the Plan made prior to the issuance of building permits. Approval of this request shall not excuse compliance with all sections of the Zoning Ordinance and all other applicable City ordinances in effect at time of building permit issuance. This approval shall become null and void if building permits are not issued for this project within one year from the date of project approval. All roof appurtenances, including air conditioners, shall be architecturally integrated and concealed from view and the sound buffered from adjacent properties and streets, in substance as provided in Building Department Policy No. 80-6, to the satisfaction of the Directors of Planning and Building. No outdoor storage of material shall occur onsite unless required by the Fire Chief. In such instance a storage plan will be submitted for approval by the Fire Chief and the Planning Director. The applicant shall prepare a detailed landscape and irrigation plan which shall be submitted to and approved by the Planning Director prior to the issuance of grading or building permits, whichever occurs first. All landscaped areas shall be maintained in a healthy and thriving condition, free from weeds, trash, and debris. All landscape plans shall be prepared to conform with the Landscape Manual and submitted per the landscape plan check procedures on file in the Planning Department. Landscape plans shall be designed to minimize water use. Lawn and other zone 1 plants (see Landscape Manual) shall be limited to areas of special visual importance or high use. Mulches shall be used and irrigation equipment and design shall promote water conservation. Prior to final occupancy, a letter from a California licensed landscape architect shall be submitted to the Planning Director certifying that all landscaping has been installed as shown on the approved landscape plans. DRB RESO NO. 178 -3- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 15. 16. 17. 18. 19. The applicant shall pay a landscape plan check and inspection fee as required by Section 20.08.050 of the Carlsbad Municipal Code. A uniform sign program for this development shall be submitted to the Planning Director for his review and approval prior to occupancy of any building. Any signs proposed for this development shall at a minimum be designed in conformance with the City’s Sign Ordinance and shall require review and approval of the Planning Director prior to installation of such signs. Medical or dental uses shall not be allowed in this project unless square footage is reduced proportionately to accommodate parking for medical use. Roof water shall dram to the street by a system of dram gutters and drainage channels to be approved by the City Engineer. entry driveway shall include a 5’ wide decorative used brick element. Entieerin~ Conditions: 21. 22. 23. 24. 25. Unless a standards variance has been issued, no variance from City Standards is authorized by virtue of approval of this site plan. The applicant shall comply with all the rules, regulations and design requirements of the respective sewer and water agencies regarding services to the project. The applicant shall be responsible for coordination with S.D.G.&E., Pacific Telephone, and Cable TV authorities. Prior to approval of any grading or building’permits for this project, the owner shall give written consent to the annexation of the area shown within the boundaries of the site plan into the existing City of Carlsbad Street Lighting and Landscaping District No. 1 on a form provided by the City. Prior to or concurrently with issuing a building permit, the applicant shall obtain a right-of-way permit for the work of removing the driveway approach on the southerly project frontage and replacing with standard curb, gutter and sidewalk. Prior to occupancy, the work in the public right-of-way shall be completed to the satisfaction of the City Engineer. Fire Conditions: 26. Prior to the issuance of building permits, complete building plans shall be submitted to and approved by the Fire Department. DFLB RESO NO. 178 -4- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 27. 28. 29. 30. 31. Additional public and/or site fire hydrants shall be provided if deemed necessary by the Fire Marshal. Applicant shall submit two (2) copies of a site plan showing locations of existing and proposed fire hydrants and onsite roads and drives to the Fire Marshal for approval. All required fire hydrants, water mains and appurtenances shall be operational prior to combustible building materials being located on the project site. All fire alarm systems, fire hydrants, extinguishing systems, automatic sprinklers, and other systems pertinent to the project shall be submitted to the Fire Department for approval prior to construction. Buildings exceeding 10,000 square feet aggregate floor area shall be sprinklered or have four-hour fire walls with no openings therein which shall split the building into 10,000 square feet (or less) areas. Water Conditions: 32. 33. 34. 35. . . . . . . . . . The entire potable and non-potable water system/systems for subject project shall be evaluated in detail to ensure that adequate capacity and pressure for domestic, landscaping and fire flow demands are met. The developer’s engineer shall schedule a meeting with the District Engineer and the City Fire Marshal and review the preliminary water system layout prior to preparation of the water system improvement plans. The developer will be responsible for all fees and deposits plus the major facility charge which will be collected at time of issuance of building permit. The Developer shall pay a San Diego County Water Authority capacity charge which will be collected at issuance of application for meter installation. ‘This project is approved upon the express condition that building permits will not be issued for development of the subject property unless the water district serving the development determines that adequate water and service is available at the time of application for water services and will continue to be available until time of OCCUp~cy”. DRB RJZSO NO. 178 -5- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 II 20 I/ PASSED, APPROVED, AND ADOPTED at a regular meeting of the Design Review Board of the City of Carlsbad, California, held on the 19th day of February, 1992 by the following vote, to wit: AYES: Chairman Noble, Board Members: Gonzales, Rowlett, Erwin & Savary. NOES: None. ABSENT: None. ABSTAIN: None. ATTEST: KATHY GRAHAM HOUSING AND REDEVELOPMENT DIRECTOR 21 22 23 24 25 26 27 28 DRB RESO NO. 178 -6- . . City of Chbd PRESIDENTIAL CENTRE RP 91-6 APPLIL,\TION COMPLETE DATE: DECEMBER 26. 1991 & STAFF REPORT DATE: FEBRUARY 19, 1992 TO: DESIGN REVIEW BOARD FROM: PLANNING DEPARTMENT SUBJECT: RP 91-6 - PRESIDENTIAL CENTRE - Request for a Major Redevelopment Permit to allow the construction of an 8,700 square foot two-story office building with subterranean parking at 2815 Jefferson Street in Sub-area 1 of the Village Redevelopment Zone. I. RECOMMENDATION That the Design Review Board ADOPT Design Review Board Resolution No. 178 recommending APPROVAL of RP 91-6 to the Housing and Redevelopment Commission based on the findings and subject to the conditions contained therein. II. PROJECT DESCRIPTION AND BACKGROUND The applicant is requesting approval of a major redevelopment permit for an 8,700 square foot professional office building located on the west side of Jefferson Street, south of the Psoriasis Center in Sub-area 1 of the Village Redevelopment Zone. This area functions as the Village area’s financial and commercial center and is designated by the General Plan for both medium high density residential and office development (RMH/O). The vacant parcel is surrounded by a mixture of single and multiple family residential and office uses. A very similar project was approved for this site by the Design Review Board and Housing and Redevelopment Commission on June 7, 1988, however, the project expired due to the former applicant’s failure to comply with a condition requiring the issuance of a building permit for the project within one year of the approval date. The proposed project consists of a two-story office building to be constructed above a larger, partially subterranean garage structure. The buildings have elements of the Cape Cod architectural style and are designed with a combination of blue wood siding and peach colored stucco, wood-trimmed paned windows, wood-trimmed single lite french doors, open balconies with blue metal railings, used brick trim, and a street level entry foyer. Walls surrounding the project will be stucco coated and capped with used brick including the walls siding the garage entry ramp which provides ingress from Jefferson Street. RP 91-6 - PRESIDENTIAL CENTRE FEBRUARY 19, 1992 PAGE 2 III: ANALYSIS Planning Issues 1. Does the project comply with the RMH/O General Plan Designation and Village Redevelopment Zone? 2. Does the project meet the goals of Sub-area 1 and comply with the development and design standards specified in the Village Design Manual? 3. Is the project consistent with the Zone 1 Local Facilities Management Plan? 4. Will the project contribute to the economic revitalization of the Redevelopment Area? DISCUSSION General Plan/Zonirig The proposed professional office project is consistent with the RMH/O General Plan designation since it is intended that offices designed for compatibility with single and multiple family uses will be developed in the area. The professional office use is permitted by right in Sub-area 1 of the Village Redevelopment Zone and is consistent with the Sub-area’s goal to function as the major commercial center for the downtown area. Village RedeveloDment DeveloDment and Design Standards The primary goal of Sub-area 1 is to provide uses which are consistent with a central business area such as office and commercial uses. Development should be oriented to pedestrian traffic, have open space amenities, and reflect the village theme. The proposed office building is oriented to pedestrian traffic by providing a 23’ landscaped front yard setback, a street level entry, and pedestrian friendly architectural features including an interesting roof line variation, wood siding with stucco and used brick trim, large paned windows, and a front balcony and porch with french doors opening toward the street. The project’s open space amenities include a large central courtyard consisting of decorative paving, bench seating and large 5’x 5’ planter boxes containing trees and shrubs. Second story balconies overlook the courtyard, and additional landscaped areas along both sides of the structures consist of a combination of hardscape, planter boxes, and benches. A - RI’ 9 l-6 - PRESIDENI lriL CENTRE FEBRUARY 19, 1992 PAGE 3 The proposed development complies with the following Village Redevelopment design and development standards specified in the Village Design Manual: DEVELOPMENT STANDARD Lot Coverage Building Coverage Building Setbacks Front Yard Side Yard Rear Yard Building Height Landscape Coverage Parking REQUIRED/MAX. PROVIDED 80% *82% 80% 41% 20’ 23’ 6.5’ 6.5’ 13’ 13’ 35’ Max. 32’ 20% 29% 29 spaces 29 spaces * The two-story buildings will be constructed above a partially subterranean garage structure (5.5’ below grade and 4.5’ above grade). Although the subterranean garage covers approximately 82 % of the lot, building coverage above the garage is only 4 1% . A concrete slab covering the garage structure 4.5’ above grade provides the sub-floor of the structures, walkways, courtyard, and landscaped areas around the building. ECONOMIC IMPACT The positive economic impact of the Presidential Centre is significant (approximately $8,668 annually). The Village Redevelopment Agency receives one percent of the increase in total assessed value of property (land plus improvements) in the form of tax increment revenues. The total assessed value of this site would increase to approximately $923,165. The development of the Presidential Centre will result in an increase of about $866,835 in assessed value, therefore, the annual tax increment revenues generated would be approximately $8,668. Additionally, as a result of this development, eight to ten professional businesses (law offices, architectural firms, consultants) will be located within the Village Redevelopment Area and 45 new jobs will be created for Carlsbad. RP 91-6 - PRESIDENTlwL CENTRE FEBRUARY 19, 1992 PAGE4 LOCAL FACILITIES MANAGEMENT ZONE The proposed project is located within Local Facilities Management Zone 1. The impacts on public facilities created by the proposed project and compliance with the adopted performance standards are summarked below: FACILITY IMPACTS City Administration Facility N/A Library N/A Wastewater Treatment Capacity N/A Parks N/A Drainage 1 Circulation 174 ADT’s Fire Station #l Schools N/A Sewer Collection System 4.8 EDU’s Water Distribution System 1100 GPD open space 29% COMPLIANCE WITH STANDARD Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes The proposed office building project is consistent with the underlying RMHIO General Plan designation, as well as the goals, development, and design standards specified in the Village Design Manual for the Village Redevelopment Zone/Sub-area 1. Staff therefore recommends approval of RP 91-6 as conditioned. The Planning Director has determined that the environmental impacts of the project have already been considered in the issuance of a Negative Declaration dated February 26, 1988. Rp 91-6 - PRESIDENTJ - CENTRE FEBRUARY 19, 1992 PAGE 5 . ATTACHMENTS 1. Design Review Board Resolution No. 178 2. Location Map 3. Background Data Sheet 4. Disclosure Statement 5. Local Facilities Assessment Form 6. Exhibits “A - “S’, dated February 19, 1992. AH:vd:lh January 20, 1992 BACKGROUND DATA SHEET _ CASE NO.: RP 91-6 A CASE NAME: Presidential Centre APPLICANT: Robert Mance REQUEST AND LOCATION: Reauest for a maior redevelonment nermit to allow the construction of an 8.700 souare foot 2-storv office building and subterranean narking garage in Sub-area 1 of the VR zone. LEGAL DESCRIPTION: Parcel #l : The southwesterly 50.0’ of the northwesterlv 241 .O’ of Lot 48 of the seaside lands according to the man thereof No. 1722 filed in the office of the Countv Recorder of San Dieno Countv. Julv 28. 1921; extent the southwesterlv 120.0’. Parcel #2: The southeasterlv 15.0’ of the northwesterlv 191.0’ of Lot 48 of seaside lands according to the man thereof No 1722 filed in the office of the Countv Recorder of San Dieno County. July 28. 1921: extent the southwesterly 120.0’. APN: 203-l lo-29 Acres .30 (Assessor’s Parcel Number) Proposed No. of Lots/Units N/A GENERAL PLAN AND ZONING Land Use Designation RMH/O Density Allowed 8-l S/at. Density Proposed N/A Existing Zone VR Proposed Zone N/A Surrounding Zoning and Land Use: (See attached for information on Carlsbad’s Zoning Requirements) Zoning Land Use Site VR North VR Vacant Office south VR Single Familv East VR MultiDle Familv West VR Side Family PUBLIC FACILITIES School District Carlsbad Water District Carlsbad Equivalent Dwelling Units (Sewer Capacity) 4.8 Public Facilities Fee Agreement, dated June 3. 1991 Sewer District Carlsbad ENVIRONMENTAL IMPACT ASSESSMENT X Negative Declaration, nreviouslv issued on Februarv 26, 1988 - Certified Environmental Impact Report, dated Other, AH:Vd DISCLOSURESTATEMENT . 1 1 APPLICANT’S STATEMENT OF DISCLOSURE OF CERTAIN OWNERSHIP INiERESTS ON ALL APPLICATIONS WHICH WILL REOUIRE DISCRETIONARY ACTION ON THE PART OF THE CITY COUNCIL OR ANY APPOINTED EOAAD. COMMISSION OR COMMi-lTEE. . (Please Print) The following information must be disclosed: 1. Applicant List the names and addresses of all persons having a financial interest in the application. Robert F. Mance 4540 Kearny Villa Road, Suite 213 San Dieno, CA 92123 619-560-0800 2. Owner List the names and addresses of all persons having any ownership interest in the property involved. George and Betty Kelso Kevin and Anna Kelso 6831 Carnation Street 3350 Ridgecrest Drive Carlsbad, CA 92009 Carlsbad, CA 92008 --FrFn l-0266 - - / 3. If any person identified pursuant to (1) or (2) above is a corporation or partnership, list the names ant addresses of all individuals owning more than 10% of the shares in the corporation or owning any partnership interest in the partnership. 4. If any person identified pursuant to (1) or (2) above is a non-profit organization or a trust, list the names ant addresses of any person serving as officer or director of the non-profit organization or as trustee or beneficiary of the trust. FRMOOo13 8/9Q 2075 Las Palmas Drive * Carlsbad. California 92009-4859 - (619) 436-l 161 p- ‘1.. -- m Disclosur8 Statement (Over) Page 2 5. Have you had more than $250 worth of business transacted with any member of City staff, Boards, Commissions,‘ Committees and Council within the past twelve months? Yes - - No x If yes, please indicate person(s) Perron is defined U: *Any individual, firm, copartnrrrhip, joint venture. association, social club, fraternal organizetion. corporation. eatate, trust. receiver. syndicate, thir and any other counry, city and county, city municipality, district or other political subdivision, or any other group or combination acting aa a unit’ (NOTE: Attach additional pages as necessary.) Signature of Owner/date Signature of applicant/date eor:pe Kelso Print or type name of owner Betty kelso FRMooo13 8/90 Print of type name of applicant . GROWTH MANAGEMENT PROGRAM CIlYOFcARlsBAD LOCAL FACLlTIFS MPACI’S ASSESSMENT FORM (To be Submitted with Development Application) PROJECT IDENTITY AND IMPACT ASSESSMENT: FILE NAME AND NO.: PRESIDENTIAL CENTRE - RP 91-6 LOCAL FACILITY MANAGEMENT ZONE: ‘1 GENERAL PLAN: RMH/O ZONING: VR DEVELOPER’S NAME: Robert Mance ADDRESS: 4540 Kearnv Villa Road. Suite 213 - San Dieno. CA 92123 PHONE NO: (619) 560-0800 ASSESSOR’S PARCEL NO.: 203-l lo-29 QUANTITY OF LAND USE/DEVELOPMENT (AC., SQ. FT., DU): 13.000 sauare feet ESTIMATED COMPLETION DATE: Februarv 1993 B. C. D. E. F. G. H. I. J. K. L. City Achmmstrafive Fachtles: Demand m Square Footage = Library: Demand in Square Footage = Wastewater Treatment Capacity (Calculate with J. Sewer) Park: Demand in Acreage = Drainage: Demand in CFS = Identify Drainage Basin = (Identify master plan facilities on site plan) Circulation: Demand in ADTs = (Identify Trip Distribution on site plan) Fire: Served by Fire Station No. = Open Space: Acreage Provided - Schools: (Demands to be determined by staff) Sewer: Demand in EDUs - Identify Sub Basin - (Identify trunk line(s) impacted on site plan) Water: Demand in GPD - N/A N/A N/A N/A 1 174 1 29% N/A 4.8 1-F 1100 The project is N/A units the Growth Management Dwelling unit allowance. AH:vd:lh Minutes at: Time of Meeting: Date of Meeting: Place of Meeting: DESIGN REVIEW BOARD 5:oo P.M. FEBRUARY lQ,lQQ2 CITY HALL COUNCIL CHAMBERS CALL TO ORDER Chairperson Noble called the Regular Meeting to order at 503 p.m. and the Pledge of Allegiance was led by Member Savary. ROLL CALL Present: Members Noble, Gonzales, Erwin (arrived at 5:QQ P.M.), Rowlett, Savary Staff Present: Kathy Graham, Housing and Redevelopment Director Karen Hirata, Deputy City Attorney Debbie Fountain, Senior Management Analyst Robert Greene, Principal Planner Anne Hysong, Assistant Planner Karen Sauer, Management Analyst PUBLIC COMMENT There were no requests to address the Board. COMMENTS FROM THE AUDIENCE ON ITEMS NOT LISTED ON THE AGENDA There were no requests to address the Board. APPROVAL OF MINUTES Member Erwin arrived at 5:OQ P.M. ACTION: Motion by Member Erwin, second by Member Savary, to approve the Minutes of the Regular Meetings of December 18, 1991, and January 27, 1992, as amended. AYES: Members Noble, Erwin, Gonzales, Rowlett, Savary NOES: None ABSTAINED: Member Rowlett (Minutes of January 27, 1992) PUBLIC HEARING: Chairman Noble announced that now was the time and place set for the Public Hearing regarding RP 91-8 Presidential Centre. Kathy Graham, Housing and Redevelopment Director, informed the Board that the applicant had written a letter requesting that fees imposed be waived. Staff had informed the applicant that the Cii Council had the authority to waive City fees and that the letter would be referred to the Cii Council. Anne Hysong, Assistant Planner, referred to Page 3 of the staff report dated February 19, 1992, and noted that the lot coverage should read 41%, not 82%. She reviewed the specifics of the redevelopment permit request. Karen Sauer, Management Analyst, stated that this permit request would place a new professional building in the redevelopment area and would bring economic and employment benefits to the Cii and Redevelopment Agency. Member Erwin stated that Resolution 178 refers to Exhibits A-J, but that Exhibits A-l are attached. He requested that Condition No. 1 read Exhibits A-l. - Ms. Graham responded to Member Erwin’s inquiry regarding 46% compact car parking by stating that in the past the Design Review Board had followed the Village Redevelopment Manual which stated that all new developments may grant credit for a maximum of 40% of the total number of spaces for compact car parking. Robert Greene, Principal Planner, stated that the Design Manual allowed for flexibility in the guidelines regarding compact car parking and noted that the project had 38% compact parking. Karen Hirata, Deputy Cky Attorney, stated that the 40% figure was merely a guideline and that the Board could request that the percentage of parking be clearly stated through findings. Chairman Noble stated that k was sufficient to state in the Minutes that, for the record, the Board had given authorii for compact parking and that it did comply. The Deputy City Attorney stated that a general finding with more specific wording could be included in the motion. Member Erwin stated that the 38% compact parking was justified by the Village Design Manual, as noted in Section IX, Page 9. Member Rowlett inquired as to whether there was sufficient room for vehicles in the turn around. Bob Wojcik, Principal Engineer, responded to Member Rowlett’s inquiry regarding turn around, said that it had been determined that there was sufficient turn around room. Chairman Noble opened the public hearing. Robert Mance, 4540 Kearny Villa Road, Suite 213, San Diego, informed the Board that he understood the letter requesting a waiver of fees was being referred to the City Council for action. Mr. Mance stated that this redevelopment project would create jobs and sales tax dollars during construction. Chairman Noble closed the public hearing. Member Erwin stated he was in support of the proposed redevelopment but was concerned with high density of compact parking underground and that the Board review the use of compact space parking in this community. MOTION: Motion by Member Erwin, second by Member Row&t, to adopt Design Review Board Resolution 178 recommending approval of RP91-6 to the Housing and Redevelopment Commission based on the findings and subject to the conditions contained therein. Further, that said resolution be amended on Page 2, line 16, to read, ’ . . . as shown on Exhibits A - J. AYES: Members Noble, Erwin, Gonzales, Rowlett, Savary NOES: None ADJOURNMENT: By proper motion, the Meeting of February 19, 1992 was adjourned at 630 p.m. Respectfully submitted, d- 1 -k t KATHY GRAHAM Housing and Redevelopment Director lsabelle Paulsen Minutes Clerk February 10, 1992 rj+O Keamy Villa Road Suite 213 San Diego. Calitixni~ 92123 FAX 619/560-54% L/C a’i 79101 619/560-0800 Mr. Bailey Noble Design Review Board 5470 10s Robles Drive Carlsbad, CA. 92008 Re: Presidential Centre RP 91-6 Dear Mr. Noble, This letter is written to introduce myself and the project (Presidential Centre) scheduled to be heard before the Design Review Board on February 19, 1992. Enclosed is an elevation of the building and a copy of the letter written to the Redevelopment Agency and Planning Department upon submission for the Major Use Permit. I assume you will have read the staffs recommendation "For Approval" of the project prior to the hearing. The enclosed letter addresses the questions I sought to have answered prior to processing the discretionary permit (RP 91-6). I was told by the staff that answers must come from the Board and/or the City Council. PREVIOUS PROJECT AND PRESIDENTIAL CENTRE The table following is from the staffs report for their recommendations. Please note that I have added the Kelso's approved standards to compare with the current plan. RP 91-6 Development Standard Recr'd Max Provided Kelso's Lot Coverage Building Coverage Building Set backs Front Yard Side Yard Rear Yard Building Height Landscape Coverage Parking 80% 82% 82% 80% 41% 41% 20' 23' 23' 6.5' 6.5' 6.5' 13' 13' 13' 35' 32' I 20% 29% iii% 29 spc 29 spc 30 spc The table shows that the project is identical to the construction Finance Investment Safes/Leasing Property Management project previously approved by the 1988. City for the Kelso's in DEVELOPMENT IS BASED ON TEE TENANT AFFORDING THE COST The developer, Ford Mance, is working with a tenant to occupy and buy the building upon completion of construction. As well, additional tenants and/or partners are being sought to take the balance of the building. A long term permanent mortgage from the Small Business Administration has been applied for. Both tenants/owners and the S.B.A. mortgage are crucial factors in order for the project to be developed. Their criteria to either occupy or invest are determined by the desirability and cost that the project development ~111 bring to the Redevelopment District of the project. Please consider the following benefits and weigh them in your determination to support my request that the permit costs be lessened. ECONOMIC IMPACT The project will have a positive impact (significant) of $8,668 annually. This represents $86,680 over the next 10 years. The value of the property will be increasing to $830,000 . Currently, the value will increase from $250,000 which is generating real property taxes of $2500 per year. Jobs will be generated in two phases of the project 1) construction and 2) occupancy. During construction, $429,000 will be spent on labor for all facets of the project including laborers, machine operators, carpenters, finishers, drivers, steel erectors, assemblers, electricians, plumbers, mechanics, masons, landscapers, roofers, painters, sheet metal fabricators, tilers, drywall placers, and even building inspectors. Estimated at $2O/hr for labor, this represents 2681 man/days of labor, $47,190 in State income taxes, $64,350 in Federal income taxes and $79,365 in purchases to local merchants during construction. Once completed, "as a result of this development", eight to ten professional businesses will be located in the Village Redevelopment Area and 45 new jobs will be created. Thirty-eight percent (38%) of all office workers shop during the day and 60% take trips to do errands durin over z the lunch hour. The average office worker spends 1900 per year on lunch, retail purchases, dinner and -entertainment purchases near their office. This office worker spends 10% of total income near their workplace on food, clothing, jewelry, accessories, etc. This represents $85,500 per year spent in Carlsbad each year thus generating retail economic sales by local commerce and $7267 per year in sales taxes. The S.B.A.'s criteria for lending is predicated on creating employment and on the building's tenant owning the building for conducting business. The tenant(s) currently considering owning/occupying have been in downtown Carlsbad for ten years. Presidential Centre can be a model project for the City of Carlsbads Redevelopment efforts, striving to keep small business in the core, keep jobs and maintain a viable commercial sector where tenants do not have to drive to conduct shopping, etc. NO LOCAL FACILITY BURDEN The project will not burden the public facilities at all. The table following is taken from the staffs report "for recommendation". The lessening of fees is justified based upon this assessment alone. To charge fees, assessments, taxes, and tariffs in return for permission to develop causes severe economic burden for this private development. Facilitv 'Imnact Compliance With Standard City Administration Facility Library Waste Water Treatment Plant Parks Drainage Circulation Fire Schools Sewer Connection System Water Distribution System Open Space None Yes None Yes None Yes None Yes 1 Yes 174 ADT's Yes Station #l Yes Kane Yes 4.8 E.D.U.'s Yes 1100 GPD Yes 29% Yes SEVERE PRIVATE DEVELOPMENT BURDEN Time Time The previous project (Kelso's) was submitted to planning The previous project (Kelso's) was submitted to planning in 1987 during the summer. in 1987 during the summer. approval in late 1988. approval in late 1988. It eventually received It eventually received A request for extension was denied A request for extension was denied after the year elapsed within which the previous after the year elapsed within which the previous applicant, applicant, Kelso, had to pull building permits. Kelso, had to pull building permits. In April 1991, the new applicant, Mance, applied for preliminary concept review and was promptly told that re-issuance would be most likely. By June 3, 1991 the application for a major use permit was submitted. At that time a letter was submitted requesting certain concessions . and/or waivers which focused on cost savings and time savings be made in order to jump start the project into beginning. After four rejections for having submitted an "incomplete" application, the project was finally scheduled for Design Review Board presentation in late February 1992, over 8 1\2 months later! The project is almost identical to the 1988 project excepting color and minor cosmetic variations. PERMIT PROCESSING Concurrently, the building working drawings were submitted on June 15, 1991 for processing a building permit. Review of plans was completed in July and returned for corrections. However, we have been unable to resubmit because engineering must wait for final Major Use-Permit approval before they can be sure that all 35 conditions of the permit will be approved. We desire to initiate construction as soon as possible after the discretionary permit is ratified. PERMIT COSTS HAVE RISEN 200% The co+ of permits have skyrocketed and the usage of the money is headed toward payment for services rendered outside the downtown Redevelopment Area. In 1988, Kelso was given estimates for permit costs. Mance was given estimates too in February 1992. Kelso 1988 Mance 1992 Change Building Permit Plan Check x xi Strong Motion Fee $ ' 65 Public Facility License Tax Traffic Impact Fee P5b201 E.D.U.'s $ 6,392 Sewer $ 5,025 Plumbing, Elec., Mech. School Fee Total + 27% + 27% + 289% + 206% +5600% + 173% + 161% + 419% + 176% + 199% This represents nearly twice the estimated cost in three years. In fact, the growth of the general economy during that time has been less than 10% during the entire period. SUMMARY The previous developer Kelso and the current developer Mance have spent over 18 months of processing time on this project combined. The costs for the time spent have been at our sole expense. processing, Separate from personal expense for over $50,000 has been spent for consultants time and materials for complying with City permit processing requirements. Now, upon arriving to meet these requirements the cost of permits has risen from $33,000 to $64,000! The results of this projects benefit to the City of Carlsbad represents a significant contribution: Item Now Completed Jobs During Const. 0 Payroll During Const. 0 Purchases During Const. 0 :4;+; Fed Taxes During Const. 0 $ 64;350 State Taxes During Const. 0 Purchases Yearly After Const. 0 $ x'o: Sales Tax Revenue Property Taxes $2,:00 8 p; Jobs Upon Completion 0 ;5 I urge you to grant the applicant his two simple requests: REQUEST NO. 1 1) 2) 3) 4) - 5) 6) 7) That the City Engineering Department determine that sewer facilities are available and be kept available through to occupancy. That the amount payable to the City for building permits, plan check, strong motion fee, E.D.U.ls, sewer and plumbing, electrical and mechanical fees be held to the schedule of fees dated July 28, 1987 and December 7, 1987. That the amount payable to the City for the public facilities (P.F.F.) be held to that same schedule applicable to the Kelso permit (1987). That no Traffic Impact Fee be assessed. That fees paid for public facilities be used in the Redevelopment area only. That sewer and water hookup costs be waived since the property paid for years for those services prior to this Redevelopment permit. That parcelization of the building (such as a condominium office) or a P.U.D. be allowed without ility of the City of Carlsbads Chapter X&47 NwWfwxdential Planned Development ordinance. processing and definition would follow the Subdivision Map Act which specifically waives any jurisdiction by the State regarding commercial or industrial property (ie. a public report, notice etc. is not necessary). Fees for compliance to define the buildings' ownership into more than one parcel are currently assessed at $6,000 and months of processing time. We request it be waived. REQUEST NO. 2 To expedite the processing of the ministerial building permits in order to mitigate any delay which might occur in obtaining the permit in order to start construction. As well, to promote quick response by building inspection and a spirit of collaboration during construction so that it can occur rapidly and smoothly. Development of this project represents one of its first kind in the Redevelopment District. very supportive and responsive. The agency has been Hopefully, Presidential Centre can set an example for Redevelopment efforts by Carlsbad. Sincerely, Robert F. Mance Ford Mance -- NOTICE OF PUBLIC HEARING RP 91-6 - PRESIDENTIAL CENTRE NOTICE IS HEREBY GIVEN that the Housing and Redevelopment Commission of the City of Carlsbad will hold a public hearing at the City Council Chambers, 1200 Carlsbad Village Drive, Carlsbad, California, at 6:00 p.m., on Tuesday, April 7, 1992, to consider an application for a Major Redevelopment Permit to allow the construction of an 8,700 square foot two-story office building with subterranean parking on property generally located at 2815 Jefferson Street, in Sub-area 1 of the Village Redevelopment Zone, and more particularly described as: Parcel #l: The southerly 50.0' of the northerly 241.0' of Lot 48 of Seaside Lands, according to Map thereof No. 1722, filed in the Office of the County Recorder of San Diego County, July 28, 1921; except the southwesterly 120.0'. Parcel #2: The southeasterly 15.0' of the northwesterly 191.0’ of Lot 48 of Seaside Lands, according to Map thereof No. 1722, filed in the Office of the County Recorder of San Diego County, July 28, 1921; except the southwesterly 120.0'. If you have any questions regarding this matter, please call Anne Hysong in the Planning Department at 438-1161, ext. 4477. If you challenge the Major Redevelopment Permit in court, you may be limited to raising only those issues raised by you or someone else at the public hearing described in this notice, or in written correspondence delivered to the City of Carlsbad City Clerk's Office at or prior to the public hearing. APPLICANT: Robert Mance PUBLISH: March 26, 1992 CITY OF CARLSBAD HOUSING AND REDEVELOPMENT COMMISSION 4 _ City d CIW~ PRESDENTIAL CENTRE I RP 91-6 ._ NOTICE OF PUBLIC HEARING _ “d.~ t”...-a NOTICE IS HEREBY GIVEN&at the Design Review Board of the‘City of Carlsbad will hold a public hearing at the Council Chambers, 1200 Carlsbad Village Drive (formerly Elm Avenue), Carlsbad, California, at 5:00 p.m. on Wednesday, February 19, 1992, to consider approval of a Major Redevelopment Permit to allow the construction of an 8,700 square foot two-story office building with subterranean parking on property generally located at 2815 Jefferson Street in Sub-area 1 of the Village Redevelopment Zone and more particularly described as: Parcel #1 : The southwesterly 50.0’ of the northwesterly 241 .O’ of Lot 48 the seaside lands according to the map thereof No. 1722 filed in the office of the County Recorder of San Diego County, July 28, 1921; except the southwesterly 120.0’. Parcel #2: The southeasterly 15.0’ of the northwesterly 191 .O’ of Lot 48 of seaside lands according to the map thereof No. 1722 filed in the office of the County Recorder of San Diego County, July 28, 1921; except the southwesterly 120.0’. Those persons wishing to speak on this proposal are cordially invited to attend the public hearing. Copies of the staff report will be available on and after February 11, 1992. If you have any questions, please call Anne Hysong in the Planning Department at 438-l 161, ext. 4477. If you challenge the Major Redevelopment Permit in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice or in written correspondence delivered to the City of Carlsbad at or prior to the public hearing. CASE FILE: RP 91-6 APPLICANT: PRESIDENTIAL CENTRE PUBLISH: FEBRUARY 6, 1992 CITY OF CARLSBAD DESIGN REVIEW BOARD AH:km I; :,. I:.. > !. "' ]I ii-!I)ii+,'d {{j :' / ., . (' ; 8' .I ,f );,,.,;I; i:‘.‘, ,,; I?.:, . * - q -Y -a . ..” . . : 17j !: I!;; LL %* - h (Form A) TO: CITY CLERK ‘S OFFICE FROM: ~N9(pQ~Q:/p~Jpjf~~;r HOUSING & REDEVELOPMENT DEPARTMENT RE: PUBLIC HEARING REQUEST Attached are the materials necessary for you to notice RP 91-6 - PRESIDENTIAL CENTRE for a public hearing before the City Council. I Please notice the item for the council meeting of April 7, 1992 . Thank you. MARTY ORENYAK Assistant City 312192 Date nwul al 105 zu* UOC s 9 8 $ i? s 8 m 7pww i?wps 3 03 a om w”* EFD =I’ 1 P *et *x D1 i ifrn C’D so”, n =bJ: 00 al 1 3 g E. mc= ulu 19 xc klr 3 -0 *91 ii w’g 1 2 u al n :: 3 June Wood P 0 Box 2134 Leucadis CA 92024 Robert E & Arlene Olivas Rte 3 Box 318 College Station TX 77849 Subsidired Housing Corp Of Ame 777 E Tahquitz Way Ste 200 Palm Springs CA 92262 John 3 & Hogan Giroux 2521 S Vista Way 422 #l/2 Carlsbad CA 92008 Arlene S Berman 880 Home Ave D Carlsbad CA 92008 Rubin A Andreatta 880 Home Ave G Carlsbad CA 92008 Dan I P ane Magtira P 0 Box 4239 Carlsbad CA 92018 Ramiro Contreras 1650 W Linda Vista Dr #105 San Marcos CA 92069 Banning T Cantarini 905 Laguna Dr Carlsbad CA 92008 Thomas G & Vickee Duncan 1789 Shamrock Upland CA 91786 Ib J L Kathleen Jensen 6523 Westchester St Houston TX 77005 Paul A Ik Louise Russell 882 Home Ave ttag211 Carlsbad CA 92008 Edmond T Trust 1989 OS-23 Sheh 6321 Esplanade Playa De1 Rey CA 90293 Joseph P Sandy 2892 Jefferson St Carlsbad CA Daniel J 81 Ernestine Cerda 1743 Lotus fwe El Centre CA 92243 swys Carp P 0 Box 90789 San Diego CA . Pgp Carlsbad Seniors Ltd Ii 1120 Silverado La Jolla CA 92037 92008 92169 **w 34 Label(s) Printed *+* Prepared for: JEANNIE Virginia L Jac Jn Keith Chaney 2718 Roosevelt St #f 2712 Madison St Carl sbad CA 92008 Carlsbad CA 92008 John Cianciarulo 4644 Telescope Ave Carlsbad CA Charles A Yates 2753 Jefferson St Carl sbad CA 92008 Tommy J & Gladys Harris 722 &buckle Pl Carlsbad CA 92008 Mary R vullican 750 Arbuckle Pl 92008 Carlsbad CA 92008 Daniel R Swem 4807 Elm Tree Dr Oceanside CA 92056 Jack D Phillips 3702 Ingraham St San Diego CA 92109 Feinberg Jonathan A Md Inc 477 El Camino Real #b-303 Encinitas CA 92024 Huston H & Helen Tucker 2810 Madison St Carlsbad CA 92008 Edith P Healey 334 West Ave Full erton CA 92632 Jeanene Enterprises Inc 2879 Jefferson St Carlsbad CA 92008 W Scott Rogers Melville W Hone 2715 Morning Glory Ln 826 Orange Ave #601 Carl sbad CA 92008 Coronado CA 922 18 *+* 26 Label(s) Printed +** Prepared for: JEANNIE d-11_ --~~-~-~~ .--. -.-_ -... a - ..-.. -- T .----IIIC . ..-._.. .- ._ I . .-y.-.-..- _____ ___ . ..-A!5 Western Nutual Mortgage II,, 2945 Harding St #IO7 Car lsbad CA )r 92008 Donald K & LaeL Dewhurst 3425 Seacrest Dr Carlsbad CA 92008 Daniel D & Irene Lopez 928 Home Ave Carlsbad CA 92008 aerald G Kelly 400 N La Costa Ave Carlsbad CA 92009 Josephine R Kingston 786 Grand Ave Carlsbad CA 92008 u Donald W & Nancy Harger 2754 Jefferson St Car 1 sbad CA Swef Properties 2774 Jefferson St Carlsbad CA Florenza M Williams P 0 Box 9872 Ranch0 Santa Fe CA 92008 92008 92067 Jeanene Enterprises Inc 2879 Jefferson St Wj Carlsbad CA 92008 Robert C & Darlene Pearson 2123 Woodwind Dr Olivenhain CA 92024 imes R & Caroline Davis fsokazu Tabata 0 Box 91s 4929 Park Dr arl sbad CA 92018 Carlsbad CA -:z3 .qnquil & Dinah Morrow Allen Bruce 0 Est Of !5 Madison St 2737 Madison St %lsbad CA 92008 Carlsbad CA 92008 92008 Howard F Trust 10-06-89 Murphy 400 N La Costa Ave Carl sbad CA 92009 Stuart C & Marilyn Wilson 1846 Avocado Rd Oceanside CA 92054 (12-27-85) Johns0 Family Trust St 1440 Gilbuck 92802 Anaheim CA -90 Barlow 92117 _ Seth Hoenig . P 0 Box 2401 s Leucadia CA 92024 George G & Sharon Marhoefer 4437 Mayfair Ct Carlsbad CA 92008 Richard S & Leslie Landreth 22s Plaza St Solana Beach CA 92075 Family Trust 12-18-90 Scanlon 7306 Borla Pl Carlsbad CA 92009 Peter A & Georgette Rock 2421 S EL Camino ReaL San Clemente CA 92672 Peter A & Georgette Rock 2421 S El Camino Real San Clemente CA 92672 Otto H & atherine Bandemer 2720 Jefferson St Carlsbad CA 72008 Family Trust 09-14-90 Klett P 0 Box 4086 Carlsbad CA 92018 Capitol Properties Ltd Iii 1120 Silverado St La Jolla CA 92037 Clifford J Bergman 3836 Altura Ave La Crescenta CA 91214 Thomas W & Christine Purkiss . 880 Home Ave F Carlsbad CA 92008 Dean-ross Schessler 882 Home Ave B Carlsbad CA 72008 George M & Adrienne Soohoo 2879 Hope Ave i Carlsbad CA 72008 Edmond T Trust 1989 05-23 Sheh i-- - -----J ‘, 6321 Esplanade t Playa De1 Rey CA 90293 -- Gordon A SC Marilyn La-1 an Attni Controllers Div. -8th Fl 400 Ca Ornia St*san Fr 94104 I. Melvin H De ooyer la23 La Jolla Ranch0 Rd La' Jolla CA 92037 Calvin R & Malinda Perkett 812 Home Ave Carlsbad CA 92008 - -- George & Rita Windrum . 4230 Clearview Dr Carlsbad CA 92008 John H & Mary Grant 2949 Harding St Carlsbad CA 92008 *** 13 Label(S) Printed *** Prepared for: JEANNIE Dorothy Metros 919 Peck &ve Manhattan Beach CA . * . . l 90266 * 9 3 r- _-.,. Carlsbad Journal Decreed A Legal Newspaper by the Superior Court of San Diego County Mail all correspondence regarding public notice advertising to W.C.C.N. Inc. P.O. Box 230878, Encinitas, CA 92023-0878 (619) 753-6543 Proof of Publication STATE OF CALIFORNIA, ss. . COUNTY OF SAN DIEGO, I am a citizen of the United States and a resident of the county aforesaid; I am over the age of eighteen years, and not a party to or interested in the above entitled matter. I am principal clerk of the printer of the Carlsbad Journal, a newspaper of general circulation, published weekly in the City of Carlsbad, County of San Diego, State of California, and which newspaper is published for the dissemination of loca1 news and intelIigence of a genera1 character, and which newspaper at all times herein mentioned had and still has a bona fide subscription list of paying subscribers, and which newspaper has been established, printed and published at regular intervals in the said City of Oceanside, County of San Diego, State of California, for a period exceeding one year next NOTICE OF PUBLIC HEARING BP Old - PRESIDENTIAL CBNTRB NOTICB IS HEREBY GIVEN th.t the HOUSI~ nad Redevelopmeat Commiuloa of the City of Carlsbad will bold l public bearing at the City Council Cbamkn. lZO0 Carla- bnd Villlpe Drive, Carlsbad, Cali- fom1*. It 0:oo P.Y., on Tlwday, April 1. ISSS, to consider .II ,p. Plicatton for I Major Redevelop. m*nt Permit to allow the conatr~c- uoo Of .n &Too rpu*re root two- story oftke buildinS with #ubterra- n*mPukIn$onpmgcltyOenenuy hatad et %315 Jefferson Street, in Sub-area I of tbe Villa@ Rcde- valopment Zone. and more pmilcu- larlr deaertbed .I: Farce1 II: Tbt mMbcrlY 50.0’ of tbcnortherly~l.0’ofLot~ofSc~- lideLlad8,~erordi~(oM~ptbcrr- 0fN0. i722,nkd inth~ornc~~fth~ County Recorder of San Diego County, July 28, 1911; except Lbe soutbresterly 11o.w. Parcel cg: The routheartcnly 15.0’ of the notiwerterly lDl.O’of Lot 4S of Seaside Lands. accordlag toHaPtbereofNo. 1m.nkdin tne olnce Of the county Recordcrbf San D1ea.s County, July ZB. 1921; .& cept the wuthwester1y 120.0’. If you have any questions reg&- bu this matter, pleaat call Allme HYrong in the Planning Depart- ment at 43alllJl. CXt 4477. - If you challebge the M4or &de- vllopment Permit in court. you mPy be limited to raising only thoje 1ama~s raised by you or ~meo,,e else at the public hearing de- uxibed in tbie notice. or in written correspondence delivered to the CitY of Carllbad City Clerk’s OtTIce at or prior to the public hearing; Applicant: Robert Ymxce CITY OF CAItLSBAD : - : HOUSING AND :. RBDEVEw-NT - : : COYWSSION - .-. 4 .. .- . - PRESIDENTML CENTRE RP 91-6 - I - cl SlzR Ylrcb 24. lssz :. preceding the date of publication of the notice hereinafter referred to; and that the notice of which the annexed is a printed copy, has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the follow- ing dates, to-wit: March 26 19 92 19- 19- 19- 19- I certify under penalty of perjury that the foregoing is true and correct. Executed at Carlsbad, County of San Diego, State of California on the 26th day of Yarch 1992 lvlY.,~t i.4.t I’ I Clerk of the Printer