HomeMy WebLinkAbout1990-03-06; Municipal Water District; 005; Operations Center - Change Order Project 86-107CMWD - AGENDA BILL 0 I 48# 4% @fld TITLE: DEPT. HD. i? ‘i’ ~ s/6/90 OPERATIONS CENTER - Change Order (CMWD Proj. 86-107) CITY Ad@jm IEPT. Cm/D I CITY MGa&? R IECOMMENDED ACTION: Adopt Resolution 6~7 approving Change Order No. 7 for import of additional soils to mix with on-site material in order to achieve the required compaction for the new Operations Center of the District - CMWD Project No. 86-107. . ITEM EXPLANATION Construction of the District's new Operations Center is continuing. The contract calls for an average of five feet of soils to be removed and recompacted prior to the construction of any parking area, sidewalks, buildings or other structures. The contractor has encountered very wet soil during excavation of the remaining parking and driveway area. This wet soil makes it impossible for the contractor to achieve the required compaction. As a result, imported material, approved by the soils engineer, has to be mixed with the on-site material to achieve the proper compaction. The contract included unit prices for additional earth work if required. The additional work required is as follows: 1200 cubic yards import material @ $8.25/yd. = $ 9,900.oo 1500 cubic yards aeration & mixing @ $2.75/yd. = 4,125.OO Equipment move in (lump sum) = 600.00 Total for this Change Order No. 7 $14,625.00 Staff has had several meetings with the contractor and the soils engineer and recommends approval of this Change Order No. 7. FISCAL IMPACT The 1989-90 budget amount for this project is $2,000,000. The original contract amount was for $1,741,668.00. This Change Order No. 7 brings the total contract amount to $1,883,235.00. Therefore, there are sufficient monies in the budget for this additional change. EXHIBITS Resolution 647 approving Change Order No. 7 for the import of additional soils to mix with on-site material in order to achieve the required compaction. RESOLUTION NO. 443 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT, APPROVING PROJECT CHANGE ORDER NO. 7 FOR THE DISTRICT'S NEW OPERATIONS CENTER CMWD PROJECT NO. 86-107 WHEREAS, import of additional soils is required in order to achieve the required compaction for the remaining areas being worked on at the new Operations Center; and ,, WHEREAS, the Board of Directors of the Carlsbad Municipal Water District hereby finds it necessary to import the additional soil as recommended in order that proper compaction can be accomplished prior to the construction of any parking areas, sidewalks, buildings or other structures. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Carlsbad Municipal Water District, as follows: 1. That the above recitations are true and correct. 2. That project Change Order No. 7 in the amount of $14,625.00 is hereby approved and the Board President is authorized to execute said change order. Following the Board President's signature of said change order, the Secretary of the Board is authorized and directed to return the original copy of said document to the Carlsbad Municipal Water District for processing. /// /// /I/ 1 /// PASSED, APPROVED AND ADOPTED by the Board of Directors of carlsbad Municipal Water District at its regular meeting held on the 6th day of March, 1990, by the following vote, to wit: AYES: Board Members Lewis, Kulchin, Pettine, and Larson NOES: None ABSENT: Board Member Mamaux ATTEST: ALmm L. ~~TENKR.ANz, Secretary of the Board l $R 28 '98 14:36 KM8R FQX#619-276-7715 ,- CHANGE OWNER . ORDER ARCHITECT ii CONTRACTOR 0 MA Di~cUMh’U G70I FllxD 0 OTHER l-l -4 \4/’ - PROJECT: CARLSBAD WATER DISTRICT cf-i~wx ORDER NUMBER: 7 (namc,address) 5950 El Camino Real Carlsbad, CA 92008 TO CONTFtACTO * {name, address) 7 REPTE CONSTRUCTION 8825 Aero Drive. Ste. 305 San Diego, CA 92123-2270 DATE: January 22, 1990 ARCHITECT’S PROJECT NO: 87-304 COMl‘I(ACT DATE: CCX4lXACT FOR: The C0IMX!t is changed as follows: SUBJECT: Import of additional soils to mix with on site material in order to achieve the required compaction for the new Operations Center. 1200 cubic yds. import material @ $8.25/yd. = $ 9,900.oo 1500 cubic yds. aeration & mixin 3 @ $2.75/yd. = 4,125.OO Equipment move in (lump sum = 600.00 Total for Change Order No. 7 $14,625.00 Not valid untli signed by the Owner, Architect and Contmtor. The ori.~&I (Contract !?um)@+!$@#&+,f$$ftitrWr/Bf/SCt) wz . , , , , , , , , , , , . . . . . , ., _ . .s 1,741,668 Net change by previously vuthorizcd Chx~gc Orders . . , , .,,,,,,,.,............... .f 126,942 The (Contract Sum) $4I#1gj1jk#~~r&k) prior to rhis Ch;cngc Order was. . . , , , . , .I 1,;868,610 The (Contract Sum) ($&yJyf#r[fl$3f+$?lpp/$PjC$) will bt: (incrased) (@k#&L$” fpjyp~~) by this Change Order in the amount of . _ . . . . . . , . , . , , , , , , . . . . .s 14,625 The new (Contract Sum) ~~~$Ql,$+!#~&f~&k-)ric1uding this Change Order will br .s 1,883,235 The Contrxt Time will bc (increasscd) (~#$&‘($#~#$) by ‘I’hc dare of Subsrancial Completion ‘as of the dart at’ this Change Or&x therefore is Feb. 5, 1990 ( 7 )days. NO’I’E: ‘This summary dots rwt rcrlrct cktngcs in rhe Conrnct SWIL Contract Time or GLI~KUW~CI Mxximum Price which have hew wthorucd by Consrfucrfon Chzn~e IXrccrivc. KROMMENHOEK MC KEOWN & ASSOC. ..--_TREPTE .--_- CARLSBAD-WATER DISTRICT -__..- ARC1 KI-ECT CONTRACVX OWNER 1515 MORFNA BIVn- Adclreas AFLClf;;9Q..CLAI REMONT MFSA BLVD. 5950 EL CAMINO REAL __ Address SAN DIEGO. CA 92110 ,_ SAN DIEGO, CA ,,92123 BY - BY Board President DATE I-IATE DATE 3/7/90 __ AlA DocuMENr 6701 - CH.4NGB ORDER l 197 WXTKJN l AL%* l 919e7 - I’HB AMLIUCAN INSTKIJTE OF ARCIIITKTS, 1735 NEW Y(sKK AVE.. N.W., WASlfING’f’Cik. VC:. 2AO@5 G701-1987