Loading...
HomeMy WebLinkAbout1990-03-06; Municipal Water District; 006; Maerkle Reservoir - Change Order Project 87-109. 5 3, 0 E % * CMWD - AGENDA BILL TITLE: ITG._/&&Q _ EPT.rbm,rn-, MAERKLE RESERVOIR - Change Order (CMWD Proj. 87-109) 3ECOMMENDED ACTION: Adopt Resolution 6+-6 approving Change Order No. 5 for the substitution of stainless steel materials in lieu of fiberglass reinforced plastic (FRP) inside the 10 million gallon Maerkle Reservoir - CMWD Project No. 87-109. ITEM EXPLANATION Construction of the District's 10 million gallon Maerkle Reservoir is currently underway. Fiberglass reinforced plastic (FRP) products were specified to be installed inside the 10 million gallon concrete reservoir for grating, handrails and access doors. However, it has since been discovered that FRP products have not been certified by the National Sanitation Foundation (NSF) as suitable for direct contact with or immersion in potable water and may cause degradation of water quality. Use of stainless steel materials will provide suitable corrosion protection without degradation of water quality. In the consultant engineer's opinion, this additional cost would have been included with the original construction bids, if stainless steel had originally been required. District staff concurs with consultant's opinion. The contractor has quoted a total lump sum cost of $41,450.82 for this change order. The price has been reviewed by District staff which recommends approval of this Change Order No. 5. FISCAL IMPACT The 1989-90 budget for this reservoir project is $5,433,000. The original contract amount totals $5,327,818.36. Including Change Order No. 5, the current contract sum $5,435,152.08, therefore the budget will be exceeded by $2,152.08. The District utilizes a $500,000 construction contingency fund in its annual budget for this type of expenditure. It is recommended that $60,000.00 be transferred from the construction contingency fund to cover this change order and any other unforeseen costs or change orders through project completion. (continued on next page) EXHIBITS 1. Resolution A#6 approving Change Order No. 5 for the substitution of stainless steel materials in lieu of fiberglass reinforced plastic (FRP) inside the 10 million gallon Maerkle Reservoir. 2. Change Order No. 5. h RESOLUTION NO. 646 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT, APPROVING PROJECT CHANGE ORDER NO. 5 FOR THE 10 MILLION GALLON MAERKLE RESERVOIR CMWD PROJECT NO. 87-109 WHEREAS, substitution of stainless steel materials in lieu of fiberglass reinforced plastic (FRP) is required and necessary inside the 10 million gallon Maerkle Reservoir, currently under construction; and I WHEREAS, the Board of Directors of the Carlsbad Municipal Water District hereby find it necessary, desirable and in the public interest to proceed with the installation of stainless steel materials in lieu of fiberglass reinforced plastics at this time. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Carlsbad Municipal Water District, California, as follows: 1. That the above recitations are true and correct. 2. That project Change Order No. 5 in the amount of $41,450.82 is hereby approved and the Board President is authorized to execute said change order. Following the Board President's signature of said change order, the Secretary of the Board is authorized and directed to return the original copy of said document to the Carlsbad Municipal Water District for processing. PASSED, APPROVED AND ADOPTED by the Board of Directors of Carlsbad Municipal Water District at its regular meeting held on the 6th day of March, 1990, by the following vote, to wit: AYES: Board Members Lewis, Kulchin, Pettine, and Larson NOES: None ABSENT: Board Member Mamaux t ATTEST: ALETHA L. RAUTENKRANZ, Secretary of the Board * - ,’ rc1 Contract Change Order C-0. No.: 5 Project: Squires Tank and Pipelines Project Owner: Carlsbad Municipal Water District Engineer: Luke-Dudek Civil Engineers, Inc. Contractor: Commercial Contractors, Inc. Item No. Chanae in Contract Amount Add Subtract I No. of days to extend contract 1 $41.450.82 _----------------------- 0 Total estimated change in Contract price: Forty One Thousand Four Hundred Fifty and 82/100 Dollars Total number of days of extension of Contract time: days Commercial Contractors, Inc. WilliamcZ/onderak, General Manager Carlsbad Municipal Water District Date: 3/7/90 Distribution: 1) Bob Greaney, CMWD, Manager 2) Bill Lopez, CMWD, Sr. Inspector 3) Steve Deering, L-D, Proj. Mgr. 4) L-D File No. 190-04-040 5) Bill Zonderak, CC1 I, c’ r* . f Contract Change Order, Item Description C-0. No.: 5 Item No: 1 Project: Squires Tank and Pipelines Project Owner: Carlsbad Municipal Water District Engineer: Luke-Dudek Civil Engineers, Inc. Contractor: Commercial Contractors, Inc. Description of Change: Substitution of stainless steel materials in lieu of fiberglass reinforced plastic (FRP) materials inside the 10 H6 reservoir (grating, handrails, access doors, etc.). This aqreed on- lump sum amount for Item No. 1 of Change Order No. 5 is inclusive of all direct and indirect costs. r “?” m,..:,’ Justification of Necessity: FRP products have not been certified by the National Sanitation Foundation (NSF) as suitable for direct contact uith or iamiersion in potable water and may cause degradation of water quality. Use of stainless steel materials will provide suitable corrosion protection without degradation of water qua1 i ty. In the Engineer’s opinion, this additional cost rrould have been included with the original construction bids. if stainless steel had originally been required. This Change Order Item will: ( ) not change (x ) increase ( ) decrease the amount payable under the Contract by apprOXimitely $ 41,450.82 based on ( ) unit bid prices ( ) agreed unit prices ( x) agreed lump sum ( ) estimated cost plus. This Change Order Item ( ) will (x ) will not extend the time for project completion by calendar days working days. Distribution: 1) Bob Greaney, CMWD Manager 2) Bill Lopez, CMWD, Sr. Inspector 3) Steve Deering, L-D, Proj. Mgr. 4) L-D File No. 190-04-040 5) Bill Zonderak, CCI By: Date: of: Luke-Dudek Civil Engineers, Inc.