Loading...
HomeMy WebLinkAbout1990-06-19; Municipal Water District; 026; Maerkle Reservoir Change Order No. 6t , -1 - b, I -MWD - -AGENDA BILL n 5 AB# 06% MTG. G//9 ho TITLE: MAERKLE RESERVOIR DEPT. HD.Rz CHANGE ORDER NO. 6 DEPT. ENG. CMWD PROJECT 87-109 RECZ)MMENDED ACTION: Adopt Resolution No. 665 approving Change Order No. 6, Item No. 1 in the amount of $52,264.02 for construction of a line to provide sewer service to the reservoir keeper's- house to replace the failed septic system and temporary sewage holding tanks, Item No. 2 for revised grading required for construction of the pump station, Item No. 3 for installation of the valve stem riser and air valve in a vertical position as directed in Change Order No. 5 and Item No. 4 requesting a time extension for weather delays. I ITEM EXPLANATION Construction of the District's 10 million gallon Maerkle Resewoir is currently underway. The request for approval of Change Order No. 6 are as follows: Item No. 1 - Extend the 6" sewer line approximately 800 1.f. and connect to an existing 6" stub out constructed as a portion of Leisure Village Oceanside, Unit No. 6. Sewer line to be constructed in accordance with the contract documents. The agreed lump sum includes 798+ of 6" PVC pipeline and two manholes. Construction of this line is required to provide sewerage service to the reservoir keeper's house and will replace the failed septic system and temporary sewage holding tanks. The total cost of Item No. 1 including labor, equipment, materials and shoring would amount to $22,684.20. Item No. 2 - Revise the grading and drainage for the proposed pump station site. The revised grading will be required for construction of the proposed pump station to be constructed later this year. By accomplishing the required earthwork at this time, additional costs associated with temporary brow ditches and hydroseeding will be avoided, and less borrow material will be required for the final backfill at the tank. The total cost of Item No. 2 including labor, equipment and subcontractor would amount to $27,874.40. Item No. 3 - Installation of valve stem and air valve in a vertical position rather that at an angle as directed by Field Order No. 5. Installation of the valve stem riser and air valve in a vertical position is required to ensure proper operation of the installed equipment. This change order is required to compensate Commercial Contractors, Inc. for the costs of implementing Field Change Order No. 5. The total cost of Item No. 3 including labor, equipment, materials and subcontractor would amount to $1,705.42. 7 Item No. 4 - Time extension for weather delays. This time extension was requested by Commercial Contractors, Inc. to extend the contract time for days they could not work. This request has been approved by the staff. No additional costs would be involved upon approval of Item No. 4. FISCAL IMPACT The 1989-90 budget amount for this reservoir project plus a subsequent appropriation is $5,493,000.00. The original contract amount totals $5,327,818.36. This change order for $52,264.02 plus previous approved change orders brings the total contract amount to $5,387.416.10. Therefore, there are sufficient monies available for this Change Order No. 6. EXHIBITS 1. Resolution No. 665 approving Change Order No. 6 for Construction of sewer line to provide sewer service to the reservoir keeper's house and will replace the failed septic system and temporary sewage holding tanks, the revised grading required for construction of the pump station, installation of the valve stem riser and air vault in a vertical position to ensure proper operation of the installed equipment required to compensate Commercial Contractors, Inc. for the costs of implementing Field Order No. 5 and time extension for weather delays. 2. Change Order No. 6. (On file in the City Clerk’s office) CMWD 87-109 RESOLUTION NO. 665 A RESOLUTION OF THE BOARD OF,DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT, APPROVING PROJECT CHANGE ORDER NO. 6 FOR THE 10 MILLION GALLON MAERKLE RESERVOIR CMWD PROJECT NO. 87-109 WHEREAS, installation of a line to provide sewer service to the reservoir keeper's house to replace the failed septic system and temporary sewage holding tanks, revised grading required for construction of the pump station, installation of the valve stem riser and air valve in a vertical position as directed in Change Order No. 5 and requested time extension of two days due to weather delays are required and necessary to complete the 10 million gallon Maerkle Reservoir, currently under construction: and WHEREAS, the Board of Directors of the Carlsbad Municipal Water District hereby find it necessary, desirable and in the public interest to proceed with the aforementioned items at this time. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Carlsbad Municipal Water District, Carlsbad, California as follows: 1. That the above recitations are true and correct. 2. That Project Change Order No. 6 in the amount of $52,264.02 is hereby approved and the Board President is authorized to execute said change order. Following the Board President's signature of said change order, the Secretary of the Board is authorized and directed to return the original copy of // // // 1 2 3 4 5 6 9 E 9 1c 13 1% 13 14 15 16 19 16 19 20 21 22 23 24 25 26 27 28 said document to the Carlsbad Municipal Water District for processing. PASSED, APPROVED AND ADOPTED by the Board of Directors of Carlsbad Municipal Water District at its regular meeting held on the 19th day of June * 1990, by the following vote, to wit: AYES: Board Members Lewis, Kulchin, Pettine, Mamaux and Larson NOES: None ABSENT: None ATTEST: ALETHA L. RAUTENKRANZ, \ Secretary of the Board CMWD 87-109 Contract Change Order C-0. No.: 6 Project: Squires Tank and Pipelines Project Owner: Carlsbad Municipal Water District Engineer: Dudek &c Associates, Inc. Contractor: Commercial Contractors, Inc. Item No. 1 2 3 4 Change in Contract Amount Add Subtract $22,664.20 ------em--- $27.874.40 ----------- $ L705.42 ----------- ---w------ ----------- No. of days to extend contract 0 0 0 2 Total estimated change in Contract price: Fifty-Two Thousand Two Hundred Sixty Four and 02/100 Dollars. Total number of days of extension of Contract time: 2 days Commercial Contractors, Inc. Carlsbad Municipal Water District Approved June 19, lelo .- Distribution: 1) Sob Greaney, CMWD, Manager 2) Bill Lopez, CMWD, Sf. Inspector 3) Steve Deering, DAI ,Proj. Mgr. 4) DAI File No. 190-04-040 5) Bill Zonderak, CCI . * CO. No.: 6 Item No: 1 Y t * Contract Change Order, Item Description Project: Squires Tank and Pipelines Project Owner: Carlsbad Municipal Water District Engineer: Dugek dc Associates, Inc. Contractor: Commercial Contractors, Inc. _ _ Description of Change: Extend the 6’ sewer li.ue from Sta lOtO to Sta 17+98i and connect to an existing 6. stub out constructed as a portion Leisure Village Oceanside, Unit Ho. 6. Sewr line to be constructed in accordance uith the contract docuents and as shown on sheets C-2 and C-10. attached. The agreed lup su includes 7W of 6’ PVC pipeline and two manholes and excludes rock excavation where blasting is required. Additional pipeline lengths required for find tie-in will be coropensated at $24.4O/L.F. for depths 10 feet or less, and $29.75/L.F. where deeper than 10 feet. Justification of Necessity: Construction of this line is required to provide sewerage service to the reservoir keeper’s house and will replace the failed septic system and temporary sewage holding tanks. This Change Order item will: ( ) not change ( X) increase ( ) decrease the amount payable under the Contract by approximately $ 22.684.20 based on ( ) unit bid prices ( ) agreed unit prices (x) agreed lump sum ( ) estimated cost plus. This Change Order Item ( ) will ( x ) will not extend the time for project completion by calendar days working days. Distribution: 1) Bob Great-my, CMWD Manager 2) Bill Lopez, CMWD, Sr. Inspector 3) Steve Deering,DAI,Proj. Mgr. 4) DA1 File No. 190-04-040 5) Bill Zonderak, CCI Date: d 5i3 &q . F’RDI=rCESiEZ) CH AbfCSE c3RDEFa s%olrL,;7,344 ; L REZ &a 1 w s3EztktFR EXl-ENsIBbl :.> .% Project: S@JIKES T(qNf g$fljD pIpE j9a: @:::> % 3 CARLSEAD l%rQii;::PAL lJAT M&)--Ch 22, 1$?Q 2 59% EL CAMfNO REAL :/ CARLSPAD, CA. 92008 Ta ‘*j~;n&y 2 In Reference To PCQ/Ch?0001/ Str?ried: C,cnplE?tsd: UENTLEMEN: PER THE REQUEST i3F DUDEK & A335PCIATES , i f-jA;~E i=,t;EFiiHEfL! 6 CHPNGE DRDER EST: MATE FOR THE EXTENSION 13F THE EXXSTXNG t INCH SEblER LINE FHUt+! SfA. tO+i~? TS ETA. 17+90 1 WE SPECIFlCALiY EXCLUDE SURVEY ANT?- i AYUiJT AND ROCk-1 E XCAVAT !13N. pup COSTS $ INCLUDING MARKUP, TOTALS s222b3G.20. F’;E&qg ISS:rE A CHM4GE PRDEE f-m THIS ITEll! OF WORK. IF ADDITIONAL FOOTAGE IS fmw1HED IN ORDER 70 EFFECT A -j-:E-:# WxTH THE LEISURE-TECH LINE THE FC)L.LQWTN13 fRICE SCHEDULE. SiiALt APPLY. 0 Ir;KH i-.IME IN%-ALtED UP T8 TEN FEET IN DEPTH d 624.40 /L*f. 6 INCH LINE OVER TEN FE*- DEPTH B 829.75 / L.F’. IF YOU REQUIRE ANYTHING i?J?Ti-fER PLEASE LET ME KN3w. 4X3 LABDR BPERATOR b4 HH IZ! $36.53...*.....**.**..a2,337.92 LABORER 38 MR e! 828.77 & 4 f-)93 tic I...*****.**.*.+~. .A-. DR I VER 27.5 HR tz 9~1.46.*...*.,~...*.e 865.15 GK-CHECK 1P l-m E s44,m .,..re*r+..r.r s 732. OCI FOREMAN 45.9 t-03 B 494*00...,.....*.*.*82,$57.rlO SUPT~TkL.....*.....,,.......*....**,*...*~~~~~~.~~ CONTRACTDH MARKUP 2u*k. . . , . * . . , . . . . . . * . . l Bf : 509 * ::,7 Lq ~ rj54. i%<j ccs EQUIPMENT 23SP EXCAVATDR IS i-33 c 31m 3* .CC~*.-“*L $3 & z 160 . GC:) 2358 W/CCMPACT IS,5 HK 8 8140.00. I .‘$2;5$0*00 950E LUAI>EH 27.5 HR G? s45.K). . . .I q. .$:-1,237.50 WATER TRUCK 27.5 HFi ‘3 ‘B35. $0 ‘ . c . * l . . 6 9&Z. 50 RAMMAX/WACKER 9 HF: @ Bl’?.%?. . . . . . . . .$ If1 . 0 0 SUBTOTAL.... .*......‘...*......‘....~-?~l2l.p3 CUNTRACTOH MARKUP ~5%.....*......*.-82,068.15 86,183,15 CC3 MGTERIALS LUMP SUM.............*...........,...~~.99i.~~~~ ccr S!“iLJ;;tXNO LWMF SUM.........*..*.....*..‘..*.*..*~ &s-J l O!:: SUB? OTCii . ..*...*.*..****.......‘.*‘...*.,“”..*... s2,791.00 CONTRACTDR MARKUP 15%,.......,.............*......~ SlS.65 SUBCONTRACTi MANHOLES 2 S-17 @ ibSit2.00. . . . . . . . . * . . iii1 t 824.00 53?2 w2 l &ST CONTRACTUF;‘MARKUP 1O%.......*....,....,.,.......e i522* 40 s; * ,QC\& l $2. TRTAL.**......*......-.....................................~~2~4~9.~,~ mc- BOND ~%...‘..‘.........“.,..,...‘....**.*....‘*.*‘..*..“**,.*.~ ,i4.60 P . PF:C3F-fDSED ct--4dhr-4GE O’F;=l3EF;: * C--b a;3 t> CT-# d& WE;= b 31 N SE&JER tEx--r&eP4t3xc3r4 g Prctj ect : SQUIRES TAN&; &ND F JFzE $QG; :3Si_lil t :7 t March 23, 1490 Fag& r: .I _" _--..- --. _ - __..._,. -___---._--.-..-.- __p_=__^_____-----__-- f GRAND T07Ai.~..l...‘......,..............*~~~~*~‘.*-~~-~ 22. I _ $ .= l ,+s’i- L -2:c.z Tata1 ca,st; B 0 . 00 .-c_-- -. _---... ---*I_- mm-- .- ----- -___-.p Propased by ; COMMERCI&L C~NTH~CTGHS Signed Br; -a.--.- Date: --_____. Contract Change Order, Item Description C.O. No.: 6 Item No: 2 Project: Squires Tank and Pipelines Project Owner: Carfsbad Municipal Water District Engineer: Ducek dc Associates, Inc. Contractor: Commercial Contractors, Inc. I Description of Change: Revise the grading and drainage for the proposed pup station site as shown on the attached. The agreed on luap su includes earthwork removal. additional brow ditch and hydroseeding, and removal of rippable rock and ‘floatmY. Rock excavation requiring blasting is soecifically excluded. Justification of Necessity: The revised grading will be required for construction of the pmp station. By accomplishing the required earthwork at this time, additional costs associated with temporary brow ditches I and hydroseeding will be avoided, and less borrow material will be reauired for the final backfill at the tank. This Change Order Item will: ( ) not change ( x) increase ( ) decrease the amount payable under the Contract by approximately $ 27 .B74.40 based on ( ) unit bid prices ( ) agreed unit prices ( X) agreed lump sum ( ) estimated cost plus. This Change Order hem ( ) will ( x) will not extend the time for project completion by calendar days working days. Distribution: 1) Bob Greaney, CMWD Manager 2) Bill Lopez, CMWD, Sr. Inspector 3) Steve DeeAng,DAI, Proj. Mgr. 4) DAI File No. 190-04-040 5) Bill Zonderak, CCI / ,,.I. ,’ I : , .’ .. ! i I..‘, / . .I ‘i,: I .: - / IQ ,! 8 4 CARLSPAD MC.II~L~ I F’AL WA-t- 5930 EL CAMINO REAL CARLSRFID~ CA. 92CO3 In Ref et-cnte To PCD/Or30CK~l/ 5’==rt!&: Campieted: .----L-- ~c-I-_a_-__c J.-e- GENTLEMEN: IF ‘y’ou REQt!S,RE ANYTHING FLRTMER PLSASE: LET RE K:d&G* cc1 LARDR QPERATUR 79.5 HK @ 93~~.3~.~....‘......,82,909.14 DRIVER 26 .5 HR @ SJ1.46 ..t*l...L.L..-.. @ 277 hQ ad.- . d 1 GR-CHECK 22.9 HR g R44.0:3. ..Ls*L*-Li*II % 990. Clf’ FOREMAN 26.5 HR Ca S54.0~~.....,.**.,...*~~~~~1~~~~~ SUBTOTAL . ..‘....‘..“..,,*~~.*..~.*.~~~ .%ki,l~E!.B~ CDNTRACT13F; MAHF:UF 20%..**.,,..........=~~~~~~-~?~ F7 F 390” cjt:, cc1 EIXIIPMENT DEIN W/SLUPEBUA~,D 20.5 I-IF: d 013-~.~0‘~3?Stt.~r~~ 950B LOADER 26.5 HR @ $4S.~~O,,....,~;~142.~~~~ WATER -ffitlCK Z&,5 HR @ %::5,c:?C!. . . . . . .$ $2?.5CJ 14tjg pj$JToR Gf+&Efi 20.5 t-IF: E 2.&r.;, ii,<:. .$:. 5c;Q.S::i SUBTDTAL.,‘...‘.‘*....~*.,I...S7,2E~.~~~ CUNTRACTOFi MAHK’JP lS%......,......ufl,043.:2 $8 ~ J&> _ aa SUEKXDTHQCTDE TRIJCK ING i 2 HR @ %6U. UO * , . . . . . . . . . * si. 7r’Q c ?>\) TKtJCK.XNG ?O l-m c? s53.m. *. -.I 1‘. . l . ,$4,95O*W DUMP FEES 6 @ ~lr(?,O!5...*..*.......S 900 L cm PRC.bJ DI-f-CH D-73 1.3 LF @ Q12,OG.. . .b1.56O.W VERTICAL DITCH TUBE Sr; LF: 4 93,” .&l: .$l,28C .c!c HYDRUSEEDING zcm:ro SF @ $0. C-7. . . . . . & E32. Ci!? EQUIPMEwr MDVE-IN./OUT 6 !-IF: @! sE-15.c~0$ 519” 00 SUBTI3TAL..........~.......*........ $~Q,752.‘1iQ CONTRACTOR MARKClF mlO% . . . . . . c . . . . . . .% 1,075*20 sr1,8~7,2ij T5TAL .‘~.‘....*....if~‘.**...~,‘.~*...‘........**....*~=.~~- 827 ,‘198*92 EOND i%...............*..,...........,-.......~............*...~ 275.93 t3RAND TOTAL-........*..,,.r....*....**..*. .z . . ..**.........~2~.8~~*4~ .; 1 March 2';, 199C) sggie " .--__- _II._.__ _.--*__ ___--_--~. *~- __.----;--LI-_-_ _.. lip_ -_ _ll---w ____-_-_I_--- -7------ Frap~.~=c’ try: CClMMERCIAL CON-rFmCicmS Signed: By : +a- ..--- __.._-....-. - Daixi?: ..,,..._ ZE2P .%--. _ ___._. . . . ---_--_. .-. ,- Ic I ,. . Contract Change Order, Item Description Project: Squires Tank and Pipelines Project Owner: Carkbad Municipal Water District Engineer: Du+k & Associates, Inc. Contractor: Commercial Contractors, Inc. -- C.O. No.: 6 Item No: 3 Description of Change: Installation of valve, stem riser and air valve in a verticle position rather than at an angle of 20.9 degrees to a verticle (perpendicular to the pipeline centerline) as directed by I Field Order Ho. 5. Justification of Necessity: Installation of the valve stem riser and air valve in a verticle position is required to ensure proper operation of the installed equipent. This change order is required to compensate CC1 for the costs of implementing Field Order Ho. 5. This Change Order Item will: ( ) not change ( x) increase ( ) decrease the amount payable under the Contract by approximately $L705-42 based on ( ) unit bid prices ( ) agreed unit prices ( X) agreed lump sum ( ) estimated cost plus. This Change Order Item ( ) will ( X ) will not extend the time for project completion by calendar days working days. Distribution: 1) Bob Greaney, CMWD Manager 2) Bill Lopez, CMWD, St. Inspector 3) Steve Deerlng,DAI,Proj. Mgr. 4) DA1 File No. 190-04-040 5) Bill Zonderak, CCI Cf)MMEF%CZf=bL. CQNTRAC-!-43)f=?~ rP4c.. 8.Z69 VICKERS STE M SAN r)IEGclp CA 92r1,1 r(bL1,9) 565,-- 5697 FrRCBPC3SEO CI-iC4MGE Ot=cX?EFz #OOOUb RE: LINE FT) VALVE ADJUST Project: SQUXRES TANK AND PIPE Job: 890i CARLSFAD MUNICIPFSL WAT March 28, i’??ci 5930 EL CAMINO REAL CARLSBAD ) CA. 92068 To Vendor 2 In Reference To COR/CKKKK~l/ Started: Cmpletedt GENTLEMEN: I HAVE PREPARED A CCST ESTIMATE FUR THE WORK: PROPOSED IN FlEiD ORDER NUMBS?? 5. THE WORE INVOLVED CONSISTS OF REORIENTING THE VALVE STEW RISER AT STA. O”2Z AND THE AIR VALVE AT STA. O-+34 TO A VERTICAL PDSXTLl3N FROM THE CURRENT ANGLE OF 20.9 DEGREES. THE COST OF PERFORMXNG THIS WORK, fNCLUDXNI3 MARKUP, JG $ PLEASE ISSUE A CHANQE ORDER FOR THIS WORK. . IF YOU REQUIRE ANYTHING FURTHER PLEASE LET ME KNOW. CCI LABOR NELDER 11 HR C 858.00....................~6~S.~~ CPERATOR 3 HR d $36.53...................$109.59 LABORER 5 HR C 428.77 6143.05 . ..I................ SUETOTAL ..I..,“..............~.....“...,. 9891.44 CCNTRACTCIR MARKUP 263’ . . . . . . . ..*..m.....-.......... 3178.28 81,069.x5 CCI EQUIPMENT 426 BACKHOE 3 HR e! ~28,5O..................S 85.50 CONTRACTOR MARKUP 157 3 12.82 . . . . . . . . ..e.......*.........m 3 98.32 MATERIALS FLANGES, NyP&G . . . . . . . ..*.....................** 9 54.tt9 CGNTRACTOR MARKUP 157 . . . . . . . . . . ..*.......*.....I.. 9 8.20 9 62.89 SUBCONTRACTOR REDRILL ACTUATOR 8 HR e 952.00.....,.......$416.~~~ CDNTRKTOR MARKUP fO%............................s 41.69 % 457.60 TOTAL .-...*...............,........~*...*........”.,.........,... $1,668.!54 BOND li' *..*.............L.*.,....,..~-.....,...................‘,. % 16.843 GRAND TOTAL “~..~...................,........,.......”............ Slt705.42 . . I I . Field Order c-w 1 Project: Squires Tank and Pipelines Proiect fY:i; .: -_ f the Contractor believes this field order entitles him to a change in the contract sum or the change order by documenting the basis in writing. this Field Order. of: Commercial Contractors, Inc. Date: Accept held Order with no change in contract price or time. qq+zJ -23 Accept Field Order subject to request of a change order to be submitted within seven calendar days. - I- : ,3 Distribution: Owner: G&bad Municipal Water District Engineer: Luke-Dudek Civil Engineers, Inc. Contractor: Commercial Contractors, Inc. Recommended by: Jeff Den Herder of: Luke-Dudek date: 01-29-90 i Reviewed by: & ‘&;g of: Luke-Dudek Civil Engineers date: / /=I//% Approved by: of: Car,sbad ,J,,,,D date: d’2-70 Please execute promptly this field order which interprets and or clarifies the contract documents or orders changes in the work without change in the contract sum or contract time. m-w.-..-- ---.------ . . ..-w-.-.-m- - _^_____ ----.---------. he following iS provided in response to CCI’s request for information (RFI) No. 5: . . The valve stem riser shall be installed vertically. This can be accomplished by remounting the valve ctuator, either using an adapter plate or by plugging and re-drilling the holes in the actuator Dlounting ‘lange’portion of the valve body to provide a vertical centerline. Coordinate with the valve supplier. See ketch 1. . The air valve shall also be installed vertically. This can be accomplished by installing a flanged bend etueen the pipe outlet and the air valve. See sketch 2. . The 38.2 percent slope corresponds to an angle of 20.9 degrees. - Field Order No.: 5 1) Bob Greaney, CMWD, Manager 2) Bill Lopez, CMWD, Sr. Inspector 3) Steve Deering, L-D, Project Manager 4) L-D File No. I 90-04-040 5) Biil Zonderak, CC! __ .---- _._..---- -_.-- _-.. ,.- - \ ____ _.. . '-- \ \ I "$ :.f --4--v._ - "l.... . . $1 I i 4 'L 4 i 1 1 i 0 i ’ LUKEcDUDEK Sheet Of Shea Date BY - f a t-- q,X VALVF, B d”- 7” fLAJsrfl f3EIJO \/ -; \ *. ..-2’ . . -. .. , LUKE-DDUDEK Sheet Of Sheets Datr Bv -- . . . . . r ‘v * Contract Change Order, Item Description Project: Squires Tank and Pipelines Project Owner: Carlsbad Municipal Water District Engineer: Du@ek & Associates, Inc. Contractor: Commercial Contractors, Inc. - CO. No.: 6 Item No: 4 Description of Change: Time extension for weather delays. Justification of Necessity: This time extension was requested by CC1 to extend the contract time for days hey could not work. This request has been approved by the CWD staff. This Change Order Item will: ( X ) not change ( ) increase ( ) decrease the amount payable under the Contract by approximately $ based on ( ) unit bid prices ( ) agreed unit prices ( ) agreed lump sum ( ) estimated cost plus. This Change Order Item (x ) will ( ) will not extend the time for project completion by 2 calendar days working days. Distribution: 1) Bob Greaney, CMWD Manager 2) Bill Lopez, CMWD, Sr. Inspector 3) Steve Deering,DAI,Proj. Mgr. 4) DA1 File No. 190-04-040 5) Bill Zonderak, CCI COMMERCIHL CONTR~r‘TOR5 SNC. e369 USCKERS S-I-E t-l SAN l3SEO0, ce 42x11 cts;Lc3> yJtjc.- sc.b9-7 January 16, 1990 CARLSBAU hUNICIPAL WATER UISTRICT SEN EL CAMINO REAL CARLSBAD, CA, 42008 Project : SWXRES TANK AND PIf’E Job4 kiWk HE: TIME EX’I’EN51ON DUE TCJ INCLEMENT WEA’ftW4 1 GJANCJU DEN? WILL.: DUE TO THE RAIN CREATING UNSAFE WWKING CONiJITXUN5, WE WERE FORCED ‘I’0 CURTAIL CCINSTRUCTZON UPEHHTIONS tiT U:‘;rO A. H. I AH THEREFORE REPUESTXNG A WE DAY EXTENSION OF 7HE CUNTRACT TIME DUE TU THIS RAIN DELAY. V,ERY TRULY YOURS, R,BERT VLkCH 6 CUMMERCIAL CONT’RACTGRS ‘INC. VTCE-PRES, REV s_ ‘e - COMMttf?CIt=%t CQNTF:clCTOF%~ INC, as69 VICKfZWS ST-E t-l SFIN DIEGO, CA 9zzlL-1 <&J-9) 569-- 5&¶??7 March 28, 1990 CARLSBAD MUNICIPAL. WATER DISTRICT 3950 EL CAMXNO REAL CARLSBAD, CA. 92008 Project: SQUIRE53 TANK AND PIPE RE: RAIN REC’D. 28MAR90 DEAR BILL: Job: 8901 DUE TO THE RAINFALL RECEIVED AT THE 3UE5ITE TODAY, WE WERE FORCED TO REDUCE OUR OPERATIONS TfJ A MINIMUM. PLEASE EXTEND THE CONTRACT PERIClD BY ONE DAY TO ALLOW FOR THE TXME LUSS INCURRED DUE TO PRECIPITATION, VERY TRtJLY YOURS, ROBERT VLACH COMMERCIAL CONTRACTORS INC. VICE-PRES.