Loading...
HomeMy WebLinkAbout1993-04-06; Municipal Water District; 207; Reclaimed & Potable Water System ImprovementsCARLSBAD ‘=‘JNICIPAL DISTRICT AGENDA APPROVAL OF PLANS AND.SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE FOR BIDS FOR RECLAIMED WATER AND POTABLE WATER SYSTEM IMPROVEMENTS BIL RECOMMENDED ACTION: Adopt Resolution No. s31 for approval of _ . plans and specifications, and authorize staff to advertise an invitation to bid for construction of reclaimed water and potable water system improvements, CMWD Project Nos. 86-109, 91-301, and 91-109, Contract No. 3394. ITEM EXPLANATION: This project is made up of three separate District projects which are being combined into one contract to take advantage of a State low interest loan for reclaimed water related projects. If these three projects were processed separately, monies from the loan would be delayed since the State will not release any funds until the last project has been awarded. Project 91-109 is for the construction of reclaimed water mains and potable water mains and water main conversions from Twin IDI Tanks northwesterly to Palomar Airport Road, in Palomar Airport Road westerly from College Boulevard to Paseo de1 Norte and in Hidden Valley Road northerly from Palomar Airport Road to a point near existing *Et Tank. Project 91-301 involves the installation of 6,400 feet of 12 inch reclaimed water main to replace a temporary 12 inch steel highline presently in operation between the El Camino Real Reclaimed Water Pump Station and the 'D' Tank area. Project 86-109 includes the installation of 1,288 feet of 16 inch potable water main in El Camino Real from the south boundary of the Carlsbad Business Park southerly to a location just south of Sun Fresh Roses, and 1,766 feet of 12 inch potable water main in an easement from Camino Vida Roble southerly to the District's 18 inch potable water transmission main that goes westerly from El Camino Real to the Twin *Dr Tank area. Both potable mains are needed to reinforce the reliability of the potable water distribution system for this part of the southwest quadrant of the City of Carlsbad. This reinforcement of the potable water system is to offset the utilization of one of the IDI water tanks for reclaimed water. As a result, the State has approved utilizing the low interest loan proceeds for these potable water lines. The plans and specifications have been completed and reviewed by staff. They are now ready for Board approval and authorization to advertise for bid. In accordance with Section 3.28.120 of the Municipal Code an Invitation to Bid will be published, and the contract will be awarded to the lowest responsive bidder subject to Board of Director's approval. PAGE 2 AB# ao;? ENVIRONMENTAL REVIEW: The environmental review process for these combined projects has been completed, and the California Coastal Commission is in the process of issuing Permit No. 6-92-227. FISCAL IMPACT: Funds for these projects have been appropriated in the 1992-93 C.I.P. as follows: CMWD PROJECT NO. I DESCRIPTION I ACCOUNT C AMT. 91-109 Reclaimed Water Line 507-1860-3393 Aviara $600,000 91-301 91-109 Reclaimed Water Line Flower Field Aviara Reserve 507-1860-3395 $700,000 507-1860-3396 $500,000 86-109 Potable Pipeline so. Camino Vida Roble 506-1860-3405 $143,750 86-109 Pipeline El Camino Real South of Camino Vida Roble 506-1860-3379 $500,000 TOTAL APPROPRIATION $2,443,750 The State Water Resources Board has approved this project to make the improvements for the reclaimed and potable water improvements. The funds for this project will be from a pre-approved state loan of $5,000,000. The State will sign the contract with the exact amount of the loan after this, the last contract under this loan, is awarded. Funds will be borrowed from the Water Fund during this period. The low interest loan will be repaid through the sale of reclaimed water and rebates from County Water Authority and Metropolitan Water Authority. The estimated construction cost for this project is $1,201,525. The estimated District-funded project costs are as follows: Design $ 135,000 Construction $1,201,525 Construction Contingencies $ 120,000 Inspection/Lab/Administration $ 120,000 Total Estimated Project Costs $1,576,325 Total Existing Appropriation $2,433,750 PAGE 3 AB# 302 EXHIBITS: 1. Location Map - Exhibit 'A'. 2. Schematic Plan, Reclaimed Water System, Failsafe Line to Interstate 5. 3. Resolution No. %31 for approval of plans and specifications and authorization to advertise an invitation to bid for construction of reclaimed water and potable water system improvements, CMWD Project Nos. 86-109, 91-309, and 91-109. CMWD 86-109, 91-301, 91-109 3 i : 4 F . E 7 E 5 1C 11 12 12 14 1E 1C 17 1E 19 20 21 22 23 24 25 26 27 28 - RESOLUTION NO. 831 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT OF CARLSBAD, CALIFORNIA, FOR APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO PUBLISH AN ADVERTISEMENT FOR BIDS FOR CONSTRUCTION OF RECLAIMED WATER AND POTABLE WATER SYSTEM IMPROVEMENTS, CMWD PROJECT NOS. 86-109, 91-301 6 91-109 WHEREAS, proposed construction is in conformance with the Reclaimed Water Master Plan: and WHEREAS, three separate CarlsbadMunicipal Water District projects are being combined into one contract to take advantage of a State low-interest loan for reclaimed water related projects; and WHEREAS, proposed improvements will serve portions of the southwest quadrant of the City of Carlsbad and the Flower Fields as shown on Exhibit “An (Location Map) and Exhibit **Brt (Schematic Plan - Reclaimed Water System - Failsafe Line to Interstate 5) attached hereto and made a part hereof; and WHEREAS, the estimated contract amount for this work is one million, two hundred and one thousand, five hundred twenty-five dollars ($1,201,525), and the Carlsbad Municipal Water District has been previously approved for a low-interest State loan in the amount of five million dollars, ($%000,000) I for the reclaimed water projects: and the proceeds from the sale of reclaimed water to' consumers and rebates from County Water Authority and Netropolitan will be utilized to repay the low-interest State loan: NOW, THEREFORE, BE IT RESOLVED, by the Board of Directors of the Carlsbad Municipal Water District as follows: 1. That the above recitations are true and correct. 2. That the plans, specifications and estimated cost of 1 II 1 one million, two hundred and one thousand, five hundred twenty-five 2 dollars, ($1,201,525), submitted by the engineering staff, which 3 are on file with the Engineering Department and incorporated herein 4 5 6 7 8 9 10 11 12 13 14 15 16 by reference, are accepted. 3. That the Secretary be authorized to publish an invitation to bid in accordance with Section 3.28.120 of the Municipal Code. PASSED, APPROVED AND ADOPTED at a meeting of the Carlsbad Municipal Water District held on the 6th day of APRIL I 192, by the following vote, to wit: AYES: Board Members Stanton, Kulchin, Nygaard, Finnila NOES: None ABSENT: ATTEST: LEWIS, President Vice President 17 18 1911 (SEAL) ALETHA L. RAUTENKRANZ, Secretary 20 21 22 23 24 25 CMWD 86-109, 91-301 & 91-109 26 27 28 2 ‘,OCATION Mp.P PROJECT NAME : m Exlkumw. CONSTRLKXlON .OF RECLAIMED WATER AND 91 - 301 I II pcTTA6LE WATER .SYSTEM IMPROVEMENTS. 91- 109 A - ., . . z P 8 Y -ij