Loading...
HomeMy WebLinkAbout1995-01-25; Municipal Water District; 0125.02; Recommendation on El Camino Real Waterline Project-. _. - CARLSBAD MUNICIPAL WATER DISTRICT - AGENDA BILL AB # a MTG. 01/25/95 CMWD DEPT. TITLE: DEPT. HD. CITY ATTY CITY MGR. RECOMMENDATION ON EL CAMIN0 REAL WATERLINE PROJECT RECOMMENDED ACTION: Staff is requesting that the Board recommend approving plans and specifications and authorization to advertise for an invitation to bid for Water Transmission Main Replacement in El Camino Real from Tamarack to Chestnut Avenue. ITEM EXPLANATION: Staff will make a presentation regarding the water transmission main replacement from the existing main in El Camino Real from Tamarack Avenue to Chestnut Avenue. CARLSBAD MUNICIPAL WATER DISTRICT - AGENDA 8lLL AB # DEPT. MTG. CMWD wm DEPT. HD. ,-- CITY MGR. - TITLE: APPROVAL, OF PUNS AND SPECIflCN"8 AND AUTHORIZATION TO ADVERTISE FOR BIOS FOR WATul TRANSMISSION cln ATn MAIN REPUCEMEM EL CAMINO REAL FROM TAMARACK AVENUC TO CHESTNUT AVENUE. CMWD OOlOl, CONTRACT 3378 ~~ ~- ~~ ~~ RECOMMENDED ACTION: Adopt Resolution No. - approving plans and specitications and authorization €0 advertise for M Invitation to bid for Water Transmission Main Replacement El Camino Real from Tamarack Avenue to Chestnut Avenue, CMWD 90-101, Contract No. 3378. ITEM MPIANATIO~ In the 1894/05 Budget, the Board of Directors appropriated funds for replacement of the existing water transmission main in El Camino Real from Tamarack Avenue to Chestnut Avenue. Staff recommends proceeding with the proposed construction. Construction b anticipated to require approximately one hundred twenty (120) calendar days tom the date of the issuance of the Notice to Proceed. This project includes instalfing a new 24-inch diameter water pipeline and a new pressure reducing station. These facilities are shown on the attached location map. Plans and Specifications for the project were prepared by the District engineering staff and are available for review. In accordance with Section 3.28.120 of the Municipal Code, an invitation to Bid will be published, and the contract will be awarded to the lowest responsive, responsible bidder subject to Board of Diredors' approval. This project has been coordinated with the Ci engineering staff, and it has been determined that there are no conflicts with any other Ci projects that may be contemplated for thk area ENVIRONMENTAL REVIRH: This project was reviewed by the Ci Planning Department and a negative declaration was issued. The California Coastal Commission does not require a permit for this project. FISCAL IMPACT: Funds in the amount of $768,411 have been appropriated in the budget As shown below, the estimated cost Is $942,448. Therefore, an additional appropriation in the amount of $175,000 is necessary. As this project serves the needs of both the current and future residents and businesses, it is recommended that $105,OOO be appropriated from the hkjor Facilities Charges fund and $70,000 lrom the Water Capital Replacement fund. There are sUmcient available balances in these funds for the additional appropriations. Estimatedconstnrctkrr .................................................... $895.448.00 lnspectionandEngMngcast ............................................... 32,O00.00 Fields urvey~............................................................ S,OOO.00 GeotechnicalSiteTesting .................................................... 10.O00.00 Total Estimated Cost ...... $942,448.00 MHIBTTS: 1. Location Map tor transrnbkm main replacement and presswe reducing station. 2. Resdution No. for approval of plans and specificam and authorization to advertise for an Invitation to Bod toc Water Transmission Main Replacement El Csmino Real from Tamarack Avenue to Chestnut Avenue, CMWD 90-101, Contract No. 3378. LOCATION MAP PROJECT NAME: . EL CAMINO WATER TRANSMISSION MAIN REPLACEMENT pRo3ECT. 90-101 I A I 1 2 3 4 5 6 7 a 9 10 31 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CITY OF CAALSBAD MUNICIPAL WATER DISTRICT, CARLSBAD, CALIFORNIA, FOR APPROVAL OF PLANS AN0 SPECIFICATIONS AND AUTHORIZATION TO PUBUSH AN ADVERTISEMENT FOR BIDS FOR WATER TRANSMISSION MAIN REPLACEMENT EL CAMINO REAL FROM TAMARACK AVENUE TO CHESTNUT AVENUE, CMWD 90-101, CONTRACT NO. 3378 WHEREAS, the Bard of Directors of the Carbbad Municipal Water District of Carlsbad, California, has determined it necessary and in the public interest to approve the water bansmission main replacement El Camino Real from Tamarack Avenue to Chestnut Avenue and to authorize publishing M advertisement for bids; and WHEREAS, plans and specifications for the water main replacement 0 Camino Real from Tamarack Avenue to Chestnut Avenue have been prepared by the Carlsbad Municipal Water District engineering staff with a cost estimate of $942,448 and are on file in the Engineering Department of the Carlsbad Municipal Water District; and WHEREAS, funds appropriated in the 1994195 Budget for replacement of the existing water transmission in El Camino Real from Tamarack Avenue to Chestnut Avenue are avaiile in the amount of $768,411, and staff recommends appropriating additional funds in the amount of $1 75,000 lrom the Capital Replacement Fund and Major Facilities Charges Fund balances; and NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Carkbad Municipal Water District of Carlsbad, California, as follows: 1. 2. That the above recitations are true and correct. That the plans and speclcations and cost estimate d$942,448 submitted by the Carlsbad Municipal Water District engineering staff which are on file with the carlsbad Municipal Water District Engineering Oepartment are incorporated herein by reference and are accepted. 3. That funds in the amount of $768,411 in the 1994195 Budget for replacement of the existing water transmission main El Camino Real from Tamarack Avenue to Chestnut Avenue are available and additional funds in the amount of $175,000 are hereby approved to be appropriated to project no. 3378 from the fdlowing fund balances: $70,000 from the Capital Replacement Fund balance and $105,000 from the Major Facilities Charges Fund balance. 1 1 2 3 4 5 6 7 a 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 86 27 28 4. That he Secretary be authorized to publish bn invitation to bid in accordmce with Section 3.28.120 of the Municipal Code. PASSED, APPROVED AND ADOPTED at a special meeting of the Carlsbad Municipal Water District held on day of AYES: NOES: ABSENT: , lo-, by the following vote, to wit: CLAUDE A. LDNIS, President ATTEST: ALETHA L RAUTNKRANZ, Secretary (SW CMWD 90-101 2