HomeMy WebLinkAbout1995-04-25; Municipal Water District; 277; Reimburse NCTD for Pipeline ReplacementCARLSBAD I-‘NICIPAL WATER DISTRICT -1GENDA BILL &‘- \B # c3.3 3 TITLE: AUTHORIZATION TO REIMBURSE NORTH COUNTY IITG. 04/25/95 TRANSIT DISTRICT FOR CONSTRUCTION OF PIPEUNE REPLACEMENT IN WASHINGTON STREET AND IEPT. CMWD CHRISTIANSEN WAY, CMWD PROJECT NO. Q3-602 IECOMMENDED ACTION: DEPT. HD.Ea CITY ATTY&? CITY MGR. $i!& Adopt Resolution No. 8”r & for authorization to reimburse North County Transit District for construction of pipeline replacement in Washington Street and Christiansen Way, CMWD Project No. Q3-602. ITEM EXPLANATION: The North County Transit District (NCTD) is constructing the Village Transit Center in the vicinity of Washington Street and Christiansen Way. Part of their project includes construction of a new roadway for Washington Street and a portion of Christensen Way. During construction, it was found that the new roadway will directly impact an existing &inch diameter water pipeline in Washington Street resulting in the need to relocate the pipeline to a deeper depth in the same location. Since the pipeline relocation work was not incorporated in the original design of the project, NCTD will be adding the work by execution of a change order to their existing construction contract. In reviewing this pipeline relocation, the CMWD staff recommends that the pipeline size be increased to 8-inch diameter to comply with current minimum pipe size standards and to meet updated fire flow conditions in the master plan. In the 1 QQ4/95 Budget, the Board of Directors appropriated funds to replace the water pipeline in Chriitiansen Way from Washington Street to Carlsbad Boulevard. CMWD staff has completed the plans for construction of this project and was scheduled to receive bids for construction in 1995. However, it is recommended that the water pipeline replacement in Christiansen Way be performed concurrent with the pipeline relocation work in Washington Street. This will avoid construction within the new improved roadway of Washington Street later on this year to connect the pipeline in Christiansen Way to the pipeline in Washington Street. It will also avoid disruption to traffic for a second time in the same area. ENVIRONMENTAL REVIEW: The proposed relocation of utility pipelines has already been considered by the San Diego County EIR prepared for the Commuter Rail Stations and approved in October 1 QSQ. In addition, the pipeline replacement in Christiansen Way has received a categorical exemption from the Cii Planning Department in accordance with Section 15302 (c) of CEQA. FISCAL IMPACT: CMWD requested, through NCTD to receive a bid proposal from Douglas E. Barnhart, Inc., the contractor on the Carlsbad Village Transit Center, to perform the work. Douglas E. Barnhart submitted four bids from pipeline subcontractors. The total cost from the lowest subcontractor bid was $116,QQ&Q8. The higher bids submitted were in the total amount of $11 Q,600.00, $150,521.20, and $163,171.20. The Engineer’s estimate for this work is $120,000. Funding for the work would be shared between NCTD and CMWD. The project cost share is based on the understanding that CMWD would be responsible for the cost of replacing the pipeline in Christiansen Way and the cost to increase the pipeline size in Washington Street from 6-inch diameter to 8-inch diameter. The CMWD share in the project cost is $47223.70. The NCTD project cost share would be based on relocating the pipeline in Washington Street in the amount of $69,773.28. The following table summarizes the project cost share based on the lowest bid. - PAGE 2 OF AB # a33 PROJECT COST SHARE SUMMARY PROJECT DESCRIPTION NCTD CMWD TOTAL COST SHARE COST SHARE COST Schedule A (Christiansen Way) $ 0.00 $45,583.70 $45,583.70 Schedule B (Washington Street) $ 1640.00 $71.413.28 847223.70 $116,QQ6.98 Funds in the amount of $316,825 for replacement of the existing pipeline in Christiansen Way and other downtown pipeline rehabilitation projects have been appropriated and are available in project number 3404. EXHIBITS: 1. 2. Location Map for the pipeline relocation and pipeline replacement. Resolution No. wl% for authorization to construct water pipeline replacement in Washington Street and Christiansen Way by Change Order through North County Transit District, CMWD Project No. 93602. -_ -, LOCATION MAP P -I 9 O’S a cn !!I# c$ 0 t i . . . 1 INSTALL 8”PVC PCTTABLE WATER MAIN To REPLACE EWST. 6” STEEL AND G’ACP WATER MAINS WHICH MUST BE LOWERED DUE To TRANSIT CENTER CONSTRUCTlON. r tWLWLEN(W~~lN~TE CONFLICT WITH OPERATKIN -OF TRANSIT CENTER. GRAND AVE : . . B CHRISTIANSEN WAY I WV ij IOICP NCTD VILIAGE TRANSIT CENTER L PROJECT NAME: WASHINGTON STREET 8 CHRISTIANSEN WAY WATER PIPELINE REPLACEMENT EXHIBIT NO. 1 4. RESOLUTION NO. 898 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT, CARLSBAD, CALIFORNIA, FOR AUTHORIZATION TO REIMBURSE NORTH COUNTY TRANSIT DISTRICT FOR CONSTRUCTION OF PIPEUNE REPLACEMENT IN WASHINGTON STREET AND CHRISTIANSEN WAY. CMWD PROJECT NO. 93-602 WHEREAS, The Board of Directors of the Carlsbad Municipal Water District of Carlsbad, 6 California has determined it necessary and in the public interest for authorization to reimburse North 7 County Transit Diitrict for construction of pipeline replacement in Washington Street and Christiansen 8 Way, CMWD Project No. 93-605; and 9 WHEREAS, plans and specifications for the replacement of the water pipelines in 10 Washington Street and Christiansen Way have been prepared by the Carlsbad Municipal Water District 11 engineering staff with a cost estimate of $12O,OOQ; and 12 WHEREAS, the Carlsbad Municipal Water District’s share in the project is $47223.70 13 based on the understanding that Carlsbad Municipal Water District is responsible for the cost of replacing 14 the pipeline in Christiansen Way and increasing the pipeline size in Washington Street to &inch diameter, 15 and North County Transit District is responsible for the replacement cost of a Sinch diameter pipeline in 16 Washington Street; and 17 WHEREAS, funds appropriated in the lQQ4/Q5 Budget for replacement of the existing 18 pipeline in Christiansen Way are available in the amount of 8316,285; and 19 NOW, THEREFORE, BE IT RESOLVED, by the Board of Directors of the Carlsbad Municipal 20 Water District of Carlsbad, California as follows: 21 1. That the above recitations are true and correct. 22 2. That the plans and specifications with a cost estimate of $120,000 submitted by 23 the Carlsbad Municipal Water District engineering staff which are on file with the Carlsbad Municipal Water 24 District are incorporated herein by reference and are accepted. 25 3. The project share cost for Carlsbad Municipal Water Distriit is 847223.70 based 26 on the low bid submitted by Douglas E. Barnhart, Inc., the contractor for the North County Transit District 27 Carlsbad Village Transit Center. 28 4. That the funds in the amount of $316,265 for replacement of the existing pipeline 1 -. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 20 21 22 23 24 25 26 27 28 in Christiansen Way from Washington Street to Carlsbad Boulevard have been appropriated and are available in the Capital Replacement Fund, project no. 3404. PASSED, APPROVED AND ADOPTED at a special meeting of the Carlsbad Municipal Water District held on the 25 t h day of APRIL , 1995, by the following vote to wit: AYES: Board Members Lewis, Kulchin, Finnila, Hall NOES: None ABSENT: Board Member Nygaar ATTEST: ALETHA L RAUTE (SEW CMWD 93-602