HomeMy WebLinkAbout1996-04-10; Municipal Water District; 0410.03; San Marcos Creek Dam.. Z 0 F n pc a 0 m Y 4B# 0410-03 TITLE: MTG. 04/10/96 DEPT. CMWD - SAN MARCOS CREEK DAM DEPT. HD. CITY ATPI. CITY MGR. This is a discussion item only. No recommendation is requested at this time. ITEM EXPLANATION: The District Engineer will make a presentation concerning the possibility of building a dam on San Marcos Creek. PRELIMINARY SITE EVALUATION FOR CONSTRUCTION OF SAN MARCOS CREEK DAM DAM CHARACTERISTICS HEIGHT: 175 feet CREST LENGTH: 400 feet BASE WIDTH: 550 feet EARTH VOLUME: ACCESS ROAD: 277,000 CY - Reinforced Concrete Face With Rockfill Piragua Street - Vista Bonita STORAGE CAPACITY: 1,640 ACRE-FEET APPURTENANT FACILITIES PUMP STATION: MAHR RESERVOIR: 600-feet elevation PIPELINE: 7,000 feet of 12-inch PRESSURE FILTERS CHLORINATION SYSTEM 700 gpm at 500-feet TDH using 120 HP motors Chemical Water Condition Reference Standards TDS 536 mg/L to 4OOO mg/L Max 750 to 1500 mg/L PH 7.70 6.5 to 8.5 Fecal Coliform Bacteria 1,600 per 100 ml 1 per 100 ml NITRATE as NO, 10.5 mg/L (C00-15mg/L) 10 mgll (Max DO- 5mg/L) PHOSPHATE 1.64 mg/L 1.95 mg/L (High levels of nutrients will encourage the growth of algae, cause for low oxygen levels) Some heavy metals were found in high concentrations. CONSIDERATION FOR UVE STREAM DISCHARGE FROM MEADOWLARK WRP TO IMPROVE WATER QUAUTY POSSIBLE USE OF WATER FOR IRRIGATION TRIBUTARY FLOW RATE No stream gage data available October, 1991 measurement at <0.6 cfs 100-YEAR STORM: 12,000 cfs 500-YEAR STORM: 19,000 cfs ! OTHER CONSIDERATIONS 1. PROJECT COST $9,OOO,OOO 2. ASSUMED WATER MELD - lo00 ACRE-FEET PER YEAR. (WATER USED ONLY FOR IRRIGATION). 3. WATER QUALITY MAY LIMIT THE USE OF THIS WATER SOURCE 4. TRIBUTARY FLOW IS LOW EXCEPT DURING STORM EVENTS 5. ALGAE GROWW ANTICIPATED RESULTING IN TOXICITY AND VISUAL AESTHETIC CONCERNS 6. COULD CONSIDER IMPROVING WATER QUAUTYAND FLOW RATE BY HAVlNG UVE STREAM DISCHARGE FROM MEADOWLARK WRP & AERATION 7. DIRECT IMPACT TO SAN MARCOS CREEK CONSERVED HABITAT 8. CONSTRUCTION IMPACTS TO LOCAL COMMUNITY COULD CONSIDER REVIEWING PROJECT IN MORE DETAIL IN 1996 MASTER PLAN PROCESS