Loading...
HomeMy WebLinkAbout1997-12-09; Municipal Water District; 398; Recoating of D1, D2, E & Elm Reservoirs, 9 zi 8 % 5 0 F 2 2 d a 4~ 3 TITLE: APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE NOTICE INVITING IIITG. 12-09-97 BIDS FOR THE RECOATING OF THE “Dl”, “D2”, “E”, AND ELM RESERVOIRS. CMWD PROJECT NO. 97-109 CITY ATTY. CITY MGR.a RECOMMENDED ACTION: Adopt Resolution No. J 0 0 y for approval of plans and specifications and authorization to advertise notice inviting bids for the recoating of the “Dl I’,” D2”,“E”, AND ELM Reservoirs, CMWD Project No. 97-109, Contract Nos. 35351 and 35291. ITEM EXPLANATION: This project involves removing the existing coal tar coating and installing a new epoxy coating for two recycled water tank reservoirs (“,I” and I‘D,“) and two potable water tank reservoirs (“E” and Elm). The recycled water tank reservoirs will be coated on the interior only and the potable water tank reservoirs will be coated on the interior and exterior. The reservoirs are in various locations in Carlsbad and are shown on the attached location map. In the 1997/98 Budget, the Board of Directors appropriated funds for removing the existing coating and installing a new coating for the “Dl” and “D2” reservoirs in the amount of $250,000 and for the “E” and Elm reservoirs in the amount of $340,000. Staff recommends proceeding with the proposed construction to recoat the “Dl”, “D2”, “E”, and Elm Steel Tank Reservoirs. The Carlsbad Municipal Water District has prepared plans and specifications to remove the existing coating and installing a new coatings on these four reservoirs. These plans are available for review. In accordance with Section 3.28.080 of the Municipal Code, an Invitation to Bid will be published, and the contract will be awarded to the lowest responsive, responsible bidder subject to the Board of Director’s approval. Construction is anticipated to require approximately one hundred eighty (180) calendar days from the date of issuance of the Notice to Proceed. FISCAL IMPACT: The engineer’s estimate for construction of this project is $590,000. This includes $250,000 for rehabilitation of the recycled water reservoirs and $340,000 for the potable water reservoirs. Construction inspection services are estimated to cost $50,000. Total project cost is $640,000. To date, funds in the amount of $640,000 have been appropriated for reservoir recoating. Therefore, there are sufficient funds available for this project. ENVIRONMENTAL IMPACT: IEPT. CMWD CONTRACT NOS. 35351 AND 35291 The Planning Director has determined the project is categorically exempt under CEQA Guidelines, Section 15.301. A Coastal Commission permit is not required for this project. / Page 2 of Agenda Bill No. 3 ?& EXHIBITS: 1. 2. Location Map Resolution No. 100 4 for approval of plans and specifications and authorization to advertise notice inviting bids for the recoating of the “Dl”, “D2”, “El’, and Elm Reservoirs, CMWD Project No. 97-109, Contract Nos. 35351 and 35291. 2 LOCATION MA; ELM RESERVOIR 0 RESERVOIRS TO BE REHABILITATED Project Name: Dl, D2, E, AND ELM RESERVOIRS COATING REHABILITATION Project Exhibit No. No. 97-109 1 3 1 2 3 4 5 6 7 a 9 10 11 12 13 14 15 16 17 ia 19 20 21 22 23 24 25 26 27 28 EXHIBIT 2 RESOLUTION NO. 1004 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT, CARLSBAD, CALIFORNIA, FOR APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE NOTICE INVITING BIDS FOR THE RECOATING OF THE “Dl”, “DZ”, “E”, AND ELM RESERVOIRS, CMWD PROJECT NO. 97- 109-CONTRACT NOS. 35351 AND 35291 WHEREAS, the Board of Directors of the Carlsbad Municipal Water District of Carlsbad, California, has determined it necessary and in the public interest to approve the plans and specifications and to authorize an advertisement for notice inviting bids for the Recoating of the “Dl”,“D2”,“E”, AND ELM Reservoirs, CMWD Project No. 97-109-Contract Nos. 35351 and 35291; and WHEREAS, funds appropriated in the 1997/98 Fiscal Year Budget for water facility upgrades in the amount of $640,000 are available; and WHEREAS, plans and specifications for “Dl”,“D2”,“E”, and Elm Reservoirs Recoating, CMWD Project No. 97-109, have been prepared by the Carlsbad Municipal Water District engineering staff with a cost estimate of $640,000, which includes $50,000 for construction inspection services, and are on file in the Engineering Department of the Carlsbad Municipal Water District; and NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Carlsbad Municipal Water District of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the plans and specifications and cost estimate of $640,000 submitted by the Carlsbad Municipal Water District engineering staff which are on file with the Carlsbad Municipal Water District Engineering Department are incorporated herein by reference and are accepted. Ill Ill . 1 i I l( 11 1: 1: 14 15 16 17 la 19 20 21 22 23 24 25 26 27 28 3. That the Secretary be authorized to publish an invitation to bid in accordance with Section 3.28.080 of the Municipal Code. PASSED, APPROVED, AND ADOPTED at a special meeting of the Board of Directors of the Carlsbad Municipal Water District of Carlsbad, California held on 9th day of December , 19 97 , by the following vote to wit: AYES: Board Members Lewis, Finnila, Nygaard, Kulchin and Hall NOES: None ABSENT: None ATTEST: (lLl.aL #?,,2.- ALETHA L. RAUTENKRANZ, Secretary (SEAL) CMWD 97-109