Loading...
HomeMy WebLinkAbout1999-07-27; Municipal Water District; 450; Authorization of Purchase of Pipeline Material-I : (r ,1 CARLSBAD MUNICIPAL WATER DISTRICT --4GENDA BILL AB # 450 TITLE: MTG. 7/27/w AUTHORIZATION FOR PURCHASE OF DEPT. PTTR PIPELINE MATERIAL FOR CAPITAL PROJECT NO. 3824 RECOMMENDED ACTION: Staff recommends the Board adopt Resolution No. /o b / authorizing the purchase of pipeline material for the construction of Santa Fe II Transmission Main Relocation, CMWD Project No. 99-103., capital project number 3824. ITEM EXPLANATION The Santa Fe II Reservoir is located south of Palomar Airport Road near Ranch0 Santa Fe Road in the City of San Marcos. A land development project referred to as Meadowlark Estates is now under construction around the reservoir. The existing transmission main to the reservoir is located within an easement. The grading operations, for Meadowlark Estates, call for construction of a large earthen embankment containing a new major road called White Sands Drive and a large concrete culvert to convey surface runoff through the earthen embankment. The toe of the earthen embankment is adjacent to the existing transmission main making access to this major facility hazardous and difficult. In addition, the storm drain culvert redirects runoff directly to the transmission main resulting in significant erosion of the cover material over the transmission main. Staff has reviewed this situation and recommends relocating approximately 2800 feet of the transmission main to White Sands Drive. Benefits of this relocation are: First, this will enable operations and maintenance staff to reach the pipeline and its valves directly from a road way surface. Second, this will eliminate the need to construct major erosion control measures in a sensitive habitat area to protect the transmission main. Third, this will eliminate the potential of damaging the large earthen embankment should a break occur in the transmission main. Because Meadowlark Estates is under construction and there is a long lead time to receive the needed material, it is recommended that the pipeline material be preordered. The pre-ordered material consists of 54-forty foot long, and 52-twelve foot long sections of 36-inch diameter cement mortar lined and coated steel pipe. In accordance with Section 3.28.120 of the Municipal Code, Notice to Bidders was published and Requests for Bid (RFB) were sent to three vendors. Two responsive bids were received. The lowest responsive bid was received from Ameron International. Bid tabulation follows: Ameron International Northwest Pipe Company ENVIRONMENTAL REVIEW $170,245.00 $198,507.00 The Planning Director has reviewed this project and EIA99-01 Negative Declaration was published on February 15, 1999. FISCAL IMPACT The developer of Meadowlark Estates, Lennar Homes, is willing to install the relocated pipeline by reimbursement agreement. This agreement is now in preparation and will be submitted to the Board for approval in the near future. The Board directed the Finance Department to appropriate funds for the purchase of this material in CMWD Resolution No. 1055, dated June 8, 1999. Funds in the amount of $450,000 have been appropriated for this project. EXHIBITS Location Map. Resolution No. /OO/ I n a E 2 g I- a t) 0 I .= \ P .I c I3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 1061 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT OF CARLSBAD CALIFORNIA, AUTHORIZING THE PURCHASE OF PIPELINE MATERIAL. WHEREAS, the Carlsbad Municipal Water District requires the purchase of pipeline material for the construction of the Santa Fe it Transmission Main Relocation, CMWD Project No. 99-103, and; ._ WHEREAS, funds appropriated by the Bodrdl fbr th&u&e it-t Resolution No. 1055 are available; .( .,. . :‘,-? NOW, ‘&@&RE, BE IT RESOLVED by the Board of l%x?ctors of the Carlsbad “. Municipal Water Di&ict of Carlsbad, California as f&llows: lf ?‘he Purchasing Officer is hereby authorked and directed to is&@ +I purchase (. or&# @‘tieron Internation+ fc% pipeline mat&-i&. ~, : ; PASSED, APPR6Vlk, ikjb ADOPTEa at $ sprkial meeting of the Board of Directors of the Carlsbad Murkpal W&k&$ District of ~w&$l$d, California held-on the, ‘: * . 27 th day of _’ ,’ Ally , ? 99!J, by ttK, fooll@@tg votk ta wit: AYES: Board Mer&er;s LetifS, Pfygaard, Binnila, Hall & Kulhin NOES: None ABSENT: None ATTEST: ALETHA L. RAUTENKRANZ, Secretary (SEAL)