Loading...
HomeMy WebLinkAbout2002-11-19; Municipal Water District; 543; Reimbursement Agreement with Calavera Hills II LLCB# 543 w: APPROVE AND AUTHORIZE EXECUTION OF REIMBURSEMENT AGREEMENT WITH CALAVERA HILLS 11, LLC, DEPT. HfF ITG. 1 1 /I 9/02 RECOMMENDED ACTION: CITY MGR- CANNON ROAD REACH 3, PROJECT NOS. 38781, 38871, AND 38921 EPT. ENG CITY ATTY. @ FOR WATER AND RECYCLED WATER PIPELINE IMPROVEMENTS WITHIN COLLEGE BOULEVARD REACH B & C AND Carlsbad Municipal Water District Board of Directors: Adopt Resolution No. 1172 approve and authorize execution of a reimbursement agreement with Calavera Hills 11, LLC, for to water and recycled water pipeline improvements within College Boulevard Reach B & C and Cannon Road Reach 3, Project Nos. 38781,38871, and 38921. ITEM EXPLANATION: Calavera Hills II, LLC, is the developer for College Boulevard Reach B and C and Cannon Road pipelines plus pressure reducing stations at the request of the District as a part of the water and Reach 3. They will be constructing 16-inch and 12-inch diameter potable water and recycled water oversized from an 8-inch diameter pipeline size. recycled water master plans. Portions of the 12-inch diameter recycled water pipeline was As a condition of project approval, Calavera Hills II, LLC, is required to construct within College Boulevard Reach B and C and Cannon Road Reach 3, the water and recycled water pipelines. The pipeline plans are shown on City Drawing No. 390-9, Sheets 37 through 41 and City cost estimate of $1,800,000 for the water and recycled water pipeline improvements. Drawing No. 404-7, Sheets 1 through 33. Calavera Hills II, LLC, has provided a reimbursement District Ordinance No. 26 provides for a reimbursement agreement on facilities greater in size than what is required to serve the development. Calavera Hills II, LLC, has agreed to construct the water and recycled water pipeline improvements through a reimbursement agreement with the District. ENVIRONMENTAL REVIEW: An Environmental Impact Report (EIR 98-02), was certified by the City Council on January 15, 2002 by Resolution No. 2002-016. These CEQA documents identify no environmental impact related to the activities referenced in the reimbursement agreements. FISCAL IMPACT The total cost for the work covered by the reimbursement agreements is estimated at $1,800,000 and will be paid from the projects as shown below: TABLE 1 1 Page 2 of Agenda Bill No. 543 Water Connection Fee Funds totaling $750,000 were appropriated in the 2002-03 Capital project costs are estimated at $900,000; therefore, an additional appropriation of $l50,000 is Improvement Program for the domestic water lines and pressure reducing stations. The total required from the Water Connection Fund. There are sufficient funds available for this appropriation. TABLE 2 The 16" and 12" recycled water pipelines are part of Phase II of the Encina Basin Water Reclamation Project. The complete project includes a new 4 mgd advanced tertiary treatment facility as well as necessary transmission and distribution systems. The total recycled water project will cost approximately $37 million of which Council previously appropriated $15.8 million from the Recycled Operations Fund for pressure reducing stations and various pipeline improvements available from the initial appropriation for this reimbursement. including the recycled pipeline in this reimbursement agreement. There are sufficient funds EXHIBITS: 1. Location Map - Domestic Water. 2. Location Map - Recycled Water. 3. agreement with Calavera Hills II, LLC, for water and recycled water pipeline improvements Resolution No. 1172 approve and authorize execution of a reimbursement within College Boulevard Reach B & C and Cannon Road Reach 3, Project Nos. 38781, 38871, and 38921. I EXHIBIT I CALAVERA HILLS PHASE /I BOUNDARY PROPOSED IMPROVEMENTS 11 CANNON ROAD REACH 3AND COLLEGE BOULEVARD REACH B & C RECYCLED WATER PIPELINES LOCATION MAP EXHIBIT 2 CALAVERA HILLS PHASE I/ BOUNDARY PROPOSED IMPROVEMENTS CANNON ROAD REACH 3AND COLLEGE BOULEVARD REACH B & C DOMESTIC WATER PIPELINE LOCATION MAP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 II RESOLUTION NO. 1172 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD MUNICIPAL WATER DISTRICT (CMWD) TO APPROVE AND AUTHORIZE EXECUTION OF A REIMBURSEMENT AGREEMENT WITH CALAVERA HILLS 11, LLC, FOR WATER AND RECYCLED WATER PIPELINE IMPROVEMENTS WITHIN COLLEGE BOULEVARD REACH B AND c AND CANNON ROAD REACH 3, PROJECT NOS. 38781, 38871, AND 38921. WHEREAS, Calavera Hills II, LLC, is the developer of the College Boulevard Reach B and C and Cannon Road, Reach 3 project; and WHEREAS, at the request of the Carlsbad Municipal Water District (CMWD), 16-inch and 12" diameter pipeline and two pressure reducing stations were designed by P&D Consultants and Daniel Boyle Engineering in College Boulevard Reach B and C and Cannon Road Reach 3: and WHEREAS, Calavera Hills 11, LLC, has requested the Board of Directors to approve a reimbursement agreement for the costs of constructing pipeline and pressure reducing station improvements: and WHEREAS, an Environmental Impact Report (EIR 98-002) was approved for the College Boulevard Reach B and C and Cannon Road Reach 3, including utilities by the City Council on July 15,2002; and WHEREAS, the total cost for the 16-inch and 12" diameter domestic water and recycled water pipeline and two pressure reducing station improvements is $1,800,000; and WHEREAS, an additional $150,000 is needed to construct the domestic pipelines: and WHEREAS, there are sufficient funds available in the Water Connection Fee Fund to appropriate the funds needed for the pipeline improvements. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of Carlsbad Municipal Water District (CMWD) of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the agreement between the District and Calavera Hills II, LLC, for the reimbursement of costs for domestic water and recycled water pipeline and pressure reducing station improvements within College Boulevard and Cannon Road is hereby approved and the President is authorized to execute said agreement on behalf of the District. k ./ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 3. That an appropriation in the amount of $150,000 is approved from the Water :onneetion Fee Fund for the domestic water pipelines. PASSED, APPROVED AND ADOPTED at a special meeting of the Carlsbad Municipal Vater District held on the J%A day of NOVEMBER , 2002 by the following vote, to wit: AYES: Board Members Lewis, Kulchin, Finnila, Nygaard, Hall NOES: None in'EST: CMWD Resolution No. 1172 Page 2 of 2 (SEAL) b