Loading...
HomeMy WebLinkAbout2003-08-19; Municipal Water District; 555; Construction of Water Recycling Facility Pipelinen W LT 6 2 e .. z 0 F 0 a n a a 0 48# 555 MTG. a/i 9/03 CARLSBAD MUNICIPAL WATER DISTRICT - AGENDA BILL TITLE: AUTHORIZATION TO ADVERTISE FOR BIDS FOR CONSTRUCTION OF THE CARLSBAD WATER RECYCLING FACILITY PIPELINE TO “D TANKS REACHES 1 & 3, FOR THE ENCINA BASIN WATER RECLAMATION PROGRAM, PHASE II PROJECT, CITY ATT A Engineer’s Estimate Inspection, Testing and Construction Management (5%) Construct ion Con t i n g en c i es (5%) TOTAL PIPELINE COST Pavement Overlay (Project No. 36671) Engineer’s Estimate Inspection, Testing and Construction Management (1 0%) Construction Contingencies (1 0%) TOTAL PAVEMENT OVERLAY COST TOTAL PROJECT COST I IClTY MGR. -m DEPT. ENG PROJECT NO. 38871 -A $3,640,000 $1 82,000 $1 82,000 $4,004,000 $451,000 $45,100 $45,100 $541,200 $4,545,200 RECOMMENDED ACTION: Adopt Resolution No. 1190 approving plans and specifications and authorizing the District Secretary to the Board to advertise for bids for the construction of the Carlsbad Water Recycling Facility Pipeline to “D” Tanks Reaches 1 & 3, for the Encina Basin Water Reclamation Program, Phase II Project, Project No. 38871 -A. ITEM EXPLANATION: The Carlsbad Water Recycling Facility (CWRF) Pipeline to “D” Tanks Reaches 1 & 3 construction contract is part of the Encina Basin Water Reclamation Program, Phase II Project (Phase 11). These pipelines will increase the capacity of the recycled water system from 3 mgd to 8 mgd by connecting the CWRF, currently under construction, to the recycled water system and will provide recycled water to Phase II customers. Included in this contract are approximately 6,900 feet of 24-inch transmission main, approximately 17,300 feet of distribution pipeline ranging from 4-inch to 12-inch, in addition to a pressure reducing station located on Avenida Encinas. The project design also includes a full-width pavement overlay for a reach of Paseo del Norte and Camino del Parque to minimize community impacts. ENVIRONMENTAL REVIEW: The pipeline project is a part of the Phase II project. A Mitigated Negative Declaration (MND) was prepared for the Phase II project. The Carlsbad City Council approved the MND on January 25, 2000 under Case No. EIA 99-09, Resolution No. 2000-37. The United States Department of the Interior completed its review of the Phase II project for compliance with the National Environmental Policy Act (NEPA) and formally approved the Phase II project on March 1, 2002. FISCAL IMPACT: On March 5, 2002, Agenda Bill No. 519/Resolution No. 1141 approved an appropriation of $15.8 million for the various pipelines in the Phase It project. On August 12, 2003, Agenda Bill No. 554/Resolution No. 11 89 approved an appropriation transfer of $1.9 million from the Recycling Facility project to the Pipelines project, resulting in a total appropriation of $17.7 million for the Phase II pipelines; therefore, there are sufficient appropriations available to construct this project. The project cost breakdown is as follows: I Page 2 of Agenda Bill No. 555 The pavement overlay will be funded with Proposition “A Local Funds (TransNet) from the Pavement Management Program, Project No. 36671. This pipeline is part of the overall Encina Basin Water Reclamation Program, Phase II shown the table below. in EXHIBITS: 1. Location Map. 2. Resolution No. 1190 approving plans and specifications and authorizing the District Secretary to the Board to advertise for bids for the construction of the Carlsbad Water Recycling Facility Pipeline to ‘ID” Tanks Reaches 1 & 3, for the Encina Basin Water Reclamation Program, Phase II Project, Project No. 38871 -A. DEPARTMENT CONTACT: Christopher Muehlbacher, (760) 602-2736, cmueh Bci.carlsbad.ca.us UNDER REIMBURSEMENT AGREEMENT PROPOSED RECYCLED WATERLINES (ORIGINAL AGREEMENT) 1-111----1- EXISTING RECYCLED WATERLINES DRAW BY: SCOTT EVANS, CARLSBAD ENGINEERING DEPT. 7/11/03 C: \CAPITAL\MUELBACHER\3887-IA.D~ 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 1190 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD MUNICIPAL WATER DISTRICT (CMWD), APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING THE DISTRICT SECRETARY TOADVERTISE FOR BIDS FOR THE CONSTRUCTION OF THE CARLSBAD WATER RECYCLING FACILITY PIPELINE TO "D TANKS REACHES 1 & 3, FOR THE ENCINA BASIN WATER RECLAMATION PROGRAM, PHASE II PROJECT, PROJECT 38871-A. WHEREAS, the Board of Directors of Carlsbad Municipal Water District has determined t necessary, desirable, and in the public interest to construct the Carlsbad Water Recycling Facility Pipeline to "D Tanks Reaches 1 & 3, for the Encina Basin Water Reclamation Program, Phase II Project, Project No. 38871-A; and WHEREAS, the Project includes a pavement overlay component for a reach of Paseo del Vorte and Camino del Parque to minimize community impacts; and WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, zquipment, transportation, and other expenses necessary or incidental to the Project have been wepared and are on file in the Engineering Department of the City of Carlsbad and are ncorporated by reference herein; and WHEREAS, there are sufficient funds appropriated in the Phase II Pipeline Project to :onstruct the pipeline component of the Project; and WHEREAS, there are sufficient funds appropriated in the Pavement Overlay Program 'roject No. 36671 to construct the pavement overlay component of the Project; and WHEREAS, a Mitigated Negative Declaration has been adopted by the City of Carlsbad Zity Council by Resolution 2000-37, dated January 25, 2000, as required by the California Environmental Quality Act; and WHEREAS, the United States Department of the Interior completed its review of the 'hase II project for compliance with the National Environmental Policy Act and formally approved he Phase II Project on March 1,2002; and I! I! 1 2 3 4 5 6 7 8 9 70 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of Carlsbad Municipal Water District as follows: 1. 2. That the plans, specifications, and contract documents, on file in the City Engineer’s office, as described above for the Carlsbad Water Recycling Facility Pipeline to ‘ID” Tanks Reaches 1 & 3, for the Encina Basin Water Reclamation Program, Phase II Project, Project No. 38871 -A are hereby approved. That the above recitations are true and correct. 3. The District Secretary of the Carlsbad Municipal Water District is hereby authorized and directed to publish, in accordance with State law, a Notice to Contractors Inviting Bids for the construction of the Carlsbad Water Recycling Facility Pipeline to “D” Tanks Reaches 1 & 3, Project No. 3887-1 A, in accordance with the plans, specifications, and contact documents referred to herein. PASSED, APPROVED AND ADOPTED at a special meeting of the Carlsbad Municipal Water District held on the 19th day of AUGUST , 2003 by the following vote, to wit: AYES: Board Members Lewis, Finnila, Kulchin, Packard NOES: None /I ABSENT: Boar CLAUDE A. LEWIS, Pres ATTEST t4%4tkLa, LORRAINE M. MOD, Secretab Page 2 of 2 of Resolution No. 1190 (SEAL)