HomeMy WebLinkAbout2003-12-02; Municipal Water District; 560; Construction of Twin D Recycled Water Pump StationP w 6 E .. 2 0 F n a m 2 p! 0 FOR THE ENCINA BASIN WATER RECLAMATION PROGRAM, PHASE II AUTHORIZATION TO ADVERTISE FOR BIDS FOR CONSTRUCTION OF THE TWIN D RECYCLED WATER PUMP STATION PROJECT, PROJECT NO. 3889 AND PROJECT NO. 3904 AND TITLE: B# 560 ITG. 12/02/03 EPT. ENG APPROPRIATEFRANSFER ADDITIONAL FUNDS TO PROJECT NO. 3889 I CITY DEpT*HKf%F ATTY CITY MGR. RECOMMENDED ACTION: Adopt Resolution No. ng6 approving plans and specifications and authorizing the District Secretary to the Board to advertise for bids for the construction of the Twin D Recycled Water Pump Station for the Encina Basin Water Reclamation Program, Phase II Project, Project No. 3889, and Project No. 3904 and appropriateAransfer additional funds to Project No. 3889. “\, ITEM EXPLANATION: Included in the Encina Basin Water Reclamation Program, Phase II Project (Phase II) are three recycled water pump stations: Twin D, Calavera, and Bressi. These pump stations will provide recycled water service to customers throughout the City. The Twin D Recycled Water Pump Station (Twin D RWPS) is a critical component of the Phase II project. This pump station will be capable of delivering water produced at the Carlsbad Water Recycling Facility (CWRF) for storage at Mahr Reservoir and the “C” Reservoir, in addition to providing recycled water to customers located at higher elevations. This facility will also be capable of transferring water from the higher-pressure zones back to the lower elevations. Included in this contract is an approximately 800 square foot, architecturally-designed building containing four vertical turbine pumps (three duty, one stand-by), a hydraulic surge arrestor system, on-site piping, landscaping improvements, frontage improvements to Black Rail Road, and an on-site pavement overlay. The Twin D RWPS will be on a District owned parcel which is generally located south of Poinsettia Lane on the east side of Black Rail Road. The property has been used as a District facility since 1958, and currently accommodates one 8.5 million gallon (MG) potable water tank, two 1.25 MG recycled water tanks, a chlorine storage and injection facility, a pressure reducing station, and a graded pad for a future 8.5 MG potable water tank. The Twin D RWPS will utilize the latest technology and will accommodate ultimate peak flows of the recycled water system. The pumping equipment includes four below ground pumps with above-ground motors placed within a masonry building. The structure has been designed to attenuate noise generation levels. ENVIRONMENTAL REVIEW: The Twin D RWPS is a part of the Phase II project. A Mitigated Negative Declaration (MND) was prepared for the Phase II project. The Carlsbad City Council approved the MND on January 25, 2000 under Case No. EIA 99-09, Resolution No. 2000-37. The United States Department of the Interior completed its review of the Phase II project for compliance with the National Environmental Policy Act (NEPA) and formally approved the Phase II project on March 1,2002. The Planning Commission approved a Conditional Use Permit (CUP 03-15) and a Coastal Development Permit (CDP 03-23) on October 1, 2003 by Planning Commission Resolution Nos. 5443 and 5444, respectively. I Page 2 of Agenda Bill No. 560 Construction (Engineer's Estimate) Contingencies Inspection, Testing and Construction Management TOTAL COST FISCAL IMPACT: $1,034,000 103,400 72,400 $1,209,800 The engineer's estimated cost to construct the Twin D RWPS is shown in Table 1, which totals $1,209,800. 1. 2. 3. 4. Total Design Cost TOTAL COST OF ALL PUMP STATIONS EXISTING APPROPRIATION TRANSFER OF EXISTING APPROPRIATIONS FROM 38091 AND 38881 ADDITIONAL PUMP STATION APPROPRIATION REQUIRED Twin D Recycled Water Pump Station (Engineer's Estimate) Calavera Recycled Water Pump Station (Preliminary Estimate) Bressi Recycled Water Pump Station (Preliminary Estimate) TABLE 1 $1,209,800 882,100 1 ,I 70,700 554,300 $3,816,900 2,600,000 61 0,000 $606,900 The remaining Phase II recycled water pump stations, Calavera and Bressi, are still in the design phase. Although the final Engineer's Estimates to construct these pump stations has not been prepared, preliminary estimates indicate that Calavera will cost approximately $882,100 and Bressi will cost approximately $1,170,700. The estimated total cost for all three pump stations is shown in Table 2. This project is part of the overall Encina Basin Water Reclamation Program, Phase II Project. Previous appropriations for this overall project total $38.2 million. The project is being funded from a Bureau of Reclamation Grant, a State Water Resources Control Board Grant and low-interest loan, and an EPA Grant. Council previously approved advances in the amount of $14.5 million from the R Water Replacement Fund to provide cash up front for the project. This advance is expected to be repaid once the loan and grant funds are received. Additional appropriations are being requested with this agenda bill and for another agenda bill before the Council on this date, both for Recycled Water Phase II projects. The combined additional appropriations equal $2,755,900. Funding will be provided by increasing the State Water Resource Control Board Loan by this amount. Since this is a significant increase in the total project cost, staff updated the revenue and expense projections (cash flows) to determine the impact this increase would have on the future operations of the program. In addition to this $2,755,900 increase, the anticipated federal grant funding was reduced by approximately $4 million due the uncertainty of funding beyond the current fiscal year. Therefore, the additional loan amount could be as high as $7 million. Page 3 of Agenda Bill No. 560 On February 12, 2002, Council was provided information about the projected revenues and expenses for the Recycled program. At that time it was estimated that an annual operating deficit of approximately $800,000 was likely once the project was complete. With the additional costs and changes in anticipated funding, the deficit is now expected to be about $1 million per year, thus requiring additional funding from potable water revenues and/or an increase in the water rate. This deficit could be reduced if additional federal grant money is obtained, or if final project costs are lower than what is being appropriated. EXHIBITS: 1. Location Map. 2. Resolution No. 1196 approving plans and specifications and authorizing the District Secretary to the Board to advertise for bids for the construction of the Twin D Recycled Water Pump' Station for the Encina Basin Water Reclamation Program, Phase I1 Project, Project No. 3889, and Project No. 3904 and appropriate/transfer additional funds to Project No. 3889. DEPARTMENT CONTACT: Christopher Muehlbacher, (760) 602-2736, cmueh8ci.carlsbad.ca.us 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 1196 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD MUNICIPAL WATER DISTRICT (CMWD), APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING THE DISTRICT SECRETARY TOADVERTISE FOR BIDS FOR THE CONSTRUCTION OF THE TWIN D RECYCLED WATER PUMP STATION FOR THE ENCINA BASIN WATER RECLAMATION PROGRAM, PHASE II PROJECT, PROJECT 3889, AND PROJECT NO. 3904 AND APPROPRlATEflRANSFER ADDITIONAL FUNDS TO PROJECT NO. 3889. WHEREAS, the Board of Directors of Carlsbad Municipal Water District has determined t necessary, desirable, and in the public interest to construct the Twin D Recycled Water Pump Station, for the Encina Basin Water Reclamation Program, Phase II Project, Project No. 3889 and 'reject No. 3904; and WHEREAS, the plans and specifications for furnjshing of all labor, materials, tools, ?quipment, transportation, and other expenses necessary or incidental to the Project have been irepared and are on file in the Engineering Department of the City of Carlsbad and are ncorporated by reference herein; and WHEREAS, funding in the amount of $2.6 million was appropriated for the Phase II qecycled Water Pump Station, Project 3889; and WHEREAS, the estimated cost to date for the Phase II Recycled Water Pump Station is ;3,816,900; and WHEREAS, a Mitigated Negative Declaration has been adopted by the City of Carlsbad Zity Council by Resolution 2000-37, dated January 25, 2000, as required by the California Znvironmental Quality Act; and WHEREAS, the United States Department of the Interior completed its review of the 'hase II Project for compliance with the National Environmental Policy Act and formally approved he Phase II Project on March 1,2002; and WHEREAS, the Planning Commission has approved a Conditional Use Permit CUP 03-15) and a Coastal Development Permit (CDP 03-23) on October 1, 2003 by Planning :ommission Resolution Nos. 5443 and 5444, respectively. I t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of Carlsbad Municipal Water District as follows: 1. 2. That the plans, specifications, and contract documents, on file in the City Engineer’s office, as described above for the Twin D Recycled Water Pump Station, for the Encina Basin Water Reclamation Program, Phase II Project, Project No. 3889, and Project No. 3904, are hereby approved. That the above recitations are true and correct. 3. The District Secretary of the Carlsbad Municipal Water District is hereby authorized and directed to publish, in accordance with State law, a Notice to Contractors Inviting Bids for the construction of the Twin D Recycled Water Pump Station, Project No. 3889 and Project No. 3904, in accordance with the plans, specifications, and contract documents referred to herein. 4. Project No. 3889. 5. That an additional $606,900 shall be appropriated from the Recycled Water Fund to That Recycled Water Funds shall be transferred from existing Recycled Water Fund projects to Project No. 3889: $210,000 from the Mahr Reservoir Project No. 3890 and $400,000 from the Flow Equalization Project No. 3888. PASSED, APPROVED AND ADOPTED at a special meeting of the Carlsbad Municipal Water District held on the 2nd day of December , 2003 by the following vote, to wit: AYES: Board Members Lewis, Finnila, Kulchin, Hall and Packard NOES: None ATTEST (SEAL) Page 2 of 2 of Resolution No. 1196 (CMWD) LO CAT1 0 N PROJECT NAME ENClNA BASIN WATER RECLAIMATION PROGRAM, PHASE I1 PROJECT WIN 'D'RECYCLED WATER PUMP STATION MAP PROJECT EXHIBIT NUMBER 7 3889 Y