HomeMy WebLinkAbout2004-06-08; Municipal Water District; 568; Calavera recycled water pump stationn w U Q 6 a a .. z 0 F 0 a n e a 0 m AB# 568 WTG. 6/08/04 DEPT. ENG t TITLE: AUTHORIZATION TO ADVERTISE FOR BIDS FOR CONSTRUCTION OF THE CALAVERA RECYCLED WATER PUMP STATION FOR THE ENCINA BASIN WATER RECLAMATION PROGRAM, PHASE II PROJECT, PROJECT NO. 3889 CITY ATTY. CITY MGR- RECOMMENDED ACTION: Construction (Engineer's Estimate) $981,000 Contingencies (1 0%) 98,000 Inspection, Testing and Construction Management (7%) 70,000 , TOTAL COST $"i149,OOO Adopt Resolution No. 1211 approving plans and specifications and authorizing the District Secretary to the Board to advertise for bids for the construction of the Calavera Recycled Water Pump Station for the Encina Basin Water Reclamation Program, Phase II Project, Project No. 3889. ITEM EXPLANATION: Included in the Encina Basin Water Reclamation Program, Phase II Project (Phase II) are three recycled water pump stations: Twin D, Calavera, and Bressi. These pump stations are used to provide pressure for the recycled water customers throughout the City. The Calavera Recycled Water Pump Station (Calavera RWPS) is a critical component of the Phase II project that provides recycled water to the Calavera Hills area 580-pressure zone. Included in this contract is an approximately 700 square foot, architecturally-designed building containing three vertical turbine pumps (two duty, one stand-by), a hydraulic surge arrestor system, and on-site piping. This pump station will be located on a District-owned fee parcel within the Calavera Hills Village "X" Carlsbad Tract CT 01 -06. The Calavera RWPS will utilize the latest technology and will accommodate ultimate peak flows of the recycled water system. The pumping equipment includes three below ground pumps with above-ground motors placed within a masonry building. The structure has been designed to attenuate noise generation levels and be architecturally compatible with the surrounding development. ENVIRONMENTAL REVIEW: The Calavera RWPS is a part of the Phase II project. A Mitigated Negative Declaration (MND) was prepared for the Phase II project. The Carlsbad City Council approved the MND on January 25, 2000 under Case No. EIA 99-09, Resolution No. 2000-37. The United States Department of the Interior completed its review of the Phase II project for compliance with the National Environmental Policy Act (NEPA) and formally approved the Phase II project on March 1.2002. The Planning Commission approved a Conditional Use Permit (CUP 03-30) on May 19, 2004 by Planning Commission Resolution No. 5628. FISCAL IMPACT: The engineer's estimated cost to construct the Calavera RWPS is shown in Table 1, which totals $1,149,000. TABLE 1 The Bressi RWPS is still in the design phase; whereas, the Twin D RWPS is being presented for construction contract award under a separate agenda bill. The estimated total cost for all three recycled water pump stations is shown in Table 2. Page 2 of Agenda Bill No. - 58 TABLE 2 PROJECT COST SUMMARY OF ALL PHASE II PROJECT RECYCLED WATER PUMP STATIONS Under the agenda bill awarding the contract for construction of the Twin D RWPS, an additional appropriation is being requested for Project No. 3889. Upon the approval of the appropriations request, there are sufficient funds available to construct the Calavera RWPS. The recycled water pump stations are part of the Encina Basin Water Reclamation Program, Phase II that is being funded from federal and state grants and a state loan. EXHIBITS: 1. Location Map. 2. Resolution No. 1211 approving plans and specifications and authorizing the District Secretary to the Board to advertise for bids for the construction of the Calavera Recycled Water Pump Station for the Encina Basin Water Reclamation Program, Phase II Project, Project No. 3889. DEPARTMENT CONTACT: Christopher Muehlbacher, (760) 602-2736, cmueh @ci.carlsbad.ca.us , PROJECT NAME ENCINA BASIN WATER RECLAMATION PROGRAM, PHASE I1 CALAVERA RECYCLED WATER PUMP STATION LO CAT1 0 N PROJECT EXHIBIT NUMBER 3889 1 MAP SI +$- NOT To SCALE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 1211 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD MUNICIPAL WATER DISTRICT (CMWD), APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING THE DISTRICT SECRETARY TOADVERTISE FOR BIDS FOR THE CONSTRUCTION OF THE CALAVERA RECYCLED WATER PUMP STATION FOR THE ENCINA BASIN WATER RECLAMATION PROGRAM, PHASE II PROJECT, PROJECT 3889. WHEREAS, the Board of Directors of Carlsbad Municipal Water District has determined it necessary, desirable, and in the public interest to construct the Calavera Recycled Water Pump Station, for the Encina Basin Water Reclamation Program, Phase II Project, Project No. 3889; and WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, equipment, transportation, and other expenses necessary or incidental to the Project have been prepared and are on file in the Engineering Department of the City of Carlsbad and are incorporated by reference herein; and WHEREAS, there are sufficient funds available to construct this project; and WHEREAS, a Mitigated Negative Declaration has been adopted by the City of Carlsbad City Council by Resolution 2000-37, dated January 25, 2000, as required by the California Environmental Quality Act; and WHEREAS, the United States Department of the Interior completed its review of the Phase II Project for compliance with the National Environmental Policy Act and formally approved the Phase II Project on March 1,2002; and WHEREAS, the Planning Commission has approved a Conditional Use Permit (CUP 03-30) on May 19,2004 by Planning Commission Resolution No. 5628. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of Carlsbad Municipal Water District as follows: 1. That the above recitations are true and correct. Ill Ill Ill 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 2. That the plans, specifications, and contract documents, on file in the City Engineer's office, as described above for the Calavera Recycled Water Pump Station, for the Encina Basin Water Reclamation Program, Phase I1 Project, Project No. 3889 are hereby approved. 3. The District Secretary of the Carlsbad Municipal Water District is hereby authorized and directed to publish, in accordance with State law, a Notice to Contractors Inviting Bids for the construction of the Calavera Recycled Water Pump Station, Project No. 3889, in accordance with the plans, specifications, and contract documents referred to herein. PASSED, APPROVED AND ADOPTED at a special meeting of the Carlsbad Municipal Water District held on the 8th day of June , 2004 by the following vote, to wit: AYES: Board Menbers Lewis, Finnila, Kulchin, Hall and Packard NOES: None fl CLAUDE A. LEWIS; resaen'll 'v - - ATTEST (SEAL) Resolution No. 1211 Page Two 4