HomeMy WebLinkAbout2004-09-28; Municipal Water District; 575; Award of Contract: Calavera Water Stationa W M a a 4 & .. z 0 F 0 a n p! a 0 m 57 5 4B# UlTG. 9/28/04 IEPT. ENG I CARLSBAD MUNICIPAL WATER DISTRICT - AGENDA BILL TITLE: AWARD OF CONTRACT FOR THE CONSTRUCTION OF DEPT. HD.A CITY ATTY.ā€™ CITY MGR. THE CALAVERA RECYCLED WATER PUMP STATION FOR THE ENCINA BASIN WATER RECLAMATION PROGRAM, PHASE II PROJECT, PROJECT NO. 3889 CONTRACT0 R LOCATION 1. Falcon General Engineering Vista 2. Zondiros Corporation San Marcos 3. TC Construction Santee RECOMMENDED ACTION: Adopt Resolution No. accepting bids and awarding a contract for the construction of the Calavera Recycled Water Pump Station for the Encina Basin Water Reclamation Program Phase II Project, Project No. 3889. BID AMOUNT $1,022,420 $1,209,000 $1,326,000 ITEM EXPLANATION: Included in the Encina Basin Water Reclamation Program, Phase II Project (Phase II) are three recycled water pump stations: Twin D, Calavera, and Bressi. These pump stations will provide recycled water service to customers throughout the City. The Calavera Recycled Water Pump Station (Calavera RWPS) is a critical component of the Phase II project that provides recycled water to the Calavera Hills area 580-pressure zone. Included in this contract is an approximately 700 square foot, architecturally-designed masonry building containing three vertical turbine pumps (two duty, one stand-by), a hydraulic surge arrestor system, and on-site piping. This pump station will be located on a District-owned parcel within the Calavera Hills Village ā€œXā€ Carlsbad Tract CT 01 -06. The Calavera RWPS will utilize the latest technology and will accommodate ultimate peak flows of the recycled water system. The pumping equipment includes three below-ground pumps with above-ground motors placed within a masonry building. The structure has been designed to attenuate noise generation levels and be architecturally compatible with the surrounding develop men t . The Calavera RWPS is a part of the Phase II project. A Mitigated Negative Declaration (MND) was prepared for the Phase II project. The Carlsbad City Council approved the MND on January 25, 2000 under Case No. EIA 99-09, Resolution No. 2000-27. The United States Department of the Interior completed its review of the Phase II project for compliance with the National Environmental Policy Act (NEPA) and formally approved the Phase II project on March 1, 2002. The Planning Commission approved a Conditional Use Permit (CUP 03-30) on May 19, 2004 by Planning Commission Resolution No. 5628. Page 2 of Agenda Bill No. 575 FISCAL IMPACT: EST1 M ATE D COSTS Construction Contract $ 1,022,420 Construction Contingencies (1 Oo/o) 100,000 100,000 GRAND TOTAL $ 1,222,420 CALAVERA RECYCLED WATER PUMP STA. - SCHEDULE A Inspection, Testing and Construction Management (1 0%) This agenda item is awarding a construction contract. The tota, construction cost of FUNDING SOURCE Federal and State Grants he projec AMOUNT Twin D Recycled Water Pump Station (estimated project cost) $1,683,600 Calavera Recycled Water Pump Station (estimated project cost) 1,222,420 Bressi Recycled Water Pump Station (preliminary project estimate) 1,128,580 Consultant Engineering Support During Construction (Krieger & Stewart Agreement) 146,370 Total Design Cost 579,360 TOTAL PROJECT COST $4,760,330 CURRENT APPROPRIATIONS 4,760,330 ADDITIONAL APPROPRIATION REQUIRED $0 - being awarded, which includes a recycled water pump station and appurtenances, is $1.22 million as shown below in Table 1. The original Engineer's Estimate for this project was $1.15 million. The increase in project cost is primarily due to the significant rise in costs for Portland cement and steel, in addition to increases in other construction materials. The cost of the recycled water pump station is $1.22 million and will be funded by Federal and State grants and a State Loan. This is one of three recycled water pump stations included in the Recycled Water Phase II Program Project No. 3889. Based on updated estimates and the current bid proposal, the existing appropriations are sufficient to construct the three recycled water pump stations as shown in Table 2. EXHIBITS: 1. Location Map 2. R eso I ut ion N 0. 224 accepting bids and awarding a contract for the construction of the Calavera Recycled Water Pump Station for the Encina Basin Water Reclamation Program Phase II Project, Project No. 3889. DEPARTMENT CONTACT: Christopher Muehlbacher, (760) 602-2736, cmueh@ci.carlsbad.ca.us LOCATI 0 N MAP SI NOT TO SCALE TE \\\ I \/- \ n\ FK! OC xv I ,,;,,.; ..: .... ..:. '..'.' '. '._ '. :. l+-L-J \ CITY & ENCINITAS PROJECT NAME I PROJECT I EXHIBIT ENCINA BASIN WATER RECLAMATION PROGRAM, PHASE I1 NUMBER CALAVERA RECYCLED WATER PUMP STATION I 3889 I 7 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 1224 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD MUNICIPAL WATER DISTRICT (CMWD), ACCEPTING BIDS AND AWARDING A CONTRACT FOR THE CONSTRUCTION OF THE CALAVERA RECYCLED WATER PUMP STATION FOR THE ENCINA BASIN WATER RECLAMATION PROGRAM PHASE II PROJECT, PROJECT NO. 3889. WHEREAS, the Board of Directors of Carlsbad Municipal Water District has determined it necessary, desirable, and in the public interest to construct the Calavera Recycled Water Pump Station, for the Encina Basin Water Reclamation Program, Phase II Project, Project No. 3889; and WHEREAS, on June 8, 2004, the Board of Directors approved the plans and specifications for the construction of the Calavera Recycled Water Pump Station, Project No. 3889; and WHEREAS, three (3) sealed bids were received on August 2,2004 for the project; and WHEREAS, the lowest responsive, responsible bid for the project was submitted by Falcon General Engineering, in the amount of $1,022,420; and WHEREAS, Subsection 3.28.172(~)(1) of the Carlsbad Municipal Code authorizes the City Manager to approve change orders in the amount equal to the contingency set at the time of the bid award. WHEREAS, funding in the amount of $4,760,330 was appropriated for the Phase II Recycled Water Pump Stations, Project No. 3889; and NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of Carlsbad Municipal Water District (CMWD) of the City of Carlsbad, California, as follows: 1. 2. That the bid submitted by Falcon General Engineering, in the amount of $1,022,420, for the construction of the Calavera Recycled Water Pump Station for the Encina Basin Water Reclamation Program, Phase II Project, is hereby accepted and the Mayor is hereby authorized and directed to execute a contract therefor. That the above recitations are true and correct. 3. That the Executive Director is hereby authorized to approve construction change orders up to $100,000. Ill 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 c 18 19 20 21 22 23 24 25 26 27 28 4. That the award of this contract is contingent upon Falcon General Engineering, executing the required contract and submitting the required bonds and insurance policies, as described in the contract, within twenty (20) days of adoption of this resolution with the understanding that the Executive Director may grant reasonable extensions of time. PASSED, APPROVED AND ADOPTED at a special meeting of the Carlsbad Municipal Water District held on the 28th day of September , 2004 by the following vote, to wit: AYES: Board Members Lewis, Finnila, Kulchin, Hall and Packard NOES: None CLAUDE A. LEWl ATTEST 4 LO AlNE M. OOD, Secretary sā€Y (SEAL)