Loading...
HomeMy WebLinkAbout2008-08-05; Municipal Water District; 661; Maerkle Reservoir Access Bridge ReplacementTf3*f J AB# MTG. DEPT. •1/11 4CARLSBAD MUNICIPAL WATER DISTRICT - AGENDA BILL J^ 661 8/05/08 ENG APPROVAL OF PLANS AND AUTHORIZATION TO ADVERTISE FOR BIDS FOR THE CONSTRUCTION OF MAERKLE RESERVOIR ACCESS BRIDGE REPLACEMENT, PROJECT NO. 5006 DEPT. HEAD V? fjtf CITY ATTY. v(jfe? CITY MGR. C</~- RECOMMENDED ACTION: Adopt Resolution No.1331 approving plans and specifications for the construction of Maerkle Reservoir Access Bridge Replacement, Project No. 5006. ITEM EXPLANATION: Maerkle Dam reservoir and its auxiliary facilities are located in the northeast part of the City and are a critical part of the potable water supply system for the City. Maerkle Dam reservoir (formerly known as Squires Dam reservoir) was initially constructed in 1963. In the late 1980's and early 1990's, various auxiliary facilities were added, including a 10 million gallon concrete storage tank, transmission pipelines, a 33.5 million gallons per day pump station, and chlorination facilities. Various projects are underway at the site to replace the facilities that have reached the end of the useful life. Two agenda bills have been approved including September 18, 2007 - Award of contract for floating cover rainwater system replacement and cover cleaning; and June 24, 2008 - Authorization to advertise for chlorine gas scrubbers replacement. The subject project replaces the original wood access bridge to the dam. The wood access bridge is over 40 years old and the wood decking and stringers are beginning to disintegrate. The replacement of this bridge is necessary as this is the only access point to the dam and failure of the bridge would stop vehicular access to the dam for operation, maintenance, and repair. ENVIRONMENTAL IMPACT: This project is a Class 2 categorical exemption (replacement or reconstruction of existing structures or facilities) and is, therefore, exempt from environmental review pursuant to Section 15302 of the California Environmental Quality Act (CEQA). FISCAL IMPACT: The Engineer's Estimate for the cost to replace the wood bridge at Maerkle Reservoir is shown in Tablet TABLE 1 ITEM Design Cost Construction Cost Contingency for Construction (20%) Inspection for Construction (10%) Testing (5%) ESTIMATED PROJECT TOTAL COST CURRENT APPROPRIATION ADDITIONAL APPROPRIATION NEEDED ESTIMATED COSTS $50,000 $108,000 $21,600 $10,800 $5,400 $195,800 $300,000 $0 DEPARTMENT CONTACT: Eva Plajzer 760-602-2787 eplai@ci.carlsbad.ca.us FOR CITY CLERKS USE ONLY BOARD ACTION: APPROVED DENIED CONTINUED WITHDRAWN AMENDED D D D D CONTINUED TO DATE SPECIFIC D CONTINUED TO DATE UNKNOWN D RETURNED TO STAFF D OTHER - SEE MINUTES P Page 2 Sufficient funds exist in the Water Replacement Fund to replace the existing wood bridge. Staff recommends approving the plans and specifications and authorizing the City Clerk to advertise for bids for the construction of Maerkle Reservoir Access Bridge Replacement, Project No. 5006. EXHIBITS: 1. Location Map. 2. Resolution No. 1331 approving plans and specifications and authorizing to advertise for bids for the construction of Maerkle Reservoir Access Bridge Replacement, Project No. 5006. LOCATION MAP SITE NOT TO SCALE PROJECT NAME MAERKLE RESERVOIR ACCESS BRIDGE REPLACEMENT PROJECT PROJECT NUMBER 5006 EXHIBIT 1 3DRAWN BY: SCOTT EVANS, CARLSBAD ENGINEERING OEPT. 7/09/08 C: \CAPITAL\PLAJZEK\5006.DWG 1 RESOLUTION NO. 1331 2 A RESOLUTION OF THE BOARD OF DIRECTORS OF 3 CARLSBAD MUNICIPAL WATER DISTRICT (CMWD), APPROVING PLANS AND SPECIFICATIONS AND 4 AUTHORIZING TO ADVERTISE FOR BIDS FOR THE CONSTRUCTION OF MAERKLE RESERVOIR ACCESS BRIDGE 5 REPLACEMENT. PROJECT NO. 5006. 6 WHEREAS, the Board has determined it necessary and in the public interest to construct 7 the access bridge at Maerkle Reservoir; and 8 WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, 9 equipment, transportation, and other expenses necessary and incidental to the construction of the Maerkle Reservoir Access Bridge Replacement, Project No. 5006, have been prepared and are 11 on file in the Engineering Department of the City of Carlsbad and are incorporated by reference 12 herein; and WHEREAS, the project is a Class 2 categorical exemption (replacement or reconstruction of existing structures or facilities) and is, therefore, exempt from environmental review pursuant to 15 Section 15302 of the California Environmental Quality Act (CEQA); and ifi WHEREAS, there are sufficient funds in the Water Replacement Fund to complete the project. 18 NOW, THEREFORE, BE IT RESOLVED by the Carlsbad Municipal Water District Board of Directors of the City of Carlsbad, California, as follows: 20 1. That the above recitations are true and correct and are incorporated herein. 21 2. That the plans, specifications, and contract documents for the construction of the 22 Maerkle Reservoir Access Bridge Replacement, Project No. 5006, on file in the Public Works- Engineering Department of the City of Carlsbad are hereby approved. 3. The Secretary of the Carlsbad Municipal Water District is hereby authorized and directed to publish, in accordance with State law, a Notice to Contractors Inviting Bids for the25 construction of the Maerkle Reservoir Access Bridge Replacement, Project No. 5006, in 26 accordance with the plans, specifications, and contract documents referred to herein. 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Special Meeting of the Carlsbad Municipal Water District of the City of Carlsbad on the 5th day of August. 2008, by the following vote, to wit: AYES: Board Members Lewis, Kulchin, Hall, Packard, Nygaard NOES: None ABSENT: None ATTEST: 4+»*tZL OCgjECRETARY fl