Loading...
HomeMy WebLinkAbout2008-09-09; Municipal Water District; 665; Award of Contract For Construction of Maerkle Disinfection Facilities Chlorine Gas Scrubbers Replacement Project NO 5009-ACARLSBAD MUNICIPAL WATER DISTRICT - AGENDA BILL 17 AB# 665 MTG. 9/09/08 DEPT. ENG APPFPTANPF OF RID^ AND AWARD OF CONTRACT FOR THE CONSTRUCTION OF MAERKLE DISINFECTION FACILITIES CHLORINE GAS SCRUBBERS REPLACEMENT, PROJECT NO. 5009-A DEPT. HEAD jj) ftyj" CITY ATTY. l(j§^ CITYMGR. lih~^ RECOMMENDED ACTION: Adopt Resolution No. 1335 accepting bids and awarding contract for the construction of Maerkle Disinfection Facilities Chlorine Gas Scrubbers Replacement, Project No. 5009-A. ITEM EXPLANATION: Maerkle Dam reservoir and its auxiliary facilities are located in the northeast part of the City and are a critical part of the potable water supply system for the City. Maerkle Dam reservoir (formerly known as Squires Dam reservoir) was initially constructed in 1963. In the late 1980's and early 1990's, various auxiliary facilities were added, including a 10 million gallon concrete storage tank, transmission pipelines, a 33.5 million gallon per day pump station, and chlorination facilities. In May 2007, staff commissioned a study to evaluate all the facilities at Maerkle Dam reservoir. The study report identified 20 priority items that need replacement to meet current code requirements for health and safety and to maintain reliability of this water supply source. These items were presented to the Board via Agenda Bill No. 645 on December 11, 2007 and are summarized in Exhibit 2. Additional agenda bills will be presented to the Board for consideration as the plans and specifications are completed and appropriate implementation schedule windows are identified. This project involves high-priority items 11 and 12, which replace the existing wet chlorine gas scrubbers with new dry chlorine gas scrubbers. The existing chlorine gas scrubbers were constructed in 1992. The existing units are requiring increased attention to remain operable and have reached the end of their useful life. To minimize the risk of chlorine gas release to the surrounding areas, the existing scrubbers need to be replaced with new scrubbers. On June 24, 2008, Carlsbad Municipal Water District (CMWD) Board adopted Resolution No. 1327 approving plans and authorizing to advertise for bids. On August 12, 2008, seven (7) bids were received. The bids are summarized below. CONTRACTOR Socal Pacific Construction Corporation S.S. Mechanical Corporation Newest Construction Co., Inc. RC Foster Corporation Watson Mechanical, Inc. Fleming Environmental, Inc. J.R. Filanc Construction Co., Inc. BUSINESS LOCATION Lake Elsinore, CA Huntington Beach, CA San Diego, CA Corona, CA Corona, CA Buena Park, CA Escondido, CA TOTAL BID AMOUNT $508,000 $537,867 $539,875 $543,767 $553,135 $594,957 $658,302 DEPARTMENT CONTACT: Eva Plajzer 760-602-2787 eplai@ci.carlsbad.ca.us FOR CITY CLERKS USE ONLY BOARD ACTION: APPROVED DENIED CONTINUED WITHDRAWN AMENDED Dn D CONTINUED TO DATE SPECIFIC D CONTINUED TO DATE UNKNOWN D RETURNED TO STAFF d OTHER - SEE MINUTES D Page 2 The lowest responsive bidder, Socal Pacific Construction Corporation, submitted a bid in the amount of $508,000. The Engineer's Estimate for the project was $550,000. Staff has completed the review of the contract documents and has determined that they are in order. Therefore, staff recommends that Socal Pacific Construction Corporation be awarded the contract. ENVIRONMENTAL IMPACT: This project is a Class 2 categorical exemption (replacement or reconstruction of existing structures or facilities) and is, therefore, exempt from environmental review pursuant to Section 15302 of the California Environmental Quality Act (CEQA). FISCAL IMPACT: Based on the construction bid from Socal Pacific Construction Corporation of $508,000, the total project cost is summarized below. ITEM Scrubbers Design Cost Scrubbers Construction Cost Contingency for Construction of Scrubbers Inspection & Testing for Construction of Scrubbers ESTIMATED TOTAL COST FOR SCRUBBERS Design Budget for Remaining Items in Exhibit 2 Construction Budget for Remaining Items in Exhibit 2 Contingency Budget for Remaining Items in Exhibit 2 Inspection & Testing Budget for Remaining Items in Exhibit 2 ESTIMATED PROJECT TOTAL COST CURRENT APPROPRIATION ADDITIONAL APPROPRIATION NEEDED ESTIMATED COSTS $50,000 $508,000 $51,000 $51,000 $660,000 $175,000 $862,666 $86,267 $86,267 $1,870,200 $1,870,200 $0 Sufficient funds exist in the Water Replacement Fund to construct the chlorine gas scrubbers. There are also sufficient funds for the remaining items in Exhibit 2. EXHIBITS: 1. 2. 3. Location Map. Maerkle Dam Reservoir Facility Prioritization List. Resolution No.1335 accepting bids and awarding the contract for the Construction of Maerkle Disinfection Facilities Chlorine Gas Scrubbers Replacement, Project No. 5009-A. LOCATION MAP SITE NOT TO SCALE PROJECT NAME DISINFECTION FACILITIES CHLORINE GAS SCRUBBERS REPLACEMENT PROJECT PROJECTNUMBER 5009A EXHIBIT 1 DRAWN BY: SCOTT EVANS, CARLSBAD ENGINEERING DEPT. 6/02/03 C: \CAPITAL\PLAJZER\5009A.DWG EXHIBIT 2 Maerkle Dam Reservoir Facility Prioritization List Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Item Replace controls and PLC for pump station Replace VFDs and switchgear for pump station Replace/reinstall discharge piping air valves Repair leak in 10 MG tank Replace joint sealant in 10 MG tank (west bay) Replace flow meter Replace chlorine dioxide generator Install SCADA monitoring system to chlorine dioxide generator Replace ammonia/monochlorite analyzer Install ammonia chillers Remove existing scrubber and install dry type scrubber Remove existing scrubber and install dry type scrubber Remove chlorine evaporator and pressure chlorine gas system Remove chlorine evaporator and pressure chlorine gas system Replace joint sealant in 10 MG tank (east bay) Install SCADA control of chloramine dosing system Install security lighting on access road Install security cameras (connected to SCADA) at gates, pump station, tank, upper and lower disinfection facilities, and reservoir. Install automatic rolling gate Underwater inspection of floating cover Location Pump Station Pump Station Pump Station lOMGTank lOMGTank Pump Station Upper Disinfection Facility Upper Disinfection Facility Lower Disinfection Facility Lower Disinfection Facility Upper Disinfection Facility Lower Disinfection Facility Upper Disinfection Facility Lower Disinfection Facility lOMGTank Lower Disinfection Facility General Site General Site General Site 200 MG Reservoir Implementation Priority 1 1 2 1 2 2 1 1 1 1 1 1 2 2 2 2 2 2 1 1 Status 90% complete Plans completed Completed Completed Schedule to be determined Schedule to be determined Received quotes Under design PO Issued Completed Bids received Bids received Completed Completed Schedule to be determined 90% complete Schedule to be determined Schedule to be determined Design Completed Dive inspection Nov 08 -4T" i^7' 3 1 RESOLUTION NO. 1335 2 A RESOLUTION OF THE BOARD OF DIRECTORS OF 3 CARLSBAD MUNICIPAL WATER DISTRICT (CMWD), ACCEPTING BIDS AND AWARDING THE CONTRACT FOR THE 4 CONSTRUCTION OF MAERKLE DISINFECTION FACILITIES CHLORINE GAS SCRUBBERS REPLACEMENT, PROJECT NO. 5 5009-A. 6 WHEREAS, the Board has determined it necessary and in the public interest to construct 7 the chlorine gas scrubbers at Maerkle disinfection facilities; and 8 WHEREAS, on June 24, 2008, through the adoption of Resolution No. 1327, the Board g approved the plans and specifications for furnishing of all labor, materials, tools, equipment, transportation, and other expenses necessary and incidental to the construction of the Maerkle Disinfection Facilities Chlorine Gas Scrubbers Replacement Project, No. 5009-A; and WHEREAS, seven (7) sealed bids were received on August 12, 2008 for the project; and 12 WHEREAS, the lowest responsive, responsible bid for the project was submitted by Socal 13 Pacific Construction Corporation in the amount of $508,000; and 14 WHEREAS, there are sufficient appropriated funds in the Water Replacement Fund to 15 complete the project. 16 NOW, THEREFORE, BE IT RESOLVED by the Carlsbad Municipal Water District Board 17 of Directors of the City of Carlsbad, California, as follows: 18 1 • That the above recitations are true and correct. 19 2. That the bid amount of $508,000 submitted by Socal Pacific Construction 20 Corporation is herby accepted and the President is hereby authorized to execute a contract with Socal Pacific Construction Corporation for the construction of the Maerkle Disinfection Facilities Chlorine Gas Scrubbers Replacement, Project No. 5009-A, in accordance with plans, 22 specifications, and contract documents referred to herein. 23 3. That the Executive Manager is hereby authorized to approve construction change 24 orders up to $51,000 for Project No. 5009-A. 25 4. That the award of contract is contingent upon the bidder submitting the lowest 26 responsive bid executing the required contract and submitting the required bonds and insurance 27 policies, as described in the contract, within twenty (20) days of adoption of this resolution. The 28 Executive Manager may grant reasonable extensions of time. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Special Meeting of the Board of Directors of the Carlsbad Municipal Water District of the City of Carlsbad on the 9th day of September, 2008, by the following vote: AYES: Board Members Lewis, Kulchin, Hall, Packard and Nygaard. NOES: None. ABSENT: None. ATTEST: M. WdOD, Secretary Q