HomeMy WebLinkAbout2009-10-20; Municipal Water District; 700; El Camino Real and Cassia pump station removal24 CARLSBAD MUNICIPAL WATER DISTRICT - AGENDA BILL AB# 700 MTG. 10/20/09 DEPT. ENG APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE FOR BIDS FOR THE KbUYULbU WA I bK PUMr o I A I IUN KbMUVAL A I bL CAMINO REAL AND CASSIA ROAD - PROJECT NO. 3487 DEPT. HEAD^ £f J CITYATTY. /(^-v CITYMGR. ,^^ RECOMMENDED ACTION: Adopt Resolution No.1380 approving plans and specifications and authorizing to advertise for bids for the Recycled Water Pump Station Removal at El Camino Real and Cassia Road, Project No. 3487. ITEM EXPLANATION: This recycled water pumping station is located at 6450 El Camino Real on the east side of El Camino Real just north of Cassia Road. The recycled water pumping station was constructed in 1991 on property owned by Vallecitos Water District. This was designed to be an interim pumping station to obtain recycled water from Vallecitos Water District's existing failsafe pipeline, which was used to convey recycled water from the Meadowlark Water Reclamation Facility to the ocean, and to supply the recycled water to Carlsbad Municipal Water District's (CMWD) Phase I recycled water distribution system. In accordance with an agreement between Vallecitos Water District and CMWD, dated August 20, 2003, the interim Phase I recycled water pump station shall be completely removed upon completion of Phase II of the Encina Basin Water Reclamation Program and initial delivery of 3.0 million gallons per day (MGD) from the Meadowlark Water Reclamation Facility. In addition, the CMWD shall replace the existing portion of Vallecitos Water District's failsafe pipeline, which was removed to construct the interim recycled water pumping station, and reconnected it at its original location with ductile iron pipe. The interim recycled water pump station was taken out of service in 2008 and is no longer necessary as part of the Phase II project. Vallecitos Water District began supplying up to 3.0 MGD of recycled water from their Meadowlark Water Reclamation Facility in the summer of 2009. The work includes removing the existing security fencing, pumping equipment, valves, and removing the upper 10-feet of the concrete wetwell. The remaining portion of the below-ground wet well will be filled with cement slurry and abandoned in place. The plans and specifications for the removal of the recycled water pumping station have been prepared and are located in the Engineering Department. The plans for the demolition work were reviewed and approved by Vallecitos Water District and the site will be restored to pre-existing conditions. There is no landscaping work required or included in the project. ENVIRONMENTAL IMPACT: The project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15301(b) - minor alteration of existing facilities of both investor and publicly- owned utilities used to provide electric power, natural gas, sewerage, or other public utility services involving negligible or no expansion. DEPARTMENT CONTACT: Jon Schauble, (760) 602-2762, ion.schauble@carlsbadca.gov FOR CITY CLERKS USE ONLY. BOARD ACTION: APPROVED Q DENIED D CONTINUED D WITHDRAWN D AMENDED D CONTINUED TO DATE SPECIFIC D CONTINUED TO DATE UNKNOWN D RETURNED TO STAFF D OTHER-SEE MINUTES D Page 2 FISCAL IMPACT: RECYCLED WATER PUMP STATION REMOVAL PROJECT No. 3487 ITEM Design Construction (Engineer's Estimate) Construction Contingency (15%) Inspection, Testing, and Construction Management (15%) ESTIMATED PROJECT TOTAL COST CURRENT APPROPRIATION ADDITIONAL APPROPRIATION ESTIMATED COST $25,781 $150,000 $22,500 $22,500 $220,781 $442,700 NONE FUNDING SOURCE WATER REPLACEMENT FUND The total project cost is estimated at $220,781 for the Recycled Water Pump Station Removal at El Camino Real and Cassia Road, Project No. 3487. There are sufficient appropriations from the Water Replacement Fund to complete this project. Any unused funds will go back into the Water Replacement Fund balance. EXHIBITS: 1. Location Map. 2. Resolution No.1380 approving plans and specifications and authorizing to advertise for bids for the Recycled Water Pump Station Removal at El Camino Real and Cassia Road, Project No. 3487. LOCATION MAP POINSETTIA SITE SITE NOT TO SCALE PROJECT NAME RECYCLED WATER PUMP STATION REMOVAL AT EL CAMINO REAL AND CASSIA ROAD PROJECT NUMBER 3487 EXHIBIT 1 DRAWN BY: SCOTT EVANS, CARLSBAD ENGINEERING DEPT. 9/22/09 C:\CAPITAL\SCHAUBLE\ECR PUMP STATION\3487.DWG 1 RESOLUTION NO. 1380 2 A RESOLUTION OF THE CARLSBAD MUNICIPAL WATER 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 DISTRICT, APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING TO ADVERTISE FOR BIDS FOR THE RECYCLED WATER PUMP STATION REMOVAL AT EL 3 4,, CAMINO REAL AND CASSIA ROAD, PROJECT NO. 3487. 5 WHEREAS, the Board of Directors of Carlsbad Municipal Water District desires to 6 remove the recycled water pump station at El Camino Real and Cassia Road, Project No. 3487; and WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, equipment, transportation, and other expenses necessary or incidental to said project have been prepared and are on file in the Engineering Department of the City of Carlsbad and are incorporated by reference herein; and WHEREAS, the estimated project costs for the Recycled Water Pump Station Removal, Project No. 3487 is estimated at $220,781; and WHEREAS, there are sufficient funds in the Water Replacement Fund to complete the project; and NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of Carlsbad Municipal Water District as follows: 1. That the above recitations are true and correct. 2. That the plans, specifications, and contract documents for the Recycled Water Pump Station Removal, Project No. 3487, on file in the Public Works Engineering Department of the City of Carlsbad, are hereby approved. 3. The Secretary of the Carlsbad Municipal Water District is hereby authorized and directed to publish, in accordance with State law, a Notice to Contractors Inviting Bids for the Recycled Water Pump Station Removal, Project No. 3487, in accordance with the plans, specifications, and contact documents referred to herein. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Special Meeting of the Carlsbad Municipal Water District on the 20^ day of October. 2009, by the following vote to wit: AYES: Board Members Lewis, Kulchin, Hall, Packard and Blackburn. NOES: None. ABSENT: None. ATTEST: LORRAINFMWeOD, Secretary (SEAL)