HomeMy WebLinkAbout2011-12-06; Municipal Water District; 743; BIDS STEEL WATER TANKS COATING AND REPAIRSCARLSBAD MUNICIPAL WATER DISTRICT - AGENDA BILL AB# 743 MTG. 12/06/2011 DEPT. UTIL APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE FOR BIDS FOR THE "D1" AND "02" STEEL WATER TANKS INTERIOR AND EXTERIOR COATING AND MISCELLANEOUS REPAIRS, PROJECT NO 5024 DEPT. DIRECTOR /^fr/ CITY ATTORNEY CITY MANAGER £^u^- RECOMMENDED ACTION: Adopt Resolution No. 1432 approving plans and specifications and authorization to advertise for bids for the "D1" and "D2" Steel Water Tanks Interior and Exterior Coating and Miscellaneous Repairs, Project No. 5024. ITEM EXPLANATION: The "D1" and "D2" tanks are located along Black Rail Road just south of Poinsettia Lane, as shown on Exhibit 1 Location Map. The "D1" and "D2" tanks are both 75 feet in diameter and 40 feet in height with a cone roof and a capacity of 1.25 million gallons each. The D1 tank was constructed in 1958 and D2 tank was constructed in 1969. The exterior of both tanks were last overcoated in 1995 and the interior of both tanks were last recoated in 1998. As part of the reservoir repair and maintenance program, this project involves the following improvements: • The exterior shell coating of both tanks is heavily chalked and exhibits minor localized spot corrosion from mechanical damage, which will be repaired by applying an over-coating consisting of a zinc / hydrophobic acrylic / HDP acrylic paint. • The interior coating system of both tanks is comprised of an epoxy coating that is in poor to fair condition on the roof and fair to good condition on the walls and floor. The appearance of corrosion is emphasized by the formation of rust bleed staining. The existing interior coating of both tanks will be removed and replaced with a zinc / polyamidoamine epoxy coating. • The severely corroded steel overflow pipe on D1 tank will be replaced. • On both tanks, to comply with Occupational Safety & Health Administration (OSHA) requirements, a new exterior steel ladder with safety cage plus handrailing mounted offset from the roof hatchway will be installed, plus a 30-inch diameter manway will be added on the tank wall for access. • On both tanks, to comply with California Department of Public Health requirements, the roof vent screens will be replaced to prevent contamination from birds, bats and insects, and a %" sample tap will be installed on each tank. • On both tanks the severely corroded earthquake rods that are attached to the roof beams will be replaced, the caulking and backer rod at the tank / concrete ringwall interface will be replaced, the liquid level indicator board will be replaced, and minor spot repairs will be performed. DEPARTMENT CONTACT: David Ahles 760-602-2748 David.Ahles@carlsbadca.gov FOR SECRETARY'S USE ONLY. BOARD ACTION: APPROVED DENIED WITHDRAWN D AMENDED D CONTINUED TO DATE SPECIFIC D CONTINUED TO DATE UNKNOWN D RETURNED TO STAFF D BOARD RECEIVED THE D REPORT/PRESENTATION OTHER - SEE MINUTES D Page 2 The interior and exterior coatings on both tanks will be inspected by a National Association of Corrosion Engineers (NACE) Certified Inspection services firm. Staff issued a "Request for Proposals" on November 1, 2011 and based on the three proposals received a professional services agreement for this inspection work will be prepared with a budget established at $50,000 to cover the amount of hours estimated based on the proposals. FISCAL IMPACT: The reservoir repair and maintenance program, Project No. 5024, includes rehabilitation of nine steel tanks and three concrete tanks. Funds in the amount of $1,885,000 have been appropriated from the water replacement fund for Project No. 5024. The Engineer's Estimate for rehabilitation of "D1" and "D2" tanks is $520,000. The total estimated project cost is shown in Table 1: TABLE 1 - "D1" and "D2" Reservoir Repair / Maintenance, Project No. 5024 Item Description "D1" and "D2" Water Tank Interior and Exterior Coating & Misc. Repairs Construction Contingencies NACE Inspection Services Total Project Costs Existing Appropriation Additional Appropriation Required Total Cost $520,000 $50,000 $50,000 $620,000 $1 ,885,000 None ENVIRONMENTAL IMPACT: The project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15301(b) - minor alteration of existing facilities of public utility services involving negligible or no expansion. EXHIBITS: 1. Location Map 2. Resolution No. 1432 of the Board of Directors of Carlsbad Municipal Water District (CMWD) for approval of Plans and Specifications and Authorization to Advertise for Bids for the "D1" and "D2" Steel Water Tanks Interior and Exterior Coating and Miscellaneous Repairs, Project No. 5024 LOCATION MAP S/7E NOT TO SCALE VICINITY MAP NOT TO SCALE S/7E PROJECT NAME D-1 & D-2 COATING REHABILITATION PROJECT NUMBER 5024 EXHIBIT 1 PLOTTED BY: SCOTT EVANS PLOT OATE:W/27/11 PATH:C:\UTIUTIES DEPARTUENT\DESIGN DMSION\PLUUUER\D TANKS COATING REHAB LOC UAP.DWG 1 RESOLUTION NO. 1432 2 A RESOLUTION OF THE BOARD OF DIRECTORS OF 3 CARLSBAD MUNICIPAL WATER DISTRICT (CMWD), FOR APPROVAL OF PLANS AND SPECIFICATIONS AND 4 AUTHORIZATION TO ADVERTISE FOR BIDS FOR THE "D1" AND "D2" STEEL WATER TANKS INTERIOR AND EXTERIOR 5 COATING AND MISCELLANEOUS REPAIRS, PROJECT NO. 5024. 6 WHEREAS, the Board of Directors of the Carlsbad Municipal Water District, Carlsbad, 7 California, desires to recoat the interior and overcoat the exterior of CMWD's "D1 and "D2" steel 8 tanks and perform miscellaneous repairs; and 9 WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, equipment, 10 transportation, and other expenses necessary or incidental to the "D1" and "D2" Steel Water Tanks 11 Interior and Exterior Coating and Miscellaneous Repairs, Project Nos. 5024, have been prepared and 12 are on file in the Utilities Department, Engineering Division, of the City of Carlsbad and are 13 incorporated herein by reference; and 14 WHEREAS, the project is exempt from the California Environmental Quality Act (CEQA) per State 15 CEQA Guidelines Section 15301(b) - minor alteration of existing facilities of public utility services ifi involving negligible or no expansion; and WHEREAS, the project is located in the coastal zone, however, repair and maintenance activities not described in Carlsbad Municipal Code Section 21.201.070 do not require a Coastal Development Permit; and 20 WHEREAS, tank inspection will be performed by a National Association of Corrosion 21 Engineers (NACE) Certified Inspection services firm for "D1" and "D2" Interior and Exterior Coating 22 and Miscellaneous Repairs, Project Nos. 5024; and 23 WHEREAS, the Engineer's Estimate for the "D1" and "D2" Interior and Exterior Coating and 24 Miscellaneous Repairs, Project Nos. 5024, is a total of $620,000, and the appropriation from the 25 Water Replacement Fund is sufficient for the project. 26 NOW, THEREFORE, BE IT RESOLVED by the Carlsbad Municipal Water District Board of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct.28 1 2. That the plans, specifications, and contract documents for the "D1" and "D2" Interior 2 and Exterior Coating and Miscellaneous Repairs, Project Nos. 5024, are on file in the Utilities Department, Engineering Division, of the City of Carlsbad and are hereby approved. o 3. The District Secretary of the Carlsbad Municipal Water District is hereby authorized 4 and directed to publish, in accordance with state law, a Notice to Contractors Inviting Bids for the 5 construction of "D1" and "D2" Interior and Exterior Coating and Miscellaneous Repairs, Project No. " 5024, in accordance with the plans, specifications, and contract documents referred to herein. 7 /// 8 /// 9 /// 10 /// 11 /// 12 /// 13 /// 14 /// 15 /// 16 /// 17 /// 18 /// 19 /// 20 /// 21 /// 22 /// 23 /// 24 /// 25 /// 26 /// 27 /// 28 '" 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Special Meeting of the Board of Directors of the Carlsbad Municipal Water District of the City of Carlsbad on the 6th day of December 2011, by the following vote to wit: AYES: Board Members Hall, Kulchin, Blackburn, Douglas, Packard. NOES: None. ABSENT: None. MATT HALL, President ATTEST: (SEAL) E M. WOOD, Secretary w- CO: ac- at: o