Loading...
HomeMy WebLinkAbout2012-02-28; Municipal Water District; 747; CONTRACTSTEEL WATER TANKS COATING REPAIRSCARLSBAD MUNICIPAL WATER DISTRICT - AGENDA Bl 747 2/28/2012 UTIL AWARD OF CONTRACT FOR THE "Dl" AND "D2" STEEL WATER TANKS INTERIOR AND EXTERIOR COATING AND MISCELLANEOUS REPAIRS, PROJECT NO 5024 DEPT. DIRECTOR, CITY ATTORNEY CITY MANAGER RECOMMENDED ACTION: Adopt Resolution No. 1436 for the "01" and "D2" Steel Water Tanks Interior and Exterior Coating and IVIiscellaneous Repairs, Project No. 5024. ITEM EXPLANATION: The "Dl" and "D2" tanks are located along Black Rail Road just south of Poinsettia Lane, as shown on Exhibit 1 Location Map. The "Dl" and "D2" tanks are both 75 feet in diameter and 40 feet in height with a cone roof and a capacity of 1.25 million gallons each. The Dl tank was constructed in 1958 and D2 tank was constructed in 1969. The exterior of both tanks were last overcoated in 1995 and the interior of both tanks were last recoated in 1998. As part of the reservoir repair and maintenance program, this project involves the following improvements: • The exterior shell coating of both tanks is heavily chalked and exhibits minor localized spot corrosion from mechanical damage, and will be repaired by applying an over-coating consisting of a zinc / hydrophobic acrylic / HDP acrylic paint. • The interior coating system of both tanks is comprised of an epoxy coating that is in poor to fair condition on the roof and fair to good condition on the walls and floor. The appearance of corrosion is emphasized by the formation of rust bleed staining. The existing interior coating of both tanks will be removed and replaced with a zinc / polyamidoamine epoxy coating. • The severely corroded steel overflow pipe on Dl tank will be replaced. • On both tanks, to comply with Occupational Safety & Health Administration (OSHA) requirements, a new exterior steel ladder with safety cage plus handrailing mounted offset from the roof hatchway will be installed, plus a 30-inch diameter manway will be added on the tank wall for access. • On both tanks, to comply with California Department of Public Health requirements, the roof vent screens will be replaced to prevent contamination from birds, bats and insects, and a %" sample tap will be installed on each tank. • On both tanks the severely corroded earthquake rods that are attached to the roof beams will be replaced, the caulking and backer rod at the tank / concrete ringwall interface will be replaced, the liquid level indicator board will be replaced, and minor spot repairs will be peri'ormed. DEPARTMENT CONTACT: David Ahles 760-602-2748 David.Ahles(gcarisbadca.gov FOR SECRETARY'S USE ONLY. K BOARD ACTION: APPROVED K CONTINUED TO DATE SPECIFIC • DENIED • CONTINUED TO DATE UNKNOWN • WITHDRAWN • RETURNED TO STAFF • AMENDED • BOARD RECEIVED THE • REPORT/PRESENTATION OTHER-SEE MINUTES • Page 2 On December 6, 2011, the Board of Director's adopted Resolution No. 1432 which approved the plans and specifications and authorized the advertisement for bids for the "Dl" and "D2" Steel Water Tanks Interior and Exterior Coating and Miscellaneous Repairs, Project No. 5024. Plans and specifications for the project are on file in the Utilities Department. The Engineer's Estimate for the project was $520,000. On January 24, 2012, the Utilities Department received nine (9) sealed bids as follows: CONTRACTOR NAME CITY/STATE TOTAL BID AMOUNT 1. Industrial Coatings & Restoration Services Inc. Oceanside, CA $488,000 2. Advanced Industrial Services Paramount, CA $499,800 3. State Painting Co., Inc. Salt Lake City, UT $524,276 4. J. Colon Coating, Inc. Alta Loma, CA $531,300 5. Cor-ray Painting Co. Santa Fe Springs, CA $531,800 6. Crosno Construction, Inc. Arroyo Grande, CA $537,634 7. Utility Service Co, Inc. Perry, GA $555,500 6. Paso Robles Tank, Inc. Paso Robles, CA $632,000 6. Blastco, Inc. Downey, CA $718,810 Staff has reviewed all bid documents submitted by Industrial Coatings and Restoration Services, Inc. and discovered one discrepancy in the bid, which is described below. The apparent lowest bid, submitted by Industrial Coatings and Restoration Services, Inc., does not meet the Experience Requirement. In accordance with the specifications the Contractor shall have a minimum often (10) applications on potable water steel tank reservoirs and a successful history in the application of the specified products to the interior and exterior surface of steel tank reservoirs. The original submittal by the apparent low bidder did not comply with the requirement. The bidder was contacted and staff requested that additional references be submitted. Industrial Coatings and Restoration Services, Inc., provided an updated submittal. A second review was performed by staff and it was determined that the apparent lowest bid, submitted by Industrial Coatings and Restoration Services, Inc., does not meet the Experience Requirement; and therefore, the bid is non-responsive. All bid documents submitted by the second lowest bidder, Advanced Industrial Services, have been reviewed by staff and were found to be in order. Advanced Industrial Services provided ten (10) valid references for applications on potable water steel tank reservoirs and a successful history in the application of the specified products to the interior and exterior surface of steel tank reservoirs. Based on the above, Staff recommends awarding the contract to the lowest responsible bidder, Advanced Industrial Services, for the total bid amount of $499,800. Page 3 FISCAL IMPACT: The reservoir repair and maintenance program. Project No. 5024, includes rehabilitation of nine steel tanks and three concrete tanks. Funds in the amount of $3,035,000 have been appropriated from the water replacement fund for Project No. 5024. The total estimated project cost is shown in Table 1: TABLE 1 - "Dl" and "D2" Reservoir Repair / Maintenance, Project No. 5024 TASK DESCRIPTION ESTIMATED COST Design $25,000 Construction Contract (Advanced Industrial Services) $499,800 Construction Contingencies $66,000 Inspection, Testing, and Construction Management $75,000 PROJECT TOTAL COST $665,800 CURRENT AVAILABLE BALANCE $2,895,068 ADDITIONAL APPROPRIATION NONE ENVIRONMENTAL IMPACT: The project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15301(b) - minor alteration of existing facilities of public utility services involving negligible or no expansion. EXHIBITS: Location Map 1. 2. Resolution No. 1436 of the Board of Directors of Carisbad Municipal Water District (CMWD) accepting bids and awarding the contract to Advanced Industrial Services for the "Dl" and "D2" Steel Water Tanks Interior and Exterior Coating and Miscellaneous Repairs, Project No. 5024 3 LOCATION MAP SITE NOT TO SCALE VICINITY MAP NOT TO SCALE PROJECT NAME D-1 & D-2 COATING REHABILITATION PROJECT NUMBER 5024 EXHIBIT 1 PLOTTED BY: SCOTT EVANS PLOT DATE:10/27/11 PATH:C:\UWVES DEPARTUENT\DESIGN DiVISI0N\AHl£S\D1 * 02 TANKS\D TANKS COAVNG REHAB LOC UAP.DWG 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 1436 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD MUNICIPAL WATER DISTRICT (CMWD), FOR ACCEPTING BIDS AND AWARDING THE CONTRACT TO INDUSTRIAL COATING AND RESTORATION SERVICES, INC. FOR THE "Dl" AND "D2" STEEL WATER TANKS INTERIOR AND EXTERIOR COATING AND MISCELLANEOUS REPAIRS, PROJECT NO. 5024. WHEREAS, the Board of Directors of the Carisbad Municipal Water District, Carisbad, California, desires to recoat the interior and overcoat the exterior of CMWD's "Dl and "D2" steel tanks and perform miscellaneous repairs; and WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, equipment, transportation, and other expenses necessary or incidental to the "Dl" and "D2" Steel Water Tanks Interior and Exterior Coating and Miscellaneous Repairs, Project Nos. 5024, have been prepared and are on file in the Utilities Department, Engineering Division, of the City of Carisbad and are incorporated herein by reference; and WHEREAS, the project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15301(b) - minor alteration of existing facilities of public utility services involving negligible or no expansion; and WHEREAS, the project is located in the coastal zone, however, repair and maintenance activities not described in Carisbad Municipal Code Section 21.201.070 do not require a Coastal Development Permit; and WHEREAS, tank inspection will be performed by a National Association of Corrosion Engineers (NACE) Certified Inspection services firm, CSI Services, for "Dl" and "D2" Interior and Exterior Coating and Miscellaneous Repairs, Project Nos. 5024; and WHEREAS, the Engineer's Estimate for the "Dl" and "D2" Interior and Exterior Coating and Miscellaneous Repairs, Project Nos. 5024, is a total of $665,800 and the appropriation from the Water Replacement Fund is sufficient for the project. WHEREAS, on December 6, 2011, the Board of Directors of Carisbad Municipal Water, Resolution No. 1432, has previously approved plans for construction of the "Dl" and "D2" Interior and Exterior Coating and Miscellaneous Repairs, Project Nos. 5024; and ^ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 WHEREAS, nine (9) sealed bids were received on January 24, 2012 by the District for the construction of said project; and WHEREAS, the apparent lowest bidders does not meet the Experience Requirement, as required in the contract documents; and therefore. Industrial Coatings and Restoration Services, Inc. bid is a nonresponsive bids; and is precluded from award of a contract; and WHEREAS, the lowest responsive and responsible bid to construct said project was submitted by Advanced Industrial Services in the amount of $499,800; and WHEREAS, there are sufficient funds currently appropriated for Project No. 5024 to complete the project; and WHEREAS, Subsection 3.28.040(C)(6) of the Carisbad Municipal Code authorizes the Executive Manager to approve change orders in the amount equal to the contingency set at the time of project award. NOW, THEREFORE, BE IT RESOLVED by the Carisbad Municipal Water District Board of the City of Carisbad, California, as follows: 1. That the above recitations are true and correct. 2. That the bid of $499,800 submitted by Advanced Industrial Services for the for the "Dl" and "D2" Interior and Exterior Coating and Miscellaneous Repairs, Project Nos. 5024,, is accepted and the President is hereby authorized to execute the contract with Industrial Coatings and Restoration Services, Inc., for Project No. 5024. 3. That the Executive Manager is hereby authorized to approve construction change orders up to $66,000. 4. That the award of this contract is contingent upon the bidder submitting the lowest responsible bid executing the required contract and submitting the required bonds and insurance policies, as described in the contract, within twenty (20) days of adoption of this resolution. The Executive Manager may grant reasonable extensions of time. /// /// 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Special Meeting of the Board of Directors of the Carisbad Municipal Water District of the City of Carisbad on the 28th day of February, 2012, by the following vote to wit: AYES: Board Members Hall, Kulchin, Blackburn, Douglas and Packard. NOES: None. ABSENT: None. \AIL, President ATTEST: INE M. WOCTD, Secretary (SEAlf)