Loading...
HomeMy WebLinkAbout2012-06-05; Municipal Water District; 752; Award Contract Meter Replacement Project No 5020CARLSBAD MUNICIPAL WATER DISTRICT - AGENDA BILL 752 6/5/2012 DEPT. UTIL AWARD OF CONTRACT FOR THE RANCHO CARLSBAD PRESSURE REDUCING STATION AND METER REPLACEMENT, PROJECT NO. 5020 DEPT. DIRECTOR CITY ATTORNEY CITY MANAGER RECOMMENDED ACTION: Adopt Resolution No. 1442 for the award of the construction contract for the Rancho Carlsbad Pressure Reducing Station and Meter Replacement, Project No. 5020. ITEM EXPLANATION: The Rancho Carlsbad Pressure Reducing Station (PRS) and Meter Replacement Project is located along El Camino Real just north of Rancho Carlsbad Drive, as shown on Exhibit 1, Location Map. It was constructed in the early 1970's to provide water to the entire Rancho Carlsbad Mobile Home Park Association. The existing facility is near the end of its useful life and needs to be replaced to continue to provide safe and reliable water service. The new flow meter will include Automated Meter Reading, (AMR) technology. On March 27, 2012, the Board of Director's adopted Resolution No. 1440, which approved the plans and specifications, and authorized the advertisement for bids for the Rancho Carlsbad PRS and Meter Replacement, Project No. 5020. Plans and specifications for the project are on file in the Utilities Department, Engineering Division. The Engineer's Estimate for the project was $250,000. On May 8, 2012, the Utilities Department received nine (9) sealed bids as follows: CONTRACTOR NAME CITY/STATE TOTAL BID AMOUNT 1. Piperin Corporation San Marcos, CA $195,000 2. Tharsos La Mesa, CA $209,135 3. Don Hubbard Contracting San Marco, CA $210,400 4. CCL Contracting Escondido, CA $215,000 5. Tryco General Engineering Lake Arrowhead, CA $229,980 6. O'connell Engineering Winchester, CA $233,950 7. Atom Engineering Construction Hemet, CA $236,498 8. Transtar Pipeline San Diego, CA $247,500 9. Acuna Corportation Whittier, CA $315,497 DEPARTMENT CONTACT: David Ahles 760-602-2748 David.Ahles^carlsbadca.qov FOR CITY CLERKS USE ONLY COUNCIL ACTION: APPROVED CONTINUED TO DATE SPECIFIC • DENIED • CONTINUED TO DATE UNKNOWN • CONTINUED • RETURNED TO STAFF • WITHDRAWN • OTHER-SEE MINUTES • AMENDED • Page 2 All bid documents submitted by the apparent lowest bidder, Piperin Corporation, have been reviewed by staff and were found to be in order. Based on the above. Staff recommends awarding the contract to the lowest responsible bidder, Piperin Corporation, for the total bid amount of $195,000. FISCAL IMPACT: Rancho Carlsbad PRS and Meter Replacement, Project No. 5020 is part of the Capital Improvement Program to rehabilitate or replace five pressure reducing stations. Funds in the amount of $1,102,000 have been appropriated from the water replacement fund for Project No. 5020. The Engineer's Estimate for Rancho Carlsbad PRS and Meter Replacement Project is $280,000. The total estimated project cost is shown in Table 1: TABLE 1 RANCHO CARLSBAD PRS AND METER REPLACEMENT, PROJECT NO. 5020 Item Description Total Cost Engineering (Design) $20,000 Rancho Carlsbad PRS and Meter Replacement (Piperin Corporation) $195,000 Construction Contingencies $40,000 Construction Management and Inspection $25,000 Total Project Costs $280,000 Existing Appropriation $1,102,000 Additional Appropriation Required None ENVIRONMENTAL IMPACT: The project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15301(b) - minor alteration of existing facilities of public utility services involving negligible or no expansion. EXHIBITS: 1. Location Map 2. Resolution No. 1442 of the Board of Directors of Carlsbad Municipal Water District (CMWD) for accepting bids and awarding the contract to Pipering Corporation for the Rancho Carlsbad PRS and Meter Replacement, Project No. 5020 LOCATION MAP NOT TO SCALE PROJECT NAME RANCHO CARLSBAD PRESSURE REDUCING STATION REPLACEMENT PROJECT NUMBER 5020 EXHIBIT 1 DRAm BY: SCOTT EVANS. CARLSBAD DKHHEERING DEPT. 3/U^2 C:\CAPITAL\AHllS\5020 RANCHO CARLSBAD PR STATWN.Dm 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 1442 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD MUNICIPAL WATER DISTRICT (CMWD), FOR ACCEPTING BIDS AND AWARDING THE CONTRACT TO PIPERIN CORPORTATION FOR THE RANCHO CARLSBAD PRESSURE REDUCING STATION AND METER REPLACEMENT. PROJECT NO. 5020. WHEREAS, the Board of Directors of the Carlsbad Municipal Water District, Carisbad, California, desires to replace and upgrade the Rancho Carlsbad Pressure Reducing Station (PRS) and Meter Replacement; and WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, equipment, transportation, and other expenses necessary or incidental to the Rancho Carlsbad PRS and Meter Replacement, Project No. 5020, have been prepared and are on file in the Utilities Department, Engineering Division, of the City of Carlsbad and are incorporated herein by reference; and WHEREAS, the project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15301(b) - minor alteration of existing facilities of public utility services involving negligible or no expansion; and WHEREAS, the Engineer's Estimate for the Rancho Carlsbad PRS and Meter Replacement, Project No. 5020, is a total of $280,000 and the appropriation from the Water Replacement Fund is sufficient for the project; and WHEREAS, the Rancho Carlsbad PRS and Meter Replacement is part of a program to replace five pressure reducing stations and there are sufficient funds available for this project; and WHEREAS, on March 27, 2012, the Board of Directors of Carlsbad Municipal Water, Resolution No. 1440, has previously approved plans for construction of the Rancho Carlsbad PRS and Meter Replacement, Project No. 5020; and WHEREAS, nine (9) sealed bids were received on May 8, 2012, by the District for the construction of said project; and WHEREAS, the lowest responsive and responsible bid to construct said project was submitted by Piperin Corporation in the amount of $195,000; and 1 1 WHEREAS, there are sufficient funds currently appropriated for Project No. 5020 to 2 complete the project; and 3 WHEREAS, Subsection 3.28.040(C)(6) of the Carlsbad Municipal Code authorizes the 4 Executive Manager to approve change orders in the amount equal to the contingency set at the 5 time of project award. 6 NOW, THEREFORE, BE IT RESOLVED by the Carlsbad Municipal Water District Board 7 of the City of Carlsbad, California, as follows: 8 1. That the above recitations are true and correct. 9 2. That the bid of $195,000 submitted by Piperin Corporation for the for the Rancho 10 Carlsbad PRS and Meter Replacement, Project No. 5020, is accepted and the President is hereby 11 authorized to execute a contract with Piperin Corporation, for Project No. 5020. 12 3. That the Executive Manager is hereby authorized to approve construction change 13 orders up to $40,000. 14 4. That the award of this contract is contingent upon the bidder submitting the lowest 15 responsible bid executing the required contract and submitting the required bonds and insurance 16 policies, as described in the contract, within twenty (20) days of adoption of this resolution. 17 The Executive Manager may grant reasonable extensions of time. 18 /// 19 /// 20 /// 21 /// 22 /// /// /// /// /// //// /// 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Special Meeting of the Board of Directors of the Carlsbad Municipal Water District of the City of Carlsbad on the 5^^ day of June, 2012, by the following vote to wit: AYES: Board Members Hall, Kulchin, Blackburn, Douglas and Packard. NOES: None. ABSENT: None. <LL, President ATTEST: (SEAL)