Loading...
HomeMy WebLinkAbout2014-10-21; Municipal Water District; 790; Accept Bids Award Contract La Costa Recycled Water11 CARLSBAD MUNICIPAL WATER DISTRICT -AGENDA BILL AB# 790 APPROVAL OF RESOLUTION ACCEPTING BIDS AND AWARD OF CONTRACT FOR CONSTRUCTION OF THE LA COSTA RECYCLED WATER PIPELINE, PROJECT NO. 5207 DEPT.DIRECTOR MTG. 10-21-14 APPROVAL OF RESOLUTION ACCEPTING BIDS AND AWARD OF CONTRACT FOR CONSTRUCTION OF THE LA COSTA RECYCLED WATER PIPELINE, PROJECT NO. 5207 GEN. COUNSEL JL^ DEPT. PW-UTIL APPROVAL OF RESOLUTION ACCEPTING BIDS AND AWARD OF CONTRACT FOR CONSTRUCTION OF THE LA COSTA RECYCLED WATER PIPELINE, PROJECT NO. 5207 CITY MGR. RECOMMENDED ACTION: Approval to adopt Resolution No. 1503 accepting bids and awarding a contract for the construction of the La Costa Recycled Water Pipeline, located on El Camino Real extending south from Alga Road, north of La Costa Avenue, Project No. 5207. ITEM EXPLANATION: The project is located along El Camino Real and extends south from Alga Road to 500 feet north of La Costa Avenue. The project is part of the Phase III Recycled Water Project. The pipeline includes the construction of approximately 5,500 linear feet of 8-inch diameter polyvinyl chloride (PVC) pipeline and recycled water services. During the construction, a minimum of two paved traffic lanes will be open for use by public traffic in each direction of travel. In an effort to avoid peak traffic volumes, lane closures will only be allowed to occur between 8:30 a.m. and 4 p.m. On September 9, 2014, twelve sealed bids were received for the construction of this project as shown on the following table. The engineer's estimate was $1,500,000. CONTRACTOR TOTAL BID Ortiz Corporation $1,219,000 Universal Pipeline Inc. $1,253,700 Ferreira Construction $1,257,980 Burtech Pipeline Inc. $1,359,226 Utah Pacific Construction $1,361,320 MNR Construction Inc. $1,411,400 Shaw Equipment Rentals Inc. $1,463,223 GRFCO Inc. $1,481,300 Palm Engineering Construction Company $1,495,500 VCl Construction $1,495,960 Tech Com International $1,545,419 Atlas-Allied Inc. $1,664,140 DEPARTMENT CONTACT: David Ahles at 760-602-2748 or email daviciahles@carlsbadca.gov FOR SECRETARY USE. BOARD ACTION: APPROVED DENIED • CONTINUED • WITHDRAWN • AMENDED • CONTINUED TO DATE SPECIFIC • . CONTINUED TO DATE UNKNOWN • RETURNED TO STAFF • OTHER- SEE MINUTES • REPORT RECEIVED • i.0 Costo Recycle Water Contract October 21, 2014 Page 2 of 2 The lowest responsive bidder, Ortiz Corporation, submitted a bid in the amount of $1,219,000. Staff has completed its review of the contract documents and has determined that Ortiz Corporation is the confirmed low bidder and their bid documents are responsive. Staff recommends that Ortiz Corporation be awarded the contract. FISCAL IMPACT: An Engineer's Estimate of the construction cost of La Costa Recycled Water Pipeline, Project No. 5207 was prepared and totals $1,500,000. The project's construction contract will be with CMWD. A summary of estimated construction costs and available funds is shown in Table 1. TABLE 1 - PROJECT CONSTRUCTION COST ESTIMATE La Costa Recycled Water Pipeline, Project No. 5207 ESTIMATED COSTS Construction Contract ( Ortiz Corporation ) $1,219,000 Construction Contingency $150,000 Construction Management, Inspection, and Material Testing $125,000 TOTAL ESTIMATED CONSTRUCTION COSTS (Segment 18) $1,494,000 Current Appropriation- La Costa Recycled Water Pipeline, Project No. 5207 $1,915,000 Current Expenditures/Encumbrances- La Costa Recycled Water Pipeline, Project No. 5207 $187,773 TOTAL AVAILABLE PHASE lil PIPELINE PROGRAM, CIP NO. 5207 $1,727,227 ADDITIONAL APPROPRIATION FOR CONSTRUCTION None Sufficient funds have been appropriated from the Recycled Water Fund to fund this project. ENVIRONMENTAL IMPACT: The La Costa Recycled Water Pipeline is part ofthe Phase III Recycled Water Project, Expansion Segment No. 8. An environmental impact assessment was conducted for the Phase III Recycled Water Project, and a Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program was approved bythe Board through Resolution No. 1455, on November 27, 2012. PUBLIC NOTIFICATION: None. EXHIBITS: 1. Resolution No. 1503 accepting bids and awarding the contract to Ortiz Corporation forthe construction ofthe La Costa Recycled Water Pipeline, Project No. 5207. 2. Location Map. 1 RESOLUTION NO. 1503 3 2 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD MUNICIPAL WATER DISTRICT (CMWD), ACCEPTING BIDS AND AWARDING THE CONTRACT TO ORTIZ CORPORATION FOR THE 4 LA COSTA RECYCLED WATER PIPELINE, LOCATED ON EL CAMINO REAL EXTENDING SOUTH FROM ALGA ROAD, NORTH OF LA 5 COSTA AVENUE, PROJECT NO. 5207 6 y WHEREAS, the Board of Directors of the Carisbad Municipal Water District, California 8 has determined it necessary, desirable, and in the public interest to construct an 8-inch 9 recycled water pipeline in El Camino Real from Alga Road to SOO-feet north of La Costa Avenue; and WHEREAS, an environmental impact assessment was conducted for the Phase III Recycled Water Project, and a Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program was approved by the Board through Resolution No. 1455, on November 27, 2012; and WHEREAS, on July 22, 2014, the Board of Directors of the Carisbad Municipal Water 10 11 12 13 14 15 16 17 District, California adopted Resolution No. 1494, which approved the plans for the construction 18 ofthe La Costa Recycled Water Pipeline, Project No. 5207; and WHEREAS, twelve sealed bids were received on September 9, 2014 by the Carisbad Municipal Water District for the construction of the La Costa Recycled Water Pipeline, Project No. 5207; and WHEREAS, the lowest responsive and responsible bid to construct said project was 24 submitted by Ortiz Corporation in the amount of $1,219,000; and 25 WHEREAS, there are sufficient funds available in the Recycled Water Fund to complete the project; and 19 20 21 22 23 26 27 28 3 1 WHEREAS, under the operating agreement with the City of Carisbad, Carisbad Municipal 2 Water District adopted the city's purchasing rules; and 3 WHEREAS, subsection 3.28.040(C)(5) of the Carisbad Municipal Code authorizes the 4 Executive Manager to approve change orders in the amount equal to the contingency set at the 5 time of project award. 6 7 NOW, THEREFORE, BE IT RESOLVED by the Carisbad Municipal Water District Board of 8 the City of Carlsbad, California, as follows: 9 1. That the above recitations are true and correct. 10 2. That the low bid of $1,219,000 submitted by Ortiz Corporation for the construction ^ ^ of the La Costa Recycled Water Pipeline, Project No. 5207 is accepted and the President is 12 hereby authorized to execute a contract for this project. 3. That the Executive Manager is hereby authorized to approve construction change orders up to $150,000. 16 4. That the award of this contract is contingent upon the bidder submitting the lowest 17 responsible bid executing the required contract and submitting the required bonds and 18 insurance policies, as described in the contract, within twenty (20) days of adoption of this 19 resolution. The Executive Manager may grant reasonable extensions of time. 20 21 // 22 // 23 // 24 // 25 // 26 // 27 28 13 14 15 1 2 3 4 5 6 7 PASSED, APPROVED AND ADOPTED at a Special Meeting ofthe Board of Directors ofthe Cartsbad Municipal Water District ofthe City of Cartsbad on the 21st day of October 2014, by the following vote to wit: AYES: NOES: ABSENT: Board Members Hall, Packard, Schumacher, Blackburn. None. Board Member Wood. 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 -]ip///y/ MATT HALL, President ATTEST: BARBARA ENGLESON, Sedrfetary ^luni,,, « : LOCATION MAP PROJECT PROJECT PROJECT NAME LA COSTA RECYCLED WATER PIPELINE PROJECT NUMBER 5207 EXHIBIT PLOTTED BY: SCOTT EVANS PLOT DATE: 7/3/14 PATH:D: \UVUVES DEPARTUENT\L0CAT10N UAPS\5207_RECYCLED WATER.DWG 6