Loading...
HomeMy WebLinkAbout2015-04-21; Municipal Water District; 801; Pressure Control Hydroelectric at Maerkle ResCARLSBAD MUNICIPAL WATER DISTRICT-AGENDA BILL 15 AB# 801 APPROVE A $35,000 INCREASE IN THE CONSTRUCTION CONTINGENCY FOR THE PRESSURE CONTROL HYDROELECTRIC FACILITY AT THE MAERKLE RESERVOIR, PROJECT NO. 5025 DEPT. DIRECTOR '^PTT, DATE 04-21-2015 APPROVE A $35,000 INCREASE IN THE CONSTRUCTION CONTINGENCY FOR THE PRESSURE CONTROL HYDROELECTRIC FACILITY AT THE MAERKLE RESERVOIR, PROJECT NO. 5025 \ % GEN. COUNSEL f^'^ DEPT. PW-TRAN APPROVE A $35,000 INCREASE IN THE CONSTRUCTION CONTINGENCY FOR THE PRESSURE CONTROL HYDROELECTRIC FACILITY AT THE MAERKLE RESERVOIR, PROJECT NO. 5025 EXEC. DIRECTOR i^V^ RECOMMENDED AaiON: Adopt Resolution No. 1520 approving and authorizing an increase in the construction contingency for the Pressure Control Hydroelectric Facility at the Maerkle Reservoir, Project No. 5025. ITEM EXPLANATION; On August 27, 2013, the Board adopted Resolution No. 1477 awarding a contract to Environmental Construction, Inc. (ECl) for the construction of the Pressure Control Hydroelectric Facility at the Maerkle Reservoir. The resolution provided a construction contingency of $100,000, which is approximately 9.1 percent of the construction award amount. Staff recommends increasing the construction contingency by $35,000 to a total of $135,000, which is approximately 12.3 percent of the construction award amount. The increase is necessary due to changes that occurred during the construction of this unique facility. These changes included modifications to the station piping related to the location of existing underground facilities. Also, delays in procuring the hydroelectric generator and additional electrical work necessary to meet current codes resulted in extended overhead costs. FISCAL IMPACT: DESCRIPTION ESTIMATED COSTS PRELIMINARY AND FINAL DESIGN, ENVIRONMENTAL, & PERMITS $436,985 CONSTRUCTION Construction contract award $1,094,652 Construction contingency award $100,000 Additional contingency authorized $35,000 Construction Management & Inspection, Miscellaneous Items, staff support $304,516 Subtotal $1,534,168 TOTAL PROJECT COST $1,971,153 CURRENT APPROPRIATION $2,000,000 ADDITIONAL APPROPRIATION REQUIRED $-0- There are sufficient funds available in the project budget to support this request. DEPARTMENT CONTACT: Patrick Vaughan 760-602-2780 patrick.vaughan(a)carlsbadca.gov FOR SECRETARY USE. BOARD ACTION: APPROVED CONTINUED TO DATE SPECIFIC • DENIED • CONTINUED TO DATE UNKNOWN • CONTINUED • RETURNED TO STAFF • WITHDRAWN • OTHER - SEE MINUTES • AMENDED • REPORT RECEIVED • Project No. 5025 Contingency Increase April 21, 2015 Page 2 of 2 ENVIRONMENTAL IMPACT; The project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15303(d) - New Construction or Conversion of Small Structures. The City Planner filed a Notice of Exemption with the County of San Diego on October 18, 2011. EXHIBITS; 1. Resolution No. ^^^Q approving and authorizing a $35,000 increase in the construction contingency for the Pressure Control Hydroelectric Facility at the Maerkle Reservoir, Project No. 5025. EXHIBIT 1 1 RESOLUTION NO. 1520 2 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD MUNICIPAL WATER DISTRICT (CMWD), APPROVING AND AUTHORIZING A $35,000 INCREASE IN THE CONSTRUCTION 4 CONTINGENCY FOR THE PRESSURE CONTROL HYDROELECTRIC FACILITY AT THE MAERKLE RESERVOIR, PROJECT NO. 5025. 5 6 7 8 9 10 WHEREAS, on August 27, 2013, the Board adopted Resolution No. 1477 awarding a contract to Environmental Construction, Inc. for the construction of the Pressure Control Hydroelectric Facility at the Maerkle Reservoir, Project No. 5025; and WHEREAS, during the course of construction it was determined that changes and 11 associated costs were incurred; and 12 WHEREAS, staff is requesting an increase of $35,000 in the contingency for the 13 14 15 16 j7 NOW, THEREFORE, BE IT RESOLVED by the Carlsbad Municipal Water District Board of 18 the City of Carlsbad, California, as follows that: 1. The above recitations are true and correct. 2. The contingency amount for Project No. 5025, Pressure Control Hydroelectric Facility at the Maerkle Reservoir is increased by $35,000 for a total project contingency of $135,000. construction of the Pressure Control Hydroelectric Facility at the Maerkle Reservoir; and WHEREAS, there are sufficient funds available in the project budget to support this mcrease. 19 20 21 22 23 24 3. The Executive Manager is hereby authorized to sign change orders up to 25 $135,000 26 II 28 " 21 22 23 24 25 26 27 28 Carlsbad Municipal Water District of the City of Carlsbad on the 21st day of April 2015, by the following vote to wit: AYES: Board Members Hall, Blackburn, Schumacher, Wood, Packard. 1 PASSED, APPROVED AND ADOPTED at a Special Meeting of the Board of Directors of the 2 3 4 5 6 7 NOES: None. 8 ABSENT: None. 9 10 11 12 13 MATT HALL, President 14 ATTEST: 15 16 -71 iX^ 17 BARBARA ENGLESON, Secretary 1^ (SEAL) 20 \m