Loading...
HomeMy WebLinkAbout2016-06-14; Municipal Water District; 835; Accept bids and award contract to Habitat Restoration Sciences Inc for Lake Calavera Preserve palm grove removal and plant restoration project No. 3821CARLSBAD MUNICIPAL WATER DISTRICT-AGENDA BILl AB# 835 r------------1 DATE: 06-14-16 DEPT. -pW ACCEPT BIDS AND AWARD A DESIGN BUILD CONTRACT TO DEPT. DIRECTOR HABITAT RESTORATION SCIENCES, INC. IN THE AMOUNT OF $310,100, AND APPROPRIATE $225,000 FOR THE LAKE CALAVERA PRESERVE PALM GROVE REMOVAL AND NATIVE PLANT RESTORATION, PROJECT NO. 3821 GEN. COUNSEL EXEC. DIRECTO , RECOMMENDED ACTION: Adopt a Resolution accepting bids and awarding a design build contract to Habitat Restoration Sciences, Inc. in the amount of $310,100 and appropriating $225,000 from the Water-Capital Replacement Fund for the Calavera Preserve Palm Grove Removal and Native Plant Restoration, Project No. 3821. ITEM EXPLANATION: Carlsbad Municipal Water District (CMWD) operates the Lake Calavera Dam located at the southwestern end of Lake Calavera off Tamarack Avenue in the City of Carlsbad, San Diego County, California. In 2009, the CMWD completed the Lake Calavera Dam Remedial Improvements Project to comply with the State of California Division of Safety of Dams (DSOD) requirements. That project included repairs to the existing Lake Calavera Reservoir intake/outlet structure, spillway, and access road; slip-lining the existing outlet; and construction of a control building including fencing for improved site security around the dam operations. Vegetation was removed at that time but has since grown back. Pursuant to DSOD directives, vegetation on the dam and in the spillway should be removed as needed to allow visual inspection of dam for erosion, rodent burrowing, and for general dam safety. The most recent vegetation clearing along the dam and spillway was completed Jan. 29, 2016, to remove the trees and bulrush in the dam spillway and vegetation growing on the dam. As mitigation for the vegetation removal, and as a condition of the 15-year vegetation maintenance permit issued by the California Department of Fish and Wildlife (CDFW), CMWD agreed to remove the large palm grove and enhance and restore the palm grove area to native vegetation. Additionally, the palm trees within two adjacent areas which are referred to as "palm islands" will be killed in place. The CDFW permit requires that the palm grove removal and native plant restoration be initiated no later than Sept. 15, 2016. To ensure that CMWD gets a quality design and a well-constructed project that meets the requirements of the permits, a best value evaluation process was utilized for this contract as allowed by Carlsbad Municipal Code section 3.28.085. DEPARTMENT CONTACT: Sherri Howard 760-602-2756 Sherri.Howard@carlsbadca.gov FOR CLERK USE. ~ COUNCIL ACTION: APPROVED CONTINUED TO DATE SPECIFIC D DENIED D CONTINUED TO DATE UNKNOWN D CONTINUED D RETURNED TO STAFF D WITHDRAWN D OTHER-SEE MINUTES 0 AMENDED D REPORT RECEIVED D Item 15; pg. 1 Award Contract to HRS June 14, 2016 Page 2 of 2 On March 24, 2016, a Request for Proposals (RFP) was advertised to solicit bids for the project. On April 26, 2016, only one proposal was received in response to the RFP. A Selection Committee reviewed the proposal submitted by Habitat Restoration Sciences, Inc. and found the proposal to be responsive to the RFP. Based upon this review, staff recommends awarding the Design Build Contract for the Lake Calavera Preserve Palm Grove Removal and Native Plant Restoration, Project No. 3821, to Habitat Restoration Sciences, Inc. in the amount of $310,100. The engineer's estimate for the project is $250,000. FISCAL IMPACT: Funding for the project is from the Water — Capital Replacement Fund. A summary of estimated costs and available funds is shown in the following table: LAKE CALAVERA PRESERVE PALM GROVE REMOVAL AND NATIVE PLANT RESTORATION, PROJECT NO. 3821 ESTIMATED COSTS Design Build Contract $310,100 Construction Contingency $31,000 Construction Management, Inspection, Public Relations and Biological Monitoring $49,839 TOTAL ESTIMATED CONSTRUCTION COSTS $390,939 Current Appropriation $6,396,908 Current Expenditures/Encumbrances $6,230,969 TOTAL ESTIMATED REMAINING BALANCE $165,939 ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION $225,000 The long term dam maintenance, and selection and installation of the mitigation site, were not originally scoped with the dam repairs. Additional funds are requested for these costs. Sufficient funds are available in the Water Replacement Fund for the additional appropriation. ENVIRONMENTAL IMPACT: A Mitigated Negative Declaration (MND) and Mitigation Monitoring and Reporting Program (MMRP) were prepared for the Lake Calavera Dam Remedial Improvements Project ([IA 11-03). The MND was administratively approved by the City Planner on Dec. 13, 2012, in compliance with the California Environmental Quality Act (CEQA) Guidelines Section 15074. The removal of the palm trees and native plant restoration is a mitigation measure for the project and, therefore, no further environmental review is required. EXHIBITS: 1. Resolution accepting bids and awarding a design build contract to Habitat Restoration Sciences, Inc. in the amount of $310,100 and appropriating $225,000 from the Water - Capital Replacement Fund for the Lake Calavera Preserve Palm Grove Removal and Native Plant Restoration, Project No. 3821. 2. Location Map. Item 15; pg. 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 1550 A RESOUTION OF THE BOARD OF DIRECTORS OF CARLSBAD MUNICIPAL WATER DISTRICT (CMWD), ACCEPTING BIDS AND AWARDING A DESIGN BUILD CONTRACT TO HABITAT RESTORATION SCIENCES, INC. IN THE AMOUNT OF $310,100 AND APPROPRIATING $225,000 FOR THE LAKE CALAVERA PRESERVE PALM GROVE REMOVAL AND NATIVE PLANT RESTORATION, PROJECT NO. 3821. EXHIBIT I WHEREAS, the Board of Directors of the Carlsbad Municipal Water District, California has determined it necessary, desirable, and in the public interest to perform the Lake Calavera Preserve Palm Grove Removal and Native Plant Restoration, Project No. 3821; and WHEREAS, the palm grove removal and native plant restoration are required by the California Department of Fish and Wildlife permit as mitigation to perform routine vegetation maintenance on the Lake Calavera Dam; and WHEREAS, on March 26, 2016, a Design Build Request for Proposal for the project was publicly advertised; and WHEREAS, one design build proposal was received for the Lake Calavera Preserve Palm Grove Removal and Native Plant Restoration, Project No. 3821; and WHEREAS, after reviewing and scoring all elements of the proposal in accordance with the selection criteria identified in the request for proposat the selection committee determined that the proposal from Habitat Restoration Sciences, Inc. is the best value proposer to provide requested design build services to perform the Lake Calavera Preserve Palm Grove Removal and Native Plant Restoration, Project No. 3821; and WHEREAS, the design build proposal received is in the amount of $310,100; and WHEREAS, staff is recommending that the Board approve the design build contract with Habitat Restoration Sciences, Inc. in the amount of$310,100; and Item 15; pg. 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 WHEREAS, an additional appropriation is necessary for the construction and construction related services; and WHEREAS, under the Operating Agreement with the City of Carlsbad, the Carlsbad Municipal Water District adopted the city's purchasing rules; and WHEREAS, subsection 3.28.090(B) of the Carlsbad Municipal Code authorizes the Executive Manager to approve change orders in the amount equal to the contingency set at the time of project award. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California as follows: II II II II II II I 1. 2. That the above recitations are true and correct. That the proposal of $310,100 submitted by Habitat Restoration Sciences, Inc. for the design and construction of the Lake Calavera Preserve Palm Grove Removal and Native Plant Restoration, Project No. 3821, is accepted and the President is hereby authorized to execute the Agreement attached hereto as Attachment A (on file in the Office of the City Clerk). 3. That the Executive Manager is hereby authorized to approve construction change orders up to $31,000. 4. That the Administrative Services Director is hereby authorized to appropriate an additional $225,000 to Project No. 3821 from the Water Replacement Fund. 5. That the award of this contract is contingent upon Habitat Restoration Sciences, Inc. executing the required contract and submitting the required bonds and insurance policies, as described in the contract, within 10 days of adoption of this resolution. The Executive Manager may grant reasonable extensions of time. Item 15; pg. 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Special Meeting of the Carlsbad Municipal Water District Board of Directors and the City Council of the City of Carlsbad and the on the 14th day of June, 2016, by the following vote to wit: AYES: Hall, Wood, Schumacher, Blackburn, Packard. NOES: None. ABSENT: None. ~~ MATI HALL, President JCI~JJr-CoP ,;___ 'BARB A ENGLESON, Secretary (SEAL) Item 15; pg. 5 Calavera Dam Maintenance Area LEGEND 'V • • • • 1,••• ••• •• •••1 A Maintenance Site (Impact Area) Mitigation Areas (Palm Grove and Native Plant Restoration) Removal 7 A E ▪ IME CITY OF OCEANSIDE •Ml Mitigation Areas Palm Grove Removal and Native Plant Restoratrion) NOT TO SCALE LOCATION MAP -gi-fvuoo f- 2- CITY OF OCEANSIDE HIGHWAY >8 CITY OF VISTA car OF toloas A N MARCOS CITY OF ENCINITAS stir t M SITE VICINITY AP NOT TO SCALE PACIFIC OCEAN PL017ED Br ALFRED ROMERO PLOT DATE 5/20/2016 PAIN: J:\ROME9O_ALFRED\Departments_Projects\TRANSPORTATION_DEPT\LOCATION-MAPS_Faraday-flr-plan\SHERRI-HOWARDS\Calavera-Preserve-Plan PROJECT NAME LAKE CALAVERA PRESERVE PALM GROVE REMOVAL AND NATIVE PLANT RESTORATION PROJECT NUMBER 3821 EXHIBIT 2 Item 15; pg. 6