Loading...
HomeMy WebLinkAbout2017-01-24; Municipal Water District; ; Adopt a Resolution approving plans and specifications and authorizing the Secretary to the Board to advertise and receive bids for the Bolero Pressure Reducing Station Replacement, Project No 5020CA Review /4-5 Cluks MUNICIPAL WATER DISTRICT4:9 •0 Staff Report 044.F.00 - Meeting Date:Jan. 24, 2017 To:President and Board Members From:Kevin Crawford, Executive Manager Staff Contact:Lindsay Leahy, Associate Engineer Lindsay.Leahy@carlsbadca.gov Subject:Adopt a Resolution approving plans and specifications and authorizing the Secretary to the Board to advertise and receive bids for the Bolero Pressure Reducing Station Replacement, Project No. 5020. Recommended Action Adopt a Resolution approving the plans and specifications and authorizing the Secretary to the Board to advertise and receive bids for the Bolero Pressure Reducing Station Replacement, Project No. 5020. Executive Summary The Bolero Pressure Reducing Station is one of Carlsbad Municipal Water District's (CMWD) 74 pressure reducing stations for the potable water distribution system. The buried concrete pressure reducing station was built in 1977 and has reached the end of its useful life and is in need of replacement. The defects include cracked and spalling concrete and exposed rebar. To coordinate distribution system upgrade efforts, the pipe and appurtenances inside the concrete vault will also be replaced due to age. Service to customers will be maintained during construction. Staff recommends approval of the project plans and specification, and authorization to advertise for construction bids of Project No. 5020. Discussion CMWD's water distribution system is divided into 17 pressure zones. A pressure reducing station is located between two different pressure zones. The station contains valves and appurtenances which maintain a downstream pressure in the system. The Bolero Pressure Reducing Station is located on Bolero Street, within the public right-of-way. The demolition of the existing vault and construction of the new vault will require a shutdown of the 12-inch Asbestos Concrete Pipe (ACP) for the duration of construction.In order to prepare for this work, CMWD has installed an insertion valve to isolate the vault location and will allow water service to customers to be maintained during construction. The project will require the existing vault and appurtenances to be removed. A new cast-in- place concrete vault will be poured and new appurtenances and concrete mortar lined and coated (CMLC) steel pipe will be installed. All existing electrical and SCADA connections will be reestablished after the installation of the new equipment. The existing 12-inch ACP will be removed and replaced with 12-inch polyvinyl chloride (PVC)pipe to the nearest joint upstream and downstream of the vault. New appurtenances will be procured and installed under this project. Fiscal Analysis The engineer's estimate of the construction cost of the Bolero Pressure Reducing Station Replacement, Project No. 5020 is $216,000. The project will be funded by the Water Capital Replacement Fund. A summary of estimated construction costs and available funds is shown below. BOLERO PRESSURE REDUCING STATION REPLACEMENT, ESTIMATED COSTSPROJECT NO. 5020 Construction Contract (Engineer's Estimate)$216,000 Construction Contingency)$30,000 Construction Management, Inspection, and Material Testing $32,000 TOTAL ESTIMATED CONSTRUCTION COSTS $278,000 Current Appropriation-Pressure Reducing Station Program,CIP No. 5020 $661,732 Current Expenditures/Encumbrances-Pressure Reducing Station Program, CIPNo. 5020 $0 'TOTAL FUNDS AVAILABLE PHASE III PIPELINE PROGRAM, CIP NO. 5208 $661,732 ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION $0 'Engineering staff typically recommends that an allowance of 10 percent of the construction cost be budgeted for potential change orders on projects of average size and complexity. Since this is a smaller than average project,staff recommends using a fixed dollar amount to ensure that adequate funds are available to address unforeseen issues that may be encountered during construction. The fixed dollar amount results in a contingency budget that is greater than 10 percent. Next Steps A Construction Contract Request for Bids will be advertised on the city bid site. Staff will then return to the Board to recommend awarding a contract to the lowest responsive and responsible bidder. Environmental Evaluation (CEQAI The project is exempt from the California Environmental Quality Act (CEQA)per State CEQA Guidelines Section 15301(b)—repair and minor alteration of existing facilities, including public utility services, involving negligible or no expansion. Further, all construction is located within the street. Public Notification None required. Exhibits 1.Resolution approving the plans and specifications and authorizing the Secretary to the Board to advertise for bids for the Bolero Pressure Reducing Station Replacement, Project No. 5020. 2.Location Map. EXHIBIT 1 RESOLUTION NO. 1561 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT BOARD,APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING THE SECRETARY TO THE BOARD TO ADVERTISE AND RECEIVE BIDS FOR THE BOLERO PRESSURE REDUCING STATION REPLACEMENT, PROJECT NO. 5020. WHEREAS,the Board of Directors of the Carlsbad Municipal Water District (CMWD), California has determined it necessary,desirable, and in the public interest to remove and replace the below ground concrete vault and appurtenances within the Bolero Pressure Reducing Station; and WHEREAS,the plans and specifications for furnishing of all labor, materials, tools, equipment, transportation, and other expenses necessary or incidentals of said project have been prepared and are on file in the Utilities Department of the City of Carlsbad and are incorporated by reference herein; and WHEREAS,the project is exempt from CEQA per State CEQA Guidelines Section 15301(b)— repair and minor alteration of existing facilities, including public utility services, involving negligible or no expansion. Further, all construction is located within the street; and WHEREAS,the engineer's estimate for the project is $216,000; and WHEREAS,sufficient funds exist in the Pressure Reducing Station Program. NOW, THEREFORE,BE IT RESOLVED by the Carlsbad Municipal Water District Board of the City of Carlsbad, California,as follows: 1.That the above recitations are true and correct. 2.That the plans, specifications and contract documents for the Bolero Pressure Reducing Station Replacement, Project No. 5020 on file in the Utilities Department of the City of Carlsbad are hereby approved. 3.The Secretary to the Board is hereby authorized and directed to publish, in accordance with State law,a Notice to Contractors Inviting Bids for the construction of the Bolero Pressure Reducing EXHIBIT 1 Station Replacement,Project No.5020,in accordance with the plans,specifications,and contract documents referred to herein. PASSED,APPROVED AND ADOPTED at a Special Meeting of the Carlsbad Municipal Water District of the City of Carlsbad on the 24th day of January, 2017, by the following vote, to wit: AYES:M. Hall,K.Blackburn, M. Schumacher,C.Schumacher, M. Packard. NOES:None. ABSENT:None. MATT ALL,P ESIDENT BARB RA ENGLESON,SECRV'Y (SEAL) ,011111111.,, ...........4„ :4+tVfz.- 03:0 lu;Ecn: •0 •. LOCATION MAP 4 ft'ai I ki0 Vibill kali 1111" 11111 WO Alli •litip '''....ir -itiri*- 11 Ate •ikes$ air*041F.4p 41741111/*It II!'Oki ;.,4 11 wiiirri /altos .--)vo-ji-::.:/_..ThrtVi w - - iiir. iii;le,P.i''(-i -•''' imowilli #SAir /**111 - aril8/4 1Irit't **-. -' 17 r gm*"iiiikaq_.ow 440.if 111401..iit NE a. xl.iit*li aliMPIN4-1 100741rv+11ce-f!IlliP .1kilipa.illY .:‘'.I;i111 1110t.. ,/,,s4.4:.itAIL•••of4. ifto.-4.- 404.,. 04 akt iter,..,....0 4„.vilimVAP i.eittia„..._./.. "11.01111.-Milifili.....ir.orignimillinZirWrin:orier —.4411011..* drir at each% a.airl.."'"...P ---'4111111 ‘4 it 14Ijrr i'..•,. CITY OF OCEANSIDE HIGHWAY AT _ #211 IIII I III IN.* I 111I 111I111 11—Tr I VICINITY lips1\11111 A6IM NOT TO SCALE ,Aumon CITY OF VISTA S 1 t‘,MOP qe On or VilII11146014thi.7s IC'''' PACIFIC WiOCEAN NOT TO SCALE CITY OF ENCINITAS --fi PROJECT NAME PROJECT EXHIBIT BOLERO PRESSURE REDUCING NUMBER STATION REPLACEMENT 5020-A 2