HomeMy WebLinkAbout2017-05-23; Municipal Water District; ; Adopt a Resolution accepting bids and awarding a contract to Wright Construction Engineering Corp. for construction of the Bolero Pressure Reducing Station Replacement, Project No. 5020-APage 305 Meeting Date: To: From: Staff Contact: Subject: May 23,2017 President and Board Members ~ Kevin Crawford, Executive Manage~ Lindsay Leahy, Associate Engineer Lindsay.Leahy@carlsbadca.gov or 760-603-7325 CA Review Adopt a Resolution accepting bids and awarding a contract to Wright Construction Engineering Corp. for construction of the Bolero Pressure Reducing Station Replacement, Project No. 5020-A. Recommended Action Adopt a Resolution accepting bids and awarding a contract to Wright Construction Engineering Corp. for construction of the Bolero Pressure Reducing Station Replacement, Project No. 5020- A. Executive Summary The Bolero Pressure Reducing Station is one of Carlsbad Municipal Water District's (CMWD) 74 pressure reducing stations for the potable water distribution system. The buried concrete pressure reducing station was built in 1977 and has reached the end of its useful life and is in need of replacement. The defects include cracked concrete and exposed rebar within the buried vault, located in Bolero Street, in the southeast portion of Carlsbad. To coordinate distribution system upgrade efforts, the pipe and appurtenances inside the concrete vault will also be replaced due to age. Water service to customers will be maintained during construction. Staff recommends accepting bids and awarding a contract to Wright Construction Engineering Corp. for the construction bids of Project No. 5020-A. Discussion CMWD's water distribution system is divided into 17 pressure zones. A pressure reducing station is located between two different pressure zones to provide customers with an acceptable range of water pressure. The pressure reducing station consists of valves and appurtenances located in a buried concrete vault which maintain a downstream pressure in the system. The Bolero Pressure Reducing Station is located on Bolero Street, within the public right-of-way. The demolition of the existing vault and construction of a new vault will require a shutdown of the 12-inch waterline for the duration of construction. In order to prepare for this work, CMWD staff installed an insertion valve to isolate the vault location that will allow water service to customers to be maintained during construction. Page 306 The scope of the project requires the existing vault and appurtenances to be removed, new cast- in-place concrete vault to be poured and new steel pipe and valves to be installed. All existing electrical and Supervisory Control and Data Acquisition (SCADA) connections will be reestablished after the installation of the new equipment. Traffic control will be in place during construction and traffic will be maintained on Bolero Street throughout the project. Traffic control plans are required to be submitted and approved prior to the contractor mobilizing to the site and beginning construction. On Jan. 23, 2017, through the adoption of Resolution No. 1561, the CMWD Board approved plans and specifications and authorized the secretary to the Board to advertise to receive bids for the Bolero Pressure Reducing Station Replacement, Project 5020-A. On March 28, 2017, seven sealed bids were received for the construction of this project as shown in the following table. BOLERO PRESSURE REDUCING STATION REPLACEMENT, PROJECT NO. 5020-A CONTRACTOR TOTAL BID 1. Wright Construction Engineering Corp. $226,000 2. Falcon Construction Co. $244,800 3. AToM Engineering Construction, Inc. $257,398 4. Canyon Springs Enterprises dba RSH Construction $265,000 5. Blue Pacific Engineering & Construction $282,300 6. Gateway Pacific Contractors, Inc. $387,631 7. Bali Construction, Inc. $419,100 Wright Construction Engineering Corp. submitted the lowest bid in the amount of $226,000. Staff has completed the review of the bid documents and has determined that Wright Construction Engineering Corp. is the confirmed low bidder and their bid documents are responsive. Wright Construction Engineering Corp. submitted a list of similar projects to show their capabilities and qualifications to perform the specified work. Staff recommends that Wright Construction Engineering Corp. be awarded the contract. The construction contract contains general performance standards, references technical specifications, and includes a one year warranty period. A 10 percent retention will be withheld from each progress payment until final acceptance of the project. The construction contract includes liquidated damages which may be assessed in the amount of $500 per day for each day in excess of the time specified for completion of the work. Fiscal Analysis The engineer's estimate of the construction cost of the Bolero Pressure Reducing Station Replacement, Project No. 5020-A is $216,000. Funds for the project have been appropriated in the Pressure Reducing Station Replacement Program in the Capital Improvement Program (CIP). A summary of estimated construction costs and available funds is shown below: Page 307 PRESSURE REDUCING STATION REPLACEMENT PROGRAM, CIP NO. 5020 Current Appropriation $1,102,000 Current Expenditures/Encumbrances $393,439 TOTAL FUNDS AVAILABLE $708,561 BOLERO PRESSURE REDUCING STATION REPLACEMENT, PROJECT NO. 5020-A Construction Contract (Wright Construction Engineering Corp.) $226,000 Construction Contingency $40,000 Construction Management, Inspection and Material Testing $65,000 TOTAL ESTIMATED CONSTRUCTION COSTS $331,000 REMAINING BALANCE AFTER CONSTRUCTION $377,561 ADDITIONAL APPROPRIATION REQUIRED $0 Next Steps Once awarded, staff will provide the Public Works contract to Wright Construction Engineering Corp. for their execution and requestthat Wright Construction Engineering Corp. provide the required bonds and proof of insurance. Once this task is complete, staff will schedule a pre- construction meeting with Wright Construction Engineering Corp. and a Notice-to-Proceed will be issued. The duration of the construction contract is 90 working days, exclusive of rain days and change orders that may extend the contract duration. Upon the successful completion of the project, staff will request that the Board accept the construction of the Bolero Pressure Reducing Station and direct the secretary of the Board to record a Notice of Completion and to release bonds. Environmental Evaluation (CEQA) The project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15301(b)-repair and minor alteration of existing facilities, including public utility services, involving negligible or no expansion. Further, all construction is located within the street. Public Notification None required. While none is required, CMWD will provide public notice in advance of construction activities using multiple media methods, such as signage, email, website and other city communication channels. The construction contractor will also be required to notify the public of construction activities. Exhibits 1. Resolution accepting bids and awarding a contract to Wright Construction Engineering Corp. for construction of the Bolero Pressure Reducing Station Replacement, Project No. 5020-A. 2. Location Map. 3. Contract is on file with the Carlsbad Municipal Water District. RESOLUTION NO. 1569 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT BOARD (CMWD), ACCEPTING BIDS AND AWARDING A CONTRACT TO WRIGHT CONSTRUCTION ENGINEERING CORP. FOR CONSTRUCTION OF THE BOLERO PRESSURE REDUCING STATION REPLACEMENT, PROJECT NO. 5020-A. EXHIBIT 1 WHEREAS, the Carlsbad Municipal Water District Board of the City of Carlsbad, California has determined it necessary, desirable, and in the public interest to remove and replace the below ground concrete vault and appurtenances within the Bolero Pressure Reducing Station; and WHEREAS, on Jan. 23, 2017, through the adoption of Resolution No. 1561, the Carlsbad Municipal Water District {CMWD) Board approved plans and specifications, and authorized the secretary to the Board to advertise to receive bids for the construction of the Bolero Pressure Reducing Station Replacement, Project No. 5020-A; and WHEREAS, seven sealed bids were received on March 28, 2017, by CMWD for the construction of this project; and WHEREAS, the lowest responsible and responsible bid was submitted by Wright Construction Engineering Corp. in the amount of $226,000; and WHEREAS, funds have been appropriated from the Bolero Pressure Reducing Station Replacement Program, Capital Improvement Project No. 5020 and are sufficient for the completion of this project; and WHEREAS, the project is exempt from CEQA per State CEQA Guidelines Section 15301(b) - repair and minor alteration of existing facilities, including public utility services, involving negligible or no expansion. Further, all construction is located within the street. EXHIBIT 1 NOW, THEREFORE, BE IT RESOLVED by the Carlsbad Municipal Water District Board of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the bid in the amount of $226,000 submitted by Wright Construction Engineering Corp. for construction of the Bolero Pressure Reducing Station Replacement, Project No. 5020-A, is accepted and the president of the Board is hereby authorized to execute a contract with Wright Construction Engineering Corp. 3. That the executive manager or designee is hereby authorized to approve construction change orders up to $40,000. 4. That the award of this contract is contingent upon the bidder submitting the lowest responsible bid, executing the required contract and submitting the required bonds and insurance policies, as described in the contract, within 20 days of adoption of this Resolution. The executive manager may grant reasonable extensions of time. PASSED, APPROVED AND ADOPTED at a Special Meeting of the Carlsbad Municipal Water District of the City of Carlsbad on the 23rd day of May, 2017, by the following vote, to wit: AYES: M. Hall, K. Blackburn, M. Schumacher, C. Schumacher, M. Packard. NOES: ABSENT: None. None. (SEAL) Page 310 NOT TO SCALf PROJECT NAME LOCATION MAP BOLERO PRESSURE REDUCING STATION REPLACEMENT PROJECT EXHIBIT NUMBER 2 5020-A