Loading...
HomeMy WebLinkAbout2017-08-22; Municipal Water District; ; Adopt a Resolution approving plans and specifications and authorizing the Board of the CMWD to advertise and receive bids for the C and D3 Steel Water Tanks Coating and Structural Repairs, Project No. 5024#16 Meeting Date: To: From: Staff Contact: Subject: Aug.22,2017 President and Board Members Kevin Crawford, Executive Manager Mark Biskup, Associate Engineer Mark.Biskup@carlsbadca.gov or 760-603-7352 CA Review r/~ Adopt a Resolution approving plans and specifications and authorizing the secretary to the Board of the Carlsbad Municipal Water District to advertise and receive bids for the C and D3 Steel Water Tanks Coating and Structural Repairs, Project No. 5024. Recommended Action Adopt a Resolution approving plans and specifications and authorizing the secretary to the Board of the Carlsbad Municipal Water District (CMWD) to advertise and receive bids for the C and D3 Steel Water Tanks Coating and Structural Repairs, Project No. 5024. Executive Summary The C tank and D3 water storage tanks are scheduled for new interior and exterior coatings and structural repairs as part of the Reservoir Repair and Maintenance Program, CIP No. 5024. Staff recommends that the Board approve the project plans and specifications and authorize the secretary to the Board to advertise and receive construction bids for C and D3 Steel Tanks Coating and Structural Repairs, Project No. 5024 (Project). Discussion CMWD owns, operates and maintains 11 potable water distribution reservoirs and 7 reservoirs that are used for either recycled water or surface water storage. In 2012, CMWD developed a Reservoir Repair and Maintenance Program (Program). As a part of that Program, both the C and D3 tanks are scheduled for interior and exterior coatings and structural repairs. The D3 tank is a circular welded steel tank, constructed in 1995. The 175 foot diameter tank stands 50 feet high and has a storage capacity of 9 million gallons. The tank is located south and east of the Poinsettia Lane and Black Rail Road intersection and is an integral component of the potable water distribution and storage system. The C tank is also a circular welded steel tank that was constructed in 1961. It is located northeast of the intersection of Cannon Road and College Boulevard near Sage Creek High School. The 75 foot diameter tank stands 32 feet high and has a storage capacity of 1 million gallons of recycled water. Originally part of the potable water distribution system, the tank was later converted to recycled water storage. The tank was last coated in the mid-1990s. Page 467 Improvements to the C and D3 tanks will include the removal of the interior coating and application of a new zinc and 3-coat epoxy coating system along with the installation of an exterior over-coating. Numerous structural repairs are required which include: replacement of earthquake rod assemblies, water level indicators, cathodic protection, interior and exterior ladders, handrails, gates and repair and replacement of miscellaneous hatches and vents. For quality assurance, special inspection of the coating systems will be provided by a National Association of Corrosion Engineers (NACE) certified inspection service firm. Fiscal Analysis The engineer's estimate of the construction cost of the C and D3 Steel Water Tanks Coating and Structural Repairs, Project No. 5024, is $1,500,000. The total Project cost of $1,910,000 includes: construction contract; contingency for change orders management; construction management and inspection; engineering support for contractor shop drawings, requests for information, meetings; community outreach. The Project will be funded by the Water Replacement Fund. A summary of available funds and estimated construction costs are shown in the table below: RESERVOIR REPAIR AND MAINTENANCE PROGRAM, CIP NO. 5024 Current Appropriation $3,314,153 Current Expenditures/Encumbrances-Planning, Design and Staff Administration $42,848 TOTAL AVAILABLE RESERVOIR REPAIR AND MAINTENANCE PROGRAM, CIP $3,271,305 NO. 5024 C & 03 STEEL WATER TANK COATING AND STRUCTURAL REPAIRS, PROJECT NO. 5024 Construction Contract (Engineer's Estimate) $1,500,000 Construction Contingency (Estimated) $150,000 Construction Management, Inspection, and Material Testing (Estimated) $225,000 TOTAL ESTIMATED CONSTRUCTION COSTS $1,875,000 Engineering and Administrative Support During Construction (Estimated) $35,000 TOTAL ESTIMATED PROJECT COSTS $1,910,000 REMAINING BALANCE AFTER PROJECT NO. 5024 $1,361,305 ADDITIONAL'APPROPRIATION NEEDED $0 Next Steps A Construction Contract Request for Bids will be advertised on the city bid site. Staff will then return to the Board to recommend awarding a contract to the lowest responsive and responsible bidder. Page 468 Environmental Evaluation (CEQA) The Project is exempt from the California Environmental Quality Act {CEQA) per State CEQA Guidelines Section 15301{b)-repair and minor alteration of existing facilities, including public utility services, involving negligible or no expansion. Public Notification This item was noticed in accordance with the Ralph M. Brown Act and was available for public viewing and review at least 72 hours prior to the scheduled meeting date. Community outreach will be performed in advance and during construction activities to provide nearby residents with information and timing of contractor activities. Exhibits 1. Resolution approving plans and specifications and authorizing the secretary to the Board of the Carlsbad Municipal Water District to advertise and receive bids for the C and D3 Steel Water Tanks Coating and Structural Repairs, Project No. 5024. 2. Location Map. 3. Project plans, specifications, and bid documents are on file at Carlsbad Municipal Water District. Page 469 RESOLUTION NO. 1582 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT BOARD {CMWD), APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING THE SECRETARY TO THE BOARD OF THE CARLSBAD MUNICIPAL WATER DISTRICT TO ADVERTISE AND RECEIVE BIDS FOR THE C AND D3 STEEL WATER TANKS COATING AND STRUCTURAL REPAIRS, PROJECT NO. 5024. EXHIBIT I WHEREAS, the Carlsbad Municipal Water District Board of the City of Carlsbad, California has determined it necessary, desirable, and in the public interest to recoat and provide structural repairs to the C and D3 steel water tanks; and WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, equipment, transportation, and other expenses necessary, or incidentals of C and D3 Steel Water Tanks Coating and Structural Repairs, Project No. 5024 (Project), have been prepared and are on file at CMWD of the City of Carlsbad and are incorporated by reference herein; and WHEREAS, the Project is exempt from CEQA per State CEQA Guidelines Section 15301{b) - repair and minor alteration of existing facilities, including public utility services, involving negligible or no expansion; and WHEREAS, the engineer's estimate of the construction contractor's bid for the Project is $1,500,000; and WHEREAS, sufficient funds exist in the Reservoir Repair and Maintenance Program, CIP No. 5024. NOW, THEREFORE, BE IT RESOLVED by the Carlsbad Municipal Water District Board of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the plans, specifications and contract documents for the C and D3 Steel Water Tanks Coating and Structural Repairs, Project No. 5024, on file at CMWD of the City of Carlsbad are hereby approved. EXHIBIT I 3. The secretary to the Board is hereby authorized and directed to publish, in accordance with State law, a Notice to Contractors Inviting Bids for the construction of the C and D3 Steel Water Tanks Coating and Structural Repairs, Project No. 5024, in accordance with the plans, specifications, and contract documents referred to herein. PASSED, APPROVED AND ADOPTED at a Special Meeting of the Carlsbad Municipal Water District ofthe City of Carlsbad on the 22nd day of August, 2017, by the following vote, to wit: AYES: NOES: ABSENT: M. Hall, K. Blackburn, M. Schumacher, C. Schumacher, M. Packard. None. None. (SEAL) EXHIBIT 2 LOCATION MAP LEGEND: • TANK LOCATIONS PROJECT NAME 03 AND C STEEL WATER TANK COATING AND STRUCTURAL REPAIRS PLOTTED BY: SCOTT EVANS PLOT DATE::7/12/17 PA7H:D:\UT1LJT1£S D£PAR1M£NT\L0CAT10N MAPS\AUTOCAD\5024-DJ AND C.DWG NOT TO SCALE PROJECT NUMBER 5024 EXHIBIT 2 Page 472