HomeMy WebLinkAbout2017-12-12; Municipal Water District; ; Adopt a Resolution accepting bids and awarding a contract to Capriati Construction Corp. for the construction of the Valve Replacement: Phase I, Project No. 5019-AOn Nov. 8, 2017, three sealed bids were received for the construction ofthis Project as shown in the following table: VALVE REPLACEMENT: PHASE I, PROJECT NO. 5019-A CONTRACTOR TOTAL BID 1. Capriati Construction Corp. $1,898,078 2. Burtech Pipeline, Inc. $1,910,400 3. Ampco Contracting, Inc. $1,962,700 Capriati Construction Corp. submitted the lowest bid in the amount of $1,898,078. The engineer's estimate of the construction cost was $1,600,000. The bid cost was higher than estimated. This is likely due to the unique nature of the Project, which includes 19 distinct construction sites, each requiring a mobilization/demobilization effort. In addition, several of the locations are within North County Transit District (NCTD} or Caltrans right-of-way or in close proximity to high traffic areas, such as the Village and schools. To minimize impacts to the city, these locations require work to be scheduled at night, during school breaks, or outside of scheduled civic events. Staff has completed the review ofthe bid documents and has determined that Capriati Construction Corp. is responsive and responsible and the confirmed low bidder. Capriati Construction Corp. submitted a list of similar projects to show their capabilities and qualifications to perform the specified work. Staff recommends that Capriati Construction Corp. be awarded the contract. The construction contract contains general performance standards, references technical specifications, and includes a one year warranty period. A five percent retention will be withheld from each progress payment until final acceptance of the project. The construction contract includes liquidated damages which may be assessed in the amount of $2,500 per day for each day in excess of the time specified for completion of the work. Fiscal Analysis The Project will primarily be funded by the Water Valve Repair/Replacement Program, CIP No. 5019, with the condition assessment work estimated at $25,388 being funded by the Water Condition Assessment Program, CIP No. 5051. The construction contract with Capriati Construction Corp. is for $1,898,078. An estimated contingency of $237,260 is assigned to this Project due to the complex nature of the Project that includes 19 different sites, each with separate mobilization/demobilization, sequencing, and potential for unknown conditions. As shown in the table below, the estimated construction phase cost of $2,610,338 includes: a construction contract; contingency for change orders management; construction management and inspection; and engineering and administrative support for contractor shop drawings, requests for information, meetings, and community outreach. With the exception of the condition assessment line item, all other Project costs will be funded by the Water Valve Repair/Replacement Program, CIP No. 5019. December 12, 2017 Item #8 Page 3 of 8 A summary of available funds and estimated construction costs are shown below: WATER VALVE REPAIR/REPLACEMENT PROGRAM, CIP NO. 5019 Current Appropriation $3,350,000 Current Expenditures/Encumbrances $728,715 TOTAL AVAILABLE -WATER VALVE REPAIR/REPLACEMENT PROGRAM, CIP $2,621,285 NO. 5019 VALVE REPLACEMENT: PHASE I, PROJECT NO. 5019-A Construction Contract (Capriati Construction Corp.) $1,898,078 Construction Contingency (Estimated) $237,260 Construction Management, Inspection, and Material Testing (Estimated) $350,000 Engineering and Administrative Support During Construction, Staff and $125,000 Consultant (Estimated) TOTAL ESTIMATED CONSTRUCTION PHASE COSTS -PROJECT NO. 5019-A $2,610,338 Portion Funded by Water Condition Assessment Program, CIP No. 5051 $25,388 REMAINDER FUNDED BY WATER VALVE REPAIR/REPLACEMENT PROGRAM, $2,584,950 CIP NO. 5019 REMAINING BALANCE AFTER PROJECT NO. 5019-A '" $36,335 ADDITIONAL APPROPRIATION NEEDED ' $0 Next Steps Once awarded, staff will provide the contract to Capriati Construction Corp. for their execution and request that Capriati Construction Corp. provide the required bonds and proof of insurance. On,ce this task is complete, staff will schedule a pre-construction meeting with Capriati Construction Corp. and a Notice-to-Proceed will be issued. The duration of the construction contract is 250 working days, exclusive of weather-related events and change orders that may extend the contract duration. Upon the successful completion of the Project, staff will request that the executive manager accept the construction of the Project, and record a Notice of Completion and to release bonds. Environmental Evaluation (CEQA) This Project is exempt from California Environmental Quality Act (CEQA) review pursuant to CEQA Guidelines Section 15302(c) -Replacement or reconstruction of an existing utility system and/or facility involving negligible or no expansion of capacity. Public Notification This item was noticed in accordance with the Ralph M . Brown Act and was available for public viewing and review at least 72 hours prior to the scheduled meeting date. Prior to the start of construction, the public will be notified of the construction activities using media methods such as signage, email, website, and other city communication channels. The construction contractor will also be required to notify the public of construction activities via changeable message signs, door hangers, letters to residents, and/or "NO PARKING" signs, as applicable. December 12, 2017 Item #8 Page 4 of 8 This Project will result in short-term water service disruptions at each of the 19 locations when the new valves are installed. Construction at some of the locations may also disrupt traffic and access. CMWD staff will complete public outreach within the vicinity of each valve replacement site for general notification of upcoming construction, as well as properly notify customers of any water service interruptions or traffic/access impacts during construction. Exhibits 1. Resolution accepting bids and awarding a contract to Capriati Construction Corp. for the construction of the Valve Replacement: Phase I, Project No. 5019-A. 2. Location Map. 3. Following award of contract and contract execution, the executed contract will be on file with the Carlsbad Municipal Water District. December 12, 2017 Item #8 Page 5 of 8 RESOLUTION NO. 1589 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT BOARD (CMWD), ACCEPTING BIDS AND AWARDING A CONTRACT TO CAPRIATI CONSTRUCTION CORP. FOR THE CONSTRUCTION OF THE VALVE REPLACEMENT: PHASE I, PROJECT NO. 5019- A. EXHIBIT 1 WHEREAS, the Carlsbad Municipal Water District Board of the City of Carlsbad, California has determined it necessary, desirable, and in the public interest to replace broken valves at prioritized locations and concurrently make other improvements and conduct condition assessment at the same locations; and WHEREAS, on Aug. 22, 2017, through the adoption of Resolution No. 1580, the CMWD Board approved plans and specifications, and authorized the secretary to the Board to advertise to receive bids for the Valve Replacement: Phase I, Project No. 5019-A (Project); and WHEREAS, the Project is exempt from CEQA per State CEQA Guidelines Section 15302(c) - replacement or reconstruction of an existing utility system and/or facility involving negligible or no expansion of capacity; and WHEREAS, three sealed bids were received on Nov. 8, 2017, by CMWD, for the construction of the Project; and WHEREAS, the lowest responsible bid was submitted by Capriati Construction Corp. in the amount of $1,898,078; and WHEREAS, funds have been appropriated from the Water Valve Repair Replacement Program, CIP No. 5019 and are sufficient for the completion of this Project; and WHEREAS, subsection 3.28.040(C)(5) of the Carlsbad Municipal Code authorizes the executive manager or designee to approve change orders in the amount equal to the contingency set at the time of Project award. December 12, 2017 Item #8 Page 6 of 8 EXHIBIT I NOW, THEREFORE, BE IT RESOLVED by the Carlsbad Municipal Water District Board of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the bid in the amount of $1,898,078 submitted by Capriati Construction Corp. for construction of the Project, is accepted and the president of the Board is hereby authorized to execute a contract with Capriati Construction Corp. 3. That the executive manager or designee is hereby authorized to approve construction change orders up to $237,260. 4. That the award of this contract is contingent upon Capriati Construction Corp. executing the required contract and submitting the required bonds and insurance policies, as described in the contract, within 20 days of adoption of this Resolution. The executive manager may grant reasonable extensions of time. PASSED, APPROVED AND ADOPTED at a Special Meeting of the Carlsbad Municipal Water District Board of the City of Carlsbad on the 12th day of December, 2017, by the following vote, to wit: AYES: NOES: ABSENT: M. Hall, K. Blackburn, M. Schumacher, C. Schumacher, M. Packard. None. None. u i . cfY11o Jn1211<,u-J~ BARBARA ENGLESON, SECRETARY (SEAL) December 12, 2017 Item #8 Page 7 of 8