Loading...
HomeMy WebLinkAbout2018-05-22; Municipal Water District; ; Plans and specifications and authorization for the secretary to the Board to advertise and receive bids for the Recycled Water Phase Ill Installation of Recycled Water ServicesMeeting Date: To: From: Staff Contact: Subject May 22, 2018 President and Board Members Kevin Crawford, Executive Manager Cathy Nhothsavath, Assistant Engineer Cathy.Nhothsavath@carlsbadca.gov or 760-438-2722 CAReview ~ Plans and specifications and authorization for the secretary to the Board to advertise and receive bids for the Recycled Water Phase Ill Installation of Recycled Water Services. Recommended Action Adopt a Resolution approving plans and specifications and authorizing the secretary to the Board to advertise and receive bids for the Recycled Water Phase Ill Installation of Recycled Water Services, Project No. 5205-B. Executive Summary The Recycled Water Phase Ill Installation of Recycled Water Services, Project No. 5205-B (Project), is part of the Carlsbad Municipal Water District's (CMWD) $37 million Phase Ill Recycled Water Program and provides recycled water services to customers adjacent to existing recycled water mains. The Carlsbad Municipal Code requires the Board to adopt plans and specifications for all construction projects that are to be formally bid when the value exceeds the limits established by the Public Contract Code including the alternate provisions of the Uniform Public Construction Cost Accounting Act. The Public Contract Code limit is $175,000. The estimated construction cost for this Project is $593,400 and therefore is subject to this requirement. Staff recommends approving the plans and specifications and authorizing the secretary to the Board to advertise and receive construction bids. Discussion CMWD started its Recycled Water Program in 1990 with Phase I. The Carlsbad Water Recycling Facility (CWRF) was constructed beginning in 2002 as part of Phase II expansion and was completed in 2008. Recycled water production was approximately 4,000 acre feet per year (afy). In 2012, Phase Ill began with the preparation of a feasibility study, which recommended an expansion of CWRF, 18 miles of new pipeline, and construction of a LS-million-gallon storage tank. Currently, only the storage tank and 6 miles of pipeline remain to be constructed. The Project will construct 26 new recycled water services for irrigation customers and three wharf heads throughout the CMWD service area. The services will range in size from 1 to 2 inches in diameter for irrigation customers adjacent to the existing recycled water distribution system and will utilize approximately 147 afy of additional recycled water. The wharf heads are May 22, 2018 Item #8 Page 1 of 6 small hydrants that will allow authorized city and CMWD staff access to recycled water for uses such as sewer cleaning, dust control ,and street sweeping. All work will be within the public right-of-way. The construction contract for the Project will contain general performance standards, technical specifications, sequencing requirements to minimize disruptions, and a one year warranty period. Retention will be withheld from each progress payment until final acceptance of the Project. The anticipated construction duration is approximately four months, and the construction contract includes liquidated damages which may be assessed for each day in excess of the time specified for completion of the work. Fiscal Analysis An engineer's estimate of the construction cost of the Project was prepared and totals $430,000. The total estimated Project cost of $593,400 includes: construction contract, contingency for change order management, construction management and inspection, and engineering and administrative support for contractor shop drawings, request for information, meetings, and community outreach. This Project is being funded by the Clean Water State Revolving Fund and Proposition 84, Round 3 Integrated Regional Water Management Grant. A summary of estimated construction costs and available funds is shown in the table below: ABANDON POTABLE WATER SERVICES (NEW RECYCLED SERVICES), CIP NO. 5205 Current Appropriation $560,000 Current Expenditures/Encumbrances $52,972 TOTAL AVAILABLE ABANDON POTABLE WATER SERVICES (NEW RECYCLED SERVICES), CIP NO. 5205 $507,028 RECYCLED WATER PHASE Ill INSTALLATION OF RECYCLED WATER SERVICES, PROJECT NO. 5205-B Construction Contract $430,000 Construction Contingency (estimated) $64,500 Construction Management, Inspection, and Material Testing (estimated) $98,900 TOTAL ESTIMATED CONSTRUCTION COSTS $593,400 REMAINING BALANCE AFTER PROJECT NO. 5205-B -$86,372 ADDITIONAL APPROPRIATION NEEDED $86,372 As shown in the table above, an additional appropriation of $86,372 is needed to meet the Project's estimated costs. If the bids received exceed available funds, staff will return to the Board and request additional funds at the time of contract award. Next Steps A construction contract request for bids will be advertised on the city bid website. Staff will then return to the Board to recommend awarding a contract to the lowest responsive and responsible bidder. Construction is estimated to begin in October 2018 and to finish by the end of December 2018. May 22, 2018 Item #8 Page 2 of 6 Environmental Evaluation (CEQA) An environmental impact assessment was conducted for the Recycled Water Phase Ill Installation of Recycled Water Services, Project No. 5205-B, and a Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program was approved by the Board through Resolution No. 1455, in Nov. 27, 2012. Public Notification This item was noticed in accordance with the Ralph M. Brown Act and was available for public viewing and review at least 72 hours prior to the scheduled meeting date. Prior to the start of construction, the public will be notified of the construction activities using media methods such as signage, email, website and other city communication channels. The construction contractor will also be required to notify the public of construction activities via changeable message signs, door hangers, letters to property owners, and/or "NO PARKING" signs, as applicable. Exhibits 1. CMWD Board Resolution. 2. Location Map. 3. Project plans, specifications, and bid documents are on file at the Carlsbad Municipal Water District. May 22, 2018 Item #8 Page 3 of 6 RESOLUTION NO. 1595 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT BOARD (CMWD), APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING THE SECRETARY TO THE BOARD TO ADVERTISE AND RECEIVE BIDS FOR THE RECYCLED WATER PHASE Ill INSTALLATION OF RECYCLED WATER SERVICES, PROJECT NO. 5205-B. EXHIBIT 1 WHEREAS, the Carlsbad Municipal Water District (CMWD) Board of Directors of the City of Carlsbad, California has determined it necessary, desirable, and in the public interest to construct recycled water services at locations adjacent to the existing recycled water distribution system throughout the CMWD service area; and WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, equipment, transportation, and other expenses necessary or incidental for the Recycled Water Phase Ill Installation of Recycled Water Services, Project No. 5205-B (Project) have been prepared and are on file at CMWD and are incorporated by reference herein; and WHEREAS, an environmental impact assessment was conducted for the Project, and a Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program was approved by the Board through Resolution No. 1455, on Nov. 27, 2012. This Project is within the scope of these environmental documents and there are no substantial changes to the Project or the circumstances under which it is being undertaken, and no new information of substantial importance that would require major revisions to these environmental documents. NOW, THEREFORE, BE IT RESOLVED by the CMWD Board of the City of Carlsbad, California, as follpws: 1. That the above recitations are true and correct. 2. That the plans, specifications and contract documents for the Recycled Water Phase Ill Installation of Recycled Water Services, Project No. 5205-B, on file at CMWD are hereby approved. 3. That the secretary to the Board is hereby authorized and directed to publish, in accordance with State law, a Notice to Contractors Inviting Bids for the construction of the Recycled Water Phase Ill Installation of Recycled Water Services, Project No. 5205-B, in accordance with the plans, specifications, and contract documents referred herein. May 22, 2018 Item #8 Page 4 of 6 PASSED, APPROVED AND ADOPTED at a Special Meeting of the Carlsbad Municipal Water District of the City of Carlsbad on the 22nd day of May, 2018, by the following vote, to wit: AYES: NOES: ABSENT: M. Hall, K. Blackburn, M. Schumacher, C. Schumacher, M. Packard. None. None. (SEAL) May 22, 2018 Item #8 Page 5 of 6 EXHIBIT 2 LOCATION MAP NOT TO SCALE LEGEND e RECYCLED WATER SERVICE INSTALLATIONS PROJECT NAME PROJECT EXHIBIT RECYCLED WATER PHASE Ill INSTALLATION OF RECYCLED WATER SERVICES NUMBER 2 5205-B PLOTT£D BY: SCOTT EVANS PLO.T DA TE: J/29/18 PA TH: D: \U11U11ES DEPAR1MENT\LOCA 110N MAPS\AUTOCAD\5205-8.DWG May 22, 2018 Item #8 Page 6 of 6