Loading...
HomeMy WebLinkAbout2018-09-25; Municipal Water District; ; Amendment No. 1 to the Professional Services Agreement with HDR, Inc. for the Potable Water, Recycled Water, and Sewer Master Plan Updates and the Asset Management Master Plan@ MUNICIPAL WATER DISTRICT Staff Report . Meeting Date: To: From: Staff Contact: Sept. 25, 2018 President and Board Members Scott Chadwick, Executive Manager Lindsay Leahy, Senior Engineer Lindsay.Leahy@carlsbadca .gov or 760-603-7325 CA Review Ifs Subject Amendment No. 1 to the Professional Services Agreement with HDR, Inc. for the Potable Water, Recycled Water, and Sewer Master Plan Updates and the Asset Management Master Plan. Recommended Action Adopt Resolutions authorizing execution of Amendment No. 1 to the Professional Services Agreement with HOR, Inc. for the Potable Water, Recycled Water, and Sewer Master Plan Updates and the Asset Management Master Plan, Project No. 5543 and appropriate an additional $200,000 in funding into the Water, Recycled Water, and Sewer Master Planning Program, CIP No. 5543. Executive Summary The Carlsbad Municipal Water District (CMWD) and the City of Carlsbad (city) are currently working on the Potable Water, Recycled Water, and Sewer Master Plan Updates and the Asset Management Master Plan, Project No. 5543 (Project). The Utilities Division recommends amending the Professional Services Agreement with HOR, Inc. (Agreement) to: 1) Refine the scope for the water, recycled water, and sewer efforts; 2) Expand the scope of regulatory reviews; 3) Use updated hydraulic models to review upcoming development projects; and 4) Refine the asset management scope. The Agreement did not delegate authority to execute amendments, therefore City Council and CMWD Board authorization is required. Amendment No. 1 is for $342,925, and an additional appropriation of $200,000 is being requested. Discussion Staff is currently working on the Project as part of the Utilities Division's continuous efforts to provide high quality service to the community through proper planning of infrastructure replacement and rehabilitation. The previous Potable Water, Recycled Water, and Sewer Master Plan updates were last updated in 2012, based on 2010 data. The current Master Plan updates will conduct capacity assessments and system evaluations on all three systems to have reliable and accurate planning documents to guide decisions on infrastructure projects and support service l_evels. Amendment No. 1 will: September 25, 2018 Item #9 Page 1 of 20 1) Refine the scope for the water, recycled water, and sewer efforts to support a schedule extension, enhance data analyses for water demand forecasting, reconcile existing capital improvement program (CIP) budgets with updated budgets, and present the findings to the City Council and CMWD Board. 2) Expand the scope of regulatory reviews to update the Sanitary Sewer Management Plan and prepare for the upcoming Carlsbad Municipal Code changes to Title 13; and 3) Use the updated hydraulic models to review upcoming development projects to assess the impact on the water and sewer systems. The Agreement also included development of an Asset Management Master Plan in parallel with the other Master Plan updates to guide the Asset Management Program and identify priorities, schedules and budgets for the rehabilitation and replacement of existing water, sewer and recycled water infrastructure. Since the Agreement was executed, the Asset Management Program has evolved as progress has been made in other efforts. Amendment No. 1 covers refinements to that existing scope to: 4) Refine the Asset Management Master Plan scope to leverage progress made recently through other Asset Management Program efforts and prepare for the upcoming Cost of Service Studies. Fiscal Analysis The maximum compensation under the Agreement for the Project is $868,000. Amendment No. 1 for $342,925 increases the maximum compensation amount to $1,210,925. A summary of current and projected Project costs is shown in the table below: WATER, RECYCLED WATER, AND SEWER MASTER PLANNING PROGRAM, CIP NO. 5543 Current Appropriation -Water, Recycled Water, and Sewer Master Planning Program, $1,078,000 CIP No. 5543 ' Current Expenditures/Encumbrances -Water, Recycled Water, and Sewer Master $895,546 Planning Program, CIP No. 5543 TOTAL AVAILABLE WATER, RECYCLED WATER, AND SEWER MASTER PLANNING $182,454 PROGRAM, CIP NO. 5543 POTABLE WATER, RECYCLED WATER, AND SEWER MASTER PLAN UPDATES AND THE ASSET MANAGEMENT MASTER PLAN, PROJECT NO. 5543 HDR, Inc. Amendment No. 1 $342,925 Administrative Project Costs (estimated} $30,000 TOTAL ESTIMATED REMAINING PROJECT COSTS $372,925 REMAINING BALANCE AFTER PROJECT NO. 5543 ($190,471) ADDITIONAL APPROPRIATION NEEDED $200,000 An additional appropriation of $200,000 is being requested from the Water, Recycled Water, and Sewer Replacement Funds in the following amounts: $80,000, $60,000, and $60,000, respectively. Sufficient funds are available for this request. September 25, 2018 Item #9 Page 2 of 20 Next Steps Staff anticipates presenting the Project to the City Council and CMWD Board in Spring 2019, including more detail on the Asset Management Master Plan. Environmental Evaluation (CEQA) The recommended action to approve an amendment to the Agreement does not constitute a "project" within the meaning of California Environmental Quality Act (CEQA), pursuant to Public Resources Code Section 21065, in that it has no potential to cause either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment, and therefore does not require environmental review. On Nov. 13, 2012, the City Council adopted Resolution No. 2012-245 certifying a Program Environmental Impact Report {EIR 12-01, SCH No. 2012021006, on file in the Planning Division) for the City of Carlsbad Sewer Master Plan Update, and the CMWD Water and Recycled Water Master Plan Updates and adopted the Candidate Findings of Fact and the Mitigation, Monitoring, and Reporting Program. For the Master Plan updates, it is anticipated that an addendum to the previously certified EIR will be prepared consistent with the CEQA Guidelines Section 15164 if only some changes or additions are necessary but none of the conditions described in Section 15162 calling for preparation of a subsequent EIR have occurred. Public Notification This item was noticed in accordance with the Ralph M. Brown Act and was available for public viewing and review at least 72 hours prior to the scheduled meeting date. Exhibits 1. City Council Resolution. 2. CMWD Resolution. September 25, 2018 Item #9 Page 3 of 20 RESOLUTION NO. 2018-176 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, AUTHORIZING ADDITIONAL FUNDING IN THE AMOUNT OF $60,000 FOR AMENDMENT NO. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH HDR, INC. FOR THE POTABLE WATER, RECYCLED WATER, AND SEWER MASTER PLAN UPDATES AND THE ASSET MANAGEMENT MASTER PLAN, PROJECT NO. 5543 Exhibit 1 WHEREAS, the City Council of the City of Carlsbad, California has determined it necessary, desirable and in the public interest to update the Potable Water, Recycled Water, and Sewer Master Plans and develop an Asset Management Master Plan; and WHEREAS, the last update to the Master Plans was completed in 2012, based on 2010 data; and WHEREAS, on Jan. 24, 2017, the City Council adopted Resolution No. 2017-20 approving a Professional Services Agreement with HDR, Inc. to provide master planning services for an amount not to exceed $868,000; and WHEREAS, the City Council has determined that it is in the best interest of the city to execute Amendment No. 1 with HDR, Inc. for additional master planning services; and WHEREAS, staff and HDR, Inc. have negotiated scope and fees in the amount of $342,925 for the additional master planning services, as described in Amendment No. 1 to the Professional Services Agreement; and WHEREAS, an additional appropriation of $60,000 is requested from the Sewer Replacement Fund to fund Amendment No. 1. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the finance director is hereby authorized to appropriate an additional $60,000 from the Sewer Replacement Fund into the Water, Recycled Water, and Sewer Master Planning Program, Capital Improvement Program No. 5543. September 25, 2018 Item #9 Page 4 of 20 Exhibit 1 PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 25th day of September. 2018, by the following vote, to wit: AYES: NOES: ABSENT: M. Hall, K. Blackburn, M. Schumacher, C. Schumacher, M. Packard. None. None. in BARBARA ENGLESON, City Clerk (SEAL) September 25, 2018 Item #9 Page 5 of 20 RESOLUTION NO. 1604 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT BOARD (CMWD), AUTHORIZING AN ADDITIONAL APPROPRIATION OF $140,000 AND EXECUTION OF AMENDMENT NO. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH HOR, INC. FOR THE POTABLE WATER, RECYCLED WATER, AND SEWER MASTER PLAN UPDATES AND THE ASSET MANAGEMENT MASTER PLAN, PROJECT NO. 5543 Exhibit 2 WHEREAS, the Carlsbad Municipal Water District (CMWD) Board of Directors of the City of Carlsbad, California has determined it necessary, desirable and in the public interest to update the Potable Water, Recycled Water, and Sewer Master Plans and develop an Asset Management Master Plan; and WHEREAS, the last update to the Master Plans was completed in 2012, based on 2010 data; and WHEREAS, on Jan. 24, 2017, the CMWD Board adopted Resolution No. 1558 approving a Professional Services Agreement with HOR, Inc. to provide master planning services for an amount not to exceed $868,000; and WHEREAS, the CMWD Board has determined that it is in the best interest of CMWD to execute Amendment No. 1 with HOR, Inc. for additional master planning services; and WHEREAS, staff and HOR, Inc. have negotiated scope and fees in the amount of $342,925 for the additional master planning services, as described in Amendment No. 1 to the Professional Services Agreement; and WHEREAS, an additional appropriation of $140,000 is requested from the Potable Water and Recycled Water Replacement Funds to fund Amendment No. 1. NOW, THEREFORE, BE IT RESOLVED by the CMWD Board of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the president of the Board is hereby authorized and directed to execute Amendment No. 1 to the Professional Services Agreement with HDR, Inc. for the Potable Water, Recycled Water, and Sewer Master Plan Updates and the Asset Management Master Plan, Project No. 5543, which is attached hereto as Attachment A. September 25, 2018 Item #9 Page 6 of 20 Exhibit 2 3. That the finance director is hereby authorized to appropriate an additional $80,000 from the Water Replacement Fund and $60,000 from the Recycled Water Replacement Fund for the Water, Recycled Water, and Sewer Master Planning Program, Capital Improvement Program No. 5543. PASSED, APPROVED AND ADOPTED at a Special Meeting of the Carlsbad Municipal Water District of the City of Carlsbad on the 25th day of September, 2018, by the following vote, to wit: AYES: NOES: ABSENT: M. Hall, K. Blackburn, M. Schumacher, C. Schumacher, M. Packard. None. None. ~-BARBARAENGLESON,SRETARY (SEAL) September 25, 2018 Item #9 Page 7 of 20 UTIL1510 AMENDMENT NO. 1 TO AGREEMENT FOR ENGINEERING MASTER PLANNING SERVICES FOR THE POTABLE WATER, RECYCLED WATER AND SEWER MASTER PLAN UPDATES AND ASSET MANAGEMENT MASTER PLAN HDR ENGINEERING ~ ~ir Amendment No. 1 is entered into and effective as of the ~ day of "" 0 ~ N'V\ Q~ , 2018, amending the agreement dated January 25, 2017 (the "Ageement") by and between the Carlsbad Municipal Water District, a Public Agency organized under the Municipal Water Act of 1911, and a Subsidiary District of the City of Carlsbad, ("CMWD"), and HOR Engineering, Inc., ("Contractor") (collectively, the "Parties") for master planning services for the potable water, recycled water, and sewer master plan updates and the asset management master plan. RECITALS A. The Parties desire to alter the Agreement's scope of work to: refine the master plan updates to enhance data analyses and present to Council/Board; expand the regulatory reviews; use the updated hydraulic models to review upcoming development projects; and refine the asset management scope to leverage progress made recently through other asset management program efforts and prepare for the upcoming cost of service studies. B. The Parties have negotiated and agreed to a supplemental scope of work and fee schedule, which is attached to and incorporated by this reference as Exhibit "A", Scope of Services and Fee. NOW, THEREFORE, in consideration of these recitals and the mutual covenants contained herein, CMWD and Contractor agree as follows: 1. In addition to those services contained in the Agreement, as may have been amended from time to time, Contractor will provide those services described in Exhibit "A". With this Amendment, the total annual Agreement amount shall not exceed one million two hundred ten thousand nine hundred twenty-five dollars ($1,210,925). 2. CMWD will pay Contractor for all work associated with those services described in Exhibit "A" on a time and materials basis not-to-exceed three hundred, forty-two thousand, nine hundred, twenty-five dollars ($342,925). Contractor will provide CMWD, on a monthly basis, copies of invoices sufficiently detailed to include hours performed, hourly rates, and related activities and costs for approval by CMWD. 3. Contractor will complete all work described in Exhibit "A" by January 25, 2020. 4. All other provisions of the Agreement, as may have been amended from time to time, will remain in full force and effect. 5. All requisite insurance policies to be maintained by Contractor pursuant to the Agreement, as may have been amended from time to time, will include coverage for this Amendment. Ill General Counsel Approved Version 9/27/16 September 25, 2018 Item #9 Page 8 of 20 UTIL1510 6. The individuals executing this Amendment and the instruments referenced in it on behalf of Contractor each represent and warrant that they have the legal power, right and actual authority to bind Contractor to the terms and conditions of this Amendment. CONTRACTOR (sign here) L1 A ;..ov Me:, 1..-1..-E:.v-£._ , v,e,-r ~~~ S( 1:£:)..1-;- (print name/title) By: (sign here) (print name/title) CARLSBAD MUNICIPAL WATER DISTRICT, a Public Agency organized under the Municipal Water Act of 1911, and a Subsidiary District of the City of Carlsbad By ~ MATT~ President ATTEST: ~-6-=-= BARBARA ENGLESON Secretary If required by CMWD, proper notarial acknowledgment of execution by contractor must be attached. If a corporation, Agreement must be signed by one corporate officer from each of the following two groups. Group A Chairman, President, or Vice-President Group B Secretary, Assistant Secretary, CFO or Assistant Treasurer Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering the officer(s) signing to bind the corporation. APPROVED AS TO FORM: CELIA A. BREWER, General Counsel By:-------=-~-----=~- Deputy General Counsel General Counsel Approved Version 9/27/16 2 September 25, 2018 Item #9 Page 9 of 20 CERTIFICATE The undersigned hereby certifies that she is the Assistant Secretary of HOR Engineering, Inc., a Nebraska corporation (the "Corporation"), and that, as such, has custody of the minute books of the Corporation, and that, by Consent and Agreement of the Board of Directors, the following resolution was unanimously adopted: "RESOLVED, that effective immediately and until termination of said individual from the Corporation, or until recision by the Corporation's Board of Directors, whichever occurs first, the following individuals are hereby granted the nondelegable authority to execute or approve on behalf of the Corporation, contracts; amendments or change orders for engineering services and architectural services incidental to engineering services to be rendered by the Corporation, ... , or releases of claim or lien in connection with such services, such contracts, amendments, change orders or releases so executed or approved shall be binding upon the Corporation: ... Aaron M. Meilleur -Vice President ... " The undersigned further certifies that the foregoing resolution has been spread in full upon the minute books of the Corporation and is in full force and effect. DATED August 22, 2018. September 25, 2018 Item #9 Page 10 of 20 UTIL 1510 EXHIBIT "A" SCOPE OF SERVICES AND FEE Over the course of the Master Plan Update project additional tasks have been identified as necessary to complete and provide added value to the master plan effort. Additional scope items are defined below. Task 1 Project Management Task 1.4 Project Management and Meetings Provide general project management functions, prepare and maintain a project schedule and monitor budgets. Provide a summary of work performed with each invoice. Submit monthly schedule updates with each status meeting. Task 1.5 (New) City Council/CMWD Board Presentation Prepare for and present at one City Council/CMWD Board Meeting regarding findings of master plans, asset management plan and PEIR addendum. Provide slide outline and key slides eight (8) weeks prior to docketed City Council meeting for staff report preparation. Provide draft slides six (6) weeks prior and review with Carlsbad staff. Provide final slides two (2) weeks prior and hold rehearsal with Carlsbad staff one (1) week prior. Task 3A Demand Analysis (POTABLE WATER) Task 3.A.4 Demand Forecast Tool Provide additional statistical demand information using the excel-based demand forecast tool. Task 3.A.6 Buildout Demand Forecast Develop and enhance buildout demand forecast excel model. Task SC Regulatory Analysis (Sewer) Task 5.C.3 Sewer Regulations Assessment Provide additional level of effort to describe the latest regulations and requirements and how they will affect the City's current regulations and procedures. Summarize SSMP deficiencies and provide recommendations. Task 5.C.4 (New) Coordination Meetings Prepare for and attend two meetings with City staff to discuss state and local sewer regulations Task 5.C.5 (New) SSMP Update As directed by City staff, modify the current version of the Sewer System Management Plan (SSMP) to incorporate updates and address deficiencies to meet the requirements of the Waste Discharge Requirements (WDR) as directed and within available budget. Examples of specific areas HOR may update include: • Goal: Work with City staff to document any updates to the goal section. • Organization: Update the organization section to meet WDR requirements and clearly identify the roles and responsibilities or City staff responsible for the SSMP development and implementation and lines of authority in an organization chart. General Counsel Approved Version 9/27/16 3 September 25, 2018 Item #9 Page 11 of 20 UTIL 1510 • Legal Authority: Reference the City's existing authorities, ordinances, agreements, and other legally binding documents to demonstrate compliance with the WDR. HOR will work with City staff to develop a plan and schedule to update any legal authorities requiring an update. • Operations and Maintenance Program: HOR will build upon the information available in the existing SSMP and will work with City staff to update documentation of existing collection system operations, maintenance, and rehabilitation programs and processes as necessary to meet the requirements of the WDR. • Design and Performance Provisions: Reference existing design and construction standards, specifications, and procedures and update the existing SSMP documentation to meet the requirements of the WDR. • Overflow Emergency Response Plan: Update the existing Sanitary Sewer Overflow Emergency Response Plan to incorporate current practices employed by the City not reflected in the plan. • FOG Control Program Plan: Document the City's existing FOG source control program and maintenance protocols to address FOG issues. • System Evaluation and Capacity Assurance Plan: Document the sewer master planning process. • Monitoring, Measurement, and Program Modifications: Define and document SSMP performance indicators currently utilized by the City for monitoring and measurement of SSMP effectiveness. Identify additional performance metrics the City will implement in the future for monitoring and measurement and work with the City to document a planned date for implementation in the SSMP. Align SSMP with results from asset management efforts. • SSMP Program Audits: Document the plan, schedule, and process for performing SSMP audits. • Communication Program: Document the specific communication protocols for public involvement. City staff will review and provide comments on the draft SSMP update. HOR will meet with City staff to review draft (up to a two (2) hour meeting) and then prepare a final SSMP update. Assumptions • City will provide HOR all source files for existing Sewer System Management Plan in Microsoft Word (.doc or .docx) format. Deliverables • Draft updates to the SSMP in track changes mode and delivered in same MS Word format provided to HOR. Task 5.C.6 (New) Title 13 Update HDR will work with City staff to develop proposed modifications to the current version of Title 13 to improve WDR compliance. • Add proposed language requiring anyone working on new or existing City sewer infrastructure is required to follow the City's standards and guidelines for sewer infrastructure design. General Counsel Approved Version 9/27/16 4 September 25, 2018 Item #9 Page 12 of 20 UTIL 1510 • Add proposed language to require proper installation, testing, and inspection of rehabilitated sewers. • Add proposed language clarifying the City's ability to require remediation of private sewer laterals if the City determines the private sewer lateral is contributing inflow/infiltration into the sewer system. • Propose alternative, progressive enforcement approach, including repeat FOG inspections, for discussion and to consider incorporation into Title 13. • Meet with City staff to review draft language (up to a two (2) hour meeting) and then prepare a final version of the Title 13 update. Assumptions • City will provide HOR all source files for existing Title 13 in Microsoft Word (.doc or .docx) format. Deliverables • Proposed edits or approach to modifying Title 13 to address the three items identified. Task GA Potable Water Model Task 6.A.7 (New) Developer Assistance for Water Model Use the model to provide existing/future system analysis for new development projects on an as needed basis. Task 68 Existing System Analysis (Water) Task 6.B.13 (New) Establish Minimum Reservoir Operating Level: Review storage criteria and required fire flow storage. Develop percent range for lowering tanks to balance water quality and still meet fire flow. Task 7 A Recycled Water Model Task 7.A.3 (New) Meet with NRG to obtain daily and seasonal recycled water demand information and evaluate delivery pressure and supply. Task 8A Sewer Model Task 8.A.2 Buildout Model Refinement Update model to include new regional facilities (Agua Hedionda Improvements) and reconcile flows with Encina SCADA data. Task 8.A.3 (New) Buena Outfall Analysis Prepare for and attend meeting with City of Vista to assess upstream diversion plans and implications to Carlsbad gravity sewer/lift station flows. Incorporate proposed improvements in the model and run model. Prepare initial results and present findings at a second meeting with City of Vista. Decisions on future flow direction will be incorporated into the buildout model for City of Carlsbad. Task 8.A.4 (New) Developer Assistance for Sewer Model Use the model to provide existing/future system analysis for new development projects on an as needed basis. General Counsel Approved Version 9/27/16 5 September 25, 2018 Item #9 Page 13 of 20 UTIL 1510 Task 9 Capital Improvement Program Task 9.C.4 (New) Reconcile existing potable water and sewer CIP projects with recommended Cl P projects from Master Plan update efforts. Task 11 Staffing Analysis Task 11.4 (New) Meetings with Neighboring Agencies Conduct meetings with neighboring agencies to review survey data and facilitate completion of the survey forms. Task 12 Draft and Final Reports Task 12.4 (New) Executive Summary Prepare an Executive Summary of all three Master Plan Updates and Asset Management Master Plan. Task 13 Asset Management After interviews and review of existing data regarding the water and recycled water pipeline infrastructure, it has been determined that the vast majority of this infrastructure is performing well and will last beyond the planning horizon of this study. This finding is based on City water loss data, the City's recently completed systematic leak detection project, direct condition assessment of three Asbestos Concrete (AC) pipes, historic break rates, common material vintages in the Carlsbad system that typically last long than other material vintages, and benchmarking of the performance of the Carlsbad system to other similar utilities. While the vast majority of pipe will outlast the planning horizon of this study, it is prudent to maintain a reserve fund to avoid future rate spikes when this infrastructure does reach the end of its useful life. To provide more value to CMWD, the focus of the Water and Recycled Water asset management component of the Master Plan will shift from quantifying the appropriate near term pipe renewal and risk towards: 1. Supporting CMWD in implementing an Opportunity AC Condition Assessment Program. This will enable Carlsbad to cost effectively collect condition assessment data that will be used in the future to replace the RIGHT pipe at the RIGHT time. This will help CMWD maximize the life of existing infrastructure, sustain desired service levels, and spend ratepayer's money wisely; 2. Supporting CMWD in identifying the appropriate long-term reserve levels for pipe renewal; and 3. Supporting CMWD in identifying appropriate renewal rates for valves and services, since CMWD's water pipes are expected to last much longer than their valves and services. This work will be documented in a written Asset Management Plan for potable water and recycled water pipelines, valves, and services. Similarly on the sewer side, the City has been working to improve their CCTV database and recently moved to PACP format. In addition, they have incorporated the lnfoMaster program which will be used to systematically assess repair and replacement projects based on decision logic incorporated into the software program. To provide more value to the City, the focus of the sewer asset management component of the Master Plan will shift to refining the decision logic and developing a risk model for sewer mains and manholes that will prioritize repair and replacement (R&R) projects. General Counsel Approved Version 9/27 /16 6 September 25, 2018 Item #9 Page 14 of 20 UTIL 1510 Delete original Task 13 contract scope of work and revise as follows: Task 13. 1 Identify the definition study area for each utility (potable water, recycled water and sewer). Participate in workshops with City staff to review prior and current asset management efforts. Based on those workshops the following assignments were established, as shown in Table 1. Task 13.2 For small diameter sewer gravity mains, perform CUES CCTV Data Review, Risk Model Development, Decision Logic Refinement. Make adjustments to risk scoring and decision logic provided by City of Carlsbad for gravity sewer historic CUES CCTV data to support budget and prepare for and conduct up to four 2-hour workshops. Meet with City staff to review decision logic results for CUES CCTV data costs and prepare for and conduct up to two 1-hour workshops. This task assumes up to 6 workshops. This task does not include using PACP CCTV data representing approximately 10% of Carlsbad's CCTV data, but a desktop analysis will be performed to forecast cost for the 10% of Carlsbad's system that does not have CUES data. Task 13.3 Conduct large diameter gravity sewer remediation workshop to document large diameter gravity sewer remediation needs. Assumes one 2-hour workshop. Risk model elements for large diameter sewer pipe are assumed to be similar to small diameter pipe. Task 13.4 (New) Provide a high level assessment of the value of the water, recycled water and wastewater vertical assets owned by the City of Carlsbad which include, and are limited to: sixteen (16) sewer lift stations, ten (10) potable water tanks, five (5) potable water booster pump stations, three (3) recycled water tanks, and two (2) recycled water booster pump stations. Valuation of the Carlsbad Water Reclamation Facility will be based on the recent construction costs for the plant expansion. All work will be performed using data that is readily available such as existing asset database information, financial records, maintenance and repair records, and replacement and renewal records. No field observations or assessments of condition and operability will be considered in the valuation of these assets. If data is missing or unavailable, reasonable assumptions will be made and documented in the study. HOR will use age as the basis for the straight-line depreciation (SLD) calculations using the installation date and assigning estimate service lives by asset class to estimate the asset service life, estimated replacement costs, and depreciation methodology. Assets will be "bundled" into one facility asset, such as a sewer lift station, using the total construction cost of the asset value and assigning an aggregate service life for the facility. HOR will apply the Original Cost less Depreciation valuation method which will be the value of each asset at a summary level using financial statements then use straight line depreciation to estimate the remaining asset life and value. Up to two one hour meetings with District engineering and finance staff are included in this task. Task 13.5 Develop Unit Costs for repair and replacement methodologies for water, recycled, and sewer. Participate in CIP workshop, defined in Task 9. Task 13.6 Prepare Capital Replacement Budget (CRB), identifying repair and rehabilitation budgets for five (5) fiscal years and long term reserve levels for water-and recycled water pipelines, valves, and services and sewer gravity mains and manholes. Prioritized projects for small diameter sewer gravity mains and manholes will be identified (see Task 13.6). Prioritized valve replacement program will be identified based on a desktop analysis and City/District's list of inoperable valves. General Counsel Approved Version 9/27/16 7 September 25, 2018 Item #9 Page 15 of 20 UTIL1510 Task 13.7 Develop and draft a systematic process methodology for prioritizing repair and rehabilitation capacity and condition upgrade projects for small diameter gravity sewer mains and manholes, based upon risk, health and safety, and other similar factors standard in the industry. Utilize MS Visio or similar tool to communicate the prioritization process methodology to staff. Provide the prioritized list of projects for the 5-year CRB. Provide updated lnfoMaster or GIS layers for prioritized sewer assets that include the following data fields based on the analysis of City assets: • Likelihood of Failure score (Probability of Failure (PoF) • Consequence of Failure score (CoF) • Total Business Risk Score (BRE) Task 13.8 Prepare a written Asset Management Plan for potable water and recycled water pipelines, valves, and services, and sewer gravity mains and manholes. The plan shall include: • Near term Rehabilitation and Repair Plan for water, recycled water and sewer facilities for assets as indicated in Table 1 • Level of service commitment (20/30/40 year renewal cost and asset valuation) for assets as indicated in Table 1 • Prioritization of asset classes by risk for assets as indicated in Table 1 • Recommendations for programmatic approaches to gathering condition data to incorporate into future risk analyses • Associated GIS and lnfoMaster Updates Prepare Draft Asset Management Plan and submit editable electronic version to City staff to review. Meet with District/City staff to review Asset Management Plan findings and recommendations. Prepare Final Asset Management Plan, incorporating consolidated District/City staff comments. Five hard copies of the Final Asset Management Plan, one electronic copy in PDF format, and associated electronic files (e.g. spreadsheets, figures, maps, and/or models) shall be delivered to the District/City on a CD in the native format of the file type. Task 13.9 (New) In conjunction with Task 1.5, prepare for and present Asset Management Plan and Level of Service Commitments at one City Council/CMWD Board Meeting. Assumptions: • Pipeline break data is available and tied to individual pipes • Consolidated CCTV database for sewer is associated with videos tied to asset IDs. • Sewer manhole costs and remediation budgets will be based on factor tied to gravity sewer main remediation costs • Risk scoring and decision logic for gravity sewers/manholes are provided by Carlsbad. Only minor adjustments to risk scoring and decision logic are required. • CUES CCTV data is loaded into City of Carlsbad lnfoMaster model with defect rating (1-100 score) and lnfoMaster model will be provided by the City of General Counsel Approved Version 9/27/16 8 September 25, 2018 Item #9 Page 16 of 20 UTIL 1510 Carlsbad. Alternative software may be needed if all necessary condition data is not loaded or easily loaded in lnfoMaster. NASSCO PACP data will not be utilized for CIP budget and renewal forecasting for gravity sewers/manholes, unless optional task is authorized. Deliverables: Draft and Final Asset Management Plan and associated GIS files and Risk Models General Counsel Approved Version 9/27/16 9 September 25, 2018 Item #9 Page 17 of 20 UTIL1510 Table 1. Asset Management Scope of Services Assignments lnfoMaster or 5-Year 5-Year 20, 30,40 Asset Asset Class Likelihood of Consequence of Decision Logic Desktop 5-Year Assets for Condition Renewal Year Valuation Failure Failure Assessment Renewal (Replacement Analysis Renewal Cost Cost Cost Cost) Water Pipes Provided by Provided by Provided by N/A HOR to HOR to HOR to HOR to West Yost West Yost West Yost Desktop provide provide provide provide Water Valves Provided by Provided by Provided by Desktop HOR to develop N/A HOR to HOR to HOR to West Yost West Yost West Yost based on provide provide provide prioritized list of inoperable valves Water Services N/A N/A N/A Desktop N/A N/A HOR to HOR to HOR to provide provide provide Recycled Water Pipes, N/A N/A N/A Desktop N/A N/A HDR to HOR to HOR to Valves, Services provide provide provide Small Diameter Sewer H DR to develop HOR to develop HDR to develop Info Master HOR to provide HDR to HOR to HOR to HOR to Gravity Mains and based on West based on West based on West provide provide provide provide Manholes (CUES data -Yost information Yost information Yost information Approximately 90% of Small Diameter Pipe) Small Diameter Sewer Provided by Provided by Provided by Desktop N/A HOR to provide HOR to HOR to HOR to Gravity Mains and West Yost West Yost West Yost based on CUES provide provide provide Manholes (PACP data -data based on based on Approximately 10% of CUES data. CUES data. Small Diameter Pipe) Large Diameter Sewer HOR to refine HOR to refine Provided by lnfoMaster for N/A HOR to HOR to HOR to HOR to Gravity Mains and based on West based on West West Yost Risk Model for provide provide provide provide Manholes Yost information Yost information CUES data) Desktop for Cost opinion Vertical Water, Sewer N/A N/A N/A N/A N/A N/A N/A N/A HOR to and Recycled Water develop based Assets (Tanks, Pump on desktop Stations, Treatment analysis Facilities, etc.) General Counsel Approved Version 9/27 /16 September 25, 2018 Item #9 Page 18 of 20 HDR Engmeermg City of Carlsbad 2016 Master Plan Updates Amendment Estimated Level of Effort and Fee August 6, 2018 LEVEL OF EFFORT, HOURS FEE, DOLLARS TASK PM QA/QC Sr. Eng AM Support Proj Eng Planner Hyd Mod Staff Eng GIS Sr. Env Env Doc Prod Adm in Sr. Eng Sr. Eng Hyd Mod Hyd Mod AM Support Roger/ Dean GI Eric/ TOTAL NO. DESCRIPTION Jennifer Sasa MikeF Dave S Dan B Ta run Joel Aria TimG Clint Rene MarkE Don M Leanne Jessica Karen K CH Admin LABOR HDRLABOR SUBS ODC TOTAL TOTAL Client Billing Rates $ 300 $ 300 $ 300 $ 240 $ 215 $ 215 $ 160 $ 128 s 128 s 300 $ 224 s 144 $ 129 $ 280 $ 190 s 165 $ 165 $ 210 $ 130 $ 227 1.05 1 .-roJeci 1v1anagemem anu 1v1ee mgs 1.1 Kick-Off Meeting 0 0 0 0 1.2 Coordination Meetings (10) 30 30 9,000 0 9.000 1.3 Monthly Status Meetings (12) 24 24 7,200 0 7,200 1.4 Project Administration/Coordination (Extended Schedule} 100 8 40 20 168 37,560 5,880 500 43.940 1.5 Prepare for and Present at Board Meeting (1) 12 16 12 40 5,904 3,528 9,432 Subtotal 1 I 1661 e I ol ol o I ol o I ol o I ol ol 1s I 40 32 1 o I o I o I o I 0 262 59,664 ! 9,408 500 69,572 69,600 3 Demand Analysis 3A Demand Analysis (P.OTABLE WATER) 3A.1 Identify the top 25 critical system users 0 0 0 0 3A.2 Evaluate annual, seasonal, and diurnal variability 0 0 0 0 3A.3 Evaluate the geographic distribution of demand (by Zone) 0 0 0 0 3A.4 Summarize statistical demand information (build excel Model) 8 40 48 11,000 0 11,000 3A.5 Confirm unit demands in District's standards 0 0 0 0 3A.6 Buildout demand determination (Forecast Model) 8 24 32 7,560 0 7,560 Subtotal 3A 1s 1 o I o I o I oj 64 j o I oj o I o I o I o I 0 o! o I ol o I o I 0 80 18,560 ! 0 0 18,560 18,600 SC Regulatory Analysis (Sewer) Review and summarize existing and pending sanitary sewer regulations 5C.1 and ordinances 0 0 0 0 5C.2 Review the City's Sewer System Management Plan (SSMP) 0 0 0 0 5C.3 Summarize deficiencies and provide recommendations in TM #4 8 16 24 48 12,360 0 12,360 5C.4 Meetings and Coordination with Staff 8 24 8 40 11,320 0 100 11,420 5C.5 SSMP Update 4 80 16 100 27,760 0 27.760 5C.6 Title 13 Update 2 40 42 12,600 0 12,600 Subtotal 5C 22 0 160 0 0 32 16 0 0 0 0 0 0 0 0 0 0 0 0 230 64,040 0 100 64,140 64,100 6 Potable Water Analysis SA Potable Water Model 6A.1 Complete the facilities of the existing potable model 0 0 0 0 Based on the characteristics of the existing model, develop calibration 6A.2 procedures for EPS (Assumes No WO calibration) 0 0 0 0 6A.3 Develop hydraulic friction factors to be used for the model 0 0 0 0 Calibrate the existing model for hydraulics based on EPS (assumes no 6A.4 WQ calibration) 0 0 0 0 6A.5 Construct a model of the 2040 system 0 0 0 0 6A.6 Develop implementation scenarios in the model 0 0 0 0 6A.7 Developer Analysis Assistance -Water thru May 2018 4 8 52 64 1,200 11,361 12,561 6A.7 Developer Analysis Assistance -Water June -Nov 2018 4 8 80 92 1,200 16,212 17,412 Subtotal SA 8 0 0 0 0 0 0 0 0 0 0 0 0 16 0 132 0 0 0 156 2,400 27,573 0 29,973 30,000 68 Existing System Analysis (POTABLE WATER} 68.1 Prepare a draft evaluation criteria for incorporation into TM #1 0 0 0 0 68.2 Analyze the existing potable water system 0 0 0 0 68.3 Size the required infrastructure to improve the existing system 0 0 0 0 68.4 Summarize HOR Cathodic Protection Rpt findings 0 0 0 0 68.5 Perform an operational evaluation of the system 0 0 0 0 68.6 Evaluate the existing pressure zone boundaries 0 0 0 0 68.7 Evaluate 2 outage scenarios developed in Task 4A3 0 0 0 0 Verify that the distribution system can meet minimum pressure 68.8 requirements 0 0 0 0 68.9 Review Annual Energy Costs and potential savings 0 0 0 0 68.10 Perform fire flow deficiency analysis and prepare a map 0 0 0 0 Evaluate hydraulic and water quality impacts on the existing system with 68.11 Desai 0 0 0 0 68.12 Summarize Chlorination Operations 0 0 0 0 68.13 Establish Minimum Tank Operation Levels for Water Quality 2 8 4 14 600 3,045 3,645 Subtotal 68 2 0 0 0 0 0 0 0 0 0 0 0 0 8 0 4 0 0 0 14 600 3,045 0 3,645 3,600 7A Recycled Water Model 7A.1 Validate the existing hydraulic model and Ops Meeting 0 0 0 0 7A.2 Review existing WQ data in system and WRPs (Assume no modeling) 0 0 0 0 7A.3 Meeting with NRG and incorporate demands/use patterns in model 2 4 6 0 1,281 1,281 su6tolari'A-0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 4 0 0 0 6 0 1,281 0 1,281 1,300 September 25, 2018 Item #9 Page 19 of 20 nu" t:.ngmeermg City of Carlsbad 2016 Master Plan Updates Amendment Estimated Level of Effort and Fee August 6, 2018 LEVEL OF EFFORT, HOURS FEE, DOLLARS TASK PM QA/QC Sr. Eng AM Support Proj Eng Planner Hyd Mod Staff Eng GIS Sr. Env· Env Doc Prod Adm in Sr. Eng Sr. Eng Hyd Mod Hyd Mod AM Support Roger/ Dean GI Eric/ TOTAL NO. DESCRIPTION Jennifer Sasa Mike F Dave S Dan B Tarun Joel Aria Tim G Clint Rene MarkE Don M Leanne Jessica Karen K CH Admin LABOR HDRLABOR SUBS ODC TOTAL TOTAL Client Billing Rates $ 300 s 300 $ 300 $ 240 $ 215 $ 215 s 160 $ 128 s 128 $ 300 s 224 $ 144 $ 129 s 280 s 190 $ 165 $ 165 s 210 $ 130 s 227 1.05 BA Sewer Model 8A.1 Complete and validate the existing sewer model 0 0 0 0 Refine existing system model to Include new facilities and reconcile EWA 6A.2 SCADAdata 4 20 24 4,400 0 4,400 6A.3 Buena Outfall Analysis 24 40 64 13,600 0 13,600 BA.4 Developer Analysis Assistance -Sewer/LAFCO forms thru May 201 B 16 80 4 100 18,176 0 18,176 8A.4 Developer Anatysis Assistance -Sewer June-Nov 2018 8 80 4 92 15,776 0 15,776 Subtotal SA 52 0 0 0 0 0 220 0 0 0 0 8 0 0 0 0 0 0 0 260 51,952 0 0 51,952 52,000 9 Capital Improvement.Programs 9.1 Conduct CIP Workshop (all utilities) 0 0 0 0 9.2 Develop unit costs for the various facilities to be implemented (all utilities) 9 Reconciliation of existing CIP "With updates 8 16 8 16 48 4,960 5,124 10,084 9A Capital Improvement Program (POTABLE WATER) 0 9A.1 Develop planning level cost estimates for the CIP 0 0 0 0 9A.4 Prepare a TM summarizing the CIP program 0 0 0 0 Subtotal Tasks 9 and 9A 6 0 0 0 0 0 16 0 0 0 0 0 0 8 0 16 0 0 0 48 4,960 5,124 0 10,064 10,100 10 Program EIR Update 10.1 Review MP CIPs 0 0 0 0 10.2 Prepare Air Quality/GHG Memorandum 0 0 0 0 10.3 Prepare an updated checklist for the existing Program EIR 0 0 0 0 10.4 Prepare a Program EIR Addendum 0 0 0 0 10.5 Meeting with Planning Commission ( 1) 4 28 8 40 8,624 0 8,624 Subtotal Task 10 4 0 0 0 0 0 0 0 0 0 26 6 0 0 0 0 0 0 0 40 6,624 0 0 6,624 6,600 11 Staffing Analysis Analyze current and.future staffing needs in the Operational and Maintenance areas of potable water, recycled water and sewer and 11.1 prepare TM #9 0 0 0 0 Analyze current and future staffing needs in the CIP and AM areas of 11.2 potable water, recycled water and sewer 0 0 0 0 11.3 Prepare TM #9 0 0 0 0 11.4 Meetings with Peer Agencies (VWO, Poway, OMWD, Oceanside) 4 12 16 1,200 2,394 3,594 Subtotal Task 11 4 0 0 0 0 0 0 0 0 0 0 0 0 0 12 0 0 0 0 16 1,200 2,394 0 3,594 3,600 12 Prepare Draft and Final Reports 12.1 Prepare report outlines that define the proposed report organization 0 0 0 0 12.2 Prepare Draft Report incorporating the District/City's comments on TMs 0 0 0 .0 12.3 Prepare Final Reports 0 0 0 0 12.4 Prepare Executive Summ~ry 24 8 40 72 14,240 0 14,240 Subtotal Task 12 24 0 0 0 0 0 6 0 0 0 0 40 0 0 0 0 0 0 0 72 14,240 0 0 14,240 14,200 13 Asset Management-Group 1 (Tasks 13.1-13.B) X Sewer Pipelines and Manholes (12) (24) (50) (68) (100) (24) (8) (4) (290) (54,960) 0 (54,960) X Water and Recycled Water Pipelines (12) (24) (52) (68) (100) (24) (8) (4) (292) (55,440) 0 (55,440) Pump Stations, Sewer Force Mains, Reservoirs, Tanks, Pressure X Regulating Stations (4) (26) (2) (48) (24) (4) (4) (112) (23,964) 0 (23,964) 13.1 Identify Boundaries/Workshops with City staff re. current AM efforts 16 46 60 8 130 30,020 0 30,020 Historic CUES CCTV Data Review, Risk Model Development, Decision 13.2 Logic Development and Workshops 16 100 100 216 41,340 0 41,340 13.3 Large diameter gravity sewer remediation workshop 12 20 20 52 10,380 0 10,380 Develop asset valuation for potable water and sewer vertical assets (pump 13.4 stations and tanks) 4 30 40 6 16 96 21,808 0 100 21,908 13.5 Develop Unit Costs/Participate in CIP Workshop (Task 9) 10 24 24 58 10,632 0 10,632 13.6 Prepare Prioritized CIP Budget 40 40 48 128 25,880 0 25,880 13.7 Develop Prioritized R&R Methodologies 8 20 32 60 11,340 0 11,340 13.6 Prepare Asset Management Plans -Draft and Final 4 8 46 60 40 20 16 8 202 39,836 0 39,836 13.9 Provide support for Staff Workshop and City Council Presentation (Task 1) 4 20 20 44 10,300 0 10,300 Subtotal Task 13 0 0 (36) 94 200 0 254 (164) (46) 0 0 (4) (4) 0 0 0 0 0 0 292 67,172 0 100 67,272 67,300 TOTAL, hours 306 8 124 94 200 96 514 (164) (48) 0 26 68 36 66 12 156 0 0 0 1,496 TOTAL, dollars 293,412 48,625 700 342,937 343,000 September 25, 2018 Item #9 Page 20 of 20