A REPORT TO THE PLANNING COMMISSION
Item No.
P.C. AGENDA OF: November 15, 2000
Application complete date: February 14, 2000
Project Planner: Michael Grim
Project Engineer: Frank Jimeno
SUBJECT: SDP 00-06/CUP 00-06/CDP 00-09 - DAYBREAK COMMUNITY CHURCH-
Request for a Site Development Plan, Conditional Use Permit and Coastal
Development Permit to allow the construction and operation of an 11,620 square
foot church and daycare facility within Aviara Planning Area 32B, generally
located at the southwest corner of Poinsettia Lane and Ambrosia Lane, in Local
Facilities Management Zone 19.
I. RECOMMENDATION
That the Planning Commission ADOPT Planning Commission Resolutions No. 4868, 4869, and
4870, APPROVING Site Development Plan SDP 00-06, Conditional Use Permit CUP 00-06,
and Coastal Development Permit CDP 00-09, based upon the findings and subject to the
conditions contained therein.
II.INTRODUCTION
The proposal involves the construction and operation of a church and daycare facility within
Planning Area 32B of the Aviara Master Plan, located on the southwest corner of Poinsettia Lane
and Ambrosia Lane. The proposed 11,620 square foot, one-story building would contain an
auditorium and related rooms for worship and five classrooms for day care and Sunday school
education. The building and site design comply with all applicable regulations and staff has no
issues with the proposal.
III. PROJECT DESCRIPTION AND BACKGROUND
Daybreak Community Church is requesting approval of a Site Development Plan, Conditional
Use Permit and Coastal Development Permit to allow the construction and operation of a church
and daycare facility in Aviara's Planning Area 32B. The Aviara Master Plan requires the
approval of a Site Development Plan prior to development of any planning area and the Zoning
Ordinance requires a Conditional Use Permit and Coastal Development Permit for churches in
the City's Coastal Zone. The project site is located at the southwest corner of Poinsettia Lane
and Ambrosia Lane and is designated Residential Medium Density (RM) in the City's General
Plan. The site is zoned Planned Community (P-C) and is located within Phase III of the Aviara
Master Plan. To the north, across Poinsettia Lane, is the Zone 19 Community Park site
(Planning Area 32). To the east, across Ambrosia Lane, is the Jefferson at Aviara apartment
complex (Planning Area 18). South of the project site is an open space for Planning Area 21 and
west of the site is vacant land within the Zone 20 Specific Plan area.
The project site is currently graded in accordance with the grading for the Master Tentative Tract
Map for Aviara Phase III (CT 92-03). All facilities (such as sewer, storm drain, roadway
o
SDP 00-06/CUP 00-06/CoWo-09 - DAYBREAK COMMUNITY^HURCH
November 15, 2000
Page 2
improvements) have been installed and are available for the project site, which would gain
access off of Ambrosia Lane. A 100-foot wide major power transmission line easement, held by
SDG&E, traverses the southwest corner of the property. A transmission tower and access road
also exist on the project site and the project has been designed to maintain access to this tower.
The proposed church/daycare facility would be contained within one building totaling 11,620
square feet. As shown on Exhibits "A" - "G", dated November 15, 2000, the building would
contain a 480-seat auditorium with stage, five classrooms/daycare rooms (for up to 100
students), administration offices, storage areas and restrooms. The architecture of the building
would follow the Mediterranean/Spanish Colonial theme of the Aviara Master Plan, with stucco
exteriors, columns, and a clay tile roof. The proposed architecture and site plan has been
reviewed and approved by the Aviara Architectural Review Board. The building would measure
29.5 feet in height and would contain a small roof-top equipment well for roof-top
appurtenances.
The Daybreak Community Church proposal is subject to the following regulations:
A. General Plan;
B. Local Coastal Program;
C. Aviara Master Plan;
D. Parking Ordinance (Chapter 21.44 of the Zoning Ordinance);
E. Conditional Use Ordinance (Chapter 21.42 of the Zoning Ordinance);
F. P-C - Planned Community Zone (Chapter 21.38 of the Zoning Ordinance);
G. Growth Management Ordinance (Chapter 21.90 of the Zoning Ordinance);
H. Zone 19 Local Facilities Management Plan.
IV. ANALYSIS
The recommendation for approval of this project was developed by analyzing the project's
consistency with the applicable policies and regulations listed above. The following analysis
section discusses compliance with each of these regulations/policies utilizing both text and
tables.
A. General Plan
The Daybreak Community Church project is consistent with the applicable policies and
programs of the General Plan. Particularly relevant to the church/daycare project are the Land
Use, Circulation, Housing, Public Safety and Open Space and Conservation elements. Table 1
below indicates how the project complies with these particular elements of the General Plan.
SDP 00-06/CUP 00-06/CD
November 15,2000
Page 3
DPi00-09 - DAYBREAK COMMUNITYTHURCHYTK
TABLE 1 - GENERAL PLAN COMPLIANCE
Element Use Classification, Goal,
Objective or Program
Proposed Uses and Improvements Compliance
Land Use Site is designated for Residential
uses with a medium density (RM).
Provide for a sufficient diversity of
land uses so that schools, parks and
recreational areas, churches and
neighborhood shopping centers are
available in close proximity to each
resident of the City.
To ensure that new master planned
communities and residential
specific plans contribute to a
balanced community by providing,
within the development, adequate
areas to meet some social/human
service needs such as sites for
worship, daycare, youth and senior
citizen activities.
Churches and daycare facilities are
conditionally allowed in
residentially designated areas.
No other church or daycare sites
exist in the immediate area
therefore provision of such will
bring these uses closer to nearby
residents.
Planning Area 32B is set aside for
church and daycare uses to ensure
their existence within the Aviara
Master Plan community.
Yes
Yes
Yes
Circulation Require new developments to
provide safe, adequate and
attractively landscaped parking
areas.
Proposed development includes
parking area designed in accordance
with City Standards and Landscape
Manual requirements.
Yes
Housing Achieve a balance between the
numbers of local jobs created
relative to the availability of
housing.
Project is conditioned to pay non-
residential linkage fee if adopted
prior to the issuance of building
permits.
Yes
Open Space
and
Conservation
Minimize environmental impacts to
sensitive resources in the City.
Project maintains existing amount
of native habitat, and erosion
control during grading reduces
sedimentation of the lagoon.
Yes
Public Safety Design all structures in accordance
with the seismic design standards of
the UBC and State building
requirements.
Provision of emergency water
systems and all-weather access
roads.
All buildings will meet UBC and
State seismic requirements.
All necessary water mains, fire
hydrants and appurtenances must be
installed prior to occupancy and all-
weather access roads will be
maintained throughout construction.
Yes
Yes
SDP 00-06/CUP 00-06/CD
November 15,2000
Page 4
m0-09 - DAYBREAK COMMUNITY'TOUR'.CH
B. Local Coastal Program
The Daybreak Community Church- Aviara PA 32B site lies within the Mello I segment of the
City's Coastal Zone and is subject to the corresponding land use policies and implementing
ordinances. The implementing ordinances for those portions of the Mello I segment within
Aviara are contained in the Aviara Master Plan. This section addresses only conformance with
the Land Use Plan since implementing ordinance conformance is addressed in Section C below.
The policies of the Mello I segment emphasize topics such as preservation of agriculture and
scenic resources, protection of environmentally sensitive resources, provision of shoreline access
and prevention of geologic instability and erosion.
The land uses allowed through the LCP segments are the same as those allowed through the
Aviara Master Plan, therefore the proposed church and daycare uses are consistent with the LCP.
All steep slopes with native vegetation were preserved through the tentative tract map for Aviara
Phase III (CT 92-03) and no encroachment is proposed with the church construction. The
current erosion control standards of the Engineering Department will be maintained throughout
the project site to deter erosion and potential lagoon sedimentation. In addition, grading is
limited to the non-rainy season (April 1st to October 1st). No agricultural lands exist on the
project site, therefore no impacts to such will occur. The project site is located 0.19 miles from
the Batiquitos Lagoon and 0.39 miles from the Pacific Ocean, therefore no existing or future
coastal access routes exist through the site. No significant visual resources exist on or near the
graded project site. Given the above, the Daybreak Community Church project is consistent with
the Mello I land use policies.
C.Aviara Master Plan
Development within Planning Area 32B is required to follow the use allocations and
development standards of the Aviara Master Plan. An analysis of the project's conformance
with these use allocations and development standards is contained in Table 3 below.
TABLE 2 - AVIARA MASTER PLAN CONFORMANCE
Master Plan Requirement Proposed Plan Compliance
Use Allocation:
Church and daycare uses.Proposed uses include church and
daycare facilities.
Yes
Building Height:
30 foot maximum.Proposed building is 29.4 feet above
existing grade.
Yes
Setbacks:
50 feet from Poinsettia Ln.
30 feet from other planning
area boundaries.
Proposed building and parking is a
minimum of 50 feet from Poinsettia Lane.
Proposed structures and parking are
located a minimum of 180 feet from the
boundary with Planning Area 21.
Yes
Yes
:DTCSDP 00-06/CUP 00-06/CDP 00-09 - DAYBREAK COMMUNIT
November 15, 2000
Page5
'YTI:HURCH
Given the above, the proposed Daybreak Community Church proposal is consistent with the
Aviara Master Plan.
D. Parking Ordinance
The parking requirements for development projects are contained in the Chapter 21.44 of the
City's Zoning Ordinance. The parking for churches is based upon the sum of all proposed uses
within the facility. The three uses within the Daybreak Community Church proposal are public
assembly, private school and administration offices. Table 3 below indicates the amount of each
of these uses, the parking requirement for each use and the provision of parking proposed by the
project. It should be noted that, of the 209 parking spaces, 40 spaces are either completely or
partially within the existing SDG&E power transmission line easement. Should they become
unusable due to the power companies constraints, the amount of parking for the church/daycare
facility will still far exceed that required by the Parking Ordinance. Given the data in Table 3
below, the project is consistent with the requirements of the Parking Ordinance.
TABLE 3 - PARKING CONFORMANCE
Proposed Use
Public Assembly - 480 seats
Classrooms - 100 students
plus 20 employees
Administration - 960 sq. ft.
Parking Requirement
One space per five (5)
seats.
One space per 10
students plus one space
per employee
One space per 250
square feet of floor area
Parking Spaces
Required
96 spaces
30 spaces
4 spaces
Parking Spaces
Provided
139 spaces
50 spaces
20 spaces
Total Parking Required: 130 spaces Total Parking Provided: 209 spaces
E.Conditional Use Ordinance
The proposed church and daycare facility is considered a Conditional Use and is therefore
subject to the regulations contained in Chapter 21.42 of the Zoning Ordinance. There are four
standard findings that must be made in order to allow the addition of a conditional use to any
property. Table 4 below list the required findings and discusses the project's consistency with
those findings.
TABLE 4 - CONSISTENCY WITH CONDITIONAL USE FINDINGS
Finding Project Consistency
That the requested use is necessary or desirable for
the development of the community, is essentially in
harmony with the various elements and objectives
of the General Plan, and is not detrimental to
existing uses or to uses specifically permitted in the
zone in which the proposed use is to be located.
The proposed church/daycare provides worship and
daycare services in an area of the City lacking these
facilities and the project will provide safe parking
areas and emergency access without encroaching
into existing open space.
SDP 00-06/CUP 00-06/CD:
November 15, 2000
Page 6
0-09 - DAYBREAK COMMUNITY OTUR.CH
TABLE 4 - CONSISTENCY WITH CONDITIONAL USE FINDINGS
Finding Project Consistency
That the site for the intended use is adequate in size
and shape to accommodate the use.
The proposed building and the required parking
and landscaping can fit within the boundaries of the
developable portion of the property within need to
encroach into required setbacks or approved open
space.
That all of the yards, setbacks, walls, fences,
landscaping, and other features necessary to adjust
the requested use to existing or permitted future
uses in the neighborhood will be provided an
maintained.
The project is completely surrounded by
landscaping and all of the proposed development
fits within the buildable portion of the lot.
That the street system serving the proposed use is
adequate to properly handle all traffic generated by
the proposed use.
The proposed use would generate 165 additional
daily traffic trips which can be supported by
Ambrosia Lane (a collector street) and Poinsettia
Lane (a major arterial roadway).
Given the above, the Daybreak Community Church project is consistent with the Conditional
Use Ordinance, Chapter 21.42 of the Zoning Ordinance.
F. P-C - Planned Community Zone
The underlying zoning of the Daybreak Community Church site is P-C, Planned Community. In
accordance with that designation, the Aviara Master Plan was created to implement that zoning.
No specific development standards or design criteria exist in the P-C zone, however, all
applicable standards and criteria are contained within, or are referenced by, master plan
documents. Therefore, conformance with the master plan requirements also indicates
conformance with the Planned Community Zone.
G. Growth Management Ordinance
The Daybreak Community Church proposal is a non-residential project and, therefore, is subject
to only some of the provisions of the Growth Management program. Table 5 details the project's
compliance with the standards of the Growth Management Ordinance.
TABLE 5 - GROWTH MANAGEMENT COMPLIANCE
Standard
City Administration
Library
Waste Water Treatment
Parks
Drainage
Circulation
Impacts/Standard
N/A
N/A
5.32 EDU
N/A
PLDAD
165 ADT
Compliance
Yes
Yes
Yes
Yes
Yes
Yes
SDP 00-06/CUP 00-06/CD
November 15, 2000
Page?
DPI00-09 - DAYBREAK COMMUNITY CHURCH
TABLE 5 - GROWTH MANAGEMENT COMPLIANCE
Standard
Fire
Open Space
Schools
Water
Impacts/Standard
Station #4
N/A
C.U.S.D.
1,170 GPD
Compliance
Yes
Yes
Yes
Yes
Given the above, the Daybreak Community Church project is consistent with the Growth
Management Ordinance.
H. Zone 19 Local Facilities Management Plan
Local Facilities Management Zone 19 covers the entire Aviara Master Plan, including Planning
Area 32B. No special development requirements, such as roadway construction or other
infrastructure requirements, apply to this 10,857 square foot church and daycare building. The
LFMP does require that all facilities needed to serve the development be in place concurrent
with, or prior to, need. The Daybreak Community Church, as conditioned, will be served with
all utilities and improvements prior to occupancy of the building and will pay the required public
facilities fee prior to issuance of building permits. Therefore the proposal is consistent with the
Zone 19 LFMP.
V. ENVIRONMENTAL REVIEW
Earlier environmental analyses have been completed for the project site on several occasions.
One was the Master Environmental Impact Report for the City's 1994 General Plan Update
(MEIR 93-01), which reviewed the potential impacts of buildout of the City's General Plan,
including transportation and air quality. Another source of previous environmental review was
the Environmental Impact Report for the Pacific Rim Country Club and Resort (EIR 83-02(A)
for CT 85-35/MP 177) certified on December 8, 1987. This document analyzed all potential
impacts for the development and occupation of the over 2,000 unit residential master plan (now
known as Aviara) with its associated 18 hole golf course, 550 room hotel, sports club,
neighborhood commercial site and church/day care site, including the development of Planning
Area 32B. The third previous environmental review was the Mitigated Negative Declaration for
the Aviara Phase III Master Plan Amendment (CT 92-03/MP 177(G)), approved January 25,
1994, which reviewed the grading and construction related to the development of Phase III,
including development of Planning Area 32B.
Without exception, the proposed church and daycare facility has no additional impacts not
previously analyzed in the earlier environmental review and no additional review or mitigation
measures are necessary. Since the site is pregraded consistent with the previous Mitigated
Negative Declaration for CT 92-03; the only land use allowed upon this site per Master Plan 177
is a church/daycare and no substantial changes have occurred with respect to the circumstances
under which the previous environmental documents were approved.
SDP 00-06/CUP 00-06/CDTO)-09 - DAYBREAK COMMUNITY CTIURCH
November 15, 2000
PageS
ATTACHMENTS;
1. Planning Commission Resolution No. 4868
2. Planning Commission Resolution No. 4869
3. Planning Commission Resolution No. 4870
4. Location Map
5. Disclosure Statement
6. Local Facilities Impact Assessment Form
7. Background Data Sheet
8. Public Notice of Prior Environmental Compliance and P II
9. Exhibits "A" - "G", dated November 15, 2000
DAYBREAK COMMUNITY CHURCH
SDP 00-06/CDP 00-09/CUP 00-06
of Carlsbad
Planning Department
DISCLOSURE STATEMENT
Applicant's statement or disclosure of certain ownership interests on all applications which will require
discretionary action on the part of the City Council or any appointed Board, Commission or Committee.
The following information MUST be disclosed at the time of application submittal. Your project cannot
be reviewed until this information is completed. Please print.
Note:
Person is defined as "Any individual, firm, co-partnership, joint venture, association, social club, fraternal
organization, corporation, estate, trust, receiver, syndicate, in this and an other county, city and county,.city
municipality, district or other political subdivision or any other group or combination acting as a unit."
Agents may sign this document; however, the legal name and entity of the applicant and property owner must be
provided below.
1.
2.
APPLICANT (Not the applicant's agent)
Provide the COMPLETE, LEGAL names and addresses of ALL persons having a financial
interest in the application. If the applicant includes a corporation or partnership, include the
names, title, addresses of all individuals owning more than 10% of the shares. IF NO
INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-
APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the
names, titles, and addresses of the corporate officers. (A separate page may be attached if
necessary.)
Person
Title N/A
Corp/Part Daybreak Community Church
Title _
Address 2270 Camino Vida Roble
Carlsbad, CA 92009 (760) 931-7773
Address
OWNER (Not the owner's agent)
Provide the COMPLETE, LEGAL names and addresses of ALL persons having any ownership
interest in the property involved. Also, provide the nature of the legal ownership (i.e, partnership,
tenants in common, non-profit, corporation, etc.). If the ownership includes a corporation or
partnership, include the names, titles, addresses of all individuals owning more than 10% of the
shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE
INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned
corporation, include the names, titles, and addresses of the corporate officers. (A separate page
may be attached if necessary.)
Person Daniel W. Grider
Title N/A
Corp/Part Daybreak Community Church
Title
Address 2270 Camino Vida Roble
Carlsbad, CA 92009 (760) 931-7773
Address
2075 Las Palmas Dr. • Carlsbad, CA 92009-1576 • (760) 438-1161 • FAX (760) 438-0894
NON-PROFIT ORGANIZATION OR TRUST
If any person identified pursuant to (1) or (2) above is a nonprofit organization or a trust, list the
names and addresses of ANY person serving as an officer or director of the non-profit
organization or as a trustee or beneficiary of the.
Non Profit/Trust Non Profit/Trust
Title
Address
Title
Address
Have you had more than $20 worth of business transacted with any member of City staff, Boards,
Commissions, Committees and/or Council within the past twelve (12) months?
Yes \ No If yes, please indicate person(s):
NOTE: Attach additional sheets if necessary.
I certify that all the above information is true and correct to the best of my knowledge.
Signature of applicant/date
Print or type name of owner Print or type name of applicant
Signature of owner/applicant's agent if applicable/date
Print or type name of owner/applicant's agent
H:ADMIN\COUNTER\DISCLOSURE STATEMENT 5/98 Page 2 of 2
CITY OF CARLSBAD
GROWTH MANAGEMENT PROGRAM
LOCAL FACILITIES IMPACTS ASSESSMENT FORM
(To be Submitted with Development Application)
PROJECT IDENTITY AND IMPACT ASSESSMENT:
FILE NAME AND NO: Daybreak Community Church - SDP QO-06/CUP 00-06/CDP 00-09
LOCAL FACILITY MANAGEMENT ZONE: 19 GENERAL PLAN: RM
ZONING: P-C
DEVELOPER'S NAME: Daybreak Community Church
ADDRESS: 2270 Camino Vida Roble. Suite M. Carlsbad CA 92009
PHONE NO.: 760-931-7773 ASSESSOR'S PARCEL NO.: 215-841-07
QUANTITY OF LAND USE/DEVELOPMENT (AC., SQ. FT., DU): 4.5 acres
ESTIMATED COMPLETION DATE: November. 2001
N/A
N/A
A. City Administrative Facilities: Demand in Square Footage = N/A
B. Library: Demand in Square Footage = N/A
C. Wastewater Treatment Capacity (Calculate with J. Sewer) 5.32 EDU
D. Park: Demand in Acreage =
E. Drainage: Demand in CFS =
Identify Drainage Basin = PLDAD
(Identify master plan facilities on site plan)
F. Circulation: Demand in ADT= 165 APT
(Identify Trip Distribution on site plan)
G. Fire: Served by Fire Station No. = Station #4
H. Open Space: Acreage Provided =
I. Schools:
(Demands to be determined by staff)
J. Sewer: Demands in EDU
K. Water: Demand in GPD= 1,170 GPP
N/A
Carlsbad Unified
5.32 EDU
BACKGROUND DATA SHEET
CASE NO:SDP QO-06/CUP QQ-Q6/CDP 00-09
CASE NAME: Daybreak Community Church
APPLICANT: Daybreak Community Church
REQUEST AND LOCATION: Request for a Site Development Plan. Conditional Use Permit
and Coastal Development Permit to allow the construction and operation of a 10,857 square foot
church and daycare facility within Aviara Planning Area 32B, generally located at the southwest
corner of Poinsettia Lane and Ambrosia Lane
LEGAL DESCRIPTION: Lot 8 of Carlsbad Tract No. CT 92-03, according to Map No.
13434, filed in the Office of the County Recorder on June 23, 1997, in the City of Carlsbad,
County of San Diego, State of California
APN: 215-841-07 Acres: 4.5 acres Proposed No. of Lots/Units: n/a
GENERAL PLAN AND ZONING
Land Use Designation: Residential Medium Density (RM)
Density Allowed: 4.0-8.0 du/ac
Existing Zone: P-C
Density Proposed: n/a
Proposed Zone: n/a
Surrounding Zoning, General Plan and Land Use:
Zoning General Plan
Site
North
South
East
West
P-C
P-C
P-C
P-C
L-C
RM
OS
RLM
RH
RLM
Current Land Use
Vacant
Vacant
Open Space
Apartments
Vacant
PUBLIC FACILITIES
School District: Carlsbad Water District: Carlsbad Sewer District: Carlsbad
Equivalent Dwelling Units (Sewer Capacity): 5.32
ENVIRONMENTAL IMPACT ASSESSMENT
Negative Declaration, issued
Certified Environmental Impact Report, dated_
Other, Prior Environmental Compliance