Loading...
HomeMy WebLinkAbout2005-01-05; Planning Commission; ; CT 04-11|PUD 04-10|SDP 04-09|CUP 04-15|CDP 04-26 - POINSETTIA.e City of Carlsbad Planning Departmen,, A REPORT TO THE PLANNING COMMISSION P.C. AGENDA OF: January 5, 2005 ItemNo. @ Application complete date: August 18, 2004 Project Planner: Barbara Kennedy Project Engineer: David Rick SUBJECT: CT 04-11/PUD 04-10/SDP 04-09/CUP 04-15/CDP 04-26 -POINSETTIA COMMONS -Request for a determination that the project is within the scope of the previously certified Poinsettia Properties Specific Plan Program EIR 96-01 and that the Program EIR adequately describes the activity for the purposes of CEQA; a recommendation of approval for a Tentative Tract Map, Non- Residential Planned Unit Development Permit, Site Development Plan, and Coastal Development Permit; and approval of a Conditional Use Permit to develop a mixed-use project consisting of the subdivision and development of 18,337 square feet of commercial/retail uses, a 3,296 square foot day care center, 51 live-work condominium units, 15 loft ~ondominium units, and 12 affordable apartments, on 5 .29 acres generally located south of A venida Encinas and north of the east-west segment of Embarcadero Lane within the Mello II Segment of the Local Coastal Program and Local Facilities Management Zone 22. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolutions No. 5806, 5807, 5808, and 5810 RECOMMENDING APPROVAL of a Tentative Tract Map CT 04-11, Non- Residential Planned Development Permit PUD 04-10, Site Development Plan SDP 04-09, and Coastal Development Permit CDP 04-26; and ADOPT Planning Commission Resolution No. 5809 APPROVING Conditional Use Permit CUP 04-15, based on the findings and subject to the conditions contained therein. II. INTRODUCTION The subject property is located in Planning Area 6 (PA 6) of the Poinsettia Properties Specific Plan (SP 210) which is identified as a mixed-use development site. The proposed project would subdivide and grade a 5.29 acre site and develop a mixed-use project consisting of 18,337 square feet of commercial/retail uses, a 3,296 square foot day care center, 51 live-work condominium units, 15 loft condominium units, and 12 affordable apartments. The site is located south of A venida Encinas and north of the east-west segment of Embarcadero Lane within the Mello II Segment of the Local Coastal Program. The project requires approval of a Tentative Tract Map and a Non-residential Planned Development Permit to subdivide the project as an air-space condominium which will allow for individual sale of the market-rate live-work and loft units. A Site Development Plan is required for the affordable housing component and a Conditional Use Permit is required for the day care center. Approval of a Coastal Development Permit is necessary due to the project's location within the Mello II Segment of the City's Local Coastal Program. The project is not located if'\ "•,; CT 04-11/PUD 04-10/SDP fo9/CUP 04-15/CDP 04-26 -POINsEWIA COMMONS January 5, 2005 Pa e2 within the Appeal Jurisdiction area, therefore the CDP is not appealable to the California Coastal Commission. fu. order to achieve the 78 units proposed, the project requires an allocation of 17 dwelling units from the City's Excess Dwelling Unit Bank. The requested actions require approval by the City Council because the subdivision contains more than 50 units. The proposed project is within the scope of the previously certified Poinsettia Properties Specific Plan Program BIR, is consistent with the zoning and land use provisions of the Poinsettia Properties Specific Plan, and incorporates a transit-oriented design focus. As designed and conditioned, the project is consistent with all relevant City regulations and policies. III. PROJECT DESCRIPTION AND BACKGROUND BACKGROUND fu. January 1998, the City Council certified the Final Program BIR (BIR 96-01) and approved the Poinsettia Properties Specific Plan. This document addresses eight planning areas wrapping around the east, west and south sides of the Poinsettia Coaster Station as shown in Attachment 10. The Specific Plan was designed to create a transit-oriented development (TOD) project located near the rail station and the nearby major transportation corridor, fu.terstate 5. The plan incorporates numerous features to create a pedestrian-focused environment where residents can accomplish their daily activities without driving. Six of the eight Planning Areas (PA) have been developed. A total of 448 single-family detached units are located within PAs 2, 4, 7, and 8; PA 3 contains a community recreation area (for PAs 2 & 4); and 92 affordable housing units are located within the multi-family project in PA 5. PA 1, located at the southeast comer of Carlsbad Boulevard and Ponto Road allows for future travel/recreation commercial uses. PA 6 is designated as a mixed-use development site and allows for up to 80,000 square feet of commercial uses and 61 residential units. PROJECT DESCRIPTION The 5.29 acre site is located within the southwest quadrant of the City in Local Facilities Management Zone 22. The proposed development is located on two parcels that are separated by Embarcadero Lane, which is currently a public street. The west side of the site is adjacent to the parking lot for the Poinsettia Coaster Station and the eastern portion of the site is adjacent to the Poinsettia Station affordable housing project. The Water's End single-family residential development is located to the south and the property to the north across A venida Encinas, owned by Encina Wastewater Authority, is vacant. The property is zoned C-T (Commercial-Tourist) with a General Plan Land Use designation of T-RIRH (Travel/Recreation Commercial and Residential High-Density 15-23 du/ac). The site has been previously graded, is currently vacant and does not contain any sensitive vegetation. The primary entrance to the site is located on the northern intersection of A venida Encinas and Embarcadero Lane. Embarcadero Lane runs in a north/south manner throughout the project site and turns to the east at the southern end of the site to reconnect with Avenida Encinas, The north-south segment of Embarcadero Lane is proposed to be vacated, realigned and reconstructed as a private street. Redesign of the street results in more surface parking due to a diagonal parking layout and privatization will allow for the use of decorative paving in the street, unique parking design features, and a project entry element. A Parking Management Plan has been prepared and parking time limitations will be enforced by the owner's association to ensure CT 04-11/PUD 04-10/SDP 109/CUP 04-15/CDP 04-26-POINSE,,IA COMMONS January 5, 2005 Pa e3 that there is adequate parking for the commercial/retail uses and for guest parking, and that the project is not impacted by overflow parking from the Poinsettia Coaster Station. The entrance to the site is accented by decorative entry signage as well as a clock tower/project entry feature in a round-about. The project has been designed as a pedestrian :friendly community and pedestrian connections are located throughout the site to connect this community with the Poinsettia Coaster Station and the Water's End residential community. The primary east-west pedestrian connection to the coaster station aligns with the project entry element and includes a wide pedestrian plaza that is adjacent to the commercial/retail uses. A pedestrian walkway has also been designed along the western edge of the project to allow for convenient pedestrian access between the project and the Poinsettia Coaster Station. The buildings have been laid out to create a walkable environment with a mixture of uses that encourages people to park their cars and walk throughout the site. All commercial/retail space will be located on the ground floor, including the 'work" portion of the live-work units, while all residences will be located on the second and third floors to create a traditional urban environment. Commercial/retail uses are located near A venida Encinas for visibility purposes, and the daycare center will be located in the northeast comer of the site. The sidewalk along Embarcadero Lane is a minimum of 11.5 feet adjacent to the commercial buildings to create a strolling boardwalk. Sidewalks along Embarcadero Lane will be at the same grade as the street to allow for a smooth transition through the site. The diagonal parking spaces will be separated from the boardwalk with a raised· planter, large potted plant, bollard, or street light located at the end of each parking space. The mixed-use project includes commercial/retail space, day care, live-work units, loft units, and affordable housing units as described below. Commercial/Retail Space There will be 18,337 square feet of commercial/retail space on the first floor of Buildings 1 and 2, which are located in the northern portion of the site on either side of Embarcadero Lane. This square footage will accommodate a mix of uses such as real estate offices, coffee houses, banking, bakery, bookstores, restaurants, video rentals, bike shops, tailors, gift stores, etc. It is envisioned that the uses within these commercial buildings will be designed to cater to transit commuters as well as nearby residents and employees of the surrounding business area. Open plazas and benches are incorporated into the project design to create focal points and gathering places and to establish a pedestrian-oriented center for the neighboring communities. Day Care Center The plan includes a 3,296 square foot day care center as required by the Poinsettia Properties Specific Plan. The day care will cater to area residents, and employees of the surrounding commercial uses, and commuters who utilize the nearby coaster station. The day care center will be incorporated into the mixed-use building (Building 1) located in the northeast portion of the site, but will be completely separated from the commercial and residential uses through building design and entrance locations. The day care site includes a playground area that will conform to applicable City and State regulations. Designated parking spaces will be provided in front of the daycare allowing parents to park and drop-off or pick-up their children. CT 04-11/PUD 04-10/SDP !09/CUP 04-15/CDP 04-26 -POINSE"IA COMMONS January 5, 2005 Pa e4 Live-Work Units Eleven separate live-work buildings containing a total of 51 units are located on the western portion of the site between Embarcadero Lane and the Poinsettia Coaster Station parking lot. Each building will contain four, five or six live-work units, ranging in size from 1,930 to 2,562 square feet (total live-work space). All of the units will be three stories with the ground level designed as a work studio and the upper two stories containing the residential portion of the unit. The buildings are designed so that the work space fronts on Embarcadero Lane, the plaza area, or the coaster parking lot. The back side of the buildings face a private interior courtyard area for the residents. The work studios are either 741 or 1,000 square feet, and are designed to encourage commercial uses by incorporating commercial style interior finishes and utilizing commercial storefront doors and windows. As shown on the elevations, the work studios will be equipped with rollup glass doors that open up to the pedestrian walkways. There will also be a commercial door, which can be used when the rollup door is closed. The work studios will be designed with only half bathrooms, a feature that will help to encourage the use of the downstairs level as· work studios rather than extra bedrooms by the owners. Additionally, an interior stairway provides the only access from the first floor work area to the living area above. The residential portions of these units are located on the second and third floors and will be designed as lofts, giving the owner maximum flexibility and the ability to create traditional bedrooms if desired. The "live" portion of the loft spaces contain between 1,189 and 1,562 square feet of living area. These units will be offered as market-rate, for-sale condominium units. Loft Units Fifteen for-sale market-rate loft condominiums will be provided above the commercial building located in the northwest portion of the site (Building 2). These units will range in size from 1,163 to 1,215 square feet within a two-level, open floor plan, providing flexibility for a unique living style that is not currently available in Carlsbad. Affordable Apartments Twelve affordable apartments will be located above commercial uses in the building on the east side of Embarcadero Lane (Building 1). The 12 stacked-flat units each contain 825 square feet of living space. Each of the units are designed with one-bedroom and one bathroom within an open floor plan for maximum flexibility. Parking The parking plan for the Poinsettia Commons project has been designed to adequately meet the parking needs for all proposed uses. Because the project includes common parking facilities for the residential guest parking and commercial uses, the applicant is requesting a 15% (19 space) parking reduction as provided in Section 21.44.050(a)(5) of the Carlsbad Municipal Code. The proposed parking reduction is discussed in the analysis section of this report. CT 04-11/PUD 04-10/SDP f 09/CUP 04-15/CDP 04-26 -POINSE~A COMMONS January 5, 2005 Pae 5 The project includes 107 surface parking spaces and 151 underground parking spaces for a total of 258 spaces. The diagonal spaces located along Embarcadero Lane are proposed to satisfy the parking requirements for the commercial uses, day care parent parking (6 spaces)~ 6 spaces for the affordable housing project (of the 18 required), and guest parking spaces for all of the residential uses. An underground parking garage containing 151 spaces will be located on the west side of Embarcadero Lane beneath the live-work units and Building 2. Access· to the underground parking is located near the midpoint of the north-south segment of Embarcadero Lane. A total of 132 enclosed garage parking spaces (66 two-car garages) will be located within the underground parking garage for the 51 live-work and 15 market-rate loft condominium units. In some instances, an internal stairway will be provided between the private garage space and the live-work unit above. An elevator and a number of stairwells are also conveniently located throughout the parking garage. Twelve open parking spaces will be provided as an option item for the affordable apartments, six spaces will be reserved for the employees of the day care center, and one handicap parking space will also be provided. Private storage units are also provided as an option item for each of the 66 live/work and market-rate loft condominium units. These storage units will help to free up garage space for vehicle parking. Gates will be installed at the entrance to the underground parking garage and no visitor or commercial parking will be provided in the underground structure. Access to the garage will only be allowed through the use of key cards. On weekends, the spaces reserved for the daycare center will be available for use by any of the project residents. Architecture The architectural theme for the project will be Beach style, which draws on the architectural elements of California coastal communities. The buildings utilize a variety of materials and siding types to create an individual identity for each unit. The siding materials include stucco, horizontal and vertical siding, and burnished CMU block. Roof designs are varied and include parapet roof structures; shed, mansard and hipped roof designs with composite roofing; and accent areas with metal seam roofs. Each dwelling unit will be designed with operable windows to take advantage of natural ventilation opportunities and each unit has a small balcony area. Accent elements, varied window designs, and building color will be used to create architectural interest and to reinforce the project design theme. The architectural style and design is in conformance with the requirements of the Poinsettia Properties Specific Plan and the buildings have been oriented to create an urban, pedestrian friendly environment. Landscaping Thirty-foot wide landscape buffers with meandering sidewalks will be provided along Avenida Encinas. This area will be landscaped with a semi-formal planting design featuring Mexican Fan Palms, Melaleuca trees, and turf areas which undulate between massed plantings of colorful shrubs and groundcovers to reinforce the existing planting theme along the street frontage. Groups of Mexican Fan Palms mixed with London Plane Trees are also shown along the western edge of the site, adjacent to the coaster station parking lot. London Plane Trees will be the primary street tree along Embarcadero Lane, with Magnolia trees used as an accent element near the clock tower. Smaller scale accent trees in raised planters will be used within the plaza area and in the private interior courtyard areas between the live-work units. e -CT 04-11/PUD 04-10/SDP 04-09/CUP 04-15/CDP 04-26-POINSETTIA COMMONS January 5, 2005 Pae 6 IV. ANALYSIS The project is subject to the following plans, ordinances, policies, and standards: A. General Plan T-RIRH (Travel/Recreation Commercial and Residential High- Density 15-23 du/ac) Land Use designation; B. Poinsettia Properties Specific Plan (SP 210); C. C-T Zone (Commercial-Tourist) Carlsbad Municipal Code (CMC) Chapter 21.29; D. City Council Policy 43 -Proposition E "Excess" Dwelling Unit Bank; E. Common Parking Facilities (CMC Chapter 21.44, Section 21.44.050(a)(5)); F. Subdivision Ordinance (Title 20 of the CMC); G. Non-Residential Planned Development Ordinance (CMC Chapter 21.47); H. Inclusionary Housing (CMC Chapter 21.85 and 21.53); I. Conditional Use Permit/Child Care Ordinance (CMC Chapters 21.42 and 21.83); J. Mello II Segment of the Local Coastal Plan, Coastal Development Permit Procedures, Coastal Agricultural Overlay Zone, and Coastal Resource Protection Overlay Zone (CMC Chapters 21.201, 21.202, and 21.203); and K. Growth Management Regulations (Zone 22 Local Facilities Management Plan). The recommendation for approval for this project was development by analyzing the project's consistency with the applicable regulations and policies. The project's compliance with each of the above regulations is discussed in detail in the sections below. A. General Plan The proposed project is consistent with the policies and programs of the General Plan. The T- R/RH (Travel/Recreation Commercial and Residential High-Density) General Plan Land Use designation for the site was adopted concurrently with the Poinsettia Properties Specific Plan and allows the development of commercial uses which serve the travel and recreational needs of tourists and residents as well as allowing residential development at a density of 15-23 du/ac. The proposed project complies with all of the elements of the General Plan as outlined in Table 1 · below: Table 1 -GENERAL PLAN COMPLIANCE USE, ELEMENT CLASSIFICATION, PROPOSED USES & COMPLY GOAL OBJECTIVE OR IMPROVEMENTS PROGRAM Land Use Site is designated for Mixed-use, transit-oriented Yes Travel/Recreation development consisting of 18,337 Commercial and square feet of commercial/retail Residential High-Density. uses, a 3,296 square foot day care center, 51 live-work units, 15 loft units, and 12 affordable apartments. Net residential density is 18.6 du/ac. • • • CT 04-11/PUD 04-10/SDP 04-09/CUP 04-15/CDP 04-26 -POINSEJ'Ti:A COMMONS January 5, 2005 Pa e7 Table 1 -GENERAL PLAN COMPLIANCE CONTINUED USE, CLASSIFICATION, PROPOSED USES & ELEMENT GOAL OBJECTIVE OR IMPROVEMENTS COMPLY PROGRAM Housing Encourage increased Live-work units, loft units, and Yes integration of housing with affordable apartments are mixed non-residential development. with commercial/retail uses. A minimum of fifteen 12 affordable apartments will be Yes percent of all units approved constructed on site. These 12 units for any master plan constitute 15% of the total number community or residential of residences. specific plan shall be affordable to lower income- households. Public Provide project review that Project improvements will not Yes Safety allows consideration of significantly impact or be seismic and geologic impacted by geologic or seismic hazards. conditions. Noise Interior noise standards of 45 The project is conditioned to Yes dBACNEL. comply with the 45 dBA CNEL interior noise standard. Noise from railroad travel An acoustical analysis was Yes through Carlsbad is not prepared and showed that the disruptive to adjacent land project meets all requirements uses and activities. concerning railroad noise. In addition, a disclosure statement regarding railroad noise will be provided to all buyers and tenants. Open Space Minimize environmental The project has been designed in Yes & impacts to sensitive accordance with all mitigation Conservation resources within the City. measures from the Poinsettia Properties Specific Plan Program EIR. Utilize Best Management The project will conform to all Yes Practices for control of storm NPDES and BMP requirements. water and to protect water quality. Circulation Requires new development All circulation improvements Yes to construct improvements including the vacation and needed to serve proposed privatization of Embarcadero Lane development. will be a part of this project. e • CT 04-11/PUD 04-10/SDP 04-09/CUP 04-15/CDP 04-26 -POINSETTIA COMMONS January 5, 2005 Pae 8 B/C. Poinsettia Properties Specific Plan and C-T Zone The Poinsettia Properties Specific Plan provides a :framework for the development of the properties within the Specific Plan area to ensure the logical and efficient provision of public facilities and community amenities for future residents .. The proposal is subject to the C-T (Commercial-Tourist) zone development standards as well as the standards included in the Specific Plan. A Non-residential Planned Development Permit, in conjunction with the Tentative Map, is required for subdivision of the project into air-space condominium units. The on-site affordable housing requires approval of a Site Development Plan and a Conditional Use Permit is required for the day care center. These actions are discussed in subsequent sections of the staff report. The Specific Plan allows PA 6 to be developed with up to 80,000 square feet of commercial/ retail uses and up to 61 residential units. Residential units were anticipated to be either residences above commercial/retail areas or live-work units. The proposal includes both types of units. In order to provide more housing opportunities within the context of a "Smart Growth," transit-oriented development, the applicant is requesting an allocation of 17 units from the City's Excess Dwelling Unit Bank for the project. City Council Policy 43 authorizes consideration of allowing excess units to be allocated to future "qualifying" residential projects and is discussed in more detail in a subsequent section of this staff report. Commercial/retail uses are proposed within the ground floor of Buildings 1 and 2, which are located closest to Avenida Encinas. Building 1 contains 7,542 square feet of commercial/retail space as well as the 3,296 square foot day care center that is required for this planning area. Additionally, 12 stacked-flat apartment units, each containing 825 square feet, will be located on the second and third floors of Building 1. These rental units will be used to satisfy the 15% inclusionary housing requirements for the project. Building 2 contains 10,795 square feet of ground floor commercial/retail space and 15 residential units on the second and third floors. The two-level loft units range in size from 1,163 to 1,215 square feet. The 51 live-work units will be located within 11 separate buildings which front on Embarcadero Lane, the public plaza, or the coaster station parking lot. The ground floor work spaces are either 741 or 1,000 square feet for a total of 45,820 square feet of work space in the live-work units. Each unit also has two levels ofliving space above which ranges from 1,189 to 1,562 square feet. The live-work and loft units will be for-sale, market-rate condominium units. The proposed development within PA 6 meets or exceeds all applicable requirements of the Specific Plan and CT zone including the focus on a pedestrian-oriented development. The project's compliance with the applicable development standards is demonstrated in Table 2 below: • • CT 04-11/PUD 04-10/SDP 04-09/CUP 04-15/CDP 04-26 -POINSETTIA COMMONS January 5, 2005 Pae 9 Table 2 -Compliance With Poinsettia Properties Specific Plan/C-T Zone STANDARD REQUIRED PROPOSED Permitted Uses Building Height Density Parking Standards Affordable Housing 80,000 square feet commercial daycare shall be included 61 residential units ( see also Density discussion below) Maximum of 35 feet or three stories Maximum of 61 units with provisions to allow for transfer of units between PA's as long as the total SP 210 dwelling unit allowance of 823 units is not exceeded. A density of 15-23 units per acre is allowed under the RH zone 276 spaces for sum of all uses. Requires approval of common parking facilities (15% parking reduction) pursuant to CMC S2 l.44.050( a)(5). 15% of units will be affordable a. 18,337 square feet of commercial b. 3,296 square foot day care center c. 51 live-work condominium units d. 15 loft condominium units e. 12 affordable apartments 35 feet, three stories The project has requested 17 units from the City's Excess Dwelling Bank for a total of78 units. Results in a total of 618 units within SP 210 The project's net density is 18.6 du/ac ( excluding Embarcadero Lane). 258 spaces provided 151 garage parking spaces • 2 car-garage for market-rate units -132 spaces • 12 underground parking spaces for affordable units • 6 underground spaces for day care employees • 1 handicap parking space 107 surface parking spaces • commercial and guest parking • represents reduction of 19 spaces (15%) 12 affordable units (15%) are provided onsite. CT 04-11/PUD 04-10/SDP '-09/CUP 04-15/CDP 04-26 -POINSE'IA COMMONS January 5, 2005 Pae 10 Table 2 -Compliance With Poinsettia Properties Specific Plan/C-T Zone Contmued STANDARD REQUIRED PROPOSED Building Setbacks and All buildings shall be setback a All buildings are setback a minimum of minimum of30 feet from 30 feet from Avenida Encinas. Landscape Setbacks A venida Encinas. Setback area includes a 20 foot 20 foot landscaped parkway is landscaped parkway. provided. 10-foot side/rear setback if 10 foot or greater setback south of adjacent to residential. Building 1. 87.9-foot building setback from east property line. 24.9 foot or greater building setback from south property line. 11.6-foot setback from west property line to building. 8.6-foot setback from west property line to balcony. 10 foot building separation 12 foot or greater building separation. Architectural Design The design scale of buildings should be reduced to a more pedestrian level. Pedestrian activity is encouraged throughout the project. Walkways and connections to the adjacent transit center have been provided and pedestrian focal points where people can gather have been incorporated into the design. Encourage housing on upper floors.· All residential units will be on the second and third stories of all buildings. Discourage buildings less than Three story buildings will be two stories high. constructed. SPECIAL REQUIREMENTS Offer commercial uses which are related to the Allowable commercial uses include: use of the Poinsettia Coaster Station. Offer low cost residential opportunities very close to the Poinsettia Transit Station. restaurants, bakery, coffee houses, video rental, banking, dry cleaners, book store, office, professional, and other uses related to the use of the coaster station, which may be approved by the Planning Director. 12 affordable loft apartments will be constructed in the northeast portion of the site. • • CT 04-11/PUD 04-10/SDP 04-09/CUP 04-15/CDP 04-26 -POINSETTIA COMMONS January 5, 2005 Pa e 11 SPECIAL REQUIREMENTS CONTINUED Offer a "mixed use" environment for people to The proposed project provides a mixture of uses work and live in one location, yet have that allows people to live and work at the same transportation services available to them. place. Reduces need or use of an automobile. Benches and/or outdoor seating shall be Outdoor seating areas have been provided provided along all pedestrian pathways. throughout the project. Use pedestrian-level design scale, discourage Buildings are close to the street, large expanses use of automobiles, provide trails and of glass are provided for display areas, pedestrian focal points. pedestrian links are provided to the coaster station, numerous seating opportunities are located along the streets and within the plaza area, bicycle parking is provided. Streets may be public and/or private. The north-south segment of Embarcadero Lane Encourage narrow local streets of 28-foot width will be vacated and redesigned as a 28-foot with canopy trees. wide private street with angled parking on both sides and canopy street trees between parking spaces. A childcare center shall be incorporated into the The construction of a 3,296 square foot daycare development of PA 6. center is planned for the northeast portion of the site. Encourage housing on upper floors and Residential loft units are located on the second discourage buildings less than two-stories high. and third floors of Buildings 1 and 2. Live- work units are three-stories with the work space on the first floor. Encourage connections to residential Pedestrian connections are provided to the neighborhoods and direct pedestrian access Poinsettia Station apartments and Water's End between buildings and at the Poinsettia Coaster development. Mixed-use pedestrian link Station. corridors are provided to the coaster station at several locations. Provide sidewalk amenities such as outdoor Tables, chairs, and benches are provided within seating area and other public gathering spaces. the plaza and along the streets and walkways. The plaza area provides a public gathering space and focal point. Lighting is provided throughout the site. D. City Council Policy 43 -Proposition E "Excess" Dwelling Unit Bank In order to "qualify" for an allocation of Excess Dwelling Units, a project must possess certain characteristics. The development possesses two of these characteristics: 1. Transit-oriented, "smart growth" development projects where increased residential density is being placed in close proximity to major transit facilities, employment opportunities, and commercial support systems, and CT 04-11/PUD 04-10/SDP ,09/CUP 04-15/CDP 04-26 -POINSE,IA COMMONS January 5, 2005 Pae 12 2. Housing development for lower-income households where a density increase is requested to implement the City mandated 15% low-income requirement of the Inclusionary Housing Ordinance. The project is located adjacent to the Poinsettia Coaster Station, incorporates commercial uses into the project and is also adjacent to employment opportunities. The Specific Plan allows 61 residential units on this site and anticipated that 15% of the units (9 units) would be for low- income households. The proposed dwelling unit increase would result in 14 additional market- rate units and 3 additional low-income units. The resulting density is 18.6 du/ac which is slightly below the growth management control point of 19 du/ac for the RH (Residential-High) General Plan Land Use designation. The Poinsettia Properties Specific Plan anticipated a total residential build-out of 823 units within the various planning areas. Many of the planning areas could not reach the anticipated density due in part to the detached product type required for several of these planning areas. To date, 540 units have been constructed or approved. With the 78 units proposed in PA 6, a total of 618 units will be provided, or 205 units under the dwelling unit allowance. As each planning area has been developed, the excess units have been transferred to the City's Excess Dwelling Unit Bank. The Specific Plan allows for a transfer of dwelling units between planning areas, and reallocation of the excess dwelling units may be achieved through the discretionary review process. Given that the project meets two of the criteria to "qualify" for allocation of excess dwelling units and that the residential build-out of the Specific Plan area is well under the original number of units anticipated, staff supports the allocation of 17 dwelling units for the project. E. Common Parking Facilities The project is requesting approval for common parking facilities and an associated 15% parking reduction as provided for in section 21.44.050(a)(5) of the Carlsbad Municipal Code. This section of the Parking Ordinance provides that when a common parking facility is to occupy a site of 5,000 square feet or more, then the parking requirements as specified in the code for each of the two or more participating buildings or uses may be reduced not more than 15% upon approval of development plans in the manner prescribed for a conditional use permit. The 15% reduction is only proposed for the 126 surface parking spaces required for the commercial/retail, day care, and guest parking and would result in a reduction of 19 parking spaces for a total of 107 parking spaces on Embarcadero Lane. Required parking for the residential units would not be affected. A parking analysis, dated May 10, 2004, was prepared for the project by Linscott Law and Greenspan. The study concludes that the types of uses planned for the site should not be evaluated as entirely separate uses since shared parking between facilities is expected to occur and this shared parking should be accounted for in planning for the project. Parking along Embarcadero Lane will provide guest parking, drop off/pick up parking for parents with children at the day care center and parking for commercial and retail patrons. While the demand for parking for the commercial and retail patrons and the day care center will mainly occur during the day, most of the demand for visitor parking will occur during the evening hours or weekends when residents are home and retail parking demand is at a minimum. • • CT 04-11/PUD 04-10/SDP 04-09/CUP 04-15/CDP 04-26 -POINSETTIA COMMONS January 5, 2005 Pae 13 The parking analysis includes details regarding parking occupancy by peak demand. The analysis shows that the peak demand for residential parking is 75% of the total demand and would occur at 8:00 p.m. At that time, the parking demand for retail uses drops to 60%, demonstrating that the uses contained in the project operate in a completely different manner with different parking demand peaks and are able to share the same parking supply. A Parking Management Plan has been prepared for the project and is included as Attachment 11. The plan indicates that the 107 spaces on Embarcadero Lane will be limited to 3 hour parking Monday through Friday between 7:00 a.m. and 6:00 p.m. in order to deter all-day commuter parking. No time limits will be imposed on Saturdays or Sundays. Six parking spaces adjacent to Building 1 will be set aside to accommodate parents picking up their children at the daycare facility. Parking in these spaces will be limited to 15 minutes between 7:00 a.m. and 6:00 p.m. on weekdays. With the privatization of the street, the City of Carlsbad will not be responsible for the enforcement of any time limits established along this street. A private company will enter into a contract with the project's Homeowner's Association and will enforce parking space time limits. F. Subdivision Ordinance The Engineering Department has reviewed the proposed tentative tract map and concluded that the subdivision complies with all applicable requirements of the Subdivision Map Act and the City's Subdivision Ordinance (CMC Title 20). All infrastructure improvements, including frontage and project-related roadways and the extension of existing drainage and sewer facilities will be installed concurrently with development. The primary entrance to the site is located on the northern side of the site at the intersection of A venida Encinas and Embarcadero Lane. Embarcadero Lane runs in a north/south manner throughout the project site and turns to the east at the southern end of the site to reconnect with A venida Encinas. Adequate vehicular circulation has been provided and the street will be wide enough to accommodate fire and trash trucks, as well as other delivery vehicles. With the development of the project, the north/south segment of Embarcadero Lane will be vacated, realigned and reconstructed as a private street with diagonal parking on both sides. The conversion of this segment of Embarcadero Lane from a public to a private street will allow the following to occur: 1. The number of parking spaces will be greatly increased by the use of diagonal parking spaces (26 existing, 107 proposed). 2. Enhanced street paving and an architectural focal point within a round-about will be provided. 3. Parking time limitations will be enforced by the owner's association to ensure that there is adequate parking for the commercial/retail uses and live/work units and that overflow parking from the Poinsettia Coaster Station does not impact the project. 4. The north/south segment of Embarcadero Lane will be maintained by the Poinsettia Commons Owner's Association. CT 04-11/PUD 04-10/SDP 109/CUP 04-15/CDP 04-26 -POINSEPrIA COMMONS January 5, 2005 Pa e 14 The project is conditioned to install private street improvements, including curbs, gutters, sidewalks, planting, street lights, and fire hydrants on Embarcadero Lane. An easement dedication is required to ensure that access rights for residents of P As 2, 4 and 5 will be reserved in perpetuity. Embarcadero Lane is adequate to handle the project's pedestrian and vehicular traffic and adequate emergency access can be accommodated along the street. The project grading includes 28,000 cubic yards of export as a result of excavation for the underground parking garage. The City's Engineering Department has indicated interest in using this export for the City's future Opportunistic Sand Replenishment Program. The developer is conditioned to participate in this future program if it is determined that the soils types are suitable for use as sand replenishment along the beach, provided that the Opportunistic Sand Replenishment Program is in place prior to commencement of grading the underground garage. G. Non-Residential Planned Development The intent and purpose of the Non-Residential Planned Development regulations are to ensure that projects develop in accordance with the General Plan and applicable specific plans and to provide a method to approve separate ownership of units within multiple-unit buil~ings or planned development lots. The proposal to allow separate ownership of residential units within multiple buildings and to allow for development of a portion of Embarcadero Lane as a private street necessitates the requirement for a Non-Residential Planned Unit Development Permit (PUD 04-10) be processed to supplement the proposed Tentative Map (CT 04-11). The site would be subdivided into five lots. Lot 1, a triangular-shaped lot located east of Embarcadero Lane, is the site for Building 1, which includes the day care and 12 affordable housing units over commercial/retail space. Lot 2 is adjacent to the west side of Embarcadero Lane and includes Buildings 2 through 13. These buildings will be further subdivided into air- space condominiums to allow the sale of the 51 live-work units, 15 loft units, and one commercial/retail space (located on the first level of Building 2). An underground parking garage (beneath Buildings 2 through 13) will provide private parking for all of the residential for-sale units, 12 spaces for the affordable housing units, six spaces for the day care center employees and one handicap parking space. The driveway access and diagonal parking spaces located along the north-south segment of Embarcadero Lane are contained within Lot 3. Lots 4 and 5 encompass the 20 foot wide landscape buffer areas along A venida Encinas that will be commonly maintained by the owners association. The project complies with the General Plan and zoning development standards as addressed in the previous discussions. The subdivision will not be detrimental to the health, safety or welfare of persons working or residing in the area and the Specific Plan specifies mixed-use development for this site. The proposed project will provide services and facilities which will contribute to the general well-being of the community and no modifications to the development standards are required to protect public health, safety, and general welfare. There are no size or configuration standards for non-residential planned development lots beyond those imposed as a part of the permit, except that they shall be reasonable as to the intended use and relation to the project. Two lots are being created to accommodate the buildings and are related to the size of the buildings and underground parking garage. The remaining lots will encompass the HOA maintained landscape areas and private street/surface parking areas. CT 04-11/PUD 04-1 O/SDP.-09/CUP 04-15/CDP 04-26 -POINSl,IA COMMONS January 5, 2005 Pae 15 Although the project includes a residential component, the Specific Plan states that a Non- Residential PUD is required, rather than a Condominium Permit (CP). Therefore, the Planned Development Standards for residential air-space condominiums are not applicable to this project. H. Inclusionary Housing The City's Inclusionary Housing regulations require that a minimum of 15% of all approved units in any residential project shall be made affordable to lower income households. The developer is proposing to satisfy the affordable housing requirements on site with the construction of 12 apartments which will be located on the northeast portion of the site. The units are each 825 square feet in size and are located on the second and third floors of Building 1. The parking requirement for a one-bedroom apartment is one and one-half spaces per unit, plus guest parking spaces. Each unit will have one designated parking space within the underground parking garage. The remaining six required parking spaces will be provided on Embarcadero Lane along with the guest parking spaces required for the entire residential component of the project. The developer has been conditioned to enter into an Affordable Housing Agreement to deed- restrict these units as affordable to lower-income households at 80% of the Average Median Income for a period of 55 years. The Affordable Housing Agreement typically requires that the inclusionary housing units shall be constructed either prior to or c·oncurrently with the market- rate units. The developer has indicated that this will not be possible since the eastern parcel must be used as a staging area for construction of the parking garage and podium. After construction has been substantially completed on the western parcel, the playground for the daycare will be used as the staging area for Building 1 which will contain the affordable units. Rational to defer construction of these units to the final phase of development can be made since there are currently excess affordable units within the Specific Plan. At the time the Specific Plan was developed, it was assumed that the affordable units within PA 5 would be just sufficient to meet the inclusionary housing requirements of P As 2, 4, 7, and 8. Therefore, the Specific Plan required PA 6 to provide its own on-site affordable housing, as opposed to utilizing housing credits within the 92 unit affordable housing project (PA 5). As previously indicated, the number of units approved in these planning areas was significantly lower than the number allocated by the Specific Plan. Given the 540 units (market-rate and affordable) which currently exist, together with the proposed 66 market-rate units in PA 6, the 15% affordable housing requirement would be 91 units and 92 are currently provided. After construction of the market- rate units in PA 6, an additional 12 affordable units will be constructed for a total of 16.8 % inclusionary units within the Specific Plan area. The developer has discussed the phasing issue with the Housing and Redevelopment Director. Given the logistics and safety issues involved with construction, and the fact that there are a sufficient number of affordable units to meet the 15% inclusionary requirement, the Housing and Redevelopment Director supports the request to delay construction of the affordable units to the final phase. CT 04-11/PUD 04-10/SDP,-09/CUP 04-15/CDP 04-26-POINSl,IA COMMONS January 5, 2005 Pae 16 I. Conditional Use Permit/Child Care Ordinance The ~pecific Plan states that a day care shall be integrated into the mixed-use development for PA 6, relative to the standards for the C-1 and C-2 zones. Although these zones require approval of a Site Development Plan (SDP), the Specific Plan requires approval of a Conditional Use Permit (CUP) for development of the day care center. The findings of approval are nearly identical for a CUP and SDP, however a CUP has an expiration period and annual review to ensure that the use does not have a detrimental effect on surrounding land uses. The development proposal includes a 3,296 square foot day care center that will accommodate 60 children. The day care center will be located on the first floor of Building 1, located in the northeast portion of the site. Parking for employees is required at the rate of 1 space per employee and 6 spaces will be provided within the underground parking garage for employee parking. One parking space for each ten children is also required and 6 spaces are provided in close proximity to the building for drop-off and pick-up of the children. The surface parking spaces will be restricted to 15 minute parking between the hours of 7 :00 a.m. and 6:00 p.m. on weekdays. The interior layout of the building has not been finalized because an operator has not yet been selected. However, each classroom area will be required to have its own exit to the playground area and the plan includes large windows to provide natural light into the building. The day care is located within a single-story building attached to the east side of Building 1. The entrance to the day care is located near the center of the building, facing Embarcadero Lane and is completely separated from any entrances to commercial/retail or residential uses. The 11,600 square feet of outdoor play area is located east of the building and is enclosed by a 6 foot high masonry block sound wall. The facility will be conditioned to allow a maximum of 60 children and 6 employees to ensure that adequate parking will be provided. Hours of operation for the daycare are not proposed at this time. The required findings for approval of a Conditional Use Permit with justification for each are summarized as follows: 1. The proposed use: a) is necessary and desirable for the development of the community in that the day care is integrated into the mixed-use transit-oriented development and will provide a needed service for the surrounding residents, commuters, and employees of the commercial areas; and b) is consistent with the General Plan in that the Poinsettia Properties Specific Plan required a child day care center to be incorporated into PA 6 and the Specific Plan has been found to be consistent with the General Plan. 2. The proposed site is adequate in size and shape to accommodate the use in that the building is designed as a one-story structure with a security entrance and a large fenced play yard is provided. An adequate number of parking spaces for drop-off/pick-up are ~onveniently located near the front of the building and parking spaces are provided for employees in the underground parking structure. Conditions are included to limit the day care to a maximum of 60 children and 6 employees to ensure that adequate parking will be provided. CT 04-11/PUD 04-10/SDP 109/CUP 04-15/CDP 04-26 -POINSE,IA COMMONS January 5, 2005 Pae 17 3. All of the yards, setbacks, walls, fences, landscaping and other features have been incorporated into the project and the use is compatible with the surrounding apartments and proposed mixed-use development. 4. The street system serving the proposed use would not be impacted by the proposed conditional use in that the traffic generated by the proposed day care and the mixed-use development is well below that originally analyzed in the EIR for the Poinsettia Properties Specific Plan. The Specific Plan requires construction of the day care either prior to or when 25% of the square footage within PA 6 is developed and occupied. As discussed previously, the developer is requesting to delay construction of Lot 1 due to the logistics and safety issues involved with construction. To ensure that the day care is constructed pursuant to the Specific Plan requirements, a condition is included to restrict occupancy of the live-work and loft units. Occupancy for up to 28 live-work units may be obtained prior to issuance of a building permit for Building 1, which includes the daycare. After the building permit for Building 1 is issued, occupancy for the remaining 23 live-work units may be obtained. Occupancy for the 15 condominium loft units may not be obtained until construction has commenced and the foundations are in place for Building 1. J. Mello II Segment of the Local Coastal Program The project, as proposed is consistent with all development and resource preservation policies of the Mello II Local Coastal Program and its implementing ordinances, Chapters 21.201, 21.202, and 21.203 of the Carlsbad Municipal Code. The property carries the same Coastal Land Use designation as the City's General Plan and the land uses allowed by the Poinsettia Properties Specific Plan were approved by the California Coastal Commission in October 1998. Therefore, the proposed use is allowed upon Planning Commission approval of a Coastal Development Permit pursuant to Chapter 21.201. The Coastal Agricultural Overlay Zone (Chapter 21.202) requires payment of an Agricultural Conversion Mitigation Fee prior to development, and this condition was also included as a mitigation measure for EIR 96-01. The intent of the Coastal Resource Protection Overlay policies and zoning (Chapter 21.203) is to provide additional protective regulations. The applicable regulations of Chapter 21.203 focus on deterring soil erosion and sedimentation through the provision of adequate drainage facilities. Lots 1, 3 and 4 will drain to the existing storm drains in Embarcadero Lane. Drainage from Lot 2 will continue to flow to the existing bio-swale located on the Water's End project as it currently flows today. This channel directs drainage to the vernal pools located between the Water's End project and the railroad right-of-way. The drainage channel in which runoff is diverted is intended to serve as a water quality treatment area. The proposed vegetated swale is used not only to direct water, but is also designed as a Best Management Practice (BMP), which is acceptable by National Pollutant Discharge Elimination System (NPDES) standards. Additionally, the project will be required to comply with NPDES standards to reduce surface pollutants to an acceptable level prior to discharge into the storm drain. A grading permit will be required for the project, and the project is conditioned to comply with the City's erosion control standards during site preparation and project construction. CT 04-11/PUD 04-10/SDP '-09/CUP 04-15/CDP 04-26 -POINSE,IA COMMONS January 5, 2005 Pa e 18 K. Growth Management Ordinance (LFMP -Zone 22) The project site is located within Local Facilities Management Zone 22 in the southwest quadrant of the City. The impacts on public facilities created by the project, and its compliance with the adopted performance standards, are summarized in Table 3 below. Table 3: GROWTH MANAGEMENT COMPLIANCE STANDARD IMPACTS COMPLIANCE City Administration 271.18 sq. ft. Yes Library 144.63 sq. ft. Yes Waste Water Treatment 89.18 EDU Yes Parks 0.54 acre Yes Drainage BasinD Yes Circulation 3,437 ADT Yes Fire Station No. 4 Yes Open Space NIA Yes Schools Carlsbad Unified Yes 7.0 elementary students 3 .1 junior high students 3.8 high school students Sewer Collection System 89.18 EDU Yes Water 19,619 GPD Yes The project contains 78 residential units at a net density of 18.6 du/ac and the Growth Management Control Point is 19 du/ac. The Poinsettia Properties Specific Plan allowed for 61 residential units within this planning area (PA 6). Therefore the project requires an allocation of 17 units from the City's Excess Dwelling Unit Bank. V. ENVIRONMENTAL REVIEW The proposed project has been reviewed pursuant to the California Environmental Quality Act (CEQA). Staff prepared an initial study for the project and concluded that no potentially significant impacts would result with the implementation of the project that were not previously examined and evaluated in the Final Program Environmental Impact Report for the Poinsettia Properties Specific Plan (SP 210) (EIR 96-01), dated July 1997, Cotton/Beland/Associates, Inc. EIR 96-01 evaluates the potential environmental effects of the development and operation of the "Poinsettia Properties Specific Plan" and associated actions including the proposed mixed-use project reviewed herein. The proposed activities would have no effects beyond those analyzed in the Program EIR, as they are a part of the program analyzed earlier. With the additional 17 dwelling units proposed for PA 6, the Specific Plan will have 205 units less than the 823 units allowed for the Specific Plan, and 391 units less than the 1,009 units analyzed under EIR 96-01. Similarly, the traffic generated by the development proposal is calculated at 3,437 ADT which is 1,933 ADT less than the 5,370 ADT calculated for the 80,000 square feet of commercial and 61 residential units previously anticipated for PA 6. CT 04-11/PUD 04-10/SDP •-09/CUP 04-15/CDP 04-26 -POINSE.IA COMMONS January 5, 2005 Pae 19 The City Council certified EIR 96-01 on January 27, 1998. At that time CEQA Findings of Fact, a Statement of Overriding Considerations, and a Mitigation Monitoring and Reporting Program were approved. All mitigation measures contained in the adopted Mitigation Monitoring and Reporting Program for BIR 96-01 which are applicable to the proposed project have been completed, incorporated into the project design or are required as conditions of approval for the project. Mitigation Measures for Noise Impacts required an acoustical analysis to identify all necessary noise control requirements necessary to meet the City of Carlsbad interior and exterior noise levels. The required studies were provided and the plans have incorporated the required noise wall and interior noise mitigation will be required for the day care and for a number of the residential units. The BIR 96-01 "Findings of Fact and Statement of Overriding Considerations" applies to all subsequent projects covered by the Poinsettia Properties Specific Plan Final Program BIR. Since the mixed-use project is within the scope of Final Program BIR 96-01, no further CEQA compliance is required. BIR 96-01 and the initial study for the development proposal are available at the Planning Department. ATTACHMENTS: 1. Planning Commission Resolution No. 5806 (CT) 2. Planning Commission Resolution No. 5807 (PUD) 3. Planning Commission Resolution No. 5808 (SDP) 4. Planning Commission Resolution No. 5809 (CUP) 5. Planning Commission Resolution No. 5810 (CDP) 6. Location Map 7. Background Data Sheet 8. Local Facilities Impact Assessment Form 9. Disclosure Statement 10. Poinsettia Properties Planning Areas 11. Parking Management Plan dated June 28, 2004 12. Reduced Exhibits (11" x 17") 13. Exhibits "A" -"FFF" dated January 5, 2005 • POINSETTIA COMMONS CT 04-11/PUD 04-10/SDP 04-09/ CUP 04-15/CDP 04-26 • BACKGROUND DATA SHEET • CASE NO: CT 04-11/PUD 04-10/SDP 04-09/CUP 04-15/CDP 04-26 CASE NAME: Poinsettia Commons APPLICANT: David DiRienzo, Urban+West+Strategies 421 North Main Street, Santa Ana, CA 92701 REQUEST AND LOCATION: Approval of a Tentative Tract Map, Non-Residential Planned Unit Development Permit, Site Development Plan, Conditional Use Permit and Coastal Development Permit to subdivide and develop a 5.29 acre site with 18,337 square feet of commercial/retail uses, a 3,296 square foot day care center, 51 live-work condominium units, 15 loft condominium units, and 12 affordable apartments, on property generally located south of Avenida Encinas and north of the east-west segment of Embarcadero Lane within the Mello II Segment of the Local Coastal Program and Local Facilities Management Zone 22. LEGAL DESCRIPTION: Lot 5 of Carlsbad Tract No. 97-10, Poinsettia Properties, in the City of Carlsbad, County of San Diego, State of California, according to Map thereof No. 13785, filed in the Office of the County Recorder of San Diego County on May 21, 1999. APN: 214-450-30 Acres: 5.29 Proposed No. of Lots/Units: ~5~lo=t=s/~7~8~u=n=it=s ________ _ GENERAL PLAN AND ZONING Land Use Designation: T-R/RH (Travel/Recreation Commercial and Residential High-Density) Density Allowed: 80,000 sq. ft. commercial and 61 dwelling units Density Proposed: 18,337 sq. ft. commercial, 3,296 sq. ft. daycare and 78 dwelling units (18.6 du/ac) Existing Zone: C-T (Commercial-Tourist) Proposed Zone:N =-"'-'/A'-=--------------- Surrounding Zoning, General Plan and Land Use: Zoning Site C-T North PM/0 South RD-M East RD-M West RD-M-Q General Plan T-R/RH PI/0 RMH RH RMIO Current Land Use Vacant Vacant Small lot SFR (Water's End) MF affordable housing (Poinsettia Station Apts.) Poinsettia Coaster Station PUBLIC FACILITIES School District: Carlsbad Unified Water District: Carlsbad Sewer District: ~C~ar~l~sb_a~d _____ _ Equivalent Dwelling Units (Sewer Capacity): =89"""'.""1=8-"'E=D"""'U"'----------------- ENVIRONMENTAL IMPACT ASSESSMENT D Negative Declaration, issued'------------------------- D Certified Environmental Impact Report, dated'------------------ t;g] Other, Within scope of previously certified Program EIR (EIR 96-01) • CITY OF CARLSBAD • GROWTH MANAGEMENT PROGRAM LOCAL FACILITIES IMPACTS ASSESSMENT FORM PROJECT IDENTITY AND IMP ACT ASSESSMENT: FILE NAME AND NO: Poinsettia Commons -CT 04-11/PUD 04-10/SDP 04-09/CUP 04- 15/CDP 04-26 LOCAL FACILITY MANAGEMENT ZONE: 22 GENERAL PLAN: -=TRIRH===------ ZONING: C-T (Commercial-Tourist) DEVELOPER'S NAME: David DiRienzo, Urban+West+Strategies ADDRESS: 421 North Main Street Santa Ana, CA 92701 PHONE NO.: 714-567-9260 ASSESSOR'S PARCEL NO.: =-21=--4'----4=5--=-0---=-3--=-0 ______ _ QUANTITY OF LAND USE/DEVELOPMENT (AC., SQ. FT., DU): ~5."'"'29'---'-'-'ac~re=s ____ _ ESTIMATED COMPLETION DATE: ________________ _ A. City Administrative Facilities: Demand in Square Footage= 271.18 sg. ft. B. Library: Demand in Square Footage= 144.63 sq. ft. C. Wastewater Treatment Capacity (Calculate with J. Sewer) 89.18 EDU D. E. F. G. H. I. J. K. Park: Drainage: Demand in Acreage = Demand in CFS = Identify Drainage Basin = 0.54 acres 6.6 CFS BasinD (Identify master plan facilities on site plan) Circulation: Demand in ADT = 3,437 ADT (Identify Trip Distribution on site plan) Fire: Open Space: Schools: Sewer: Served by Fire Station No. = N=--c..=..o'-. 4.,:___ ___ _ Acreage Provided = =-N"'""I A'""'-------- CUSD Elementary: 7.0, JH: 3.1, HS: 3.8 Demands in EDU 89.18 EDU Identify Sub Basin= _22_B _____ _ (Identify trunk line(s) impacted on site plan) Water: Demand in GPD = 19,619 GPD L. The project requires allocation of 17 units from the City's Excess Dwelling Unit Bank. • DISCLOSURE STATEMENT Applicant's statement or disclosure of certain ownership interests on all applications which will require discretionary action on the part of the City Council or any appointed Board, Commission or Committee. The following information MUST be disclosed at the time of application submittal. Your project cannot be reviewed until this information is completed. Please print. Note: Person is defined as "Any individual, finn, co-partnership, joint venture, association, social club, fraternal organization, corporation, estate, trust, receiver, syndicate, in this and any other county, city and county, city municipality, district or other political subdivision or any other group or combination acting as a unit." Agents may sign this document; however, the legal name and entity of the applicant and property owner must be provided below. 1. APPLICANT (Not the applicant's agent) Provide the COMPLETE, LEGAL names and addresses of ALL persons having a financial interest in the application. If the applicant includes a corporation or partnership, include the names, title, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON- APPLICABLE (NI A) IN THE SP ACE BELOW If a publicly-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person David DiRienzo Title President Address 421 North Main Street Santa Ana, CA 92701 2. OWNER (Not the owner's agent) Corp/Part Corporation Title Urban+West+Strategies Address 421 North Main Street Santa Ana, CA 92701 Provide the COMPLETE, LEGAL names and addresses of ALL persons having any ownership interest in the property involved. Also, provide the nature of the legal ownership (i.e, partnership, tenants in common, non-profit, corporation, etc.). If the ownership includes a corporation or partnership, include the names, title, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (NIA) IN THE SPACE BELOW. If a publicly- owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person David DiRienzo Title President Address 421 North Main Street Santa Ana, CA 92701 Corp/Part Corporation Title Teak Investors, LLC Address 421 North Main Street Santa Ana, CA 92701 1635 Faraday Avenue• Carlsbad, CA 92008-7314 • (760) 602-4600 • FAX (760) 602-8559 fl1) • • 3. NON-PROFIT ORGANIZATION OR TRUST If any person identified pursuant to ( 1) or (2) above is a nonprofit organization or a trust, list the names and addresses of ANY person serving as an officer or director of the non-profit organization or as trustee or beneficiary of the. Non Profit/Trust _________ _ Title -------------- Address ___________ _ 4. Have you had more than $250 worth of business transacted with any member of City staff, Boards, Commissions, Committees and/or Council within the past twelve (12) months? 0Yes ~ No If yes, please indicate person(s): _____________ _ NOTE: Attach additional sheets if necessary. I certify that all the above information is true and correct to the best of my knowledge. ~ ~ :s c-;----, s Signature of owner/date .S /7 / () 7 Signature of applicant/date David DiRienzo, Teak Investors, LLC David DiRienzo, Urban+West+Strategies Print or type name of owner Print or type name of applicant Signature of owner/applicant's agent if applicable/date Mike Howes, Hofman Planning Associates Print or type name of owner/applicant's agent H:ADMIN\COUNTER\DISCLOSURE STATEMENT 5/98 Page 2 of 2 DISCLOSURE STATEMENT ATTACHMENT I ' Additional persons having a financial interest in the application: Tom Schmidt 261 School A venue Suite 400 Excelsior, 1\1N 55331 Don Augustine, Lynn Wells, Mukesh Assomull 1650 Hotel Circle North Suite 200 San Diego, CA 92108 -"'f', -r-i • PA4 @' PO.INSETTIA· PROPERTIES Introduction • Parking Management Plan Poinsettia Commons September, 2004 Poinsettia Commons will be a true transit oriented project that has been designed to reduce the dependence on automobiles. It is anticipated that a substantial portion of the patrons of the future office and commercial uses will come from commuters on the Coaster. They will be able to park at the Coaster parking lot and walk over to coffee shops, cleaners and the day care center rather than making a number of separate trips. In addition to commuters, a strong pedestrian connection will be established between the Water's End project to the south, residential communities, time-share, and beach visitors to the west and Poinsettia Commons to encourage residents, guests, and visitors to stroll over to the future commercial uses. The peak demand for parking will occur during weekdays between 7:00 A.M. and 5:00 P.M. when most of the commercial/office uses will be open and the adjacent Poinsettia Coaster Station parking lot will be fully utilized. Parking on the north-south segment of Embarcadero Lane will be strictly monitored and controlled during the peak demand period on weekdays by the HOA management company and commercial property management company. On weekends there will be less demand for parking on Embarcadero Lane and plenty of empty parking spaces in the Poinsettia Coaster Station parking lot. However, this mixed- use community is not relying on any of the existing spaces in the Coaster parking lot to fulfill its parking requirements. Project Description The Poinsettia Commons project consists of 51 live work, 15 market rate town home lofts, 12 affordable "loft style" apartments, a 3,296 square foot daycare center that will accommodate 60 children and an additional 18,337 square feet of retail/ commercial. Project parking will be provided in an underground parking structure located below the live-work and market rate lofts, and along Embarcadero Lane, the private street running through the middle of the project site. The underground parking structure will be accessed from Embarcadero Lane and will contain an enclosed two-car garage for each live-work and market rate loft, one assigned parking space for each of the 12 affordable apartments and six parking spaces will be reserved for employees of the daycare facility. One handicapped space will also be provided. One hundred seven (107) parking spaces Poinsettia Commons Parking Management Plan 1 • • will be provided on Embarcadero Lane for commercial/retail parking, visitor parking and loading/unloading for the daycare center. Underground Parking Garage As previously mentioned, 66 two-car enclosed garages will be located in the underground parking structure for a total of 132 parking spaces. In addition, 19 parking spaces (including one handicapped space) in the structure will be reserved for the affordable units and the daycare facility. No visitor or commercial parking will be provided in the underground parking structure. Gates will be installed at the entrance to the underground parking structure to ensure that these spaces are reserved for residents and daycare employees. Access to the garage will be allowed through the use of key cards. Key cards will be issued to residents at the close of escrow and to daycare employees when they are hired. Residents of the affordable project will be given a key card when they sign their lease. On weekends, residents of the affordable units, live/work units and/or the market rate lofts will be allowed to utilize any of the spaces reserved for the daycare center in the underground parking garage. Embarcadero Lane One hundred and seven parking spaces will be located on Embarcadero Lane for commercial/retail parking, visitor parking and loading/unloading for the daycare center. Poinsettia Coaster Station currently has a parking problem and commuters would likely take any additional parking spaces before most of the businesses in the Poinsettia Commons have opened. To ensure that the parking on Embarcadero Lane is not used by commuters heading to the Poinsettia Coaster Station, all parking on Embarcadero Lane will be limited to three (3) hours Monday through Friday. Time limits will be enforced from 7:00 a.m. to 6:00 p.m. No time limits will be imposed on Saturdays or Sundays. A private company that will enter into a contract with the project's management association will enforce parking space time limits. Because of the privatization of the north-south segment of Embarcadero Lane, the City of Carlsbad will not be responsible for the enforcement of any time limits established along this street. Signage will be posted along Embarcadero Lane to inform motorists of the time restrictions. Additional information on the types and sizes of the signs being used can be found in the Poinsettia Commons Sign Program. Day Care Parking Six (6) parking spaces will be located on Embarcadero Lane adjacent to Building One to accommodate parents picking up their children at the daycare facility. These spaces will Poinsettia Commons Parking Management Plan 2 • • be limited to a maximum of 15 minute parking between 7:00 A.M. and 6:00 P.M. on weekdays. Guest Parking Guest parking will be limited to Embarcadero Lane. No parking spaces will be set aside as "guest parking", although residents will be allowed to obtain a temporary parking permit from the Poinsettia Commons management company for visiting guests that may be staying for more than three hours. The management company will issue the visitor parking permit for the requested number of days. Vehicles parked without a permit or with an expired permit must comply with time restrictions or risk being towed. Loading, Unloading and Deliveries No parking spaces will be dedicated for loading, unloading and/or deliveries. Deliveries will be limited to 7:00 A.M. to 10:00 A.M. on weekdays and 8:00 A.M. to 5:00 P.M. on weekends. Poinsettia Commons Parking Management Plan 3