Loading...
HomeMy WebLinkAbout2015-05-20; Planning Commission; ; CUP 15-01 - PALOMAR BREWING COMPANY The City of Carlsbad Planning Division A REPORT TO THE PLANNING COMMISSION Item No. Application complete date: March 23, 2015 P.C. AGENDA OF: May 20, 2015 Project Planner: Chris Garcia Project Engineer: Jason Geldert SUBJECT: CUP 15-01 – PALOMAR BREWING COMPANY – Request for a Conditional Use Permit to allow Palomar Brewing Company to operate a brewery and tasting room in an existing office/industrial building on property located at 2719 Loker Avenue West, Suite D, in the P-M Zone and in Local Facilities Management Zone 5. The City Planner has determined that this project is exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15301, “Existing Facilities,” of the State CEQA Guidelines and will not have any adverse significant impact on the environment. A Notice of Exemption shall be filed with the County Clerk upon approval of this project. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 7100 RECOMMENDING APPROVAL of CUP 15-01, based upon the findings and subject to the conditions contained therein. II. PROJECT DESCRIPTION AND BACKGROUND This application is a request for a Conditional Use Permit to allow a brewery and tasting room to operate in a 3,280 square foot suite (Suite D) within an existing office/industrial building on property located at 2719 Loker Avenue West, in the P-M Zone. Interior tenant improvements are proposed for this project and there are no proposed improvements to the exterior of the building. The General Plan Land Use designation for the site is Planned Industrial (PI) and the Zoning designation for the site is Planned Industrial (P-M). The project site consists of six buildings on individual lots with a common lot mostly containing parking areas and landscaping. One of the six buildings is further subdivided into four air- space condominiums with the brewery and tasting room proposed in one of the four air-space units. The entire project site consists of office and industrial uses, with a retail gun store in an adjacent building. Please see Attachment 4 for a list of current businesses on-site and their operating hours. The proposed 3,280 square foot brewery is broken down into 1,847 s.f. of warehouse, 541 s.f. of manufacturing, 242 s.f. of office and a 650 s.f. retail tasting room. The proposed hours of operation of the tasting room are as follows: Wednesdays 4 pm – 8 pm, Thursdays 4 pm – 9 pm, Fridays 4 pm – 10 pm, Saturdays 1 pm – 10 pm, Sundays 1 pm – 7 pm and closed Mondays and Tuesdays. The project is compatible with the surrounding uses in that a brewery is a manufacturing use that is permitted by right use in the Planned Industrial zone. A brewery with an accessory retail sales and tasting room area is a conditionally permitted use subject to City Council approval. However, as stated above, the hours of operation for the retail tasting room are largely outside of the typical business hours for other industrial and office uses at the site and in the surrounding area. Although a retail gun store on the site will also be open during these hours, each use has satisfied the required parking on-site and will be able to operate simultaneously. Additionally, there is no separation requirement between a retail gun store and a brewery with a tasting room. The project has been conditioned to obtain and keep a valid license from the California Department of Alcoholic Beverage Control. 1 CUP 15-01 – PALOMAR BREWING COMPANY May 20, 2015 Page 2 Table A below includes the General Plan designations, zoning and current land uses of the project site and surrounding properties. TABLE A – GENERAL PLAN, ZONING AND LAND USE Location General Plan Designation Zoning Current Land Use Site Planned Industrial – PI Planned Industrial – PM Office, Manufacturing, Warehousing, Retail. North Planned Industrial – PI Planned Industrial – PM Office, Manufacturing, Warehousing. South Planned Industrial – PI Planned Industrial – PM Office, Manufacturing, Warehousing. East Planned Industrial – PI Planned Industrial – PM Office, Manufacturing, Warehousing. West Planned Industrial – PI Planned Industrial – PM Office, Manufacturing, Warehousing, Retail Shopping Center. III. ANALYSIS The proposed project is subject to the following plans, ordinances, standards, and policies: A. Planned Industrial (PI) General Plan Land Use Designation; B. Planned Industrial (P-M) Zone (C.M.C. Chapter 21.34); C. Parking Ordinance (C.M.C. Chapter 21.44); D. Conditional Use Permit Regulations (C.M.C. Chapter 21.42); and E. Growth Management Ordinance (C.M.C. Chapter 21.90). The recommendation for approval of this project was developed by analyzing the project’s consistency with the applicable regulations and policies. The project’s compliance with each of the above regulations is discussed in the sections below. A. General Plan Compliance (Planned Industrial Land Use Designation) The site has a General Plan Land Use designation of Planned Industrial (PI) and the project complies with the General Plan. Carlsbad General Plan Land Use Element, Industrial Implementing Policy C.9, states the following: “Include provisions in the Planned Industrial (P-M) zone for ancillary commercial/retail, office, places of worship, recreational, and other service uses. These include, but are not limited to, commercial/retail services which are accessory to the primary use, conference facilities, churches, daycare centers, recreational facilities, educational facilities and short-term lodging”. The proposed brewery is a permitted use in the Planned Industrial zone and the tasting room is considered a retail service that is accessory to a brewery and is allowed by a Conditional Use Permit (CUP) in the Planned Industrial zone subject to City Council approval. B. Planned Industrial (P-M) Zone (C.M.C. Chapter 21.34) The proposed project site is zoned Planned Industrial (P-M) and is therefore subject to the provisions of Chapter 21.34 of the Zoning Ordinance. Breweries are permitted in the P-M Zone. However, breweries with accessory tasting rooms are subject to the approval of a Conditional Use Permit. Tasting rooms are limited to 20% of the gross floor area of the building/suite or 2,000 square feet, whichever is less. The CUP 15-01 – PALOMAR BREWING COMPANY May 20, 2015 Page 3 proposed brewery and tasting room will occupy an existing 3,280 square foot suite and does not propose any additions or exterior improvements to the existing building. The proposed tasting room is 650 square feet which is 19.8% of the gross floor area of the suite and therefore complies with the 20% maximum size requirement. Parking compliance is discussed in section C below. C. Parking Ordinance (C.M.C. Chapter 21.44) The parking lot for the project site has 220 parking spaces, or 1 space per 367 square feet of building space. The primary brewery use is considered a manufacturing use and has a required parking ratio of 1 parking space per 400 square feet of manufacturing space. Furthermore, the accessory tasting room has the same parking requirement as the primary use (1 parking space per 400 square feet) according to Note 3 of Table A, Section 21.34.020 of the Carlsbad Municipal Code. The office portion of the proposed brewery has a required parking ratio of 1 parking space per 250 square feet of office space. The warehouse portion has a required parking ratio of 1 parking space per 1,000 square feet of warehouse space. Based upon the aforementioned mentioned parking ratios, the use requires 6 parking spaces. The remaining suites and buildings are comprised of office, manufacturing, warehousing and retail. All of the uses together, including the brewery, require a total of 209 spaces. Therefore, there will be a surplus of 11 parking spaces. Future tenant improvements and/or new uses proposed for vacant suites on the site will be evaluated for parking compliance prior to issuance of a building permit or business license. D. Conditional Use Permit Regulations (C.M.C. Chapter 21.42) The proposed project is a use which is allowed in the Planned Industrial Zone (P-M) subject to the approval of a Conditional Use Permit by the City Council. Chapter 21.42 of the Carlsbad Municipal Code requires that four findings be made in order to approve a conditional use permit. All of these findings can be made for this project as discussed below: 1. That the requested use is necessary or desirable for the development of the community, and is in harmony with the various elements and objectives of the general plan, including, if applicable, the certified local coastal program, specific plan or master plan, in that the proposed brewery and tasting room will add to Carlsbad another popular use that is enjoyed throughout the county. The use will provide a good balance by utilizing the industrial park space for manufacturing during typical working hours and will provide a social environment on evenings and weekends when the industrial park is less utilized. Furthermore, per Industrial Implementing Policy C.9 of the General Plan Land Use Element, ancillary commercial (tasting room) is a compatible land use in the PI land use designation and are conditionally permitted in the implementing P-M zone. 2. That the requested use is not detrimental to existing uses or to uses specifically permitted in the zone in which the proposed use is to be located in that the proposed brewery and tasting room is compatible with the surrounding office/industrial park uses and the proposed use will provide adequate parking that is consistent with the city’s parking requirements. The existing site has been designed to accommodate all required parking on-site and provides for adequate traffic circulation. Furthermore the brewery and tasting room is proposed to be located within an existing building and only tenant improvements to the interior are required for the use. CUP 15-01 – PALOMAR BREWING COMPANY May 20, 2015 Page 4 3. That the site for the proposed conditional use is adequate in size and shape to accommodate the yards, setbacks, walls, fences, parking, loading facilities, buffer areas, landscaping and other development features prescribed in this code and required by the City Planner, planning commission or city council, in order to integrate the use with other uses in the neighborhood, in that the brewery and tasting room will occupy 3,280 square feet of an existing building with existing onsite landscaping and parking and requires no site alterations or additional amenities. Furthermore, the project complies with all of the required development standards of the P-M Zone including that a tasting room is limited to 20% of the gross floor area or 2,000 square feet, whichever is less. The proposed 650 square foot tasting room is 19.8% of the proposed 3,280 square foot space, which is adequate in size and shape to accommodate the use as shown on Exhibits “A – B.” The brewery and tasting room requires 6 parking spaces. Including Palomar Brewing Company, the property has an excess of 11 parking spaces for all existing uses and therefore meets all parking requirements. 4. That the street system serving the proposed use is adequate to properly handle all traffic generated by the proposed use, in that the project is provided access from Loker Avenue West, a local street which is currently operating at an acceptable level of service and accessed from Palomar Airport Road and El Fuerte Street. The 26 average daily trips associated with this proposed brewery and tasting room can be accommodated by the existing street system. E. Growth Management Ordinance (C.M.C. Chapter 21.90) The proposed project is located within Local Facilities Management Zone 5 in the southwest quadrant of the City. The impacts on public facilities created by the project, and its compliance with the adopted performance standards, are summarized in Table B below: TABLE B – GROWTH MANAGEMENT STANDARD IMPACTS COMPLIANCE? City Administration N/A N/A Library N/A N/A Waste Water Treatment .36 EDU Yes Parks N/A N/A Drainage N/A N/A Circulation 26 ADT Yes Fire Station No. 5 Yes Open Space N/A N/A Schools N/A N/A Sewer Collection System .36 EDU Yes Water 79.2 GPD Yes IV. ENVIRONMENTAL REVIEW The City Planner has determined that this project is exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15301, “Existing Facilities,” of the State CEQA Guidelines and will not have any adverse significant impact on the environment. A Notice of Exemption shall be filed with the County Clerk upon approval of this project. CUP 15-01 – PALOMAR BREWING COMPANY May 20, 2015 Page 5 ATTACHMENTS: 1. Planning Commission Resolution No. 7100 2. Location Map 3. Disclosure Statement 4. Business Hours of Promontory Business Park 5. Reduced Exhibits 6. Exhibits “A” – “B” dated May 20, 2015 INNOVATION WY PALOMAR AIRPORTRD LO KER AV W E S T SITE MAP JPALOMARAIRPORTRD E L C AMREALL A COSTA AV C A R L S B A D B LELCAMINOREAL MELR O S E DRAVIARAPY RANCHOS ANTAFERDCOLLEGEBLSITE CUP 15-01Palomar Brewing Company ATTACHMENT 4 *** Business hours listed are approximate and subject to change at any time. Business Hours of Promontory Business Park *** 2711 Loker Avenue West – Imagination Design Studio Monday – Friday 9:00 AM – 5:00 PM 2713 Loker Avenue West – Torrey Pines Scientific Monday – Thursday 8:00 AM – 5:00 PM Friday 8:00 AM – 4:30 PM 2715 Loker Avenue West – Verdezyne Monday – Friday 9:00 AM – 5:00 PM 2717 Loker Avenue West #A – Verdezyne Monday – Friday 9:00 AM – 5:00 PM 2717 Loker Avenue West #B – Gunther Guns Monday – Closed Tuesday – Sunday 10:00 AM – 6:00 PM 2719 Loker Avenue West #A – Carlsbad Custom Cabinets Monday – Friday 9:00 AM – 5:00 PM 2719 Loker Avenue West #A – Palomar Brewing Company Proposed Hours: Monday – Tuesday Closed Wednesday 4:00 PM – 8:00 PM Thursday 4:00 PM – 9:00 PM Friday 4:00 PM – 10:00 PM Saturday 1:00 PM – 10:00 PM Sunday 1:00 PM – 7:00 PM 2719 Loker Avenue West #D – Island Batik Monday – Friday 9:00 AM – 5:00 PM 2721 Loker Avenue W West – Vacant CUP 15-01Palomar Brewing Company Location of Brewery and Tasting Room Location of Brewery and Tasting Room 2717 Loker Parking Spaces - 30 2719 Loker Parking Spaces - 22 2721 Loker Parking Spaces - 29 2711 Loker Parking Spaces - 59 2713 Loker Parking Spaces - 24 2715 Loker Parking Spaces - 37 Suite A Suite B Suite A Suite B/C Suite D Exisiting Zoning - Planned Industrial (P-M) Existing General Plan - Planned Industrial (PI) Assessor’s Parcel Number - 209-081-39-02 2719 Loker Ave W STE D Carlsbad, Ca 92010 1080 Existing Use Plus Proposed Brewery - Square Footage Retail Manufactering office warehouse Total per suite Total for Building 2717 Loker 13925 Suite A - Verdezyne, Inc 0 2581 1240 0 3821 Suite B - Gunther 1359 0 647 10104 2719 Loker 14526 Suite A - Carlsbad Custom Cabinets 0 2349 517 1080 3946 Suite B - Island Batik 0 0 500 6800 7300 Suite D - Palomar Brewing Co. 0 1191 242 1847 3280 2721 Loker 16694 Blue Earth Inc. 0 0 9000 7694 16694 2711 Loker 14633 Imagination Design Studios Ltd.0 7316 7317 0 14633 2713 Loker 9433 Torrey Pines Scientific 0 4716 4717 0 9433 2715 Loker 11472 Verdezyne 0 5464 4397 1611 11472 8098 Existing Use Plus Proposed Brewery - Required Parking Retail Manufactering office warehouse Total per suite Total for Building 2717 Loker 28 Suite A - Verdezyne, Inc 0 6.45 4.96 0 12 Suite B - Gunther 4.53 0 2.58 8.1 16 2719 Loker 25 Suite A - Carlsbad Custom Cabinets 0 5.87 2.07 1.08 10 Suite B - Island Batik 0 0 2 6.8 9 Suite D - Palomar Brewing Co. 0 2.97 0.97 1.85 6 2721 Loker 44 Blue Earth Inc. 0 0 36 7.7 44 2711 Loker 48 Imagination Design Studios Ltd.0 18.29 29.28 0 48 2713 Loker 31 Torrey Pines Scientific 0 11.79 18.87 0 31 2715 Loker 33 Verdezyne 0 13.66 17.59 1.61 33 Total Parking Available For Promontory Complex: 220 Total Parking Required For Promontory Complex: 209 Area enclosed where alcohol is permitted 1,847 242 Proposed Seating : High Tables 4 with 16 seats Barstools - 15 Project: Palomar Brewing Company Existing Use: Planned Industrial (P-M) Existing General Plan: Planned Industrial (PI) Assessor’s Parcel Number: 209 - 081 - 39 - 02