Loading...
HomeMy WebLinkAbout2017-12-06; Planning Commission; ; RP 16-13/CDP 16-35 (DEV16040) – CARLSBAD VILLAGE CENTER( ERRATA SHEET FOR AGENDA ITEM #3 Memorandum December 6, 2017 To: Planning Commission From: Shannon Harker, Associate Planner Via Don Neu, City Planner · ( City of Carlsbad Re: Errata Sheet for Agenda Item #3 -RP 16-13/CDP 16-35 -CARLSBAD VILLAGE CENTER Staff is recommending that the Planning Commission revise Finding No. 10 of Planning Commission Resolution No. 7276 to correct the following typographical error: 10. That there are an adequate number of units in the Excess Dwelling Unit Bank in the Northwest Quadrant to allocate U ~ units. Per the city's Quadrant Dwelling Unit Report (latest available dated September 2017), 584 units remain available for allocation in the Village. In addition, staff is recommending the addition of the following finding to Planning Commission Resolution No. 7276. The parking analysis is contained in the staff report, however the finding was inadvertently left out of the resolution. The Developer/Property owner qualifies to participate in the Parking In-Lieu Fee Program and participation in the program will satisfy the parking requirements for the project. Justification for participation in the Parking In-Lieu Fee Program is contained in the following findings: 1. The project is consistent with Village Review Master Plan and Design Manual in that the project assists in satisfying the goals and objectives through the following actions 1) the mixed-use project stimulates property improvements and new development in the Village by constructing a new permitted mixed-use building in an area with a mix of dated buildings and increasing the intensity of development within the Village; 2) it establishes Carlsbad Village as a quality shopping, working and living environment by providing new employment opportunities; increasing the number, quality, diversity and affordability of housing units within the Village; and reinforcing pedestrian retail continuity within the Village commercial areas; and 3) improves the physical appearance of the Village Area by developing the northwest corner of Carlsbad Village Drive and State Street with a new building that adheres to the land use regulations and design guidelines set forth for the area. Community & Economic Development Planning Division 1635 Faraday Avenue I Carlsbad, CA 92008 I 760-602-4600 I 760-602-8560 fax AGENDA ITEM #3 -RP 16-.d/CDP 16-35-CARLSBAD VILLAGE CEN i t::R December 6, 2017 Pa e 2 2. The proposed use is consistent with the goals and objectives set forth for Land Use District 1 of the Village Master Plan and Design Manual in that the mixed-use development not only provides mutually supportive uses in the form of residential, professional office and commercial retail uses along Carlsbad Village Drive and State Street, but reinforces the pedestrian orientation desired for the downtown area by providing new residents and employees an opportunity to walk to local shopping, dining, recreation, and mass transit functions; furthermore, its close proximity to existing bus routes and mass transit help to further the goal of providing new economic and residential development near transportation corridors; and lastly, it will contribute to the revitalization of the Village area in the form of a new building in the core of the Village with new commercial lease space, new employment opportunities and new consumers. 3. Adequate parking is available within the Village to accommodate the project's parking demands in that based on the most recent parking study {Kimley Horn, September 2017), the average occupancy for all public parking lots is 51.1 percent. The single highest measurement of occupancy was on a weekday afternoon in May 2016, wherein the occupancy rate was 70 percent. This utilization ratio allows for continued implementation of the parking in-lieu fee program because it is less than the 85 percent threshold for maximum utilization set by the City Council. 4. The In-Lieu Fee Program has not been suspended or terminated by the City Council. The City of Carlsbad Planning Division A REPORT TO THE PLANNING COMMISSION Item No. Application complete date: June 29, 2017 P.C. AGENDA OF: December 6, 2017 Project Planner: Shannon Harker Project Engineer: Kyrenne Chua SUBJECT: RP 16-13/CDP 16-35 (DEV16040) – CARLSBAD VILLAGE CENTER – Request for a recommendation of approval of a Major Review Permit and Coastal Development Permit to allow for 1) the removal of existing storage containers; 2) the construction of a 25,631 square foot, four-story, mixed-use building consisting of a subterranean parking garage, ground floor retail, commercial office space and five (5) residential apartments; and 3) the purchase of 17 parking in-lieu fees. The 0.17-acre property is addressed as 2995 State Street and is located on the northwest corner of State Street and Carlsbad Village Drive, in Land Use District 1 of the Village Review zone, the Village Segment of the Local Coastal Program, and within Local Facilities Management Zone 1. The City Planner has determined that this project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment, and is therefore categorically exempt from the requirement for the preparation of environmental documents pursuant to Section 15332 (In-fill Development Projects) of the State CEQA guidelines. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 7276 RECOMMENDING APPROVAL of Major Review Permit RP 16-13 and Coastal Development Permit CDP 16-35 to the City Council based on the findings and subject to the conditions contained therein. II. PROJECT DESCRIPTION AND BACKGROUND The 0.17-acre site (APN 203-293-06-00) at 2995 State Street is located on the northwest corner of State Street and Carlsbad Village Drive. The State Street alley borders the site to the west. The property is located within the boundaries of the coastal zone; the project is not located within the Coastal Commission’s appealable area. The site is currently developed with a storage container which has been repurposed as a smoothie bar. An application is currently on file to add two (2) additional storage containers to the site for the sale of food and alcohol (AMEND 2017-0009/AMEND 2017-0010). The uses are considered to be interim until the subject site is redeveloped. Table 1 below includes the General Plan designations, zoning and current land uses of the project site and surrounding properties. 3 RP 16-13/CDP 16-35 (DEV16040) – CARLSBAD VILLAGE CENTER December 6, 2017 Page 2 TABLE 1 – SURROUNDING LAND USES Location General Plan Designation Zoning Current Land Use Site Village (V) Village Review (V-R) Land Use District 1, Carlsbad Village Center Storage container repurposed for the sale of food North Village (V) Village Review (V-R) Land Use District 1, Carlsbad Village Center One and two-story retail and restaurant uses; 16- 26’-tall building adjacent to proposed project South Village (V) Village Review (V-R) Land Use District 1, Carlsbad Village Center Retail and restaurant uses East Village (V) Village Review (V-R) Land Use District 1, Carlsbad Village Center Retail and restaurant uses West Village (V) Village Review (V-R) Land Use District 1, Carlsbad Village Center Public parking lot, Carlsbad Visitor Center and railroad right-of-way Project Proposal: The project applicant is requesting approval of a Major Review Permit (RP) and Coastal Development Permit (CDP) to remove the existing storage containers and construct a 25,631 square foot (SF), four- story, 45-foot-tall mixed-use building, consisting of a 12-space subterranean parking garage, 3,954 SF of ground floor retail use, 2,339 SF of professional office use on the second floor and a total of five (5) residential apartments on the second, third and fourth floors. In addition to the commercial retail space fronting State Street to the east and Carlsbad Village Drive to the south, the ground floor includes a separate lobby area adjacent to the State Street frontage with stairs and elevator access to the offices and residential units above. A secondary stairwell is proposed off the Carlsbad Village Drive frontage. With retail depths ranging from 23 to 58 feet and a plate height of 12 feet, the proposed commercial retail space is designed to provide a variety of retail tenant opportunities. Also included on the ground floor and adjacent to the alley is a covered van accessible handicap parking space, an enclosed trash enclosure and two car elevators which are proposed to provide access to the subterranean parking garage. The 12-space parking garage off the State Street alley provides the requisite parking for the residential units (including guest parking spaces) and will satisfy a portion of the required parking for the retail and office uses. To satisfy the balance of required parking spaces, the applicant proposes to purchase 17 parking in-lieu fees through the Village Parking In-Lieu Fee Program. The 2,339 square foot commercial office on the second floor wraps around the corner elevation facing State Street and Carlsbad Village Drive and is set back eight (8) to 12 feet from the façade of the ground floor retail space. A large patio for the office tenants is proposed within the building setback area. A 1,224 square foot, one-bedroom residential apartment is also proposed on the second floor at the northwest corner of the building. The remaining four (4), one-bedroom apartments, ranging in size from 849 to 2,468 square feet, are proposed on the third and fourth floors. Specifically, a total of three (3) units are proposed on the second floor and one (1) unit on the fourth floor. Table 2 below provides a summary of the details for the apartments. RP 16-13/CDP 16-35 (DEV16040) – CARLSBAD VILLAGE CENTER December 6, 2017 Page 3 TABLE 2 – UNIT SUMMARY Unit Bedrooms/Bathrooms Size Private Patio/Deck/Terrace 2A 1 bedroom/ 1.5 bathrooms 1,224 SF 116 SF 3A 1 bedroom + den/ 1.5 bathrooms 1,357 SF 133 SF 3B 1 bedroom/ 1.5 bathrooms 849 SF 140 SF 3C 1 bedroom/ 1.5 bathrooms 1,224 SF 116 SF 4A 1 bedroom + den/ 2 bathrooms 2,468 SF 1,957 SF The architectural massing of the proposed mixed use building consists of a retail base at-grade with upper level office space and residential units (second and third floors) stepped back, creating opportunities for patios and reducing building mass. The fourth floor steps back further and features articulated gable roofs and craftsman-style detailing. Retail shops fronting Carlsbad Village Drive and State Street are proposed to be highlighted with vintage signage and varied canopies. All tenant units include private balconies that have views of downtown Carlsbad. Varied wall surface planes create a further reduction in building mass when viewed from the pedestrian level. The primary architectural material utilized throughout the building design is a brick facade. Specifically, the ground floor retail area includes a darker brick base, with the upper levels using a lighter brick with accent bands. Decorative trusses enhance the exterior and roof line profile, as well as the retail level entries. A “green” screen wall with landscaping is proposed along the northern property line adjacent to the residential and office lobby, which creates an enhanced entry and provides an aesthetic buffer from the adjacent two-story building to the north. The project proposes to satisfy the inclusionary housing obligation associated with the development of five (5) residential apartments through the payment of in-lieu inclusionary housing fees. The proposed density of the project is 29.4 dwelling units per acre and will generate 236 average daily trips. Grading for the proposed project includes 2,500 cubic yards of cut for the development of the subterranean parking garage and no fill. As a result, a total of 2,500 cubic yards of material is proposed to be exported from the site. III. ANALYSIS The proposed project is subject to the following ordinances, standards, and policies: A. Village (V) General Plan Land Use designation; B. Village Review (VR) Zone (CMC Chapter 21.35), Land Use District 1, Carlsbad Village Center (Village Master Plan and Design Manual); C. Coastal Development Regulations for the Village Segment of the Local Coastal Program (CMC Chapter 21.81 and Village Master Plan and Design Manual); D. Inclusionary Housing Ordinance (CMC Chapter 21.85); and E. Growth Management Ordinance (CMC Chapter 21.90), Local Facilities Management Plan Zone 1. RP 16-13/CDP 16-35 (DEV16040) – CARLSBAD VILLAGE CENTER December 6, 2017 Page 4 The recommendation for approval of this project was developed by analyzing the project’s consistency with the applicable regulations and policies. The project’s compliance with each of the above regulations and policies is discussed in the sections below. A. Village (V) General Plan Land Use designation The subject property, comprising one legal parcel, has a General Plan Land Use designation of Village (V). As discussed in the Village Master Plan, properties within the Village Area do not have an assigned residential density as it relates to Growth Management Plan compliance. Therefore, the minimum and maximum densities for residential development are established in the Village Master Plan. For mixed use projects, the minimum allowable density is calculated based on 50 percent of the developable area. Table 3 below identifies the permissible density range for properties located within Land Use District 1. TABLE 3 – PROJECT DENSITY Gross Acres Net Acres Allowable Density Range; Min/Max Dwelling Units per Village Master Plan Project Density; Proposed Dwelling units 0.17 ac 0.17 Density Range : 28-35 du/ac Minimum units (based on 50% of the developable area): 0.17 x 0.50 = 0.08 0.08 acres x 28 du/ac = 2 units Maximum units: 0.17 acres x 35 du/ac = 6 units 2-6 dwelling units = allowable range 29.4 du/ac 5 dwelling units Pursuant to the Housing Element of the General Plan, because a Growth Management Control Point has not been established for residential development in the Village, all residential units approved in the Village must be withdrawn from the city’s Excess Dwelling Unit Bank. The city’s Excess Dwelling Unit Bank is implemented through City Council Policy No. 43. Pursuant to City Council Policy No. 43, an applicant for an allocation of dwelling units shall agree to provide the number of inclusionary units as required pursuant to Carlsbad Municipal Code (CMC) Section 21.85.050. As discussed in Section C below, the proposal to pay in-lieu inclusionary housing fees for five (5) residential units is consistent with the inclusionary housing requirements as set forth in City Council Policy No. 43. In addition, the project is conditioned to pay the requisite in-lieu inclusionary housing fees prior to recordation of the final map. In approving a request for an allocation of excess dwelling units, the project shall meet the findings identified in City Council Policy No. 43. Specifically, the project location and density shall be found to be compatible with adjacent land uses and applicable provisions of the General Plan and other applicable planning documents. As discussed in the attached Planning Commission Resolution No. 7276, the proposed project meets these findings. Since the proposed project requires approval from City Council, the City Council is the final decision-making authority for the allocation from the Excess Dwelling Unit Bank. RP 16-13/CDP 16-35 (DEV16040) – CARLSBAD VILLAGE CENTER December 6, 2017 Page 5 The following Table 4 describes how the proposed project is consistent with the various elements of the Carlsbad General Plan. TABLE 4 – GENERAL PLAN COMPLIANCE Element Goal/Policy Compliance with Goal/Policy Land Use Goal 2-G.29: Maintain the Village as a center for residents and visitors with commercial, residential, dining, civic, cultural, and entertainment activities. Goal 2-G.30: Develop a distinct identity for the Village by encouraging a variety of uses and activities, such as a mix of residential, commercial office, restaurants and specialty retail shops, which traditionally locate in a pedestrian–oriented downtown area and attract visitors and residents from across the community by creating a lively, interesting social environment. Policy 2-P.70: Seek an increased presence of both residents and activity in the Village with new development, particularly residential, including residential as part of a mixed-use development, as well as commercial, entertainment and cultural uses that serve both residents and visitors. The proposed four-story mixed-use development provides mutually supportive uses in the form of residential, professional office and retail opportunities and reinforces the pedestrian orientation desired for the downtown area by providing new residents and employees an opportunity to walk to local shopping, dining, recreation, and mass transit functions. Its close proximity to existing bus routes and the train station help to further the goal of providing new economic and residential development near transportation corridors. The project will contribute to the revitalization of the Village area in the form of a new building in the core of the Village with new commercial lease space, new employment opportunities and new consumers. Mobility Goal 3-G.3: Provide inviting streetscapes that encourage walking and promote livable streets. Policy 3-P.5: Require developers to construct or pay their fair share toward improvements for all travel modes consistent with the Mobility Element, the Growth Management Plan, and specific impacts associated with their development. The proposed project has been designed to meet all of the circulation requirements, which include vehicular access off the State Street alley. In addition, the applicant will be required to pay traffic impact fees prior to the issuance of building permits that will go towards future road improvements. The proposed project is located approximately ¼ mile from the train/coaster station, which provides service throughout the day. The project’s close proximity to the transit stop will provide residents with the opportunity to commute to major job centers, thereby reducing RP 16-13/CDP 16-35 (DEV16040) – CARLSBAD VILLAGE CENTER December 6, 2017 Page 6 vehicle miles traveled (VMTs) and their carbon footprint. Furthermore, the project supports walkability and mobility by locating the project near existing goods and services within the Village. The existing street trees along State Street and Carlsbad Village Drive will be retained. The project proposes to add raised planters and potted plants adjacent to the retail storefronts to further enhance the streetscape and promote livable streets. Public Safety Goal 6-G.1: Minimize injury, loss of life, and damage to property resulting from fire, flood, hazardous material release, or seismic disasters. Policy 6-P.6: Enforce the requirements of Titles 18, 20, and 21 pertaining to drainage and flood control when reviewing applications for building permits and subdivisions. Policy 6-P.34: Enforce the Uniform Building and Fire codes, adopted by the city, to provide fire protection standards for all existing and proposed structures. Policy 6-P.39: Ensure all new development complies with all applicable regulations regarding the provision of public utilities and facilities. The proposed structural improvements are required to be designed in conformance with all seismic design standards. In addition, the proposed project is consistent with all of the applicable fire safety requirements. Further, the project is conditioned to develop and implement a program of “best management practices” for the elimination and reduction of pollutants which enter into and/or are transported within storm drainage facilities. Noise Goal 5-G.2: Ensure that new development is compatible with the noise environment, by continuing to use potential noise exposure as a criterion in land use planning. Policy 5.P.2: Require a noise study analysis be conducted for all discretionary development proposals located where projected noise exposure would be other than “normally acceptable.” The noise study prepared by Birdseye Planning Group (July 2016) determined that the worst-case cumulative noise level from the surrounding roadways and the railroad was 64.1 and 70.7 dBA CNEL, respectively, at the property line. The proposed project is designed to meet or exceed California Energy Code Title 24 standards, which require construction methods and materials resulting in energy efficient structures and up to a 30 dBA reduction in exterior noise levels. RP 16-13/CDP 16-35 (DEV16040) – CARLSBAD VILLAGE CENTER December 6, 2017 Page 7 Assuming the windows are closed and with the inclusion of mechanical ventilation (proposed as part of the project), interior noise levels would be reduced to less than the 45 dBA CNEL interior noise level threshold. Housing Goal 10-G.3: Sufficient new, affordable housing opportunities in all quadrants of the city to meet the needs of current lower and moderate income households and those with special needs, and a fair share proportion of future lower and moderate income households. Policy 10-P.15: Pursuant to the Inclusionary Housing Ordinance, require affordability for lower income households of a minimum of 15 percent of all residential ownership and qualifying rental projects. Policy 10-P.18 Adhere to City Council Policy Statement 43 when considering allocation of “excess dwelling units” for the purpose of allowing development to exceed the Growth Management Control Point (GMCP) density. With limited exceptions, the allocation of excess dwelling units will require provision of housing affordable to lower income households. As less than seven (7) units are proposed, the inclusionary requirements may be satisfied through the payment to the city of an in-lieu inclusionary housing fee. The project is conditioned to require the payment of the applicable housing in- lieu fee for five (5) units prior to issuance of the building permit. In approving a request for an allocation of excess dwelling units, the project shall meet the findings identified in City Council Policy No. 43. Specifically, the project location and density shall be found to be compatible with adjacent land uses, the General Plan and any other applicable planning document. As discussed in the attached Planning Commission Resolution No. 7276, the proposed project meets these findings. B. Village Review Zone (CMC Chapter 21.35), Land Use District 1 - Carlsbad Village Center (Village Master Plan and Design Manual) The subject property is located within Land Use District 1, Carlsbad Village Center, of the Village Master Plan. Pursuant to the Village Master Plan, mixed-use (commercial retail, professional office and residential uses) is a permitted use. The specific development standards for new development within Land Use District 1 and the project’s compliance with these standards are shown in Table 5 below. No variances or standards modifications are requested. In addition, no architectural projections are proposed. TABLE 5 – VILLAGE MASTER PLAN, LAND USE DISTRICT 1 (CARLSBAD VILLAGE CENTER) STANDARD REQUIRED/ALLOWED PROPOSED COMPLY Front Yard Setback (State Street) Ground floor: No minimum or maximum setback Ground Floor: 1’ to 9’ Yes RP 16-13/CDP 16-35 (DEV16040) – CARLSBAD VILLAGE CENTER December 6, 2017 Page 8 Upper floors: 10’ average setback Upper Floors: Exceeds 10’ average along the State Street and Carlsbad Village Drive frontages Side Yard Setback: No minimum or maximum setback None to 17’ Yes Rear Yard Setback: (State Street Alley) No minimum or maximum setback 3-’6” to 10’-6” Yes Open Space: 20% = 1,500 SF 55% (4,115 SF) Yes Open space may be public or private and may be dedicated to landscaped planters, open space pockets and/or connections, roof gardens/patios, balconies, other patios and outdoor eating areas. Landscape/Planters: 852 SF Private Balconies/Roof Terrace: 3,263 SF Building Coverage: 100% 87% Yes Building Height: 45’ maximum 45’ Yes Parking: Commercial Retail and Office: One (1) space per 300 SF of net floor area. 5,779 SF ÷ 300 SF = 20 spaces Proposed: 13 spaces on-site, plus a request to purchase 17 parking credits. 12 parking spaces are provided onsite in the subterranean parking garage and one handicap van accessible parking stall is provided off the State Street alley. The balance of the required parking, 17 parking spaces, will be provided through the participation in the Village Parking In-Lieu Fee Program. Findings of support are discussed below and also in Planning Commission Resolution No. 7276. Yes Multi-family Dwellings 1.5 spaces per 1 bedroom unit (shall be provided onsite) Guest: 0.5 spaces per unit for properties located in coastal zone Proposed project: 5, one-bedroom apartments 1.5 spaces x 5 units = 7.5 spaces 0.5 spaces x 5 units = 2.5 spaces Total residential spaces required = 10 spaces Total Spaces Required: 20 + 10 = 30 spaces 10 spaces must be provided onsite for the 5 residential units and guest parking. The remaining spaces can be provided onsite, or satisfied via the Village Parking In-Lieu Fee Program. Compact Parking A maximum 40% of the total number of parking spaces provided on-site may be constructed to meet the requirements of a small or compact vehicle. 40% x 13 spaces = 5 spaces 5 compact spaces proposed. Yes RP 16-13/CDP 16-35 (DEV16040) – CARLSBAD VILLAGE CENTER December 6, 2017 Page 9 The project is consistent with the design guidelines of the Village Master Plan and Design Manual by providing access to the parking area from the alley, stepping the building back at upper levels, utilizing simple building forms, and providing visual interest on all sides of the building with varied materials and window forms. As discussed in Table 5 above, the project proposes to satisfy a portion of its requirement to provide parking spaces off-site through participation in the Village Parking In-Lieu Fee Program. The fees collected from the Village Parking In-Lieu Fee Program are deposited into an earmarked, interest- bearing fund to be used for construction of new, or maintenance of existing, public parking facilities within the Village Area. For the purposes of determining participation in the program, the Village has been divided into two (2) parking zones (i.e., Zone 1 and Zone 2). The subject property is located within Zone 1, which allows developers/property owners to make an in-lieu fee payment for up to 100 percent of the on-site parking requirement for proposed new development, conversion and/or intensifications of use if the property is located within 600 feet of an existing public parking facility. Pursuant to Figure 17 of the Village Master Plan, several public parking lots are located within 600 feet of the property. The project applicant is requesting participation in the Village Parking In-Lieu Fee Program for 17 parking spaces or 57 percent of the total required parking for the project. As a condition of project approval, the applicant shall be required to enter into an agreement to pay the parking in-lieu fee prior to the issuance of building permits for the project. The current fee is $11,240 per required parking space to be provided off-site. In order to participate in the Village Parking In-Lieu Fee Program the following findings must be made by the appropriate decision-making authority: 1. The proposed project is consistent with the goals and objectives of the Village Master Plan and Design Manual; 2. The proposed use is consistent with the land use district in which the property is located; 3. Adequate parking is available within the Village to accommodate the project’s parking demands; and 4. The In-Lieu Fee Program has not been suspended or terminated by the City Council. Justification for the above referenced findings is as follows: 1. The project is consistent with Village Review Master Plan and Design Manual in that the project assists in satisfying the goals and objectives through the following actions 1) the mixed-use project stimulates property improvements and new development in the Village by constructing a new permitted mixed- use building in an area with a mix of dated buildings and increasing the intensity of development within the Village; 2) it establishes Carlsbad Village as a quality shopping, working and living environment by providing new employment opportunities; increasing the number, quality, diversity and affordability of housing units within the Village; and reinforcing pedestrian retail continuity within the Village commercial areas; and 3) improves the physical appearance of the Village Area by developing the northwest corner of Carlsbad Village Drive and State Street with a new building that adheres to the land use regulations and design guidelines set forth for the area; 2. The proposed use is consistent with the goals and objectives set forth for Land Use District 1 of the Village Master Plan and Design Manual in that the mixed-use development not only provides mutually supportive uses in the form of residential, professional office and commercial retail uses along Carlsbad Village Drive and State Street, but reinforces the pedestrian orientation desired for the downtown area by providing new residents and employees an opportunity to walk to local shopping, dining, recreation, and mass transit functions; furthermore, its close proximity to existing bus routes RP 16-13/CDP 16-35 (DEV16040) – CARLSBAD VILLAGE CENTER December 6, 2017 Page 10 and mass transit help to further the goal of providing new economic and residential development near transportation corridors; and lastly, it will contribute to the revitalization of the Village area in the form of a new building in the core of the Village with new commercial lease space, new employment opportunities and new consumers; 3. Adequate parking is available within the Village to accommodate the project's parking demands. Based on the most recent parking study (May and July 2017, weekday/weekend), the average occupancy for all public parking lots is 51.1 percent. The single highest measurement of occupancy was on a weekday afternoon in May 2017, wherein the occupancy rate was 70 percent. This utilization ratio allows for continued implementation of the parking in-lieu fee program because it is less than the 85 percent threshold for maximum utilization set by the City Council; and 4. The In-Lieu Fee Program has not been suspended or terminated by the City Council. Based on these findings, it is staff’s recommendation that the proposed project warrants granting participation in the Parking In-Lieu Fee Program for a maximum of 17 parking spaces. If the City Council grants participation in the Parking In-Lieu Fee Program, the project will satisfy its parking requirement as set forth in the Village Master Plan and Design Manual. C. Coastal Development Regulations for the Village Segment of the Local Coastal Program (CMC Chapter 21.81 and Village Master Plan and Design Manual) The site for the proposed project is located within the Village Segment of the Coastal Zone. Consistency with the Village Local Coastal Program is required for this project. The Village Master Plan and Design Manual function as the Local Coastal Program for the Village area. Therefore, as long as the project is consistent with the Village Master Plan and Design Manual, the project is consistent with the Local Coastal Program. Staff finds the proposed project, as discussed in the prior section and in Planning Commission Resolution No. 7276, to be consistent with the Village Master Plan and Design Manual and, therefore, the Local Coastal Program. D. Inclusionary Housing Ordinance Pursuant to CMC Chapter 21.85, for all residential development less than seven (7) units, the inclusionary housing requirement may be satisfied through the payment of an inclusionary housing in-lieu fee. The proposal to construct five (5) residential apartment units is conditioned to pay the applicable housing in- lieu fee for five (5) units prior to issuance of the building permit. E. Growth Management Ordinance (CMC Chapter 21.90), Local Facilities Management Zone 1 The proposed project is located within Local Facilities Management Zone 1 in the northwest quadrant of the city. The impacts on public facilities created by the project, and its compliance with the adopted performance standards, are summarized in Table 6 below. TABLE 6 – GROWTH MANAGEMENT COMPLIANCE STANDARD IMPACTS COMPLIANCE City Administration 17.38 sq. ft. Yes Library 9.27 sq. ft. Yes Waste Water Treatment 5 EDUs Yes Parks .03 acres Yes RP 16-13/CDP 16-35 (DEV16040) – CARLSBAD VILLAGE CENTER December 6, 2017 Page 11 Drainage Basin A (alley): 0.23 CFS Basin B (Carlsbad Village Drive/State Street): 0.66 CFS Yes Circulation 236 ADT Yes Fire Station 1 Yes Open Space N/A N/A Schools Carlsbad (E: 0.85, M: 0.42, H: 0.37) Yes Sewer Collection System 1,870 GPD Yes Water 2,698 GPD Yes Properties located within the boundaries of the Village Master Plan do not have a Growth Management Control Point or an allocation for dwelling units. Therefore, as five (5) units are proposed, a total of five (5) dwelling units are proposed to be deducted from the city’s Excess Dwelling Unit Bank (EDUB). Pursuant to Planning Commission Resolution No. 7276, the allocation from the EDUB can be supported. IV. ENVIRONMENTAL REVIEW The project qualifies as a CEQA Guidelines Section 15332 (In-Fill Development Project) Class 32 Categorical Exemption. The project is consistent with the Village Master Plan as well as the General Plan, the project site is within the city limits, is less than 5 acres in size, and is surrounded by urban uses; there is no evidence that the site has value as habitat for endangered, rare, or threatened species; approval of the project will not result in significant effects relating to traffic, noise, air quality, or water quality; and the site can be adequately served by all required utilities and public services. The project is exempt from further environmental documentation pursuant to Section 15332 of the State CEQA guidelines. A Notice of Exemption will be filed by the City Planner upon final project approval. Pursuant to a Greenhouse Gas Analysis prepared for the proposed project (Birdseye Planning Group, May 2017), the annual emissions generated by the proposed project would total 243 MTCO2e. Therefore, the project is not subject to Climate Action Plan measures as the project does not exceed the 900 MTCO2e screening threshold. ATTACHMENTS: 1. Planning Commission Resolution No. 7276 2. Location Map 3. Disclosure Statement 4. Reduced Exhibits 5. Full Size Exhibits “A” – “S” dated December 6, 2017 S T A T E S T CARLSBAD VILLAGE DRT Y L E R S T A L L E Y W A S H I N G T O N S T ST A T E S T A L L E YGRAND AVOAK AV ALLEYR O O S E V E L T S T S T A T E S T A LL E Y RP 16-13 / CDP 16-35 Carlsbad Village Center SITE MAP SITE E L C AMINO R E A LLA COSTA AV A L G A R DCARLSBAD BL ATTACHMENT 2 ATTACHMENT 3 APPROVEDTHIS IS THE APPROVED TENTATIVE MAP/SITEPLAN FOR PROJECT NO. PER CONDITIONPLANNING DIVISION DATE ENGINEERING DIVISION DATENO. OF PLANNING COMMISSIONRESOLUTION NO. APPROVED THIS IS THE APPROVED TENTATIVE MAP/SITE PLAN FOR PROJECT NO. PER CONDITION PLANNING DIVISION DATE ENGINEERING DIVISION DATE NO. OF PLANNING COMMISSION RESOLUTION NO. N55° 58' 07.61"E 99.963 S34° 01' 51.97"E75.098N34° 01' 39.36"W75.099S55° 58' 05.66"W 99.968 IL-3CONCEPTUALWATERCONSERVATIONPLANCarlsbad Village CenterLandscape Concept Plan for:Ground FloorSecond StoryI ( 12/06/2017 Stepping back the fa~ade to allow light at street level Use of brick to reference historical structures First floor awnings match storefront context Items which work well within the neighborhood context Are the hip roof pediments on the fa~ade needed? Consider making a 90 degree corner (not 45 degrees) . I . .f. Community character questions 1 Consider aligning the second floor (not stepping back the first floor) on State Street to ( l!Ol~-U~ITZ~~~-~-~-~- ;.,.,~ .. ~e7-s-.j.-;,::; 'f,~-~ "H~~~.,,,,.,•_1~,:r.j•:./c :::.• Does this take away the public alley] · Community character questions ··-..·--:-;::::i Relocating the historic Santa F~~:!~; I allows visitor center visibility, adds to defining the urban alley entry and I enlivens the connection to transit. l Impact on the State Street and Carlsbad Village Drive neighborhood 12/06/2017 2 ( I~- HOIS....,St. t, .... N!"p l9~0SUr.-d ~~Q.)ntr...."tu-,e...., ~~(S'>S'.b ~I SaeK.Sao.d~~--~~~ ... ~~~L__ ........ __ 51 ~ln!.~~1,1 ... ~!hl!f,:~ ,w .-,d~,Sf'Ortl'oe,(Vl'!fftbrd llT..atft,~~Wl lffi ~e.a:tn"t.cl~tloCl::r:>5!:o'«,15\ad.t'll.~I.~. ~~~\':Gtb:b,H~lf"¥>1"itl~ l'l<:t"tolUtffl~C~~~n:l'otc<it ( JUl_..,.St. &AC! l!l'n, 11111"-'s" b:Jlsq".x,Qncrtr,!a ,U~lh-1~ ~t.~~""'IU ~(.:,,.e.G,u. G&e;,u,!1'1tr;rf.filini~ ¥!Cditwc1Trqtlrl!u'OI ..:b,~t:'-Jbail"'=1e;rn~~~lfWril __ __..._._ __ .......,......t.-:ua 12/06/2017 3