Loading...
HomeMy WebLinkAbout2019-06-19; Planning Commission; ; SDP 2019-0002/CUP 2018-0021 (DEV2018-0196) – PURE PROJECT BREWERY AND TASTING ROOM Item No. Application complete date: April 15, 2019 P.C. AGENDA OF: June 19, 2019 Project Planner: Shannon Harker Project Engineer: Jennifer Horodyski SUBJECT: SDP 2019-0002/CUP 2018-0021 (DEV2018-0196) – PURE PROJECT BREWERY AND TASTING ROOM – Request for a recommendation of approval of a Minor Site Development Plan and Conditional Use Permit for a 2,206-square-foot brewery and tasting room and the purchase of one (1) parking in-lieu fee. The site is located at 2825 State Street in the Village Center (VC) District of the Village and Barrio Master Plan and within Local Facilities Management Zone 1. The City Planner has determined that this project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment and is therefore categorically exempt from the requirement for the preparation of environmental documents pursuant to section 15303 (New Construction or Conversion of Small Structures) of the State CEQA guidelines. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 7335 RECOMMENDING APPROVAL of Site Development Plan SDP 2019-0002 and Conditional Use Permit CUP 2018-0021 to the City Council based on the findings and subject to the conditions contained therein. II. PROJECT DESCRIPTION AND BACKGROUND Project Setting: The 0.11-acre site is located on the corner of State Street and Christiansen Way and adjacent to the State Street alley to the west. The property is developed with a 3,725-square-foot retail building, the rear portion of which is currently vacant. The front or eastern portion of the building is occupied by the Handel’s Ice Cream shop. The project is located outside of the Coastal Zone and within the Village Center (VC) District of the Village and Barrio Master Plan (VBMP). Table A below includes the General Plan designations, zoning and current land uses of the project site and surrounding properties. TABLE A – SITE AND SURROUNDING LAND USE Location General Plan Designation Zoning Current Land Use Site Village/Barrio (VB) Village/Barrio (V-B) – Village Center (VC) District Retail- Handel’s Ice Cream North Village/Barrio (VB) Village/Barrio (V-B) – Village Center (VC) District New Village Arts Theater 1 SDP 2019-0002/CUP 2018-0021 (DEV2018-0196) – PURE PROJECT BREWERY AND TASTING ROOM June 19, 2019 Page 2 South Village/Barrio (VB) Village/Barrio (V-B) – Village Center (VC) District Shorehouse Kitchen East Village/Barrio (VB) Village/Barrio (V-B) – Village Center (VC) District Retail and Theater West Village/Barrio (VB) Village/Barrio (V-B) – Village Center (VC) District Carlsbad Village Train Station Project Description: The project applicant, Pure Project Brewing, is requesting approval of a Minor Site Development Plan and Conditional Use Permit to convert 2,206 square feet of a single-story retail building located at 2825 State Street (APN 203-294-01) into a craft brewery with a tasting room. The uses in the brewery include a 1,482- square-foot retail, storage and production area, as well as 724-square-foot tasting area, which includes a 335-square-foot patio. The northwest corner of the building is proposed to be demolished to create the outdoor patio. Additional minor modifications to the exterior of the structure are proposed to accommodate the use, including the addition of windows and the replacement of an existing metal roll- up door on the north elevation with a new glass and aluminum roll-up door which will serve as the public entrance to the brewery. A 3.5-foot-tall horizontal wood fence is proposed around the perimeter of the outdoor patio. Based on information provided by the applicant, the initial stages of the manufacturing process to brew beer will be completed offsite at Pure Project’s primary production facility located in San Diego. The applicant has described the process as follows: a. Unfermented beer will be produced at a brewing facility offsite. Once the unfermented beer is created, it will be transferred to the proposed brewery where yeast will be added to produce beer. Once the yeast has been added, the liquid will mature in fermentation tanks proposed to be located within the building. Upon maturation, the beer will be packaged into stainless steel kegs and stored in a walk-in cooler onsite. The fermentation tanks are comprised of large wooden tanks with the following approximate dimensions: 78.7” high, 57.9” wide, and 72.8” long. Each tank holds approximately 1,600 gallons of beer. Smaller wooden barrels would also be used for further storage and beer maturation as needed. The fermentation tanks will be fitted with air locks to prevent odors from escaping. A residential-sized water heater will be used on site for cleaning and pasteurization of parts, hoses, and other equipment. b. The production of the unfermented beer offsite will eliminate the need to dispose of the solid refuse made by spent-grains used in the process. It will also eliminate the need for steam and gas exhaust porting to the exterior of the building. The fermentation of the beer onsite will generate a liquid by-product that can be disposed through the local sewer system. c. The weekly output of beer produced onsite will be dependent upon the demands of the tasting room. The production levels will comply with the minimum requirements per the Type 23 (i.e., Small Beer Manufacturer License) Alcohol Beverage Control (ABC) license and will not exceed the maximum levels as specified in the license. d. The bottling of beer onsite is not proposed. Beer will be packaged into stainless steel kegs or growlers sold onsite. SDP 2019-0002/CUP 2018-0021 (DEV2018-0196) – PURE PROJECT BREWERY AND TASTING ROOM June 19, 2019 Page 3 The conversion of the vacant retail space into a brewery with a tasting room is an intensification which results in the requirement for one additional parking space. Since the site is fully developed and the existing stalls at the rear of the site existed as parking for the retail use, the applicant proposes to purchase one (1) parking in-lieu fee through the Village Parking In-Lieu Fee Program to satisfy the parking requirements. The findings related to the request for the parking in-lieu fee are discussed in Section B of the staff report, as well as in Planning Commission Resolution No. 7335. Pursuant to the land use matrix for the Village and Barrio Master Plan, a brewery is a conditionally- permitted use and is subject to special regulations which are required to be analyzed as part of the Conditional Use Permit (CUP). A Minor Site Development Plan (SDP) is required for the intensification in use which results in additional parking. While the Minor SDP is typically an administrative-level decision, because the CUP requires City Council approval, the SDP also requires City Council approval. III. ANALYSIS The proposed project is subject to the following ordinances, standards, and policies: A. Village-Barrio (VB) General Plan Land Use Designation; B. Village-Barrio (V-B) Zone (CMC Chapter 21.35), Village Center (VC) District of the Village and Barrio Master Plan; and C. Growth Management Ordinance (CMC Chapter 21.90), Local Facilities Management Plan Zone 1. The recommendation for approval of this project was developed by analyzing the project’s consistency with the applicable regulations and policies. The project’s compliance with each of the above regulations and policies is discussed in the sections below. A. Village-Barrio (VB) General Plan Land Use Designation The subject property has a General Plan Land Use designation of Village-Barrio (VB) and is within the Village Center (VC) District of the Village and Barrio Master Plan (VBMP). As discussed in Table B below, the project complies with the Elements of the General Plan. TABLE B – GENERAL PLAN COMPLIANCE Element Use, Classification, Goal, Objective, or Program Proposed Uses & Improvements Comply? Land Use & Community Design Goal 2-G.29 Maintain and enhance the Village as a center for residents and visitors with commercial, residential, dining, civic, cultural and entertainment activities. Goal 2-G.30 Develop a distinct identity for the Village by encouraging a variety of uses and activities, such as a mix of residential, commercial office, restaurants and specialty retail shops, which traditionally locate in a pedestrian–oriented downtown area The proposal to convert 2,206 square feet of a 3,725-square-foot retail building to a brewery with an accessory tasting room and outdoor patio contributes toward the goal of providing a lively, interesting social environment in the Village. The addition of a craft brewery complements the surrounding mix of land uses, which includes multi-family residential units, a theater, retail stores, restaurants and an ice cream shop. Yes SDP 2019-0002/CUP 2018-0021 (DEV2018-0196) – PURE PROJECT BREWERY AND TASTING ROOM June 19, 2019 Page 4 Element Use, Classification, Goal, Objective, or Program Proposed Uses & Improvements Comply? and attract visitors and residents from across the community by creating a lively, interesting social environment. Mobility Policy 3-P.5 Require developers to construct or pay their fair share toward improvements for all travel modes consistent with the Mobility Element, the Growth Management Plan, and specific impacts associated with their development. Policy 3-P.29 Evaluate incorporating pedestrian and bicycle infrastructure within the city as part of any private development or capital project. Goal 3-G.3 Provide inviting streetscapes that encourage walking and promote livable streets. The applicant is required to pay traffic impact fees for the intensification in use prior to the issuance of building permits that would go toward future road improvements. The proposed project is located adjacent to the Carlsbad Village train station, which provides rail and bus service throughout the day. The project supports walkability and mobility by locating near residential and commercial land uses. Bicycle racks are proposed as a component of the proposed project. In addition, street trees are existing in the sidewalk adjacent to Christiansen Way. Yes Public Safety Goal 6-G.1 Minimize injury, loss of life, and damage to property resulting from fire, flood, hazardous material release, or seismic disasters. Policy 6-P.6 Enforce the requirements of Titles 18, 20, and 21 pertaining to drainage and flood control when reviewing applications for building permits and subdivisions. Policy 6-P.34 Enforce the Uniform Building and Fire codes, adopted by the city, to provide fire protection standards for all existing and proposed structures. Policy 6-P.39 Ensure all new development complies with all applicable regulations The proposed structural improvements would be required to meet all seismic design standards. The Fire Department approved the project and indicated that fire sprinklers are not required for an occupant load less than 100. Therefore, the proposed project is consistent with the applicable fire safety requirements. In addition, the Police Department has approved the proposed brewery use. The project would be required to develop and implement a program of “best management practices” for the elimination and reduction of pollutants which enter and/or are transported within storm drainage facilities. Yes SDP 2019-0002/CUP 2018-0021 (DEV2018-0196) – PURE PROJECT BREWERY AND TASTING ROOM June 19, 2019 Page 5 Element Use, Classification, Goal, Objective, or Program Proposed Uses & Improvements Comply? regarding the provision of public utilities and facilities. The project has been conditioned to pay all applicable public facilities fees for Zone 1. B. Village-Barrio Zone (CMC Chapter 21.35) and Village Center District The subject property is located within the Village Center (VC) District of the Village and Barrio Master Plan (VBMP). Breweries are conditionally-permitted and are required to comply with special regulations. No variances or standards modifications are being requested for the project. The project’s compliance with the development standards specific to the VC District, as well as the area-wide standards within the VBMP, are provided in Tables C and D below. The project’s compliance with the conditional use permit regulations of the VBMP are provided in Table E below. Please see Attachment 4 for an analysis of the project’s compliance with the Design Guidelines of the VBMP. TABLE C – COMPLIANCE WITH THE VILLAGE AND BARRIO MASTER PLAN VILLAGE CENTER (VC) DISTRICT Standard Required/Allowed Proposed Comply? Front Yard Setback Minimum of 0 feet; maximum of 5 feet to building at the ground floor. Additional depth permitted where area includes a plaza, courtyard, or outdoor dining. Additional depth is also permitted to accommodate electrical transformers, utility connection, meter pedestals, and similar equipment only if other locations are infeasible as determined by the decision-maker. Awnings, canopies, upper floor balconies, plazas, courtyards, and outdoor dining are permitted to encroach within the setback up to the property line. Minimum ten-foot landscape setback where surface parking areas are located adjacent to a public street. Zero setback; the existing building is located on the property line. The proposed outdoor patio will also be located on the north property line, facing Christiansen Way. Yes Side Yard Setback No minimum setback Zero; building is located on the property line. Yes Rear Yard Setback No minimum setback 39’ Yes Lot Coverage No maximum 75 percent Yes Service and Delivery Areas Service and loading areas shall be conducted using alley access where the condition exists. All service and loading activities will occur off the State Street alley to the west. Yes Building Height Maximum 45 feet, 4 stories 12’ – 13’, one story Yes SDP 2019-0002/CUP 2018-0021 (DEV2018-0196) – PURE PROJECT BREWERY AND TASTING ROOM June 19, 2019 Page 6 Standard Required/Allowed Proposed Comply? Building Massing Maximum wall plane and roofline variation: No building façade visible from any public street shall extend more than 40 feet in length without a 5-foot minimum variation in the wall plane, as well as a change in roofline. The north façade of the existing building is 75 feet in length. The demolition of 335 square feet at the northwest corner of the building to create an outdoor patio will bring the north façade into compliance with this requirement. Yes Parking Brewery/Distillery/Winery: One space per 150 square feet of the tasting room and one space per 415 square feet for all other uses (e.g. production, storage, and retail sales). Converting uses (buildings existing as of Master Plan adoption date): Building space may be converted from one use to another without additional parking, provided both uses have the same parking requirements set forth within Section 2.6.6. If the new use has a higher parking requirement than the existing use, 50 percent of the additional parking based on the higher parking requirement shall be provided. Existing gross floor area: 2206 SF Parking calculation for prior retail use: 2,206 SF ÷ 415 SF = 5.3 spaces for retail use Parking calculation for proposed brewery use, including outdoor patio: Tasting room: 725 SF ÷ 150 SF = 4.8 spaces Retail/storage: 1,481 SF ÷ 415 SF = 3.5 spaces 4.8 + 3.5 = 8.3 spaces for brewery 8.3 spaces – 5.3 spaces = 3 additional spaces 3 spaces x 0.50 = 1.5 spaces; round down to 1; **1 parking in-lieu fee required to be purchased One parking in-lieu fee is proposed to be purchased. Please see discussion below and Planning Commission Resolution No. 7335 for findings for approval. Yes Ground Floor Street Frontage Uses New ground floor street frontage uses permitted within the boundaries of the use restriction area identified on Figure 2-2 shall occupy more than one- half of the habitable space developed on the ground floor and shall span at least 80 percent of the building frontage. The proposed brewery and existing Handel’s ice cream shop are uses which are permitted on the ground floor and Yes SDP 2019-0002/CUP 2018-0021 (DEV2018-0196) – PURE PROJECT BREWERY AND TASTING ROOM June 19, 2019 Page 7 Standard Required/Allowed Proposed Comply? Up to 20 percent of the building frontage may be used for a lobby or entryway to uses above or behind ground floor street frontage uses. occupy 100 percent of the building frontage. TABLE D – COMPLIANCE WITH THE VILLAGE AND BARRIO MASTER PLAN AREA-WIDE STANDARDS Standard Required/Allowed Proposed Comply? Ingress and Egress Development shall be permitted a maximum of one access point from the public street. A driveway curb cut shall not exceed 20 feet in width and shall maintain a free line of sight. An existing driveway off the State Street alley provides access to the existing parking stalls at the rear of the building. Yes Property Line Walls/Fences Maximum height in front yard setback: 3.5’ Maximum height in side/rear yard setback: 6’ Wall/fence height shall be measured from the lowest side of finished grade. A 3.5’ horizontal wood fence is proposed around the perimeter of the outdoor patio. Yes Building Orientation Buildings shall be oriented toward primary street frontage. The existing building has a zero setback along State Street and Christiansen Way and is therefore oriented toward the street frontages. Yes Building Entrances The primary entrance of a ground floor commercial use shall be oriented toward the primary street frontage. The entrance to the brewery is oriented toward Christiansen Way. Yes Roof Protrusions Roof-mounted mechanical equipment and freestanding screening that is not architecturally integrated shall be set back from the building face at least equivalent to the height of the screening. The project is conditioned to require screening for any roof- mounted mechanical equipment that will be visible. Yes Window Glazing The bottom of any window or product display window shall not be more than 3.5 feet above the adjacent sidewalk. Transparent or translucent glazing is required on the ground-floor façade of a commercial or retail use All proposed windows are less than 3.5 feet above the sidewalk. In addition, the windows and Yes SDP 2019-0002/CUP 2018-0021 (DEV2018-0196) – PURE PROJECT BREWERY AND TASTING ROOM June 19, 2019 Page 8 Standard Required/Allowed Proposed Comply? facing a public street. Opaque, reflective or dark tinted glass is not permitted. doors will have transparent glazing. TABLE E – COMPLIANCE WITH THE CONDITIONAL USE PERMIT SPECIAL REGULATIONS FOR BREWERIES STANDARD ANALYSIS Comply? Deliveries of materials and supplies shall not occur during hours that would negatively impact residents within the vicinity of the brewery’s location. As the proposed project is not located adjacent to any residential land uses, no impacts related to the delivery of materials and supplies are anticipated. Yes By-products or waste from production shall be removed within 24 hours and properly disposed of off the property. The applicant proposes to produce unfermented beer at a brewing facility offsite. The production of the unfermented beer generates the bulk of the by-products since it entails extracting liquid from ground malt, hops or other grains. The production of the unfermented beer offsite will eliminate the solid refuse made by spent- grains used in the process and would also eliminate the need for steam and gas exhaust porting to the exterior of the building. The fermentation of the beer onsite will generate a liquid by-product that can be disposed through the local sewer system. Yes Fermentation tanks shall be located indoors and installed with a filter to reduce the odor emanating from the brewery site. The fermentation tanks are proposed to be located inside the brewery and will be fitted with air locks to prevent odors from escaping indoors. Yes Parking In-Lieu Fee Program As discussed in Table C above, the project proposes to the satisfy the requirement to provide one (1) parking space by participating in the Parking In-Lieu Fee Program of the VBMP. The fees collected from the Parking In-Lieu Fee Program are deposited into an earmarked, interest-bearing fund to be used for construction of new, or maintenance of existing, public parking facilities within the Village Area. Pursuant to the VBMP, participation in the Parking In-Lieu Fee Program is subject to the following requirements: a. The Parking In-Lieu Fee Program shall be applicable only to non-residential uses in specific areas east of the railroad corridor. b. Only non-residential uses in the Village Center (VC) district (east of the railroad tracks only) and in the Village General (VG), Freeway Commercial (FC) and Pine-Tyler Mixed-Use (PT) districts are eligible to participate in the Parking In-Lieu Fee Program. c. The average occupancy of off-street public parking spaces within a quarter mile radius of the property boundaries of the use requesting to pay the In-Lieu Fee shall be under 85 percent based on the most recent city-authorized parking study or other information determined acceptable by the city planner. SDP 2019-0002/CUP 2018-0021 (DEV2018-0196) – PURE PROJECT BREWERY AND TASTING ROOM June 19, 2019 Page 9 d. The In-Lieu payment shall always be made for a whole parking space. e. Fee payment shall not result in a reserved parking space or spaces. In addition, the following findings must be made by the appropriate decision-making authority: a. The use complies with the program’s participation restrictions; b. Adequate off-street public parking is available to accommodate the project’s parking demand, based on the city’s most recent city-authorized parking study or other information; and c. The In-Lieu Fee Program has not been suspended or terminated by the City Council. The subject property is located east of the railroad tracks and within the VC District. In addition, the proposed brewery is a non-residential use. A total of five (5) public parking lots and 274 parking spaces are located within a quarter mile radius of the property. Based on the most recent data available, which includes the results of the parking study completed August 2018 (weekday and weekend), the maximum average occupancy of the lots located within a quarter mile radius was 78.9 percent (weekday average, 9 AM – 9 PM, August 2018), which is less than the threshold of an average of 85 percent. Based on these findings, it is staff’s recommendation that the proposed project warrants granting participation in the Parking In-Lieu Fee Program and the purchase of one (1) parking in-lieu fee. If the City Council grants participation in the Parking In-Lieu Fee Program, the project will satisfy its parking requirement as set forth in the Village and Barrio Master Plan. As a condition of project approval, the applicant shall be required to enter into an agreement to pay the parking in-lieu fee prior to the issuance of building permits for the project. The current fee is $11,240 per required parking space. C. Growth Management The proposed project is located within Local Facilities Management Zone 1 in the Northwest Quadrant of the city. The impacts on public facilities created by the project, and its compliance with the adopted performance standards, are summarized in Table F below. TABLE F – GROWTH MANAGEMENT COMPLIANCE Standard Impacts Compliance City Administration N/A N/A Library N/A N/A Waste Water Treatment 1 EDU Yes Parks N/A N/A Drainage Basin A; N/A Yes Circulation 52 ADT Yes Fire Station 1 Yes Open Space N/A N/A Schools N/A N/A Sewer Collection System 1 EDU Yes Water 400 GPD Yes IV. ENVIRONMENTAL REVIEW The City Planner has determined that the project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment, and it is therefore SDP 2019-0002/CUP 2018-0021 (DEV2018-0196) – PURE PROJECT BREWERY AND TASTING ROOM June 19, 2019 Page 10 categorically exempt from the requirement for the preparation of environmental documents pursuant to Section 15303 (New Construction or Conversion of Small Structures) Class 3 Categorical Exemption of the State CEQA Guidelines. The project entails the conversion of an existing small structure not exceeding 2,500 square feet in floor area from one use to another where only minor modifications are made to the exterior of the structure. In addition, the project does not involve the use of hazardous substances. In making this determination, the City Planner has found that the exceptions listed in Section 15300.2 of the state CEQA Guidelines do not apply to this project. A Notice of Exemption will be filed by the City Planner upon final project approval. The project’s compliance with the recently-adopted Climate Action Plan Ordinances, if deemed applicable, will be verified prior to issuance of the building permit. V. DEVELOPMENT PROJECT PUBLIC INVOLVEMENT POLICY The proposed project is subject to the Early Public Notice and the Enhanced Stakeholder Outreach processes outlined in City Council Policy No. 84 – Development Project Public Involvement Policy. The policy requires applicants of certain development projects, such as the proposed Conditional Use Permit, to provide an opportunity for, and to consider input from interested and affected stakeholders prior to project consideration by city decision-makers. On November 21, 2018, the applicant mailed an early public notice and an invitation to a stakeholder outreach meeting to property owners within 600 feet of the project site. On December 13, 2018, an informational meeting was held onsite with the surrounding community. Approximately 25-30 individuals attended the meeting, a majority of which comprised the applicant’s project team. Project renderings as well as the site and floor plans were posted for the public to review. Comment cards were available; however, no comments were received. Verbal feedback received from the public was positive. The early public notice and the informational meeting described above satisfy the requirements of City Council Policy No. 84. ATTACHMENTS: 1. Planning Commission Resolution No. 7335 2. Location Map 3. Disclosure Statement 4. Village and Barrio Master Plan Design Guidelines Analysis 5. Reduced Exhibits 6. Full Size Exhibits “A” – “F” dated June 19, 2019 6 7$ 7(  6 767$ 7 (  6 7 5226( 9( / 7  6 75226 (9 ( / 7  6 7 &&$$55 //66 %%$$''99 ,,////$$**((''55 **55 $$11 ''$$99 0$', 62 1 6 70$' ,621 6 7 &$5/6%$ ' % /&$5/ 6%$' % / &+5, 6 7, $ 1 6 ( 1 : < &+5, 6 7, $ 1 6 ( 1 : <:$6+, 1* 721 6 7:$6+ ,1* 721  6 7 %((& + $ 9 %((& + $ 9 SDP 2019-0002 / CUP 2018-0021 Pure Project Brewery and Tasting Room SITE MAP JPALOMARAIRPORTRDELCAMREALELCAMINOREA L LA CO STAAVCARLSBADBLMELR O SEDRCOLLEGEBLAV I ARA PY RANCH O S ANTAFERDSITE 1 ATTACHMENT 4 VILLAGE AND BARRIO MASTER PLAN DESIGN GUIDELINES ANALYSIS SDP 2019-0002/CUP 2018-0021(DEV2018-0196) – PURE PROJECT BREWERY AND TASTING ROOM INTENT The Design Guidelines (guidelines) intend to implement and enhance the existing character within the Village and Barrio as new development and property improvements occur. Together, the Village and Barrio are a unique, mixed-use environment. They serve as both a shopping and entertainment destination as well as a place to live and work. The guidelines aim to improve the character of the Village and Barrio while improving livability. Guidelines address many components of building style and orientation, including site layout, building massing, roof form, building façades, and appurtenances. Images are intended to provide a visual example of a targeted topic described in the caption and may not represent all aspects and direction provided within this document. Through these areas of focus, the guidelines strive to foster authentic designs with straightforward and functional construction. All development should align with the spirit and intent of the design guidelines presented in this chapter. Designers and developers should consider at a minimum that these guidelines are a starting point for quality development, and do not comprise every possible strategy for achieving high quality design. Therefore, it is prudent that designers use their own techniques for achieving authentic, high quality design. The following guidelines apply to all new and remodeled development within the entire Master Plan Area unless exempt as determined by Section 6.3.2. 2.8.2 SITE PLANNING GUIDELINES CONSISTENCY STATEMENT A.Site layout 1.Place buildings adjacent to, and oriented towards, the street. Locate prominent architectural features near corners and intersections. 2.Orient storefronts and major building entries towards major streets, courtyards, or plazas. 3.Minimize gaps between buildings in order to create a continuous, pedestrian- oriented environment. 4.Place parking lots so as not to interrupt commercial street frontages. 5.Incorporate functional and aesthetic vehicular and pedestrian connections to adjacent sites. 6.Create small pedestrian plazas along the street wall through the use of recesses in building form. 7.Provide easily identifiable pedestrian access from the street and/or sidewalk to key areas within the site. 8.Incorporate plazas, landscaped areas, fountains, public art, textured pavement, and vertical building features to create focal points that enhance a pedestrian’s experience. 9.Utilize atriums and outdoor courtyards to increase the variety and number of views and to bring additional sunlight into large developments. 10.Give careful design consideration to corner lots, as they are typically a focal point in the urban fabric. 11.Utilize courtyards or other methods to break up the building mass and provide natural ventilation, wherever possible. The brewery and tasting room are proposed in an existing building which is located on the front and street-side property lines. The building does not have any gaps and provides a continuous, pedestrian- oriented environment. The addition of the outdoor patio further enhances the pedestrian and customer experience. B.Parking and access 1.Locate parking behind buildings and away from the street, wherever possible. 2.Use pervious paving materials, whenever possible. 3.Buffer residential uses from commercial parking lots by landscaping, fencing, and/or walls. 4.When walls or fences are utilized to screen parking, provide breaks to allow for pedestrian circulation and limit height for safety and security purposes. 5.Divide large parking lots into smaller areas with landscaping and clearly marked pedestrian paths. Two existing parking spaces are located to the rear of the building, off the State Street alley. Bicycle racks are proposed to be installed adjacent to the outdoor patio and adjacent to the existing transformer. 2 6.Highlight primary pedestrian access paths within parking areas with decorative paving, trellises, canopies, lighting, and similar improvements. 7.Create pedestrian paseos to parking lots of buildings. 8.Locate parking below grade or in structures, where feasible. 9.Design parking structures so their height and bulk are consistent with adjacent buildings. 10.Provide bicycle parking at convenient locations such as entrances or other visible and accessible areas. 11.Provide electric vehicle charging stations and equipment where feasible and as otherwise required. C.Plazas and open space 1.Provide private or common open space and pedestrian connections to such spaces to enhance the living environment and contribute to a walkable neighborhood character. 2.Semi-public outdoor spaces, such as small plazas and courtyards are encouraged between private and public spaces to support pedestrian activity and connectivity. 3.Design plazas and building entries to maximize circulation opportunities between adjacent uses. 4.Provide landscaping and high-quality paving materials, such as stone, concrete or tile, for plazas and open spaces. 5.Place outdoor furniture, such as seating, low walls, trash receptacles, bike racks and other elements, in outdoor pedestrian spaces. 6.Site buildings to define open space areas. Ensure that outdoor areas are visible from public streets and accessible from buildings, as well as, streets and pedestrian and bicycle networks. As the brewery is proposed in an existing building, there is not an opportunity to add plazas or open space. Bike racks are proposed to be added to the rear of the building, adjacent to the outdoor patio and public sidewalk. D.Outdoor Seating 1.Incorporate seating into well-trafficked outdoor areas, to maximize opportunities for people to interact. 2.Consider movable seating so that people can accommodate their own preferences and respond to the weather or time of day. 3.Provide lighting to ensure that outdoor seating areas are safe places at night. An outdoor patio with moveable seats is proposed in conjunction with the proposed brewery and tasting room which will encourage pedestrian interaction along the Christiansen Way frontage. Lighting will be provided for the outdoor patio to ensure safety for the customers and pedestrians. E.Connectivity 1.Connect all commercial buildings to the public sidewalk via a publicly accessible path or walkway. 2. Provide attractive, well-marked pedestrian links that create a clear path of travel between parking, buildings and sidewalks. 3. Ensure that alleys are well lit, open, and visible to passersby. 4.Enhance existing walkways or paseos to become more inviting. 5. Provide secondary entries to alleys. The existing building is located on the north property line, adjacent to the public sidewalk. Therefore, the entry to the brewery will be visible to the public. An existing roll-up door at the rear (west) elevation provides private secondary access off the State Street alley. The roll-up door is intended to be used for deliveries. F. Mechanical Equipment and Service Areas 1. Carefully design, locate, and integrate service, utility, and loading areas into the site plan. These critical functional elements should not detract from the public view shed area or create a nuisance for adjacent property owners, pedestrian circulation, or vehicle traffic. An existing transformer is located at the rear of the property, with visibility from Christiansen Way and the State Street alley. The applicant proposes to add landscaping around 3 2. Locate loading areas in the rear of a site where possible. 3. Locate mechanical equipment and service areas along and accessed from alleys or the rear of properties, wherever possible. 4. Place public utility equipment, meter pedestals, and transformers underground or away from sidewalks and pedestrian areas, where feasible. 5. Screen all mechanical equipment from public view. 6. Ensure roof mounted mechanical equipment and screening do not interfere with required solar zones or installed solar photovoltaic or solar water heating systems. 7. Design trash and recycling enclosures to be consistent with the project and building architecture, and site and screen them to minimize visual impact. the transformer, where feasible, to soften the view. If additional roof- mounted equipment is needed for the operation of the brewery, it will be required to be screened, pursuant to the project conditions. Compliance will be verified prior to issuance of the building permit. G. Landscaping Landscaping shall meet the policies and requirements set forth in the City of Carlsbad Landscape Manual. 1.Utilize landscaping to define building entrances, parking lots, and the edge of various land uses. 2. Utilize landscaping to buffer and screen properties. 3.Consider safety, environmental impacts, and accent elements when selecting and locating landscaping elements. 4. Landscaping, between the front property line and the building creates a visually interesting transitional space. Select and place plants to enhance and soften architectural elevations, screen undesirable building features and contribute to the overall quality of the streetscape. 5. Select species that are compatible with Carlsbad’s semi-arid Mediterranean climate, and that will grow to an appropriate size at maturity. 6. When there are minimal landscape areas between the building and the street, incorporate planters onto porches, recessed building entrances, and planters on decks and balconies. 7. Minimize paved vehicle areas such as driveways and parking areas. Design driveways to be no wider than necessary to provide access. Incorporate permeable surfaces, such as interlocking pavers, porous asphalt, power blocks, and lattice blocks/ grass-crete or ribbon driveways where feasible. 8. Utilize planting to screen less desirable areas from public view, i.e., trash, enclosures, parking areas, storage areas, loading areas, and public utilities. 9. Provide landscaping between any parking lot and adjacent sidewalks or other paved pedestrian areas, as well as, within surface parking lots. 10.Incorporate native and drought tolerant vegetation whenever possible. Avoid use of invasive or noxious plants. 11.Incorporate lattice work and landscaping onto existing blank walls to support flowering vines growing out of planters placed at their base. 12.Plant trees and fast growing and flowering vines along fences and walls to soften the appearance of the fencing and screen views to functional on-site work and storage areas. 13. Utilize vines, espaliers, and potted plants to provide wall, column, and post texture and color and to accentuate entryways, courtyards, and sidewalks. 14. Incorporate large planters into seating areas. Planters should be open to the soil below and should incorporate permanent irrigation systems. 15. Maintain landscaping and yard areas regularly to keep a desirable, healthy Street trees and above-ground concrete planters currently exist in the sidewalk adjacent to Christiansen Way. The applicant proposes to add landscaping around the existing transformer to screen it to the maximum extent feasible. In addition, a tree is proposed in the outdoor patio area which will enhance the streetscape and customer experience. 4 appearance, eliminate trash, and control vermin. 16. Incorporate Low Impact Development (LID) strategies, site design, and source control measures into projects. Examples include rain gardens, rain barrels, grassy swales, soil amendments, and native plants. 17.Utilize seasonal shading from trees and shrubs when developing planting schemes for courtyards and streetscapes on south and west facing facades. H. Fences and walls 1. Construct fences of quality and durable materials, such as, wood, vinyl or wrought iron. 2. Architecturally treat all site walls to complement the building design. 3. Chain link fences and other “see-through” fences are not appropriate for screening. 4.Fences and walls directly adjacent to sidewalks and pedestrian plazas in commercial and mixed-use areas should be avoided unless designed as a pedestrian amenity or a low wall landscape feature. A 3.5’-tall wood fence with horizontal slats is proposed around the perimeter of outdoor patio. The design and material of the fencing complements the existing building and proposed brewery use. 2.8.3 BUILDING FORM AND MASSING GUIDELINES CONSISTENCY STATEMENT A.Building Form and Articulation 1.Reduce the imposing appearance of tall buildings by stepping back from street level on elevations above the ground floor. 2. Utilize horizontal and vertical articulation to break up monolithic street walls and facades. 3.Utilize techniques to reduce massing, such as variation in wall plane and height and variation in roof form and levels. 4. Surface detailing may be used, but does not serve as a substitute for distinctive massing. 5.Consider adjacent low density uses when designing and orienting a building. For example, avoid balconies overlooking rear yards. 6. Minimize the vertical emphasis of architectural design elements by incorporating features such as horizontal bands, reveals, trims, awnings, eaves, and overhangs or other ornamentation, along different levels of the wall surface. 7. Minimize blank walls by: a.Adding window openings and/or entrances and other relief. b.Providing recessed glazing and storefronts. c.Adding vertical pilasters which may reflect internal building structure. d.Changing color and texture along the wall surface. e.Varying the planes of the exterior walls in depth and/or direction. f.Adding trims, projections, and reveals along different wall surfaces. 8. Articulate the building façade by varying building elements to create contrast. Integrate all architectural elements into the building design to avoid the look of “tacked on” architectural features. 9. Utilize facade projections and recesses such as bay windows, planter boxes, roof overhangs, and entry way recesses. 10.Arrange columns such that they appear to support the weight of the building or feature above and are balanced in height, weight, and depth. Spindly columns can appear out of proportion with the element it is supporting. 11.Size shutters appropriately, when used to cover the window opening. 12. Avoid exterior sliding or fixed security grilles over windows along street The brewery proposes to locate in an existing vacant retail suite. The northwest corner of the building will be demolished to create an outdoor patio which will break up the mass, building planes and roof structure of the building as viewed from Christiansen Way and the State Street Alley. Additional minor modifications to the exterior of the structure are proposed to accommodate the use, including the addition of windows and the replacement of an existing metal roll- up door on the north elevation with a new glass and aluminum roll-up door which will serve as the public entrance to the brewery. 5 frontages. 13. Discourage and avoid “chain” corporate architecture and generic designs. Each project should strive to achieve the unique architectural style or character. 14.Design roofs to accommodate a solar photo-voltaic system and/or solar water heating system, as required by California Building Code. 15.Utilize details such as wall surfaces constructed with patterns, changes in materials, building pop-outs, columns, and recessed areas to create shadow patterns and depth on the wall surfaces. 16. Ensure that proportions are consistent with selected architectural styles. 17. Incorporate the characteristic proportions of traditional facades in new infill development. 18.Balance the ratio of height, width, and depth of arches and columns to emphasize strength and balance. 19. Ensure consistency between the height of a column and its mass or thickness with the weight of the overhead structure the column supports. 20.Infill buildings that are much wider than the existing facades should be broken down into a series of appropriately proportioned structural bays or components. 21.Consider transitions between the height of new development and the height of adjacent existing development. 22. Utilize vertical building focal elements. Towers, spires, or domes may foster community identity and serve as landmarks. 23.Utilize windows and open wrought iron balconies to provide opportunities for residents to passively observe and report suspicious activity. 24.Utilize accent materials to highlight building features and provide visual interest. Accent materials may include any of the following: a.Wood b.Glass c.Glass block (transom) d.Tile e.Brick f.Concrete g.Stone h.Awnings i.Plaster (smooth or textured) 25. Use building materials and finishes that are true to the structure’s architectural style. 26. Windows, doors, and entries should be designed to capture the desired architectural style of the building. 27. Generally, use no more than three different materials on exterior wall surfaces. While certain styles may successfully incorporate multiple surface materials, caution must be used as too many materials can result in a less than aesthetically pleasing building. 28. Ensure material changes occur at intersecting planes, preferably at inside corners of changing wall planes or where architectural elements intersect, such as a chimney, pilaster, or projection. 29.Utilize light and neutral base colors. Generally muted color schemes will 6 promote visual unity and allow awnings, window displays, signs and landscaping to be given proper emphasis. 30.Ensure lighting is architecturally compatible with the building. 31. Articulate storefronts with carefully arranged doors, windows, arches, trellises, or awnings, rather than blank walls. 32. Ensure that the main entrance to a building is clearly identifiable and unique, as it is the primary point of arrival and should be treated with significance. 33. Window type, material, shape, and proportion should complement the architectural style of the building. 34. Utilize recessed windows where appropriate to the architectural style, to provide depth. B. Awnings 1. Use awnings made of commercial grade canvas or metal and that are either fixed or retractable. 2. Avoid plasticized and/or vinyl fabrics and back-lit awnings. 3. Maintain a minimum of six (6) inch clearance from second floor features such as windows. 4. Avoid wrapping awnings around buildings in continuous bands. 5. Place awnings only on top of doors, on top of windows, or within vertical elements when the façade of a building is divided into distinct structural bays. N/A. No awnings are proposed. C. Balconies 6. Place balconies adjacent to operable doorways. Faux balconies or those that do not appear usable are discouraged. 7. Visually support all balconies, either from below by decorative beams and/or brackets, from above by cables, or by other parts of the building. 8. On corners, balconies may wrap around the side of the building. N/A. No balconies are proposed. D. Roof Forms 1. Ensure that roof materials and colors are consistent with the desired architecture or style of the building. 2. Utilize multi-roof forms, hips, gables, shed roof combinations, and sufficiently articulated flat roofs to create interesting and varying roof forms that will reduce building mass, add visual appeal, and enhance existing Village and Barrio character and massing. 3. Avoid long, unbroken, horizontal roof lines. 4. Avoid flat roofs unless sufficient articulation of detail is provided, such as precast treatments, continuous banding or projecting cornices, lentils, caps, corner details, or variety in pitch (sculpted), height, and roofline. 5. Avoid the “tacked on” appearance of parapets, and ensure their appearance conveys a sense of permanence. If the interior side of a parapet is visible from the pedestrian and/or motorist area of the project, utilize appropriate detail and properly apply materials. The brewery proposes to operate in an existing building. The addition of the outdoor patio will help break up the flat roof facing the north and west. E. Lighting 1.Provide exterior building lighting, particularly in commercial and high- pedestrian areas. 2. Design or select light fixtures that are architecturally compatible with the building. 3.Integrate light fixtures that are downcast or low cut-off fixtures to prevent Exterior lighting will be provided and reviewed as part of the building plan check. 7 glare and light pollution. 4. Design lighting in such a way as to prevent the direct view of the light source from adjacent properties or uses, particularly residential properties or uses. 5. Utilize lighting on architectural details, focal points, and parking areas to increase safety, help with orientation, and highlight site attributes and the identity of an area. 6.Use energy-efficient lamps such as LED lights for all exterior lighting along with adaptive lighting controls to contribute to energy conservation and potentially reduce long-term costs. PROJECT DIRECTORYVICINITY MAPSCOPE OF WORKBUILDING OWNERLINDA CAROL MINORUSSELL SATTERLYSUSAN SATTERLY2825 STATE STREETCARLSBAD, CA 92008T: 760.717.3760TENANTPURE PROJECT9030 KENAMAR DR, #308SAN DIEGO, CA 92121T: 530.409.7647CONTACT: JESSE PINEDESIGNERTEC/SCAPE DESIGN1889 BACON ST. STE 8SAN DIEGO, CAT: 704.996.7272CONTACT: ANDY MCCABEPROJECT DATAPROJECT ADDRESS:2825 STATE STREETCARLSBAD, CA 92008T1.0TITLE SHEETA. ALL EXITS SHALL BE PROVIDED IN ACCORDING TO CHAPTER 10, OF THE CBC ALL GLASS SHALL COMPLY WITH THE REQUIREMENTS OF CHAPTER 24 OF THE CBC.EXITS5.4.3.2.1.THE SPECIFICATIONS, INCLUDED HEREWITH, ARE AN INTEGRAL PART OF THESECONTRACT DOCUMENTS AND ALL CONDITIONS MENTIONED IN EITHER SHALL BEEXECUTED AS THOUGH SPECIFICALLY MENTIONED IN BOTH.ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH APPLICABLEREQUIREMENTS OF THE LOCAL FIRE MARSHALL, THE CITY OF SAN DIEGO BUILDINGOFFICIALS AND UTILITY COMPANIES FURNISHING SERVICES. NOTHING IN THE PLANSOR SPECIFICATIONS SHALL BE CONSTRUCTED AS PERMITTING WORK THAT IS NOTIN CONFORMANCE WITH APPLICABLE CODES OR REGULATIONS. CODES GOVERNINGTHIS WORK INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING:-THE 2016 CALIFORNIA BUILDING (CBC) IS BASED ON THE 2015 IBC, BUT INCLUDES NUMEROUS STATE OF CALIFORNIA AMENDMENTS.-THE 2016 CALIFORNIA ELECTRICAL CODE (CEC) IS BASED ON THE 2015 NECWITH STATE OF CALIFORNIA AMENDMENTS.-THE 2016 CALIFORNIA MECHANICAL CODE (CMC) IS BASED ON THE 2015 UMCWITH STATE OF CALIFORNIA AMENDMENTS.-THE 2016 CALIFORNIA PLUMBING CODE (CPC) IS BASED ON THE 2015 UPCWITH STATE OF CALIFORNIA AMENDMENTS.-THE 2016 CALIFORNIA ENERGY CODE.-THE 2016 UNIFORM FIRE CODE AND-2016 CALIFORNIA AMENDMENTS AMERICANS WITH DISABILITIES ACT(CALIFORNIA BUILDING CODE - CHAPTER 11)THESE PLANS AND ALL NEW WORK SHALL COMPLY WITH THE CALIFORNIA BUILDINGSTANDARDS CODE FOUND IN THE STATE OF CALIFORNIA - TITLE 24 CCR ASAMENDED AND ADOPTED BY THE CITY OF CARLSBAD.REQUIREMENTS OF CODES AND REGULATIONS SHALL BE CONSIDERED AS MINIMUM.WHERE CONTRACT DOCUMENTS EXCEED W/O VIOLATING CODE AND REGULATIONREQUIREMENTS, CONTRACT DOCUMENTS SHALL TAKE PRECEDENCE. WHERECODES CONFLICT, THE MORE STRINGENT SHALL APPLY.ALL REQUIRED PERMITS SHALL BE OBTAINED FROM THE BUILDING OFFICIALS ANDTHE LOCAL FIRE MARSHAL BEFORE THE BUILDING IS OCCUPIED. FIRE DEPT.APPROVAL SHALL BE REQUESTED PRIOR TO FRAMING INSPECTIONCONTRACTORS/SUBCONTRACTORS SHALL FIELD VERIFY ALL LOCATIONS,DIMENSIONS, AND CONDITIONS OF WALLS, DOORS, PLUMBING, MECHANICALELECTRICAL ITEMS, ETC. (WHETHER SHOWN OR NOT SHOWN ON THE DRAWINGS)PRIOR TO START OF CONSTRUCTION. CONTRACTOR TO ADVISE THE ARCHITECT OFANY ADVERSE CONDITIONS OR DISCREPANCIES.B. ALL EXIT DOORS SHALL BE OPENABLE FROM THE INSIDE WITHOUT USE OF A KEYOR ANY SPECIAL KNOWLEDGE OR EFFORT AND SHALL BE ACCESSIBLE BY THEHANDICAPPED. PROVIDE PANIC HARDWARE AT EXITS TO EXTERIOR AND ASREQUIRED BY CODE.APN:ZONE:OCCUPANCY:TYPE V-BCONSTRUCTION TYPE:NON-SPRINKLEREDFIRE SPRINKLER SYSTEM:HEIGHT:13'-0"B OCCUPANCY1 STORYSTORIES:EXISTING BUILDINGLOT 7 AND 8 IN BLOCK J OF TOWN OF CARLSBAD, INTHE CITY OF CARLSBAD, ACCORDING TO MAPTHEREOF NO. 535 FILED IN THE OFFICE OF THECOUNTY RECORDER OF SAN DIEGO COUNTY MAY 2,1888 AND MAP NO. 775 FILED IN THE OFFICE OF THECOUNTY RECORDER OF SAN DIEGO COUNTY.LEGAL DESCRIPTION:PROPOSED TENANT IMPROVEMENTGENERAL NOTEST1.0 TITLE SHEETSHEET INDEXA0.0 SITE PLANA1.0 FLOOR PLANA2.0 ROOF PLANV-R, VILLAGE REVIEW(THE PROJECT IS LOCATED IN THE VC, VILLAGECENTER DISTRICT OF THE VILLAGE AND BARRIOMASTER PLAN)203-294-01-003743 SFGROSS FLOOR AREA:2206 SF (TENANT SPACE NET AREA OF WORK)GROSS FLOOR AREA:OCCUPANCY:TYPE V-B (NO CHANGE)CONSTRUCTION TYPE:FIRE SPRINKLER SYSTEM:HEIGHT: 13'-0" (NO CHANGE)B OCCUPANCY1 STORY (NO CHANGE)STORIES:TENANT IMPROVEMENT OF B OCCUPANCY SPACE- NEW INTERIOR NON-BEARING PARTITION WALL FRAMING- NEW LIGHTING AND POWER- NEW DUCTWORK (DISTRIBUTION) FROM EXISTING HVAC UNIT- NEW CASEWORK- NEW INTERIOR FINISHESNON-SPRINKLERED (NO CHANGE)PURE PROJECT CARLSBADA3.0EXTERIOR ELEVATIONSPARKING ANALYSIS:SDP 2019-0002 / CUP 2018-0021 GRAND AVROOSEVELT STSTATE STCARLSBAD VILLAGE DRNOT TO SCALESITECARLSBAD VILLAGESTATIONCHRISTIANSENWYWASHINGTON STTRAFFIC & UTILITIES INFOTYPENA3.1EXISTING EXTERIOR ELEVATIONSWATER & SEWER DISTRICT SERVING THE PROJECT:CITY OF CARLSBAD WASTE WATER DIVISIONSCHOOL DISTRICT SERVING THE PROJECT:CARLSBAD UNIFIED SCHOOL DISTRICTPROPOSED WATER DEMANDS RESULTING FROM THE PROJECT:MAXIMUM WATER FLOW = 14 GPMPROPOSED SEWER GENERATION RESULTING FROM THE PROJECT:33 DFU = 1 EDUFLOOR AREA(IN SF)ADT GENERATIONRATEADT CALCULATIONAVERAGE DAILY TRAFFIC GENERATED BY THE PROJECT:GROSS2206----TASTING ROOM724160115.8RETAIL5434021.7MANUFACTURING19940.8STORAGE74021.5TOTAL ADT139.8PROPOSAL FOR A CONDITIONAL USE PERMIT / MINOR SITE DEVELOPMENT PLAN TOCONVERT 2206 SF OF A VACANT RETAIL SUITE TO A BREWERY WITH A TASTING ROOMOF 389 SF AND AN OUTDOOR PATIO OF 335 SF.PORTION OF EXISTING BUILDING TO BE DEMOLISHED FOR NEW OUTDOOR PATIO (SEESHEET A0.0 FOR LOCATION).USESQUAREFOOTAGEPARKING RATEPARKINGSPACESREQUIREDTASTING ROOMRETAIL/STORAGE724 SF1482 SF1 PER 150 SF1 PER 415 SF4.8 SPACES3.5 SPACESPARKING CALCULATION FOR PRIOR RETAIL USE:2206 SF / 415 SF = 5.3 SPACES FOR RETAIL USEPARKING CALCULATION FOR PROPOSED BREWERY USE10.26.182825 STATE STREETCARLSBAD CA 92008CUP SUBMTTLPURE PROJECT CARLSBADPROJ 18012CUP 2018-002101.23.19CUP RESBMTTLSDP 2019-000203.12.19CUP RESBMTTL4.8 + 3.5 = 8.3 SPACES8.3 SPACES - 5.3 SPACES = 3 SPACES3 SPACES x 0.5 = 1.5 SPACES; ROUND DOWN TO 1 TOTAL SPACE 74'-10"25'-3"50'-0''PROPERTY LINE100'-0"PROPERTY LINE9'-0"8'-0"24'-0"7'-3"9'-6"24'-0"6'-6"4'-11"(E) 6' HIGH CONCRETE CURB(E) 6" HIGH CONCRETE CURB20'-0" WIDE ALLEYSTATE STREETCHRISTIANSEN WAY(E) LANDSCAPEAREA(E) TRASHENCLSRE(E) GREASEINTERCEPTOR(E) TRNSFRMRPROPOSEDBICYCLE PARKING(E) SIDEWALK TO REMAIN(E) STORM DRAIN(E) CURB CUT/DRIVEWAYPLPLPLPLPLPLPLPLPLPLPLN.I.C.(E) SIDEWALK TO REMAIN(E) 6' HIGH CONCRETE CURBCLCLCLCLCLCL40'-4"29'-11"38'-4"(E) FIRE HYDRANT(E) ST. LIGHT(E) ST. LIGHT(E) LANDSCAPEEXISTINGADJACENTBUILDINGEXISTINGBUILDING(NOT PART OF SCOPE)(E) ACCESSIBLECURB RAMP(E) ACCESSIBLECURB RAMP(E) ACCESSIBLECURB RAMP(E) ACCESSIBLECURB RAMP(E) SIDEWALK TO REMAINSCOPE OFTENANTIMPROVEMENT(E) LANDSCAPE(E) LANDSCAPE(E) LANDSCAPE(E) LANDSCAPE(E) LANDSCAPE(E) LANDSCAPE(E) LANDSCAPE(E) LANDSCAPE(E) TRASH CAN(E) RAISEDPLANTER(E) RAISEDPLANTER(E) RAISEDPLANTER(E) RAISEDPLANTER(E) RAISEDPLANTER(E) RAISEDPLANTER(E) 8" WATER LINE PER DWG 238-2(E) 8" SEWER LINE PER DWG 120-2(E) ELECTRICALMETER(E) 5/8" WATERMETERAREA OFDEMO FOROUTDOOR PATIO(335 SF)(E) WHEEL STOPS(2206 SF)PROPOSEDLANDSCAPE AREATO SCREENTRANSFORMERPROPOSED IN-GROUNDTREE AT NEW PATIOA0.0SITE PLAN10.26.182825 STATE STREETCARLSBAD CA 92008CUP SUBMTTLPURE PROJECT CARLSBADPROJ 18012CUP 2018-002101.23.19CUP RESBMTTLSDP 2019-000203.12.19CUP RESBMTTL1SITE PLAN1/8" = 1'-0"04'8' 16' N352-(&7'$7$PROJECT ADDRESS:2825 STATE STREETCARLSBAD, CA 92008PROPERTY OWNER:LINDA CAROL MINORUSSELL SATTERLYSUSAN SATTERLY2825 STATE STREETCARLSBAD, CA 92008T: 760.717.37600.115 ACRES (5000 SF)SITE ACREAGE:9,&,1,7<0$3PURE PROJECTPROJECT NAME:CONDITIONAL USE PERMITAPPLICATION TYPE:APN:ZONE: C3 (COMMERCIAL)203-294-01-00LOT 7 AND 8 IN BLOCK J OFTOWN OF CARLSBAD, IN THECITY OF CARLSBAD,ACCORDING TO MAPTHEREOF NO. 535 FILED INTHE OFFICE OF THE COUNTYRECORDER OF SAN DIEGOCOUNTY MAY 2, 1888 ANDMAP NO. 775 FILED IN THEOFFICE OF THE COUNTYRECORDER OF SAN DIEGOCOUNTY.LEGAL DESCRIPTION:3743 SFEXISTING BUILDINGSQUARE FOOTAGE(NO CHANGE):3$5.,1*7$%/(GRAND AVROOSEVELT STSTATE STCARLSBAD VILLAGE DRNOT TO SCALECARLSBAD VILLAGESTATIONCHRISTIANSENWYWASHINGTON STNPARKING CALCULATION FOR PRIOR RETAIL USE:2206 SF / 415 SF = 5.3 SPACES FOR RETAIL USESDP 2019-002 / CUP 2018-0021USESQUAREFOOTAGEPARKING RATEPARKINGSPACESREQUIREDTASTING ROOMRETAIL/STORAGE724 SF1482 SF1 PER 150 SF1 PER 415 SF4.8 SPACES3.5 SPACESPARKING CALCULATION FOR PROPOSED BREWERY USE4.8 + 3.5 = 8.3 SPACES8.3 SPACES - 5.3 SPACES = 3 SPACES3 SPACES x 0.5 = 1.5 SPACES; ROUND DOWN TO 1 TOTAL SPACESITE AREA: 5000 SFBUILDING AREA: 3743 SF3743 / 5000 = 0.75(75% COVERAGE)BUILDING COVERAGE: WALK-INCOOLERBEER TAPSBARREL STORAGESTORAGESTORAGEAREABREWERYPRODUCTIONAREARETAILAREAOUTDOORPATIOTASTINGAREATASTINGAREATO GO RETAIL BEERREFRIGERATOREGRESSDOORMERCHANDISEDISPLAY TABLEMERCHANDISEDISPLAY TABLERETAILSERVICEAREANEIGHBORINGTENANT(NOT IN SCOPE)RESTROOMRESTROOMBARREL WITHAIR LOCKBARREL WITHAIR LOCKBARREL WITHAIR LOCKDELIVERYDOOR FORNEIGHBORINGTENANT(E) ROLL-UPDELIVERYDOORRAILINGPLPLPLPLPLPLPLPLRAILINGRAILING2A3.03A3.01A3.04A3.0A1.0FLOOR PLAN10.26.182825 STATE STREETCARLSBAD CA 92008CUP SUBMTTLPURE PROJECT CARLSBADPROJ 18012CUP 2018-002101.23.19CUP RESBMTTLSDP 2019-000203.12.19CUP RESBMTTL1FLOOR PLAN1/4" = 1'-0"02' 4'8'N352-(&7'$7$PROJECT ADDRESS:2825 STATE STREETCARLSBAD, CA 92008OCCUPANCY:TYPE V-BCONSTRUCTION TYPE:B OCCUPANCYSDP 2019-002 / CUP 2018-0021'225 :,1'2:127(6ALL NEW WINDOWS AND DOORS SHALL HAVETRANSPARENT OR TRANSLUCENT GLAZING (E) AWNING / OVERHANG TO REMAIN(E) 30" HIGH PARAPET(E) 30" HIGH PARAPET(E) SLOPE2" / 12"SLOPE14" / 1'-0"ROOF CRICKET14" / 1'-0"(E) 30" HIGH PARAPET(E) 30" HIGH PARAPET(E) 30" HIGH PARAPET(E) 30" HIGH PARAPET(E) 30" HIGH PARAPET(E) 30" HIGH PARAPET(E) PARAPET(E) PARAPET(E) PARAPET(E) PARAPET(E) SLOPE2" / 12"(E) SLOPE2" / 12"(E) SLOPE2" / 12"(E) SLOPE2" / 12"14" / 1'-0"14" / 1'-0"14" / 1'-0"(E) 30" HIGH PARAPET14" / 1'-0"14" / 1'-0"EXISTING ROOFING TO REMAINEXISTING ROOFING TO REMAINEXISTING ROOFING TO REMAINEXISTING ROOFING TO REMAINEXISTING ROOFING TO REMAIN(E) ROOF TOPEQUIPMENT(E) ROOF TOPEQUIPMENT(E) ROOF TOPEQUIPMENTAREA OF DEMO FOROUTDOOR PATIO(335 SF)A2.0ROOF PLAN10.26.182825 STATE STREETCARLSBAD CA 92008CUP SUBMTTLPURE PROJECT CARLSBADPROJ 18012CUP 2018-002101.23.19CUP RESBMTTLSDP 2019-000203.12.19CUP RESBMTTL1ROOF PLAN1/4" = 1'-0"02' 4'8'N352-(&7'$7$PROJECT ADDRESS:2825 STATE STREETCARLSBAD, CA 92008OCCUPANCY:TYPE V-BCONSTRUCTION TYPE:B OCCUPANCYSDP 2019-002 / CUP 2018-0021'225 :,1'2:127(6ALL NEW WINDOWS AND DOORS SHALL HAVETRANSPARENT OR TRANSLUCENT GLAZING 0'-0"GRADE LEVEL AT SIDEWALK12'-0"T.O. PARAPETAREA OF SCOPENEIGHBORING TENANTNEW STL & WOOD RAILING ATPROPOSED OUTDOOR PATIONEW GLASS & ALUMINUMROLL-UP DOOR TO REPLACEEXISTING SOLID ROLL-UP DOORNEW GLASS & ALUMINUMROLL-UP DOORS TOPROPOSED OUTDOOR PATIO0'-0"GRADE LEVEL AT SIDEWALK12'-0"T.O. PARAPETNEW STL & WOOD RAILING ATPROPOSED OUTDOOR PATIOPROPOSED GLASS &ALUMINUM ROLL-UP WINDOWNEW GLASS & ALUMINUMROLL-UP DOOR TO PROPOSEDOUTDOOR PATIOAREA OF SCOPENEIGHBORING TENANT0'-0"GRADE LEVEL AT SIDEWALK12'-0"T.O. PARAPET0'-0"GRADE LEVEL AT SIDEWALK13'-0"T.O. PARAPETA3.0EXTERIORELEVATIONS10.26.182825 STATE STREETCARLSBAD CA 92008CUP SUBMTTLPURE PROJECT CARLSBADPROJ 18012CUP 2018-002101.23.19CUP RESBMTTLSDP 2019-000203.12.19CUP RESBMTTL02' 4' 8'2WEST EXTERIOR ELEVATION 1/4" = 1'-0"1NORTH EXTERIOR ELEVATION1/4" = 1'-0"3SOUTH EXTERIOR ELEVATION (NO CHANGE PROPOSED)1/4" = 1'-0"4EAST EXTERIOR ELEVATION (NO CHANGE PROPOSED)1/4" = 1'-0"352-(&7'$7$PROJECT ADDRESS:2825 STATE STREETCARLSBAD, CA 92008OCCUPANCY:TYPE V-BCONSTRUCTION TYPE:B OCCUPANCYSDP 2019-002 / CUP 2018-0021'225 :,1'2:127(6ALL NEW WINDOWS AND DOORS SHALL HAVETRANSPARENT OR TRANSLUCENT GLAZING AREA OF SCOPENEIGHBORING TENANT0'-0"GRADE LEVEL AT SIDEWALK12'-0"T.O. PARAPET0'-0"GRADE LEVEL AT SIDEWALK12'-0"T.O. PARAPETA3.1EXISTINGEXTERIORELEVATIONS10.26.182825 STATE STREETCARLSBAD CA 92008CUP SUBMTTLPURE PROJECT CARLSBADPROJ 18012CUP 2018-002101.23.19CUP RESBMTTLSDP 2019-000203.12.19CUP RESBMTTL02' 4'8'2WEST EXTERIOR ELEVATION 1/4" = 1'-0"1NORTH EXTERIOR ELEVATION1/4" = 1'-0"352-(&7'$7$PROJECT ADDRESS:2825 STATE STREETCARLSBAD, CA 92008OCCUPANCY:TYPE V-BCONSTRUCTION TYPE:B OCCUPANCYSDP 2019-002 / CUP 2018-0021'225 :,1'2:127(6ALL NEW WINDOWS AND DOORS SHALL HAVETRANSPARENT OR TRANSLUCENT GLAZING