Loading...
HomeMy WebLinkAbout2019-10-02; Planning Commission; ; CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSONItem No. Application complete date: July 3, 2019 P.C. AGENDA OF: October 2, 2019 Project Planner: Jason Goff Project Engineer: Tecla Levy SUBJECT: CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON - Request for a recommendation of approval of a Tentative Tract Map and Site Development Plan to construct a four-story mixed-use building with seven air-space condominiums consisting of six residential units and one commercial unit on a 0.21-acre site located at 786 Grand Avenue in the Village Center (VC) District of the Village and Barrio Master Plan and within Local Facilities Management Zone 1. The City Planner has determined that this project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment, and is therefore categorically exempt from the requirement for the preparation of environmental documents pursuant to section 15332 (In-fill Development Projects) of the State CEQA guidelines. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 7347 RECOMMENDING APPROVAL of Tentative Tract Map CT 2018-0008 and Site Development Plan SDP 2018-0010 to the City Council based on the findings and subject to the conditions contained therein. II. PROJECT DESCRIPTION AND BACKGROUND Project Setting: The 0.21-acre site is comprised of four (4) legal lots (Lots 13-16 of Map No. 535 recorded in 1888) located on the northwest corner of Grand Avenue and Jefferson Street. The site consists of a relatively level, rectangular shaped property, and is developed with a vacant one-story building constructed between 1947 and 1948. The existing structure served as a single-family residence for 62 years before operating as a small day care home from 2010 to 2018. The project is located outside of the Coastal Zone and is within the Village Center (VC) District of the Village and Barrio Master Plan (VBMP). Table A below includes the General Plan designations, zoning and current land uses of the project site and surrounding properties. TABLE A – SITE AND SURROUNDING LAND USES Location General Plan Designation Zoning Current Land Use Site Village/Barrio (V-B) Village/Barrio (V-B) – Village Center (VC) per the VBMP Vacant one-story small daycare home North V-B V-B (VC) One-story single-family home 2 CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 2 TABLE A – SITE AND SURROUNDING LAND USES (CONTINUED) Location General Plan Designation Zoning Current Land Use South V-B V-B (VC) Two-and-three-story offices East V-B V-B (VC) One-story medical office and three-story multiple- family residential West V-B V-B (VC) One-story medical office and restaurant (Grand Avenue Bar and Grill) Project Description: The project applicant, RREG Investment, LLC Series 1033, is requesting approval of a Tentative Tract Map (CT) and Site Development Plan (SDP) to demolish the existing structure, and construct a 16,272-square- foot four-story mixed-use building consisting of six (6) residential units, one (1) ground floor commercial unit (1,823 square feet), an outdoor covered patio (344 square feet), and a roof deck (1,934 square feet). A detailed breakdown of each unit is summarized in Table B below. TABLE B – DETAILS FOR UNIT TYPE Unit# Floor Assignment Size (Gross SF) Bedroom/ Bathrooms Storage Open Space Patio Roof Deck Commercial 1st 1,823 SF -- -- 344 SF -- 1 2nd 2,147 SF 3/3 37 SF 174 SF -- 2 2nd 2,112 SF 3/2.5 37 SF 149 SF -- 3 2nd/3rd 2,395 SF 2/2 -- 238 SF -- 4 3rd 2,147 SF 3/3 37 SF 164 SF -- 5 3rd 2,112 SF 3/2.5 37 SF 149 SF -- 6 4th 3,414 SF 4/3.5 78 SF 1,614 SF 1,934 SF The project also includes construction of an enclosed at-grade parking garage with 12 vehicle parking spaces and six (6) bicycle parking spaces provided within. Access to the garage is provided from Jefferson Street. The proposed density is 28.6 dwelling units per acre (du/ac) and generates a net increase of 36 average daily trips (ADT) over the previous day care use for a total of 121 ADTs. Grading for the proposed project includes 150 cubic yards (CY) of cut, 15 CY of fill, and 135 CY of export. In addition to the 1,823 square feet of commercial space fronting Grand Avenue, the ground floor also includes a covered patio (344 square feet) to serve a future commercial tenant and a separate lobby area (124 square feet) with stairs and elevator access to the residential units above. The proposed roof deck is a private amenity for Unit 6. Access to the roof deck is being provided through an operable skylight with stairs leading onto the roof. As such, the project does not propose any stair or elevator tower elements that would project above the allowable building height. Frontage improvements along both Grand Avenue and Jefferson Street include new curb, gutter, sidewalks, bike racks, street trees and landscaping. The proposed architectural design is characterized as contemporary. The ground floor elevations of the proposed building fronting on Grand Avenue and Jefferson Street incorporate a natural limestone tile and a faux wood veneer by Eldorado Stone in a color described as “sandalwood.” This faux wood material is also incorporated into a portion of the fourth-floor elevation facing Grand Avenue. The rest of the building materials consist of horizontal siding, smooth stucco, and decorative burnished block. All residential CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 3 windows are recessed two-to-three-inches in depth and consist of clear residential glass set within black vinyl trim. The ground floor street-facing elevation at the commercial tenant space and lobby area will include a large glass storefront system with matte black window mullions and frames. Metal canopies and overhanging parapet caps accent portions of the building elevations and tower features. Third level balconies facing Grand Avenue include glass railings, while large four-foot-wide landscape planters adorn the three levels located above the parking garage entrance facing Jefferson Street. A CT is required to merge the four (4) existing legal lots into one (1) common lot with seven airspace condominium units consisting of six (6) residential units and one (1) commercial unit. The SDP is required per Section 6.3.3.B.1(a) of the VBMP for new construction of buildings over 5,000 square feet (cumulative gross floor area) in size or new buildings or projects with more than four (4) dwelling units. Both permits require a Planning Commission recommendation and City Council approval. III. ANALYSIS The proposed project is subject to the following ordinances, standards, and policies: A. Village-Barrio (V-B) General Plan Land Use Designation; B. Village-Barrio (V-B) Zone (CMC Chapter 21.35), Village Center (VC) District of the Village and Barrio Master Plan; C. Subdivision Ordinance (CMC Title 20); D. Inclusionary Housing Ordinance (CMC Chapter 21.85); and E. Growth Management Ordinance (CMC Chapter 21.90), Local Facilities Management Plan Zone 1. The recommendation for approval of this project was developed by analyzing the project’s consistency with the applicable regulations and policies. The project’s compliance with each of the above regulations and policies is discussed in the sections below. A. Village-Barrio (V-B) General Plan Land Use Designation The subject property has a General Plan Land Use designation of Village-Barrio (V-B) and is within the Village Center (VC) District of the Village and Barrio Master Plan (VBMP). Properties within the VC District do not have an assigned residential density as it relates to Growth Management Plan compliance. Therefore, the minimum and maximum densities for residential development are established in the VBMP. Table C below identifies the permissible density range for properties within the VC District, as well as the allowable density range based on the size of the project site and the proposed density and units. TABLE C – PROPOSED DENSITY Gross Acres Net Acres Allowable Density Range; Min/Max Dwelling Units per Village and Barrio Master Plan* Project Density; Proposed Dwelling Units 0.21 0.21 28-35 dwelling units per acre (du/ac) Minimum: 3 dwelling units Maximum: 7 dwelling units 28.6 du/ac 6 dwelling units * For mixed-use projects, the minimum density shall be calculated based on fifty percent of the developable area and the maximum density shall be calculated based on the entire developable area (VBMP, Chapter 2.4). CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 4 As identified above, the project’s density of 28.6 du/ac falls below the maximum density of 35 dwelling units per acre and, therefore, complies with the allowed density for the VC District. Pursuant to the Housing Element of the General Plan, because a Growth Management Control Point has not been established for residential development in the VC District, all residential units approved in the Village must be withdrawn from the city’s Excess Dwelling Unit Bank (EDUB). The EDUB is implemented through City Council Policy No. 43. Pursuant to City Council Policy No. 43, an applicant for an allocation of dwelling units shall agree to provide the number of inclusionary units or fee as required pursuant to CMC Section 21.85.110. The project is conditioned to pay an affordable housing in-lieu fee on a per unit basis prior to building permit issuance for five units, or six units if building permits for the six-unit project have not been applied for within two years of demolishing the existing single-family home on-site. In order to approve an allocation of excess dwelling units, the project shall meet the findings identified in City Council Policy No. 43. Specifically, the project location and density shall be found to be compatible with adjacent land uses and the project is consistent with the General Plan and any other applicable planning document. As the proposed project requires action by the City Council, the City Council is the final decision-making authority for the allocation from the EDUB. Lastly, the project is subject to compliance with the Elements of the General Plan as outlined in Table D below: TABLE D – GENERAL PLAN COMPLIANCE Element Use, Classification, Goal, Objective, or Program Proposed Uses & Improvements Comply Land Use Goal 2-G.29: Maintain and enhance the Village as a center for residents and visitors with commercial, residential, dining, civic, cultural, and entertainment activities. The proposal to construct a mixed-use project with six (6) residential condominiums and ground floor retail would enhance the vitality of the Village by providing new residential and commercial land uses near the downtown core area. The project reinforces the pedestrian orientation desired for the downtown area by providing residents an opportunity to walk to shopping, restaurants, recreation, and mass transit functions. The project’s proximity to existing bus routes and mass transit help further the goal of providing new economic development near transportation corridors. Overall, the mixed-use project would contribute toward the revitalization of the Village area. Yes Goal 2-G.30: Develop a distinct identity for the Village by encouraging a variety of uses and activities, such as a mix of residential, commercial office, restaurants and specialty retail shops, which traditionally locate in a pedestrian–oriented downtown area and attract visitors and residents from across the community by creating a lively, interesting social environment. CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 5 TABLE D – GENERAL PLAN COMPLIANCE (CONTINUED) Element Use, Classification, Goal, Objective, or Program Proposed Uses & Improvements Comply Land Use Policy 2-P.70: Seek an increased presence of both residents and activity in the Village with new development, particularly residential, including residential as part of a mixed-use development, as well as commercial, entertainment and cultural uses that serve both residents and visitors. See response above. Yes Mobility Goal 3-G.3: Provide inviting streetscapes that encourage walking and promote livable streets. The proposed project is located approximately one-quarter mile from the Carlsbad Village train station, which provides rail and bus service throughout the day. The project’s proximity to the transit station would provide residents with the opportunity to commute to major job centers, thereby reducing vehicle miles traveled (VMTs) and the carbon footprint. Furthermore, the project supports walkability and mobility by locating the project near existing goods and services within the Village. Yes Policy 3-P.5: Require developers to construct or pay their fair share toward improvements for all travel modes consistent with the Mobility Element, the Growth Management Plan, and specific impacts associated with their development. The proposed project has been designed to meet circulation requirements, which include maintaining or enhancing frontage improvements consisting of sidewalks and landscaping. In addition, the applicant is required to pay traffic impact fees prior to the issuance of building permits that would go toward future road improvements. Yes CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 6 TABLE D – GENERAL PLAN COMPLIANCE (CONTINUED) Element Use, Classification, Goal, Objective, or Program Proposed Uses & Improvements Comply Mobility Policy 3-P.41: Consider supporting new development and existing businesses with various incentives (such as parking standards modifications) for implementing TDM programs that minimize the reliance on single occupant automotive travel during peak commute hours. The proposed project has been designed to reduce its reliance on single occupant automotive travel by substituting one commercial/retail parking space for six bicycle parking spaces located inside the parking garage in accordance with the Area-Wide Standards of the Village and Barrio Master Plan. These bicycle parking spaces consist of two vertical hanging racks that will accommodate up to three bicycles each. The project is also providing additional bicycle parking along both the Grand Avenue and Jefferson Street frontages. Yes Noise Goal 5-G.2: Ensure that new development is compatible with the noise environment, by continuing to use potential noise exposure as a criterion in land use planning. Policy 5.P.2: Require a noise study analysis be conducted for all discretionary development proposals located where projected noise exposure would be other than “normally acceptable.” The proposed project is consistent with the Noise Element of the General Plan in that the building’s design, with windows closed, complies with the requirements of the noise study (Birdseye Planning Group, LLC, dated September 2018) and adequately attenuates the interior noise levels for the new condominiums to 45 dB(a) CNEL or less (i.e., interior average noise level). The project is conditioned to provide mechanical ventilation. Yes Housing Policy 10-P.15: Pursuant to the Inclusionary Housing Ordinance, require affordability for lower income households of a minimum of 15 percent of all residential ownership and qualifying rental projects. The inclusionary housing requirement may be satisfied through the payment of an in-lieu fee for projects that have less than seven units. The six-unit residential air-space condominium project is consistent with the Housing Element of the General Plan and the Inclusionary Housing Ordinance as the project has been conditioned to pay an affordable housing in-lieu fee on a per unit basis prior to building permit issuance for five units, or six units if building permits for the six-unit project have not been applied for within two years of demolishing the existing single-family home on-site. Yes CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 7 TABLE D – GENERAL PLAN COMPLIANCE (CONTINUED) Element Use, Classification, Goal, Objective, or Program Proposed Uses & Improvements Comply Public Safety Goal 6-G.1: Minimize injury, loss of life, and damage to property resulting from fire, flood, hazardous material release, or seismic disasters. Policy 6-P.6: Enforce the requirements of Titles 18, 20, and 21 pertaining to drainage and flood control when reviewing applications for building permits and subdivisions. Policy 6-P.34: Enforce the Uniform Building and Fire codes, adopted by the city, to provide fire protection standards for all existing and proposed structures. Policy 6-P.39: Ensure all new development complies with all applicable regulations regarding the provision of public utilities and facilities. The proposed structural improvements would be required to meet all seismic design standards. The Fire Department has reviewed and approved the proposed conceptual building design with fire sprinklers included throughout the building along with a wet standpipe per the National Fire Protection Association (NFPA) 24 standards. Therefore, the proposed project is consistent with the applicable fire safety requirements. The project would be required to develop and implement a program of “best management practices” for the elimination and reduction of pollutants which enter and/or are transported within storm drainage facilities. The project has been conditioned to pay all applicable public facilities fees for Zone 1. Yes B. Village-Barrio Zone (CMC Chapter 21.35) and Village Center District The subject property is located within the Village Center (VC) District of the Village and Barrio Master Plan (VBMP). Mixed-use is permitted by right in the VC District. The project’s compliance with the development standards specific to the VC District, as well as the Area-Wide Standards of the VBMP, are provided in Tables E and F below. Please see Attachment 4 for an analysis of the project’s compliance with the Design Guidelines of the VBMP. CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 8 TABLE E – VILLAGE AND BARRIO MASTER PLAN - VILLAGE CENTER (VC) DISTRICT Standard Required/Allowed Proposed Comply Front/ Corner Setback Minimum of 0 feet; maximum of 5 feet to building (at the ground floor). Additional depth permitted where area includes a plaza, courtyard, or outdoor dining. Additional depth is also permitted to accommodate electrical transformers, utility connection, meter pedestals, and similar equipment only if other locations are infeasible as determined by the decision-maker. Grand Avenue: 1st floor: ϭ഻-Ϭ഼Ύ *A 7഻-ϯ഼ƐĞƚďĂĐŬĂƚƚŚĞĐŽŵŵĞƌĐŝĂů tenant space entry vestibule is necessary to accommodate two water quality treatment planters that have been sized down to their minimum volume capacities. 2nd floor: ϭ഻-Ϭ഼ƚŽϭϱ഻-Ϭ഼ 3rd floor͗ϭ഻-Ϭ഼ƚŽϭϱ഻-Ϭ഼ 4th ĨůŽŽƌ͗ϮϬ഻-ϰ഼ƚŽϮϵ഻-Ϯ഼ Yes Jefferson Street: 1st &ůŽŽƌ͗ϭ഻-Ϭ഼Ύ ΎϭϬ഻-Ϭ഼setback for a courtyard w/ utilities (gas meters) at the residential lobby. *A 10’-1” utility setback for the Fire Department Connection (FDC) and electrical transformer. 2nd floor: ϭ഻-Ϭ഼ƚŽϭϭ഻-Ϯ഼ 3rd floor: ϭ഻-Ϭ഼ƚŽϭϭ഻-Ϯ഼ 4th floor: ϭ഻-Ϭ഼ƚŽϭϭ഻-Ϯ഼ Side Setback No minimum setback North side: 8” to 4഻-ϴ഼ West side: ϭ഻-ϰ഼ ƚŽϭϰ഻-Ϭ഼ Yes Rear Setback No minimum setback No rear yard. This is a corner lot with two sides. Yes Lot Coverage Not applicable 87.9 percent Yes CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 9 TABLE E – VILLAGE AND BARRIO MASTER PLAN - VILLAGE CENTER (VC) DISTRICT (CONTINUED) Standard Required/Allowed Proposed Comply Density 28 to 35 du/ac 28.6 du/ac Yes Open Space Minimum of 60 square feet of private open space per unit; minimum dimension of 6 feet in any direction. Common open space not required for projects with less than 11 units. All open space is proposed as private patios and a roof deck. The smallest patio proposed is 149 ƐƋƵĂƌĞĨĞĞƚǁŝƚŚĂĚŝŵĞŶƐŝŽŶŽĨϭϮ഻- Ϭ഼ďLJϭϮ഻-ϵ഼͘ĂĐŚƉĂƚŝŽͬƌŽŽĨĚĞĐŬ area exceeds the minimum area and dimension requirements. Yes Service/ Delivery Areas Service and loading shall be conducted using alley access where the condition exists. No alley access exists. Yes Building Height Maximum 45 feet, 4 stories 45 feet, 4 stories Yes If a 4-story building is proposed: A maximum of 30 percent of the 4th story, street-facing façade can have a zero-foot setback. The remaining 70 percent shall be set back a minimum of 10 feet. Grand Avenue 4th floor: All ϳϴ഻-Ϯ഼of the building’s lineal street frontage is set back greater than 10 feet. Jefferson Avenue 4th Floor: 30% of the building’s lineal street frontage ;ϳϴ഻-ϴ഼Ϳ equals 21 feet. Therefore, no more than 21 feet can have a zero-foot setback. 21 feet of this street frontage is set back ďĞƚǁĞĞŶϭ഻-Ϭ഼ĂŶĚϰ഻-Ϭ഼͘ The remaining 70% of this street frontage is set back 10 feet or greater. If a 4-story building is proposed: The total square footage of enclosed 4th story floor space shall not exceed 80 percent of the 3rd floor footprint of the building (exclusive of balcony/patio) 3rd floor area: 7,478 SF Excluding patios: 7,165 SF 4th floor area: 4,048 SF The enclosed 4th story floor space represents 56 percent of the 3rd floor footprint. CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 10 TABLE E – VILLAGE AND BARRIO MASTER PLAN - VILLAGE CENTER (VC) DISTRICT (CONTINUED) Standard Required/Allowed Proposed Comply Building Massing No building façade visible from any public street shall extend more than 40 feet in length without a 5-foot minimum variation in the wall plane, as well as a change in roofline. All building elevations visible from Grand Avenue and Jefferson Street have been articulated to incorporate the minimum 5-foot variation in wall plane as required. The building roofline is also varied appropriately. Yes Ground Floor Street Frontage Uses New ground floor street frontage uses shall occupy more than one- half of the habitable space developed on the ground floor and shall span at least 80 percent of the building frontage. Up to 20 percent of a building frontage may be used for a lobby or entryway to uses above or behind ground floor street uses. The ground floor commercial unit oriented towards Grand Avenue occupies more than one-half of the habitable space and incudes a covered outdoor plaza on the corner at its intersection with Jefferson Street. The ground floor commercial unit, including the covered outdoor plaza, spans 100 percent of the building frontage. Along Jefferson Street the residential lobby area with stairwell and elevator is less than 20 percent of building frontage; however, the 80 percent ground floor commercial street frontage cannot be achieved without eliminating parking and vehicular access. Eliminating parking will reduce the number of residential units and the minimum density of 28 dwelling units per acre will not be achieved. Therefore, a standards modification is required to achieve the required minimum density for the project. The necessary findings to support the standards modification are provided below. Yes CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 11 TABLE F – VILLAGE AND BARRIO MASTER PLAN - AREA-WIDE STANDARDS Standard Required/Allowed Proposed Comply Ingress/ Egress Development shall be permitted a maximum of one access point from the public street. A driveway curb cut shall not exceed 20 feet in width and shall maintain a free line of sight. One access point is proposed off Jefferson Street. The width of the proposed driveway curb cut, exclusive of the approach, is 20 feet and provides a free line of site. Yes Parking Multiple-family Dwellings w/ two or more bedrooms: One and a half spaces per unit, one space required to be covered. No visitor parking required. No compact spaces allowed. 2-Bedroom Units: 1 unit x 1.5 = 1.5 spaces 3-bedroom Units: 4 units x 1.5 = 6 spaces 4-Bedroom Units: 1 unit x 1.5 = 1.5 spaces No. of Spaces Required: 9 spaces No. of Spaces Provided: 9 spaces All spaces are covered. Yes Commercial Retail: One space per 415 square feet of gross floor area 1,823 square feet ÷ 415 = 4 spaces No. of Spaces Required: 4 spaces No. of Spaces Provided: 3 spaces (see section below) Substitution of Car Parking with Bicycle Parking: New and existing uses with at least five required or existing off-street parking spaces may convert or substitute a minimum of one vehicle space and up to one space for every 10 vehicle spaces to unrequired additional bicycle parking as long as the spaces are conveniently located near the entrance, yield at least six bicycle parking spaces per parking space, and comply with the requirements of the city engineer. 1 commercial/retail parking space has been substituted inside the parking garage for 6 bicycle parking spaces. The proposed bicycle parking consists of two vertical hanging racks that will accommodate up to three bicycles each. In addition, the project is also providing bicycle parking along both the Grand Avenue and Jefferson Street frontages. CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 12 TABLE F – VILLAGE AND BARRIO MASTER PLAN - AREA-WIDE STANDARDS (CONTINUED) Standard Required/Allowed Proposed Comply Building Orientation Buildings shall be oriented toward primary street frontage. The primary entrance of a ground floor commercial use shall be oriented towards the primary street frontage. Of the two frontages, Grand Avenue exhibits more of an urban environment and was chosen as the primary frontage. The ground floor commercial storefront and entrance have been oriented towards this frontage. The upper floors of the building, which include the residential units, have also been oriented such that their primary living spaces and patios are oriented towards this frontage to help activate the street frontage below. Jefferson Street, which consists of more transitional type uses (i.e., professional offices, apartments, and single-family homes), has a less urban feel to it. As such, access to the parking garage and residential lobby have been oriented along this frontage. Yes Window Glazing 45 percent minimum glazing of ground-floor façade for retail uses adjacent to a public street. Façade measured from plate height to finish floor. Area of Glazing = 460 square feet Percentage Required = 45 percent Percentage Provided = 50 percent Yes The bottom of any window or product display window shall not be more than 3.5 feet above the adjacent sidewalk. Storefront glazing extends to the ground. Transparent or translucent glazing is required on the ground-floor façade of a commercial or retail use facing a public street. Opaque, reflective, or dark tinted glass is not permitted. Storefront glazing of clear glass. CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 13 TABLE F – VILLAGE AND BARRIO MASTER PLAN - AREA-WIDE STANDARDS (CONTINUED) Standard Required/Allowed Proposed Comply Roof Protrusions All roof structures, including protrusions such as equipment housing and guardrails; parapets and equipment screening; architectural features such as decorative or accent elements and towers; flagpoles; and roof decks and their amenities, shall complement and be consistent with the design of the building. Architecturally integrated parapets ĞdžƚĞŶĚŝŶŐƵƉƚŽϰϵ഻-ϲ഼ĂƌĞŝŶĐůƵĚĞĚ͘ No portion of architectural parapets that extend above the maximum building height provide additional floor space. Yes Roof mounted mechanical equipment and freestanding screening that is not architecturally integrated shall be set back from the building face at least equivalent to the height of the screening. Mechanical equipment is provided on the roof of the third and fourth floors consisting of A/C condensing units and solar panels. Mechanical equipment screening is provided in the form of building parapets, which are architecturally integrated. No additional setback is required. CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 14 TABLE F – VILLAGE AND BARRIO MASTER PLAN - AREA-WIDE STANDARDS (CONTINUED) Standard Required/Allowed Proposed Comply Roof Protrusions Architectural features: Up to 10 feet above maximum building height. Architectural features that are within 10 feet of a building face shall be cumulatively limited in width to 30 percent of that building face. Architectural features, protruding above the maximum 45-foot building height and located within 10 feet of the building face, consist of the following: Two architectural tower features located along Jefferson Street ĞdžƚĞŶĚŝŶŐƵƉƚŽϰϵ഻-ϲ഼ŝŶŚĞŝŐŚƚ; one tower feature with butterfly roof ĞdžƚĞŶĚŝŶŐƚŽϰϳ഻-ϱЩ2഼ŝŶŚĞŝŐŚƚŽŶ the north elevation; and a parapet ĞdžƚĞŶĚŝŶŐƚŽϰϵ഻-ϲ഼ŝŶŚĞŝŐŚƚŽŶƚŚĞ west side. No portion of the building located along Grand Avenue includes an architectural feature that is subject to this standard. 4th Floor architectural feature (cumulative length): North side = ϭϭ഻-Ϭ഼ East side = Ϯϭ഻-Ϭ഼ West side = ϴ഻-ϵ഼ Building Width/30% Building Face: North side = ϴϳ഻-ϲ഼ͬϮϲ഻-ϰ഼ ĂƐƚƐŝĚĞсϵϴ഻ͬϮϵ഻ West side = ϵϴ഻ͬϮϵ഻ The cumulative length of each architectural feature identified above measures less than 30 percent of the width of each respective building face. All other parapets that are less- than-or-equal-to 42 inches in height have been set back a minimum 5 feet from the building face. Yes Standards Modification: Pursuant to Section 2.6.7 of the VMP, a modification to a development standard may be permitted by the decision-making authority in all districts. A standards modification is permitted to construct residential development at densities at the minimum set forth for the applicable land use district, which in this case CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 15 is 28 dwelling units per acre according to the Village Center (VC) District. To grant a standards modification, the decision-making authority shall make the following findings: That the applicant has provided acceptable evidence to demonstrate the need for the standards modification and there is no other way to reasonably achieve one or more of the purposes outlined in Section 2.6.7.B without the modification. The addition of retail frontage along 80 percent of the Jefferson Street frontage, absent an alley to access required parking behind the building, is not feasible because the lot cannot accommodate the required parking to achieve the minimum density for the site. That the standards modification is consistent with the goals and objectives of the Master Plan and the vision and intent of the applicable district. A primary goal of the Village and Barrio Master Plan (VBMP) is to maintain and enhance the Village as a community focal point with high quality shopping, dining, entertainment, working and living environments. The proposed standards modification achieves this goal by allowing the minimum density specified in the VBMP while still providing sufficient ground floor retail to achieve the desired high quality commercial and living environment. Furthermore, the standards modification allows for the project to provide a continuous and interesting commercial street frontage along Grand Avenue consistent with the VBMP placemaking goal of creating great streets and the placemaking policy of implementing the Grand Avenue Promenade with continuous commercial street frontage along Grand Avenue, which necessitates vehicular and residential access off Jefferson Street absent an alley. Site Development Plan: Pursuant to Section 6.3.3.B.1(a) of the VBMP, new construction of buildings over 5,000 square feet (cumulative gross floor area) in size or new buildings or projects with more than four (4) dwelling units are subject to the approval of a SDP pursuant to CMC Chapter 21.06. A SDP is included as part of the discretionary permits, and the required findings and justification for approving the SDP can be made as summarized below: That the proposed development or use is consistent with the General Plan and any applicable master plan or specific plan, complies with all applicable provisions of Chapter 21.06 of the Carlsbad Municipal Code, and all other applicable provisions of this code. The proposed one-lot tentative tract map with seven air-space condominium units consisting of six (6) residential units and one (1) commercial unit satisfies all minimum requirements of Titles 20 and 21 with respect to uses, public facilities, access, parking and setbacks; and is consistent with the General Plan as described above. Pursuant to provisions of the Village and Barrio Master Plan (VBMP), a standards modification is required to meet the minimum density for the proposed mixed-use project as it relates to ground floor street frontage uses along Jefferson Street. The findings for approval to support this modification can be made. That the requested development or use is properly related to the site, surroundings and environmental settings, will not be detrimental to existing development or uses or to development or uses specifically permitted in the area in which the proposed development or use is to be located, and will not adversely impact the site, surroundings or traffic circulation. CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 16 The project consists of the demolition of an existing one-story structure (single-family residence converted into a daycare) and the construction of a four-story mixed-use building with seven air-space condominiums consisting of six residential units and one commercial unit on a 0.21-acre infill site located at 786 Grand Avenue, within the Village Center (VC) District of the Village and Barrio Master Plan (VBMP). The subject property is bordered to the north by one-story single-family residential and multi-story professional offices, to the south by multi-story professional offices, to the west by a medical office and restaurant, and to the east by medical office and three-story multiple-family residential. The adjacent properties are also located within the VC District of the VBMP. Mixed-use is permitted by right in the VC District. Given the variety of existing uses within the vicinity of the project site, which include multi-story residential and office developments, as well as the wide variety of uses permitted in the surrounding VC District, the proposed seven air-space condominium units, consisting of six (6) residential units and one (1) commercial unit, are compatible with existing and future land uses. The proposed mixed-use project will not adversely impact the site, surroundings, or traffic circulation in that the existing surrounding streets have adequate capacity to accommodate the 121 Average Daily Trips (ADT) generated by the project, which is a net increase of only 36 ADT above the previous daycare use. With exception of a standards modification related to ground floor street frontage uses along Jefferson Street, the project complies with all minimum development standards of the VC District and the VBMP, and the project is adequately parked on-site and does not result in any significant environmental impacts. That the site for the intended development or use is adequate in size and shape to accommodate the use. The VC District allows residential development at a density range of 28 to 35 dwelling units per acre. Based on an acreage of 0.21 acres, the proposed six-unit residential condominium project has a density of 28.6 dwelling units per acre. As the proposed project falls within the allowable density range and meets all required development standards with the proposed standards modification, the project site can accommodate the proposed density. That all yards, setbacks, walls, fences, landscaping, and other features necessary to adjust the requested development or use to existing or permitted future development or use in the neighborhood will be provided and maintained. The mixed-use project complies with all development standards (i.e. setbacks, lot coverage, parking, and height restrictions) of the VC District and the VBMP with the proposed standards modification. The landscaping proposed along Grand Avenue and Jefferson Street will be provided consistent with the requirements of the city’s Landscape Manual. That the street systems serving the proposed development or use is adequate to properly handle all traffic generated by the proposed use. The mixed-use project will take access from Jefferson Street, which is identified as a Village Street. Jefferson Street is designed to adequately handle the 121 Average Daily Trips (ADT) generated by the project, which is a net increase of 36 ADT above the existing day-care use. Jefferson Street is improved with pavement, curb, gutter, and attached sidewalk. The project will reconstruct portions of the curb, gutter and sidewalk along the project frontage to accommodate project access into an at-grade parking garage and landscaping and street trees within a new 5-foot-wide parkway. CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 17 C. Subdivision Ordinance The Land Development Engineering Division has reviewed the proposed Tentative Tract Map and has found that the subdivision complies with all applicable requirements of the Subdivision Map Act and the city’s Subdivision Ordinance (Title 20) for Major Subdivisions. The subdivision is considered major because it involves the division of land into five or more condominiums. The project has been conditioned to install all infrastructure-related improvements and the necessary easements for these improvements concurrent with the development. D. Inclusionary Housing For all residential development having less than seven units, the inclusionary housing requirement may be satisfied through the payment of an inclusionary housing in-lieu fee. The proposal to construct six residential condominium units has been conditioned to pay the applicable housing in-lieu fee for five units prior to building permit issuance or six units if building permits for the six-unit project have not been applied for within two years of demolishing the existing single-family home on-site. E. Growth Management The proposed project is located within Local Facilities Management Zone 1 in the Northwest Quadrant of the city. The impacts on public facilities created by the project, and its compliance with the adopted performance standards, are summarized in Table G below. TABLE G – GROWTH MANAGEMENT COMPLIANCE Standard Impacts Compliance City Administration 21.2 square feet Yes Library 11.32 square feet Yes Waste Water Treatment Residential: 1,320 GPD Commercial: 223 GPD Total: 1,543 GPD Yes Parks 0.04 acres Yes Drainage 1.13 CFS, Basin B Yes Circulation Existing: 85 ADT Proposed: 121 ADT Net increase: 36 ADT Yes Fire Station 1 Yes Open Space NA NA Schools Carlsbad Elementary: 0.7 students Carlsbad Middle: 0.37 students Carlsbad High: 0.47 students Yes Sewer Collection System Residential: 1,320 GPD Commercial: 223 GPD Total: 1,543 GPD Yes Water Residential: 1,500 GPD Commercial: 419 GPD Total: 1,919 GPD Yes Properties located within the VC District of the Village and Barrio Master Plan do not have a Growth Management Control Point or an allocation for dwelling units. Therefore, as one (1) vacant unit is proposed to be demolished and six (6) residential units are proposed to be constructed, a total of five (5) dwelling units will be deducted from the city’s Excess Dwelling Unit Bank (EDUB). Pursuant to Planning Commission Resolution No. 7347, the allocation from the EDUB can be supported since 546 units are CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 18 available for allocation in the Village according to the city’s Quadrant Dwelling Unit Report dated July 31, 2019, less any allocations recently approved. IV. ENVIRONMENTAL REVIEW The City Planner has determined that the project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment, and it is therefore categorically exempt from the requirement for the preparation of environmental documents pursuant to Section 15332 (In-fill Development Projects) Class 32 Categorical Exemption of the State CEQA Guidelines. The project is consistent with the General Plan as well as with the Zoning Ordinance. The project site is within the city limits, is less than five acres in size, and is surrounded by urban uses. There is no evidence that the site has value as habitat for endangered, rare, or threatened species. Approval of the project will not result in significant effects relating to traffic, noise, air quality, or water quality. The site can be adequately served by all required utilities and public services. In making this determination, the City Planner has found that the exceptions listed in Section 15300.2 of the state CEQA Guidelines do not apply to this project, including historical resources. Specifically, the existing 71-year-old dwelling unit that is proposed to be demolished as part of the project is not identified on a local register of historical resources and a qualified professional has determined that the structure does not meet the criteria for listing on the California Register of Historical Resources. A Notice of Exemption will be filed by the City Planner upon final project approval. The project will be required to comply with the recently adopted Climate Action Plan Ordinances, including energy efficiency measures and solar photovoltaic systems (Ordinance No. CS-347, effective August 14, 2019) and electric vehicle charging infrastructure (Ordinance No. CS-349, effective April 11, 2019). If building permits are not issued by January 1, 2020, the project will also be subject to the new residential standards for water heating. ATTACHMENTS: 1. Planning Commission Resolution No. 7347 2. Location Map 3. Disclosure Statement 4. Village and Barrio Master Plan Design Guidelines Analysis 5. Correspondence 6. Reduced Exhibits 7. Full Size Exhibits “A - X” dated October 2, 2019 CARL S B A D VI L L A G E D R CARL S B A D VI L L A G E D R S T A T E S T S TA TE S T HOPE A VHOPE AV GRAN D A V GRAN D A VMADI SON STMAD I SON S T HOME A V HOME A V JE F F ER SO N S T J E F FE RSON S T ROOSE VE L T S TROOSEV E L T S T HARD ING S THARD ING S T ARBU C K L E P L ARBU C K L E P L CT 2018-0008 / SDP 2018-0010 (DEV2018-0055) Grand Jefferson SITE MAP JPALOMARAIRPORTRDELCAMREALELCAMINOREA L LA CO STAAVCARLSBAD B LMELR O SEDRCOLLEGEBLAV I ARA PY RANCH O S ANTAFERDSITE dd,DEdϮ dd,DEdϯ dd,DEdϰ VILLAGE AND BARRIO MASTER PLAN DESIGN GUIDELINES ANALYSIS CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON INTENT The Design Guidelines (guidelines) intend to implement and enhance the existing character within the Village and Barrio as new development and property improvements occur. Together, the Village and Barrio are a unique, mixed-use environment. They serve as both a shopping and entertainment destination as well as a place to live and work. The guidelines aim to improve the character of the Village and Barrio while improving livability. Guidelines address many components of building style and orientation, including site layout, building massing, roof form, building façades, and appurtenances. Images are intended to provide a visual example of a targeted topic described in the caption and may not represent all aspects and direction provided within this document. Through these areas of focus, the guidelines strive to foster authentic designs with straightforward and functional construction. All development should align with the spirit and intent of the design guidelines presented in this chapter. Designers and developers should consider at a minimum that these guidelines are a starting point for quality development, and do not comprise every possible strategy for achieving high quality design. Therefore, it is prudent that designers use their own techniques for achieving authentic, high quality design. The following guidelines apply to all new and remodeled development within the entire Master Plan Area unless exempt as determined by Section 6.3.2. 2.8.2 SITE PLANNING GUIDELINES CONSISTENCY STATEMENT A.Site layout 1. Place buildings adjacent to, and oriented towards, the street. Locate prominent architectural features near corners and intersections. 2. Orient storefronts and major building entries towards major streets, courtyards, or plazas. 3. Minimize gaps between buildings in order to create a continuous, pedestrian-oriented environment. 4. Place parking lots so as not to interrupt commercial street frontages. 5. Incorporate functional and aesthetic vehicular and pedestrian connections to adjacent sites. 6.Create small pedestrian plazas along the street wall through the use of recesses in building form. 7. Provide easily identifiable pedestrian access from the street and/or sidewalk to key areas within the site. 8. Incorporate plazas, landscaped areas, fountains, public art, textured pavement, and vertical building features to create focal points that enhance a pedestrian’s experience. 9.Utilize atriums and outdoor courtyards to increase the variety and number of views and to bring additional sunlight into large developments. 10. Give careful design consideration to corner lots, as they are typically a focal point in the urban fabric. 11. Utilize courtyards or other methods to break up the building mass and provide natural ventilation, wherever possible. The proposed mixed-use building has been placed adjacent to and is architecturally oriented towards the street. Grand Avenue exhibits more of an urban environment and was chosen as the primary frontage. The upper floors of the building, which include the residential units, have also been oriented such that their primary living spaces and patios are oriented towards this frontage to help activate the street frontage below. Jefferson Street, which consists of more transitional type uses (i.e., professional offices, apartments, and single-family homes), has a less urban feel to it. As such, access to the parking garage and residential lobby have been oriented along this frontage. A covered outdoor plaza and a three-story tower with butterfly roof have been located at the street corner intersection, while parking and access have been located to the north on Jefferson to avoid interrupting the commercial street frontage. The plaza area, with future outdoor seating, along with enhanced building materials, decorative metal awnings, lighting and landscaping all help to activate the street corner and set it apart as a focal point for this mixed-use project. B.Parking and Access 1. Locate parking behind buildings and away from the street, wherever possible. 2. Use pervious paving materials, whenever possible. 3. Buffer residential uses from commercial parking lots by landscaping, fencing, and/or walls. 4. When walls or fences are utilized to screen parking, provide breaks to allow for pedestrian circulation and limit Parking is located to the rear of this corner oriented building inside a covered at-grade parking garage with access off the lesser of the two prominent streets (i.e., Jefferson Street). Parking is covered so pervious paving is not a factor. However, decorative paving is provided at the garage entry. The nearby residential uses are buffered from parking by garage walls. Bicycle parking is provided inside the parking garage in addition to two other locations near the commercial and 2 height for safety and security purposes. 5.Divide large parking lots into smaller areas with landscaping and clearly marked pedestrian paths. 6. Highlight primary pedestrian access paths within parking areas with decorative paving, trellises, canopies, lighting, and similar improvements. 7.Create pedestrian paseos to parking lots of buildings. 8.Locate parking below grade or in structures, where feasible. 9.Design parking structures so their height and bulk are consistent with adjacent buildings. 10.Provide bicycle parking at convenient locations such as entrances or other visible and accessible areas. 11.Provide electric vehicle charging stations and equipment where feasible and as otherwise required. residential entrances. Electrical charging stations and equipment are proposed. C.Plazas and Open Space 1.Provide private or common open space and pedestrian connections to such spaces to enhance the living environment and contribute to a walkable neighborhood character. 2.Semi-public outdoor spaces, such as small plazas and courtyards are encouraged between private and public spaces to support pedestrian activity and connectivity. 3.Design plazas and building entries to maximize circulation opportunities between adjacent uses. 4.Provide landscaping and high-quality paving materials, such as stone, concrete or tile, for plazas and open spaces. 5. Place outdoor furniture, such as seating, low walls, trash receptacles, bike racks and other elements, in outdoor pedestrian spaces. 6. Site buildings to define open space areas. Ensure that outdoor areas are visible from public streets and accessible from buildings, as well as, streets and pedestrian and bicycle networks. The proposed six-unit condominium project complies with the private open space requirements of the Village Center (VC) District of the Village and Barrio Master Plan (VBMP), which requires a minimum of 60 square feet per unit. All open space is proposed as private patios and a roof deck. The smallest ƉĂƚŝŽƉƌŽƉŽƐĞĚŝƐϭϰϵƐƋƵĂƌĞĨĞĞƚǁŝƚŚĂĚŝŵĞŶƐŝŽŶŽĨϭϮ഻-Ϭ഼ ďLJϭϮ഻-ϵ഼͘ In addition, a covered outdoor patio is also proposed at the corner of the building facing the intersection of Grand Avenue and Jefferson Street. The patio area is 344 square feet in size and is designed to serve the ground floor retail commercial space oriented towards Grand Avenue. The patio area is connected to the public sidewalk along Grand Avenue, but is separated by decorative landscape along Jefferson Street. The connection along the Grand Avenue frontage is designed to maximize and encourage opportunities for people to interact along this street, which has a more urban feel to it in comparison to Jefferson Street at this location. The landscaping located between the public sidewalk and outdoor patio along Jefferson Street is designed to buffer the public space and discourage public interaction at this portion of the street corner where the sidewalk begins to transition north into a neighborhood that is predominantly residential mixed with professional office buildings. Decorative paving is proposed within the patio area. While decorative lighting is currently proposed on the exterior of the building, lighting within the covered patio will be further defined later with tenant improvements for the ground floor retail use. D.Outdoor Seating 1. Incorporate seating into well-trafficked outdoor areas, to maximize opportunities for people to interact. 2. Consider movable seating so that people can accommodate their own preferences and respond to the weather or time of day. 3. Provide lighting to ensure that outdoor seating areas are safe places at night. A 344-square-foot covered outdoor seating area is provided as part of the ground floor commercial tenant space located at the southeast corner of the building near the intersection of Grand Avenue and Jefferson Street. The public right-of-way along Grand Avenue is wide enough to easily accommodate future sidewalk café type seating. No seating is currently proposed in either scenario, but would likely consist of movable type chairs and tables. The street frontage along this project is also proposed to be well lit to help confirm a feeling of safety at night. 3 E.Connectivity 1. Connect all commercial buildings to the public sidewalk via a publicly accessible path or walkway. 2. Provide attractive, well-marked pedestrian links that create a clear path of travel between parking, buildings and sidewalks. 3. Ensure that alleys are well lit, open, and visible to passersby. 4. Enhance existing walkways or paseos to become more inviting. 5. Provide secondary entries to alleys. The commercial portion of the building is located at the ground floor and is directly fronting on the Grand Avenue public right-of-way. A separate access from the at-grade parking garage into the commercial tenant suite is provided to the rear of the retail space. Street trees are provided along Grand Avenue, and decorative landscape with street trees is provided along Jefferson Street in the form of detached parkways and planter areas between the building and public sidewalk. F.Mechanical Equipment and Service Areas 1. Carefully design, locate, and integrate service, utility, and loading areas into the site plan. These critical functional elements should not detract from the public view shed area or create a nuisance for adjacent property owners, pedestrian circulation, or vehicle traffic. 2. Locate loading areas in the rear of a site where possible. 3. Locate mechanical equipment and service areas along and accessed from alleys or the rear of properties, wherever possible. 4. Place public utility equipment, meter pedestals, and transformers underground or away from sidewalks and pedestrian areas, where feasible. 5. Screen all mechanical equipment from public view. 6. Ensure roof mounted mechanical equipment and screening do not interfere with required solar zones or installed solar photovoltaic or solar water heating systems. 7. Design trash and recycling enclosures to be consistent with the project and building architecture, and site and screen them to minimize visual impact. Due to the lot configuration, density, parking requirements, lack of alley access, pedestrian circulation, driveway access and aisle widths, the transformer, backflow preventers and gas meters are located within the frontage along Jefferson Street. To the maximum extent feasible, the ground-mounted mechanical equipment is screened with landscaping. The utilities cannot be screened on all sides as access is needed for maintenance. G.Landscaping Landscaping shall meet the policies and requirements set forth in the City of Carlsbad Landscape Manual. 1.Utilize landscaping to define building entrances, parking lots, and the edge of various land uses. 2. Utilize landscaping to buffer and screen properties. 3.Consider safety, environmental impacts, and accent elements when selecting and locating landscaping elements. 4. Landscaping, between the front property line and the building creates a visually interesting transitional space. Select and place plants to enhance and soften architectural elevations, screen undesirable building features and contribute to the overall quality of the streetscape. 5. Select species that are compatible with Carlsbad’s semi- arid Mediterranean climate, and that will grow to an appropriate size at maturity. 6. When there are minimal landscape areas between the building and the street, incorporate planters onto porches, recessed building entrances, and planters on decks and balconies. The commercial entry on the south side of the building, and the walkway providing access into the lobby area of the building on the east side, including the driveway/garage entrance, have all been framed with landscape planters to define points of entry into the building. The south elevation of the building has a repetition of street trees planted along it and the east elevation has a combination of both trees and foundation plantings to soften the appearance of the building. The vast majority of the plantings are of low level heights except for the grouping that is screening the utilities along the eastern property line so hiding spaces have been minimized. All standards relating to preserving visual lines of sight as defined by the City of Carlsbad have been met for this project. The tree plantings along the southern property line offer a typical urban parkway design solution where pedestrian access has been accommodated while also providing trees that will offer a softening of the building elevation and also provide shade for an area with a high percentage of pavement. Small 4 7. Minimize paved vehicle areas such as driveways and parking areas. Design driveways to be no wider than necessary to provide access. Incorporate permeable surfaces, such as interlocking pavers, porous asphalt, power blocks, and lattice blocks/grasscrete or ribbon driveways where feasible. 8. Utilize planting to screen less desirable areas from public view, i.e., trash, enclosures, parking areas, storage areas, loading areas, and public utilities. 9. Provide landscaping between any parking lot and adjacent sidewalks or other paved pedestrian areas, as well as, within surface parking lots. 10.Incorporate native and drought tolerant vegetation whenever possible. Avoid use of invasive or noxious plants. 11.Incorporate lattice work and landscaping onto existing blank walls to support flowering vines growing out of planters placed at their base. 12.Plant trees and fast growing and flowering vines along fences and walls to soften the appearance of the fencing and screen views to functional on-site work and storage areas. 13. Utilize vines, espaliers, and potted plants to provide wall, column, and post texture and color and to accentuate entryways, courtyards, and sidewalks. 14. Incorporate large planters into seating areas. Planters should be open to the soil below and should incorporate permanent irrigation systems. 15. Maintain landscaping and yard areas regularly to keep a desirable, healthy appearance, eliminate trash, and control vermin. 16. Incorporate Low Impact Development (LID) strategies, site design, and source control measures into projects. Examples include rain gardens, rain barrels, grassy swales, soil amendments, and native plants. 17.Utilize seasonal shading from trees and shrubs when developing planting schemes for courtyards and streetscapes on south and west facing facades. accent planters have been placed on each side of the primary entryway into the commercial tenant space. All consideration has been given with respect to the selection of plant materials for this project. The vast majority of plant options for this project represent low water use varieties to be compatible with Carlsbad’s semi-arid Mediterranean climate. The plants have all been selected to grow into the spaces they have been placed so as to minimize the need for pruning. This approach will help preserve the natural character of the many plant varieties anticipated to be incorporated into this project. Planters have been proposed for each side of the recessed entrance leading into the commercial tenant space located on the south side as well as the residential lobby entrance located on the east side. The decorative tree grates that have been incorporated into the pedestrian sidewalk along Grand Avenue provide a safe walking surface to the public, but also offers a decorative contrasting surface to an otherwise open expanse of paving where ease of pedestrian travel is necessary. The parking area has been minimized by it being located within the physical limits of the building footprint. The driveway entrance on the eastern side of the site has been designed to provide safe access while minimizing the width. Enhanced concrete has been proposed to provide visual interest to what is considered a more functional feature for a typical site. Along the eastern side of the building there is a grouping of utility hardware that has been screened by a dense hedge like shrub mass. The parking lot for this project has been located within the footprint of the building, so there is no need for additional landscaping to screen this area from public view. Approximately 80 percent of the plant materials considered for this project qualify as drought tolerant and have been screened regarding any potential of being classified by the State of California as being invasive or noxious. Along the eastern and southern elevations of the building vines or espalier form plant varieties have been placed into open planters and pocket planters to offer a vertical accent to the building’ exterior. There are no maintainable sections of wall or fencing proposed for this site, so there is no screening requirement necessary. The covered outdoor seating area located at the southeast corner of the building includes a large planter bed between it and the public right-of-way. The planter has complete soil exposure and is irrigated by an automatic drip irrigation system. 5 The building and landscape as well as the surrounding public right-of-way area will be maintained at a high level by an owner’s association. There are numerous areas of the project designed for water purification and storm runoff control. At final landscape, soil tests will be conducted and the appropriate soil amendments will be recommended and incorporated into the planter areas prior to moving forward with installation of plant materials. Most of the plants to be used for this project are considered low water use varietals. The tree selected for the south facing streetscape area is a broadleaf evergreen variety that will form a canopy to provide shade and offer a flowering accent during the summer months. The west side of the building has no streetscape or courtyard elements proposed. 6 2.8.3 BUILDING FORM AND MASSING GUIDELINES CONSISTENCY STATEMENT A. Building Form and Articulation 1.Reduce the imposing appearance of tall buildings by stepping back from street level on elevations above the ground floor. 2. Utilize horizontal and vertical articulation to break up monolithic street walls and facades. 3.Utilize techniques to reduce massing, such as variation in wall plane and height and variation in roof form and levels. 4. Surface detailing may be used, but does not serve as a substitute for distinctive massing. 5.Consider adjacent low density uses when designing and orienting a building. For example, avoid balconies overlooking rear yards. 6. Minimize the vertical emphasis of architectural design elements by incorporating features such as horizontal bands, reveals, trims, awnings, eaves, and overhangs or other ornamentation, along different levels of the wall surface. 7. Minimize blank walls by: a. Adding window openings and/or entrances and other relief. b.Providing recessed glazing and storefronts. c. Adding vertical pilasters which may reflect internal building structure. d. Changing color and texture along the wall surface. e. Varying the planes of the exterior walls in depth and/or direction. f. Adding trims, projections, and reveals along different wall surfaces. 8. Articulate the building façade by varying building elements to create contrast. Integrate all architectural elements into the building design to avoid the look of “tacked on” architectural features. 9. Utilize facade projections and recesses such as bay windows, planter boxes, roof overhangs, and entry way recesses. 10.Arrange columns such that they appear to support the weight of the building or feature above and are balanced in height, weight, and depth. Spindly columns can appear out of proportion with the element it is supporting. 11.Size shutters appropriately, when used to cover the window opening. 12. Avoid exterior sliding or fixed security grilles over windows along street frontages. 13. Discourage and avoid “chain” corporate architecture and generic designs. Each project should strive to achieve the unique architectural style or character. 14.Design roofs to accommodate a solar photo-voltaic system and/or solar water heating system, as required by California Building Code. The fourth-floor building elevation is stepped back 20’-4” to 29’-8” from the property line along Grand Avenue helping to reduce the building’s overall appearance along this street frontage. The building podium contains a horizontal metal band providing a visible line of separation between the retail and the residential elements above. To create vertical building articulation, the residential portion of the building utilizes decorative siding elements separated by smooth stucco elements at varying wall planes combined with enhanced color transitions. Recessed balconies and walkways create additional levels of building articulation. All building elevations utilize multiple layers of wall plane variation which help to reduce building massing. The upper floor is stepped back from the third-floor along the primary street frontage at Grand Avenue. The building parapet contains multiple height variations along with sloped roof and sloped parapet elements providing additional layers of architectural interest. Surface detailing in the form of smooth limestone, decorative stone veneer (faux wood pattern), decorative metal, decorative siding and smooth stucco materials are proposed. The project has been designed to orient patios toward the street and away from adjacent residential properties as much as possible. Unit 3 is the only unit that includes a patio nearest the adjacent residential properties located to the north, and this patio area has been restricted to the second-floor level of the building to help minimize privacy issues at this location. No overhanging type balconies are proposed. Unit 6 also includes a fourth-floor patio and roof deck with northern exposures; however, these features have been set back approximately five and seven feet from the common property line, which combined with height, minimizes the line-of-sight and thus the ability to peer over and into the adjacent properties. A horizontal metal band has been incorporated at the upper portion of the podium separating the retail area from the residential area. Decorative eyebrows and metal canopies have been added at all retail space window and door openings. Additionally, decorative protruding eyebrow features have been added above all windows and strategically within blank wall areas. A decorative reveal pattern has been included within the smooth stucco areas. Blank walls have been minimized by adding and recessing windows in all locations possible a depth of two-to-three inches. Decorative reveals and projecting eyebrows have been added to blank walls. Multiple wall plane changes have been provided along with strategic color enhancements. 7 15.Utilize details such as wall surfaces constructed with patterns, changes in materials, building pop-outs, columns, and recessed areas to create shadow patterns and depth on the wall surfaces. 16. Ensure that proportions are consistent with selected architectural styles. 17. Incorporate the characteristic proportions of traditional facades in new infill development. 18.Balance the ratio of height, width, and depth of arches and columns to emphasize strength and balance. 19. Ensure consistency between the height of a column and its mass or thickness with the weight of the overhead structure the column supports. 20.Infill buildings that are much wider than the existing facades should be broken down into a series of appropriately proportioned structural bays or components. 21.Consider transitions between the height of new development and the height of adjacent existing development. 22. Utilize vertical building focal elements. Towers, spires, or domes may foster community identity and serve as landmarks. 23.Utilize windows and open wrought iron balconies to provide opportunities for residents to passively observe and report suspicious activity. 24.Utilize accent materials to highlight building features and provide visual interest. Accent materials may include any of the following: a.Wood b. Glass c. Glass block (transom) d. Tile e. Brick f.Concrete g.Stone h.Awnings i. Plaster (smooth or textured) 25. Use building materials and finishes that are true to the structure’s architectural style. 26. Windows, doors, and entries should be designed to capture the desired architectural style of the building. 27. Generally, use no more than three different materials on exterior wall surfaces. While certain styles may successfully incorporate multiple surface materials, caution must be used as too many materials can result in a less than aesthetically pleasing building. 28. Ensure material changes occur at intersecting planes, preferably at inside corners of changing wall planes or where architectural elements intersect, such as a chimney, pilaster, or projection. 29.Utilize light and neutral base colors. Generally muted color schemes will promote visual unity and allow awnings, window displays, signs and landscaping to be The building façade has been articulated using plane changes, material changes, added projection elements and color changes. Decorative metal canopies, projecting eyebrows, metal trim and recessed entries have been incorporated into the building design to provide building façade interest and create unique shadow patterns and depth. The building roof is designed to incorporate a photovoltaic solar system per current City of Carlsbad Climate Action Plan requirements. The southeast corner of the building, located at the corner of Grand Avenue and Jefferson Street, incorporates a tower element with an outdoor covered patio area. The tower element, featuring decorative stone veneer (faux wood pattern), large decorative metal awnings with anchor brackets, vertical and horizontal metal trim, enhanced colored siding, decorative light sconces, and a butterfly roof design, assist in creating a strong street presence at the intersection. Material changes have been strategically located at inside corners and decorative reveal features. The street frontage storefront and entry door systems have been designed to promote a high level of visibility into the retail space. Building entrances have been strategically situated in locations that clearly portray the primary entry element for the residential and retail portions of the project. Recessed black-framed windows have been incorporated into the design of the building to provide an added level of interest. 8 given proper emphasis. 30.Ensure lighting is architecturally compatible with the building. 31. Articulate storefronts with carefully arranged doors, windows, arches, trellises, or awnings, rather than blank walls. 32. Ensure that the main entrance to a building is clearly identifiable and unique, as it is the primary point of arrival and should be treated with significance. 33. Window type, material, shape, and proportion should complement the architectural style of the building. 34. Utilize recessed windows where appropriate to the architectural style, to provide depth. B. Awnings 1. Use awnings made of commercial grade canvas or metal and that are either fixed or retractable. 2. Avoid plasticized, and/or vinyl fabrics, and back-lit awnings. 3. Maintain a minimum six (6) inch clearance from second floor features such as windows. 4. Avoid wrapping awnings around buildings in continuous bands. 5. Place awnings only on top of doors, on top of windows, or within vertical elements when the façade of a building is divided into distinct structural bays. The project proposes fixed metal awnings on the ground floor elevations along both street frontages at Grand Avenue and Jefferson Street. Awnings are located above the commercial entrance, covered patio recesses, residential lobby and garage entrances. The proposed awnings avoid wrapping around the building in a continuous band and maintain the minimum six- inch clearance from the second-floor features. C. Balconies 1. Place balconies adjacent to operable doorways. Faux balconies or those that do not appear usable are discouraged. 2. Visually support all balconies, either from below by decorative beams and/or brackets, from above by cables, or by other parts of the building. 3. On corners, balconies may wrap around the side of the building. No balconies or faux balconies are proposed with this project. However, each residential unit does provide an outdoor patio area. Each of these areas is located adjacent to operable doorways. D. Roof Forms 1. Ensure that roof materials and colors are consistent with the desired architecture or style of the building. 2. Utilize multi-roof forms, hips, gables, shed roof combinations, and sufficiently articulated flat roofs to create interesting and varying roof forms that will reduce building mass, add visual appeal, and enhance existing Village and Barrio character and massing. 3. Avoid long, unbroken, horizontal roof lines. 4. Avoid flat roofs unless sufficient articulation of detail is provided, such as precast treatments, continuous banding or projecting cornices, lentils, caps, corner details, or variety in pitch (sculpted), height, and roofline. 5. Avoid the “tacked on” appearance of parapets, and ensure their appearance conveys a sense of permanence. If the interior side of a parapet is visible from the pedestrian and/or motorist area of the project, utilize appropriate detail and properly apply materials. The project avoids long, unbroken horizontal roof lines and flat roof elements through use of architectural tower features with butterfly roof designs, varied parapet heights and overhanging parapet caps. Parapet interior sides are only visible to the third and fourth floor residences and have been architecturally treated to present a finished appearance. 9 E.Lighting 1.Provide exterior building lighting, particularly in commercial and high-pedestrian areas. 2. Design or select light fixtures that are architecturally compatible with the building. 3.Integrate light fixtures that are downcast or low cut-off fixtures to prevent glare and light pollution. 4. Design lighting in such a way as to prevent the direct view of the light source from adjacent properties or uses, particularly residential properties or uses. 5. Utilize lighting on architectural details, focal points, and parking areas to increase safety, help with orientation, and highlight site attributes and the identity of an area. 6.Use energy-efficient lamps such as LED lights for all exterior lighting along with adaptive lighting controls to contribute to energy conservation and potentially reduce long-term costs. Architectural lighting is proposed along the street-facing elevations of the building on the ground floor at Grand Avenue and Jefferson Street. Proposed light fixtures are considered downcast or low cut-off type fixtures that help to prevent light glare or pollution. Light fixture locations have been selected for areas on the building that provide exterior building lighting in commercial and high pedestrian traffic areas for increased safety, helping with orientation, and which focus on architectural detailing. The Carlsbad Village Decorative Pedestrian Lighting Study does not contain any recommendations for the intersection of Grand Avenue and Jefferson Street. From:Ziv Ran To:Jason Goff Subject:ct2018-0008/sdp2018-0010 Date:Wednesday, August 14, 2019 8:50:10 AM I am opposed to the project as it will destroy village character. Ziv Ran Forest Av. dd,DEdϱ Date:5-13-19Sheet Title:Sheet Number:Project:File:Revisions:12GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008SDP 2018-0010DEV 2018-0055KIRK MOELLER ARCHITECTS, INC.2888 LOKER AVE. EAST, STE 220CARLSBAD, CA 92010KIRK@KMARCHITECTSINC.COM760-814-8128ARCHITECTURALAPPROVEDTHIS IS THE APPROVED TENTATIVE MAP/SITEPLAN FOR PROJECT NO. PER CONDITIONPLANNING DIVISION DATE ENGINEERING DIVISION DATENO. OF PLANNING COMMISSIONRESOLUTION NO.A0.1 COVER SHEETA1.1 SITE PLANNOTE: ALL PROJECT SIGNAGE TO BE UNDER A SEPARATE PERMITNEW PROPOSED MIXED USE RETAIL AND RESIDENTIAL PROJECT CONSISTING OF A FIRST FLOOR RETAIL /COMMERCIAL / PARKING GARAGE, SECOND, THIRD AND FOURTH FLOOR RESIDENTIAL UNITS. 6 TOTALRESIDENTIAL UNITS PROPOSED.786 GRAND AVENUE203-302-04-00AREAS:1ST FLOOR TOTAL GROSS:HANDICAP PARKING SPACES PROVIDED:TOTAL SPACES PROVIDED: STANDARD PARKING SPACES PROVIDED:1 SP.12 SP.11 SP.LOT AREA:EXISTING COMMERCIAL LOT: 9,060 S.F. / .208 ACRESIDENTIAL UNITS:TOTAL GROSS FLOOR AREA:16,272 S.F.TOTAL PARKING GARAGE AREA:4,334 S.F. - COMMERCIAL:1,823 S.F.1,947 S.F.5,637 S.F.2ND FLOOR (2 1/2 CONDO UNITS TOTAL GROSS):VILLAGE (V)GENERAL PLANVILLAGE REVIEW (V-R)ZONINGVILLAGE MASTER PLAN (VMP)MASTER PLANNOCOASTAL ZONEPROPOSED WATER USAGERESIDENTIAL250 GPD X 6 UNITS = 1,500 GPDCOMMERCIAL (RETAIL).23 GPD PER SF X 1,823 SF = 419 GPDBUILDING TOTAL1,919 GPDRESIDENTIAL8 TRIPS PER D.U. X 6 UNITS = 48 ADTCOMMERCIAL (RETAIL)40/1,000 S.F.=.04 X 1,823 GROSS S.F. = 73 ADTBUILDING TOTAL121 ADTTOTAL LOT AREA:PARKING REQUIREDCOMMERCIAL RETAIL (1,823 SF GROSS / 415)4 SP.MULTI FAMILY CONDO (4-3 BDRM. UNITS X 1.5)TOTAL SPACES REQUIRED: 13 SPACESPARKING PROVIDEDCARLSBAD UNIFIED SCHOOL DISTRICTSCHOOL DISTRICTCARLSBAD MUNICIPLE WATER DISTRICTWATER SERVICECARLSBAD WASTEWATER DIVISIONSEWER SERVICEPROPOSED SEWER USAGERESIDENTIAL(EDU) = 220 GAL/DAY X 6 DU X (1 EDU PER/DU) = 1,320 GAL/DAYCOMMERCIAL (R)1 EDU / 1,800 SF = 1,823 SF / 1,800 = 1.01 X 220 = 223 GAL/DAYBUILDING TOTAL1,543 GAL/DAYTOTAL CONDOMINIUM UNITS6 UNITS - LOBBY AREA:124 S.F.DWELLING UNIT DENSITY:.208 AC X 35 D.U./AC = 7.28 UNITS ALLOWED (MAX. PER VILLAGE MASTER PLAN)BUILDING / LOT COVERAGE:TOTAL GRADE USEABLE AREA AND COVERED PARKING AREA 6966 SF / 87.9%NOTE: THE RESIDENTIAL CONDOMINIUM AND APARTMENT UNITS MUST BE ACCESSIBLE ANDADAPTABLE.PROPOSED DRAINAGE DISCHARGE / BASINDRAINAGE BASIN/ HYDROLOGICAL AREA: CONDOMINIUM NOTETHIS IS A MAP OF A CONDOMINIUM PROJECT AS DEFINED IN SECTION 4125 OF THE CIVIL CODE OF THESTATE OF CALIFORNIA AND IS FILED PURSUANT TO THE SUBDIVISION MAP ACT. THE NUMBER OFCONDOMINIUM UNITS IS 7. 6 RESIDENTIAL UNITS AND 1 COMMERCIAL UNIT.CARLSBAD, CALIFORNIAWATER METER NOTETHE DIRECTOR OF PUBLIC WORKS SHALL CONSIDER THE INSTALLATION OF SUB METERS PER SEC. 9FROM CMWD ORD. 45. A LETTER SHALL BE SUBMITTED INDICATING THE REASONS FOR THE REQUESTALONG WITH AN ANALYSIS OF ALL THE FIXTURE UNITS OF ALL RESIDENTIAL AND COMMERCIAL/OFFICECONDOMINIUMS SERVED BY THE MASTER PUBLIC METER TO DETERMINE THE NUMBER AND SIZE OFMASTER PUBLIC METERS NEEDED.1 SP. CREDITMULTI FAMILY ON SITE PARKING SPACES PROVIDED:9 SP. (ALL REQUIRED)EXISTING BUILDING:DAY CARE BUILDING TO BE REMOVED 2,124 SF40/1,000 S.F.=.04 X 2,124 S.F. = 85 ADTNOISE NOTETHIS PROJECT IS NOT WITHIN A NOISE CRITICAL AREA (CNEL CONTOUR OF 60 dB) AS SHOWN ON THEGENERAL PLAN.RESIDENTIAL CONDO UNIT 1 (3 BEDROOM)6 SP.DENSITY PROPOSED = 28.85 UNITS PER ACREA2.1 FIRST FLOOR PLANA2.2 SECOND FLOOR PLANA3.1 BUILDING ELEVATIONS3,418 S.F.4TH FLOOR (1 CONDO UNITS TOTAL GROSS):RESIDENTIAL CONDO UNIT 6 (4 BEDROOM)9,060 S.F. / .208 ACA2.3 THIRD FLOOR PLANA2.4 FOURTH FLOOR PLANA2.5 ROOF PLANA3.2 BUILDING ELEVATIONSA1.2 SETBACK EXHIBITSRESIDENTIAL CONDO UNIT 2 (3 BEDROOM)RESIDENTIAL CONDO UNIT 3 FIRST FLOOR (2 BEDROOM)1,378 S.F.2,112 S.F.2,147 S.F.TOTAL 2ND FLOOR5,270 S.F.3RD FLOOR (2 1/2 CONDO UNITS TOTAL GROSS):RESIDENTIAL CONDO UNIT 4 (3 BEDROOM)RESIDENTIAL CONDO UNIT 5 (3 BEDROOM)RESIDENTIAL CONDO UNIT 3 LOFT1,017 S.F.2,112 S.F.2,141 S.F.TOTAL 3RD FLOOR(1-2 BDRM. UNITS X 1.5)1.5 SP.THE GRAND JEFFERSONMIXED USE DEVELOPMENT786 GRAND AVENUESHEET INDEXPROJECT DIRECTORYPROJECT INFORMATIONCODESVICINITY MAPAPPROVALSDEFERRED SUBMITTALSSPECIAL INSPECTIONSSCOPE OF WORKUTILITY/ SERVICE PROVIDERSOWNER/ DEVELOPER: RINCON HOMESCONTACT: KEVIN DUNN3005 S EL CAMINO REALSAN CLEMENTE, CALIFORNIA 92672T: 949-438-5494--2016 CALIFORNIA BUILDING CODE2016 CALIFORNIA FIRE CODE2016 CALIFORNIA PLUMBING CODE2016 CALIFORNIA MECHANICAL CODE2016 CALIFORNIA ELECTRICAL CODE2016 CALIFORNIA EXISTING BUILDING CODE2016 CALIFORNIA GREEN BUILDING STANDARDS CODE2016 CALIFORNIA ENERGY CODEPLUMBING CALCULATIONSASSESSORS PARCEL NUMBER:ADDRESS:OCCUPANCY/ SEPARATED OR NON-SEPARATED: B, S-2, R-2TYPE OF CONSTRUCTION:IIIBFIRE ALARM:YESFIRE SPRINKLERS:YES, NFPA 13STORIES:4HEIGHT (MAXIMUM):45'-0"USE:MIXED-USE: RETAIL/ RESIDENTIALBUILDING AREA ANALYSISGENERAL NOTESNOTE: CONTRACTOR TO PROVIDE A DEFERRED SUBMITTAL TO THE FIRE DEPARTMENT FOR FIRESPRINKLER AND FIRE ALARM PLANS.NOTE: FLAMMABLE AND COMBUSTIBLE LIQUIDS SHALL BE IN COMPLIANCE WITH CFC 5705.3.5.2.HAZARDOUS MATERIALS SHALL BE IN COMPLIANCE WITH CBC 307.1(1) AND 307.1(2).NOTE: SUBMITTAL DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THEREGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE, WHO SHALL REVIEW THEM ANDFORWARD THEM TO THE BUILDING OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERREDSUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND THAT THEY HAVE BEEN FOUND TO BE INGENERAL CONFORMANCE WITH THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL ITEMSSHALL NOT BE INSTALLED UNTIL THEIR DESIGN AND SUBMITTAL DOCUMENTS HAVE BEENAPPROVED BY THE BUILDING OFFICIAL.SITEPASCO LARET SUITER & ASSOCIATES (PLSA)CONTACT: TYLER LAWSON535 N HIGHWAY 101 STE ASOLANA BEACH, CALIFORNIA 92075T: 858-259-8212CIVIL: KIRK MOELLER ARCHITECTS, INC.CONTACT: KIRK MOELLER2888 LOKER AVENUE EAST, STE 220CARLSBAD, CALIFORNIA 92010T: 760-803-8006ARCHITECT: ALLOWABLE ARCHITECTURAL PROJECTIONS (VBMP 2.6.2.C.4.C) 55'-0"NOTE: ENTIRE BUILDING SHALL BE FIRE SPRINKLERED PER NFPA STANDARD 13 AND CITY OF CARLSBADREGULATIONS. A WET STANDPIPE PER NFPA 24 SHALL ALSO BE PROVIDED. PLANS SHALL BE PROVIDEDTO THE FIRE DEPARTMENT FOR REVIEW AND APPROVAL.(1-4 BDRM. UNITS X 1.5)1.5 SP.PARKING ANALYSISOPEN SPACE ANALYSISNDAEDALUS DESIGN GROUPCONTACT: JEFF SMITH2725 JEFFERSON ST, STE 15BCARLSBAD, CA 92010T: 760-720-4337LANDSCAPEARCHITECT:LEGAL DESCRIPTIONTHE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE CITY OF CARLSBAD, IN THE COUNTY OF SAN DIEGO, STATE OFCALIFORNIA, AND IS DESCRIBED AS FOLLOWS:ALL OF LOTS 13, 14, 15 AND 16 IN BLOCK 50 OF CARLSBAD TOWNSITE, IN THE CITY OF CARLSBAD, COUNTY OF SAN DIEGO, STATEOF CALIFORNIA, ACCORDING TO THE MAP THEREOF NO. 535, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGOCOUNTY, MAY 2, 1888, EXCEPTING THEREFROM, THE SOUTHWESTERLY 50 FEET THEREOF.AVERAGE DAILY TRAFFICSTANDPIPE SYSTEM:YES, WITHIN STAIRWELLSLANDSCAPE AREA: 1ST FLOOR:PLANTER AREAS: 92 S.F.SITE LANDSCAPE AREA: 443 S.F.2ND FLOOR (PLANTERS): 72 S.F.3RD FLOOR (PLANTERS):72 S.F.4TH FLOOR (PLANTERS): 72 S.F.ROOF DECK (PLANTERS): 0 S.F.TOTAL LANDSCAPE AREA:751 S.F.TOTAL LANDSCAPE % OF LOT AREA:8.3%PRIVATE RESIDENTIAL OPEN SPACE PER SECTION 2.7.1.2 OF VBMP:RESIDENCE 1 BALCONY: 174 S.F.RESIDENCE 2 BALCONY: 149 S.F.RESIDENCE 3 BALCONY: 238 S.F.RESIDENCE 4 BALCONY: 164 S.F.RESIDENCE 5 BALCONY: 149 S.F.RESIDENCE 6: 4TH FLOOR DECK:1,614 S.F.ROOF DECK: 1,934 S.F.TOTAL RESIDENCE 6:3,548 S.F.TOTAL PRIVATE RESIDENTIAL OPEN SPACE:4,422 S.F.PUBLIC PLAZA SPACE:FIRST FLOOR: 344 S.F.PROVIDED MAX. BLDG HEIGHT W/ ARCH.PROJECTIONS PER VBMP 2.6.2.C.4.C49'-6"6 BICYCLE SPACES PROVIDED (2 RACKS OF 3-BICYCLES EACH PROVIDED WITHINPARKING GARAGE) IN LIEU OF 1 CAR PARKING SPACE PER VBMP 2.6.6 TABLE 2-4(SUBSTITUTION OF CAR PARKING WITH BICYCLE PARKING):TOTAL SPACES PROVIDED INCLUDING CREDITS: 13 SPACESPEAK DRAINAGE DISCHARGE POST DEVELOPMENT (Q100)= 1.13 C.F.S.CARLSBAD/ BUENA VISTA CREEK/ BASIN "B" PER MASTER PLAN A4.1 BUILDING SECTIONSA4.2 BUILDING SECTIONSCIVILC-1 COVER SHEETC-2 PRELIMINARY GRADING PLANC-3 SECTIONS AND DETAILSLANDSCAPEL-1 TREE SURVEY PLANL-2 CONCEPTUAL LANDSCAPE PLAN SITE/1ST FLOORL-3 CONCEPTUAL LANDSCAPE PLAN 2ND, 3RD, AND 4TH FLOORSL-4 WATER CONSERVATION PLANL-5 LANDSCAPE WATER USE EXHIBITL-6 LANDSCAPE MAINTENANCE RESPONSIBILITYEXISTING ON-SITE COMMERCIAL BUILDINGNET DIFFERENCE121 - 85 = 36 ADT NET ADDITIONALEVSE PARKING REQUIREMENT: 1 SPACE RESIDENTIAL (9 X .1=1)EVSE IINSTALLED SPACE (50% EVSE): 1 SPACE RESIDENTIAL EVSE INSTALLEDA. CONSISTENT WITH GENERAL PLAN LAND USE AND ZONINGYESCLIMATE ACTION PLAN (CAP)I. GHG STUDY REQUIREDNOB. ENERGY EFFICIENCY REQUIREMENTNOC. PHOTOVOLTAIC REQUIREMENTYESI. KW-DC ROOF MOUNTED24II. KW-DC GROUND MOUNTED0III. KW-DC TOTAL PROJECT 24 (48 PANELS TOTAL)D. ELECTRIC VEHICLE CHARGING REQUIREMENT YESI. # EV CHARGERS1II. # EV READY0III. # EV CAPABLE1E. HOT WATER HEATING REQUIREMENTF. TRAFFIC DEMAND MANAGEMENT REQUIRED NOYES, 40 SF SOLAR COLLECTORS PROVIDED(2 PANELS TOTAL)C-4 DRAINAGE MANAGEMENT AREA EXHIBIT- ROOF PLANC-5 DRAINAGE MANAGEMENT AREA EXHIBIT- 4TH & 3RD FLOOR BMP'SC-6 DRAINAGE MANAGEMENT AREA EXHIBIT- 2ND & GROUND FLOOR BMP'Sdd,DEdϲ XXXX X X XXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X XXXXXXXXXXXXX EGGSTTTCCW DECKHOUSEHOUSESIDEWALK SIDEWALKFF 55.76RF 65.0CONC DWYSIDEWALKRF 68.9RF 66.8RF 66.42RF 64.0FF 55.44FF 54.6FF 54.9SHEDACCESS LIMITEDFF 56.30FF 56.44RF 70.8RF 68.8DECKSTEPSCOVERED PATIOASPHALTCONCSHEDFF 56.4STEP55 5554 5454 54545454 54 53535354.854.554.253.753.754.155.253.553.753.353.253.253.153.853.954.155.355.354.954.754.554.154.054.354.254.253.253.553.653.753.754.854.3NUEJEFFERSONSTR(N09°33'57"E 51.25' ROS 18380)(335.19' ROS 21269)(N09°35'32"E 51.25' ROS 21269)N10°01'31"E 51.25'(N55°32'11"E 89.96' ROS 18380)BN55°55'01"E 89.90'N55°58'24"E 89.90'N34°02'34"W 99.68' N34°02'34"W 99.77'SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSWWWWWWWWWWW WWWWWGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGIRWSSWWWWWSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSW W W W W W WWWWWW WWWWWWWWWWWSWWWWWWWWGRAND AVENUEJEFFERSON STREETTRASHLOBBYELEV EQUIPMENTELEC.COMMERCIAL1,823 SF GRFDCTRANS.RECYCLEPLANTERCOVERED OUTDOOR PLAZA344 SFUPUPSTAIR 1STAIR 2ELEVATORPLANTERPLANTERNOTE: ELECTRIC VEHICLECHARGING STATION PROVISIONS SHALL BEPROVIDED PER CURRENT CODE AND VBMPGAS MTRSPLANTERPARKING GARAGE - 12 VEHICULAR SPACESAND (2) 3-BICYCLE (6 TOTAL) PARKING SPACES20'-0"24'-0"20'-0"8'-0"9'-0"8'-6" TYP.18'-0"2'8'-6" TYP.123456791011 12EXISTING BUILDING1'-5"34'-6"12'-0"17'-7"1'6'-3"1'98'-0"9"77'-5"11'-2"1'-4"SIDEWALK13'-0"SIDEWALKSIDEWALKDRIVEWAYLANDSCAPELANDSCAPELANDSCAPE1'-1"4'-0"10'-0"40'-0"16'-0"23'-11"BICYCLEPARKINGBICYCLEPARKINGDECORATIVE SCOREDCOLORED CONCRETE19'-5"3'-4"ACCESSIBLE PATHOF TRAVEL5'-2"6'-0"2'-3"6'-0"1'-9"2'-0"3'-0"18'-5"MAIL6'-0"5'-0"LANDSCAPESIDEWALKLANDSCAPELANDSCAPELANDSCAPE4'20'-0"LOCATION OF FUTUREGREASE INTERCEPTORLOCATION OF (1)ELECTRIC CARCHARGING STATIONINSTALLED818"8'-6"5'-0"8'-6" TYP.18"LANDSCAPEF.F.E.= 54.3PAD= 53.6DECORATIVESCOREDCOLOREDCONCRETE3-BIKE VERTICALHANGING RACK- SARISINFRASTRUCTUREMODEL #80433-BIKE VERTICALHANGING RACK- SARISINFRASTRUCTUREMODEL #8043GREASE DUCTLOCATION ABOVE1 RESIDENTIALMETER (TO BESUB-METERED)AND 1COMMERCIALMETERLOCATION OF (1)ELECTRIC CARCHARGING STATIONCAPABLE17'-0"Date:5-13-19Sheet Title:Sheet Number:Project:File:Revisions:12GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008SDP 2018-0010DEV 2018-0055KIRK MOELLER ARCHITECTS, INC.2888 LOKER AVE. EAST, STE 220CARLSBAD, CA 92010KIRK@KMARCHITECTSINC.COM760-814-8128APPROVEDTHIS IS THE APPROVED TENTATIVE MAP/SITEPLAN FOR PROJECT NO. PER CONDITIONPLANNING DIVISION DATE ENGINEERING DIVISION DATENO. OF PLANNING COMMISSIONRESOLUTION NO.A1.110'05'20'PROPERTY LINEZERO CURB8'-6" x 17'-6" W/ 2'-6" O.H.LANDSCAPED AREA"C" DRWGS. FOR THICKNESSCONCRETE PAVING - SEE8'-6" x 20'-0" MIN.STANDARD PARKING STALLSTANDARD PARKING STALLHANDICAP PARKING STALL,9' x 18' MIN.SEWER LATERALGAS LINE - SEE CIVILSGSEE CIVILFIRE HYDRANTEXISTING PUBLICLIGHT STANDARDPRIVATE FIRE HYDRANT-CATCH BASINWATER LINE - SEE CIVILAPPROX. LOCATIONAPPROXIMATE LOCATIONC.B.WF.H.ACCESSIBLE PATH OF TRAVELFIRE LANE - CURB TO BE PTD.NOTE: ALL PROPERTY LINES, EASEMENTS AND BUILDINGS, BOTH EXISTING AND PROPOSED, ARESHOWN ON THIS SITE PLAN.8'-0" x 15'-0" MIN.COMPACT PARKING STALLcNOTE: ALL SIGNAGE TO BE "UNDER SEPARATE PERMIT" AND "SEPARATE REVIEW".RED W/ WHITE LETTERS "NOPARKING FIRE LANE" REF.D/WPANTRYWINE11'-3"21'-2"21'-2"3'-9"20'-10"PER VBMP SECTION 2.7.1 #3 A & BTOTAL 4TH STORY LINEAL FEET FRONTAGE ALONG GRAND AVENUE: 78'-2"TOTAL BUILDING LINEAL FRONTAGE 0-10' SETBACK FROM PROPERTY LINE:0TOTAL BUILDING LINEAL FRONTAGE MORE THAN 10' SETBACK FROM PROPERTY LINE: 78'-2"PERCENTAGE OF LINEAL FRONTAGE 0-10' SETBACK FROM PROPERTY LINE: 0 / 78'-2" = 0% (MAX. 30%)78'-2"20'-4"PER VBMP SECTION 2.7.1 #3 A & BTOTAL 4TH STORY LINEAL FEET FRONTAGE ALONG JEFFERSON: 78'-8"TOTAL BUILDING LINEAL FRONTAGE 0-10' SETBACK FROM PROPERTY LINE: 21'-0" (SEE RECTANGULAR BOXES)TOTAL BUILDING LINEAL FRONTAGE MORE THAN 10' SETBACK FROM PROPERTY LINE: 57'-8"PERCENTAGE OF LINEAL FRONTAGE 0-10' SETBACK FROM PROPERTY LINE: 21' / 78'-8" = 26.7% (MAX. 30%)10'-4"12'-8"10'-8"45'-0"11'-2"1'-0"4'-0"10'-0"78'-8"REQUIRED: TOTAL SF OF ENCLOSEDFOURTH FLOOR SPACE SHALL NOTEXCEED 80% OF THE THIRD FLOORFOOTPRINT PER VBMP 2.7.1.G.3 bPROVIDED: ENCLOSED FOURTHSTORY IS 54% OF THIRD FLOORFOOTPRINT22'-9"ENCLOSED FOURTHFLOOR = 4,048 SF / 54%THIRD FLOOR FOOTPRINTINCLUDES AREA BELOWFOURTH FLOORTOTAL = 7,478 SFKEY3RD FLOOR ROOF AREAWALKWAYPLANTERSTORAGE22'-3"29'-8"3RD FLOOR ROOF AREA3RD FLOOR ROOF AREA3RD FLOOR ROOF AREA4TH FLOOR AREA4TH FLOOR AREA3RD FLOOR FOOTPRINT 7,478 SF3,730 SF103 SF215 SFDate:5-13-19Sheet Title:Sheet Number:Project:File:Revisions:12GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008SDP 2018-0010DEV 2018-0055KIRK MOELLER ARCHITECTS, INC.2888 LOKER AVE. EAST, STE 220CARLSBAD, CA 92010KIRK@KMARCHITECTSINC.COM760-814-8128A1.28'04'16'8'04'16'8'04'16' TRASHLOBBYELEV EQUIPMENTELEC.COMMERCIAL1,823 SF GRFDCTRANS.RECYCLEPLANTERCOVERED OUTDOOR PLAZA344 SFUPUPSTAIR 1STAIR 2ELEVATORPLANTERPLANTERNOTE: ELECTRIC VEHICLECHARGING STATION PROVISIONS SHALL BEPROVIDED PER CURRENT CODE AND VBMPGAS MTRSPLANTERPARKING GARAGE - 12 VEHICULAR SPACESAND (2) 3-BICYCLE (6 TOTAL) PARKING SPACES38'-0"15'-0"24'-0"21'-0"77'-5"10'-1"36'-6"12'-0"20'-7"20'-7"12'-8"10'-8"24'-0"21'-0"5'-2"9'-1"87'-6"98'-0"20'-0"24'-0"20'-0"8'-0"9'-0"8'-6"18'-0"6'-0"8'-6"6'-3"12345678 9 10 11121'-0"1'-5"1'-0"1'-1"1'-4"9"1'-0"8"LOCATION OFSECURITY GATE3'-0"6'-0"1'-0"A4.23A4.24A4.12A4.1118'-5"8'-6"2'-0"4'-0"WHEELSTOPLINE OFCOMMERCIALGREASE DUCTSHAFT OVERHEADSTRUCTURALCOLUMNSTRUCTURALCOLUMN17'-0"10'-0"Date:5-13-19Sheet Title:Sheet Number:Project:File:Revisions:12GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008SDP 2018-0010DEV 2018-0055KIRK MOELLER ARCHITECTS, INC.2888 LOKER AVE. EAST, STE 220CARLSBAD, CA 92010KIRK@KMARCHITECTSINC.COM760-814-8128A2.18'04'16' UPDNSTAIR 2PLANTER 72 SFFACE OF BUILDING WALL BELOWSTORAGE 137 S.F.DWDININGLIVINGD/W MASTERBEDROOMPATIO174 SFBEDROOM 3BEDROOM 2KITCHENCLLAUNDRYCLREF.UNIT 12147 SFPANTRYWALKWAY UPDNSTAIR 1DININGW D LIVINGLINENMASTERBEDROOMBEDROOM 3BEDROOM 2KITCHENPOWD.CLCLCLCLLAUNDRYUNIT 22112 SFREF.PANTRYCLPATIO149 SFLINENDININGD/WREF.UPPATIO238 SFBEDROOM 2KITCHENCLPANTRYUNIT 31378 SF MAIN1017 SF LOFT2395 SF TOTALDESKD/W CLCLELEVATORFPSTORAGE 237 S.F.LIVING3'-0"2'-8"15'-11"12'-0"16'-7"19'-4"7'-2"11'-10"5'-2"21'-0"10'-4"87'-6"97'-0"9'-2"13'-3"15'-11"27'-9"20'-1"11'-0"10'-1"11'-2"31'-2"13'-8"16'-4"10'-8"1'-0"1'-5"1'-0"1'-0"8"1'-1"1'-4"9"10'-1"11'-0"18'-11"10'-4"29'-7"5'-6"11'-2"2'-6"8'-2"6"3'-0"6'-0"1'-0"8"6'-9"12'-4"9'-8"4'-5"4'-5"2'-8"1'-0"8"A4.23A4.24A4.12A4.118"6'-0"4'-4"1'-0"4'-0"1'-0"1'-0"1'-0"7'-0"5"12'-9"AREA OFCOMMERCIALGREASE DUCT SHAFTDate:5-13-19Sheet Title:Sheet Number:Project:File:Revisions:12GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008SDP 2018-0010DEV 2018-0055KIRK MOELLER ARCHITECTS, INC.2888 LOKER AVE. EAST, STE 220CARLSBAD, CA 92010KIRK@KMARCHITECTSINC.COM760-814-8128A2.28'04'16' UPDNSTAIR 272 SF PLANTERFACE OF BUILDING WALL BELOWCLMASTER BEDROOMOPEN TO BELOWUNIT 3LOFTDNWDLAUNDRYPATIO164 SFWALKWAYUPDNSTAIR 1W D LINENBEDROOM 3BEDROOM 2POWD.CLCLCLCLLAUNDRYUNIT 52112 SFPATIO149 SFELEVATORLIVINGDININGLIVINGMASTERBEDROOMKITCHENREF.PANTRYD/W STORAGE 437 S.F.STORAGE 537 S.F.DWDININGD/W MASTERBEDROOMBEDROOM 3BEDROOM 2KITCHENCLLAUNDRYCLREF.UNIT 42147 SFPANTRY LINENCLCL3'-0"2'-8"15'-11"12'-0"16'-7"19'-4"7'-2"11'-10"5'-2"21'-0"10'-4"87'-6"97'-0"9'-2"13'-3"15'-11"27'-9"20'-1"11'-0"10'-1"11'-2"31'-2"13'-8"16'-4"10'-8"1'-0"1'-5"1'-0"1'-0"8"1'-1"1'-4"9"10'-1"11'-0"18'-11"10'-4"29'-7"5'-6"11'-2"2'-6"8'-2"6"3'-0"6'-0"1'-0"8"6'-9"12'-4"9'-8"4'-5"4'-5"2'-8"1'-0"8"A4.23A4.24A4.12A4.118"6'-0"4'-4"1'-0"4'-0"1'-0"1'-0"1'-0"7'-0"5"12'-9"AREA OFCOMMERCIALGREASE DUCT SHAFTDate:5-13-19Sheet Title:Sheet Number:Project:File:Revisions:12GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008SDP 2018-0010DEV 2018-0055KIRK MOELLER ARCHITECTS, INC.2888 LOKER AVE. EAST, STE 220CARLSBAD, CA 92010KIRK@KMARCHITECTSINC.COM760-814-8128A2.38'04'16' PLANTER 72 SFCOVERED WALKWAYFACE OF BUILDING WALL BELOWUPDNUPDNSTAIR 1STAIR 2STORAGE 678 S.F.DININGDWUPUNIT 63418 SFUPBEDROOM 3BEDROOM 4PATIO191 SFCLCLCLLAUNDRYMASTERBEDROOMREF.D/WFOYERLIVINGPANTRYDUAL SIDEDFIREPLACE / TVCOVERED PATIO620 SFBEDROOM 2LINENUPSKYLIGHTABOVENICHELINENRAISED PATIO803 SFCLCLPOWDERELEVATORWINELOW WALL, TYP.GUARDRAILHEIGHT PERROOF PLANUNOCCUPIEDROOF AREALOW WALL, TYP.UNOCCUPIEDMECHANICALAREA3'-2"3'-7"6'-4"2'-6"10'-5"5'-2"7'-2"18'-10"5'-2"21'-0"10'-4"87'-6"98'-0"3'-0"14'-2"19'-1"14'-7"20'-1"11'-0"10'-1"18'-0"12'-5"16'-3"1'-5"1'-0"1'-0"8"1'-1"1'-4"9"8'-9"9'-5"10'-4"1'-4"5'-6"11'-2"2'-6"2'-4"3'-0"6'-0"1'-0"4'-0"2'-8"6'-9"11'-10"9'-8"A4.23A4.24A4.12A4.113'-0"7'-9"6'-11"6"1'-11"5'-2"14'-2"1'-0"18'-8"10'-9"3'-9"20'-10"3'-0"5'-10"1'-0"4'-9"7'-4"8"1'-0"6'-5"1'-5"1'-10"1'-6"2'-7"AREA OFCOMMERCIALGREASE DUCT SHAFTDate:5-13-19Sheet Title:Sheet Number:Project:File:Revisions:12GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008SDP 2018-0010DEV 2018-0055KIRK MOELLER ARCHITECTS, INC.2888 LOKER AVE. EAST, STE 220CARLSBAD, CA 92010KIRK@KMARCHITECTSINC.COM760-814-8128A2.48'04'16' DNUNIT 6 PRIVATE ROOF DECK1934 SFWGS81 C.F.LOWSTORAGEMECHANICAL YARD 4TH FLOOR BELOW4TH FLOOR PLANTER BELOWBALCONY PARAPET 2ND FLOOR BELOW4TH FLOOR WALKWAY BELOW49'-6"ALL ROOF DECK AREAS TO DRAIN MINIMUM1/4"/FT. TO INTERNAL DRAIN SYSTEMGREASE DUCTCHASE BELOWBALCONY PARAPET 3RD FLOOR BELOWSCUPPERROOF DRAIN(TYP.)4TH FLOOR DECK BELOW4TH FLOORDECK BELOWMECHANICAL YARD48'-6"49'-6"48'-6"49'-6"48'-6"48'-6"46'-4"47'-4"46'-4"49'-6"47'-4"49'-6"48'-6"38'-4 1/2"38'-4 1/2"48'-6"38'-4 1/2"16'-7 1/2"18'-1 1/2"43'-4"39'-8 1/2"38'-4 1/2"38'-4 1/2"43'-7"40'-10 1/2"41'-3"42'-11"38'-10 1/2"41'-10 1/2"40'-4 1/2"45'-3"RIDGE 47'-5 1/2"RIDGE 46'-10 1/2"AREA OF SOLARFIELD. 16 PV PANELSWITH A MIN. OF 500WATTS EACH UNIT.48 TOTAL PANELS.OPERABLE SLIDINGSKYLIGHT- DASHED LINEINDICATES "OPEN"POSITION48'-6"GUARDRAIL48'-6"GUARDRAIL48'-6"GUARDRAIL48'-6"49'-6"48'-6"48'-6"48'-6"48'-6"2:122:122:122% MIN. TYP.2% MIN. TYP.2% MIN. TYP.2% MIN. TYP.2% MIN. TYP.2% MIN. TYP.2% MIN. TYP.2% MIN. TYP.2% MIN. TYP. TYP.2% MIN. TYP.2% MIN. TYP.2% MIN. TYP.2% MIN. TYP.2% MIN. TYP.2:122:122:122:122:122:1248'-6"GUARDRAIL46'-4"SCUPPERSCUPPER41'-10 1/2"41'-10 1/2"40'-10 1/2" TYP.AREA OF SOLARFIELD. 11 PV PANELSWITH A MIN. OF 500WATTS EACH PANEL.48 TOTAL PANELS.AREA OF SOLARFIELD. 9 PV PANELSWITH A MIN. OF 500WATTS EACH PANEL.48 TOTAL PANELS.AREA OF SOLARFIELD FOR HOTWATER HEATING. 2PV PANELS WITH AMIN. OF 500 WATTSEACH PANEL. 2TOTAL PANELS.AREA OF SOLARFIELD. 13 PVPANELS WITH AMIN. OF 500WATTS EACHUNIT. 48 TOTALPANELS.48'-6"GUARDRAILDate:5-13-19Sheet Title:Sheet Number:Project:File:Revisions:12GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008SDP 2018-0010DEV 2018-0055KIRK MOELLER ARCHITECTS, INC.2888 LOKER AVE. EAST, STE 220CARLSBAD, CA 92010KIRK@KMARCHITECTSINC.COM760-814-8128A2.58'04'16' PROJECTCOMMERCIAL LIGHTING- LIGHT FIXTURES SHALL BEDOWNCAST OR LOW CUT OFF FIXTURES TO PREVENT GLAREAND LIGHT POLLUTIONOFF-WHITE SMOOTH STUCCOCOVERED PLAZA10'-1 1/2"10'-1 1/2"10'-1 1/2"14'-7 1/2"2ND FLOOR3RD FLOORMAX. HEIGHT4'-6"4TH FLOORROOF DECK45'-0"49'-6" ARCHITECTURAL PROJECTIONROLL-UP COMMERCIAL METALGRATE GARAGE DOORLIGHT GREY SMOOTH STUCCO TRIM AND PARAPET CAPS54.2 (E) GRADEAPPROX. LOCATION OFMECHANICAL UNITS BEHIND ARCH.FEATURE PER VBMP 2.8.2.F.6.LIGHT GREY SMOOTH STUCCO DECORATIVE 3 INCHEYEBROW ACCENTS, TYP.HORIZONTAL SIDING- JAMES HARDIE DREAMCOLLECTION PACIFIC BLUE (EQ. SW PAINT #6509)NATURAL LIMESTONE TILE- ROCAS AZUL 12X24 BYARIZONA TILEDARK GREY METAL CANOPY AND PARAPET CAPELDORADO STONE VINTAGE RANCH, COLOR: SADDLEWOODPROVIDED BY THOMPSON BUILDING MATERIALSDECORATIVE STOREFRONT SYSTEM WITH MATTE BLACK MULLION COLORCLEAR RESIDENTIAL GLASS WITH BLACK VINYL WINDOW TRIM,RECESSED 2"-3", TYPICAL786GRANDTENANTOFF-WHITE SMOOTH STUCCONATURAL LIMESTONE TILE- ROCAS AZUL 12X24 BY ARIZONA TILEGLASS RAILINGDARK GREY METAL CANOPY AND PARAPET CAPRETAIL STREET FACADE FROMFINISHED FLOOR TO PLATEHEIGHT- WALL AREA: 911 SF(DASHED LINE)AREA OF GLAZING: 460 SFPERCENTAGE REQUIRED: 45%PER VBMP 2.6.3A 1PERCENTAGE PROVIDED: 50%14'-7 1/2"10'-1 1/2"10'-1 1/2"8'-1 1/2"2'-0"4TH FLR DECK4TH FLOOR3RD FLOOR2ND FLOORROOF DECKMAX. HEIGHT4'-6"45'-0"49'-6" ARCHITECTURAL PROJECTIONAPPROX. LOCATION OFMECHANICAL UNITS BEHIND ARCH.FEATURE PER VBMP 2.8.2.F.6.LIGHT GREY SMOOTH STUCCO TRIM AND PARAPET CAPS54.2 (E) GRADE8" TRIM BOARD PAINTED TO MATCHTRIM COLORHORIZONTAL SIDING- JAMES HARDIE DREAM COLLECTION PACIFICBLUE (EQ. SW PAINT #6509)ELDORADO STONE VINTAGE RANCH, COLOR: SADDLEWOODPROVIDED BY THOMPSON BUILDING MATERIALSLIGHT GREY SMOOTH STUCCO DECORATIVE 3 INCH EYEBROWACCENTS, TYP.DECORATIVE STOREFRONT SYSTEM WITH MATTE BLACK MULLION COLORCLEAR RESIDENTIAL GLASS WITH BLACK VINYL WINDOW TRIM,RECESSED 2"-3", TYPICALDate:5-13-19Sheet Title:Sheet Number:Project:File:Revisions:12GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008SDP 2018-0010DEV 2018-0055KIRK MOELLER ARCHITECTS, INC.2888 LOKER AVE. EAST, STE 220CARLSBAD, CA 92010KIRK@KMARCHITECTSINC.COM760-814-8128A3.1-28'04'16'8'04'16' DECORATIVE BURNISHED BLOCKDECORATIVE METAL SCREENS10'-1 1/2"10'-1 1/2"10'-1 1/2"14'-7 1/2"3RD FLOORROOF DECK4TH FLR DECK4TH FLOOR2ND FLOORMAX. HEIGHT4'-6"45'-0"49'-6" ARCHITECTURAL PROJECTIONLIGHT GREY SMOOTH STUCCO TRIM AND PARAPET CAPS54.2 (E) GRADEDECORATIVE ARTIFICIAL WALL PLANTERSOFF-WHITE SMOOTH STUCCOHORIZONTAL SIDING- JAMES HARDIE DREAMCOLLECTION PACIFIC BLUE (EQ. SW PAINT #6509)LIGHT GREY SMOOTH STUCCO DECORATIVE 3 INCHEYEBROW ACCENTS, TYP.8" TRIM BOARD PAINTED TO MATCHTRIM COLORNATURAL LIMESTONE TILE- ROCAS AZUL 12X24 BYARIZONA TILE1'-0"DARK GREY METAL CANOPY AND PARAPET CAPCLEAR RESIDENTIAL GLASS WITH BLACK VINYLWINDOW TRIM, RECESSED 2"-3", TYPICAL10'-1 1/2"10'-1 1/2"10'-1 1/2"14'-7 1/2"4TH FLOOR3RD FLOOR2ND FLOORROOF DECKMAX. HEIGHT4'-6"45'-0"49'-6" ARCHITECTURAL PROJECTIONDECORATIVE BURNISHED BLOCKDECORATIVE METAL SCREENS54.2 (E) GRADELIGHT GREY SMOOTH STUCCO TRIM AND PARAPET CAPSOFF-WHITE SMOOTH STUCCOHORIZONTAL SIDING- JAMES HARDIE DREAMCOLLECTION PACIFIC BLUE (EQ. SW PAINT #6509)LIGHT GREY SMOOTH STUCCO DECORATIVE 3 INCHEYEBROW ACCENTS, TYP.ELDORADO STONE VINTAGE RANCH, COLOR: SADDLEWOODPROVIDED BY THOMPSON BUILDING MATERIALSCLEAR RESIDENTIAL GLASS WITH BLACK VINYLWINDOW TRIM, RECESSED 2"-3", TYPICALSTORAGE ROOMSDIRECTLY ABOVE TRASHENCLOSURE ACTING AS"ROOF"DECORATIVE BLACKVENT IN EACH DOOR TOBE SIZED PER REQ'D.7'-0"13'-0" 4 EQ.1'-0"2'-7"METAL TRIMMEDDOORS WITHDECORATIVE AEPSPAN FLEXSERIES 1.5FX20-12METAL PANEL,COLOR TO MATCHBUILDING TRIMDate:5-13-19Sheet Title:Sheet Number:Project:File:Revisions:12GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008SDP 2018-0010DEV 2018-0055KIRK MOELLER ARCHITECTS, INC.2888 LOKER AVE. EAST, STE 220CARLSBAD, CA 92010KIRK@KMARCHITECTSINC.COM760-814-8128A3.1-28'04'16'8'04'16'8'04'16' PARKING GARAGEEXTERIOR HALLWAYFOYERCLKITCHENPANTRYEXTERIOR HALLWAYFOYERCLKITCHENPANTRYKITCHENHALLWAYBEDROOMSTORAGEROOF DECKROOF DECKROOF9'-0"5'-0"7 1/2"3'-6"6'-7 1/2"3'-6"6'-7 1/2"3'-6"6'-7 1/2"4'-6"2'-0"3'-6"10'-1 1/2"1'-0"49'-6" TOP OF ARCHITECTURAL PROJECTION14'-7 1/2"10'-1 1/2"10'-1 1/2"10'-1 1/2"45'-0" TOP OF ROOF10'-1 1/2"8'-1 1/2"14'-7 1/2"3'-6"LIVING ROOMDINING KITCHENLIVING ROOMRETAILCOVERED PATIORETAILLIVING ROOMDINING KITCHENLIVING ROOMEXTERIORBALCONYBALCONYBALCONYBALCONYRAISED PATIO14'-0"BOTTOM OF PLATE7 1/2"3'-6"14'-7 1/2"3'-6"6'-5 1/2"49'-6" TOP OF ARCHITECTURAL PROJECTION14'-7 1/2"10'-1 1/2"12'-1 1/2"8'-1 1/2"45'-0" TOP OF ROOF8'-11 1/2"1'-2"10'-11 1/2"1'-2"6'-10 1/2"1'-3"4'-6"8'-7 1/2"6'-7 1/2"3421GRANDJEFFERSONDate:5-13-19Sheet Title:Sheet Number:Project:File:Revisions:12GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008SDP 2018-0010DEV 2018-0055KIRK MOELLER ARCHITECTS, INC.2888 LOKER AVE. EAST, STE 220CARLSBAD, CA 92010KIRK@KMARCHITECTSINC.COM760-814-8128A4.1-28'04'16'8'04'16' PARKING GARAGERETAILLIVING ROOMRAISED PATIOKITCHENDINING ROOMHALLWAY/ ENTRYLIVING ROOMKITCHENDINING ROOMHALLWAY/ ENTRYMASTER BEDROOMHALLDINING ROOM/ KITCHENLIVING ROOMCOVERED PATIOSTORAGEROOF DECKLIVING ROOM5'-0"4'-6"1'-6"10'-1 1/2"2'-0"49'-6" TOP OF ARCHITECTURAL PROJECTION14'-7 1/2"10'-1 1/2"10'-1 1/2"10'-1 1/2"45'-0" TOP OF ROOF14'-0"BOTTOM OF PLATE7 1/2"3'-6"6'-7 1/2"8'-11 1/2"1'-2"3'-4"5'-7 1/2"1'-2"4'-6"3'-1 1/2"6'-7 1/2"3'-6"14'-7 1/2"3'-6"PARKING GARAGERETAILBALCONYBALCONYMASTER BEDROOM MASTER CLOSET BEDROOM KITCHENKITCHENPANTRYCOVERED PATIOMASTER BEDROOMRAISED PATIOCLOSET SHOWER MASTER BEDROOMMASTER BEDROOM MASTER CLOSETBALCONYBEDROOMBEDROOM BEDROOMROOF DECK3'-6"4'-2"3'-6"3'-6"49'-6" TOP OF ARCHITECTURAL PROJECTION14'-7 1/2"10'-1 1/2"10'-1 1/2"10'-1 1/2"45'-0" TOP OF ROOF14'-0"BOTTOM OF PLATE3'-6"5'-5 1/2"1'-2"8'-11 1/2"1'-2"3'-4"5'-7 1/2"1'-2"4'-6"7 1/2"3'-11 1/2"8'-7 1/2"6'-7 1/2"14'-7 1/2"3421GRANDJEFFERSONDate:5-13-19Sheet Title:Sheet Number:Project:File:Revisions:12GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008SDP 2018-0010DEV 2018-0055KIRK MOELLER ARCHITECTS, INC.2888 LOKER AVE. EAST, STE 220CARLSBAD, CA 92010KIRK@KMARCHITECTSINC.COM760-814-8128A4.1-28'04'16'8'04'16'