Loading...
HomeMy WebLinkAbout2019-10-16; Planning Commission; ; CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSONItem No. Application complete date: July 3, 2019 P.C. AGENDA OF:October 2, 2019 Project Planner: Jason Goff Project Engineer: Tecla Levy SUBJECT: CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON - Request for a recommendation of approval of a Tentative Tract Map and Site Development Plan to construct a four-story mixed-use building with seven air-space condominiums consisting of six residential units and one commercial unit on a 0.21-acre site located at 786 Grand Avenue in the Village Center (VC) District of the Village and Barrio Master Plan and within Local Facilities Management Zone 1. The City Planner has determined that this project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment, and is therefore categorically exempt from the requirement for the preparation of environmental documents pursuant to section 15332 (In-fill Development Projects) of the State CEQA guidelines. I.RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 7347 RECOMMENDING APPROVAL of Tentative Tract Map CT 2018-0008 and Site Development Plan SDP 2018-0010 to the City Council based on the findings and subject to the conditions contained therein. II.PROJECT DESCRIPTION AND BACKGROUND Project Setting: The 0.21-acre site is comprised of four (4) legal lots (Lots 13-16 of Map No. 535 recorded in 1888) located on the northwest corner of Grand Avenue and Jefferson Street. The site consists of a relatively level, rectangular shaped property, and is developed with a vacant one-story building constructed between 1947 and 1948. The existing structure served as a single-family residence for 62 years before operating as a small day care home from 2010 to 2018. The project is located outside of the Coastal Zone and is within the Village Center (VC) District of the Village and Barrio Master Plan (VBMP). Table A below includes the General Plan designations, zoning and current land uses of the project site and surrounding properties. TABLE A – SITE AND SURROUNDING LAND USES Location General Plan Designation Zoning Current Land Use Site Village/Barrio (V-B) Village/Barrio (V-B) – Village Center (VC) per the VBMP Vacant one-story small daycare home North V-B V-B (VC)One-story single-family home 2 CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 2 TABLE A – SITE AND SURROUNDING LAND USES (CONTINUED) Location General Plan Designation Zoning Current Land Use South V-B V-B (VC)Two-and-three-story offices East V-B V-B (VC) One-story medical office and three-story multiple- family residential West V-B V-B (VC) One-story medical office and restaurant (Grand Avenue Bar and Grill) Project Description: The project applicant, RREG Investment, LLC Series 1033, is requesting approval of a Tentative Tract Map (CT) and Site Development Plan (SDP) to demolish the existing structure, and construct a 16,272-square- foot four-story mixed-use building consisting of six (6) residential units, one (1) ground floor commercial unit (1,823 square feet), an outdoor covered patio (344 square feet), and a roof deck (1,934 square feet). A detailed breakdown of each unit is summarized in Table B below. TABLE B – DETAILS FOR UNIT TYPE Unit# Floor Assignment Size (Gross SF) Bedroom/ Bathrooms Storage Open Space Patio Roof Deck Commercial 1st 1,823 SF -- -- 344 SF -- 1 2nd 2,147 SF 3/3 37 SF 174 SF -- 2 2nd 2,112 SF 3/2.5 37 SF 149 SF -- 3 2nd/3rd 2,395 SF 2/2 -- 238 SF -- 4 3rd 2,147 SF 3/3 37 SF 164 SF -- 5 3rd 2,112 SF 3/2.5 37 SF 149 SF -- 6 4th 3,414 SF 4/3.5 78 SF 1,614 SF 1,934 SF The project also includes construction of an enclosed at-grade parking garage with 12 vehicle parking spaces and six (6) bicycle parking spaces provided within. Access to the garage is provided from Jefferson Street. The proposed density is 28.6 dwelling units per acre (du/ac) and generates a net increase of 36 average daily trips (ADT) over the previous day care use for a total of 121 ADTs. Grading for the proposed project includes 150 cubic yards (CY) of cut, 15 CY of fill, and 135 CY of export. In addition to the 1,823 square feet of commercial space fronting Grand Avenue, the ground floor also includes a covered patio (344 square feet) to serve a future commercial tenant and a separate lobby area (124 square feet) with stairs and elevator access to the residential units above. The proposed roof deck is a private amenity for Unit 6. Access to the roof deck is being provided through an operable skylight with stairs leading onto the roof. As such, the project does not propose any stair or elevator tower elements that would project above the allowable building height. Frontage improvements along both Grand Avenue and Jefferson Street include new curb, gutter, sidewalks, bike racks, street trees and landscaping. The proposed architectural design is characterized as contemporary. The ground floor elevations of the proposed building fronting on Grand Avenue and Jefferson Street incorporate a natural limestone tile and a faux wood veneer by Eldorado Stone in a color described as “sandalwood.” This faux wood material is also incorporated into a portion of the fourth-floor elevation facing Grand Avenue. The rest of the building materials consist of horizontal siding, smooth stucco, and decorative burnished block. All residential CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 3 windows are recessed two-to-three-inches in depth and consist of clear residential glass set within black vinyl trim. The ground floor street-facing elevation at the commercial tenant space and lobby area will include a large glass storefront system with matte black window mullions and frames. Metal canopies and overhanging parapet caps accent portions of the building elevations and tower features. Third level balconies facing Grand Avenue include glass railings, while large four-foot-wide landscape planters adorn the three levels located above the parking garage entrance facing Jefferson Street. A CT is required to merge the four (4) existing legal lots into one (1) common lot with seven airspace condominium units consisting of six (6) residential units and one (1) commercial unit. The SDP is required per Section 6.3.3.B.1(a) of the VBMP for new construction of buildings over 5,000 square feet (cumulative gross floor area) in size or new buildings or projects with more than four (4) dwelling units. Both permits require a Planning Commission recommendation and City Council approval. III. ANALYSIS The proposed project is subject to the following ordinances, standards, and policies: A. Village-Barrio (V-B) General Plan Land Use Designation; B. Village-Barrio (V-B) Zone (CMC Chapter 21.35), Village Center (VC) District of the Village and Barrio Master Plan; C. Subdivision Ordinance (CMC Title 20); D. Inclusionary Housing Ordinance (CMC Chapter 21.85); and E. Growth Management Ordinance (CMC Chapter 21.90), Local Facilities Management Plan Zone 1. The recommendation for approval of this project was developed by analyzing the project’s consistency with the applicable regulations and policies. The project’s compliance with each of the above regulations and policies is discussed in the sections below. A. Village-Barrio (V-B) General Plan Land Use Designation The subject property has a General Plan Land Use designation of Village-Barrio (V-B) and is within the Village Center (VC) District of the Village and Barrio Master Plan (VBMP). Properties within the VC District do not have an assigned residential density as it relates to Growth Management Plan compliance. Therefore, the minimum and maximum densities for residential development are established in the VBMP. Table C below identifies the permissible density range for properties within the VC District, as well as the allowable density range based on the size of the project site and the proposed density and units. TABLE C – PROPOSED DENSITY Gross Acres Net Acres Allowable Density Range; Min/Max Dwelling Units per Village and Barrio Master Plan* Project Density; Proposed Dwelling Units 0.21 0.21 28-35 dwelling units per acre (du/ac) Minimum: 3 dwelling units Maximum: 7 dwelling units 28.6 du/ac 6 dwelling units * For mixed-use projects, the minimum density shall be calculated based on fifty percent of the developable area and the maximum density shall be calculated based on the entire developable area (VBMP, Chapter 2.4). CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 4 As identified above, the project’s density of 28.6 du/ac falls below the maximum density of 35 dwelling units per acre and, therefore, complies with the allowed density for the VC District. Pursuant to the Housing Element of the General Plan, because a Growth Management Control Point has not been established for residential development in the VC District, all residential units approved in the Village must be withdrawn from the city’s Excess Dwelling Unit Bank (EDUB). The EDUB is implemented through City Council Policy No. 43. Pursuant to City Council Policy No. 43, an applicant for an allocation of dwelling units shall agree to provide the number of inclusionary units or fee as required pursuant to CMC Section 21.85.110. The project is conditioned to pay an affordable housing in-lieu fee on a per unit basis prior to building permit issuance for five units, or six units if building permits for the six-unit project have not been applied for within two years of demolishing the existing single-family home on-site. In order to approve an allocation of excess dwelling units, the project shall meet the findings identified in City Council Policy No. 43. Specifically, the project location and density shall be found to be compatible with adjacent land uses and the project is consistent with the General Plan and any other applicable planning document. As the proposed project requires action by the City Council, the City Council is the final decision-making authority for the allocation from the EDUB. Lastly, the project is subject to compliance with the Elements of the General Plan as outlined in Table D below: TABLE D – GENERAL PLAN COMPLIANCE Element Use, Classification, Goal, Objective, or Program Proposed Uses & Improvements Comply Land Use Goal 2-G.29: Maintain and enhance the Village as a center for residents and visitors with commercial, residential, dining, civic, cultural, and entertainment activities. The proposal to construct a mixed-use project with six (6) residential condominiums and ground floor retail would enhance the vitality of the Village by providing new residential and commercial land uses near the downtown core area. The project reinforces the pedestrian orientation desired for the downtown area by providing residents an opportunity to walk to shopping, restaurants, recreation, and mass transit functions. The project’s proximity to existing bus routes and mass transit help further the goal of providing new economic development near transportation corridors. Overall, the mixed-use project would contribute toward the revitalization of the Village area. Yes Goal 2-G.30: Develop a distinct identity for the Village by encouraging a variety of uses and activities, such as a mix of residential, commercial office, restaurants and specialty retail shops, which traditionally locate in a pedestrian–oriented downtown area and attract visitors and residents from across the community by creating a lively, interesting social environment. CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 5 TABLE D – GENERAL PLAN COMPLIANCE (CONTINUED) Element Use, Classification, Goal, Objective, or Program Proposed Uses & Improvements Comply Land Use Policy 2-P.70: Seek an increased presence of both residents and activity in the Village with new development, particularly residential, including residential as part of a mixed-use development, as well as commercial, entertainment and cultural uses that serve both residents and visitors. See response above. Yes Mobility Goal 3-G.3: Provide inviting streetscapes that encourage walking and promote livable streets. The proposed project is located approximately one-quarter mile from the Carlsbad Village train station, which provides rail and bus service throughout the day. The project’s proximity to the transit station would provide residents with the opportunity to commute to major job centers, thereby reducing vehicle miles traveled (VMTs) and the carbon footprint. Furthermore, the project supports walkability and mobility by locating the project near existing goods and services within the Village. Yes Policy 3-P.5: Require developers to construct or pay their fair share toward improvements for all travel modes consistent with the Mobility Element, the Growth Management Plan, and specific impacts associated with their development. The proposed project has been designed to meet circulation requirements, which include maintaining or enhancing frontage improvements consisting of sidewalks and landscaping. In addition, the applicant is required to pay traffic impact fees prior to the issuance of building permits that would go toward future road improvements. Yes CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 6 TABLE D – GENERAL PLAN COMPLIANCE (CONTINUED) Element Use, Classification, Goal, Objective, or Program Proposed Uses & Improvements Comply Mobility Policy 3-P.41: Consider supporting new development and existing businesses with various incentives (such as parking standards modifications) for implementing TDM programs that minimize the reliance on single occupant automotive travel during peak commute hours. The proposed project has been designed to reduce its reliance on single occupant automotive travel by substituting one commercial/retail parking space for six bicycle parking spaces located inside the parking garage in accordance with the Area-Wide Standards of the Village and Barrio Master Plan. These bicycle parking spaces consist of two vertical hanging racks that will accommodate up to three bicycles each. The project is also providing additional bicycle parking along both the Grand Avenue and Jefferson Street frontages. Yes Noise Goal 5-G.2: Ensure that new development is compatible with the noise environment, by continuing to use potential noise exposure as a criterion in land use planning. Policy 5.P.2: Require a noise study analysis be conducted for all discretionary development proposals located where projected noise exposure would be other than “normally acceptable.” The proposed project is consistent with the Noise Element of the General Plan in that the building’s design, with windows closed, complies with the requirements of the noise study (Birdseye Planning Group, LLC, dated September 2018) and adequately attenuates the interior noise levels for the new condominiums to 45 dB(a) CNEL or less (i.e., interior average noise level). The project is conditioned to provide mechanical ventilation. Yes Housing Policy 10-P.15: Pursuant to the Inclusionary Housing Ordinance, require affordability for lower income households of a minimum of 15 percent of all residential ownership and qualifying rental projects. The inclusionary housing requirement may be satisfied through the payment of an in-lieu fee for projects that have less than seven units. The six-unit residential air-space condominium project is consistent with the Housing Element of the General Plan and the Inclusionary Housing Ordinance as the project has been conditioned to pay an affordable housing in-lieu fee on a per unit basis prior to building permit issuance for five units, or six units if building permits for the six-unit project have not been applied for within two years of demolishing the existing single-family home on-site. Yes CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 7 TABLE D – GENERAL PLAN COMPLIANCE (CONTINUED) Element Use, Classification, Goal, Objective, or Program Proposed Uses & Improvements Comply Public Safety Goal 6-G.1: Minimize injury, loss of life, and damage to property resulting from fire, flood, hazardous material release, or seismic disasters. Policy 6-P.6: Enforce the requirements of Titles 18, 20, and 21 pertaining to drainage and flood control when reviewing applications for building permits and subdivisions. Policy 6-P.34: Enforce the Uniform Building and Fire codes, adopted by the city, to provide fire protection standards for all existing and proposed structures. Policy 6-P.39: Ensure all new development complies with all applicable regulations regarding the provision of public utilities and facilities. The proposed structural improvements would be required to meet all seismic design standards. The Fire Department has reviewed and approved the proposed conceptual building design with fire sprinklers included throughout the building along with a wet standpipe per the National Fire Protection Association (NFPA) 24 standards. Therefore, the proposed project is consistent with the applicable fire safety requirements. The project would be required to develop and implement a program of “best management practices” for the elimination and reduction of pollutants which enter and/or are transported within storm drainage facilities. The project has been conditioned to pay all applicable public facilities fees for Zone 1. Yes B. Village-Barrio Zone (CMC Chapter 21.35) and Village Center District The subject property is located within the Village Center (VC) District of the Village and Barrio Master Plan (VBMP). Mixed-use is permitted by right in the VC District. The project’s compliance with the development standards specific to the VC District, as well as the Area-Wide Standards of the VBMP, are provided in Tables E and F below. Please see Attachment 4 for an analysis of the project’s compliance with the Design Guidelines of the VBMP. CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 8 TABLE E – VILLAGE AND BARRIO MASTER PLAN - VILLAGE CENTER (VC) DISTRICT Standard Required/Allowed Proposed Comply Front/ Corner Setback Minimum of 0 feet; maximum of 5 feet to building (at the ground floor). Additional depth permitted where area includes a plaza, courtyard, or outdoor dining. Additional depth is also permitted to accommodate electrical transformers, utility connection, meter pedestals, and similar equipment only if other locations are infeasible as determined by the decision-maker. Grand Avenue: 1st floor: 1′-0″* *A 7′-3″ setback at the commercial tenant space entry vestibule is necessary to accommodate two water quality treatment planters that have been sized down to their minimum volume capacities. 2nd floor: 1′-0″ to 15′-0″ 3rd floor: 1′-0″ to 15′-0″ 4th floor: 20′-4″ to 29′-2″ Yes Jefferson Street: 1st Floor: 1′-0″* *A 10′-0″ setback for a courtyard w/ utilities (gas meters) at the residential lobby. *A 10’-1” utility setback for the Fire Department Connection (FDC) and electrical transformer. 2nd floor: 1′-0″ to 11′-2″ 3rd floor: 1′-0″ to 11′-2″ 4th floor: 1′-0″ to 11′-2″ Side Setback No minimum setback North side: 8” to 4′-8″ West side: 1′-4″ to 14′-0″ Yes Rear Setback No minimum setback No rear yard. This is a corner lot with two sides. Yes Lot Coverage Not applicable 87.9 percent Yes CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 9 TABLE E – VILLAGE AND BARRIO MASTER PLAN - VILLAGE CENTER (VC) DISTRICT (CONTINUED) Standard Required/Allowed Proposed Comply Density 28 to 35 du/ac 28.6 du/ac Yes Open Space Minimum of 60 square feet of private open space per unit; minimum dimension of 6 feet in any direction. Common open space not required for projects with less than 11 units. All open space is proposed as private patios and a roof deck. The smallest patio proposed is 149 square feet with a dimension of 12′- 0″ by 12′-9″. Each patio/roof deck area exceeds the minimum area and dimension requirements. Yes Service/ Delivery Areas Service and loading shall be conducted using alley access where the condition exists. No alley access exists. Yes Building Height Maximum 45 feet, 4 stories 45 feet, 4 stories Yes If a 4-story building is proposed: A maximum of 30 percent of the 4th story, street-facing façade can have a zero-foot setback. The remaining 70 percent shall be set back a minimum of 10 feet. Grand Avenue 4th floor: All 78′-2″ of the building’s lineal street frontage is set back greater than 10 feet. Jefferson Avenue 4th Floor: 30% of the building’s lineal street frontage (78′-8″) equals 21 feet. Therefore, no more than 21 feet can have a zero-foot setback. 21 feet of this street frontage is set back between 1′-0″ and 4′-0″. The remaining 70% of this street frontage is set back 10 feet or greater. If a 4-story building is proposed: The total square footage of enclosed 4th story floor space shall not exceed 80 percent of the 3rd floor footprint of the building (exclusive of balcony/patio) 3rd floor area: 7,478 SF Excluding patios: 7,165 SF 4th floor area: 4,048 SF The enclosed 4th story floor space represents 56 percent of the 3rd floor footprint. CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 10 TABLE E – VILLAGE AND BARRIO MASTER PLAN - VILLAGE CENTER (VC) DISTRICT (CONTINUED) Standard Required/Allowed Proposed Comply Building Massing No building façade visible from any public street shall extend more than 40 feet in length without a 5-foot minimum variation in the wall plane, as well as a change in roofline. All building elevations visible from Grand Avenue and Jefferson Street have been articulated to incorporate the minimum 5-foot variation in wall plane as required. The building roofline is also varied appropriately. Yes Ground Floor Street Frontage Uses New ground floor street frontage uses shall occupy more than one- half of the habitable space developed on the ground floor and shall span at least 80 percent of the building frontage. Up to 20 percent of a building frontage may be used for a lobby or entryway to uses above or behind ground floor street uses. The ground floor commercial unit oriented towards Grand Avenue occupies more than one-half of the habitable space and incudes a covered outdoor plaza on the corner at its intersection with Jefferson Street. The ground floor commercial unit, including the covered outdoor plaza, spans 100 percent of the building frontage. Along Jefferson Street the residential lobby area with stairwell and elevator is less than 20 percent of building frontage; however, the 80 percent ground floor commercial street frontage cannot be achieved without eliminating parking and vehicular access. Eliminating parking will reduce the number of residential units and the minimum density of 28 dwelling units per acre will not be achieved. Therefore, a standards modification is required to achieve the required minimum density for the project. The necessary findings to support the standards modification are provided below. Yes CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 11 TABLE F – VILLAGE AND BARRIO MASTER PLAN - AREA-WIDE STANDARDS Standard Required/Allowed Proposed Comply Ingress/ Egress Development shall be permitted a maximum of one access point from the public street. A driveway curb cut shall not exceed 20 feet in width and shall maintain a free line of sight. One access point is proposed off Jefferson Street. The width of the proposed driveway curb cut, exclusive of the approach, is 20 feet and provides a free line of site. Yes Parking Multiple-family Dwellings w/ two or more bedrooms: One and a half spaces per unit, one space required to be covered. No visitor parking required. No compact spaces allowed. 2-Bedroom Units: 1 unit x 1.5 = 1.5 spaces 3-bedroom Units: 4 units x 1.5 = 6 spaces 4-Bedroom Units: 1 unit x 1.5 = 1.5 spaces No. of Spaces Required: 9 spaces No. of Spaces Provided: 9 spaces All spaces are covered. Yes Commercial Retail: One space per 415 square feet of gross floor area 1,823 square feet ÷ 415 = 4 spaces No. of Spaces Required: 4 spaces No. of Spaces Provided: 3 spaces (see section below) Substitution of Car Parking with Bicycle Parking: New and existing uses with at least five required or existing off-street parking spaces may convert or substitute a minimum of one vehicle space and up to one space for every 10 vehicle spaces to unrequired additional bicycle parking as long as the spaces are conveniently located near the entrance, yield at least six bicycle parking spaces per parking space, and comply with the requirements of the city engineer. 1 commercial/retail parking space has been substituted inside the parking garage for 6 bicycle parking spaces. The proposed bicycle parking consists of two vertical hanging racks that will accommodate up to three bicycles each. In addition, the project is also providing bicycle parking along both the Grand Avenue and Jefferson Street frontages. CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 12 TABLE F – VILLAGE AND BARRIO MASTER PLAN - AREA-WIDE STANDARDS (CONTINUED) Standard Required/Allowed Proposed Comply Building Orientation Buildings shall be oriented toward primary street frontage. The primary entrance of a ground floor commercial use shall be oriented towards the primary street frontage. Of the two frontages, Grand Avenue exhibits more of an urban environment and was chosen as the primary frontage. The ground floor commercial storefront and entrance have been oriented towards this frontage. The upper floors of the building, which include the residential units, have also been oriented such that their primary living spaces and patios are oriented towards this frontage to help activate the street frontage below. Jefferson Street, which consists of more transitional type uses (i.e., professional offices, apartments, and single-family homes), has a less urban feel to it. As such, access to the parking garage and residential lobby have been oriented along this frontage. Yes Window Glazing 45 percent minimum glazing of ground-floor façade for retail uses adjacent to a public street. Façade measured from plate height to finish floor. Area of Glazing = 460 square feet Percentage Required = 45 percent Percentage Provided = 50 percent Yes The bottom of any window or product display window shall not be more than 3.5 feet above the adjacent sidewalk. Storefront glazing extends to the ground. Transparent or translucent glazing is required on the ground-floor façade of a commercial or retail use facing a public street. Opaque, reflective, or dark tinted glass is not permitted. Storefront glazing of clear glass. CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 13 TABLE F – VILLAGE AND BARRIO MASTER PLAN - AREA-WIDE STANDARDS (CONTINUED) Standard Required/Allowed Proposed Comply Roof Protrusions All roof structures, including protrusions such as equipment housing and guardrails; parapets and equipment screening; architectural features such as decorative or accent elements and towers; flagpoles; and roof decks and their amenities, shall complement and be consistent with the design of the building. Architecturally integrated parapets extending up to 49′-6″ are included. No portion of architectural parapets that extend above the maximum building height provide additional floor space. Yes Roof mounted mechanical equipment and freestanding screening that is not architecturally integrated shall be set back from the building face at least equivalent to the height of the screening. Mechanical equipment is provided on the roof of the third and fourth floors consisting of A/C condensing units and solar panels. Mechanical equipment screening is provided in the form of building parapets, which are architecturally integrated. No additional setback is required. CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 14 TABLE F – VILLAGE AND BARRIO MASTER PLAN - AREA-WIDE STANDARDS (CONTINUED) Standard Required/Allowed Proposed Comply Roof Protrusions Architectural features: Up to 10 feet above maximum building height. Architectural features that are within 10 feet of a building face shall be cumulatively limited in width to 30 percent of that building face. Architectural features, protruding above the maximum 45-foot building height and located within 10 feet of the building face, consist of the following: Two architectural tower features located along Jefferson Street extending up to 49′-6″ in height; one tower feature with butterfly roof extending to 47′-5⅟2″ in height on the north elevation; and a parapet extending to 49′-6″ in height on the west side. No portion of the building located along Grand Avenue includes an architectural feature that is subject to this standard. 4th Floor architectural feature (cumulative length): North side = 11′-0″ East side = 21′-0″ West side = 8′-9″ Building Width/30% Building Face: North side = 87′-6″ / 26′-4″ East side = 98′ / 29′ West side = 98′ / 29′ The cumulative length of each architectural feature identified above measures less than 30 percent of the width of each respective building face. All other parapets that are less- than-or-equal-to 42 inches in height have been set back a minimum 5 feet from the building face. Yes Standards Modification: Pursuant to Section 2.6.7 of the VMP, a modification to a development standard may be permitted by the decision-making authority in all districts. A standards modification is permitted to construct residential development at densities at the minimum set forth for the applicable land use district, which in this case CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 15 is 28 dwelling units per acre according to the Village Center (VC) District. To grant a standards modification, the decision-making authority shall make the following findings: That the applicant has provided acceptable evidence to demonstrate the need for the standards modification and there is no other way to reasonably achieve one or more of the purposes outlined in Section 2.6.7.B without the modification. The addition of retail frontage along 80 percent of the Jefferson Street frontage, absent an alley to access required parking behind the building, is not feasible because the lot cannot accommodate the required parking to achieve the minimum density for the site. That the standards modification is consistent with the goals and objectives of the Master Plan and the vision and intent of the applicable district. A primary goal of the Village and Barrio Master Plan (VBMP) is to maintain and enhance the Village as a community focal point with high quality shopping, dining, entertainment, working and living environments. The proposed standards modification achieves this goal by allowing the minimum density specified in the VBMP while still providing sufficient ground floor retail to achieve the desired high quality commercial and living environment. Furthermore, the standards modification allows for the project to provide a continuous and interesting commercial street frontage along Grand Avenue consistent with the VBMP placemaking goal of creating great streets and the placemaking policy of implementing the Grand Avenue Promenade with continuous commercial street frontage along Grand Avenue, which necessitates vehicular and residential access off Jefferson Street absent an alley. Site Development Plan: Pursuant to Section 6.3.3.B.1(a) of the VBMP, new construction of buildings over 5,000 square feet (cumulative gross floor area) in size or new buildings or projects with more than four (4) dwelling units are subject to the approval of a SDP pursuant to CMC Chapter 21.06. A SDP is included as part of the discretionary permits, and the required findings and justification for approving the SDP can be made as summarized below: That the proposed development or use is consistent with the General Plan and any applicable master plan or specific plan, complies with all applicable provisions of Chapter 21.06 of the Carlsbad Municipal Code, and all other applicable provisions of this code. The proposed one-lot tentative tract map with seven air-space condominium units consisting of six (6) residential units and one (1) commercial unit satisfies all minimum requirements of Titles 20 and 21 with respect to uses, public facilities, access, parking and setbacks; and is consistent with the General Plan as described above. Pursuant to provisions of the Village and Barrio Master Plan (VBMP), a standards modification is required to meet the minimum density for the proposed mixed-use project as it relates to ground floor street frontage uses along Jefferson Street. The findings for approval to support this modification can be made. That the requested development or use is properly related to the site, surroundings and environmental settings, will not be detrimental to existing development or uses or to development or uses specifically permitted in the area in which the proposed development or use is to be located, and will not adversely impact the site, surroundings or traffic circulation. CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 16 The project consists of the demolition of an existing one-story structure (single-family residence converted into a daycare) and the construction of a four-story mixed-use building with seven air-space condominiums consisting of six residential units and one commercial unit on a 0.21-acre infill site located at 786 Grand Avenue, within the Village Center (VC) District of the Village and Barrio Master Plan (VBMP). The subject property is bordered to the north by one-story single-family residential and multi-story professional offices, to the south by multi-story professional offices, to the west by a medical office and restaurant, and to the east by medical office and three-story multiple-family residential. The adjacent properties are also located within the VC District of the VBMP. Mixed-use is permitted by right in the VC District. Given the variety of existing uses within the vicinity of the project site, which include multi-story residential and office developments, as well as the wide variety of uses permitted in the surrounding VC District, the proposed seven air-space condominium units, consisting of six (6) residential units and one (1) commercial unit, are compatible with existing and future land uses. The proposed mixed-use project will not adversely impact the site, surroundings, or traffic circulation in that the existing surrounding streets have adequate capacity to accommodate the 121 Average Daily Trips (ADT) generated by the project, which is a net increase of only 36 ADT above the previous daycare use. With exception of a standards modification related to ground floor street frontage uses along Jefferson Street, the project complies with all minimum development standards of the VC District and the VBMP, and the project is adequately parked on-site and does not result in any significant environmental impacts. That the site for the intended development or use is adequate in size and shape to accommodate the use. The VC District allows residential development at a density range of 28 to 35 dwelling units per acre. Based on an acreage of 0.21 acres, the proposed six-unit residential condominium project has a density of 28.6 dwelling units per acre. As the proposed project falls within the allowable density range and meets all required development standards with the proposed standards modification, the project site can accommodate the proposed density. That all yards, setbacks, walls, fences, landscaping, and other features necessary to adjust the requested development or use to existing or permitted future development or use in the neighborhood will be provided and maintained. The mixed-use project complies with all development standards (i.e. setbacks, lot coverage, parking, and height restrictions) of the VC District and the VBMP with the proposed standards modification. The landscaping proposed along Grand Avenue and Jefferson Street will be provided consistent with the requirements of the city’s Landscape Manual. That the street systems serving the proposed development or use is adequate to properly handle all traffic generated by the proposed use. The mixed-use project will take access from Jefferson Street, which is identified as a Village Street. Jefferson Street is designed to adequately handle the 121 Average Daily Trips (ADT) generated by the project, which is a net increase of 36 ADT above the existing day-care use. Jefferson Street is improved with pavement, curb, gutter, and attached sidewalk. The project will reconstruct portions of the curb, gutter and sidewalk along the project frontage to accommodate project access into an at-grade parking garage and landscaping and street trees within a new 5-foot-wide parkway. CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 17 C. Subdivision Ordinance The Land Development Engineering Division has reviewed the proposed Tentative Tract Map and has found that the subdivision complies with all applicable requirements of the Subdivision Map Act and the city’s Subdivision Ordinance (Title 20) for Major Subdivisions. The subdivision is considered major because it involves the division of land into five or more condominiums. The project has been conditioned to install all infrastructure-related improvements and the necessary easements for these improvements concurrent with the development. D. Inclusionary Housing For all residential development having less than seven units, the inclusionary housing requirement may be satisfied through the payment of an inclusionary housing in-lieu fee. The proposal to construct six residential condominium units has been conditioned to pay the applicable housing in-lieu fee for five units prior to building permit issuance or six units if building permits for the six-unit project have not been applied for within two years of demolishing the existing single-family home on-site. E. Growth Management The proposed project is located within Local Facilities Management Zone 1 in the Northwest Quadrant of the city. The impacts on public facilities created by the project, and its compliance with the adopted performance standards, are summarized in Table G below. TABLE G – GROWTH MANAGEMENT COMPLIANCE Standard Impacts Compliance City Administration 21.2 square feet Yes Library 11.32 square feet Yes Waste Water Treatment Residential: 1,320 GPD Commercial: 223 GPD Total: 1,543 GPD Yes Parks 0.04 acres Yes Drainage 1.13 CFS, Basin B Yes Circulation Existing: 85 ADT Proposed: 121 ADT Net increase: 36 ADT Yes Fire Station 1 Yes Open Space NA NA Schools Carlsbad Elementary: 0.7 students Carlsbad Middle: 0.37 students Carlsbad High: 0.47 students Yes Sewer Collection System Residential: 1,320 GPD Commercial: 223 GPD Total: 1,543 GPD Yes Water Residential: 1,500 GPD Commercial: 419 GPD Total: 1,919 GPD Yes Properties located within the VC District of the Village and Barrio Master Plan do not have a Growth Management Control Point or an allocation for dwelling units. Therefore, as one (1) vacant unit is proposed to be demolished and six (6) residential units are proposed to be constructed, a total of five (5) dwelling units will be deducted from the city’s Excess Dwelling Unit Bank (EDUB). Pursuant to Planning Commission Resolution No. 7347, the allocation from the EDUB can be supported since 546 units are CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON October 2, 2019 Page 18 available for allocation in the Village according to the city’s Quadrant Dwelling Unit Report dated July 31, 2019, less any allocations recently approved. IV. ENVIRONMENTAL REVIEW The City Planner has determined that the project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment, and it is therefore categorically exempt from the requirement for the preparation of environmental documents pursuant to Section 15332 (In-fill Development Projects) Class 32 Categorical Exemption of the State CEQA Guidelines. The project is consistent with the General Plan as well as with the Zoning Ordinance. The project site is within the city limits, is less than five acres in size, and is surrounded by urban uses. There is no evidence that the site has value as habitat for endangered, rare, or threatened species. Approval of the project will not result in significant effects relating to traffic, noise, air quality, or water quality. The site can be adequately served by all required utilities and public services. In making this determination, the City Planner has found that the exceptions listed in Section 15300.2 of the state CEQA Guidelines do not apply to this project, including historical resources. Specifically, the existing 71-year-old dwelling unit that is proposed to be demolished as part of the project is not identified on a local register of historical resources and a qualified professional has determined that the structure does not meet the criteria for listing on the California Register of Historical Resources. A Notice of Exemption will be filed by the City Planner upon final project approval. The project will be required to comply with the recently adopted Climate Action Plan Ordinances, including energy efficiency measures and solar photovoltaic systems (Ordinance No. CS-347, effective August 14, 2019) and electric vehicle charging infrastructure (Ordinance No. CS-349, effective April 11, 2019). If building permits are not issued by January 1, 2020, the project will also be subject to the new residential standards for water heating. ATTACHMENTS: 1. Planning Commission Resolution No. 7347 2. Location Map 3. Disclosure Statement 4. Village and Barrio Master Plan Design Guidelines Analysis 5. Correspondence 6. Reduced Exhibits 7. Full Size Exhibits “A - X” dated October 2, 2019 CARLSBAD VILLAGE DRCARLSBAD VILLAGE DRS T A T E S T S T A T E S T H O P E A V H O P E A V GRAND AVGRAND AVM A D I S O N S T M A D I S O N S T HOME AVHOME AVJE F F E R S O N S T JE F F E R S O N S T R O O S E V E L T S T R O O S E V E L T S T H A R D I N G S T H A R D I N G S TARBUCKLE PLARBUCKLE PLCT 2018-0008 / SDP 2018-0010 (DEV2018-0055) Grand Jefferson SITE MAP JPALOMARAIRPORTRDELCAMREALELCAMINOREAL LA CO STAAVCA R LSBA D B LME LRO S E DRCOLLEGEBLAVI ARAPY RANCHO S ANTAFERDSITE ATTACHMENT 2 ATTACHMENT 3 ATTACHMENT 4 VILLAGE AND BARRIO MASTER PLAN DESIGN GUIDELINES ANALYSIS CT 2018-0008/SDP 2018-0010 (DEV2018-0055) – GRAND JEFFERSON INTENT The Design Guidelines (guidelines) intend to implement and enhance the existing character within the Village and Barrio as new development and property improvements occur. Together, the Village and Barrio are a unique, mixed-use environment. They serve as both a shopping and entertainment destination as well as a place to live and work. The guidelines aim to improve the character of the Village and Barrio while improving livability. Guidelines address many components of building style and orientation, including site layout, building massing, roof form, building façades, and appurtenances. Images are intended to provide a visual example of a targeted topic described in the caption and may not represent all aspects and direction provided within this document. Through these areas of focus, the guidelines strive to foster authentic designs with straightforward and functional construction. All development should align with the spirit and intent of the design guidelines presented in this chapter. Designers and developers should consider at a minimum that these guidelines are a starting point for quality development, and do not comprise every possible strategy for achieving high quality design. Therefore, it is prudent that designers use their own techniques for achieving authentic, high quality design. The following guidelines apply to all new and remodeled development within the entire Master Plan Area unless exempt as determined by Section 6.3.2. 2.8.2 SITE PLANNING GUIDELINES CONSISTENCY STATEMENT A.Site layout 1.Place buildings adjacent to, and oriented towards, the street. Locate prominent architectural features near corners and intersections. 2.Orient storefronts and major building entries towards major streets, courtyards, or plazas. 3.Minimize gaps between buildings in order to create a continuous, pedestrian-oriented environment. 4.Place parking lots so as not to interrupt commercial street frontages.5.Incorporate functional and aesthetic vehicular and pedestrian connections to adjacent sites. 6.Create small pedestrian plazas along the street wall through the use of recesses in building form. 7.Provide easily identifiable pedestrian access from the street and/or sidewalk to key areas within the site. 8.Incorporate plazas, landscaped areas, fountains, public art, textured pavement, and vertical building features to create focal points that enhance a pedestrian’s experience. 9.Utilize atriums and outdoor courtyards to increase the variety and number of views and to bring additional sunlight into large developments. 10.Give careful design consideration to corner lots, as they are typically a focal point in the urban fabric. 11.Utilize courtyards or other methods to break up the building mass and provide natural ventilation, wherever possible. The proposed mixed-use building has been placed adjacent to and is architecturally oriented towards the street. Grand Avenue exhibits more of an urban environment and was chosen as the primary frontage. The upper floors of the building, which include the residential units, have also been oriented such that their primary living spaces and patios are oriented towards this frontage to help activate the street frontage below. Jefferson Street, which consists of more transitional type uses (i.e., professional offices, apartments, and single-family homes), has a less urban feel to it. As such, access to the parking garage and residential lobby have been oriented along this frontage. A covered outdoor plaza and a three-story tower with butterfly roof have been located at the street corner intersection, while parking and access have been located to the north on Jefferson to avoid interrupting the commercial street frontage. The plaza area, with future outdoor seating, along with enhanced building materials, decorative metal awnings, lighting and landscaping all help to activate the street corner and set it apart as a focal point for this mixed-use project. B.Parking and Access 1.Locate parking behind buildings and away from the street, wherever possible. 2.Use pervious paving materials, whenever possible. 3.Buffer residential uses from commercial parking lots by landscaping, fencing, and/or walls. 4.When walls or fences are utilized to screen parking, provide breaks to allow for pedestrian circulation and limit Parking is located to the rear of this corner oriented building inside a covered at-grade parking garage with access off the lesser of the two prominent streets (i.e., Jefferson Street). Parking is covered so pervious paving is not a factor. However, decorative paving is provided at the garage entry. The nearby residential uses are buffered from parking by garage walls. Bicycle parking is provided inside the parking garage in addition to two other locations near the commercial and 2 height for safety and security purposes. 5.Divide large parking lots into smaller areas with landscaping and clearly marked pedestrian paths. 6.Highlight primary pedestrian access paths within parking areas with decorative paving, trellises, canopies, lighting, and similar improvements. 7.Create pedestrian paseos to parking lots of buildings. 8.Locate parking below grade or in structures, where feasible. 9.Design parking structures so their height and bulk are consistent with adjacent buildings. 10.Provide bicycle parking at convenient locations such as entrances or other visible and accessible areas. 11.Provide electric vehicle charging stations and equipment where feasible and as otherwise required. residential entrances. Electrical charging stations and equipment are proposed. C.Plazas and Open Space 1.Provide private or common open space and pedestrian connections to such spaces to enhance the living environment and contribute to a walkable neighborhood character. 2.Semi-public outdoor spaces, such as small plazas and courtyards are encouraged between private and public spaces to support pedestrian activity and connectivity. 3.Design plazas and building entries to maximize circulation opportunities between adjacent uses. 4.Provide landscaping and high-quality paving materials, such as stone, concrete or tile, for plazas and open spaces. 5.Place outdoor furniture, such as seating, low walls, trash receptacles, bike racks and other elements, in outdoor pedestrian spaces. 6.Site buildings to define open space areas. Ensure that outdoor areas are visible from public streets and accessible from buildings, as well as, streets and pedestrian and bicycle networks. The proposed six-unit condominium project complies with the private open space requirements of the Village Center (VC) District of the Village and Barrio Master Plan (VBMP), which requires a minimum of 60 square feet per unit. All open space is proposed as private patios and a roof deck. The smallest patio proposed is 149 square feet with a dimension of 12′-0″ by 12′-9″. In addition, a covered outdoor patio is also proposed at the corner of the building facing the intersection of Grand Avenue and Jefferson Street. The patio area is 344 square feet in size and is designed to serve the ground floor retail commercial space oriented towards Grand Avenue. The patio area is connected to the public sidewalk along Grand Avenue, but is separated by decorative landscape along Jefferson Street. The connection along the Grand Avenue frontage is designed to maximize and encourage opportunities for people to interact along this street, which has a more urban feel to it in comparison to Jefferson Street at this location. The landscaping located between the public sidewalk and outdoor patio along Jefferson Street is designed to buffer the public space and discourage public interaction at this portion of the street corner where the sidewalk begins to transition north into a neighborhood that is predominantly residential mixed with professional office buildings. Decorative paving is proposed within the patio area. While decorative lighting is currently proposed on the exterior of the building, lighting within the covered patio will be further defined later with tenant improvements for the ground floor retail use. D.Outdoor Seating 1.Incorporate seating into well-trafficked outdoor areas, to maximize opportunities for people to interact. 2.Consider movable seating so that people can accommodate their own preferences and respond to the weather or time of day. 3.Provide lighting to ensure that outdoor seating areas are safe places at night. A 344-square-foot covered outdoor seating area is provided as part of the ground floor commercial tenant space located at the southeast corner of the building near the intersection of Grand Avenue and Jefferson Street. The public right-of-way along Grand Avenue is wide enough to easily accommodate future sidewalk café type seating. No seating is currently proposed in either scenario, but would likely consist of movable type chairs and tables. The street frontage along this project is also proposed to be well lit to help confirm a feeling of safety at night. 3 E.Connectivity 1.Connect all commercial buildings to the public sidewalk via a publicly accessible path or walkway. 2.Provide attractive, well-marked pedestrian links that create a clear path of travel between parking, buildings and sidewalks. 3.Ensure that alleys are well lit, open, and visible to passersby. 4.Enhance existing walkways or paseos to become more inviting. 5.Provide secondary entries to alleys. The commercial portion of the building is located at the ground floor and is directly fronting on the Grand Avenue public right-of-way. A separate access from the at-grade parking garage into the commercial tenant suite is provided to the rear of the retail space. Street trees are provided along Grand Avenue, and decorative landscape with street trees is provided along Jefferson Street in the form of detached parkways and planter areas between the building and public sidewalk. F.Mechanical Equipment and Service Areas 1.Carefully design, locate, and integrate service, utility, and loading areas into the site plan. These critical functional elements should not detract from the public view shed area or create a nuisance for adjacent property owners, pedestrian circulation, or vehicle traffic. 2.Locate loading areas in the rear of a site where possible. 3.Locate mechanical equipment and service areas along and accessed from alleys or the rear of properties, wherever possible. 4. Place public utility equipment, meter pedestals, and transformers underground or away from sidewalks and pedestrian areas, where feasible. 5.Screen all mechanical equipment from public view. 6.Ensure roof mounted mechanical equipment and screening do not interfere with required solar zones or installed solar photovoltaic or solar water heating systems. 7.Design trash and recycling enclosures to be consistent with the project and building architecture, and site and screen them to minimize visual impact. Due to the lot configuration, density, parking requirements, lack of alley access, pedestrian circulation, driveway access and aisle widths, the transformer, backflow preventers and gas meters are located within the frontage along Jefferson Street. To the maximum extent feasible, the ground-mounted mechanical equipment is screened with landscaping. The utilities cannot be screened on all sides as access is needed for maintenance. G.Landscaping Landscaping shall meet the policies and requirements set forth in the City of Carlsbad Landscape Manual. 1.Utilize landscaping to define building entrances, parking lots, and the edge of various land uses. 2.Utilize landscaping to buffer and screen properties. 3.Consider safety, environmental impacts, and accent elements when selecting and locating landscaping elements. 4.Landscaping, between the front property line and thebuilding creates a visually interesting transitional space. Select and place plants to enhance and soften architectural elevations, screen undesirable building features and contribute to the overall quality of the streetscape. 5.Select species that are compatible with Carlsbad’s semi- arid Mediterranean climate, and that will grow to an appropriate size at maturity. 6.When there are minimal landscape areas between the building and the street, incorporate planters onto porches, recessed building entrances, and planters on decks and balconies. The commercial entry on the south side of the building, and the walkway providing access into the lobby area of the building on the east side, including the driveway/garage entrance, have all been framed with landscape planters to define points of entry into the building. The south elevation of the building has a repetition of street trees planted along it and the east elevation has a combination of both trees and foundation plantings to soften the appearance of the building. The vast majority of the plantings are of low level heights except for the grouping that is screening the utilities along the eastern property line so hiding spaces have been minimized. All standards relating to preserving visual lines of sight as defined by the City of Carlsbad have been met for this project. The tree plantings along the southern property line offer a typical urban parkway design solution where pedestrian access has been accommodated while also providing trees that will offer a softening of the building elevation and also provide shade for an area with a high percentage of pavement. Small 4 7.Minimize paved vehicle areas such as driveways and parking areas. Design driveways to be no wider than necessary to provide access. Incorporate permeable surfaces, such as interlocking pavers, porous asphalt, power blocks, and lattice blocks/grasscrete or ribbon driveways where feasible. 8.Utilize planting to screen less desirable areas from public view, i.e., trash, enclosures, parking areas, storage areas, loading areas, and public utilities. 9.Provide landscaping between any parking lot and adjacent sidewalks or other paved pedestrian areas, as well as, within surface parking lots. 10.Incorporate native and drought tolerant vegetation whenever possible. Avoid use of invasive or noxious plants. 11.Incorporate lattice work and landscaping onto existing blank walls to support flowering vines growing out of planters placed at their base. 12.Plant trees and fast growing and flowering vines along fences and walls to soften the appearance of the fencingand screen views to functional on-site work and storage areas. 13.Utilize vines, espaliers, and potted plants to provide wall, column, and post texture and color and to accentuate entryways, courtyards, and sidewalks. 14.Incorporate large planters into seating areas. Planters should be open to the soil below and should incorporate permanent irrigation systems. 15.Maintain landscaping and yard areas regularly to keep a desirable, healthy appearance, eliminate trash, and control vermin. 16.Incorporate Low Impact Development (LID) strategies, site design, and source control measures into projects. Examples include rain gardens, rain barrels, grassy swales, soil amendments, and native plants. 17.Utilize seasonal shading from trees and shrubs when developing planting schemes for courtyards and streetscapes on south and west facing facades. accent planters have been placed on each side of the primary entryway into the commercial tenant space. All consideration has been given with respect to the selection of plant materials for this project. The vast majority of plant options for this project represent low water use varieties to be compatible with Carlsbad’s semi-arid Mediterranean climate. The plants have all been selected to grow into the spaces they have been placed so as to minimize the need for pruning. This approach will help preserve the natural character of the many plant varieties anticipated to be incorporated into this project. Planters have been proposed for each side of the recessed entrance leading into the commercial tenant space located on the south side as well as the residential lobby entrance located on the east side. The decorative tree grates that have been incorporated into the pedestrian sidewalk along Grand Avenue provide a safe walking surface to the public, but also offers a decorative contrasting surface to an otherwise open expanse of paving where ease of pedestrian travel is necessary. The parking area has been minimized by it being located within the physical limits of the building footprint. The driveway entrance on the eastern side of the site has been designed to provide safe access while minimizing the width. Enhanced concrete has been proposed to provide visual interest to what is considered a more functional feature for a typical site. Along the eastern side of the building there is a grouping of utility hardware that has been screened by a dense hedge like shrub mass. The parking lot for this project has been located within the footprint of the building, so there is no need for additional landscaping to screen this area from public view. Approximately 80 percent of the plant materials considered for this project qualify as drought tolerant and have been screened regarding any potential of being classified by the State of California as being invasive or noxious. Along the eastern and southern elevations of the building vines or espalier form plant varieties have been placed into open planters and pocket planters to offer a vertical accent to the building’ exterior. There are no maintainable sections of wall or fencing proposed for this site, so there is no screening requirement necessary. The covered outdoor seating area located at the southeast corner of the building includes a large planter bed between it and the public right-of-way. The planter has complete soil exposure and is irrigated by an automatic drip irrigation system. 5 The building and landscape as well as the surrounding public right-of-way area will be maintained at a high level by an owner’s association. There are numerous areas of the project designed for water purification and storm runoff control. At final landscape, soil tests will be conducted and the appropriate soil amendments will be recommended and incorporated into the planter areas prior to moving forward with installation of plant materials. Most of the plants to be used for this project are considered low water use varietals. The tree selected for the south facing streetscape area is a broadleaf evergreen variety that will form a canopy to provide shade and offer a flowering accent during the summer months. The west side of the building has no streetscape or courtyard elements proposed. 6 2.8.3 BUILDING FORM AND MASSING GUIDELINES CONSISTENCY STATEMENT A.Building Form and Articulation 1.Reduce the imposing appearance of tall buildings by stepping back from street level on elevations above the ground floor. 2.Utilize horizontal and vertical articulation to break up monolithic street walls and facades. 3.Utilize techniques to reduce massing, such as variation in wall plane and height and variation in roof form and levels. 4.Surface detailing may be used, but does not serve as a substitute for distinctive massing. 5.Consider adjacent low density uses when designing and orienting a building. For example, avoid balconies overlooking rear yards. 6.Minimize the vertical emphasis of architectural design elements by incorporating features such as horizontal bands, reveals, trims, awnings, eaves, and overhangs or other ornamentation, along different levels of the wall surface. 7.Minimize blank walls by: a.Adding window openings and/or entrances and other relief. b.Providing recessed glazing and storefronts. c.Adding vertical pilasters which may reflect internal building structure. d.Changing color and texture along the wall surface. e.Varying the planes of the exterior walls in depth and/or direction. f.Adding trims, projections, and reveals along different wall surfaces. 8.Articulate the building façade by varying building elements to create contrast. Integrate all architectural elements into the building design to avoid the look of “tacked on” architectural features. 9.Utilize facade projections and recesses such as bay windows, planter boxes, roof overhangs, and entry way recesses. 10.Arrange columns such that they appear to support the weight of the building or feature above and are balanced in height, weight, and depth. Spindly columns can appear out of proportion with the element it is supporting. 11.Size shutters appropriately, when used to cover the window opening. 12.Avoid exterior sliding or fixed security grilles over windows along street frontages. 13.Discourage and avoid “chain” corporate architecture and generic designs. Each project should strive to achieve the unique architectural style or character. 14.Design roofs to accommodate a solar photo-voltaic system and/or solar water heating system, as required by California Building Code. The fourth-floor building elevation is stepped back 20’-4” to 29’-8” from the property line along Grand Avenue helping to reduce the building’s overall appearance along this street frontage. The building podium contains a horizontal metal band providing a visible line of separation between the retail and the residential elements above. To create vertical building articulation, the residential portion of the building utilizes decorative siding elements separated by smooth stucco elements at varying wall planes combined with enhanced color transitions. Recessed balconies and walkways create additional levels of building articulation. All building elevations utilize multiple layers of wall plane variation which help to reduce building massing. The upper floor is stepped back from the third-floor along the primary street frontage at Grand Avenue. The building parapet contains multiple height variations along with sloped roof and sloped parapet elements providing additional layers of architectural interest. Surface detailing in the form of smooth limestone, decorative stone veneer (faux wood pattern), decorative metal, decorative siding and smooth stucco materials are proposed. The project has been designed to orient patios toward the street and away from adjacent residential properties as much as possible. Unit 3 is the only unit that includes a patio nearest the adjacent residential properties located to the north, and this patio area has been restricted to the second-floor level of the building to help minimize privacy issues at this location. No overhanging type balconies are proposed. Unit 6 also includes a fourth-floor patio and roof deck with northern exposures; however, these features have been set back approximately five and seven feet from the common property line, which combined with height, minimizes the line-of-sight and thus the ability to peer over and into the adjacent properties. A horizontal metal band has been incorporated at the upper portion of the podium separating the retail area from the residential area. Decorative eyebrows and metal canopies have been added at all retail space window and door openings. Additionally, decorative protruding eyebrow features have been added above all windows and strategically within blank wall areas. A decorative reveal pattern has been included within the smooth stucco areas. Blank walls have been minimized by adding and recessing windows in all locations possible a depth of two-to-three inches. Decorative reveals and projecting eyebrows have been added to blank walls. Multiple wall plane changes have been provided along with strategic color enhancements. 7 15.Utilize details such as wall surfaces constructed with patterns, changes in materials, building pop-outs, columns, and recessed areas to create shadow patterns and depth on the wall surfaces. 16.Ensure that proportions are consistent with selected architectural styles. 17.Incorporate the characteristic proportions of traditional facades in new infill development. 18.Balance the ratio of height, width, and depth of arches and columns to emphasize strength and balance. 19.Ensure consistency between the height of a column and its mass or thickness with the weight of the overhead structure the column supports. 20.Infill buildings that are much wider than the existing facades should be broken down into a series of appropriately proportioned structural bays or components. 21.Consider transitions between the height of new development and the height of adjacent existing development.22.Utilize vertical building focal elements. Towers, spires, or domes may foster community identity and serve as landmarks. 23.Utilize windows and open wrought iron balconies to provide opportunities for residents to passively observe and report suspicious activity. 24.Utilize accent materials to highlight building features and provide visual interest. Accent materials may include any of the following: a.Wood b.Glass c.Glass block (transom) d.Tile e.Brick f.Concrete g.Stone h.Awnings i.Plaster (smooth or textured) 25.Use building materials and finishes that are true to the structure’s architectural style. 26.Windows, doors, and entries should be designed to capture the desired architectural style of the building. 27.Generally, use no more than three different materials on exterior wall surfaces. While certain styles may successfully incorporate multiple surface materials, caution must be used as too many materials can result in a less than aesthetically pleasing building. 28.Ensure material changes occur at intersecting planes, preferably at inside corners of changing wall planes orwhere architectural elements intersect, such as a chimney, pilaster, or projection. 29.Utilize light and neutral base colors. Generally muted color schemes will promote visual unity and allow awnings, window displays, signs and landscaping to be The building façade has been articulated using plane changes, material changes, added projection elements and color changes. Decorative metal canopies, projecting eyebrows, metal trim and recessed entries have been incorporated into the building design to provide building façade interest and create unique shadow patterns and depth. The building roof is designed to incorporate a photovoltaic solar system per current City of Carlsbad Climate Action Plan requirements. The southeast corner of the building, located at the corner of Grand Avenue and Jefferson Street, incorporates a tower element with an outdoor covered patio area. The tower element, featuring decorative stone veneer (faux wood pattern), large decorative metal awnings with anchor brackets, vertical and horizontal metal trim, enhanced colored siding, decorative light sconces, and a butterfly roof design, assist in creating a strong street presence at the intersection. Material changes have been strategically located at inside corners and decorative reveal features. The street frontage storefront and entry door systems have been designed to promote a high level of visibility into the retail space. Building entrances have been strategically situated in locations that clearly portray the primary entry element for the residential and retail portions of the project. Recessed black-framed windows have been incorporated into the design of the building to provide an added level of interest. 8 given proper emphasis. 30.Ensure lighting is architecturally compatible with the building. 31.Articulate storefronts with carefully arranged doors, windows, arches, trellises, or awnings, rather than blank walls. 32.Ensure that the main entrance to a building is clearly identifiable and unique, as it is the primary point of arrival and should be treated with significance. 33.Window type, material, shape, and proportion should complement the architectural style of the building. 34.Utilize recessed windows where appropriate to the architectural style, to provide depth. B.Awnings 1.Use awnings made of commercial grade canvas or metal and that are either fixed or retractable. 2.Avoid plasticized, and/or vinyl fabrics, and back-lit awnings. 3.Maintain a minimum six (6) inch clearance from second floor features such as windows. 4.Avoid wrapping awnings around buildings in continuous bands. 5.Place awnings only on top of doors, on top of windows, or within vertical elements when the façade of a building is divided into distinct structural bays. The project proposes fixed metal awnings on the ground floor elevations along both street frontages at Grand Avenue and Jefferson Street. Awnings are located above the commercial entrance, covered patio recesses, residential lobby and garage entrances. The proposed awnings avoid wrapping around the building in a continuous band and maintain the minimum six- inch clearance from the second-floor features. C.Balconies 1.Place balconies adjacent to operable doorways. Faux balconies or those that do not appear usable are discouraged. 2.Visually support all balconies, either from below by decorative beams and/or brackets, from above by cables, or by other parts of the building. 3.On corners, balconies may wrap around the side of the building. No balconies or faux balconies are proposed with this project. However, each residential unit does provide an outdoor patio area. Each of these areas is located adjacent to operable doorways. D.Roof Forms 1.Ensure that roof materials and colors are consistent with the desired architecture or style of the building. 2.Utilize multi-roof forms, hips, gables, shed roof combinations, and sufficiently articulated flat roofs to create interesting and varying roof forms that will reduce building mass, add visual appeal, and enhance existing Village and Barrio character and massing. 3.Avoid long, unbroken, horizontal roof lines. 4.Avoid flat roofs unless sufficient articulation of detail is provided, such as precast treatments, continuous banding or projecting cornices, lentils, caps, corner details, or variety in pitch (sculpted), height, and roofline. 5.Avoid the “tacked on” appearance of parapets, and ensure their appearance conveys a sense of permanence. If the interior side of a parapet is visible from the pedestrian and/or motorist area of the project, utilize appropriate detail and properly apply materials. The project avoids long, unbroken horizontal roof lines and flat roof elements through use of architectural tower features with butterfly roof designs, varied parapet heights and overhanging parapet caps. Parapet interior sides are only visible to the third and fourth floor residences and have been architecturally treated to present a finished appearance. 9 E.Lighting 1.Provide exterior building lighting, particularly in commercial and high-pedestrian areas. 2.Design or select light fixtures that are architecturally compatible with the building. 3.Integrate light fixtures that are downcast or low cut-off fixtures to prevent glare and light pollution. 4.Design lighting in such a way as to prevent the direct view of the light source from adjacent properties or uses, particularly residential properties or uses. 5.Utilize lighting on architectural details, focal points, and parking areas to increase safety, help with orientation, and highlight site attributes and the identity of an area. 6.Use energy-efficient lamps such as LED lights for all exterior lighting along with adaptive lighting controls to contribute to energy conservation and potentially reduce long-term costs. Architectural lighting is proposed along the street-facing elevations of the building on the ground floor at Grand Avenue and Jefferson Street. Proposed light fixtures are considered downcast or low cut-off type fixtures that help to prevent light glare or pollution. Light fixture locations have been selected for areas on the building that provide exterior building lighting in commercial and high pedestrian traffic areas for increased safety, helping with orientation, and which focus on architectural detailing. The Carlsbad Village Decorative Pedestrian Lighting Study does not contain any recommendations for the intersection of Grand Avenue and Jefferson Street. From:Ziv Ran To:Jason Goff Subject:ct2018-0008/sdp2018-0010 Date:Wednesday, August 14, 2019 8:50:10 AM I am opposed to the project as it will destroy village character. Ziv Ran Forest Av. ATTACHMENT 5 October 1, 2019 Planning Commissioners, City of Carlsbad I am contacting you regarding agenda item #2 CT2018-008;SDP2018-0010 on the October 2, hearing a development proposal labeled “Grand Jefferson”. I have two issues on which I would like to provide input, 1 Architectural Styles; 2 Street trees. ARCHITECTURE - Recently I offered up my opinion on Village architecture in a position paper our City Council. In it I express that I felt it very important to protect and enhance the qualities that help make our Village ( the heart of our town) unique. One of those qualities is its heritage, in the fact that the core area of the Village had its first real “bloom” almost one hundred years ago in the 1920s. Voting to approve this project will not do that rather it will help dilute this quality and the overall uniqueness. The style of this development proposal is what is common in today’s real estate development industry. Like it or not it is what you will most likely find being built all over the San Diego region, the southern California region. Building this project will help date the Village giving it the stamp of this time period and make it look like all other areas build today. I do understand that your charge is to only find errors by the planning staff that then allow you to vote no and recommend it be stopped. Also I am aware that the State has taken away judgement by City councils on design issues that are not specifically given as written standards. So I expect to read this project will make it through your hearing and the Council’s. With that we should all know that we, all of us, have failed in doing the best job possible for our community. page1of2 STREET TREES - The Council will be bringing back the recently approved V- B Master Plan for additional review. One issue not yet on their list but that should be added is a comprehensive plan for street trees. The V-B is a semi urban neighborhood, yes the only one in all of Carlsbad. Hence trees along its streets should be viewed as an important element in making this neighborhood the best it can (World Class City -right) . Important enough not be held as an after thought guided by too limited a scope of inputs. The Grand Jeff. site today has 6 -30ft Queen palms on the parcel that would be ideal as street trees adjacent to a 50ft building. Instead the dev proposal shows planting King Palms from 36 inch boxes. I was told the applicant is doing this because they where directed to by the City. Kings naturally shed their fronds at the end of the life cycle making them the easiest tree to maintain. Certainly, maintenance should be a consideration but not the primary one in selecting trees for our streets. Re-use is a part of sustain ability, and I am confident your Commission supports that practice. Please ask that the applicant dig, box, store and then reuse the existing Queen Palms. Also please ask the City Council to put the issue of Street Trees on their list of Master Plan items to be further discussed in their upcoming hears. Respectfully, WILKINSON DESIGN GROUP Robert E W ilkinson PLA 1999 October 9, 2019 Planning Commissioners, City of Carlsbad The hearing back on the 2 was the first I’ve attended in a few months, givingnd me the opportunity to view the commission with your newer appointees. I was impressed with the thoroughness and depth of your review of the development proposals before you and as a member of the engaged community I appreciate that very much. Once again my comments herein are regarding proposal CT2018-008;SDP2018-0010 labeled “Grand Jefferson”. I am sure you all, as I, hope that a creative proposal for development of this corner property can find its way to approval and be built. However, as for how it was presented at your split vote on the 2 the proposal is not there yet. This project my be a firstnd rate example of the term “efficiency of scale” that is that it may just be too small a parcel for a four story mixed use building. Since a number of you where not seated during the approval of the recent V-B Master Plan allow me to provide some background. As a founding member of ”Imagine Carlsbad” we originated the idea of the Grand Promenade. W e have also pitched and pushed for retaining a commercial core and taking the steps needed to see that it can compete with other retail centers so the Village flourishes as Carlsbad’s Town Center. This means that many of the projects in this area will be “mixed use” with retail in the street level space and housing above. Getting this type of development right seems to be no easy task. Certainly there are many requirements or ingredients needed to make it work. One is parking, all to often, the proposal does all it can to max out the number of residential units where the developer gets their quickest return on investment. That means parking for those units, all to often pushes the street level commercial space to only get the area that is left over as an after page1of3 thought. To solve that conflict we want to see the parking go sub-grade. But there in lies the scale issue, when the property is this small there is no room for ramped access. A common car lift can work for resident parking but only where there is ample area for queuing as in an alley, Grand J can’t make either of these two solutions work, economy of scale right? We have pitched that mixed use project’s should, not only have the ability to purchase off site parking for commercial uses (parking in lieu), but also be allowed to offer residential units to have only one parking space on site offering additional parking spaces on a lease basis in a near by group, shared, multi level parking facility. To make it easier to achieve that kind of facility the city government should be a partner in it. Allow me to circle back to the big picture of a strong commercial / retail center in the Village. Regarding private use of cars, the City pitches the idea that the Village does not need a parking structure. That our society will move away from today’s norm of using private cars for every move we make. We are all for that but realistically if it happens it will take time. W hile we wait, the Village’s retail core must compete with other retail centers in the area all of which have ample parking. Our solution to this is to build a couple shared facilities that are constructed so a portion of the facility (as we evolve over 25 years) can be remodeled and re-purposed to something other than parking. To achieve this means that our local government has wrapped its arms around the Village to insure it becomes our Town Center. Back to the Grand J, on parking, at this point they should look at the solutions used by other approved projects in the Village-Barrio providing two parking space for each res unit by stacking then vertically. Using individual lifts that puts one car below grade. This should free up the area needed to solve the other demands on this development. One of those other demands is the cleaning of drainage water. page2of3 To solve the drainage issue the project has proposed to use a prefab planter devise. However the project has limited space to place these devices so they are putting four of them at each of the street tree locations. The devise limits the size of the plants that can be used within them. The solution, as proposed, uses Magnolia trees, specifically Magnolia Little Gem, descriptive name as yes the tree is a dwarf verity. At maturity it will top out at a 20ft height and that will take twenty years (Magnolias are slow growers). Realistically these trees will never see 20ft, as one of the criteria street trees should be judged by is their durability. Unfortunately small trees like the one proposed are subject to vandalism. More important in bringing this forward for your consideration is the design issue of scale and proportion that seems to have been ignored. In an semi urban environment like the Village there needs be a relationship between the trees we place along our streets and the buildings they are adjacent to. Propose the use of a dwarf tree next to a 50ft building, what! The Master Plan has made the statement “Make Great Streets”, the solution proposed in the Grand J falls far short of that. The proposed solution is a prime example for my current pitch to the Council, as they bring back the MP for re-consideration, that is the need for a comprehensive street tree plan for the Village. The project must find other areas to clean storm water and it should reuse the Queen Palms (30ft) existing on site as project’s street trees. Again, like you I hope we can find a creative solution for a new development at this corner. However, if the solutions discussed here continue to be part of this proposal I ask that you all vote no, as we need to do better than misguided and mediocre. Respectfully, WILKINSON DESIGN GROUP Robert E Wilkinson PLA 1999 Date:5-13-19 Sheet Title: Sheet Number: Project: File: Revisions: 1 2 GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008 SDP 2018-0010 DEV 2018-0055 KIRK MOELLER ARCHITECTS, INC. 2888 LOKER AVE. EAST, STE 220 CARLSBAD, CA 92010 KIRK@KMARCHITECTSINC.COM 760-814-8128 ARCHITECTURAL APPROVED THIS IS THE APPROVED TENTATIVE MAP/SITE PLAN FOR PROJECT NO. PER CONDITION PLANNING DIVISION DATE ENGINEERING DIVISION DATE NO. OF PLANNING COMMISSION RESOLUTION NO. A0.1 COVER SHEET A1.1 SITE PLAN NOTE: ALL PROJECT SIGNAGE TO BE UNDER A SEPARATE PERMIT NEW PROPOSED MIXED USE RETAIL AND RESIDENTIAL PROJECT CONSISTING OF A FIRST FLOOR RETAIL / COMMERCIAL / PARKING GARAGE, SECOND, THIRD AND FOURTH FLOOR RESIDENTIAL UNITS. 6 TOTAL RESIDENTIAL UNITS PROPOSED. 786 GRAND AVENUE 203-302-04-00 AREAS: 1ST FLOOR TOTAL GROSS: HANDICAP PARKING SPACES PROVIDED: TOTAL SPACES PROVIDED: STANDARD PARKING SPACES PROVIDED: 1 SP. 12 SP. 11 SP. LOT AREA: EXISTING COMMERCIAL LOT:9,060 S.F. / .208 AC RESIDENTIAL UNITS: TOTAL GROSS FLOOR AREA:16,272 S.F. TOTAL PARKING GARAGE AREA:4,334 S.F. - COMMERCIAL:1,823 S.F. 1,947 S.F. 5,637 S.F. 2ND FLOOR (2 1/2 CONDO UNITS TOTAL GROSS): VILLAGE (V)GENERAL PLAN VILLAGE REVIEW (V-R)ZONING VILLAGE MASTER PLAN (VMP)MASTER PLAN NOCOASTAL ZONE PROPOSED WATER USAGE RESIDENTIAL 250 GPD X 6 UNITS = 1,500 GPD COMMERCIAL (RETAIL).23 GPD PER SF X 1,823 SF = 419 GPD BUILDING TOTAL 1,919 GPD RESIDENTIAL 8 TRIPS PER D.U. X 6 UNITS = 48 ADT COMMERCIAL (RETAIL)40/1,000 S.F.=.04 X 1,823 GROSS S.F. = 73 ADT BUILDING TOTAL 121 ADT TOTAL LOT AREA: PARKING REQUIRED COMMERCIAL RETAIL (1,823 SF GROSS / 415)4 SP. MULTI FAMILY CONDO (4-3 BDRM. UNITS X 1.5) TOTAL SPACES REQUIRED: 13 SPACES PARKING PROVIDED CARLSBAD UNIFIED SCHOOL DISTRICTSCHOOL DISTRICT CARLSBAD MUNICIPLE WATER DISTRICTWATER SERVICE CARLSBAD WASTEWATER DIVISIONSEWER SERVICE PROPOSED SEWER USAGE RESIDENTIAL (EDU) = 220 GAL/DAY X 6 DU X (1 EDU PER/DU) = 1,320 GAL/DAY COMMERCIAL (R)1 EDU / 1,800 SF = 1,823 SF / 1,800 = 1.01 X 220 = 223 GAL/DAY BUILDING TOTAL 1,543 GAL/DAY TOTAL CONDOMINIUM UNITS 6 UNITS - LOBBY AREA:124 S.F. DWELLING UNIT DENSITY: .208 AC X 35 D.U./AC = 7.28 UNITS ALLOWED (MAX. PER VILLAGE MASTER PLAN) BUILDING / LOT COVERAGE: TOTAL GRADE USEABLE AREA AND COVERED PARKING AREA 6966 SF / 87.9% NOTE: THE RESIDENTIAL CONDOMINIUM AND APARTMENT UNITS MUST BE ACCESSIBLE AND ADAPTABLE. PROPOSED DRAINAGE DISCHARGE / BASIN DRAINAGE BASIN/ HYDROLOGICAL AREA: CONDOMINIUM NOTE THIS IS A MAP OF A CONDOMINIUM PROJECT AS DEFINED IN SECTION 4125 OF THE CIVIL CODE OF THE STATE OF CALIFORNIA AND IS FILED PURSUANT TO THE SUBDIVISION MAP ACT. THE NUMBER OF CONDOMINIUM UNITS IS 7. 6 RESIDENTIAL UNITS AND 1 COMMERCIAL UNIT. CARLSBAD, CALIFORNIA WATER METER NOTE THE DIRECTOR OF PUBLIC WORKS SHALL CONSIDER THE INSTALLATION OF SUB METERS PER SEC. 9 FROM CMWD ORD. 45. A LETTER SHALL BE SUBMITTED INDICATING THE REASONS FOR THE REQUEST ALONG WITH AN ANALYSIS OF ALL THE FIXTURE UNITS OF ALL RESIDENTIAL AND COMMERCIAL/OFFICE CONDOMINIUMS SERVED BY THE MASTER PUBLIC METER TO DETERMINE THE NUMBER AND SIZE OF MASTER PUBLIC METERS NEEDED. 1 SP. CREDIT MULTI FAMILY ON SITE PARKING SPACES PROVIDED:9 SP. (ALL REQUIRED) EXISTING BUILDING: DAY CARE BUILDING TO BE REMOVED 2,124 SF 40/1,000 S.F.=.04 X 2,124 S.F. = 85 ADT NOISE NOTE THIS PROJECT IS NOT WITHIN A NOISE CRITICAL AREA (CNEL CONTOUR OF 60 dB) AS SHOWN ON THE GENERAL PLAN. RESIDENTIAL CONDO UNIT 1 (3 BEDROOM) 6 SP. DENSITY PROPOSED = 28.85 UNITS PER ACRE A2.1 FIRST FLOOR PLAN A2.2 SECOND FLOOR PLAN A3.1 BUILDING ELEVATIONS 3,418 S.F.4TH FLOOR (1 CONDO UNITS TOTAL GROSS): RESIDENTIAL CONDO UNIT 6 (4 BEDROOM) 9,060 S.F. / .208 AC A2.3 THIRD FLOOR PLAN A2.4 FOURTH FLOOR PLAN A2.5 ROOF PLAN A3.2 BUILDING ELEVATIONS A1.2 SETBACK EXHIBITS RESIDENTIAL CONDO UNIT 2 (3 BEDROOM) RESIDENTIAL CONDO UNIT 3 FIRST FLOOR (2 BEDROOM)1,378 S.F. 2,112 S.F. 2,147 S.F. TOTAL 2ND FLOOR 5,270 S.F. 3RD FLOOR (2 1/2 CONDO UNITS TOTAL GROSS): RESIDENTIAL CONDO UNIT 4 (3 BEDROOM) RESIDENTIAL CONDO UNIT 5 (3 BEDROOM) RESIDENTIAL CONDO UNIT 3 LOFT 1,017 S.F. 2,112 S.F. 2,141 S.F. TOTAL 3RD FLOOR (1-2 BDRM. UNITS X 1.5)1.5 SP. THE GRAND JEFFERSON MIXED USE DEVELOPMENT 786 GRAND AVENUE SHEET INDEXPROJECT DIRECTORYPROJECT INFORMATIONCODES VICINITY MAP APPROVALS DEFERRED SUBMITTALS SPECIAL INSPECTIONS SCOPE OF WORK UTILITY/ SERVICE PROVIDERS OWNER/ DEVELOPER: RINCON HOMES CONTACT: KEVIN DUNN 3005 S EL CAMINO REAL SAN CLEMENTE, CALIFORNIA 92672 T: 949-438-5494 - - 2016 CALIFORNIA BUILDING CODE 2016 CALIFORNIA FIRE CODE 2016 CALIFORNIA PLUMBING CODE 2016 CALIFORNIA MECHANICAL CODE 2016 CALIFORNIA ELECTRICAL CODE 2016 CALIFORNIA EXISTING BUILDING CODE 2016 CALIFORNIA GREEN BUILDING STANDARDS CODE 2016 CALIFORNIA ENERGY CODE PLUMBING CALCULATIONS ASSESSORS PARCEL NUMBER: ADDRESS: OCCUPANCY/ SEPARATED OR NON-SEPARATED:B, S-2, R-2 TYPE OF CONSTRUCTION:IIIB FIRE ALARM:YES FIRE SPRINKLERS:YES, NFPA 13 STORIES:4 HEIGHT (MAXIMUM):45'-0" USE:MIXED-USE: RETAIL/ RESIDENTIAL BUILDING AREA ANALYSIS GENERAL NOTES NOTE: CONTRACTOR TO PROVIDE A DEFERRED SUBMITTAL TO THE FIRE DEPARTMENT FOR FIRE SPRINKLER AND FIRE ALARM PLANS. NOTE: FLAMMABLE AND COMBUSTIBLE LIQUIDS SHALL BE IN COMPLIANCE WITH CFC 5705.3.5.2. HAZARDOUS MATERIALS SHALL BE IN COMPLIANCE WITH CBC 307.1(1) AND 307.1(2). NOTE: SUBMITTAL DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE, WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND THAT THEY HAVE BEEN FOUND TO BE IN GENERAL CONFORMANCE WITH THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THEIR DESIGN AND SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING OFFICIAL. SITE PASCO LARET SUITER & ASSOCIATES (PLSA) CONTACT: TYLER LAWSON 535 N HIGHWAY 101 STE A SOLANA BEACH, CALIFORNIA 92075 T: 858-259-8212 CIVIL: KIRK MOELLER ARCHITECTS, INC. CONTACT: KIRK MOELLER 2888 LOKER AVENUE EAST, STE 220 CARLSBAD, CALIFORNIA 92010 T: 760-803-8006 ARCHITECT: ALLOWABLE ARCHITECTURAL PROJECTIONS (VBMP 2.6.2.C.4.C)55'-0" NOTE: ENTIRE BUILDING SHALL BE FIRE SPRINKLERED PER NFPA STANDARD 13 AND CITY OF CARLSBAD REGULATIONS. A WET STANDPIPE PER NFPA 24 SHALL ALSO BE PROVIDED. PLANS SHALL BE PROVIDED TO THE FIRE DEPARTMENT FOR REVIEW AND APPROVAL. (1-4 BDRM. UNITS X 1.5)1.5 SP. PARKING ANALYSIS OPEN SPACE ANALYSIS N DAEDALUS DESIGN GROUP CONTACT: JEFF SMITH 2725 JEFFERSON ST, STE 15B CARLSBAD, CA 92010 T: 760-720-4337 LANDSCAPE ARCHITECT: LEGAL DESCRIPTION THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE CITY OF CARLSBAD, IN THE COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: ALL OF LOTS 13, 14, 15 AND 16 IN BLOCK 50 OF CARLSBAD TOWNSITE, IN THE CITY OF CARLSBAD, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO THE MAP THEREOF NO. 535, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY, MAY 2, 1888, EXCEPTING THEREFROM, THE SOUTHWESTERLY 50 FEET THEREOF. AVERAGE DAILY TRAFFIC STANDPIPE SYSTEM:YES, WITHIN STAIRWELLS LANDSCAPE AREA: 1ST FLOOR: PLANTER AREAS: 92 S.F. SITE LANDSCAPE AREA: 443 S.F. 2ND FLOOR (PLANTERS): 72 S.F. 3RD FLOOR (PLANTERS):72 S.F. 4TH FLOOR (PLANTERS): 72 S.F. ROOF DECK (PLANTERS): 0 S.F. TOTAL LANDSCAPE AREA:751 S.F. TOTAL LANDSCAPE % OF LOT AREA:8.3% PRIVATE RESIDENTIAL OPEN SPACE PER SECTION 2.7.1.2 OF VBMP: RESIDENCE 1 BALCONY: 174 S.F. RESIDENCE 2 BALCONY: 149 S.F. RESIDENCE 3 BALCONY: 238 S.F. RESIDENCE 4 BALCONY: 164 S.F. RESIDENCE 5 BALCONY: 149 S.F. RESIDENCE 6: 4TH FLOOR DECK:1,614 S.F. ROOF DECK: 1,934 S.F. TOTAL RESIDENCE 6:3,548 S.F. TOTAL PRIVATE RESIDENTIAL OPEN SPACE:4,422 S.F. PUBLIC PLAZA SPACE: FIRST FLOOR: 344 S.F. PROVIDED MAX. BLDG HEIGHT W/ ARCH.PROJECTIONS PER VBMP 2.6.2.C.4.C 49'-6" 6 BICYCLE SPACES PROVIDED (2 RACKS OF 3-BICYCLES EACH PROVIDED WITHIN PARKING GARAGE) IN LIEU OF 1 CAR PARKING SPACE PER VBMP 2.6.6 TABLE 2-4 (SUBSTITUTION OF CAR PARKING WITH BICYCLE PARKING): TOTAL SPACES PROVIDED INCLUDING CREDITS: 13 SPACES PEAK DRAINAGE DISCHARGE POST DEVELOPMENT (Q100)= 1.13 C.F.S. CARLSBAD/ BUENA VISTA CREEK/ BASIN "B" PER MASTER PLAN A4.1 BUILDING SECTIONS A4.2 BUILDING SECTIONS CIVIL C-1 COVER SHEET C-2 PRELIMINARY GRADING PLAN C-3 SECTIONS AND DETAILS LANDSCAPE L-1 TREE SURVEY PLAN L-2 CONCEPTUAL LANDSCAPE PLAN SITE/1ST FLOOR L-3 CONCEPTUAL LANDSCAPE PLAN 2ND, 3RD, AND 4TH FLOORS L-4 WATER CONSERVATION PLAN L-5 LANDSCAPE WATER USE EXHIBIT L-6 LANDSCAPE MAINTENANCE RESPONSIBILITY EXISTING ON-SITE COMMERCIAL BUILDING NET DIFFERENCE 121 - 85 = 36 ADT NET ADDITIONAL EVSE PARKING REQUIREMENT:1 SPACE RESIDENTIAL (9 X .1=1) EVSE IINSTALLED SPACE (50% EVSE):1 SPACE RESIDENTIAL EVSE INSTALLED A. CONSISTENT WITH GENERAL PLAN LAND USE AND ZONING YES CLIMATE ACTION PLAN (CAP) I. GHG STUDY REQUIRED NO B. ENERGY EFFICIENCY REQUIREMENT NO C. PHOTOVOLTAIC REQUIREMENT YES I. KW-DC ROOF MOUNTED 24 II. KW-DC GROUND MOUNTED 0 III. KW-DC TOTAL PROJECT 24 (48 PANELS TOTAL) D. ELECTRIC VEHICLE CHARGING REQUIREMENT YES I. # EV CHARGERS 1 II. # EV READY 0 III. # EV CAPABLE 1 E. HOT WATER HEATING REQUIREMENT F. TRAFFIC DEMAND MANAGEMENT REQUIRED NO YES, 40 SF SOLAR COLLECTORS PROVIDED (2 PANELS TOTAL) C-4 DRAINAGE MANAGEMENT AREA EXHIBIT- ROOF PLAN C-5 DRAINAGE MANAGEMENT AREA EXHIBIT- 4TH & 3RD FLOOR BMP'S C-6 DRAINAGE MANAGEMENT AREA EXHIBIT- 2ND & GROUND FLOOR BMP'S ATTACHMENT 6 XXX XXXX X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXE G G S T T T C C W DECK HOUSE HOUSE SIDEWALKSIDEWALK FF 55.76 RF 65.0 CONC DWY SIDEWALK RF 68.9 RF 66.8 RF 66.42 RF 64.0 FF 55.44 FF 54.6 FF 54.9 SHED ACC E S S LI MI T E D FF 56.30 FF 56.44 RF 70.8 RF 68.8 DECK ST E P S C O V E R E D P A T I O ASPHALT CONC SHED FF 56.4 STEP 5555 54545454 5454545453 5353 54. 8 54. 5 54. 2 53 . 7 53 . 7 54. 1 55 . 2 53. 5 53. 7 53. 3 53. 2 53. 2 53. 1 53 . 8 53. 9 54. 1 55. 3 55. 3 54 . 9 54. 7 54. 5 54. 1 54. 0 54. 3 54. 2 54. 2 53 . 2 53. 5 53 . 6 53 . 7 53. 7 54. 8 54. 3 GRAND AVENUE JEFFERSONSTREET(N09°33'57" E 51.25' R O S 18380)(335.19' ROS 21269)(N09°35'32" E 51.25' R O S 21269) N10°01'31"E 51.25' (N55°32'11"E 89.96' ROS 18380)(N55°32'11"E 321.27' - ROS 18380) B E L I E V E D T O B E D I S T U R B E D B Y C O N S T R U C T I O N N55°55'01"E 89.90' N55°58'24"E 89.90'N34°02'34"W 99.68'N34°02'34"W 99.77'S S S S S S S S S S S S S S S S S S S S S S S S SSSSSSSSSSSSSSSSSSSSSSSSWWWWWWWWWWWW W W W W GGGGGGGGGGGGGGGGGGGGGGG G G G G G G G G G G G G G G G G G IR W S S W W W W W S S S S S S S S SSSSSSSSSSSSSSSSSSSSSSSSS S S S WWWWWWWWWWWWW W W W W W W W W W W S W W W W W W WWGRAND AVENUE JEFFERSON STREETTRASH LOBBY ELEV EQUIPMENT ELEC. COMMERCIAL 1,823 SF GR FDC TRANS. RECYCLE PLANTERCOVERED OUTDOOR PLAZA 344 SF UP UP STAIR 1 STAIR 2 ELEVATOR PLANTERPLANTERNOTE: ELECTRIC VEHICLE CHARGING STATION PROVISIONS SHALL BE PROVIDED PER CURRENT CODE AND VBMP GAS MTRS PLANTER PARKING GARAGE - 12 VEHICULAR SPACES AND (2) 3-BICYCLE (6 TOTAL) PARKING SPACES20'-0"24'-0"20'-0"8'-0"9'-0"8'-6" TYP.18'-0"2'8'-6" TYP. 1 2 3 4 5 6 7 9 10 11 12 EXISTING BUILDING 1'-5"34'-6"12'-0"17'-7"1'6'-3"1'98'-0"9"77'-5"11'-2"1'-4" SIDEWALK13'-0"SIDEWALK SIDEWALK DRIVEWAY LANDSCAPE LANDSCAPE LANDSCAPE 1'-1" 4'-0" 10'-0" 40'-0" 16'-0"23'-11" BICYCLE PARKING BICYCLE PARKING DECORATIVE SCORED COLORED CONCRETE19'-5"3'-4" ACCESSIBLE PATH OF TRAVEL 5'-2"6'-0"2'-3"6'-0"1'-9"2'-0"3'-0"18'-5" MAIL 6'-0"5'-0"LANDSCAPE SIDEWALK LANDSCAPELANDSCAPE LANDSCAPE4'20'-0"LOCATION OF FUTURE GREASE INTERCEPTOR LOCATION OF (1) ELECTRIC CAR CHARGING STATION INSTALLED 8 18" 8'-6" 5'-0" 8'-6" TYP. 18" LANDSCAPE F.F.E.= 54.3 PAD= 53.6 DECORATIVE SCORED COLORED CONCRETE 3-BIKE VERTICAL HANGING RACK- SARIS INFRASTRUCTURE MODEL #8043 3-BIKE VERTICAL HANGING RACK- SARIS INFRASTRUCTURE MODEL #8043 GREASE DUCT LOCATION ABOVE 1 RESIDENTIAL METER (TO BE SUB-METERED) AND 1 COMMERCIAL METER LOCATION OF (1) ELECTRIC CAR CHARGING STATION CAPABLE 17'-0" Date:5-13-19 Sheet Title: Sheet Number: Project: File: Revisions: 1 2 GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008 SDP 2018-0010 DEV 2018-0055 KIRK MOELLER ARCHITECTS, INC. 2888 LOKER AVE. EAST, STE 220 CARLSBAD, CA 92010 KIRK@KMARCHITECTSINC.COM 760-814-8128 APPROVED THIS IS THE APPROVED TENTATIVE MAP/SITE PLAN FOR PROJECT NO. PER CONDITION PLANNING DIVISION DATE ENGINEERING DIVISION DATE NO. OF PLANNING COMMISSION RESOLUTION NO. A1.1 10'0 5'20' PROPERTY LINE ZERO CURB 8'-6" x 17'-6" W/ 2'-6" O.H. LANDSCAPED AREA "C" DRWGS. FOR THICKNESS CONCRETE PAVING - SEE 8'-6" x 20'-0" MIN. STANDARD PARKING STALL STANDARD PARKING STALL HANDICAP PARKING STALL, 9' x 18' MIN. SEWER LATERAL GAS LINE - SEE CIVIL S G SEE CIVIL FIRE HYDRANT EXISTING PUBLIC LIGHT STANDARD PRIVATE FIRE HYDRANT- CATCH BASIN WATER LINE - SEE CIVIL APPROX. LOCATION APPROXIMATE LOCATION C.B. W F.H. ACCESSIBLE PATH OF TRAVEL FIRE LANE - CURB TO BE PTD. NOTE: ALL PROPERTY LINES, EASEMENTS AND BUILDINGS, BOTH EXISTING AND PROPOSED, ARE SHOWN ON THIS SITE PLAN. 8'-0" x 15'-0" MIN.COMPACT PARKING STALLc NOTE: ALL SIGNAGE TO BE "UNDER SEPARATE PERMIT" AND "SEPARATE REVIEW". RED W/ WHITE LETTERS "NO PARKING FIRE LANE" REF.D/WPANTRY WINE11'-3"21'-2"21'-2"3'-9"20'-10" PER VBMP SECTION 2.7.1 #3 A & B TOTAL 4TH STORY LINEAL FEET FRONTAGE ALONG GRAND AVENUE: 78'-2" TOTAL BUILDING LINEAL FRONTAGE 0-10' SETBACK FROM PROPERTY LINE:0 TOTAL BUILDING LINEAL FRONTAGE MORE THAN 10' SETBACK FROM PROPERTY LINE: 78'-2" PERCENTAGE OF LINEAL FRONTAGE 0-10' SETBACK FROM PROPERTY LINE: 0 / 78'-2" = 0% (MAX. 30%) 78'-2"20'-4"PER VBMP SECTION 2.7.1 #3 A & B TOTAL 4TH STORY LINEAL FEET FRONTAGE ALONG JEFFERSON: 78'-8" TOTAL BUILDING LINEAL FRONTAGE 0-10' SETBACK FROM PROPERTY LINE: 21'-0" (SEE RECTANGULAR BOXES) TOTAL BUILDING LINEAL FRONTAGE MORE THAN 10' SETBACK FROM PROPERTY LINE: 57'-8" PERCENTAGE OF LINEAL FRONTAGE 0-10' SETBACK FROM PROPERTY LINE: 21' / 78'-8" = 26.7% (MAX. 30%) 10'-4"12'-8"10'-8"45'-0"11'-2"1'-0"4'-0"10'-0"78'-8" REQUIRED: TOTAL SF OF ENCLOSED FOURTH FLOOR SPACE SHALL NOT EXCEED 80% OF THE THIRD FLOOR FOOTPRINT PER VBMP 2.7.1.G.3 b PROVIDED: ENCLOSED FOURTH STORY IS 54% OF THIRD FLOOR FOOTPRINT22'-9"ENCLOSED FOURTH FLOOR = 4,048 SF / 54% THIRD FLOOR FOOTPRINT INCLUDES AREA BELOW FOURTH FLOOR TOTAL = 7,478 SF KEY 3RD FLOOR ROOF AREA WALKWAY PLANTER STORAGE 22'-3"29'-8"3RD FLOOR ROOF AREA 3RD FLOOR ROOF AREA 3RD FLOOR ROOF AREA 4TH FLOOR AREA 4TH FLOOR AREA 3RD FLOOR FOOTPRINT 7,478 SF 3,730 SF 103 SF 215 SF Date:5-13-19 Sheet Title: Sheet Number: Project: File: Revisions: 1 2 GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008 SDP 2018-0010 DEV 2018-0055 KIRK MOELLER ARCHITECTS, INC. 2888 LOKER AVE. EAST, STE 220 CARLSBAD, CA 92010 KIRK@KMARCHITECTSINC.COM 760-814-8128 A1.2 8'0 4'16'8'0 4'16' 8'0 4'16' TRASH LOBBY ELEV EQUIPMENT ELEC. COMMERCIAL 1,823 SF GR FDC TRANS. RECYCLE PLANTERCOVERED OUTDOOR PLAZA 344 SF UP UP STAIR 1 STAIR 2 ELEVATOR PLANTERPLANTERNOTE: ELECTRIC VEHICLE CHARGING STATION PROVISIONS SHALL BE PROVIDED PER CURRENT CODE AND VBMP GAS MTRS PLANTER PARKING GARAGE - 12 VEHICULAR SPACES AND (2) 3-BICYCLE (6 TOTAL) PARKING SPACES 38'-0"15'-0"24'-0"21'-0"77'-5"10'-1" 36'-6"12'-0"20'-7"20'-7"12'-8"10'-8"24'-0"21'-0"5'-2"9'-1"87'-6"98'-0"20'-0"24'-0"20'-0"8'-0"9'-0"8'-6"18'-0"6'-0"8'-6"6'-3"1 2 3 4 5 6 7 8 9 10 11 12 1'-0"1'-5"1'-0" 1'-1"1'-4"9"1'-0"8"LOCATION OF SECURITY GATE 3'-0"6'-0" 1'-0" A4.2 3 A4.2 4 A4.1 2 A4.1 1 18'-5" 8'-6"2'-0"4'-0"WHEEL STOP LINE OF COMMERCIAL GREASE DUCT SHAFT OVERHEAD STRUCTURAL COLUMN STRUCTURAL COLUMN 17'-0" 10'-0" Date:5-13-19 Sheet Title: Sheet Number: Project: File: Revisions: 1 2 GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008 SDP 2018-0010 DEV 2018-0055 KIRK MOELLER ARCHITECTS, INC. 2888 LOKER AVE. EAST, STE 220 CARLSBAD, CA 92010 KIRK@KMARCHITECTSINC.COM 760-814-8128 A2.1 8'0 4'16' UP DN STAIR 2 PLANTER 72 SFFACE OF BUILDING WALL BELOWSTORAGE 1 37 S.F. D W DINING LIVINGD/WMASTER BEDROOM PATIO 174 SF BEDROOM 3 BEDROOM 2 KITCHEN CL LAUNDRY CL REF.UNIT 1 2147 SF PANTRYWALKWAY UP DN STAIR 1 DININGWDLIVINGLINENMASTER BEDROOM BEDROOM 3 BEDROOM 2 KITCHEN POWD. CL CL CL CL LAUNDRY UNIT 2 2112 SF REF.PANTRY CL PATIO 149 SF LINEN DINING D/W REF. UP PATIO 238 SF BEDROOM 2 KITCHEN CL PANTRY UNIT 3 1378 SF MAIN 1017 SF LOFT 2395 SF TOTAL DESK D/WCL CL ELEVATOR FP STORAGE 2 37 S.F. LIVING3'-0"2'-8" 15'-11"12'-0"16'-7"19'-4"7'-2"11'-10"5'-2"21'-0"10'-4"87'-6"97'-0"9'-2"13'-3" 15'-11"27'-9"20'-1"11'-0"10'-1"11'-2"31'-2"13'-8"16'-4"10'-8"1'-0"1'-5"1'-0"1'-0"8"1'-1"1'-4"9"10'-1"11'-0"18'-11" 10'-4"29'-7"5'-6"11'-2"2'-6"8'-2"6"3'-0"6'-0"1'-0"8"6'-9"12'-4" 9'-8"4'-5"4'-5"2'-8"1'-0" 8" A4.2 3 A4.2 4 A4.1 2 A4.1 1 8"6'-0"4'-4"1'-0"4'-0"1'-0"1'-0"1'-0"7'-0"5"12'-9"AREA OF COMMERCIAL GREASE DUCT SHAFT Date:5-13-19 Sheet Title: Sheet Number: Project: File: Revisions: 1 2 GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008 SDP 2018-0010 DEV 2018-0055 KIRK MOELLER ARCHITECTS, INC. 2888 LOKER AVE. EAST, STE 220 CARLSBAD, CA 92010 KIRK@KMARCHITECTSINC.COM 760-814-8128 A2.2 8'0 4'16' UP DN STAIR 2 72 SF PLANTERFACE OF BUILDING WALL BELOWCL MASTER BEDROOM OPEN TO BELOW UNIT 3 LOFT DN WDLAUNDRY PATIO 164 SF WALKWAY UP DN STAIR 1WDLINENBEDROOM 3 BEDROOM 2 POWD. CL CL CL CL LAUNDRY UNIT 5 2112 SF PATIO 149 SF ELEVATOR LIVING DINING LIVING MASTER BEDROOM KITCHEN REF.PANTRY D/WSTORAGE 4 37 S.F. STORAGE 5 37 S.F. D W DINING D/WMASTER BEDROOM BEDROOM 3 BEDROOM 2 KITCHEN CL LAUNDRY CL REF.UNIT 4 2147 SF PANTRYLINEN CL CL3'-0"2'-8" 15'-11"12'-0"16'-7"19'-4"7'-2"11'-10"5'-2"21'-0"10'-4"87'-6"97'-0"9'-2"13'-3" 15'-11"27'-9"20'-1"11'-0"10'-1"11'-2"31'-2"13'-8"16'-4"10'-8"1'-0"1'-5"1'-0"1'-0"8"1'-1"1'-4"9"10'-1"11'-0"18'-11" 10'-4"29'-7"5'-6"11'-2"2'-6"8'-2"6"3'-0"6'-0"1'-0"8"6'-9"12'-4" 9'-8"4'-5"4'-5"2'-8"1'-0" 8" A4.2 3 A4.2 4 A4.1 2 A4.1 1 8"6'-0"4'-4"1'-0"4'-0"1'-0"1'-0"1'-0"7'-0"5"12'-9"AREA OF COMMERCIAL GREASE DUCT SHAFT Date:5-13-19 Sheet Title: Sheet Number: Project: File: Revisions: 1 2 GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008 SDP 2018-0010 DEV 2018-0055 KIRK MOELLER ARCHITECTS, INC. 2888 LOKER AVE. EAST, STE 220 CARLSBAD, CA 92010 KIRK@KMARCHITECTSINC.COM 760-814-8128 A2.3 8'0 4'16' PLANTER 72 SFCOVERED WALKWAY FACE OF BUILDING WALL BELOWUP DN UP DN STAIR 1 STAIR 2 STORAGE 6 78 S.F. DINING D W UP UNIT 6 3418 SF UP BEDROOM 3 BEDROOM 4 PATIO 191 SF CL CL CL LAUNDRY MASTER BEDROOM REF.D/WFOYER LIVING PANTRY DUAL SIDED FIREPLACE / TV COVERED PATIO 620 SF BEDROOM 2 LINENUP SKYLIGHT ABOVENICHELINEN RAISED PATIO 803 SF CL CLPOWDER ELEVATORWINE LOW WALL, TYP. GUARDRAIL HEIGHT PER ROOF PLAN UNOCCUPIED ROOF AREA LOW WALL, TYP. UNOCCUPIED MECHANICAL AREA3'-2"3'-7" 6'-4"2'-6"10'-5"5'-2"7'-2"18'-10"5'-2"21'-0"10'-4"87'-6"98'-0"3'-0"14'-2"19'-1"14'-7"20'-1"11'-0"10'-1"18'-0"12'-5"16'-3"1'-5"1'-0"1'-0"8"1'-1"1'-4"9"8'-9"9'-5" 10'-4"1'-4"5'-6"11'-2"2'-6"2'-4"3'-0"6'-0"1'-0"4'-0"2'-8" 6'-9"11'-10" 9'-8" A4.2 3 A4.2 4 A4.1 2 A4.1 13'-0"7'-9"6'-11"6"1'-11"5'-2"14'-2"1'-0"18'-8"10'-9"3'-9"20'-10"3'-0"5'-10"1'-0"4'-9"7'-4"8"1'-0"6'-5" 1'-5" 1'-10" 1'-6" 2'-7" AREA OF COMMERCIAL GREASE DUCT SHAFT Date:5-13-19 Sheet Title: Sheet Number: Project: File: Revisions: 1 2 GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008 SDP 2018-0010 DEV 2018-0055 KIRK MOELLER ARCHITECTS, INC. 2888 LOKER AVE. EAST, STE 220 CARLSBAD, CA 92010 KIRK@KMARCHITECTSINC.COM 760-814-8128 A2.4 8'0 4'16' DN UNIT 6 PRIVATE ROOF DECK 1934 SF W G S 81 C.F. LOW STORAGE MECHANICAL YARD 4TH FLOOR BELOW4TH FLOOR PLANTER BELOWBALCONY PARAPET 2ND FLOOR BELOW 4TH FLOOR WALKWAY BELOW49'-6" ALL ROOF DECK AREAS TO DRAIN MINIMUM 1/4"/FT. TO INTERNAL DRAIN SYSTEM GREASE DUCT CHASE BELOW BALCONY PARAPET 3RD FLOOR BELOW SCUPPER ROOF DRAIN (TYP.) 4TH FLOOR DECK BELOW 4TH FLOOR DECK BELOW MECHANICAL YARD 48'-6" 49'-6" 48'-6" 49'-6" 48'-6" 48'-6" 46'-4" 47'-4" 46'-4" 49'-6" 47'-4" 49'-6" 48'-6"38'-4 1/2" 38'-4 1/2" 48'-6" 38'-4 1/2" 16'-7 1/2"18'-1 1/2" 43'-4" 39'-8 1/2" 38'-4 1/2" 38'-4 1/2" 43'-7" 40'-10 1/2" 41'-3"42'-11" 38'-10 1/2"41'-10 1/2" 40'-4 1/2" 45'-3" RIDGE 47'-5 1/2" RIDGE 46'-10 1/2" AREA OF SOLAR FIELD. 16 PV PANELS WITH A MIN. OF 500 WATTS EACH UNIT. 48 TOTAL PANELS. OPERABLE SLIDING SKYLIGHT- DASHED LINE INDICATES "OPEN" POSITION 48'-6" GUARDRAIL 48'-6" GUARDRAIL48'-6" GUARDRAIL 48'-6" 49'-6" 48'-6" 48'-6" 48'-6" 48'-6" 2:12 2:12 2:12 2% MIN. TYP. 2% MIN. TYP. 2% MIN. TYP. 2% MIN. TYP. 2% MIN. TYP. 2% MIN. TYP.2% MIN. TYP.2% MIN. TYP.2% MIN. TYP. TYP.2% MIN. TYP.2% MIN. TYP.2% MIN. TYP.2% MIN. TYP.2% MIN. TYP.2:12 2:12 2:122:122:122:1248'-6" GUARDRAIL 46'-4" SCUPPER SCUPPER 41'-10 1/2"41'-10 1/2" 40'-10 1/2" TYP. AREA OF SOLAR FIELD. 11 PV PANELS WITH A MIN. OF 500 WATTS EACH PANEL. 48 TOTAL PANELS. AREA OF SOLAR FIELD. 9 PV PANELS WITH A MIN. OF 500 WATTS EACH PANEL. 48 TOTAL PANELS. AREA OF SOLAR FIELD FOR HOT WATER HEATING. 2 PV PANELS WITH A MIN. OF 500 WATTS EACH PANEL. 2 TOTAL PANELS. AREA OF SOLAR FIELD. 13 PV PANELS WITH A MIN. OF 500 WATTS EACH UNIT. 48 TOTAL PANELS. 48'-6" GUARDRAIL Date:5-13-19 Sheet Title: Sheet Number: Project: File: Revisions: 1 2 GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008 SDP 2018-0010 DEV 2018-0055 KIRK MOELLER ARCHITECTS, INC. 2888 LOKER AVE. EAST, STE 220 CARLSBAD, CA 92010 KIRK@KMARCHITECTSINC.COM 760-814-8128 A2.5 8'0 4'16' PROJECT COMMERCIAL LIGHTING- LIGHT FIXTURES SHALL BE DOWNCAST OR LOW CUT OFF FIXTURES TO PREVENT GLARE AND LIGHT POLLUTION OFF-WHITE SMOOTH STUCCO COVERED PLAZA 10'-1 1/2"10'-1 1/2"10'-1 1/2"14'-7 1/2"2ND FLOOR 3RD FLOOR MAX. HEIGHT 4'-6"4TH FLOOR ROOF DECK 45'-0"49'-6" ARCHITECTURAL PROJECTIONROLL-UP COMMERCIAL METAL GRATE GARAGE DOOR LIGHT GREY SMOOTH STUCCO TRIM AND PARAPET CAPS 54.2 (E) GRADE APPROX. LOCATION OF MECHANICAL UNITS BEHIND ARCH. FEATURE PER VBMP 2.8.2.F.6. LIGHT GREY SMOOTH STUCCO DECORATIVE 3 INCH EYEBROW ACCENTS, TYP. HORIZONTAL SIDING- JAMES HARDIE DREAM COLLECTION PACIFIC BLUE (EQ. SW PAINT #6509) NATURAL LIMESTONE TILE- ROCAS AZUL 12X24 BY ARIZONA TILE DARK GREY METAL CANOPY AND PARAPET CAP ELDORADO STONE VINTAGE RANCH, COLOR: SADDLEWOOD PROVIDED BY THOMPSON BUILDING MATERIALS DECORATIVE STOREFRONT SYSTEM WITH MATTE BLACK MULLION COLOR CLEAR RESIDENTIAL GLASS WITH BLACK VINYL WINDOW TRIM, RECESSED 2"-3", TYPICAL 7 8 6 G R A N D TENANT OFF-WHITE SMOOTH STUCCO NATURAL LIMESTONE TILE- ROCAS AZUL 12X24 BY ARIZONA TILE GLASS RAILING DARK GREY METAL CANOPY AND PARAPET CAP RETAIL STREET FACADE FROM FINISHED FLOOR TO PLATE HEIGHT- WALL AREA: 911 SF (DASHED LINE) AREA OF GLAZING: 460 SF PERCENTAGE REQUIRED: 45% PER VBMP 2.6.3A 1 PERCENTAGE PROVIDED: 50%14'-7 1/2"10'-1 1/2"10'-1 1/2"8'-1 1/2"2'-0"4TH FLR DECK 4TH FLOOR 3RD FLOOR 2ND FLOOR ROOF DECK MAX. HEIGHT 4'-6"45'-0"49'-6" ARCHITECTURAL PROJECTIONAPPROX. LOCATION OF MECHANICAL UNITS BEHIND ARCH. FEATURE PER VBMP 2.8.2.F.6. LIGHT GREY SMOOTH STUCCO TRIM AND PARAPET CAPS 54.2 (E) GRADE 8" TRIM BOARD PAINTED TO MATCH TRIM COLOR HORIZONTAL SIDING- JAMES HARDIE DREAM COLLECTION PACIFIC BLUE (EQ. SW PAINT #6509) ELDORADO STONE VINTAGE RANCH, COLOR: SADDLEWOOD PROVIDED BY THOMPSON BUILDING MATERIALS LIGHT GREY SMOOTH STUCCO DECORATIVE 3 INCH EYEBROW ACCENTS, TYP. DECORATIVE STOREFRONT SYSTEM WITH MATTE BLACK MULLION COLOR CLEAR RESIDENTIAL GLASS WITH BLACK VINYL WINDOW TRIM, RECESSED 2"-3", TYPICAL Date:5-13-19 Sheet Title: Sheet Number: Project: File: Revisions: 1 2 GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008 SDP 2018-0010 DEV 2018-0055 KIRK MOELLER ARCHITECTS, INC. 2888 LOKER AVE. EAST, STE 220 CARLSBAD, CA 92010 KIRK@KMARCHITECTSINC.COM 760-814-8128 A3.1-2 8'0 4'16' 8'0 4'16' DECORATIVE BURNISHED BLOCK DECORATIVE METAL SCREENS 10'-1 1/2"10'-1 1/2"10'-1 1/2"14'-7 1/2"3RD FLOOR ROOF DECK 4TH FLR DECK 4TH FLOOR 2ND FLOOR MAX. HEIGHT 4'-6"45'-0"49'-6" ARCHITECTURAL PROJECTIONLIGHT GREY SMOOTH STUCCO TRIM AND PARAPET CAPS 54.2 (E) GRADE DECORATIVE ARTIFICIAL WALL PLANTERS OFF-WHITE SMOOTH STUCCO HORIZONTAL SIDING- JAMES HARDIE DREAM COLLECTION PACIFIC BLUE (EQ. SW PAINT #6509) LIGHT GREY SMOOTH STUCCO DECORATIVE 3 INCH EYEBROW ACCENTS, TYP. 8" TRIM BOARD PAINTED TO MATCH TRIM COLOR NATURAL LIMESTONE TILE- ROCAS AZUL 12X24 BY ARIZONA TILE 1'-0" DARK GREY METAL CANOPY AND PARAPET CAP CLEAR RESIDENTIAL GLASS WITH BLACK VINYL WINDOW TRIM, RECESSED 2"-3", TYPICAL 10'-1 1/2"10'-1 1/2"10'-1 1/2"14'-7 1/2"4TH FLOOR 3RD FLOOR 2ND FLOOR ROOF DECK MAX. HEIGHT 4'-6"45'-0"49'-6" ARCHITECTURAL PROJECTIONDECORATIVE BURNISHED BLOCK DECORATIVE METAL SCREENS 54.2 (E) GRADE LIGHT GREY SMOOTH STUCCO TRIM AND PARAPET CAPS OFF-WHITE SMOOTH STUCCO HORIZONTAL SIDING- JAMES HARDIE DREAM COLLECTION PACIFIC BLUE (EQ. SW PAINT #6509) LIGHT GREY SMOOTH STUCCO DECORATIVE 3 INCH EYEBROW ACCENTS, TYP. ELDORADO STONE VINTAGE RANCH, COLOR: SADDLEWOOD PROVIDED BY THOMPSON BUILDING MATERIALS CLEAR RESIDENTIAL GLASS WITH BLACK VINYL WINDOW TRIM, RECESSED 2"-3", TYPICAL STORAGE ROOMS DIRECTLY ABOVE TRASH ENCLOSURE ACTING AS "ROOF" DECORATIVE BLACK VENT IN EACH DOOR TO BE SIZED PER REQ'D.7'-0"13'-0" 4 EQ.1'-0"2'-7" METAL TRIMMED DOORS WITH DECORATIVE AEP SPAN FLEX SERIES 1.5FX20-12 METAL PANEL, COLOR TO MATCH BUILDING TRIM Date:5-13-19 Sheet Title: Sheet Number: Project: File: Revisions: 1 2 GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008 SDP 2018-0010 DEV 2018-0055 KIRK MOELLER ARCHITECTS, INC. 2888 LOKER AVE. EAST, STE 220 CARLSBAD, CA 92010 KIRK@KMARCHITECTSINC.COM 760-814-8128 A3.1-2 8'0 4'16' 8'0 4'16' 8'0 4'16' PARKING GARAGE EXTERIOR HALLWAYFOYERCLKITCHENPANTRY EXTERIOR HALLWAYFOYERCLKITCHENPANTRY KITCHEN HALLWAY BEDROOM STORAGEROOF DECK ROOF DECK ROOF 9'-0"5'-0"7 1/2"3'-6"6'-7 1/2"3'-6"6'-7 1/2"3'-6"6'-7 1/2"4'-6"2'-0"3'-6"10'-1 1/2"1'-0"49'-6" TOP OF ARCHITECTURAL PROJECTION14'-7 1/2"10'-1 1/2"10'-1 1/2"10'-1 1/2"45'-0" TOP OF ROOF10'-1 1/2"8'-1 1/2"14'-7 1/2"3'-6"LIVING ROOM DINING KITCHENLIVING ROOM RETAIL COVERED PATIORETAIL LIVING ROOM DINING KITCHENLIVING ROOM EXTERIOR BALCONYBALCONY BALCONYBALCONY RAISED PATIO 14'-0"BOTTOM OF PLATE7 1/2"3'-6"14'-7 1/2"3'-6"6'-5 1/2"49'-6" TOP OF ARCHITECTURAL PROJECTION14'-7 1/2"10'-1 1/2"12'-1 1/2"8'-1 1/2"45'-0" TOP OF ROOF8'-11 1/2"1'-2"10'-11 1/2"1'-2"6'-10 1/2"1'-3"4'-6"8'-7 1/2"6'-7 1/2"3 4 2 1 GRAND JEFFERSONDate:5-13-19 Sheet Title: Sheet Number: Project: File: Revisions: 1 2 GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008 SDP 2018-0010 DEV 2018-0055 KIRK MOELLER ARCHITECTS, INC. 2888 LOKER AVE. EAST, STE 220 CARLSBAD, CA 92010 KIRK@KMARCHITECTSINC.COM 760-814-8128 A4.1-2 8'0 4'16' 8'0 4'16' PARKING GARAGERETAIL LIVING ROOM RAISED PATIO KITCHEN DINING ROOM HALLWAY/ ENTRY LIVING ROOM KITCHEN DINING ROOM HALLWAY/ ENTRY MASTER BEDROOMHALLDINING ROOM/ KITCHENLIVING ROOMCOVERED PATIO STORAGE ROOF DECK LIVING ROOM5'-0"4'-6"1'-6"10'-1 1/2"2'-0"49'-6" TOP OF ARCHITECTURAL PROJECTION14'-7 1/2"10'-1 1/2"10'-1 1/2"10'-1 1/2"45'-0" TOP OF ROOF14'-0"BOTTOM OF PLATE7 1/2"3'-6"6'-7 1/2"8'-11 1/2"1'-2"3'-4"5'-7 1/2"1'-2"4'-6"3'-1 1/2"6'-7 1/2"3'-6"14'-7 1/2"3'-6"PARKING GARAGERETAIL BALCONY BALCONY MASTER BEDROOM MASTER CLOSET BEDROOM KITCHEN KITCHENPANTRYCOVERED PATIO MASTER BEDROOMRAISED PATIO CLOSET SHOWER MASTER BEDROOMMASTER BEDROOM MASTER CLOSET BALCONYBEDROOM BEDROOM BEDROOM ROOF DECK 33'-6"4'-2"3'-6"3'-6"49'-6" TOP OF ARCHITECTURAL PROJECTION14'-7 1/2"10'-1 1/2"10'-1 1/2"10'-1 1/2"45'-0" TOP OF ROOF14'-0"BOTTOM OF PLATE3'-6"5'-5 1/2"1'-2"8'-11 1/2"1'-2"3'-4"5'-7 1/2"1'-2"4'-6"7 1/2"3'-11 1/2"8'-7 1/2"6'-7 1/2"14'-7 1/2"3 4 2 1 GRAND JEFFERSONDate:5-13-19 Sheet Title: Sheet Number: Project: File: Revisions: 1 2 GRAND JEFFERSON786 GRAND AVENUECARLSBAD, CAGRAND JEFFERSONCT 2018-0008 SDP 2018-0010 DEV 2018-0055 KIRK MOELLER ARCHITECTS, INC. 2888 LOKER AVE. EAST, STE 220 CARLSBAD, CA 92010 KIRK@KMARCHITECTSINC.COM 760-814-8128 A4.1-2 8'0 4'16' 8'0 4'16'