HomeMy WebLinkAbout1974-09-18; Encina Joint Advisory Committee Ad Hoc; Minutesc.c. Minutes of JOINT ADVISORY COMMITTEE September 18, 1974 Chairman, Ed Stiles Vice-Chairman, Stanley Mahr Present:Buena: Carlsbad: Encinitas: Leucadia: San Diego Co: San Marcos: Vista: Brown & Caldwell: LOWV: Ed Stiles, Bill Dominguez Dave Dunne, Lew Chase, Tim Flanagan, Diane Edmunds Mark Schneider, Lee Arnold, Jack Kubota Richard Hanson, G. Stanley VanSickle Jim Frandsen, Chuck Oldsen Stanley Mahr, Jim McKay Paul Pressman, Joseph Zapotocky, Bob Foo Eric Mische Ruth Honnold Minutes of August 21 Meeting Minutes were approved as read. Operation and Maintenance Reports Chuck Oldsen introduced Jim Frandsen, who would be substituting for Chuck at next month's meeting. Leucadia and Encinitas have been added to the entry gate sign. also noted that the operators of the plant have new uniforms. It was Laboratory activity has been carried out at San Elijo and an outside lab temporarily. Burroughs industrial waste was in conformance except for one sampling. Burroughs has made a proposal regarding upgrading of their discharge; the County is reviewing the proposal. The foaming problem with the digester is still occurring. Odor complaints have also been received. When the new digester is in operation, the digester will be de-watered and cleaned. Flow record reports show that daily average flow has gone up to 7.0 MGD, which is an all-time high; Carlsbad showed the greatest increase. Cost report for first two months did not include utilities cost for the pump stations and treatment facility. Totals are below pro-rated budget. Carlsbad and Leucadia provided most of the new connections in the monthly flow projections. Progress Report on Construction Phase II is 76% complete; Phase IIA is 55% complete. The strike is still continuing and paving has been held up, along with any concrete delivery. Joint Advisory Committee September 18, 1974 Page 2 3. Progress Report on Construction, cont'd. The boiler is in place and being worked on now. The lab is nearly ready for use. 4. Progress on Phase III A letter was received from the State Division of Water Quality dated August 19, 1974 stating that they had received our plan of study and had approved the plan with modifications as noted. It was related that tomorrow, September 19,. the State representative and staff, along with an EPA representative would meet to talk about eligibility, etc. Eric Mische of Brown and Caldwell will be the project manager of the plan for Phase III. He gave a brief idea of the proce6ses which have to be gone through, including a staff meeting to discuss the projected population and projected flows from each agency. The approaches to the problem must be made from the point of reality as well as in terms of reality with regards to grant eligibility. 5. Report by Special JAC Subcommittee The subcommittee met, and their action was to appoint Ron Beckman and Jack Kubota to redraft the letter that was composed originally and send it out with specifications for a management study to several firms of their choosing. They were to proceed on a schedule that would provide, at the next JAC meeting, a recommendation from the subcommittee for JAC as to which firm would be recommended and a cost recommendation. There will be one more subcommittee meeting this month when the reports are received, in order to decide on a firm. 6. Audit of FY 73-74 Encina Operation Budget Tim Flanagan advised that, last year, the audit was done by Wayne Carroll of Carroll and Brantley. He requested permission to hire the same firm at a price not to exceed $1,000. Motion (Dominguez-McKay) carried. 7. Other Business No pictures have been taken for the movie about the Facility because of the strike and the plant being untidy. A rough outline has been prepared and a draft is now being written of the narrative. The movie is not expected to be completed in less than 2-3 months. Chuck Oldsen related that Vista and Carlsbad had hired a consultant, Brown and Caldwell, to increase the capacity of the Buena Vista pump station, to complete paralleling of the existing force main and increase the capacity of the Agua Hedionda pump station. Projects have been in . planning for a long time, and do not directly relate to the other owners. Construction will be starting in March of next year. A project report has been prepared. The question of the project engineer preparing the environmental report was raised by Vista, as this is prohibited by their ordinances. The attorney for Vista advised he would check into the matter, Joint Advisory Committee September 18, 1974 Page 3 8. Set Date for Next Meeting Next meeting was set for October 16, 1974. Respectfully submitted, Diane Edmunds