Loading...
HomeMy WebLinkAbout1976-10-27; Encina Joint Advisory Committee Ad Hoc; MinutesJOINT ADVISORY COMMITTEE OCTOBER 27, 1976 CHAIRMAN, Ed Stiles Vice-Chairman, Stanley Mahr 1. PRESENT: BUENA: Ed Stiles CARLSBAD: A.J. Skotnicki, Mary Casler, Ron Beckman, Wilda Varner ENCINITAS: Mark Schneider, Jack Kubota LEUCADIA: Richard Hanson SAN MARCOS: Jim McKay, Stanley Mahr VISTA: Joe Zapotocky, Bob Foo, Paul Pressman . COUNTY: Chuck Oldsen, Jim Frandsen EWPCF: Les Evans BLADE TRIBUNE: Liz Harris LWV: Ruth Hannold 2. Minutes of September 29, 1976 Minutes were approved as submitted^ Mr. Les Evans was introduced as the new General Manager for the Encina Plant. 3. Operations & Maintenance Report Chuck Oldsen advised that septage dumping activity has not increased. Chuck Oldsen advised that the centrifuge was completely overhauled. The approximate cost for labor and parts was $4,000 to $5,000. Flow Report: Flows for September are up for all agencies. Expenditure Report: Costs were below prorated budget amount. 4. Review of Existing and Projected Flows There were 170 new connections, as shown on the chart for September. There was some discussion regarding the "Est. Flow per EDU" column, no action was taken to revise. 5. Report of Sulphide Condition Carlsbad, Encinitas, & Leucadia are still working on resolving the high sulphide condition in the Ponto line upstream of the junction of Carlsbad with Encinitas and Leucadia. 6. Progress Report on Consultant for Digester Foaming Problem Woodside-Kubota was awarded the-project. Isadore Nusbaum and Lloyd Hedlin are the consultants undertaking this project. Unfortunately, Isadore Nusbaum has not been able to do any work on the project due to hospitalization, however, Lloyd Hedlin did start work on Oct. 23. Hopefully a draft will have been submitted by the next JAC meeting. 7. Progress Report on Flow Meter by Brown & Caldwell Chuck Oldsen advised that the propellar meter .is reading high. Due to this malfunction, either the weir will be relocated or the propellar meter will be moved further up the pipeline. Brown & Caldwell will be doing something to attempt to correct this problem. 8. Report on Flow Measuring at Plant & Throughout Joint System As a result of a staff meeting, the firm Hirsch & Koptionak were contacted regarding the prospect of measuring the flow at all of the metering locations throughout the joint systems. Chuck Oldsen wrote Hirsch & Koptionak a letter setting forth a pre- liminary scope of work for the survey. Hirsch & Koptionak then made a second proposal at which the estimated cost would be $6,500 with one month allotted time. Motion passed (FOO- SKOTNICKI) JAC staff proceed with the project. Meeting was scheduled for November 18, 1976 at 9:00 AM between JAC staff and Koptionak to work out details. 9. Progress Report on Phase III Upgrading and Enlargement Chuck Oldsen reported that he spoke to Ray Walsh, State Water Resources Control Board, who reported that State and EPA (Water Division) finally met and have set a schedule to decide on EWPCF (along with other agencies) by November 1. Chuck Oldsen . advised he was informed that EPA (Water Division) is unhappy with Encina's facilities plan. Leucadia County Water District has not yet approved the resolution for Phase III upgrading. At this time Paul Pressman advised that due to the fact that approval from EPA and State has not yet been received, JAC should withdraw their application for Coastal permit from the Coastal Commission as they will be coming to a close in the near future. In view of the closing of this phase of the Coastal Commission, it would appear to be beneficial to JAC to resubmit application to the new Coastal Commission. Motion passed (ZAPOTOCKY-McKAY) to authorize the withdrawal of the application for Coastal permit unless EPA and State Water Resources Control Board approves grant for Phase III and Leucadia County Water District approves the resolution for the project by November 16. 10. Progress Report on Solar Aqua Systems After some discussion it was decided that a meeting of a subcommittee comprised of a representative from each agency meet on November 18, 1976 at 10:00 am regarding details of implementing Solar Aqua Systems proposal. 11. Adopt Correct Fees for "Office Engineering Services During Construction" Chuck Oldsen advised that the figures as shown in the JAC minutes of 8-25-76 for Phase III services by Brown & Caldwell are incorrect; the figure in this report reads $132,630. *The correct figure is $120,845, a difference of $11,785. See corrected chart below: ^ Figure Originally Agreed Today's Engineering Services To 23 February 1976 Proposed Fee Design Services $700,000 $ 737,600 Office Engineer Services 140,000 *120,845 during construction Part 1 Submittal 40,000 41,275 O&M Manual Parts 2 and 3 Submittal 25,000 27,795 O&M Manual Subtotal $905,000 $ 939,300 Miscellaneous Services 100,000 200,000 TOTAL $1,005,000 $1,127,515 Motion passed (FOO-STILES) that corrected fees be approved and go on record. Next meeting scheduled for November 24, 1976. Respectfully submitted, Wilda Varner