HomeMy WebLinkAboutCIP 4608; POINSETTIA COMMUNITY PARK PHASE IV; PRIORITY DEVELOPMENT PROJECT (PDP) STORM WATER QUALITY MANAGEMENT PLAN (SWQMP) FOR POINSETTIA COMMUNITY PARK PHASE IV DOG PARK & PARKING LOT; 2020-10-15TABLE OF CONTENTS Certification Page Project Vicinity Map FORM E-34 Storm Water Standard Questionnaire Site Information FORM E-36 Standard Project Requirement Checklist Summary of PDP Structural BMPs Attachment 1: Backup for PDP Pollutant Control BMPs Attachment 1a: DMA Exhibit Attachment 1b: Tabular Summary of DMAs and Design Capture Volume Calculations Attachment 1c: Harvest and Use Feasibility Screening (when applicable) Attachment 1d: Categorization of Infiltration Feasibility Condition (when applicable) Attachment 1e: Pollutant Control BMP Design Worksheets / Calculations Attachment 2: Backup for PDP Hydromodification Control Measures Attachment 2a: Hydromodification Management Exhibit Attachment 2b: Management of Critical Coarse Sediment Yield Areas Attachment 2c: Geomorphic Assessment of Receiving Channels Attachment 2d: Flow Control Facility Design Attachment 3: Structural BMP Maintenance Thresholds and Actions Attachment 4: Single Sheet BMP (SSBMP) Exhibit PROJECT VICINITY MAP INSTRUCTIONS: To address post-development pollutants that may be generated from development projects, the city requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer to the Engineering Standards (Volume 5). This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to ‘STANDARD PROJECT’ requirements or be subject to ‘PRIORITY DEVELOPMENT PROJECT’ (PDP) requirements. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the city. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A completed and signed questionnaire must be submitted with each development project application. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. PROJECT INFORMATION PROJECT NAME: Poinsettia Community Park Phase IV Dog Park & Parking Lot PROJECT ID: ADDRESS: 6600 Hidden Valley Road APN: 214-140-13, The project is (check one): New Development Redevelopment The total proposed disturbed area is: 72,000 ft2 (1.65) acres The total proposed newly created and/or replaced impervious area is: 18,977 ft2 (0.43) acres If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the SWQMP # of the larger development project: Project ID SWQMP #: Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. E-34 Page 1 of 4 REV 03/19 Development Services Land Development Engineering 1635 Faraday Avenue (760) 602-2750 www.carlsbadca.gov STORM WATER STANDARDS QUESTIONNAIRE E-34 X E-34 Page 2 of 4 REV 03/19 STEP 1 TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a “development project”, please answer the following question: YES NO Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? If you answered “yes” to the above question, provide justification below then go to Step 5, mark the third box stating “my project is not a ‘development project’ and not subject to the requirements of the BMP manual” and complete applicant information. Justification/discussion: (e.g. the project includes only interior remodels within an existing building): If you answered “no” to the above question, the project is a ‘development project’, go to Step 2. STEP 2 TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer the following questions: Is your project LIMITED to one or more of the following: YES NO 1. Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: a) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non- erodible permeable areas; OR b) Designed and constructed to be hydraulically disconnected from paved streets or roads; OR c) Designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets guidance? 2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in accordance with the USEPA Green Streets guidance? 3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? If you answered “yes” to one or more of the above questions, provide discussion/justification below, then go to Step 5, mark the second box stating “my project is EXEMPT from PDP …” and complete applicant information. Discussion to justify exemption ( e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): If you answered “no” to the above questions, your project is not exempt from PDP, go to Step 3. E-34 Page 3 of 4 REV 03/19 STEP 3 TO BE COMPLETED FOR ALL NEW OR REDEVELOPMENT PROJECTS To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1)): YES NO 1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 2. Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 3. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification (SIC) code 5812). 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside development project includes development on any natural slope that is twenty-five percent or greater. 5. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious street, road, highway, freeway or driveway surface collectively over the entire project site? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. 7. Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? “Discharging Directly to” includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingled with flows from adjacent lands).* 8. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface that supports an automotive repair shop? An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. 9. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category includes RGO’s that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per day. 10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? 11. Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? (CMC 21.203.040) If you answered “yes” to one or more of the above questions, your project is a PDP. If your project is a redevelopment project, go to step 4. If your project is a new project, go to step 5, check the first box stating “My project is a PDP …” and complete applicant information. If you answered “no” to all of the above questions, your project is a ‘STANDARD PROJECT.’ Go to step 5, check the second box stating “My project is a ‘STANDARD PROJECT’…” and complete applicant information. E-34 Page 4 of 4 REV 03/19 STEP 4 TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPMENT PROJECTS (PDP) ONLY Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)): YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? Complete the percent impervious calculation below: Existing impervious area (A) = +/- 200,000 sq. ft. Total proposed newly created or replaced impervious area (B) = 18,977 sq. ft. Percent impervious area created or replaced (B/A)*100 = 9.5 % If you answered “yes”, the structural BMPs required for PDP apply only to the creation or replacement of impervious surface and not the entire development. Go to step 5, check the first box stating “My project is a PDP …” and complete applicant information. If you answered “no,” the structural BMP’s required for PDP apply to the entire development. Go to step 5, check the check the first box stating “My project is a PDP …” and complete applicant information. STEP 5 CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP) for submittal at time of application. My project is a ‘STANDARD PROJECT’ OR EXEMPT from PDP and must only comply with ‘STANDARD PROJECT’ stormwater requirements of the BMP Manual. As part of these requirements, I will submit a “Standard Project Requirement Checklist Form E-36” and incorporate low impact development strategies throughout my project. Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations and exhibits to verify if ‘STANDARD PROJECT’ stormwater requirements apply. My Project is NOT a ‘development project’ and is not subject to the requirements of the BMP Manual. Applicant Information and Signature Box Applicant Name: Kenneth T. Kozlik, PE Applicant Title: Civil Engineer Applicant Signature: Date: 08/18/2020 * Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City. This Box for City Use Only City Concurrence: YES NO By: Date: Project ID: X SITE INFORMATION CHECKLIST Project Summary Information Project Name Poinsettia Community Park Phase IV Dog Park & Parking Lot Project ID CD 2018-0048 Project Address 6600 Hidden Valley Road, Carlsbad, CA 92011 Assessor's Parcel Number(s) (APN(s)) 214-140-13,-23,&-39 Project Watershed (Hydrologic Unit) Carlsbad 904 Parcel Area 41.14 Acres (1,792,000 Square Feet) Existing Impervious Area (subset of Parcel Area) 4.59 Acres (+/-200,000 Square Feet) Area to be disturbed by the project (Project Area) 1.65 Acres (72,000 Square Feet) Project Proposed Impervious Area (subset of Project Area) 0.43 Acres (18,977 Square Feet) Project Proposed Pervious Area (subset of Project Area) 1.22 Acres (53,023 Square Feet) Note: Proposed Impervious Area + Proposed Pervious Area = Area to be Disturbed by the Project. This may be less than the Parcel Area. Description of Existing Site Condition and Drainage Patterns Current Status of the Site (select all that apply): Existing development Previously graded but not built out Agricultural or other non-impervious use Vacant, undeveloped/natural Description / Additional Information: Existing Land Cover Includes (select all that apply): Vegetative Cover Non-Vegetated Pervious Areas Impervious Areas Description / Additional Information: Underlying Soil belongs to Hydrologic Soil Group (select all that apply): NRCS Type A NRCS Type B NRCS Type C NRCS Type D Approximate Depth to Groundwater (GW): GW Depth < 5 feet 5 feet < GW Depth < 10 feet 10 feet < GW Depth < 20 feet GW Depth > 20 feet Existing Natural Hydrologic Features (select all that apply): Watercourses Seeps Springs Wetlands None Description / Additional Information: Description of Existing Site Topography and Drainage [How is storm water runoff conveyed from the site? At a minimum, this description should answer (1) whether existing drainage conveyance is natural or urban; (2) describe existing constructed storm water conveyance systems, if applicable; and (3) is runoff from offsite conveyed through the site? if so, describe]: Phase IV of Poinsettia Community Park consists of two barrens but previously graded portions of the Poinsettia Park. The Southern half (dog park) of the area in study currently drains from the east to the west via surface drainage into an existing 24”x24” catch basin curb apron. The northern portion (parking lot) is flat throughout and has minor surface drainage from the east to the west. This area eventually drains to the said existing 24”x24” catch basin curb apron located north west of the area in study. No offsite drainage is comingled with the area of study. Description of Proposed Site Development and Drainage Patterns Project Description / Proposed Land Use and/or Activities: The study of area proposes to construct a dog park which entails impervious surfaces and grading of the southern portion. The northern portion is being proposed as a parking lot of impervious surface. List/describe proposed impervious features of the project (e.g., buildings, roadways, parking lots, courtyards, athletic courts, other impervious features): Roadways, parking, sidewalks. List/describe proposed pervious features of the project (e.g., landscape areas): Landscape areas Does the project include grading and changes to site topography? Yes No Description / Additional Information: The dog park will retain the same drainage pattern but graded to flatten existing slopes and utilize seat walls for major grade jumps. The parking lot will remain the same drainage pattern but graded for impervious pavement. Does the project include changes to site drainage (e.g., installation of new storm water conveyance systems)? Yes No Description / Additional Information: The dog park will install 12”x12” catch basin and graded swale along the southwest perimeter of the southern portion to capture all the site drainage. All onsite runoff will be conveyed to proposed biofiltration (BF1) and connect via proposed 8” storm drain to existing inlet apron located south west of the site. The parking lot will be constructed with valley gutters to capture onsite drainage into proposed biofiltration (BF2). Once treated, this runoff will be conveyed via new storm drain system into said north west inlet apron located north west of the site. Identify whether any of the following features, activities, and/or pollutant source areas will be present (select all that apply): On-site storm drain inlets Interior floor drains and elevator shaft sump pumps Interior parking garages Need for future indoor & structural pest control Landscape/Outdoor Pesticide Use Pools, spas, ponds, decorative fountains, and other water features Food service Refuse areas Industrial processes Outdoor storage of equipment or materials Vehicle and Equipment Cleaning Vehicle/Equipment Repair and Maintenance Fuel Dispensing Areas Loading Docks Fire Sprinkler Test Water Miscellaneous Drain or Wash Water Plazas, sidewalks, and parking lots Identification of Receiving Water Pollutants of Concern Describe path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable): The storm drain systems for Poinsettia Park discharge to the canyon to the west. This canyon then flows north for about 0.4 miles to a confluence with Encina Creek. The creek then flows about 0.8 miles west to discharge to the Pacific Ocean. List any 303(d) impaired water bodies within the path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable), identify the pollutant(s)/stressor(s) causing impairment, and identify any TMDLs for the impaired water bodies: 303(d) Impaired Water Body Pollutant(s)/Stressor(s) TMDLs None Identification of Project Site Pollutants Identify pollutants anticipated from the project site based on all proposed use(s) of the site (see BMP Design Manual Appendix B.6): Pollutant Not Applicable to the Project Site Anticipated from the Project Site Also a Receiving Water Pollutant of Concern Sediment P Nutrients P Heavy Metals X Organic Compounds X Trash & Debris X Oxygen Demanding Substances P Oil & Grease X Bacteria & Viruses P Pesticides P Hydromodification Management Requirements Do hydromodification management requirements apply (see Section 1.6 of the BMP Design Manual)? Yes, hydromodification management flow control structural BMPs required. No, the project will discharge runoff directly to existing underground storm drains discharging directly to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean. No, the project will discharge runoff directly to conveyance channels whose bed and bank are concrete-lined all the way from the point of discharge to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean. No, the project will discharge runoff directly to an area identified as appropriate for an exemption by the WMAA for the watershed in which the project resides. Description / Additional Information (to be provided if a 'No' answer has been selected above): Critical Coarse Sediment Yield Areas* *This Section only required if hydromodification management requirements apply Based on the maps provided within the WMAA, do potential critical coarse sediment yield areas exist within the project drainage boundaries? Yes No, No critical coarse sediment yield areas to be protected based on WMAA maps If yes, have any of the optional analyses presented in Section 6.2 of the BMP Design Manual been performed? 6.2.1 Verification of Geomorphic Landscape Units (GLUs) Onsite 6.2.2 Downstream Systems Sensitivity to Coarse Sediment 6.2.3 Optional Additional Analysis of Potential Critical Coarse Sediment Yield Areas Onsite No optional analyses performed, the project will avoid critical coarse sediment yield areas identified based on WMAA maps If optional analyses were performed, what is the final result? No critical coarse sediment yield areas to be protected based on verification of GLUs onsite Critical coarse sediment yield areas exist but additional analysis has determined that protection is not required. Documentation attached in Attachment 8 of the SWQMP. Critical coarse sediment yield areas exist and require protection. The project will implement management measures described in Sections 6.2.4 and 6.2.5 as applicable, and the areas are identified on the SWQMP Exhibit. Discussion / Additional Information: Flow Control for Post-Project Runoff* *This Section only required if hydromodification management requirements apply List and describe point(s) of compliance (POCs) for flow control for hydromodification management (see Section 6.3.1). For each POC, provide a POC identification name or number correlating to the project's HMP Exhibit and a receiving channel identification name or number correlating to the project's HMP Exhibit. POC 1 located south west of Dog Park area and collect all proposed runoff within the dog park. POC 2 located north west of the parking lot and collect all proposed runoff within parking lot except De Minims Areas as shown on DMA/HMP Exhibit. Has a geomorphic assessment been performed for the receiving channel(s)? No, the low flow threshold is 0.1Q2 (default low flow threshold) Yes, the result is the low flow threshold is 0.1Q2 Yes, the result is the low flow threshold is 0.3Q2 Yes, the result is the low flow threshold is 0.5Q2 If a geomorphic assessment has been performed, provide title, date, and preparer: Discussion / Additional Information: (optional) Other Site Requirements and Constraints When applicable, list other site requirements or constraints that will influence storm water management design, such as zoning requirements including setbacks and open space, or City codes governing minimum street width, sidewalk construction, allowable pavement types, and drainage requirements. Optional Additional Information or Continuation of Previous Sections As Needed This space provided for additional information or continuation of information from previous sections as needed. E-36 Page 1 of 4 Revised 09/16 Development Services Land Development Engineering 1635 Faraday Avenue (760) 602-2750 www.carlsbadca.gov STANDARD PROJECT REQUIREMENT CHECKLIST E-36 Project Information Project Name: Project ID: DWG No. or Building Permit No.: Source Control BMPs All development projects must implement source control BMPs SC-1 through SC-6 where applicable and feasible. See Chapter 4 and Appendix E.1 of the BMP Design Manual (Volume 5 of City Engineering Standards) for information to implement source control BMPs shown in this checklist. Answer each category below pursuant to the following.  "Yes" means the project will implement the source control BMP as described in Chapter 4 and/or Appendix E.1 of the Model BMP Design Manual. Discussion/justification is not required.  "No" means the BMP is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. Please add attachments if more space is needed.  "N/A" means the BMP is not applicable at the project site because the project does not include the feature that is addressed by the BMP (e.g., the project has no outdoor materials storage areas). Discussion/justification may be provided. Source Control Requirement Applied? SC-1 Prevention of Illicit Discharges into the MS4 Yes No N/A Discussion/justification if SC-1 not implemented: SC-2 Storm Drain Stenciling or Signage Yes No N/A Discussion/justification if SC-2 not implemented: SC-3 Protect Outdoor Materials Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal Yes No N/A Discussion/justification if SC-3 not implemented: Poinsettia Community Park Phase IV Dog Park & Parking Lot 525-1A E-36 Page 2 of 4 Revised 09/16 Source Control Requirement (continued) Applied? SC-4 Protect Materials Stored in Outdoor Work Areas from Rainfall, Run-On, Runoff, and Wind Dispersal Yes No N/A Discussion/justification if SC-4 not implemented: SC-5 Protect Trash Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal Yes No N/A Discussion/justification if SC-5 not implemented: SC-6 Additional BMPs based on Potential Sources of Runoff Pollutants must answer for each source listed below and identify additional BMPs. (See Table in Appendix E.1 of BMP Manual for guidance). On-site storm drain inlets Yes No N/A Interior floor drains and elevator shaft sump pumps Yes No N/A Interior parking garages Yes No N/A Need for future indoor & structural pest control Yes No N/A Landscape/Outdoor Pesticide Use Yes No N/A Pools, spas, ponds, decorative fountains, and other water features Yes No N/A Food service Yes No N/A Refuse areas Yes No N/A Industrial processes Yes No N/A Outdoor storage of equipment or materials Yes No N/A Vehicle and Equipment Cleaning Yes No N/A Vehicle/Equipment Repair and Maintenance Yes No N/A Fuel Dispensing Areas Yes No N/A Loading Docks Yes No N/A Fire Sprinkler Test Water Yes No N/A Miscellaneous Drain or Wash Water Yes No N/A Plazas, sidewalks, and parking lots Yes No N/A For “Yes” answers, identify the additional BMP per Appendix E.1. Provide justification for “No” answers. On-site storm drain inlets: Mark all inlets with the words "No Dumping! Flows to Bay" or similar. Need for future indoor & structural pest control: Provide Integrated Pest Management information to owners Landscape/Outdoor Pesticide Use: Provide IPM information to owners Plazas, sidewalks, and parking lots: Plazas, sidewalks, and parking lots shall be swept regularly to prevent the accumulation of litter and debris. Debris from washing shall be collected to prevent entry into the storm drain system. E-36 Page 3 of 4 Revised 09/16 Site Design BMPs All development projects must implement site design BMPs SD-1 through SD-8 where applicable and feasible. See Chapter 4 and Appendix E.2 thru E.6 of the BMP Design Manual (Volume 5 of City Engineering Standards) for information to implement site design BMPs shown in this checklist. Answer each category below pursuant to the following.  "Yes" means the project will implement the site design BMPs as described in Chapter 4 and/or Appendix E.2 thru E.6 of the Model BMP Design Manual. Discussion / justification is not required.  "No" means the BMPs is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. Please add attachments if more space is needed.  "N/A" means the BMPs is not applicable at the project site because the project does not include the feature that is addressed by the BMPs (e.g., the project site has no existing natural areas to conserve). Discussion/justification may be provided. Site Design Requirement Applied? SD-1 Maintain Natural Drainage Pathways and Hydrologic Features Yes No N/A Discussion/justification if SD-1 not implemented: SD-2 Conserve Natural Areas, Soils, and Vegetation Yes No N/A Discussion/justification if SD-2 not implemented: SD-3 Minimize Impervious Area Yes No N/A Discussion/justification if SD-3 not implemented: SD-4 Minimize Soil Compaction Yes No N/A Discussion/justification if SD-4 not implemented: SD-5 Impervious Area Dispersion Yes No N/A Discussion/justification if SD-5 not implemented: E-36 Page 4 of 4 Revised 09/16 Site Design Requirement (continued) Applied? SD-6 Runoff Collection Yes No N/A Discussion/justification if SD-6 not implemented: SD-7 Landscaping with Native or Drought Tolerant Species Yes No N/A Discussion/justification if SD-7 not implemented: SD-8 Harvesting and Using Precipitation Yes No N/A Discussion/justification if SD-8 not implemented: Harvest and Use infeasible per Form I-7 SUMMARY OF PDP STRUCTURAL BMPS PDP Structural BMPs All PDPs must implement structural BMPs for storm water pollutant control (see Chapter 5 of the BMP Design Manual). Selection of PDP structural BMPs for storm water pollutant control must be based on the selection process described in Chapter 5. PDPs subject to hydromodification management requirements must also implement structural BMPs for flow control for hydromodification management (see Chapter 6 of the BMP Design Manual). Both storm water pollutant control and flow control for hydromodification management can be achieved within the same structural BMP(s). PDP structural BMPs must be verified by the City at the completion of construction. This may include requiring the project owner or project owner's representative to certify construction of the structural BMPs (see Section 1.12 of the BMP Design Manual). PDP structural BMPs must be maintained into perpetuity, and the City must confirm the maintenance (see Section 7 of the BMP Design Manual). Use this form to provide narrative description of the general strategy for structural BMP implementation at the project site in the box below. Then complete the PDP structural BMP summary information sheet for each structural BMP within the project (copy the BMP summary information page as many times as needed to provide summary information for each individual structural BMP). Describe the general strategy for structural BMP implementation at the site. This information must describe how the steps for selecting and designing storm water pollutant control BMPs presented in Section 5.1 of the BMP Design Manual were followed, and the results (type of BMPs selected). For projects requiring hydromodification flow control BMPs, indicate whether pollutant control and flow control BMPs are integrated together or separate. The Poinsettia Community Park project proposes to utilize standard biofiltration to provide both pollutant control and flow control. Harvest and reuse of storm water is considered infeasible due to the lack of indoor demand, and the infeasibility of modifying the existing irrigation system to integrate storm water reuse. Retention by infiltration or bioretention is considered infeasible downstream of the existing dual culvert systems due to the low percolation rates (400 min/in). [Continue on next page as necessary.] [Continued from previous page – This page is reserved for continuation of description of general strategy for structural BMP implementation at the site.] Structural BMP Summary Information [Copy this page as needed to provide information for each individual proposed structural BMP] Structural BMP ID No. BF1 DWG 525-1A Sheet No. 4 Type of structural BMP: Retention by harvest and use (HU-1) Retention by infiltration basin (INF-1) Retention by bioretention (INF-2) Retention by permeable pavement (INF-3) Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) Detention pond or vault for hydromodification management Other (describe in discussion section below) Purpose: Pollutant control only Hydromodification control only Combined pollutant control and hydromodification control Pre-treatment/forebay for another structural BMP Other (describe in discussion section below) Discussion (as needed): Structural BMP Summary Information [Copy this page as needed to provide information for each individual proposed structural BMP] Structural BMP ID No. BF2 DWG 525-1A Sheet No. 5 Type of structural BMP: Retention by harvest and use (HU-1) Retention by infiltration basin (INF-1) Retention by bioretention (INF-2) Retention by permeable pavement (INF-3) Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) Detention pond or vault for hydromodification management Other (describe in discussion section below) Purpose: Pollutant control only Hydromodification control only Combined pollutant control and hydromodification control Pre-treatment/forebay for another structural BMP Other (describe in discussion section below) Discussion (as needed): ATTACHMENT 1 BACKUP FOR PDP POLLUTANT CONTROL BMPS This is the cover sheet for Attachment 1. Check which Items are Included behind this cover sheet: Attachment Sequence Contents Checklist Attachment 1a DMA Exhibit (Required) See DMA Exhibit Checklist on the back of this Attachment cover sheet. (24”x36” Exhibit typically required) Included (Combined with Hydromodification Management Exhibit) Attachment 2a Attachment 1b Tabular Summary of DMAs Showing DMA ID matching DMA Exhibit, DMA Area, and DMA Type (Required)* *Provide table in this Attachment OR on DMA Exhibit in Attachment 1a Included on DMA Exhibit in Attachment 1a Included as Attachment 1b, separate from DMA Exhibit Attachment 1c Form I-7, Harvest and Use Feasibility Screening Checklist (Required unless the entire project will use infiltration BMPs) Refer to Appendix B.3-1 of the BMP Design Manual to complete Form I-7. Included Not included because the entire project will use infiltration BMPs Attachment 1d Form I-8, Categorization of Infiltration Feasibility Condition (Required unless the project will use harvest and use BMPs) Refer to Appendices C and D of the BMP Design Manual to complete Form I-8. Included Not included because the entire project will use harvest and use BMPs Attachment 1e Pollutant Control BMP Design Worksheets / Calculations (Required) Refer to Appendices B and E of the BMP Design Manual for structural pollutant control BMP design guidelines Included Use this checklist to ensure the required information has been included on the DMA Exhibit: The DMA Exhibit must identify: Underlying hydrologic soil group Approximate depth to groundwater Existing natural hydrologic features (watercourses, seeps, springs, wetlands) Critical coarse sediment yield areas to be protected (if present) Existing topography and impervious areas Existing and proposed site drainage network and connections to drainage offsite Proposed grading Proposed impervious features Proposed design features and surface treatments used to minimize imperviousness Drainage management area (DMA) boundaries, DMA ID numbers, and DMA areas (square footage or acreage), and DMA type (i.e., drains to BMP, self-retaining, or self-mitigating) Structural BMPs (identify location and type of BMP) Use this checklist to ensure the required information has been included on the Hydromodification Management Exhibit: The Hydromodification Management Exhibit must identify: Underlying hydrologic soil group Approximate depth to groundwater Existing natural hydrologic features ( watercourses, seeps, springs, wetlands) Critical coarse sediment yield areas to be protected (if present) Existing topography Existing and proposed site drainage network and connections to drainage offsite Proposed grading Proposed impervious features Proposed design features and surface treatments used to minimize imperviousness Point(s) of Compliance (POC) for Hydromodification Management Existing and proposed drainage boundary and drainage area to each POC (when necessary, create separate exhibits for pre-development and post-project conditions) Structural BMPs for hydromodification management (identify location, type of BMP, and size/detail) HD HD WHPOC 1POC 2DE MINIMIS 185 SFDE MINIMIS 285 SFLEGENDSITE DATAXXXpervious definitionpervious concrete problemsprevious weatherpervious vs permeable XXXXXXX X X XX XXXKEY MAPN.T.S.POINSETTIA COMMUNITY PARKPHASE IVDOG PARK & PARKING LOTDMA & HYDROMOD EXHIBITJOB NO.DRAWN BY:SHEET1 of 1GNIREENEIGN6390 Greenwich Dr., Suite 170San Diego, California 92122tel 858.554.1500 fax 858.597.0335www.fuscoe.com Project Name:Hydrologic Unit:Project Applicant:Rain Gauge:Jurisdiction:Total Project Area:Parcel (APN):Low Flow Threshold:BMP Name:BMP Type:BMP Native Soil Type:BMP Infiltration Rate (in/hr):HMP Sizing FactorsMinimum BMP SizeDMA NameArea (sf)Pre Project Soil TypePre-Project SlopePost Project Surface TypeArea Weighted Runoff Factor(Table G.2-1)1Surface Area Surface Area (SF)Impervious 3,817 D Moderate Concrete 1.00.07 267Pervious 44,586 D Moderate Landscape 0.10.07 3120 00 00 00 00 00 00 00 00 00 00 00 000BMP Tributary Area48,403Minimum BMP Size579Proposed BMP Size*600* Assumes standard configuration 10.00in18.00 in6.00in12in3.0in3.5Notes:1. Runoff factors which are used for hydromodification management flow control (Table G.2-1) are different from the runoff factors used for pollutant control BMP sizing (Table B.1-1). Table references are taken from the San Diego Region Model BMP Design Manual, April 2018.This BMP Sizing Spreadsheet has been updated in conformance with the San Diego Region Model BMP Design Manual, April 2018. For questions or concerns please contact the jurisdiction in which your project is located.Describe the BMP's in sufficient detail in your PDP SWQMP to demonstrate the area, volume, and other criteria can be met within the constraints of the site.BMP's must be adapted and applied to the conditions specific to the development project such as unstable slopes or the lack of available head. Designated Staff have final review and approval authority over the project design.Underdrain OffsetBioretention Soil Media DepthFilter CoarseGravel Storage Layer DepthSurface Ponding DepthAreas Draining to BMPCity of Carlsbad214-140-13DBMP Sizing Spreadsheet V3.00.025Biofiltration0.1Q20OceansideCarlsbadBF1Poinsettia Dog ParkCity of Carlsbad Project Name:Hydrologic Unit:Project Applicant:Rain Gauge:Jurisdiction:Total Project Area:Parcel (APN):Low Flow Threshold:BMP NameBMP Type:Rain GaugeUnit Runoff Ratio DMA Area (ac)Orifice Flow - %Q2Orifice AreaSoil Type Slope (cfs/ac)(cfs) (in2)ImperviousOceansideDModerate0.5750.0880.0050.07PerviousOceansideDModerate0.5751.0240.0590.863.580.0640.931.09Max Orifice HeadMax Tot. Allowable Orifice FlowMax Tot. AllowableOrifice AreaMax Orifice Diameter(feet)(cfs)(in2)(in)0.0510.0540.791.000Average outflow during surface drawdownMax Orifice Outflow Actual Orifice AreaSelected Orifice Diameter(cfs) (cfs)(in2)(in)Drawdown (Hrs) 2.7BF1Pre-developed ConditionNo Orifice Required for Infiltration FacilitiesDMA NameCarlsbadBMP Sizing Spreadsheet V3.0City of Carlsbad214-140-13Poinsettia Dog ParkCity of Carlsbad0.1Q20OceansideBiofiltrationDrawdown time exceeds 96 Hrs. Project must implement a vector control program. Project Name: Hydrologic Unit: Project Applicant: Rain Gauge: Jurisdiction: Total Project Area: Parcel (APN): Low Flow Threshold: BMP Name: BMP Type: BMP Native Soil Type:BMP Infiltration Rate (in/hr): HMP Sizing Factors Minimum BMP Size DMA Name Area (sf) Pre Project Soil Type Pre-Project Slope Post Project Surface Type Area Weighted Runoff Factor (Table G.2-1)1 Surface Area Surface Area (SF) Parking Lot 11,329 D Moderate Concrete 1.0 0.07 793 Pervious 8,443 D Moderate Landscape 0.1 0.07 59 Restroom Building 716 D Moderate Roofs 1.0 0.07 50 Walkway 2,668 D Moderate Roofs 1.0 0.07 187 Driveway 447 D Moderate Roofs 1.0 0.07 31 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 BMP Tributary Area 23,603 Minimum BMP Size 1120 Proposed BMP Size*1120 * Assumes standard configuration 10.00 in 18.00 in 6.00 in 12 in 3.0 in 3.5 Notes: 1. Runoff factors which are used for hydromodification management flow control (Table G.2-1) are different from the runoff factors used for pollutant control BMP sizing (Table B.1-1). Table references are taken from the San Diego Region Model BMP Design Manual, April 2018. Describe the BMP's in sufficient detail in your PDP SWQMP to demonstrate the area, volume, and other criteria can be met within the constraints of the site. BMP's must be adapted and applied to the conditions specific to the development project such as unstable slopes or the lack of available head. Designated Staff have final review and approval authority over the project design. This BMP Sizing Spreadsheet has been updated in conformance with the San Diego Region Model BMP Design Manual, April 2018. For questions or concerns please contact the jurisdiction in which your project is located. Areas Draining to BMP Surface Ponding Depth Bioretention Soil Media Depth Filter Coarse Gravel Storage Layer Depth Underdrain Offset 214-140-13 0.1Q2 BF2 Biofiltration D 0.025 BMP Sizing Spreadsheet V3.0 Poinsettia Dog Park Carlsbad City of Carlsbad Oceanside City of Carlsbad 0 Project Name:Hydrologic Unit:Project Applicant:Rain Gauge:Jurisdiction:Total Project Area:Parcel (APN):Low Flow Threshold:BMP NameBMP Type:Rain GaugeUnit Runoff Ratio DMA Area (ac)Orifice Flow - %Q2Orifice AreaSoil Type Slope (cfs/ac)(cfs) (in2)Parking LotOceansideDModerate0.5750.2600.0150.21PerviousOceansideDModerate0.5750.1940.0110.16Restroom BuildingOceansideDModerate0.5750.0160.0010.01WalkwayOceansideDModerate0.5750.0610.0040.05DrivewayOceansideDModerate0.5750.0100.0010.013.750.0310.440.75Max Orifice HeadMax Tot. Allowable Orifice FlowMax Tot. AllowableOrifice AreaMax Orifice Diameter(feet)(cfs)(in2)(in)0.0180.0200.280.600Average outflow during surface drawdownMax Orifice Outflow Actual Orifice AreaSelected Orifice Diameter(cfs) (cfs)(in2)(in)Drawdown (Hrs) 16.8No Orifice Required for Infiltration FacilitiesDrawdown time exceeds 96 Hrs. Project must implement a vector control program.214-140-130.1Q2BF2BiofiltrationDMA NamePre-developed ConditionCity of Carlsbad0BMP Sizing Spreadsheet V3.0Poinsettia Dog ParkCarlsbadCity of CarlsbadOceanside ATTACHMENT 2 BACKUP FOR PDP HYDROMODIFICATION CONTROL MEASURES [This is the cover sheet for Attachment 2.] Indicate which Items are Included behind this cover sheet: Attachment Sequence Contents Checklist Attachment 2a Hydromodification Management Exhibit (Required) Combined with DMA Exhibit (Attachment 1a) Attachment 2b Management of Critical Coarse Sediment Yield Areas (WMAA Exhibit is required, additional analyses are optional) See Section 6.2 of the BMP Design Manual. Exhibit showing project drainage boundaries marked on WMAA Critical Coarse Sediment Yield Area Map (Required) Optional analyses for Critical Coarse Sediment Yield Area Determination 6.2.1 Verification of Geomorphic Landscape Units Onsite 6.2.2 Downstream Systems Sensitivity to Coarse Sediment 6.2.3 Optional Additional Analysis of Potential Critical Coarse Sediment Yield Areas Onsite Attachment 2c Geomorphic Assessment of Receiving Channels (Optional) See Section 6.3.4 of the BMP Design Manual. Not performed Included Attachment 2d Flow Control Facility Design and Structural BMP Drawdown Calculations (Required) See Chapter 6 and Appendix G of the BMP Design Manual Included See Attachment 1e ATTACHMENT 2b WMAA Map with Potential Critical Coarse Sediment Areas and Project Boundary ATTACHMENT 3 Structural BMP Maintenance Information Use this checklist to ensure the required information has been included in the Structural BMP Maintenance Information Attachment: Preliminary Design/Planning/CEQA level submittal: Attachment 3 must identify: Typical maintenance indicators and actions for proposed structural BMP(s) based on Section 7.7 of the BMP Design Manual Final Design level submittal: Attachment 3 must identify: Specific maintenance indicators and actions for proposed structural BMP(s). This shall be based on Section 7.7 of the BMP Design Manual and enhanced to reflect actual proposed components of the structural BMP(s) How to access the structural BMP(s) to inspect and perform maintenance Features that are provided to facilitate inspection (e.g., observation ports, cleanouts, silt posts, or other features that allow the inspector to view necessary components of the structural BMP and compare to maintenance thresholds) Manufacturer and part number for proprietary parts of structural BMP(s) when applicable Maintenance thresholds for BMPs subject to siltation or heavy trash(e.g., silt level posts or other markings shall be included in all BMP components that will trap and store sediment, trash, and/or debris, so that the inspector may determine how full the BMP is, and the maintenance personnel may determine where the bottom of the BMP is . If required, posts or other markings shall be indicated and described on structural BMP plans.) Recommended equipment to perform maintenance When applicable, necessary special training or certification requirements for inspection and maintenance personnel such as confined space entry or hazardous waste management BF-1 Biofiltration BMP MAINTENANCE FACT SHEET FOR STRUCTURAL BMP BF-1 BIOFILTRATION Biofiltration facilities are vegetated surface water systems that filter water through vegetation, and soil or engineered media prior to discharge via underdrain or overflow to the downstream conveyance system. Biofiltration facilities have limited or no infiltration. They are typically designed to provide enough hydraulic head to move flows through the underdrain connection to the storm drain system. Typical biofiltration components include: • Inflow distribution mechanisms (e.g., perimeter flow spreader or filter strips) • Energy dissipation mechanism for concentrated inflows (e.g., splash blocks or riprap) • Shallow surface ponding for captured flows • Side slope and basin bottom vegetation selected based on climate and ponding depth • Non-floating mulch layer • Media layer (planting mix or engineered media) capable of supporting vegetation growth • Filter course layer consisting of aggregate to prevent the migration of fines into uncompacted native soils or the aggregate storage layer • Aggregate storage layer with underdrain(s) • Impermeable liner or uncompacted native soils at the bottom of the facility • Overflow structure Normal Expected Maintenance Biofiltration requires routine maintenance to: remove accumulated materials such as sediment, trash or debris; maintain vegetation health; maintain infiltration capacity of the media layer; replenish mulch; and maintain integrity of side slopes, inlets, energy dissipators, and outlets. A summary table of standard inspection and maintenance indicators is provided within this Fact Sheet. Non-Standard Maintenance or BMP Failure If any of the following scenarios are observed, the BMP is not performing as intended to protect downstream waterways from pollution and/or erosion. Corrective maintenance, increased inspection and maintenance, BMP replacement, or a different BMP type will be required. • The BMP is not drained between storm events. Surface ponding longer than approximately 24 hours following a storm event may be detrimental to vegetation health, and surface ponding longer than approximately 96 hours following a storm event poses a risk of vector (mosquito) breeding. Poor drainage can result from clogging of the media layer, filter course, aggregate storage layer, underdrain, or outlet structure. The specific cause of the drainage issue must be determined and corrected. • Sediment, trash, or debris accumulation greater than 25% of the surface ponding volume within one month. This means the load from the tributary drainage area is too high, reducing BMP function or clogging the BMP. This would require pretreatment measures within the tributary area draining to the BMP to intercept the materials. Pretreatment components, especially for sediment, will extend the life of components that are more expensive to replace such as media, filter course, and aggregate layers. • Erosion due to concentrated storm water runoff flow that is not readily corrected by adding erosion control blankets, adding stone at flow entry points, or minor re-grading to restore proper drainage according to the original plan. If the issue is not corrected by restoring the BMP to the original plan and grade, the [City Engineer] shall be contacted prior to any additional repairs or reconstruction. BF-1 Page 1 of 11 January 12, 2017 BF-1 Biofiltration Other Special Considerations Biofiltration is a vegetated structural BMP. Vegetated structural BMPs that are constructed in the vicinity of, or connected to, an existing jurisdictional water or wetland could inadvertently result in creation of expanded waters or wetlands. As such, vegetated structural BMPs have the potential to come under the jurisdiction of the United States Army Corps of Engineers, SDRWQCB, California Department of Fish and Wildlife, or the United States Fish and Wildlife Service. This could result in the need for specific resource agency permits and costly mitigation to perform maintenance of the structural BMP. Along with proper placement of a structural BMP, routine maintenance is key to preventing this scenario. BF-1 Page 2 of 11 January 12, 2017 BF-1 Biofiltration SUMMARY OF STANDARD INSPECTION AND MAINTENANCE FOR BF-1 BIOFILTRATION The property owner is responsible to ensure inspection, operation and maintenance of permanent BMPs on their property unless responsibility has been formally transferred to an agency, community facilities district, homeowners association, property owners association, or other special district. Maintenance frequencies listed in this table are average/typical frequencies. Actual maintenance needs are site-specific, and maintenance may be required more frequently. Maintenance must be performed whenever needed, based on maintenance indicators presented in this table. The BMP owner is responsible for conducting regular inspections to see when maintenance is needed based on the maintenance indicators. During the first year of operation of a structural BMP, inspection is recommended at least once prior to August 31 and then monthly from September through May. Inspection during a storm event is also recommended. After the initial period of frequent inspections, the minimum inspection and maintenance frequency can be determined based on the results of the first year inspections. Threshold/Indicator Maintenance Action Typical Maintenance Frequency Accumulation of sediment, litter, or debris Remove and properly dispose of accumulated materials, without damage to the vegetation or compaction of the media layer. • Inspect monthly. If the BMP is 25% full* or more in one month, increase inspection frequency to monthly plus after every 0.1-inch or larger storm event. • Remove any accumulated materials found at each inspection. Obstructed inlet or outlet structure Clear blockage. • Inspect monthly and after every 0.5-inch or larger storm event. • Remove any accumulated materials found at each inspection. Damage to structural components such as weirs, inlet or outlet structures Repair or replace as applicable • Inspect annually. • Maintenance when needed. Poor vegetation establishment Re-seed, re-plant, or re-establish vegetation per original plans. • Inspect monthly. • Maintenance when needed. Dead or diseased vegetation Remove dead or diseased vegetation, re-seed, re-plant, or re-establish vegetation per original plans. • Inspect monthly. • Maintenance when needed. Overgrown vegetation Mow or trim as appropriate. • Inspect monthly. • Maintenance when needed. 2/3 of mulch has decomposed, or mulch has been removed Remove decomposed fraction and top off with fresh mulch to a total depth of 3 inches. • Inspect monthly. • Replenish mulch annually, or more frequently when needed based on inspection. *“25% full” is defined as ¼ of the depth from the design bottom elevation to the crest of the outflow structure (e.g., if the height to the outflow opening is 12 inches from the bottom elevation, then the materials must be removed when there is 3 inches of accumulation – this should be marked on the outflow structure). BF-1 Page 3 of 11 January 12, 2017 BF-1 Biofiltration SUMMARY OF STANDARD INSPECTION AND MAINTENANCE FOR BF-1 BIOFILTRATION (Continued from previous page) Threshold/Indicator Maintenance Action Typical Maintenance Frequency Erosion due to concentrated irrigation flow Repair/re-seed/re-plant eroded areas and adjust the irrigation system. • Inspect monthly. • Maintenance when needed. Erosion due to concentrated storm water runoff flow Repair/re-seed/re-plant eroded areas, and make appropriate corrective measures such as adding erosion control blankets, adding stone at flow entry points, or minor re-grading to restore proper drainage according to the original plan. If the issue is not corrected by restoring the BMP to the original plan and grade, the [City Engineer] shall be contacted prior to any additional repairs or reconstruction. • Inspect after every 0.5-inch or larger storm event. If erosion due to storm water flow has been observed, increase inspection frequency to after every 0.1-inch or larger storm event. • Maintenance when needed. If the issue is not corrected by restoring the BMP to the original plan and grade, the [City Engineer] shall be contacted prior to any additional repairs or reconstruction. Standing water in BMP for longer than 24 hours following a storm event Surface ponding longer than approximately 24 hours following a storm event may be detrimental to vegetation health Make appropriate corrective measures such as adjusting irrigation system, removing obstructions of debris or invasive vegetation, clearing underdrains, or repairing/replacing clogged or compacted soils. • Inspect monthly and after every 0.5-inch or larger storm event. If standing water is observed, increase inspection frequency to after every 0.1-inch or larger storm event. • Maintenance when needed. Presence of mosquitos/larvae For images of egg rafts, larva, pupa, and adult mosquitos, see http://www.mosquito.org/biology If mosquitos/larvae are observed: first, immediately remove any standing water by dispersing to nearby landscaping; second, make corrective measures as applicable to restore BMP drainage to prevent standing water. If mosquitos persist following corrective measures to remove standing water, or if the BMP design does not meet the 96-hour drawdown criteria due to release rates controlled by an orifice installed on the underdrain, the [City Engineer] shall be contacted to determine a solution. A different BMP type, or a Vector Management Plan prepared with concurrence from the County of San Diego Department of Environmental Health, may be required. • Inspect monthly and after every 0.5-inch or larger storm event. If mosquitos are observed, increase inspection frequency to after every 0.1-inch or larger storm event. • Maintenance when needed. Underdrain clogged Clear blockage. • Inspect if standing water is observed for longer than 24-96 hours following a storm event. • Maintenance when needed. BF-1 Page 4 of 11 January 12, 2017 BF-1 Biofiltration References American Mosquito Control Association. http://www.mosquito.org/ California Storm Water Quality Association (CASQA). 2003. Municipal BMP Handbook. https://www.casqa.org/resources/bmp-handbooks/municipal-bmp-handbook County of San Diego. 2014. Low Impact Development Handbook. http://www.sandiegocounty.gov/content/sdc/dpw/watersheds/susmp/lid.html San Diego County Copermittees. 2016. Model BMP Design Manual, Appendix E, Fact Sheet BF-1. http://www.projectcleanwater.org/index.php?option=com_content&view=article&id=250&Itemid=220 BF-1 Page 5 of 11 January 12, 2017 BF-1 Biofiltration Page Intentionally Blank for Double-Sided Printing BF-1 Page 6 of 11 January 12, 2017 BF-1 Biofiltration Date: Inspector: BMP ID No.: Permit No.: APN(s): Property / Development Name: Responsible Party Name and Phone Number: Property Address of BMP: Responsible Party Address: INSPECTION AND MAINTENANCE CHECKLIST FOR BF-1 BIOFILTRATION PAGE 1 of 5 Threshold/Indicator Maintenance Recommendation Date Description of Maintenance Conducted Accumulation of sediment, litter, or debris Maintenance Needed? ☐ YES ☐ NO ☐ N/A ☐ Remove and properly dispose of accumulated materials, without damage to the vegetation ☐ If sediment, litter, or debris accumulation exceeds 25% of the surface ponding volume within one month (25% full*), add a forebay or other pre-treatment measures within the tributary area draining to the BMP to intercept the materials. ☐ Other / Comments: Poor vegetation establishment Maintenance Needed? ☐ YES ☐ NO ☐ N/A ☐ Re-seed, re-plant, or re-establish vegetation per original plans ☐ Other / Comments: *“25% full” is defined as ¼ of the depth from the design bottom elevation to the crest of the outflow structure (e.g., if the height to the outflow opening is 12 inches from the bottom elevation, then the materials must be removed when there is 3 inches of accumulation – this should be marked on the outflow structure). BF-1 Page 7 of 11 January 12, 2017 BF-1 Biofiltration Date: Inspector: BMP ID No.: Permit No.: APN(s): INSPECTION AND MAINTENANCE CHECKLIST FOR BF-1 BIOFILTRATION PAGE 2 of 5 Threshold/Indicator Maintenance Recommendation Date Description of Maintenance Conducted Dead or diseased vegetation Maintenance Needed? ☐ YES ☐ NO ☐ N/A ☐ Remove dead or diseased vegetation, re- seed, re-plant, or re-establish vegetation per original plans ☐ Other / Comments: Overgrown vegetation Maintenance Needed? ☐ YES ☐ NO ☐ N/A ☐ Mow or trim as appropriate ☐ Other / Comments: 2/3 of mulch has decomposed, or mulch has been removed Maintenance Needed? ☐ YES ☐ NO ☐ N/A ☐ Remove decomposed fraction and top off with fresh mulch to a total depth of 3 inches ☐ Other / Comments: BF-1 Page 8 of 11 January 12, 2017 BF-1 Biofiltration Date: Inspector: BMP ID No.: Permit No.: APN(s): INSPECTION AND MAINTENANCE CHECKLIST FOR BF-1 BIOFILTRATION PAGE 3 of 5 Threshold/Indicator Maintenance Recommendation Date Description of Maintenance Conducted Erosion due to concentrated irrigation flow Maintenance Needed? ☐ YES ☐ NO ☐ N/A ☐ Repair/re-seed/re-plant eroded areas and adjust the irrigation system ☐ Other / Comments: Erosion due to concentrated storm water runoff flow Maintenance Needed? ☐ YES ☐ NO ☐ N/A ☐ Repair/re-seed/re-plant eroded areas, and make appropriate corrective measures such as adding erosion control blankets, adding stone at flow entry points, or minor re-grading to restore proper drainage according to the original plan ☐ If the issue is not corrected by restoring the BMP to the original plan and grade, the [City Engineer] shall be contacted prior to any additional repairs or reconstruction ☐ Other / Comments: BF-1 Page 9 of 11 January 12, 2017 BF-1 Biofiltration Date: Inspector: BMP ID No.: Permit No.: APN(s): INSPECTION AND MAINTENANCE CHECKLIST FOR BF-1 BIOFILTRATION PAGE 4 of 5 Threshold/Indicator Maintenance Recommendation Date Description of Maintenance Conducted Obstructed inlet or outlet structure Maintenance Needed? ☐ YES ☐ NO ☐ N/A ☐ Clear blockage ☐ Other / Comments: Underdrain clogged (inspect underdrain if standing water is observed for longer than 24-96 hours following a storm event) Maintenance Needed? ☐ YES ☐ NO ☐ N/A ☐ Clear blockage ☐ Other / Comments: Damage to structural components such as weirs, inlet or outlet structures Maintenance Needed? ☐ YES ☐ NO ☐ N/A ☐ Repair or replace as applicable ☐ Other / Comments: BF-1 Page 10 of 11 January 12, 2017 BF-1 Biofiltration Date: Inspector: BMP ID No.: Permit No.: APN(s): INSPECTION AND MAINTENANCE CHECKLIST FOR BF-1 BIOFILTRATION PAGE 5 of 5 Threshold/Indicator Maintenance Recommendation Date Description of Maintenance Conducted Standing water in BMP for longer than 24-96 hours following a storm event* Surface ponding longer than approximately 24 hours following a storm event may be detrimental to vegetation health Maintenance Needed? ☐ YES ☐ NO ☐ N/A ☐ Make appropriate corrective measures such as adjusting irrigation system, removing obstructions of debris or invasive vegetation, clearing underdrains, or repairing/replacing clogged or compacted soils ☐ Other / Comments: Presence of mosquitos/larvae For images of egg rafts, larva, pupa, and adult mosquitos, see http://www.mosquito.org/biology Maintenance Needed? ☐ YES ☐ NO ☐ N/A ☐ Apply corrective measures to remove standing water in BMP when standing water occurs for longer than 24-96 hours following a storm event.** ☐ Other / Comments: *Surface ponding longer than approximately 24 hours following a storm event may be detrimental to vegetation health, and surface ponding longer than approximately 96 hours following a storm event poses a risk of vector (mosquito) breeding. Poor drainage can result from clogging of the media layer, filter course, aggregate storage layer, underdrain, or outlet structure. The specific cause of the drainage issue must be determined and corrected. **If mosquitos persist following corrective measures to remove standing water, or if the BMP design does not meet the 96-hour drawdown criteria due to release rates controlled by an orifice installed on the underdrain, the [City Engineer] shall be contacted to determine a solution. A different BMP type, or a Vector Management Plan prepared with concurrence from the County of San Diego Department of Environmental Health, may be required. BF-1 Page 11 of 11 January 12, 2017 ATTACHMENT 4 City standard Single Sheet BMP (SSBMP) Exhibit [Use the City’s standard Single Sheet BMP Plan.] BIOFILTRATIONAREAFILTERINLETBMP TYPEBMP ID #SYMBOLCASQA NO.DRAWING NO.SHEET NO.(S)MAINTENANCEFREQUENCYBMP TABLE1. THESE BMPS ARE MANDATORY TO BE INSTALLED PER MANUFACTURER'SRECOMMENDATIONS OR THESE PLANS.2. NO CHANGES TO THE PROPOSED BMPS ON THIS SHEET WITHOUT PRIORAPPROVAL FROM THE CITY ENGINEER.3. NO SUBSTITUTIONS TO THE MATERIAL OR TYPES OR PLANTING TYPESWITHOUT PRIOR APPROVAL FROM THE CITY ENGINEER.4. NO OCCUPANCY WILL BE GRANTED UNTIL THE CITY INSPECTION STAFFHAS INSPECTED THIS PROJECT FOR APPROPRIATE BMP CONSTRUCTIONAND INSTALLATION.BMP NOTES:PARTY RESPONSIBLE FOR MAINTENANCE:NAMEADDRESSPHONE NO.CONTACTPLAN PREPARED BY:NAMEADDRESSPHONE NO.CERTIFICATIONCOMPANYTC-32TC-50INSPECTION FREQUENCYQUANTITYLOW IMPACT DESIGN (L.I.D.)SOURCE CONTROLHYDROMODIFICATION & TREATMENT CONTROL5. REFER TO MAINTENANCE AGREEMENT DOCUMENT.525-1A4, 5SEMI-ANNUALLY10 EA.VEGETATIVESWALETC-30ANNUALLYMONTHLYSTENCILSSD-13DRAINS TO OCEANNO DUMPING**6. SEE PROJECT SWMP FOR ADDITIONAL INFORMATION.SIGNATUREQUARTERLYQUARTERLYQUARTERLYBMP CONSTRUCTION AND INSPECTION NOTES:THE EOW WILL VERIFY THAT PERMANENT BMPS ARE CONSTRUCTED ANDOPERATING IN COMPLIANCE WITH THE APPLICABLE REQUIREMENTS.PRIOR TO OCCUPANCY THE EOW MUST PROVIDE:1.PHOTOGRAPHS OF THE INSTALLATION OF PERMANENT BMPSPRIOR TO CONSTRUCTION, DURING CONSTRUCTION, AND AT FINALINSTALLATION.2.A WET STAMPED LETTER VERIFYING THAT PERMANENT BMPS ARECONSTRUCTED AND OPERATING PER THE REQUIREMENTS OF THEAPPROVED PLANS.3.PHOTOGRAPHS TO VERIFY THAT PERMANENT WATER QUALITYTREATMENT SIGNAGE HAS BEEN INSTALLED.PRIOR TO RELEASE OF SECURITIES, THE DEVELOPER IS RESPONSIBLEFOR ENSURING THE PERMANENT BMPS HAVE NOT BEEN REMOVED ORMODIFIED BY THE NEW HOMEOWNER OR HOA WITHOUT THE APPROVALOF THE CITY ENGINEER.10 EA.700 SF1,720 SFQUARTERLYQUARTERLYREV. 1/2020525-1A525-1A525-1A4, 544, 501020401" = 20'-0"SCALE :12 EV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYVAN ACCESSIBLEEV CHARGINGONLYHDHDWH1. THESE BMPS ARE MANDATORY TO BE INSTALLED PER MANUFACTURER'SRECOMMENDATIONS OR THESE PLANS.2. NO CHANGES TO THE PROPOSED BMPS ON THIS SHEET WITHOUT PRIORAPPROVAL FROM THE CITY ENGINEER.3. NO SUBSTITUTIONS TO THE MATERIAL OR TYPES OR PLANTING TYPESWITHOUT PRIOR APPROVAL FROM THE CITY ENGINEER.4. NO OCCUPANCY WILL BE GRANTED UNTIL THE CITY INSPECTION STAFFHAS INSPECTED THIS PROJECT FOR APPROPRIATE BMP CONSTRUCTIONAND INSTALLATION.BMP NOTES:PARTY RESPONSIBLE FOR MAINTENANCE:NAMEADDRESSPHONE NO.CONTACTPLAN PREPARED BY:NAMEADDRESSPHONE NO.CERTIFICATIONCOMPANY5. REFER TO MAINTENANCE AGREEMENT DOCUMENT.6. SEE PROJECT SWMP FOR ADDITIONAL INFORMATION.SIGNATUREBMP CONSTRUCTION AND INSPECTION NOTES:THE EOW WILL VERIFY THAT PERMANENT BMPS ARE CONSTRUCTED ANDOPERATING IN COMPLIANCE WITH THE APPLICABLE REQUIREMENTS.PRIOR TO OCCUPANCY THE EOW MUST PROVIDE:1.PHOTOGRAPHS OF THE INSTALLATION OF PERMANENT BMPSPRIOR TO CONSTRUCTION, DURING CONSTRUCTION, AND AT FINALINSTALLATION.2.A WET STAMPED LETTER VERIFYING THAT PERMANENT BMPS ARECONSTRUCTED AND OPERATING PER THE REQUIREMENTS OF THEAPPROVED PLANS.3.PHOTOGRAPHS TO VERIFY THAT PERMANENT WATER QUALITYTREATMENT SIGNAGE HAS BEEN INSTALLED.PRIOR TO RELEASE OF SECURITIES, THE DEVELOPER IS RESPONSIBLEFOR ENSURING THE PERMANENT BMPS HAVE NOT BEEN REMOVED ORMODIFIED BY THE NEW HOMEOWNER OR HOA WITHOUT THE APPROVALOF THE CITY ENGINEER.REV. 1/2020510201" = 10'-0"SCALE :0MATCHLINE SEE LEFTMATCHLINE SEE RIGHT22BIOFILTRATIONAREAFILTERINLETBMP TYPEBMP ID #SYMBOLCASQA NO.DRAWING NO.SHEET NO.(S)MAINTENANCEFREQUENCYBMP TABLETC-32TC-50INSPECTION FREQUENCYQUANTITYLOW IMPACT DESIGN (L.I.D.)SOURCE CONTROLHYDROMODIFICATION & TREATMENT CONTROL525-1A4, 5SEMI-ANNUALLY10 EA.VEGETATIVESWALETC-30ANNUALLYMONTHLYSTENCILSSD-13DRAINS TO OCEANNO DUMPING**QUARTERLYQUARTERLYQUARTERLY10 EA.700 SF1,720 SFQUARTERLYQUARTERLY525-1A525-1A525-1A4, 544, 5