HomeMy WebLinkAbout2020-11-17; Municipal Water District; Resolution 1647RESOLUTION NO. 1647 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT OF THE CITY OF CARLSBAD, CALIFORNIA, ACCEPTING BIDS AND AWARDING A CONTRACT TO CCL CONTRACTING, INC. FOR CONSTRUCTION OF THE VALVE REPLACEMENT PHASE II, CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECT NO. 5019-E, AND CONDITION ASSESSMENT, CIP PROJECT NO. 5051, IN AN AMOUNT NOT TO EXCEED $1,335,500 WHEREAS, the Carlsbad Municipal Water District (CMWD) Board of the City of Carlsbad, California has determined it necessary, desirable, and in the public interest to replace broken valves at prioritized locations, to concurrently make other improvements and to conduct a condition assessment of pipes at the same locations; and WHEREAS, on July 28, 2020, through adoption of Resolution No. 1643, the CMWD Board approved plans and specifications, and authorized the secretary to the Board to advertise to receive bids for the Project; and WHEREAS, on Sept. 15, 2020, 15 sealed bids were received for construction of the Project; and WHEREAS, the lowest responsible and responsive bid was submitted by CCL Contracting, Inc. in the amount of $1,335,500; and WHEREAS, Carlsbad Municipal Code (CMC) Sections 3.28.080(C) and 3.28.080(1)(6) require the CMWD Board of Directors to award all formally bid contracts when the value exceeds $200,000; therefore, the Project is subject to this requirement; and WHEREAS, funds have been appropriated from the Water Valve Repair Replacement Program, CIP Project No. 5019, and from the Water Infrastructure Condition Assessment Program, CIP Project No. 5051, and are sufficient for completion of this Project; and WHEREAS, CMC Section 3.28.040(C)(5) authorizes the executive manager or designee to approve change orders in the amount equal to the contingency set at the time of Project award, which is $264,900 for the Project; and Nov. 17, 2020 Item #4 Page 6 of 22 WHEREAS, the city planner has determined that the Project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15302(c) - replacement or reconstruction of an existing utility system and/or facility involving negligible or no expansion of capacity and that none of the exceptions described in CEQA section 15300.2 are applicable to this project. NOW, THEREFORE, BE IT RESOLVED by the Carlsbad Municipal Water District Board of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the bid in the amount of $1,335,500 submitted by CCL Contracting, Inc. for construction of the Project, is accepted, and the president of the Board is hereby authorized to execute a contract with CCL Contracting, Inc. 3. That the executive manager or designee is hereby authorized to approve construction change orders up to $264,900. 4. That the city planner has determined that the Project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15302(c) - replacement or reconstruction of an existing utility system and/or facility involving negligible or no expansion of capacity and that none of the exceptions described in CEQA section 15300.2 are applicable to this project. 5. That the award of this contract is contingent upon CCL Contracting, Inc. executing the required contract and submitting the required bonds and insurance policies, as described in the contract, within 20 days of adoption of this Resolution. The executive manager may grant reasonable extensions of time to execute the contract and assemble the required bonds and insurance policies. Nov. 17, 2020 Item #4 Page 7 of 22 PASSED, APPROVED AND ADOPTED at a Special Meeting of the Board of Directors of the Carlsbad Municipal Water District of the City of Carlsbad on the 17th day of November, 2020, by the following vote, to wit: AYES: Hall, Blackburn, Bhat-Patel, Schumacher. NAYS: None. ABSENT: None. MATT HALL, PRESIDENT -Y\AAW-)DOMArr. BARBARA ENGLESON, SE ETARY (SEAL) Nov. 17, 2020 Item #4 Page 8 of 22